Reducing Handling Risks
Which is safest: masonry, open panel timber frame built with a forklift or more advanced panelised modern methods of construction (MMC) using a crane? That question is explored in a new study prepared by AIMCH.
A
ccording to the new Health and Safety Risk Profiling of MMC Solutions report from Advanced Industrialised Methods for the Construction of Homes Innovation Project (AIMCH), panelised timber methods can improve new homes and reduce health and safety hazard exposure on construction sites by 20%..
The study concludes all methods are safe, but have differing health and safety risk profiles, with crane erect panelised methods, providing 20% less exposure to health and safety risks on site.
The £6.5 million collaborative R&D AIMCH project seeks to industrialise how homes are constructed by mainstreaming the use of panelised MMC methods. Previously AIMCH research has demonstrated how utilising panelised MMC systems would result in new homes being built faster, cost effectively, to a high quality and with a lower carbon footprint. This latest study strengthens the case for panelised MMC by concluding that housing sites using panelised MMC systems could reduce on-site health and safety risk exposure by 20%.
Increasingly, panelised MMC systems are being used to build new homes that have progressively more pre-manufactured elements such as prefabricated floor cassettes, pre-fitted windows, and pre-insulated closed walls. These systems require a crane to offload and position the components on site.
The study, Health and Safety Risk Profiling of MMC Solutions, prepared by Stewart Milne Group, with support from Limberger Associates, assessed the difference in risk exposure between two timber frame systems: one built on-site using manual assembly techniques with the aid of a forklift (GEN1), also typical of masonry-built home – the other a more advanced MMC system (GEN3), using higher levels of prefabrication, requiring the use of a crane on site.
Stewart Dalgarno, AIMCH Project Director and Director of Innovation & Sustainability at Stewart Milne Group said: “This is the first study we have undertaken to compare the health and safety risk exposure of both construction methods and it is gratifying to see that the crane-erect panelised MMC methods championed by AIMCH reduce safety risks and hazard exposure by 20% on-site, where the injury rate per 100,000 workers is 42% higher than in manufacturing, and where 50% of deaths are attributed to falls from height, compared with 16% in manufacturing.”
The study undertook two deep dive evaluations of working practices and techniques in two areas, floors, and windows, where increasing the pre-manufactured value (PMV) is likely to become commonplace. The study developed a methodology for assessing risk, aligned with Health & Safety Executive (HSE) hazard classifications, and consequential risk profiles were developed for each. These covered hazards such as falls from height; slips and trips; moving and handling loads; and lifting operations and were used to compare the effect of on-site working practise differences between GEN1 site assembly and GEN 3 prefabricated construction methods. The first of these, which compared forklift and loose joists (GEN1) against prefabricated floor cassettes and crane (GEN 3), identified a fundamental health and safety improvement between the two methods: loose joists rely on more manual labour and material movement on-site and the installation of a safety decking system, whereas the use of floor cassettes dispenses with the need for safety decking and significantly speeds up the installation process, removing many of the health and safety exposure risks such as trips and falls, manual handling, material movement associated with loose joist and flooring installation. When looking at the second category, forklift and site-fitted windows against crane and factory-fitted windows, the latter was found to reduce health and safety hazard exposure, especially applicable with manual handling of heavy components and moving materials, which is a known contributory factor to musculoskeletal disorders.
In both areas the utilisation of GEN 3 systems transfers some of the health and safety risks from the construction site to the MMC factory, where workplace safety systems are generally better managed. However, a heavier reliance on the use of cranes introduces an increased risk of a high impact safety event occurring, such as floor cassettes breaking their slings and slipping off the end of the bearing when being placed. This is a risk, albeit low, requires strict safety protocols to be in place.
To ensure that the transfer of risk from the construction site to the factory does not lead to an abdication of risk management, the report emphasis the important of MMC suppliers investing in safer and more productive factory techniques that eliminate manual working hazards through mechanical handling, automation, and robotic applications, as well as through standardisation of processes and components.
Full details of the Health and Safety Risk Profiling of MMC Solutions report, including the risk profiling methodology employed can be found at www.aimch.co.uk/outputs
Safety Storage Efficiency
Enhance Safety, Storage and Efficiency in your timber & wood panel warehouse with Combilift
Combilift is the perfect fit for the wood panel industry. Our forklifts of all sizes are designed for long product loads and narrow aisle operation, allowing you to maximise your storage, efficiency and safety.
Contact Us Today
To find out how Combilift can help you unlock every inch of your storage space