A DESIGN | BUILD PRE-SALE PROPOSAL 240 EAST 74TH STREET | NEW YORK , NY | 10021
THE RENOVATED HOME THE DESIGN | RENOVATION AUTHORITY
TM
PRE-SALE PROPOSAL
240 EAST 74TH STREET TOWNHOUSE NEW YORK, NY | 10021
PRE-SALE PROPOSAL
PREPARED EXCLUSIVELY FOR:
THE SERHANT TEAM N E S T S E E K E R S I N T E R N AT I O N A L
The Residence 240 East 74th Street New York, New York 10021
102.17'
Block: 1428 Lot: 32 Map Number: 8C Zoning District: R10
73TH STREET
3" VENT PIPE
3" VENT PIPE
3" VENT PIPE 4" SOIL & WASTE PIPE
4" SOIL & WASTE PIPE
4" SOIL & WASTE PIPE LAUNDRY CLOSET
106 BATH 3
KITCHEN
CAP TUB
2"
2"
2"
4"
1-1/2"
2"
2" 1-1/2"
1-1/2"
RELOCATE SINK
2"
NEW WASHER
2"
RELOCATE WC
1-1/2"
1-1/2"
2"
2"
2"
2"
2"
RELOCATE LAV
2"
RELOCATE TUB
1-1/2"
RELOCATE WC
1-1/2"
2"
2"
2"
REPLACE LAV IN EXISTING LOCATION
2"
RELOCATE SHOWER
1-1/2"
RELOCATE WC
1-1/2"
REPLACE LAV
1-1/2"
2"
2"
2"
2"
RELOCATE KITCHEN SINK
3" VENT PIPE 4" SOIL & WASTE PIPE 104 BATH 2
RELOCATE DISHWASHER
3" VENT PIPE 4" SOIL & WASTE PIPE 109 M. BATH
NEW LAV ON NEW ROUGH
COVER SHEET NOTES EXISTING/DEMOLITION PLAN PROPOSED FLOOR PLAN CONSTRUCTION DETAILS PROPOSED REFLECTED CEILING PLAN PROPOSED ELECTRICAL PLAN PROPOSED FLOORING PLAN MOLDING & INTERIOR DOOR DETAILS ENCLOSURE DETAILS MILLWORK DETAILS MILLWORK DETAILS MILLWORK DETAILS MECHANICAL DETAILS 1 MECHANICAL DETAILS 2
RELOCATE SHOWER
A-001.00 A-002.00 A-003.00 A-004.00 A-005.00 A-006.00 A-007.00 A-008.00 A-009.00 A-010.00 A-011.00 A-012.00 A-013.00 M-001.00 M-002.00
16.67'
2ND AVENUE
74TH STREET
DW WASHER
2"
2"
4"
2"
2"
4"
4"
2"
2"
4"
A 001.00 SCALE:
240 EAST 74TH STREET NEW YORK, NY 10021
EXISTING FLOOR PLAN
GARDEN
TERRACE TERRACE
FP
STORAGE / MECHANICAL
MASTER BEDROOM
BOILER ROOM
FP FP
WIC
FP
DINING ROOM
LIVING ROOM
FP
LIBRARY
CL
WIC
CL
CL
CL
LAUNDRY
WIC
DECKED ROOF TERRACE
BEDROOM
CL
CL
CL
CL
CL CL
WIC
KITCHEN WIC CL FP
BREAKFAST ROOM
ENTRY GALLERY
CL MECHANICAL
GYM
CL
CL
OPEN TO BELOW FP
BEDROOM
FP
BEDROOM
CL MEZZANINE
BASEMENT
GARDEN FLOOR
STORAGE
PARLOR FLOOR
3RD FLOOR
4TH FLOOR
5TH FLOOR
ROOF
PROPOSED
FLOOR PLAN
GARDEN
BOOKCASE BOOKCASE
BOOKCASE
BOOKCASE
BUILT-IN MILLWORK
TERRACE
MASTER BEDROOM BEDROOM 4
SUB ZERO REF SUB ZERO FRZ
PR
WALK-IN PANTRY
LIVING ROOM
MASTER BATH
WIC
DRESSING ROOM
LINEN CL
BENCH
CL
PR
LIBRARY
BOOKCASE
BUILT-IN MILLWORK
KITCHEN
BOOKCASE
MIELE DW
BOOKCASE
CL
FP
BOOKCASE
LAUNDRY
BOOKCASE
FP
CL
D
DECKED ROOF TERRACE
FP FP
W
FP
BOOKCASE
STORAGE / MECHANICAL
BOILER ROOM
TERRACE
PR BENCH
COAT CL
WET BAR
SUB ZERO UC REF
BENCH
SUB ZERO WINE
BENCH
CL
WET BAR WIC
WIC
DINING ROOM GALLERY
BEDROOM 2
OPEN TO BELOW FP
MECHANICAL
GYM
BEDROOM 3
FP
WINE STORAGE
BASEMENT
GARDEN FLOOR
STORAGE
PARLOR FLOOR
3RD FLOOR
4TH FLOOR
5TH FLOOR
ROOF
DESIGN | SPECIFICATION HIGHLIGHTS BESPOKE KITCHEN & BATHS KITCHEN 1” thick solid wood beaded inset framed cabinetry with walnut interiors hand painted on site. countertops fabricated with 2” thick Calacatta Marble specified by Superior Stone. full height matching backsplash in Calacatta Marble. premium appliances throughout the kitchen specified by Miele, Wolf, and Sub-Zero.
