THREE GOALS 1. Thorough Renovation of RMH
2. Provide Additional Space for the Architecture School
3. Enhance Connections Between TSA and the Larger Tulane Community
THREE PLANNING PRINCIPLES 1. Consider the entire campus as a whole when addressing issues of physical planning 2. Preserve the existing character & buildings of the historic front campus 3. Reinforce & preserve the existing patterns of quads & outdoor spaces
SITE ANALYSIS: FULL CAMPUS
SITE ANALYSIS: FRONT CAMPUS
PHASING
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 1 Joint Research + Design Center Integrate TSA with Larger University Community placement of shop relocation of cafe additional gallery space Flexible Design office space studio space classroom space laboratory space
PHASE 2 Richardson Memorial Hall Renovations Thorough Renovations code compliance ADA accessibility Increased Efficiency reconfigure offices & classrooms Preserve + Enhance Historic Integrity minimal changes to exterior
PHASE 3 Richardson Building Renovations code compliance ADA accessibility Improve Quality of Spaces + Systems
PHASE 4 Science & Engineering Replacing Obsolete Buildings Improving Quality of Space Introduction of New Green Space
END RESULT
PHASE 1 Joint Research + Design Center
JR+DC GEOMETRIES
WORKSPACE
SHOP
KITCHEN CAFE GALLERY
JR+DC PUBLIC GROUND FLOOR main entry | cafe | gallery | shop
JR+DC SECOND + THIRD FLOORS flexible space
JR+DC FOURTH + FIFTH FLOORS flexible space
PHASE 2 Richardson Memorial Hall Renovations
72,873 17,107s 60,032
20,000sf sf 20,000
5,000sf sf 5,000
10,000sf sf 10,000
15,000sf sf 15,000
KIERAN TIMBERLAKE UPDATED SCHEME PROPOSED
Studios Studios
1 Lecture, 2 Large, 3 Small 1 Lecture, 1 Large, 1 Medium, & 7 Small 1 Lecture, 2 Large, 2 Medium, & 5 Small SISE 1 Lecture, 2 Large, & 7 Small
Classrooms Classrooms
8 Administration, 23 Faculty, 1 Conference, & 2 Program 10 Administration, 21 Faculty, 1 Conference, 3 Program, & 8 SISE 9 Administration, 20 Faculty, 1 Conference, 3 Program, & 8 SISE SISE 10 Administration, 21 Faculty, 1 Conference, 3 Program, & 8 SISE
Offices
Offices
Library Library
Computer Lab Computer Lab
Digital Output Lab Digital Output Lab
Commons FacultyFaculty Commons
Circulation Circuation
New Bldg
Mechanical Mechanical
Restrooms Restrooms
6%
9 Sinks, 10 Toilets, & 3 Urinals 18 Sinks, 14 Toilets, 4 Urinals, & 2 Showers 16 Sinks, 20 Toilets, & 2 Showers
Storage Storage
Flex Space Flex Space
Shop Shop
Cafe Cafe
New Bldg
New Bldg
Gallery Gallery New Bldg Library Slide Slide Library
10%
d 44% of Additional Floor Space
Total Estimated Gross Square Footage TOTAL ESTIMATED GROSS SQUARE FOOTAGE EXISTING RMH REQUESTED PROGRAM KIERAN TIMBERLAKE UPDATED SCHEME PROPOSED
20,000sf
15,000sf
