PASSING OF COB BALLS
PREPARATION OF MIX
LAYING OF COB BALLS
PUNCTURING THROUGH THUMBER
ADDITTION OF STRAWS
STAMPING TO FINE
PREPARATION OF COB BALLS
LAYING OF COB BALLS
CHISELING THE HORIZONTAL SPLUGES
LEVELING THE EDGES WITH TOOTH PICKER
LEVELING WITH TOOTHPICKER
PREPARATION OF COB BALLS PUNCTURING THE TOP LAYER
SURFACE CRACK
SURFACE CRACK FILLINGS
STRUCTURAL CRACKS STRUCTURAL CRACK
VOIDS
CHISELING FOR STRICHING
PREPARATION OF MIX
COLLECTION OF INGREDIENTS
DIFFERENT CRACK FILLING AND MIXES
BAMBOO ROOFING SPLITING AND NAILING OF TREATED BAMBOO SPLITS.
BAMBOO NAILING
WASTE COCONUT COIR AS HEAT INSULANT OVER THE ROOF
INTERIOR MUD PLASTERING FINAL ROOF AFTER LIME CREATING
LAYING OF OF LAYING COB BALLS COB BALLS BAMBOO NAILING AND BRICK BAT BREAKING
PREPARATION OF LIME CRETE MIX LAYING OF COB BALLS
PREPARATION OF MIX
SUN DRIED
ADOBE BRICKS LAYING THE MX
PREPARATION OF ADOBE LABELING
PROCESS OF FILLINF
EXPRIMENTING
FILLING WITH DIFFERENT FORMWORKS
LEVELING OF LIME CRETE FLOOR FINISH
BAMBOO MEZANINE FIXTURE
LIME CRETE MIX FLOOR FILLING
FLOORING AND LEVELING OF WALLS DONE
TRENCH ATTACHED TO TRACTOR FOR GRINDING THE MIX AT CENTRE OF PULLEY
FINAL SEWED CHAKKI LIME
TEST FOR COMSISTENCY
MIXING TO ATTAIN FINE FERMENTED KADDUKAI JAGGERY WATER
BAGS OF KADDUKAI DRAINED IN FOR TWO WEEKS TO FERMENT
MIXING TO ATTAIN FINE FERMENTED KADDUKAI JAGGERY WATER
CURING BEFORE BASE COAT
APPLYING BASE COAT
LEVELING THE SUFACE TO FILL VOIDS
COLLECTION OF DEMOLISH CONSTRUCTION WASTE
PREPARATION OF MIX
MAKING FORMWORK
MIXING TO FINE
FILLING THE FORM WITH EARTHCRETE
REINFORCEMENTS TO HOLD FORMWORK
GAP FILLING
KEY PLAN – 1:350
KEY PLAN – 1:350
BB’