E-Leaflet-03.12.2024

Page 1


and factor y facilities built to international standards of quality and sustainability

S trategically located at the intersection of major transpor tation routes and industrial hubs - just 32 km from Hanoi and 42 km from Noi Bai International Airpor t - the park combines robust infrastructure with eco -friendly design, connectivity across manufacturing and logistics sectors

Thuan Thanh II Industrial Park
Mao Dien Commune, Thuan Thanh District
Bac Ninh Province
SLP Park Bac Ninh

PRIME LOCATION & NETWORK

• Multi-site network drives scalability and connectivity

SMART DESIGN FOR EFFICIENCY

• Technology-driven solutions meet diverse industry demands.

GFA: 17,941m²

GFA: 18,799m²

GFA: 19,813m²

QUALITY & RELIABILITY

• Suppor ts high-racking and operational durability

SUSTAINABILITY FOCUS

• Eco-friendly design and construction materials.

PARTNER OF CHOICE

• Tailored layouts designed for growth and adaptability.

A0 1

A comprehensive business-enabling ecosystem tailored to meet the unique needs of customers,

• EXPERT CONSULTATION AND INSIGHTS • CONNECTIONS WITH TRUSTED PARTNERS

Canopy

PRO JECT DETAILS

OTHER MAJOR PROJECT FEATURES

Lighting

Power Capacity

RBW: ready-to-use LED lighting

RBF: wiring for flexible LED installation

RBW: 20VA/sqm NLA

RBF: 160VA/sqm NLA

Domestic WWTP Capacity: 100 m³/day & night

Ventilation Exhaust fan

Fire Protection System Sprinkler system, PA system, and fire detection system Public Area Security 24/7 CCTV monitoring

UTILITIES PRICES REFERENCES

Normal hours: 3,007 VND/kWh + 5% of loss on transmission line

• 04:00 to 09:30;

• 11:30 to 17:00;

• 20:00 to 22:00

Peak hours: 5,174 VND/kWh + 5% of loss on transmission line

• 09:30 to 11:30; • 17:00 to 20:00 Off-Peak hours: 1,830 VND/kWh + 5% of loss on transmission line • 22:00 to 4:00

VND/m³ Wastewater

* Excluded VAT, and subject to the contract with service providers from time to time 7,727 VND/m³

INDUSTRIES

ALLOWED BY IP

Main investment sectors

Food production and processing (C10)

Garment production (C14)

Paper and paper product manufacturing (C17)

Rubber and plastic product manufacturing (C22)

Electrical equipment manufacturing (C27)

Machinery and equipment manufacturing not classified elsewhere (C28)

Automotive and other motor vehicle

manufacturing (excluding electroplating which is a stage in the production process) (C29)

Other processing and manufacturing industries (C32)

OTHERS

Corporate income tax (CIT)

• Tax exemption: 2 years

• 50% reduction: 4 subsequent years

EPEs

Eligible to apply for EPE licenses

preventive maintenance services are provided for all the Lessor's fixtures and assets

O P TIMIZE D SO L U TIO

Total: 5,698m2 WH: 4,949m2 st: 195m2 nd: 195m2 Platform: 215m2 Canopy: 144m2

Total: 4,420m2 WH: 4,060m2 Platform: 216m2 Canopy: 144m2

Total: 5,525m2 WH: 5,075m2 Platform: 270m2 Canopy: 180m2

Total: 5,698m2 WH: 4,949m2

st: 195m2 nd: 195m2 Platform: 215m2 Canopy: 144m2

Total: 4,420m2 WH: 4,060m2 Platform: 216m2 Canopy: 144m2

Total: 4,420m2 WH: 4,060m2 Platform: 216m2 Canopy: 144m2

Total: 5,698m2 WH: 4,934m2 st: 195m2 nd: 195m2 Platform: 215m2 Canopy: 144m2

Total: 5,738m2 WH: 5,133m2 st: 195m2 nd: 195m2 Platform: 215m2

Total: 4,830m2 WH: 4,225m2

st: 195m2 nd: 195m2 Platform: 215m2

Total: 4,625m2 WH: 4,355m2 Platform: 270m2

Total: 4,625m2 WH: 4,355m2 Platform: 270m2

Total: 5,698m2 WH: 4,934m2 st: 195m2 nd: 195m2 Platform: 215m2 Canopy: 144m2 Electric room: 15m2 Total: 4,830m2 WH: 4,210m2 st: 195m2 nd: 195m2 Platform: 215m2 Electric room: 15m2

Total: 5,520m2 WH: 5,250m2 Platform: 270m2

Total: 5,738m2 WH: 5,118m2 st: 195m2 nd: 195m2

Platform: 215m2 Electric room: 15m2

Total: 5,738m2 WH: 5,118m2 st: 195m2 nd: 195m2

Platform: 215m2 Electric room: 15m2

Total: 5,520m2 WH: 5,250m2 Platform: 270m2

Total: 4,634m2 WH: 4,083m2 st: 195m2 nd: 195m2 Platform: 161m2

Hanoi - Hai Phong Expressway
Hanoi - Lang Son Expressway
Hanoi - Lao Cai

B A C N I N H Province

SLP Park Bac Ninh

SLP Park Yen Phong

SLP Park Yen Phong 2C

SLP Park Nam Son Hap Linh

H A I P HO N G City

SLP Park Hai Phong

H UN G Y E N Province

SLP Park Hung Yen 1

Sa Island

SLP Park Long Hau

SLP Park Xuyen A

LO N G A N Province VI N H LO N G Province

SLP Park Nam Thuan

ON G N A I Province

SLP Park Loc An Binh Son

SLP Park Binh Minh

1 M S Q M BU

Ward, District 1, HCMC

A N O I O FFI C E

10, Lotte Centre

Tower),

Level
(East
54 Lieu Giai, Cong Vi Ward, Ba Dinh District, Hanoi
Explore more about SLP Park Bac Ninh
Truong Sa Island
Hoang

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.