MASTER BATHROOM select Calacatta 4” x 12” herringbone marble tiles on all floors. select Calacatta 12” x 24” marble tiles specified by ABC worldwide stone on all walls. custom solid wood vanity and medicine cabinets with walnut interiors hand painted on site. fixtures specified in polished nickel finishes by Waterworks, Toto and Samuel Heath.
GUEST | CHILDRENS’ BATHROOMS select carrara and bardiglio basketweave mosaic marble specified by Artistic Tile on all floors. white ceramic 3” x 6” subway tile with matching trim to be installed to wainscot height. fixtures specified by polished nickel finishes by Newport Brass, Toto and California Faucets.
DESIGN | SPECFICATION HIGHLIGHTS ARCHITECTURAL DETAILS FLOORING wood floors throughout to be fine sanded, stained and finished. all existing wood floors of the residence to be stained and refinished kitchen and all associated to receive new 5” Wide Plank Select Walnut specified by carlyle wood flooring
INTERIOR DOORS | HARDWARE all interior doors specified as custom 1¾” solid wood paneled doors, all custom jams and casings throughout. door hardware specified by Baldwin & Merit Metal
TRIMWORK AND MILLWORK new baseboards, casings & crown moldings throughout as specified custom millwork at all windows to incorporate radiators and/or HVAC units to provide additional storage as available all windows to receive new finish trim and window sills throughout to be consistent with specified baseboards, and door casings rough and full skim coat plastering, priming and painting to be completed to a ‘level five’ finish throughout the residence, including hand painting all millwork and cabinetry throughout the residence
BASEMENT FLOOR PLAN
LAUNDRY ROOM LEVEL OF FINISH
EXERCISE ROOM LEVEL OF FINISH
WINE CELLAR LEVEL OF FINISH
GARDEN FLOOR FLOOR PLAN
KITCHEN
LEVEL OF FINISH
KITCHEN LEVEL OF FINISH
KITCHEN
INSPIRATION
KITCHEN INSPIRATION
KITCHEN LEVEL OF FINISH
KITCHEN LEVEL OF FINISH
KITCHEN LEVEL OF FINISH
DINING ROOM LEVEL OF FINISH
DINING ROOM INSPIRATION
DINING ROOM INSPIRATION
POWDER ROOM LEVEL OF FINISH
POWDER ROOM INSPIRATION
PARLOR FLOOR FLOOR PLAN
LIVING ROOM INSPIRATION
LIVING ROOM INSPIRATION
LIVING ROOM LEVEL OF FINISH
LIVING ROOM LEVEL OF FINISH
LIVING ROOM LEVEL OF FINISH
LIVING ROOM LEVEL OF FINISH
LIVING ROOM LEVEL OF FINISH
THIRD FLOOR FLOOR PLAN
LIBRARY LEVEL OF FINISH
LIBRARY
LEVEL OF FINISH
MILLWORK LEVEL OF FINISH
FOURTH FLOOR FLOOR PLAN
MASTER SUITE LEVEL OF FINISH
MASTER SUITE LEVEL OF FINISH
MASTER SUITE LEVEL OF FINISH
MASTER SUITE LEVEL OF FINISH
MASTER SUITE LEVEL OF FINISH
FIFTH FLOOR FLOOR PLAN
SECONDARY BATHROOM LEVEL OF FINISH
SECONDARY BATHROOM LEVEL OF FINISH
CHILDREN’S SUITE INSPIRATION
CHILDREN’S SUITE INSPIRATION
CHILDREN’S SUITE LEVEL OF FINISH
CHILDREN’S SUITE LEVEL OF FINISH
MEDIA ROOM INSPIRATION
MEDIA ROOM
INSPIRATION
ROOF TERRACE FLOOR PLAN
ROOF TERRACE LEVEL OF FINISH
ROOF TERRACE LEVEL OF FINISH
ROOF TERRACE INSPIRATION
ARCHITECTURAL DETAILS SITE SAFETY daily on site supervision of all trades to assure work is being completed to NYC Building code and The Renovated Home workplace guidelines DEMOLITION | PROTECTION proposed renovation would require the entire removal of all interiors; including walls, partitions, closet interiors, bathrooms, millwork, and cabinetry, throughout the residence as noted to accommodate the new proposed plan and details CARTING | DEBRIS | SITE REMOVALS continuous debris pick-ups throughout the entire course of construction through completion full debris removal and carting during demolition and a full cleaning at completion of demolition in preparation of work to commence professional cleaning crew at completion of project including full exterior and interior window cleaning prior to client occupancy ROUGH | TRIM ELECTRICAL all work to be completed by our NYC licensed and insured master electrician. all rough electrical materials and installation included. all new rough and trim electrical throughout the residence. new service or full upgrade of existing panel throughout the residence if specified. permitting, inspections, and sign offs throughout LIGHTING PACKAGE this line item includes all finish recessed lighting throughout the residence as well as all undercabinet lighting, task lighting as designed throughout
