Tiffany N. Barraza Overall Building Sections
SHEET CONTENT
PORTFOLIO
| Perspective Section Rendering
OCEANSIDE HIGH SCHOOL PERFORMING ARTS CENTER Oceanside, California
PROJECT DESCRIPTION: A new performing arts center on the Oceanside High School campus to serve the students and the Oceanside Community. The Performaing Arts Center includes a ticket booth, concessions stand, 300 seat theater with an orchestra pit and catwalk levels, black box theater, and classrooms.
SOFTWARE Revit Architecture Navisworks Adobe Illustrator, InDesign, Photoshop
Tiffany N Barraza
Portfolio | 2014
Elevations, Perspectives and Site Plan
EXTERIOR PERSPECTIVE Outsourced
Oceanside High School Performing Arts Center All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
DPH Hall
SHEET CONTENT
RIVERVIEW APARTMENT COMMUNITY AN IRVINE COMPANY DEVELOPMENT San Jose, California
PROJECT DESCRIPTION: Riverview Apartment Community is a 5 parcel/ 5 bldg mid rise development. Parcel 5 and 6 buildings contain approximately 250 residential units and have a total of 5 levels, a leasing center, business center, swimming pool at podium oor and a pool lounge.
SOFTWARE Revit Architecture
Tiffany N Barraza
Portfolio | 2014
Elevations and Perspectives
SHEET CONTENT
EXTERIOR PERSPECTIVE
Riverview Apartment Community All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
DPH Hall
CSU SAN MARCOS SCHOOL OF NURSING San Marcos, California
PROJECT DESCRIPTION Renovation of a portion of an existing classroom building for the School of Nursing. The project is a total of 12,154 sf of interior renovation. A new door was added to provide an entry at grade for the School of Nursing with a new pedestal paver finish over the existing roof to provide level access. The new entry connects with a new sidewalk to adjacent sidewalks. The School of Nursing suite includes office, conference rooms, mock exam rooms, a skills lab, simulation lab suite and restroom upgrades.
SOFTWARE Revit Architecture Adobe Illustrator, InDesign, Photoshop
Tiffany N Barraza
Portfolio | 2014
Site Photos and Project Renderings
EXTERIOR PERSPECTIVE CSU San Marcos School of Nursing All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
DPH Hall
SHEET CONTENT
MEETING AND EXHIBIT HALL Dhahran, Kingdom of Saudi Arabia
PROGRAM +/- 4,000 sq. meter multi-purpose hall with foldable partitions that subdivide the oor into multiple rooms 15 meter clear interior height hall Lower and upper mezzanine level administrative space Lower level commercial kitchen capable of supporting 3,000 guests Open air roof deck restaurant and landscape
SOFTWARE Revit Architecture Illustrator InDesign
Tiffany N Barraza
Portfolio | 2014
Overall Building Sections | Perspective Rendering
G
F.7
F
E
D
C
B
7
A 9
A.3
8.6
8
5
7.2 6.8
6
SHEET CONTENT
3
5.2 4.8
4
3.2 2.8
2
1
1.5
1 A3-00
F.9 3 A3-01
2
1
A3-00
A3-12
1 A4-45
RESTAURANT
WOMEN'S MEN'S TOILET TOILET 408 409
MECH. ROOM
35010
4
LOWER ROOF
A5-50
34150
LOWER ROOF 34150
MECH. ROOM 304
UPPER MEZZANINE FLOOR
UPPER MEZZANINE FLOOR
28650
28650
24150
1 A5-50
STORAGE 203
LOWER MEZZANINE FLOOR
LOWER MEZZANINE FLOOR
2
3
A3-10
24150
1 A3-10
A3-10
STAIR 2
CORRIDOR
HALL 114
B99
GROUND FLOOR
HALL
HALL
HALL
121
118
114
HALL 108
GROUND FLOOR
15150 LOBBY CORRIDOR B03
12900 BASEMENT PLAN
CORR. 161 m²
MECHANICAL ROOM B39
MPOE ROOM B38
WATER SUPPLY TANKS B37
WATER TREATMENT PUMP ROOM B36
10650
15150 LOBBY STORAGE B13
12900 BASEMENT PLAN
? ?
EMERGENCY GENERATOR 99 m²
10650 4
2
A3-12
A3-00
1
SECTION A NTS
2
SECTION B NTS
EXTERIOR PERSPECTIVE Outsourced
Dhahran Palace Hotel Hall All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
Overall Ground Floor Plan and Roof Plan
SHEET CONTENT
9
8.6
8
7.2
7
6.8
6
5.2
5
4.8
4
3.2
3
2.8
2
1.5
1
1
9
8.6
8
7.2
7
6.8
6
5.2
5
4.8
4
3.2
3
2.8
2
1.5
1
A4-27
5389
6850
1300
10930
1300
11155
1300
11155
1300
11155
11155
2 12240
10930
1300
1300
11155
11155
2
9.2
A4-27
1300
11155
1300
1300
10930
6850
1
5390
A4-24
9.2
A3-01
1 1 A3-00
7.8
A4-55
11155
A4-55
8.5
4
A.1
1300
2 A3-11
A.1
A2-00 1
4
3 A3-12
6
1
5
A4-80
1
A4-80
A4-46
4
5390
A4-46
2
A3-11
6850
A5-42
4
2
A4-84
A4-40
1
5
12900
A4-24
A4-84
A3-11
5 A4-55
A.2
A3-12
1
15150
DN
A.2
A4-30
5
1
ELEV 5
A4-52
5
MECH. ROOM
MEN'S TOILET
DN
ELEV 6
AH-2
A.3
1
2
10980
3000
A4-32
WOMEN'S TOILET 124
WOMEN'S TOILET 126
1
A3-01 1
MEN'S TOILET 135
COFFEE SHOP 130
LOBBY 1 101 1 TICKETING
15150 COAT ROOM 138
STOR. 131
WOMEN'S TOILET 128
3 A4-84
SECURITY 103
2
ELEV 5
A4-84
6
1 ELEV 6
A4-53
A4-40
1 A4-84
A4-52
A4-84
2
DN
A4-86
2 A3-01
1
1
A2-01
B
2
UP
WOMEN'S TOILET 136
TEL/DATA 132
2
1
A3-01
4
A
1
1
DN
A4-60
B
MEZZANINE
3
3000
CORRIDOR
A4-60
MEN'S TOILET 127
ELEV 4
WOMEN'S TOILET
A4-87
A6-27
1
A4-31
3
A4-31
FAMILY AREA
2
A4-80
A5-43
UP
A4-53
A4-33
PREP ROOM
MEN'S TOILET 125
MEN'S TOILET 123
4
VESTIBULE
ELEV 4
1
A4-80 4
OPEN TO BELOW
A4-85
A.3
A
11100
A4-88 1
5
A4-88
2
1
2 A4-86
2 A4-85 4
10980
3 TO OPEN BELOW A4-85
11100
A3-11
A4-44
10930
A2-00
A3-11
3
1 A3-00
12900
3
1300
1
2 A3-11
8.5 7.8
3 A3-12
1300
1
A2-01
A3-01
CONCRETE PAVERS
DN
1 2
A4-21
2 2 HALL 121
D
5
1
2
A4-81
A4-81
A4-21
A4-82
HALL 118
A4-82 A4-83
A4-83
2
1
1 HALL 114
D
3498
3000
A3-00
HALL 108
2 A3-00
4000
4000
A4-21
A5-42
EXIT IN CATWALK BELOW
3000 3000
3000
5920 850 1010
3000
3000
3000
3000
40001
2952
3000
A3-11
3000
3000
5
F.7
UP UP
F.9
A4-51
3000
2952
4000
3000
3000
3000
3000
3000
3000
2910
4000
3000
3000
3000
3000
G
A4-51
10980
2 A4-41
F ELEV 2 ELEV 1
STAIR 2
UP STAIR 3
UP
ELEV 3
STAIRUP1 WEDDING PREP 112
CORR.