55,766 9,742sf additional program 72,873 17,107sf more than requested 60,032 10,000sf
5,000sf
46,024
Studios
1 Lecture, 2 Large, 3 Small 1 Lecture, 1 Large, 1 Medium, & 7 Small 1 Lecture, 2 Large, 2 Medium, & 5 Small SISE 1 Lecture, 2 Large, & 7 Small
Classrooms
8 Administration, 23 Faculty, 1 Conference, & 2 Program 10 Administration, 21 Faculty, 1 Conference, 3 Program, & 8 SISE 9 Administration, 20 Faculty, 1 Conference, 3 Program, & 8 SISE SISE 10 Administration, 21 Faculty, 1 Conference, 3 Program, & 8 SISE
Offices
Library
Computer Lab
Digital Output Lab
Faculty Commons
Circulation
New Bldg
Mechanical
Restrooms
6%
9 Sinks, 10 Toilets, & 3 Urinals 18 Sinks, 14 Toilets, 4 Urinals, & 2 Showers 16 Sinks, 20 Toilets, & 2 Showers
Storage
Flex Space
Shop New Bldg
10%
Studios Classrooms Offices Library Computer Lab Digital Output Lab Faculty Commons Circulation Mechanical Restrooms Storage Flex Shop Café Gallery Slide Library Total Floor Space Estimated Gross SF
d 44% of Additional Floor Space
EXISTING 14,889 6,223 5,303 2,766 535 420 354 8,448 1,632 617 550 0 978 600 0 517 43,832 46,024
REQUESTED 14,889 6,735 6,657 2,010 1,022 433 409 12,038 1,990 1,500 229 567 2,252 1,310 1,069 0 53,110 55,766
TIMBERLAKE 15,084 8,004 6,472 2,625 1,051 474 458 20,669 20,669 7,266 1,494 822 810 2,157 1,042 975 0 69,403 72,873
PROPOSED 14,738 7,422 6,710 2,009 1,038 427 539 14,346 3,254 1,507 229 323 2,252 1,310 1,069 0 57,173 60,032
'1
$
6 67$,5 6)
% 0(16 5(675220 6)
:20(1
$ (//(& 6)
83 5
( (/(9 6) 6) )
&
6 67$,5 6)
( (/(9 /2%%< 6)
23(1 72 %(/2:
' &867 72',$ 6)
83
' '1
'1
$ &203 2)),&( 6)
23(1 72 %(/2:
&255,'25
5,'25 6)
%
$ &255,'2 6)
% 255,'25 6)
/$5*( &/$665220 6)
*/ %$/867(56 7<3 % 6725$*( 6) )
% 6725$*( 6)
$ $ 9 6725$*( $ 6)
$ 6725$ 6)
23(1 72 %(/2: 5(3$,5 5()85%,6+ (;* :' */ '5
& 725$*( ( 6)
Office 114 99 SF
Office 126 144 SF
Office 112 137 SF
Office 110 137 SF
Mechanical 104 23(1 72 %(/2: 1291 SF 23(1 72 %(/2:
Digital $ Output Lab. &$ $7(5,1* .,,7&+(1 6) ) 106 459 SF
Office 108 142 SF
Office 119 136 SF
Office 117 130 SF
Office 115 130 SF
5(3$,5 5()85%,6+ (;* :' */ '5
Conference Rm 124 436 SF
23(5$%/( :$// 31/6 7<3
83
)&8 (437 6(( 0(&+ '(6&5,37,21 7<3
833(5 /2%%< 6)
Office 122 145 SF
& 9(67,%8/( 6) '1
Hall 100A 581 SF
Office 121 99 SF
% /($51,1* &200216 6)
Office 111 130 SF
Office 109 125 SF
Office 107 130 SF
Office 105 139 SF
671 3$9,1*
Student Lounge 101 362 SF
'1
Faculty Lounge 101B 362 SF
'1
Sprinkler Pump Rm 101A 177 SF
Office 116B 145 SF
Office 118A 145 SF
Office 118B 114 SF
Office 135 131 SF
Office 137 103 SF
Office 120 108 SF
Hall 100B 598 SF
Hall 100 2059 SF
Office 113 135 SF
Office 116A 145 SF
Office 123 138 SF
Office 125 122 SF
Office 127 127 SF
Office 129 131 SF
Office 131 131 SF
Office 133 131 SF
Office 139 108 SF