ARCHITECTURAL DETAILS ROUGH | TRIM PLUMBING all work to be completed by our NYC licensed and insured master plumber includes all new branch, waste, and water to all locations throughout the residence all piped back to the local risers mandatory 24-hour retention tests included for all new showers all trim plumbing to completion throughout permitting, inspections, and sign-offs throughout SPRINKLERS as applicable MIRRORS | GLASS | GLAZING as designed throughout the residence including glazing for millwork, closet mirrors and shower enclosures as designed throughout WOOD FLOORING | SPECIALTY FLOORING as designed and specified throughout the residence HVAC this budgetary placeholder is for the installation of a full HVAC system including all acoustically lined ductwork, all new thru wall compressors (5 ton units) and all associated masonry work air handlers, zoned systems which all include the installation of NEST thermostats to control throughout. All associated electrical, plumbing and filing for this mechanical element is included within this line item. full dimensioned duct work drawings and all associated filing documentation is included within this package for the NYC DOB filing as well as all filing for the buildings alteration team to review
ARCHITECTURAL DETAILS APPLIANCES within this line item is a budgetary placeholder for kitchen appliances as specified in the design specifications. Sub-Zero, Wolf, and Miele are specified to identify the level of this budgetary placeholder WOOD DOORS | JAMBS | CASINGS delivery and tax on elements and all associated installation labor. included is the installation of all new doors (1 ¾” thickness), jambs, trims, hardware (passage sets throughout, privacy sets for all bathrooms, and three 4” hinges mortised on site for each door. door styles to be confirmed through design HARDWARE | DECORATIVE all hardware is specified for as custom polished nickel from Baldwin. all hardware styles to be selected by client ROUGH CARPENTRY this line item includes all rough and trim carpentry, partitions as needed, ceilings, drywall, trim, base and crown molding installations, and accessory installations at completion as proposed within the plans. millwork installations are calculated within the pricing of the individual millwork elements listed below CLOSET INTERIORS this line item includes a budgetary placeholder for all closet interiors provided by California Closets The Renovated Home has used California Closets exclusively since 1988 for all of its closet interiors. absent our own full wood custom closet interiors bespoke custom offerings are available but are not included within this budgetary proposal
ARCHITECTURAL DETAILS STONE | MARBLE | TILE MATERIAL templating, installation, sealing, and protection of all completed countertops fabrication Labor of all slab stone throughout. Stone: this is the fabrication of all stone throughout kitchen material for these Countertops: Budgeted in Calacatta Marble with a 2� Thick built-up edge in a honed finish. all natural stone to be sealed with two coats of Sealer templating, installation, sealing, and protection of full stone / tiled backsplash to completion preparation includes ALL of the necessary sand, cement, labor and materials to re-build the structure of the bathrooms to prepare for the installation of the finishes and materials Specified and Included for all waterproofing is the Laticrete 9235 waterproofing membrane installation includes the labor to install all provided tile and stone once the preparation is completed. installation of floor stone/tiles, wall stone/tiles, and custom stone included. sealing of all natural stone products at completion with two coats of Bulletproof Sealer. all high grade Latricrete bonding materials to be used. fabrication: all fabrication cost for the custom door saddle, and vanity top.
