Company profile PT Global Jaya Maritimindo

Page 1


COMPANY PROFILE

COMPANY NAME

PT. Global Jaya Maritimindo MAIN OFFICE

Jl. Agung Timur IX Blok O1 No. 24 Sunter Jaya, Jakarta 14350 Indonesia Telephone Faxcimile Email Website

+62 21 6502987 +62 21 6511669 gjm_lines@yahoo.com www.gjmdredging.com

ESTABLISHED IN

12 June 2012

BOARD OF ADVISORS

Head Advisor Herman Jaya Advisor Yan Yanbiao BOARD OF DIRECTORS

Head Director Irwan Hermanto Director Lin Xiao Chun Director Midin Himawan

1


COMPANY OVERVIEW

PT. Global Jaya Maritimindo was officially established under the Yobana Samial, SH., notary certificate number 05 in 12 June 2012. PT. Global Jaya Maritimindo is a dredging and reclamation company with scope of activities across the entire Indonesian waters. PT. Global Jaya Maritimindo has formed successful cooperation with multiple dredging and shoreline reclamation companies in Indonesia.

VISION Strengthening the reputation as one of widely recognized and highly accountable Indonesianbased shipping companies. MISSION Delivering the best dredging and reclamation works and service to the respected clients with the highest degree of professionality and integrity.

The company proud motto is: “Timely delivery, precise quantity and quality” “Tepat Waktu, Tepat Jumlah dan Tepat Mutu” In doing its business, PT. Global Jaya Maritimindo aspires to accomplish their commitment to all respected customers under a mutually beneficial cooperation in order to maintain their status as a highly recognized and reliable dredging and reclamation company in the country. Meanwhile the company applies global trait and world class quality into their nationalscale activities to contribute to Indonesia’s development and prosperity. To strive in the ever increasing number and scope of dredging and reclamation activities, PT. Global Jaya Maritimindo as of 2014 forms cooperation with PT. Rukindo to operate a number of Trailing Suction Hopper Dredger (TSHD) fleets. Some of PT. Rukindo-owned fleets involved in the PT. Global Jaya Maritimindo – PT. Rukindo joint cooperation is the 5000 m3 in capacity of TSHD Bali II. 2


EQUIPMENT TRAILING SUCTION DREDGER 6000 tons

SUKABUMI MAJU GENERAL SPECIFICATION Length (l.o.a.)

99.00 m

Breadth (mld.)

16.60 m

Depth (mld.)

6.70 m

Loaded draft

5.50 m

Unloaded draft

2.00 m

Hold capacity

6000 tons

Dredging depth

26 m

Diameter of discharge pipe

600 mm

Conveyor range

22 m

Main engine

932 kW x 2

Speed

10 knot

Construction year

2009

Shipyard

Anhui, China

3


EQUIPMENT TRAILING SUCTION DREDGER 5200 tons

GJ801

GENERAL SPECIFICATION Length (l.o.a.)

93.80 m

Breadth (mld.)

15.60 m

Depth (mld.)

6.20 m

Loaded draft

4.65 m

Unloaded draft

0.98 m

Hold capacity

5200 tons

Dredging depth

24 m

Diameter of discharge pipe

600 mm

Conveyor range

22 m

Main engine

745 kW x 2

Speed

10 knot

Construction year

2008

Shipyard

Anhui, China

4


EQUIPMENT TRAILING SUCTION DREDGER 6800 tons

GJ802

GENERAL SPECIFICATION Length (l.o.a.)

99.20 m

Breadth (mld.)

16.80 m

Depth (mld.)

6.80 m

Loaded draft

4.29 m

Unloaded draft

2.70 m

Hold capacity

6800 tons

Dredging depth

30 m

Diameter of discharge pipe

600 mm

Conveyor range

30 m

Main engine

735 kW

Speed

10 knot

Construction year

2010

Shipyard

Anhui, China

5


EQUIPMENT CUTTER SUCTION DREDGER 26 INCH

GJ901

GENERAL SPECIFICATION Length (l.o.a.)

58.30 m

Breadth (mld.)