Faculty Workspace 101C 177 SF
UP
UP
RMH FIRST FLOOR
private offices [low ceiling height] | student & faculty lounge adjacency | core established | faculty outdoor spaces
( (/(9 6) 6) ) 6 67$,5 6)
75220 6)
83
) 6725$*( 6)
$
6+2:(5 6 67$,5 6)
&29(5(' 6+23 &2857 6+23 &2857 &$123< $%9
:20(1
$ (& 6)
( (/(9 /2%%< 6)
23(1 72 $%9
' &867 72 ' 6)
83
& ,1&20,1* 87,/,7,(6 6)
83 6+23 6)
255,'25 6)
23(1 72 $%9
&255,'25 6)
')
$ &255,'25 6)
$/80 */ 675)7 7<3
6 67$,5 6)
' 20(67,& :$7(5 6)
&255,'25 6)
% &255,'25 6)
&255,'25 6)
6+23 ),7287 1,& % &1& 6)
*(5
% 75$6+ &2//(&7,21 6)
( 6725$*( 6)
' 6725$*( 6)
0$,/ &23< 6)
. 6725 5$* * 6) 5
0 6,6( $667 ',5 6)
*$//(5< 6)
$/80 */ 675)7 7<3 ) ' '867 &2//(&7,21 6)
&255,'25 6)
&725 6)
) 5(&(37,21 6)
6,6( 6(1
0 $662& 6)
6)
725$*( 6) 6 6)
'(
&255,'25 6)
2 23(1 72 $%9
/2:(5 /2%%< 6)
$ $ < 2)),&( 6) 6
1 0$,/ &23< 6)
83
23(1 72 $%9 9
& 6725$*( 6)
2 5$* *( 6) 6
% ),5( 3803 6)
83
23(1 72 $%9 & 6+23 6725$*( 6)
$ (/(&75,&$/ 6)
1 6,6( $667 6)
23(5$%/( :$// 31/6 : 7$&.%2$5' ),1 7<3 )&8 (437 6(( 0(&+ '(6&5,37,21 7<3
)),& &(
( %8'*( (7 $ 6)
) 25 2) '( (9 6)
* * $'0,1 6+$ $5(' 6)
667/ )/5 *5,//( 5(
% &$) 6) & &$)( 6(59,&( 6) ), ),7287 1,&
) 63(&,$/ (;+,%,7 6)
' 63(&,$/ (;+,%,7 7 6)
Academic Support Faculty Student Services Studios Mechanical Support
KT FIRST FLOOR
main entry | private offices | administration block | cafe + shop + gallery
% 0(16 5(675220 6)
$ 3,183
'1
( (/(9 6) 6) )
& :20(16 5(6752 220 0 6)
0') Associate 6) Dean's Office 204A 185 SF &255,'25
&
$ & 6)
83
)/(; 5220 6)
6 67$,5 6)
0
6 67$,5 6)
5
( (/(9 /2%%< 6)
6)
3,183 /281*( 6)
$/80 */ 675)7 7<3 *
&255,'25 6)
')
25 6)
Assitant Dean's Office 204C 185 SF % 0(&+$1,&$/
(59 6(( 0(&+ '(6&5,37,21 +
Dean's Office 204B 214 SF
6)
83 '1
$/80 */ 675)7 7<3 ) % &255,'25 6)
6)
&255,'25 6)
$/80 */ 675)7 7<3
Admin. Admin. Office Office 204E 204D 100 SF 100 SF
$
(/(&75,&$/ 6) Reception 204 397 SF
Storage 201B 64 SF
678',2 6)
Lecture 201 2729 SF
'1
678',2 6)
23(5$%/( :$// 31/6 : 7$&.%2$5' ),1 7<3
)&8 (437 6(( 0(&+ 4 + '(6&5,37,21 7<3 5
'1
3,183 /281*( 6)
5(3$,5 5()85%,6+ (;* :' */ '5
5(3$,5 5()85%,6+ (;* :' */ '5
$/80 */ 675)7 7<3
Storage 201A 165 SF
Pin-Up Space 200A 265 SF
DN
Learning Commons 202B 2000 SF
Pin-Up Space 7< 2)),&( 200B 6) 266 SF
Lobby 200 2396 SF
)$&8/7< 6)
678',2 6)
Computer Lab. 202A 1029 SF
DN
RMH SECOND FLOOR
public floor | administration block | large lecture hall | library & computer lab
'1
$
6 67$,5 6)
% 0(16 5(675220 6)
$ (//(& 6)
83 5
:20(1
( (/(9 6) 6) )
&
6 67$,5 6)
' &867 72',$ 6)
83
( (/(9 /2%%< 6)
23(1 72 %(/2:
' '1
'1
$ &203 2)),&( 6)
23(1 72 %(/2:
&255,'25
5,'25 6)
%
$ &255,'2 6)
% 255,'25 6)
/$5*( &/$665220 6)
*/ %$/867(56 7<3 % 6725$*( 6) )
% 6725$*( 6)
$ $ 9 6725$*( $ 6)
$ 6725$ 6)