BUDGETARY GUIDANCE CATEGORY
CATEGORY PERCENTAGE
TOTAL CATEGORY
Site Safety & Protection
0.48%
$9,741.00
Demolition
3.05%
$61,895.94
Carting, Debris & Site Removals
2.15%
$43,631.56
Hoist & Crane
0.45%
$9,132.19
Scaffolding & Sidewalk Bridge
0.75%
$15,220.31
Shoring, Bracing & Underpinning
0.00%
$0.00
Excavation & Fill
0.00%
$0.00
Conrete / Masonry (Slabs & Formwork)
0.80%
$16,235.00
Rough & Trim Electrical
6.50%
$131,909.38
Ligting Package
2.10%
$42,616.88
Fireproofing
0.72%
$14,611.50
Plumbing
5.75%
$116,689.06
Plumbing Fixtures, Fitting, Accessories
3.02%
$61,287.13
Sprinklers
2.25%
$45,660.94
BUDGETARY GUIDANCE
CATEGORY
CATEGORY PERCENTAGE
TOTAL CATEGORY
Mirrors, Glass & Glazing
1.70%
$34,499.38
Wood Flooring (and stairs as applicable)
4.85%
$98,424.69
Specialty Flooring
0.00%
$0.00
HVAC
5.55%
$112,630.31
Appliances (allowance)
1.70%
$34,499.38
Windoww & Exterior Doors
5.50%
$111,615.63
Elevator Package and Associate Work (tune up of existing)
1.05%
$21,308.44
Front Facade
0.00%
$0.00
Structural Steel
0.00%
$0.00
Metal Joists
0.00%
$0.00
Exterior Components
0.00%
$0.00
Roofing, Scuppers, & Gutters
0.00%
$0.00
Wood Doors, Jambs, Casings & Installation
4.20%
$85,233.75
Hardware & Decorative
2.50%
$50,734.38
BUDGETARY GUIDANCE CATEGORY
CATEGORY PERCENTAGE
TOTAL CATEGORY
Interior Stairs & Railings
0.00%
$0.00
Rough Carpentry & all associated
6.35%
$128,865.31
Closet Interiors
1.55%
$31,455.31
Building Materials
2.80%
$56,822.50
Architectural Millwork, Installation, Trim Installation
5.35%
$108,571.56
Custom Kitchen Cabinets, Vanity, & Installation
5.85%
$118,718.44
Painting, Coating, Finishing, Plaster, & Skim Coating
6.05%
$122,777.19
Stone, Marble, & Tile Material
7.48%
$151,797.25
Stone, Marble, & Tile Installation
5.85%
$118,718.44
Fireplaces
1.10%
$22,323.13
Audio & Video Systems, Motorized Shades, & Security Systems
1.75%
$35,514.06
Project & Site Setup
0.75%
$15,220.31
Project Administration Reimbursable
0.05%
$1,014.69
BUDGETARY GUIDANCE
CATEGORY
CATEGORY PERCENTAGE
TOTAL CATEGORY
Total Construction Costs
100.00%
$2,029,375.00
Total Square Footage of Residence
4,775
Per Square Foot Value of Renovation
$425.00
The Renovated Home Drafting, Design, Architecture, Permitting 4.5%
4.50%
$91,321.88
TRH Construction 16%
16.00%
$324,700.00
TRH General Conditions 4%
4.00%
$81,175.00
TRH Insurance 1.25%
1.25%
$25,367.19
Total The Renovated Home
25.75%
$522,564.06
Total Project Cost
$2,551,939.06
PARTNERS IN DESIGN
PARTNERS IN DESIGN
THE RENOVATED HOME THE DESIGN | RENOVATION AUTHORITY
DESIGN STUDIO 1477 3RD AVENUE NEW YORK, NY 10028 WWW.THERENOVATEDHOME.COM