Evolve modular housing

Page 1

Building 11 Campbeltown Road Birkenhead Merseyside CH41 9BP Telephone 01302 346 620 Web www.evolvebuiltforlife.com

Lower cost Faster delivery Higher quality Greater sustainability


“ This year, we have begun working with Keepmoat on a really exciting new development that has the potential to reduce carbon emissions by a staggering 44 per cent. We have commissioned 68 Evolve units that will be built at a factory, before being assembled on site at our flagship development at Easington Road. Our goal is to be one of the best housing providers in the country, and that includes tackling carbon emissions�. Cath Purdy Chief Executive Housing Hartlepool


text pages II

21/9/10

10:20

Page 1

Welcome to Evolve ‘built for life’ Evolve is creating high quality homes 25% cheaper than traditional procurement methods - homes that can be complete in 12 weeks, meeting Code 4 standards and are ‘built for life’. Evolve ‘Built for life’ is a whole new way of thinking. It means we construct our houses off site, to the highest engineered quality. It means we minimise waste and build to Code 4 standard with 43% less carbon than traditional building. Lower cost The Evolve approach demonstrates that high quality Code 4 standard homes can be delivered 25% cheaper than traditional houses Procuring the Evolve way can significantly reduce site prelim’ costs

Higher quality Each house is built in our factory and fully complete internally! With Evolve house being built in a factory, our precision process achieves minimum waste

Greater sustainability Faster delivery The Evolve scheme construction schedule is 12 weeks in comparison with a typical 22 week programme We can deliver Evolve houses to site ready for roofing six weeks after planning approval

Evolve houses meet minimum Level 4 of the Code for Sustainable homes and embody 43% less carbon than buildings built using traditional methods Our houses achieve high sustainability performance measures because of the timber frame (zero embodied carbon) method of construction.


text pages II

21/9/10

10:20

Page 2

Lower cost

The Evolve approach demonstrates that high quality Code 4 standard homes can be delivered

2 3

25

%

cheaper

than traditional houses. Procuring the Evolve way can significantly reduce site prelim’ costs.


text pages II

21/9/10

10:20

Page 3

Time is money! Traditional build

x

=

For a 40 unit scheme - assumes 2 properties per week = 42 week build programme

Evolve build

x

=

For a 40 unit scheme - assumes 4 properties per week = 21 week build programme

Evolve means quicker to site, faster on site = 25% cost saving Evolve is supporting the ‘more for less’ strategy By delivering more dwellings of higher quality for less cost,iswemoney! are building on Keepmoat’s build Time Traditional reputation as leaders in community regeneration.

infinite detail, which means material use is optimised, waste is minimised – with little impact from the great British weather!

The off site manufacture also contributes to cost savings when compared to traditional We understand the challenges facing our client building methods, as construction time on site partners – especially when For it comes to delivering construction reduced. significantly a 40 unit scheme - assumes 2isproperties per week = 42 Off weeksite build programme also low cost, high value for money housing solutions offers a hedge against future ‘super’ whilst making best use of resources. building inflation.

x

=

Evolve build

The cost benefits are realised because building off site controls costs. This enables us to tightly monitor resources such as labour, materials and time. The process of manufacture is engineered to

x

=

For a 40 unit scheme - assumes 4 properties per week = 21 week build programme

Evolve means quicker to site, faster on site = 25% cost saving


text pages II

21/9/10

Faster delivery

10:20

Page 4

4 5

The Evolve scheme construction schedule is

12

This level of output is not being achieved anywhere else in large-scale housing development. Time savings are due not only to the off site manufacture and the reduced period on site, but through early engagement to create ‘end to end’ time scale reductions.

weeks in comparison with a typical 22-week programme. We can deliver Evolve houses to site ready for roofing six weeks after planning approval.


text pages II

21/9/10

10:20

Page 5

Production benefits Build phase:

Weeks

Foundations/Slab/Stats

Superstructure

Roof

Fit out

22 weeks

Traditional build

Timber Frame build

16 weeks

6 week saving

Evolve build

11 weeks 11 week saving

Place units

The Evolve method demonstrates all round time savings to deliver real cost saving benefits.