2230
STAGING 110
ELEC. ROOM 116 3000
4
A4-42
STAGING 120
3000
2
5
A2-00
3 A3-01
2
A4-50
TEL. DATA 117
STAIR 4
3000
2 A4-51
3000
A4-43
F
CH-2
4
1010
3000
A4-20
CH-1 1 A4-50
A4-21
A4-21
2
HALL 109
3
2 2
ELEV. LOBBY
1 A3-11
1
RESTAURANT LOWER ROOF REFERENCE PLAN NTS
REF NORTH
3 A3-01
TRUE NORTH
2
Dhahran Palace Hotel Hall
A2-00 1 A3-00
1
GROUND FLOOR REFERENCE PLAN NTS
F.7 F.9 G
A5-42
A3-00
1
E TYP.
850 5920
3000
A5-50
A5-42
10980
3000
4 3000
4
3000
AH-5
AH-3
2 A3-00
4
3
E
10980
2
EXIT IN CATWALK BELOW
EXIT IN CATWALK BELOW
10980
3498
4000 3983
LANDSCAPED GREEN ROOF
2 A3-00
A2-01
4000
1991
ELEC. CLOSET
10980
LINE OF TENSILE STRUCTURE ABOVE
STAIR 6 DN
C
HALL 107
3
3490
3000
DN
A2-01
A4-86
STAIR 7
44479
1
10980
1990
A4-45
A4-86
3490
4000
1
A4-87 4
STAIR 8
C
4000
2
LANDSCAPED GREEN ROOF
REF NORTH
TRUE NORTH
SHEET CONTENT
Building Details
Sim Typ. 3
9
A5-52
054000.A10
148423.A1 148423.A2
Reinforced Concrete Topping Slab, Sloped to Drain Raised Concrete Slab- See Structural Dwgs. Vertical Rebar Structural Slab 150mm thk. CMU Wall 50mm Stone Panel with Anchor per Structural Engr. 50mm Stone Cap Stainless Steel Anchor Structural Steel Beam- See Structural Dwgs. Wide Flange Beam- See Structural Dwgs. Structural Steel Column- See Structural Dwgs. 200mm Metal Stud 100x100mm Steel Angle
044200.A2 1675
230
100
700
25
50
044200.A1
1850 1524
079200.A2
032000.A1
054000.A9
3
4
071354.A1
4
RESTAURANT
093016.A1
A5-53
A5-53
35010
051200.A2
093016.A1
A5-53
RESTAURANT
10
RESTAURANT
35010
10
1% SLOPE
35010
032000.A3
032000.A2
076000.A1
850
076000.A1
850
054000.A8
042200.A1
072100.A1
100mm Metal Stud 63mm Metal Stud 150x150mm Tube Steel @ 3.000 o.c.- See Structural Dwgs. Steel Plate Support- See Structural Dwgs. 200mm Dia. Tensile Structure Cable End Support Column- See Structural Dwgs. 055000.A3 Continuous Steel Angle Bolted to the Concrete Wall 071354.A1 Single-Ply Waterproofing Membrane 072100.A1 R-19 Batt Insulation 072100.A3 R30 Tappered Rigid Insulation 072519.A1 Weather Resistive Barrier 074243.A1 Composite Metal Panel 075563.A1 Drainage Mat 075563.A2 Filter Fabric 076000.A1 Galvanized Metal Flashing 078100.A1 Spray Applied Fire Proofing 079200.A1 Sealant 079200.A2 Backer Rod 079200.A3 Expansion Filler Material Sealant & Backer Rod on Expansion Filler Material 079200.A5 092116.30.A1 16mm Gypsum Board Type X 092116.30.A2 16mm Glass Mat Water Resistant Gypsum Board 092400.A1 Cement Plaster 093016.A1 Quarry Tile on Thinset 148423.A1 Window Washing Gondola 148423.A2 Steel Pin
054000.A8
032000.A2
054000.A9
LOWER ROOF
075563.A2
34150
075563.A1
LOWER ROOF 078100.A1
34150
033000.A2
054000.A2
071354.A1
054000.A2
1
DETAIL OF ROOF GONDOLA SYSTEM
2
NTS
DETAIL AT CABLE END COLUMN SUPPORT
3
NTS
074243.A1
072100.A1
072519.A1
092116.30.A2
074243.A1
9
072519.A1
079200.A3
092116.30.A2
092116.30.A1
079200.A5 076000.A1
160
093016.A1 079200.A2
072100.A1
072519.A1
LOWER MEZZ. UPPER MEZZ.
076000.A1
GROUND FLOOR 15150
RESTAURANT
50
079200.A1
TYPICAL BASE DETAIL AT CMU WALL NTS
051200.A3
092116.30.A2
092116.30.A1
35010
044200.A2
054000.A6 072100.A3
044200.A3
032000.A1
054000.A1
13
051200.A1 078100.A1
055000.A3
054000.A5
075563.A1
092116.30.A1 50
4
TYPICAL BASE DETAIL AT PARAPET WALL NTS
232
5
98
120
200
072519.A1
50
044200.A1 50
WEST WALL SECTION AT LOWER & UPPER MEZZ.
6
NTS
EXTERIOR PERSPECTIVE Outsourced
All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
150
076000.A1
042200.A1
600
16 30
350
044200.A1
Typ.
054000.A5 054000.A6 054000.A8 054000.A9 054000.A10
Dhahran Palace Hotel Hall
20
092400.A1
50 12
1850
032000.A1 032000.A2 032000.A3 033000.A2 042200.A1 044200.A1 044200.A2 044200.A3 051200.A1 051200.A2 051200.A3 054000.A1 054000.A2
9
50
TRANSITION DETAIL AT METAL PANEL & STONE NTS
PALACE EXPANSION Dammam, Kingdom of Saudi Arabia
PROGRAM New living room addition Kitchen expansion and remodel Buffet room addition New dining room relocation and remodel Restroom relocation and remodel Existing living room remodel New RCP Expansion to match existing exterior form and material
SOFTWARE Revit Architecture Illustrator InDesign
Tiffany N Barraza
Portfolio | 2014
Overall Ground Floor Plan
NTS
EXTERIOR PERSPECTIVE
Said Ali Ghodran Palace All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
SHEET CONTENT
SHEET CONTENT
Overall Building Sections | Perspective Section Rendering
NTS
NTS
Said Ali Ghodran Palace
NTS
Interior Perspective Renderings | Perspective Section Rendering
South Wing - Dining and Buffet Room
North Wing - Living Room Expansion
EXTERIOR PERSPECTIVE
All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
SHEET CONTENT
GENERAL ACUTE CARE HOSPITAL Dammam, Kingdom of Saudi Arabia
Mall
Nursing T Tower
Healing Gard
PROGRAM 55,000 sq. meters
5
Medical OfďŹ ce Building
153 patient beds Spa and wellness center
4
Commercial space Residential tower Roof deck healing garden Designed to allow for future expansion
SOFTWARE
3
1
2
Revit Architecture Illustrator InDesign
6
1
5
Diagnostic Parking Tiffany N Barraza
Portfolio | 2014
Overall Building Sections | Perspective Section Rendering
SHEET CONTENT
6
GENERAL NOTES:
A3-10
U
T
S
R
Q
M
N
J
H
G
F
E
D
C
B
A
K
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND MEASUREMENTS IN THE FIELD PRIOR TO STARTING CONSTRUCTION.