% /($51,1* &200216 6) 23(1 72 %(/2: 5(3$,5 5()85%,6+ (;* :' */ '5
& 725$*( ( 6)
23(1 72 %(/2:
23(1 72 %(/2:
23(5$%/( :$// 31/6 7<3
83 $ &$ $7(5,1* .,,7&+(1 6) )
5(3$,5 5()85%,6+ (;* :' */ '5
833(5 /2%%< 6)
)&8 (437 6(( 0(&+ '(6&5,37,21 7<3
& 9(67,%8/( 6) '1
671 3$9,1*
'1
'1
Academic Support Faculty Student Services Studios
KT SECOND FLOOR
large lecture hall | classrooms | learning commons
Mechanical Support
UNLIMITED 75% 45% 25% 15% 0% 0% 15% 25%
LOYOLA PARKING GARAGE
45% 75% UNLIMITED
ELECTRICAL TRANSFORMER
DINWIDDIE HALL
GINGKO
RICHARDSON BUILDING
0% 15% 25% 45% 75% UNLIMITED
LIVE OAK
LIVE OAK
LIVE OAK
LIVE OAK
DAWN REDWOOD
LIVE OAK
GIBSON HALL
PROJECT PARAMETERS
SITE CONSTRAINTS
TULANE UNIVERSITY RICHARDSON MEMORIAL HALL SCHEMATIC DESIGN UPDATE
10 SEPTEMBER 2014| © KIERANTIMBERLAKE
% 0(16 5(675220 6)
'1 6 67$,5 6)
$ 3,183 6)
83
:20(1
( (/(9 6) 6) )
&
6 67$,5 6)
$ (//(& 6)
( (/(9 /2%%< 6)
' &867 72', 6)
)$
$ $ &25 55,'25 6) 6) )
Outdoor Workspace
(/(&75,&$/ 6)
Collaborative Workspace 5(3$,5 5()85%,6+ (;* :' */ '5
Studio 301 2975 SF
% &255,'25 6)
6)
$/80 */ 675)7 7<3
678',2 6)
83 '1
$/80 */ 675)7 7<3 *
&255,'25 6)
6)
)$&8/7< < 2)),&( 6) 6)
( 672 25$*( 6)
6)
Outdoor Workspace 23(5$%/( :$// 31/6 $ : 7$&.%2$5' ),1 7<3 &
Lecture 304 1219 SF
Collaborative )&8 (437 6(( 0(&+ 4 '(6&5,37,21 7<3 5 Workspace
3,183 /281*( 6)
5(3$,5 5()85%,6+ (;* :' */ '5
Hall 300 1953 SF
Studio 302 3082 SF
$/80 */ 675)7 7<3
)$&8/7< 6)
Classroom 303 345 SF
7< 2)),&( Classroom 6) 305 345 SF
Classroom 303B 235 SF
RMH THIRD FLOOR
academic floor [core studio spaces + various-sized classrooms]
5
% 0(16 5(675220 6)
$ 3,183
'1
( (/(9 6) 6) )
& :20(16 5(6752 220 0 6)
$ & 6)
83
)/(; 5220 6)
& 0') 6)
( (/(9 /2%%< 6)
6)
3,183 /281*( 6)
6 67$,5 6)
0
6 67$,5 6)
83 '1
$/80 */ 675)7 7<3 *
&255,'25 6)
')
(59 6(( 0(&+ '(6&5,37,21 +
$/80 */ 675)7 7<3 ) &255,'25 6)
25 6)
% 0(&+$1,&$/ 6)
% &255,'25 6)
&255,'25 6)
$/80 */ 675)7 7<3
23(5$%/( :$// 31/6 : 7$&.%2$5' ),1 7<3
$ (/(&75,&$/ 6)
'1
678',2 6)
678',2 6)
5(3$,5 5()85%,6+ (;* :' */ '5
)&8 (437 6(( 0(&+ 4 + '(6&5,37,21 7<3 5
'1
3,183 /281*( 6)
678',2 6)
5(3$,5 5()85%,6+ (;* :' */ '5
$/80 */ 675)7 7<3
)$&8/7< 6)
7< 2)),&( 6)
Academic Support Faculty Student Services Studios Mechanical Support
KT THIRD FLOOR
studio spaces | classrooms | offices
'1 6 67$,5
% 0(16 5(675220 6)
:20(1
&
( (/(9 6) 6) ) 6 67$,5 6)
( (/(9 6) 6) ) 5
$/80 */ 6.</,*+7
Outdoor Workspace
5 667 *5'5/ 7<3
522) :$/.:$< 35(&$67 &21& 3$9(56
5
&255,'25 6)
667 *5'5/ 7<3
522) :$/.:$< 35(&$67 &21& 3$9(56 5 5
Classroom 404 1226 SF $ $ &25 55,'25 6) 6 6)
5
60$// &/$ $6 6) 6) 6
' '1
/$665220 6) 6
% &255,'25 6)
6 67$,5 6)
Outdoor Workspace
5
Collaborative Workspace
Collaborative Workspace
0(&+ 6)
6 67$,5 6)
3,18
'1 '1
Studio 401 2975 SF
0(&+ *$//(5< 6)