12.20 m

Depth (mld.)

3.50 m

Loaded draft

2.16 m

Unloaded draft

1.69 m

Dredging depth

18 m

Diameter of suction pipe

700 mm

Diameter of discharge pipe

650 mm

Shore discharge distance

5000 m

Main engine

876 kW x 3

Cutting power

410 kW

Cutting diameter

2000 mm

Water flow

7000 m3/hr

Capacity

1200 – 1800 m3/hr

Construction year

2005

Shipyard

Shanghai, China

6


EQUIPMENT CUTTER SUCTION DREDGER 26 INCH

PUNCAK BESAR GENERAL SPECIFICATION Length (l.o.a.)

54.00 m

Breadth (mld.)

16.00 m

Bepth (mld.)

4.00 m

Loaded draft

1.80 m

Unloaded draft

1.40 m

Dredging depth

19 m

Diameter of suction pipe

700 mm

Diameter of discharge pipe

650 mm

Shore discharge distance

5000 m

Main engine

2500 kW + 1125 kW

Cutting power

700 kw

Cutting diameter

2200 mm

Water flow

9000 m3/hr, 8500 m3/hr

Pump lift

29 m + 68 m

Capacity

1800 - 2300 m3/hr

Construction year

2010

Shipyard

Zhoushan, China

7


EQUIPMENT TRAILING SUCTION HOPPER DREDGER 5000 m3

BALI II

JOINT OPERATION WITH PT. RUKINDO

GENERAL SPECIFICATION Length (l.o.a.)

124.40 m

Breadth (mld.)

18.00 m

Depth (mld.)

10.30 m

Loaded draft

7.90 m

Gross tonnage

8420 tons

Net tonnage

6603 tons

Output of propulsion machinery

3000 kW x 2

Power of dredge pump

800 / 1265 kW

Dredging depth

30 m

Hopper capacity

5000 m3

Shipyard

O&K/Germany/1994

8


EQUIPMENT CLAMSHEL DREDGER

GJ701

GENERAL SPECIFICATION Length (l.o.a.)

43.40 m

Breadth (mld.)

18.00 m

Depth (mld.)

3.50 m

Draft

2.00 m

Maximum lift capacity

8 m3

Maximum bucket depth

30 m

Clamshell bucket operation

600 m3/hr

Clamshell bucket power

1100 kW

Construction year

2007

Shipyard

Japan

9


EQUIPMENT SPLIT BARGE HOPPER 1000 m3

GJ501

GENERAL SPECIFICATION Length (l.o.a.)

62.20 m

Breadth (mld.)

12.20 m

Loaded draft

3.60 m

Unloaded draft

1.60 m

Propulsion power

353 kW x 2

Speed

9.0 knot

Construction year

2011

Shipyard

Anhui, China

10


EQUIPMENT SPLIT BARGE HOPPER 1000 m3

GJ502

GENERAL SPECIFICATION Length (l.o.a.)

62.20 m

Breadth (mld.)

12.20 m

Loaded draft

3.60 m

Unloaded draft

1.60 m

Propulsion power

353 kW x 2

Speed

9.0 knot

Construction year

2011

Shipyard

Anhui, China

11


EQUIPMENT TUG BOAT

GJ201

GENERAL SPECIFICATION Length (l.o.a.)

30.00 m

Breadth (mld.)

8.00 m

Depth (mld.)

3.00 m

Main engine

180 kW x 2

Cranes capacity

20 tons

Speed

10 knot

Construction year

2010

Shipyard

Zhejiang, China

12


EQUIPMENT TUG BOAT

GJ202

GENERAL SPECIFICATION Length (l.o.a.)

17.80 m

Breadth (mld.)

4.60 m

Depth (mld.)

2.10 m

Main engine

240 kW

Cranes capacity

5 tons

Speed

8 knot

Construction year

2010

Shipyard

Zhejiang, China

13


EQUIPMENT TUG BOAT

AMETIS

GENERAL SPECIFICATION Length (l.o.a.)

48.00 m

Breadth (mld.)

10.00 m

Depth (mld.)