TOP OF MECHANICAL SCREEN 45000 3 A3-10
2. REFER TO GENERAL NOTES ON SHEET A0-00 FOR INFORMATION NOT INDICATED ON THIS SHEET.
6500
4 A3-10
26 ELEVATORS 13 & 14 MACHINE ROOM R-1
ELEVATORS 5 & 6 MACHINE ROOM R-003
5
MECHANICAL PENTHOUSE R-001
5
ELEVATOR E1, E2, E3 & E4 MACHINE ROOM R-002
K
3000
1 A3-10
7
J
H
G
E
F
D
C
B
SECTION KEYNOTES:
A
ROOF
11
35500 MALE WAITING ROOM 6-031
CORRIDOR 6-033
CORRIDOR 5-039
MALE WAITING ROOM 5-031
CORRIDOR 5-033
CORRIDOR 6-036
VIP GUEST SUITE 6-037
LEVEL 6
7 UNIT TYPE C 5-100
IT 5-117
CORRIDOR 5-116
UNIT TYPE C 5-114
CORRIDOR 5-036
2 A2-14
VIP GUEST SUITE 5-037
5
31200
1 A3-11
2
5
LEVEL 5 26900
6 IT 4-117
UNIT TYPE C 4-100
UNIT TYPE C 4-114
CORRIDOR 4-116
C194
C196
C200
CORRIDOR 4-039
MALE WAITING ROOM 4-031
CORRIDOR 4-033
CORRIDOR 4-036
4300
7 24
VIP GUEST SUITE 4-037
ELECT. 4-139
LEVEL 4
IT 4-140
STAFF LOUNGE 4-141
EXAM 4-142
EXAM 4-153
OFFICE 4-144
OFFICE 4-155
EXAM 4-160
OFFICE 4-161
LEVEL 5 26900
6
1
3000
CORRIDOR 6-039
4300
GUEST ROOM 6-109
WC 6-109A
3020 1280
CORRIDOR 6-100
LIVING 6-101
5
4300
7
IT 3-117
CORRIDOR 3-116
UNIT TYPE C 3-114
CORRIDOR 3-039
MALE WAITING ROOM 3-031
ELEVATOR LOBBY 3-033
CORRIDOR 3-036
VIP GUEST SUITE 3-037
ELECT. 3-139
LEVEL 3
IT 3-140
STAFF LOUNGE 3-141
EXAM 3-142
OFFICE 3-144
EXAM 3-153
OFFICE 3-155
EXAM 3-160
OFFICE 3-161
UNIT TYPE C 2-100
IT 2-117
CORRIDOR 2-116
MEETING ROOM 2-114
ELEVATOR LOBBY 2-195
5
MALE WC 2-194
FEMALE WC 2-193
7
C41
CORRIDOR 2-205
6100
ELEVATOR E1
ELEVATOR E5
ELEVATOR E13
7
ELECT. 2-139
LEVEL 2
IT 2-140
STAFF LOUNGE 2-141
EXAM 2-142
EXAM 2-153
OFFICE 2-144
OFFICE 2-155
OFFICE 2-161
EXAM 2-160
LEVEL 2 12200
12200
3
FROZEN SECTION 1-138
STAIR S9
FREIGHT ELEVATOR ROOM 1-365
WAITING FOR SURGERY 1-367
ADMIN. 1-368
CORRIDOR 1-370
WAITING FOR SURGERY 1-371
FEMALE WAITING 1-372
ELEVATOR LOBBY 1-374
MALE REST. 1-376
FEMALE WAITING 1-377
MALE WAITING 1-378
CORRIDOR 1-382
LEVEL 1
ELEC 1-328
6100
CORRIDOR G-277
FREIGHT ELEV FREIGHT ELEVATOR ROOM FE3 G-330
CORRIDOR G-325
COMPOUNDING G-097
STAFF LOUNGE G-355
PHARMACY G-096
GENERAL USE G-332
ELEVATOR VESTIBULE G-334
POLICE SECURITY G-034
OFFICE G-036
FRONT DESK G-041
I.T. B1-195
FEMALE LOCKER B1-018
FREIGHT ELEVATOR ROOM B1-206
CENTRAL PLANT / AIR HANDLERS ROOM B1-021
PARKING B2-010
DOMESTIC WATER TANK B2-005
ELEVATOR LOBBY B1-199
JANITOR B1-200
CORRIDOR B1-192
? ?
NURSE STATION 1-339
EXAM 1-343
OFFICE G-023
OFFICE G-022
OFFICE G-025
OFFICE G-029
CORRIDOR G-349
ELECT. G-044
IS G-045
OFFICE G-046
OUTPATIENT CLINIC ADMINISTRATION G-048
OFFICE G-049
OFFICE G-050
FUTURE RETAIL G-051
CORR. G-353
RETAIL G-300
2 A3-10
VIP PARKING B1-050
LEVEL B1 -5000 LEVEL B2 5
SECTION B NTS
0
20 m
EXTERIOR SLAB, SLOPE AWAY FROM BUILDING, 2% MINIMUM PARKING RAMP, SLOPE PER PLAN
STORAGE B1-037
VESTIBULE B1-210
PARKING B2-010
VIP PARKING B1-050
STORAGE B2-009
VEST. B2-014
11
CAST IN PLACE CONCRETE AWNING, SEE ROOF PLAN
12
CABLE SUPPORTED TENSILE FABRIC ROOFING
13
ANNODIZED ALUMINUM ARCHITECTURAL LOUVER
14
0
17 18
LEVEL B1
19
CAST IN PLACE CONCRETE RAMP, PROVIDE NON-SLIP FINISH
20
OVERHEAD TRACK FOR AUTOMATED SLIDING GATE
15 16
-5000 LEVEL B2 -8000
-8000
21
"RUST" COLORED LOCKABLE AUTOMATED SLIDING GATE
22
GALVANIZED STEEL BAR SAFETY GRATING
3
1
10 m
9 10
GROUND LEVEL
3 CLINICAL ENGINEERING B1-035
PARAPET, PER FLOOR PLAN
STRUCTURAL VISION SCREEN FRAMING, PER STRUCTUAL DWGS. PERFORATED ALUMINUM PANEL SHADING DEVICE ON PRIMED AND PAINTED STRUCTURAL STEEL FRAME TAPERED STRUCTURAL STEEL COLUMN BASE, PRIMED AND PAINTED CAST IN PLACE MONUMENT VENTILATION RISER, SEE MECHANCAL DRAWINGS FOR LOUVER REQUIRMENT CONCRETE FOUNDATION PER STRUCTURAL DRAWINGS
6100
4 CRYOGENIC STORAGE G-244
A3-10
2
LEVEL 1
0 5000
A3-14 STORAGE B1-019
STORAGE 1-336
7
GROUND LEVEL
4 CORRIDOR B1-188
CLINIC 1-331
A3-12
4
LOBBY G-343
5000
I.T. G-073
3000
HOUSING WASTE ROOM G-276
3000
9
CLINIC 1-330
7 6100
6100
7
IT 1-329
6100
CORRIDOR 1-130
5000
IT 1-128
3000
SOILED UTIL. 1-047
1800
SOILED ELEVATOR ROOM 1-122
7
5
6100
7
6100
A3-14
PRIMED AND PAINTED STEEL HANDRAIL
5
8
18300
6100
6
MECHANICAL DUCT, SEE MECHANICAL DRAWINGS
4
EXTRUDED ANODIZED ALUMINUM SUN SHADE DEVICE
LEVEL 3
18300
3
PRE-FINISHED EXTRUDED ALUMINUM CURTAIN WALL SYSTEM, PER ELEVATION CAST IN PLACE CONCRETE, FINISH PER ELEVATION
4300
UNIT TYPE C 3-100
4300
7 24
ROOF CURB, PER ROOF PLANS
7
22600 7
RATED MECHANICAL SHAFT, SEE MECHANICAL DRAWINGS
2
6
LEVEL 4
22600
6
1
SECTION A
NTS
0
10 m
23
TEMPERED GLASS GUARDRAIL ASSEMBLY, COLOR "1"
24
TEMPERED GLASS GUARDRAIL ASSEMBLY, COLOR "2"
25
TEMPERED GLASS GUARDRAIL ASSEMBLY, COLOR "3"
26
STRUCTURAL STEEL BRACING, PER STRUCTURAL DWGS.