&255,'25 6)
Hall 400 1975 SF 23(5$%/( :$// 31/6 : 7$&.%2$5' ),1 7<3
$/80 */ 675)7 7<3
23(1 72 %(/2: 2 $+8 6(( 0(&+ '(6&5,37,21
Classroom 405 340 SF
Studio 402 3082 SF
Classroom 407 248 SF
23(1 72 %(/2: 2
Classroom 406 344 SF &8/7<
RMH FOURTH FLOOR
academic floor [core studio spaces + various-sized classrooms]
% 0(16 5(675220 6)
'1 6 67$,5 6)
$ 3,183 6)
83
$ (//(& 6)
:20(1
( (/(9 6) 6) )
&
6 67$,5 6)
( (/(9 /2%%< 6)
' &867 72', 6)
)$
83 '1
$/80 */ 675)7 7<3 *
&255,'25 6)
6)
)$&8/7< < 2)),&( 6) 6)
$ $ &25 55,'25 6) 6) )
( 672 25$*( 6)
(/(&75,&$/ 6)
$/80 */ 675)7 7<3
% &255,'25 6)
6)
6)
23(5$%/( :$// 31/6 $ : 7$&.%2$5' ),1 7<3 &
)&8 (437 6(( 0(&+ 4 '(6&5,37,21 7<3 5
678',2 6) 5(3$,5 5()85%,6+ (;* :' */ '5
3,183 /281*( 6)
5(3$,5 5()85%,6+ (;* :' */ '5
$/80 */ 675)7 7<3
)$&8/7< 6)
7< 2)),&( 6)
Academic Support Faculty Student Services Studios Mechanical Support
KT FOURTH FLOOR
studio spaces | classrooms | offices | flex space '1
$ 3,183
% 0(16 5(675220 6)
& :20(16 5(6752 220 0 6)
( (/(9 6) 6) ) 0
6 67$,5 6)
Studio 504B 588 SF
Studio 504A 588 SF
Hall 500 1145 SF Flex Space 501 163 SF
Studio 503 739 SF
Studio 505 738 SF
Flex Space 502 160 SF
RMH FIFTH FLOOR
options studio space | flex space
( (/(9 6) 6) ) 5
$/80 */ 6.</,*+7
6 67$,5 6)
3,18
5 667 *5'5/ 7<3
522) :$/.:$< 35(&$67 &21& 3$9(56
667 *5'5/ 7<3
522) :$/.:$< 35(&$67 &21& 3$9(56 5 5
5
&255,'25 6)
' '1
$ $ &25 55,'25 6) 6 6)
5
60$// &/$ $6 6) 6) 6
0(&+ 6)
/$665220 6) 6
6 67$,5 6)
% &255,'25 6)
5
'1 '1
0(&+ *$//(5< 6)
&255,'25 6) $/80 */ 675)7 7<3
23(1 72 %(/2: 2
23(5$%/( :$// 31/6 : 7$&.%2$5' ),1 7<3
23(1 72 %(/2: 2
$+8 6(( 0(&+ '(6&5,37,21
&8/7<
Academic Support Faculty Student Services Studios Mechanical Support
KT FIFTH FLOOR
offices | classrooms | circulation | mechanical space % 0(16 5(675220 6)
'1 6 67$,5 6)
83
$ 3,183 6)
$ (//(& 6)
:20(1
( (/(9 6) 6) )
&
6 67$,5 6)
( (/(9 /2%%< 6)
' &867 72', 6) &255,'25
)$&8/7< < 2)),&( 6) 6)
$/80 */ 675)7 7<3 *
)$
83 '1
RMH TRANSVERSE SECTION
KT TRANSVERSE SECTION
x 1.35 (soft costs)
= $11.8 Million
COST ANALYSIS COST ANALYSIS
Our Studio Scheme Keiran Timberlake Scheme
6
& ,1&20,1* 87,/,7,(6 6)
% ),5( 3803
11,393 external 27,074 gross gross sf sf (addition (addition +only) architecture program only) x $325/sf (hard cost) xx $325/sf (hard cost) 1.35 (soft costs) x 1.35 (soft costs)
= $11.8 Million = $5.0 Million Our Studio Scheme
COST ANALYSIS
11,393 gross sf (addition + external That’s a difference of $6.8 Million Keiran Timberlake Scheme
6
& ,1&20,1* 87,/,7,(6 6)
% ),5( 3803
architecture program only) x $325/sf (hard cost) 27,074 grosscosts) sf (addition only) x 1.35 (soft x $325/sf (hard cost) x 1.35 (soft costs)
= $5.0 Million = $11.8 Million
That’s a difference ofOur $6.8 Million Studio Scheme