4.60 m

Loaded draft

3.18 m

Unloaded draft

3.20 m

Main engine

1000 kW x 2

Cranes capacity

5 tons

Speed

10 knot

Construction year

2010

Shipyard

Wuhan, China

14


CERTIFICATES

NPWP 0003.253.950.4-048.000 NO. SIUPAL B.X-115/AL 001 TDP 09.01.1.1.61.40452 SKDP 572/1.751.21/2012 BENTUK HUKUM Perseroan Terbatas (PT) Nomor 05 Tanggal 12 Juni 2012 AKTA NOTARIS (Notaris Yobana Samial, SH.)

15


ACTIVITIES LOADING AND UNLOADING PROCESS IN VARIOUS PROJECT IN INDONESIA

16


PROJECT HIGHLIGHTS GRESIK, EAST JAVA MARUNDA, JAKARTA DUMAI, RIAU

JAVA INTEGRATED INDUSTRIAL AND PORT ESTATE ONSHORE NORMALIZATION AT GRESIK, EAST JAVA

MARUNDA CENTER TERMINAL 1B DREDGING PROJECT AT JAKARTA

SITE CLEARANCE AND LAND FILLING AT PROJECT OLEOCHEMICAL PLANT, LUBUK GAUNG, DUMAI

17


PROJECT HIGHLIGHTS BELAWAN, NORTH SUMATRA CILACAP, CENTRAL JAVA

KSOP BELAWAN HARBOR CHANNEL NAVIGATION AND BASIN DREDGING PROJECT AT BELAWAN, MEDAN

PLTU 2 JATENG ADIPALA DREDGING PROJECT AT CILACAP, CENTRAL JAVA

18


PROJECT HIGHLIGHTS ANCOL, JAKARTA SERANG, BANTEN DUMAI, RIAU

JAKARTA EMERGENCY DREDGING INITIATIVE (JEDI) RECLAMATION AT ANCOL, JAKARTA

PT SINAR SERANG QUARRY SUCTION AND DREDGING PROJECT AT SERANG, BANTEN

OLEOCHEMICAL (SINAR MAS GROUP) RECLAMATION AND SHORE PROTECTION PROJECT AT LUBUK GAUNG, DUMAI, RIAU

19


PROJECT AFFILIATIONS CILEGON, BANTEN PALU, CENTRAL SULAWESI

PT. GLOBAL JAYA DINAMIKA SAND QUARRY PROJECT AT BOJONEGARA, CILEGON, BANTEN

PT. OPTIMA TIGABIRU JAYA NUSANTARA STONE QUARRY PROJECT AT PALU, CENTRAL SULAWESI

20


PROJECT MAIN LIST

NO

PROJECT

LOCATION

1

Reclamation

Gresik, East Java

2

Dredging

Cilacap, Central Java

CLIENT

YEAR

STATUS

PT. Berkah Kawasan Manyar Sejahtera (AKR Group) PT. China Harbor Indonesia

2015

Ongoing

2015

Finished

2015

Finished

2014

Finished

2014

Finished

2014

Finished

2013

Finished

PT. Energi Sejahtera Mas

3

Reclamation

4

Dredging

5

Dredging

Dumai, Riau Belawan, North Sumatra Marunda Center, Jakarta

6

Dredging and Reclamation

Batu Ampar, Batam, Riau Islands

7

Dredging and Reclamation

Dumai, Riau

Inai – Asindo, JO PT. China Harbor Indonesia PT. Barelang PT. Wijaya Karya (Persero) Tbk. PT. Tri Mar Theo PT. Energi Sejahtera Mas

8

Dredging

Serang, Banten

PT. Saga Construction

2013

Finished

9

Dredging and Reclamation

Serang, Banten – Ancol, Jakarta

PT. Brantas Abipraya

2013

Finished

10

Dredging and Reclamation

Serang, Banten – Ancol, Jakarta

PT. Sinar Serang

2013

Finished

21


Jl. Agung Timur IX Blok O1 No. 24 Sunter Jaya Jakarta 14350 Tel +62 21 6502987 Fax +6222 21 6511669 www.gjmdredging.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.