20 m
Mall
PROGRAM DIAGRAM 1 2 3 4 5 6 7
Clinics, Mosque, Retail, Spa & Auditorium Administrative Areas Patient Care Unit Patient Care Unit- Future Expansion Diagnostic and Treatmentreatment- Future Expansion Diagnostic and Treatment Staff Housing
Nursing Tower Healing Garden Staff Housing
5
Medical OfямБce Building
4
7
3
1
2 6
1
5
Surgery
All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
Diagnostic Imaging Parking
Level 1 Overall Plan | Perspective Section Rendering
1
2
3
4
5
6
7
8
9
10
11
12
2
3
A3-00
A3-00
GENERAL NOTES:
14
15
16
17 18
19
1
20
21
22
23
A3-00
90510 1475 1875
5770
2210 1725
3215
1250
3935
9715
9030
5800
500
1
9030
9715
3935
1250
3215
1725 2210
5770
1875 1475
85200 17207
A1-29
2. REFER TO GENERAL NOTES ON SHEET A0-00 FOR INFORMATION NOT INDICATED ON THIS SHEET.
4310
500
50785
17208
1 EXAM 1-343
6300 CORRIDOR 1-341
FEMALE LOCKER 1-309
CORRIDOR 1-380
ELEVATOR E1
CORR. 1-024
ST 1-023
MALE GYM 1-018
JANITOR 1-020
ANTEROOM 1-253
OFFICE 1-022
CORR. 1-237
ICU
ELEVATOR E6
CORR. 1-375
DIET HOLD 1-228
CLEAN UTIL. SOILED UTIL. 1-232 1-231
PP 1-077 FEMALE LOCKER 1-007 CONSULT 1-100
ELEVATOR E5
PP 1-076
BATH 1-099 TRASH CORE 1-229
HAZ MAT 1-241
ELEVATOR LOBBY 1-374
LINEN 1-230
CLEAN LINEN 1-098
FEMALE GYM 1-006
FEMALE TOILET 1-373
2 STORAGE 1-233
J
KITCHEN TOILET 1-012 1-011
EQUIPMENT STORAGE 1-096
CORRIDOR 1-097
TRASH HOLD 1-227
1 HOUR FIRE PARTITION
CORR. 1-171
CORRIDOR 1-170
1 HOUR FIRE / SMOKE PARTITION 2 HOUR FIRE PARTITION
ANESTHESIOLOGIST 1-169
2 HOUR FIRE / SMOKE PARTITION
PT 1-161
NOUR-MED 1-168
WALL TYPE REFERENCE REFER TO SHEET A5-20.
SOILED UTI. 1-167
PARTITION NOTES:
CORRIDOR 1-156
2. TYPICAL PARTITION TYPE IS "P-1" PER SHEET A5-20 UNLESS OTHERWISE NOTED.
STORAGE 1-157
CORR. 1-162
SURGERY DIRECTOR 1-164
SOIL. UTI 1-152
OP RECEPTION 1-147
PT 1-149
CONSULT 1-146
CORR. 1-145
CONTROL 1-144
WAITING FOR SURGERY 1-367
MALE LOCKER 1-142
ALIGN
6
ALIGN WALL TO CENTERLINE OF CURTAIN WALL MULLION PER DETAIL 12/A5-41
7
SEE ENLARGED PLAN FOR DIMENSIONS AND INFORMATION NOT SHOWN ON THIS PLAN.
8
TEMPERED GLASS HANDRAIL, SEE DETAIL 10/A5-53.
9
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 1
10
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 3
11
SEE LEVEL ABOVE OR BELOW FOR SHAFT OPENING DIMENSIONS
12
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 2
13
MOTORIZED SWING TYPE PARKING GATE
14
TICKET DISPENSER FOR PARKING ACCESS
15
REFER TO DETAIL 26/A1-01 FOR TYP. TOILET PLAN
16
REFER TO SHEET A1-01 FOR TYPICAL FIXTURE LOCATIONS
17
PRE-MANUFACTURED, INSULATED, SECURITY BOOTH
18
1070mm HIGH x 200mm CMU WALL
19
PNEUMATIC TUBE STATION.
ENDO PRE-OP/POST-OP 1-111
STAIR S7
ON-CALL 1-079
1 FREIGHT ELEV FE3
SOILED UTILITY 1-106
EQUIP. STORAGE 1-060
CORRIDOR 1-137 SUB STERILE 1-134
NURSE MANAGER 1-059
LACTATION EDU. 1-061
ACC. PT 1-105
STAFF LOUNGE 1-062 FROZEN SECTION 1-138
O.R. 3 1-135 57.46 m²
A3-01
CORRIDOR 1-058
CLEAN SCOPES 1-108
STAIR S9 CORRIDOR 1-139
O.R. 1 1-132
ELEVATOR E14
ELEVATOR E13
SUB STERILE 1-133
CLEAN UTILITY 1-067
MEDICATION NURSE STATION 1-063 1-064 CORRIDOR 1-065
WELL BABY 1-054 CORRIDOR 1-057
HOLDING 1-066
FUTURE NOUR. 1-205
R
2 CORRIDOR 1-130
FUTURE STERILE CORE 1-188
CORRIDOR 1-056
ELEC 1-129
STAIR S4
IT 1-128
CLEAN UTIL. 1-051 CLEAN CORR. 1-046
SUB STERILE 1-126 O.R. 4 1-127
O.R. 2 1-124
ANESTHES. 1-036
1
1 3 A3-00
0
LEVEL 1 NTS
10 m
20 m
CORR. 1-040
STAIR S3
CORR. 1-039
A2-01
CLEAN UTILITY 1-035
VIP NICU 1-034
A3-01 CORR. FUTURE STO. 1-203 1-202
FUTURE MEDICATION 1-201
STORAGE 1-048
ANTEROOM 1-038
C-SECTION ROOM 1-037
CORRIDOR 1-123
A1-31
NURSE STATION 1-049
SICK BABY 1-052
ACC. M. TOILET SH. M. LOCK. 1-044 1-045 F. LOCK 1-041
SOILED ELEVATOR ROOM 1-122 FUTURE CORRIDOR 1-185
MED. NOUR. 1-050
ACC. F. TOILET- SH 1-042
SOILED UTIL. 1-047
SUB STERILE 1-125
1
CORRIDOR 1-053
STERILE CORE 1-131
FUTURE CORRIDOR 1-189
ISO NICU 1-033
P Q
FUTURE CORRIDOR 1-204
FUTURE STO. 1-206 GOWN 1-055
2 A3-01
North
Said Ali Ghodran Medical Center
VEST. 1-389
N CORR. 1-109
4890
5
ANTEROOM 1-070 PHYSICIANS' LOUNGE 1-081
CHILDREN'S PLAY 1-080
SCOPE STERILZERS 1-110
BLOOD STORAGE 1-136
ELEVATOR FE4
M
ISO LDR 1-071
CORR. 1-084
ACC. ST 1-113
PT 1-107
FUTURE CORRIDOR 1-191
OBSTETRICS
NURSE STATION 1-085
VEST. 1-032
OBSTETRICS EXPANSION
FUTURE CORRIDOR 1-199
OPEN TO BELOW
R7
S 6740
ATM EQUIPMENT INSTALLED PER MFG.