text pages II

21/9/10

Higher quality

10:20

Page 6

6 7

窶話


text pages II

21/9/10

10:20

Page 7

Evolve houses are

‘built for life’ in our factory with heating and wiring pre-installed, decorated and with kitchens and bathrooms in place. Fully complete internally and built with minimal waste, quality and sustainability go hand in hand. With a selection of quality house styles to fit any planning guidelines, an Evolve house arrives on site, ready for the roof and the external finish to be applied to match your choice. This is the Evolve ‘turn key’ solution. We achieve consistency of quality through our commitment to ‘vertically integrated’ supply chain partnerships. This brings client benefits of reliable product supply, as well as service and procurement efficiencies. By delivering our houses to site as a preconstructed unit, they are an ideal application for

any situation – from small infill plots, garage sites through to large regeneration schemes. What’s more, we build in house style choices from traditional to contemporary. Our houses are exceptionally energy efficient and use mainly natural materials from sustainable sources to create a product that exceeds current HCA standards and meets HQI, Lifetime Homes, Secure by Design and Scheme Development Standards.


text pages II

21/9/10

10:20

Page 8

Greater sustainability

8 9

Evolve houses meet

Level 4

of the Code for Sustainable homes and embodies

43%


text pages II

21/9/10

10:20

Page 9

3% less carbon than buildings built using traditional methods. Our houses achieve high sustainability performance measures because of the timber frame (zero embodied carbon) method of construction. Evolve inspired by nature The Evolve house embodies a holistic approach to design excellence that blends sustainability with the wellbeing of occupants. Our houses use a minimum of energy to heat or cool them, produce low carbon emissions and are inexpensive to run.

To enhance these benefits further, Evolve houses offer the possibility for occupants to sell electricity back to the grid with a total reduced carbon emissions of 44% compared to current building regulations.

Specific energy saving features can include: solar photovoltaic cells to supply electricity, high levels of air tightness (1) and thermal performance; low U-Values; whole house mechanical ventilation heat recovery systems and energy monitors. We can also achieve Level 4 through fabric alone!

The Evolve approach is leading the way in rethinking how affordable housing is designed and constructed. With increasing concerns about climate change, resource depletion and energy security, our responsibility is to deliver a housing solution that enhances the quality of life for generations to come.


text pages II

21/9/10

10:20

Page 10

Evolve ‘built for life’

10 11

Our experience of forming Public Private Partnerships (PPPs) in the regeneration arena means we can work with you to deliver an The Evolve ‘built for life’ approach is an ideal solution for delivering affordable housing. As part of a partnering model, it offers options for cross subsidy as well as enabling the structure to capitalise the cost of the investment in the housing stock. Procuring the Evolve solution can be achieved through a flexible mix of reduced grant funding and innovative use of resources. It has potential as a nil grant solution.

We have been at the forefront of the PPP agenda for many years, comprehensively refining innovative solutions in response to partner and customer requirements. Evolve is one such solution, providing a key delivery mechanism to achieve successful community regeneration.

uneq


text pages II

21/9/10

10:20

Page 11

equalled solution Evolve houses can be delivered as part of a bespoke solution, where our approach provides: Earlier occupation of new facilities Best value in the procurement process, minimising risk for the public sector with value-for-money principles Efficiency by utilising best practice supply chain management Planning and design skills Construction excellence Environmental and corporate responsibility.

to housing market renewal, using a product that represents a real innovation.


text pages II

21/9/10

10:21

Page 12

It’s all about vision

12

The Evolve ‘built for life’ delivers on all levels. So, don’t just take our word for it – come and see for yourself, by visiting our factory to see production in action, or alternatively, contact us to arrange a site visit.

01302 346 620 Evolve ‘built for life’ Building 11 Campbeltown Road Birkenhead Merseyside CH41 9BP 01302 346 620 www.evolvebuiltforlife.com

Telephone Web


“ This year, we have begun working with Keepmoat on a really exciting new development that has the potential to reduce carbon emissions by a staggering 44 per cent. We have commissioned 68 Evolve units that will be built at a factory, before being assembled on site at our flagship development at Easington Road. Our goal is to be one of the best housing providers in the country, and that includes tackling carbon emissions�. Cath Purdy Chief Executive Housing Hartlepool


Building 11 Campbeltown Road Birkenhead Merseyside CH41 9BP Telephone 01302 346 620 Web www.evolvebuiltforlife.com

Lower cost Faster delivery Higher quality Greater sustainability


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.