CORRIDOR 1-086
15900
CENTER WALL ON COLUMN GRID.
K
LDR 1-073
CORRIDOR 1-091
FUTURE LDR 1-198
FUTURE LDR 1-197
FUTURE LDR 1-196
SLOPE 2%
BOLLARD , SEE DETAIL 11/A5-53
SCOPE STOR. 1-114
FREIGHT ELEVATOR ROOM 1-365
CONSULT 1-140
MECHANICAL UNIT, PER MECHANICAL DRAWINGS. PROVIDE GALVANIZED STRUCTURAL STEEL FRAME SUPPORT.
TRIAGE 1-088
MED/NOURISHMENT 1-082
FLOOR PLAN KEYNOTES:
4
NURSE ST. 1-115
CONSULT 1-141
FEMALE LOCKER 1-143
ACC.PT 1-089
WAITING 1-083
ENDO II 1-112
A3-01
3
MED. NOU. 1-117
ENDO I 1-116
CORRIDOR 1-366
STAIR S8
1
TRASH 1-090
EQUIPMENT/SUPPLIES 1-072
ADMIN. 1-368
ACC. PT 1-150
EQUIP. STOR. 1-001
CORRIDOR 1-087
CONTROL 1-369
CORR. 1-148
CLEA. UTI 1-151
SOILED LINEN 1-002
CORRIDOR 1-370
SAT PHARM 1-172
NOUR. 1-153
FEMALE POST-OP 1-158
VEST. 1-163
CLEAN LINEN 1-003
A2-00
LDR 1-074
SOILED LINEN 1-092
WAITING FOR SURGERY 1-371
CONSULT 1-173
NURSE STATION 1-155
MED. 1-154
NURSE STATION 1-165
S. MGR. 1-166
1. ALL DIMENSIONS SHOWN ARE TO FINISHED FACE OF GYP. BOARD, TYPICAL U.O.N. REFER TO SHEET A5-10 FOR GENERAL NOTES AND REQUIREMENTS FOR PARTITIONS.
ACC. PT 1-160
MALE POST-OP 1-159
CORRIDOR 1-004
MALE PRE-OP 1-174
MALE PRE-OP 1-175
FEMALE PRE-OP 1-176
VIP ICU 1-234
DIET HOLD 1-093
10673
SCHEDULING 1-177
2
SOILED UTIL. 1-094
FEMALE WAITING 1-372
SMOKE PARTITION NON-RATED
PP 1-075
CLEAN UTIL. 1-095
CORRIDOR 1-005
9250
ICU WARD 1-236
IT 1-240
DICTATION 1-350
W.P. 5
PP 1-078
IS 1-013
OH 1-008
FEMALE WAITING 1-242
MED/NUT. 1-348
OT TEACHING 1-014
MALE REST. 1-376
STORAGE 1-243
NURSE STATION 1-238
CORRIDOR 1-009
MALE LOCKER 1-010 ACC. WC 1-245
CORRIDOR 1-255
CORRIDOR 1-251
FEMALE WAITING 1-377 ACC. WC 1-246
ELECT. 1-247
SOILED L. 1-015
9150
CONSULT 1-249
ACC. ST 1-244
A3-00
CORRIDOR 1-016
8530
PED. ICU WARD 1-252
17. THE GENERAL CONTRACTOR SHALL SEISMICALLY ANCHOR ALL EXISTING AND NEW BUILDING SYSTEMS ABOVE CEILING INCLUDING BUT NOT LIMITED TO DUCTWORK, ELECTRICAL CONDUITS AND TRAYS, SPRINKLER PIPES, PLUMBING PIPES, ETC. REFER TO A0-00 FOR MORE INFORMATION.
MALE WAITING 1-250
RECEPTION 1-349
8220
16. THE GENERAL CONTRACTOR SHALL VERIFY THE LEVELNESS OF THE SLAB ATALL NEW DOOR LOCATIONS PRIOR TO CONSTRUCTION. APPLY LEVELING MATERIAL AS NECESSARY DURING CONSTRUCTION TO ACHIEVE MAX. OF 9.5mm CLEARANCE FROM FINISH FLOOR TO UNDERSIDE OF NEW DOOR, REPLACE FINISHES TO MATCH EXISTING AS NEEDED.
REHAB
CORRIDOR 1-248
CORRIDOR 1-344
1
EQUIPMENT STORAGE 1-213
MALE WAITING 1-378
15. PROVIDE ACOUSTICAL INSULATION IN ALL NEW WALL ASSEMBLIES.
116618
14. REFER TO SHEETS A1-01 FOR ACCESSIBILITY REQUIREMENTS.
H
ACC. ST 1-025
10820
ELEVATOR E2 ELEVATOR E3
ISOLATION CCU 1-254
ACC. PT 1-180
13. FOR DOOR INFORMATION REFER TO DOOR SCHEDULE, SHEET A6-00.
2
9045
DIRECTOR OFF. 1-026
ELEVATOR E4
VIP LOBBY 1-068
WALL LEGEND:
ELEC 1-296
JANITOR 1-298
STAIR S2
12. REFER TO FINISH PLAN AND SCHEDULE AMD INTERIOR DESIGN DOCUMENTS FOR TYPES OF FINISHES.
A2-01
G
STEAM 1-299
117036
STAIR S1
IS 1-297
SAUNA 1-300 CORRIDOR 1-382
JANITOR 1-388
4950
SOILED LINEN 1-301
CORRIDOR 1-384
ELEC 1-328
F
CLEAN LINEN 1-302
CORRIDOR 1-381
FEMALE WC 1-386 IT 1-329
A3-02
OPEN TO BELOW
CORRIDOR 1-383
11. REFER TO EQUIPMENT PLAN, CEILING PLAN, INTERIOR ELEVATIONS AND ROOM FINISH SCHEDULE ALONG WITH MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION, AND FIRE ALARM SECTIONS FOR FURTHER DESCRIPTION OF SCOPE OF WORK.
1
CORRIDOR 1-304
MALE LOCKER 1-303
MALE WC 1-387
1
4200
1
FILE STORAGE 1-324
CLO. 1-326A
8. CONTRACTOR PARKING TO BE IN CONTRACTOR DESIGNATED PARKING AREA.
A1-30
E
WAITING 1-305
M WAITING 1-326
CLO. 1-327A
7. CONTRACTOR STAGING TO BE IN THE ROOMS UNDER REMODEL.
9. THE CONTRACTOR SHALL ENSURE THAT THE AREA UNDER REMODEL IS LOCKED AND OTHERWISE SECURED AFTER HOURS.
CORR. 1-308
15570
F WAITING 1-327
CLINIC 1-330
1
MASSAGE 1-306
CORR. 1-312
DAYCARE 1-313
9250
CORRIDOR 1-314
37942
LOBBY 1-333
CORRIDOR 1-332
A3-02
5500
YOGA 1-307 SAUNA 1-310
FRONT DESK 1-315
NURSE STATION 1-325
6. REFER TO GENERAL NOTES ON SHEET A0-00 FOR INFORMATION NOT INDICATED ON THIS SHEET.
D
STEAM 1-311
TOILET 1-334
STORAGE 1-336
CLINIC 1-331
SPIN 1-317
OFFICE 1-316
ELEVATOR E12
ELEVATOR E10 TOILET 1-335
5. THE GENERAL CONTRACTOR SHALL X-RAY AND/OR ULTRASOUND THE EXISTING CONCRETE FLOORS AND FLOOR ABOVE FOR ANY POSSIBLE EMBEDDED CONDUITS, STRUCTURAL REBAR OR UNFORESEEN CONDITION THAT IS OUTSIDE THE SCOPE OF WORK AND MIGHT IMPEDE THE ANCHORING OF EQUIPMENT OR CONFLICT WITH TRENCHING PRIOR TO CONSTRUCTION.
ELEVATOR E11
ELEVATOR E9
SU 1-338
NURSE STATION 1-339
C STAIR S6
STOR. 1-340
CU 1-337
4. THE GENERAL CONTRACTOR SHALL SEPARATE DISSIMILAR METALS WITH BUILDING PAPER OR PLASTIC SHIM.
CORRIDOR 1-318
STAIR S5
STORAGE 1-339A
52103
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING, ACCESS, DEBRIS REMOVAL, STAGING AREAS AND HOURS OF CONSTRUCTION WITH OWNER PRIOR TO START OF CONSTRUCTION. 3. THE GENERAL CONTRACTOR SHALL COORDINATE WITH STRUCTURAL, MEP, FIRE ALARM, FIRE PROTECTION, NURSE CALL, INTERIORS AND EQUIPMENT DRAWINGS PRIOR TO STARTING CONSTRUCTION. THE PROJECT MANUAL AND ALL DRAWINGS IN THE CONSTRUCTION DRAWINGS SHALL BE PART OF THE CONSTRUCTION DOCUMENTS.
X
B
CARDIO/WEIGHTS 1-319
EXAM 1-342
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND MEASUREMENTS IN THE FIELD PRIOR TO STARTING CONSTRUCTION.
10. VERIFY ALL DIMENSIONS WITH EQUIPMENT SCHEDULE PRIOR TO START OF CONSTRUCTION.
A
1775
A2-00
GENERAL FLOOR PLAN NOTES:
650
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND MEASUREMENTS IN THE FIELD PRIOR TO STARTING CONSTRUCTION.
13
OPEN TO BELOW
2196
SHEET CONTENT
T U
1. ALL CASEWORK SHALL BE "CUSTOM" GRADE AS DEFINED BY THE WOODWORK INSTITUTE OF CALIFORNIA. 2. FINISH ALL EXPOSED AND SEMI-EXPOSED SURFACES OF CASEWORK INCLUDING THE INTERIOR OF OPEN CASEWORK AND SHELVING WITH PLASTIC LAMINATE. ALL COUNTERTOPS SHALL BE PLASTIC LAMINATE UNLESS NOTED OTHERWISE. 3. PROVIDE PLASTIC LAMINATE SOFFIT TO ENCLOSE SPACE BETWEEN CEILING AND TOP OF CABINET. TYPICAL UNLESS NOTED OTHERWISE. 4. BASES ON CASEWORK SHALL BE 150mm UNLESS OTHERWISE NOTED. PROVIDE SAME FINISH BASE MATERIAL AS ADJACENT WALLS. EXTEND BASE TO WALL AT ALL CABINET RETURNS AND END PANELS.
Level 6 Penthouse Plan and Elevations | Typical Residential Unit Type C Plan Level 3-5 and Elevations | Perspective Section Rendering
SHEET CONTENT
5. IN CASES OF CABINET INSTALLATIONS BETWEEN WALLS, VERIFY DIMENSIONS IN FIELD AND PROVIDE FILLER PANEL STRIPS AT ENDS OR REDUCE END CABINETS WIDTH AS REQUIRED TO FIT SPACE AS INDICATED.
6. ALL CABINET DOORS AND DRAWERS SHALL HAVE PULLS. UPPER AND LOWER CABINET DOORS AND FULL HEIGHT CABINETS SHALL HAVE PULLS MOUNTED VERTICALLY. DRAWERS SHALL HAVE HORIZONTAL PULLS. 7. ALL FILE DRAWERS SHALL BE SIZED FOR A4 FORMS. PROVIDE FILE RODS EXTENDING FRONT TO BACK OF DRAWER UNIT. TYPICAL 8.
COORDINATE HEIGHT AND LOCATION OF BACKING PLATES FOR CASEWORK WITH STUD FRAMING CONTRACTOR. REF ALSO TO STRUCTURAL SHEETS FOR FURTHER DETAILS.
9. REFER TO DETAILS 2 & 3 ON SHEET A5-80 FOR WALL CABINET ANCHORAGE/BACKING TRACK CONNECTION.
9.8
9.9 918
10
10.7
566
6414
10.8
10.9
666
1143
11
12
807
5800
12.1
12.2
807
1143
13
12.3 666
6414
10. GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF ROUGH OPENINGS AND COORDINATE W/ OWNER FOR ALL EQUIPMENT CLEARANCES PRIOR TO PREPARING SHOP DRAWINGS AND FABRICATION.
13.2
13.1 566
918
10.7
10.8
2241
10.9
11
12
12.1
12.2
1470
12.3
GENERAL NOTES:
2-100A
FLOOR PLAN KEYNOTES:
4 A5-53
1202
P1
P1
P1
P3R
227
P1
873
P1
P1
2137
672
1203
P1
1389
420
1980
1218
P1
2-100E
1950
P6
LINEN 518
3165
1980
1877
6-111B
H 2
P1
749
1634
300
300
578
1600
3548
3886
FTPED = SINK FOOT CONTROL PEDALS
DEPTH (U.O.N. ON ELEVATIONS)
3552
LOWER CASE: 609mm DEEP U.O.N. UPPER CASE: 355mm DEEP U.O.N. TALL CASE: 355mm DEEP U.O.N.
T
2011
1278
660
1300
756
287258
1321
6-104A
6-100C
P5
P1
PANTRY 6-106
A C D DP DS E F IC J
BALCONY
P1
A4-78
E
P1
F
P1
A4-78
6-100D
S1
TAG MODEL NUMBER
900
P4
650
6-107A
P7
S
P1
2
1772
P7
P1
P7
1888
A5-81 P1
661
LIVING 6-101
P1
P1
P1
TV ROOM 6-103
P1
OFFICE 6-107
6-107B
116
6-104B
P5 P1
1332
6-104D
6-102A
DINING 6-102
P5
2192
1409
2192
2010
1262
6-103A
RECESSED SANITARY NAPKIN DISPENSER
B
B-38034
RECESSED PAPER TOWEL DISPENSER & WASTE REC. (600 C-FOLD)
B-165 2436
P1
P1 6-101A
P5
D
B-3574
E
B-3474
RECESSED SEAT COVER DISPENSER
F
B-6806X36 36" (915mm) GRAB BAR W/ CONCEALED MOUNTING
G
B-3888
RECESSED MULTI-ROLL TOILET TISSUE DISPENSER
H
B-4369
J
B-155
RECESSED PAPER TOWEL DISPENSER & WASTE REC. (300 C-FOLD) SURFACE MOUNTED SOAP DISPENSER (OFCI)
K
B-212
CLOTHES HOOK AND BUMPER
L
B-6806X42 42" (1067mm)GRAB BAR W/ CONCEALED MOUNTING. B-505
N
KB110
O
B4262
P
6-101B
9
PENTHOUSE PLAN NTS
?
E
254G30
222G30
222G42
ROOM 6-104 EAST NTS
302B48
D
?
2740
?
ROOM 6-104 NORTH 1 NTS
G
153F24
C
B
ROOM 6-105 WEST NTS
4
ATM EQUIPMENT INSTALLED PER MFG.
5
ALIGN
6
ALIGN WALL TO CENTERLINE OF CURTAIN WALL MULLION PER DETAIL 12/A5-41
7
SEE ENLARGED PLAN FOR DIMENSIONS AND INFORMATION NOT SHOWN ON THIS PLAN.
8
TEMPERED GLASS HANDRAIL, SEE DETAIL 10/A5-53.
9
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 1
10
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 3
11
SEE LEVEL ABOVE OR BELOW FOR SHAFT OPENING DIMENSIONS
12
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 2
13
MOTORIZED SWING TYPE PARKING GATE
14
TICKET DISPENSER FOR PARKING ACCESS
15
REFER TO DETAIL 26/A1-01 FOR TYP. TOILET PLAN
16
REFER TO SHEET A1-01 FOR TYPICAL FIXTURE LOCATIONS
17
PRE-MANUFACTURED, INSULATED, SECURITY BOOTH
18
1070mm HIGH x 200mm CMU WALL
19
PNEUMATIC TUBE STATION.
1
SYSTEM FURNITURE
2
25mm THICK STAINLESS STEEL PARTITION
3
SURFACE MOUNTED TEMPERED GLASS
4
PAINTED FINISH, SEE INTERIORS DRAWINGS
5
STAINLESS STEEL LOCKERS
6
WALL TILE, SEE INTERIORS DRAWINGS
7
COVE BASE
8
COMPLIANT FOLDING SHOWER SEAT
9
SOFFIT ABOVE CABINETS
10
ACCESSIBLE CABINET WITH TOE -KICK AS PART OF DOOR OPEN TO BEYOND
12
PREMANUFACTURED HEADWALL SYSTEM
13
FINISH TO MATCH HEADWALL SYSTEM
14
BACKLIT TRANSLUCENT PANEL
15
PNEUMATIC TUBE STATION
8.
A
COORDINATE HEIGHT AND LOCATION OF BACKING PLATES FOR CASEWORK WITH STUD FRAMING CONTRACTOR. REF ALSO TO STRUCTURAL SHEETS FOR FURTHER DETAILS.
9. REFER TO DETAILS 2 & 3 ON SHEET A5-80 FOR WALL CABINET ANCHORAGE/BACKING TRACK CONNECTION.
M153F42
ROOM 6-104 SOUTH NTS
CENTER WALL ON COLUMN GRID.
7. ALL FILE DRAWERS SHALL BE SIZED FOR A4 FORMS. PROVIDE FILE RODS EXTENDING FRONT TO BACK OF DRAWER UNIT. TYPICAL
302B42
302D48
BOLLARD , SEE DETAIL 11/A5-53
3
11
6. ALL CABINET DOORS AND DRAWERS SHALL HAVE PULLS. UPPER AND LOWER CABINET DOORS AND FULL HEIGHT CABINETS SHALL HAVE PULLS MOUNTED VERTICALLY. DRAWERS SHALL HAVE HORIZONTAL PULLS.
9
301D12
302D30
2800
?
MECHANICAL UNIT, PER MECHANICAL DRAWINGS. PROVIDE GALVANIZED STRUCTURAL STEEL FRAME SUPPORT.
2
ELEVATION KEYNOTES:
5. IN CASES OF CABINET INSTALLATIONS BETWEEN WALLS, VERIFY DIMENSIONS IN FIELD AND PROVIDE FILLER PANEL STRIPS AT ENDS OR REDUCE END CABINETS WIDTH AS REQUIRED TO FIT SPACE AS INDICATED.
2740
?
302D30301D15
302D42 301D12
2800
?
NURSE CALL NITROUS OXIDE OXYGEN NURSE CALL PULL STATION SWITCH TELEPHONE TASK LIGHT TELEVISION VACUUM VOLUME CONTROL VACUUM SLIDE
4. BASES ON CASEWORK SHALL BE 150mm UNLESS OTHERWISE NOTED. PROVIDE SAME FINISH BASE MATERIAL AS ADJACENT WALLS. EXTEND BASE TO WALL AT ALL CABINET RETURNS AND END PANELS.
CUSTOM L-SHAPED GRAB BAR WITH CONCEALED MOUNTING
9
301D24
2800
2
-
3. PROVIDE PLASTIC LAMINATE SOFFIT TO ENCLOSE SPACE BETWEEN CEILING AND TOP OF CABINET. TYPICAL UNLESS NOTED OTHERWISE.
9
9
9
N NO O PS S T TL TV V VC VS
2. FINISH ALL EXPOSED AND SEMI-EXPOSED SURFACES OF THE INTERIOR OF OPEN CASEWORK CASEWORK INCLUDING AND SHELVING WITH PLASTIC LAMINATE. ALL COUNTERTOPS SHALL BE PLASTIC LAMINATE UNLESS NOTED OTHERWISE.
S. S. RECESSED SPECIMEN PASS THROUGH CABINET SEE DETAIL 1/A5-40 FOR INSTALLATION HORIZONTAL RECESSED-MOUNTED S.S. FINISH BABY CHANGING STATION SURFACE MOUNTED PAPER TOWEL DISPENSER
---
MEDICAL COMPRESSED AIR CODE BLUE DATA DICTAPHONE DIMMER SWITCH DUPLEX ELECT. OUTLET FAX MACHINE INTERCOM JUNCTION BOX
1. ALL CASEWORK SHALL BE "CUSTOM" GRADE AS DEFINED BY THE WOODWORK INSTITUTE OF CALIFORNIA.
24"x36" (610 x 915mm) ANGLE FRAME MIRROR RECESSED SEAT COVER DISP, NAPKIN DISP, TISSUE DISPENSER
M
-
GENERAL CASEWORK NOTES:
B-353
P1 P5
DESCRIPTION
A
C
428
300
300
510 300
P4
A4-78
A5-81
410 480
ACCESSORY SCHED.- TOILET NOTE: MODEL NUMBERS REFERENCED REFER TO "BOBRICK WASHROOM EQUIPMENT CO." P4
WC 6-105
S1
P1
670
G A4-78
P1
UNIT TYPE C PLAN NTS
6-103B
1288
6-104C
6-100B
6-100E
B
4 C
P1
A
1734
KITCHEN 6-104
P1
1776
S1
D
P1
782
P1
3060
6-106A
950
6-105A
P1
572
P1
1326
P1
898
P1
P4
530
1
CORRIDOR 6-100
869
816
457 609 685 762 812 865 915 990 1066 1219 1371 1828 2032 2184 2438 AS REQ'D.
OUTLET DESCRIPTION
2-100J
P7
R
HEIGHT
A B C D E F G H J K L M N P Q R
TASK915 = 915mm TASK LIGHT MODULE
P2R
P1
P1
2203
BEDROOM 2
P6 P6
6-100A
1673
NUMBER
TASK1219 = 1219mm TASK LIGHT MODULE
2295
1598
P4
P4
HEIGHT
CASE WIDTH (INCHES) (-- = AS REQ'D.) CASE HEIGHT CASE TYPE (REFER TO W.I.C.) SPECIAL PREFIX D = DOUBLE M = MODIFY
2-100D
P6
2-100C
LIVING ROOM
P2R
100 1998
P6
BEDROOM 1
6-113A
A5-53
100
1100
6-108A
P4
NOTES
TASK609 = 609mm TASK LIGHT MODULE
WALK-IN 6-113
13110
1890
L
6-111A
P1
1
D100G24
CLOSET 2
2290
P1
1100
2295
2-100G
P1
P1
P6
UTIL.
P6
2-100H
A4-78
P4
ELEVATOR E13
6-109A
P1
J
A5-53
1598
P7
WC 6-111A
P6
CLOSET 1
K
370 P4
3 P1
6-110A
P1
3 P1
S1
REFER TO EQUIPMENT SCHEDULE.
CASE ID NUMBER
A5-53
1890
1677
S1
P6 2-100B
851
1345
6-111C
1177
370
6-110B
6-110D
P1
453
Q
M 6-109C
592
605
P1
1877
A4-78
509
1677
518
N
P1
6-108C
WALK-IN 6-114
P
P1 P1
P7
P1 P1
WC 6-109A
1200
P1
KITCHEN
A4-78
S1
608
P1
434
A5-53 6-110C
WC 6-110A
P1
P1R
762
WC 6-108A
2
930
1980
434
R
1i
2-100F
P1
930
2560
434
6-109B
434
6-108B
P1
P7
1928
923
LEGEND:
S
P7
862
P1
1760
P7
300
6-108D
420
BATHROOM 119
845
6-111E
1929
2162
S1
862
P1
U
A5-81
Q
P7
6-109D
3168
A4-78
1
2. REFER TO GENERAL NOTES ON SHEET A0-00 FOR INFORMATION NOT INDICATED ON THIS SHEET. 2
914
MASTER SUITE 6-111
S
P
P1
ENTRY
T
457
GUEST ROOM 6-109
1348
650
GUEST ROOM 6-108
845
6-110E
6-109E
P1
1332
MASTER SUITE 6-110
1332
1332
P7
602
P1R
P1
P1
602
1332
227
6-108E
603
350
603
227
602 350
602 227
1348
1. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND MEASUREMENTS IN THE FIELD PRIOR TO STARTING CONSTRUCTION.
10. GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF OPENINGS AND COORDINATE W/ OWNER FOR ALL ROUGH EQUIPMENT CLEARANCES PRIOR TO PREPARING SHOP DRAWINGS AND FABRICATION.
ROOM 6-105 SOUTH NTS
300
FLOOR PLAN KEYNOTES: 400
100
3
9
9
1
3
2800
2800
2500
2500
2400
2500
2500
2500
2500
2500
2400
2400
2400
3
M153E30 M153E30
ROOM 2-100 NORTH 2 T NTS
ROOM 2-100 WEST S NTS
ROOM 2-100 NORTH 1 R NTS
ROOM 6-109A EAST Q NTS
ROOM 6-109A NORTH P NTS
N
ROOM 6-109A WEST NTS
ROOM 6-109A SOUTH M NTS
L
ROOM 6-111A EAST NTS
K
ROOM 6-111A NORTH NTS
J
6-111A WEST NTS
H
ROOM 6-111A SOUTH NTS
ROOM 6-104 NORTH 2 G NTS
F
ROOM 6-104 WEST NTS
MECHANICAL UNIT, PER MECHANICAL DRAWINGS. PROVIDE GALVANIZED STRUCTURAL STEEL FRAME SUPPORT.
2
BOLLARD , SEE DETAIL 11/A5-53
3
CENTER WALL ON COLUMN GRID.
4
ATM EQUIPMENT INSTALLED PER MFG.
5
ALIGN
6
ALIGN WALL TO CENTERLINE OF CURTAIN WALL MULLION PER DETAIL 12/A5-41
7
SEE ENLARGED PLAN FOR DIMENSIONS AND INFORMATION NOT SHOWN ON THIS PLAN.
8
TEMPERED GLASS HANDRAIL, SEE DETAIL 10/A5-53.
9
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 1
10
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 3
11
SEE LEVEL ABOVE OR BELOW FOR SHAFT OPENING DIMENSIONS
12
WALL IS CENTERED ALONG A RADIAL LINE FROM WORK POINT 2
13
MOTORIZED SWING TYPE PARKING GATE
14
TICKET DISPENSER FOR PARKING ACCESS
15
REFER TO DETAIL 26/A1-01 FOR TYP. TOILET PLAN
16
REFER TO SHEET A1-01 FOR TYPICAL FIXTURE LOCATIONS
17
PRE-MANUFACTURED, INSULATED, SECURITY BOOTH
18
1070mm HIGH x 200mm CMU WALL
19
PNEUMATIC TUBE STATION.
ELEVATION KEYNOTES: 1 2
Mall
4
PROGRAM DIAGRAM 1 2 3 4 5 6 7
Clinics, Mosque, Retail, Spa & Auditorium Administrative Areas Patient Care Unit Patient Care Unit- Future Expansion Diagnostic and Treatmentreatment- Future Expansion Diagnostic and Treatment Staff Housing
3
Medical OfямБce Building
SYSTEM FURNITURE 25mm THICK STAINLESS STEEL PARTITION SURFACE MOUNTED TEMPERED GLASS
Nursing Tower PAINTED FINISH, SEE INTERIORS DRAWINGS
5
STAINLESS STEEL LOCKERS
6
WALL TILE, SEE INTERIORS DRAWINGS
7
COVE BASE
8
COMPLIANT FOLDING SHOWER SEAT
9
SOFFIT ABOVE CABINETS
10
ACCESSIBLE CABINET WITH TOE -KICK AS PART OF DOOR OPEN TO BEYOND
11
Healing Garden
4
12
PREMANUFACTURED HEADWALL SYSTEM
13
FINISH TO MATCH HEADWALL SYSTEM
14
BACKLIT TRANSLUCENT PANEL
15
PNEUMATIC TUBE STATION
1
Staff Housing
5
7
3
2 6
1
5
Surgery
All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
Diagnostic Imaging Parking
BI-PLANE ANGIOGRAPHY ROOM La Jolla, California
PROGRAM Convert existing film files storage area into new Bi-Plane Angiography suite New Bi-Plane OR New control room New equipment room New corridor Office expansions Trenching for new conduit Phasing plans Design in accordance with Infection Control standards
SOFTWARE AutoCAD Architecture Illustrator InDesign
Tiffany N Barraza
Portfolio | 2014
Operating Room Partial Plan | Operating Room Elevations
NTS
NTS
NTS
NTS
NTS
Scripps Green Hospital All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
SHEET CONTENT
HYBRID CARDIOVASCULAR OPERATING ROOM La Jolla, California
PROGRAM Convert existing OR into a state of the art imaging and open heart surgery room New control room New equipment closet Corridor remodel Trenching for new conduit Phasing plans Design in accordance with Infection Control standards
SOFTWARE AutoCAD Architecture Revit Architecture Photoshop Illustrator InDesign
Tiffany N Barraza
Portfolio | 2014
Operating Room Partial Plan | Operating Room Elevations | Perspective Rendering
NTS
SHEET CONTENT
NTS
NTS
NTS
NTS
INTERIOR PERSPECTIVE
Scripps Green Hospital All rights reserved. No part of this work may be reproduced or copied in any form or by any means, graphic, electronic, or mechanical, including photocopying, recording, taping, or information and retrieval systems without written permission.
Tiffany N. Barraza Por t f olio
t if f any nbarr az a@gmail.com
619 565 9203