East Valley Business - 03.14.21

Page 1

east valley

Volume 3 Issue 35 Mesa, AZ

March 14, 2021

Club Red hopes to reopen in a similar space BY ALEX GALLAGHER Tribune Staff Writer

A

IN THE BIZ

fter 15 years of hosting concerts and events, Club Red closed the curtains and its location on University Drive. Club Red co-owner Paul Benson, however, is on the hunt for a new space to call Club Red and he has other business ventures in mind. Benson has been with the company for 13 years and went from an audio intern to co-owner in 2017, two years after the death of original proprietor Kim Commons. Prior to the pandemic, Club Red averaged about 26 to 28 shows per month. That number dropped to eight shows from March to December of 2020, Benson said. “Once stuff started shutting down, we wanted to do everything we could do the right way,” Benson added. “We installed medical-grade �ilters in our air conditioners. We installed ionizers. We put hand sanitizers everywhere. We really did everything we possibly could do to meet the standards to remain open, but we never got the permission to do it.” Benson is frustrated by this. “Unfortunately, with a business like ours, as soon as the government gives us the OK to reopen, it takes four to six weeks to put anything together,” Benson said. “Often, by the time we would hit that four- to six-week period where we had a show planned, we had to cancel it because we were shut back down again.” Club Red staff hoped they would function best by having smaller shows in their larger room. “We completely shut down the small Public Notices ............... page 2 © Copyright, 2021 East Valley Tribune

room because it wasn’t a viable option,” Benson said “We were going to put all of our events in the larger room, even if they were smaller events, so that people would be able to responsibly social distance themselves.” Then Benson had an epiphany. “We realistically have no idea when live music is going to be able to come back to the real market,” Benson said. “Instead of paying another year’s worth of bills, we knew we could build something better in the future and we’d rather do that then sit with an empty building for another year.” The last major show Club Red hosted, Benson said, was by the English speed metal band DragonForce on March 5, 2020. The last show was the local metal group Scylla on March 23, 2020. Local musicians took Club Red’s closure hard. Kenny Barton of As Thick as Thieves and Note to Self said he is mourning the loss of Club Red. “Honestly, it was like hearing of a good friend passing away,” Barton said. “It just felt sad and then I immediately started reminiscing about all the shows I’ve played there and all the other amazing musicians I’ve shared the stage with there.” Barton played his �irst show at Club Red in 2015 when As Thick as Thieves released its �irst EP. He was a regular at the venue since then. Joey Lawler, also known as rapper Yung Joey, hit the stage there in 2015. “Playing at Club Red was surreal,” Lawler said. “Just knowing that I was on the same stage as so many artists that I’ve seen perform there and looked up to was something I’ll never forget.” He said his fondest memory was �ighting his way through a crowd at a Vince Staples (USPS 004-616) is published weekly

Mailing Address: 1620 W. Fountainhead Pkwy., Suite 219, Tempe, AZ 85282

(480) 898-6500 Steven Strickbine, publisher Paul Maryniak, executive editor

show so he could see the suede on the rapper’s shoes. Jacob Coleman is the drummer in the metal band Outsiders, who played their �irst show at the venue in December 2017. He was thrilled to open for The Word Alive and Miss May I at Club Red. “It was a huge deal to me because those were both of the �irst bands that I had listened to that got me into metalcore,” said Coleman, who has a Miss May I tattoo. “Getting to open up for some of my biggest in�luences from when I was younger was awesome. “When I think of Club Red, I think of what it means to be a part of the community in Arizona. When you are at a show, you’re with family. That feeling is something I miss so much.” It wasn’t easy for Benson to break the news to his 40-person staff, either. To celebrate the club’s legacy, he hosted a barbecue at the venue for employees. Benson said he hopes it is not a permanent farewell to the Club Red brand. He is hopeful he will �ind a similar space with two stages and two rooms with a 350- and 750-person capacities. Benson also has another business venture he’s excited about — the food truck Red Owl Burgers and Brews. “Our current venture is to take the food truck that we’ve had the past couple of years and start moving it around town,” Benson said. Benson also hopes to open a brick and mortar where he could host release parties or comedy shows. “We’re going to get the food truck out in about a month and we’re looking forward to getting around town and feeding hungry people,” Benson said. Subscriptions are $26 for 2 years, $14 for one year. Periodicals postage paid at Phoenix, AZ 85026.

POSTMASTER: Send address changes to: East Valley Tribune, 1620 W. Fountainhead Pkwy., Suite 291, Tempe, AZ 85282


Public Notice TO: Stephens Triplett, DO 1034 S. 105th Place, Apt. 1091 Mesa, AZ 85209 The State Medical Board of Ohio 30 E. Broad Street, 3rd Floor Columbus, OH 43215-6127 In the Matter of: Stephens Triplett, DO 20-CRF-092 On January 14, 2021 the State Medical Board of Ohio mailed an Order of Revocation to Stephens Triplett, DO. The order was sent to Dr. Triplett via certified mail, return receipt requested, at his last known address of record, 1034 S. 105th Place, Apt. 1091, Mesa, AZ 85209. The Order was returned to the Board from the postal service marked “Re-turn to Sender, Not Deliverable as Address, Unable to For-ward”. Dr. Triplett may be entitled to an appeal. Such an appeal must be commenced by the filing of a Notice of Appeal with the State Medical Board and the Franklin County Court of Common Pleas. The Notice of Appeal must set forth the Order appealed from and state that the State Medical Board’s Order is not supported by reliable, probative, and substantive evidence and is not in accordance with law. The Notice of Appeal may, but is not required to, set forth the specific grounds of the appeal. Any such appeal must be filed within fifteen (15) days after the last date of publication in accordance with the requirements of Section 119.12, Ohio Revised Code. Please contact the undersigned to ascertain the last date of publication. Any questions or correspondence should be addressed to: Jackie Moore Case Control Office 30 E. Broad Street, 3rd Floor Columbus, OH 43215-6127 Jackie.moore@med.ohio.gov Published: East Valley Tribune, Mar. 7, 14, 21, 2021 / 36894

Public Notice CITY OF MESA MESA, ARIZONA PUBLIC SAFETY TRAINING FACILITY DRIVING TRACK 3240 N. 40 th Street PROJECT NO. CP0544 ADVERTISEMENT FOR BIDS NOTICE IS HEREBY GIVEN that sealed bids will be received until Thursday, April 15, 2021, at 1:30 p.m. All sealed bids will be received electronically at EngineeringBids@ mesaaz.gov. Bids must be submitted as an unencrypted PDF attachment with a maximum size limit of 20MB. Any bid received after the time specified will be returned without any consideration. This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Pavement reconstruction and expansion of existing Public Safety Training Facility driving track and associated drain-age improvements. Approximately 72,000 SY of pavement

The Engineer’s Estimate range is $4,800,000 to $5,300,000. For all technical, contract, bidrelated, or other questions, please contact Donna Horn at donna. horn@mesaaz.gov. Contact with City Employees. All firms interested in this project (including the firm’s employees, representatives, agents, lobbyists, attorneys, and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, to as-sure that contract decisions are made in public, and to protect the integrity of the selection process. All contact on this selection process should be addressed to the authorized representative identified above. Contractors desiring to submit proposals may purchase sets of the Bid Documents from ARC Document Solutions, LLC, at https://order.e-arc.com/arcEOC/ PWELL_Main.asp?mem=29. Click on “Go” for the Public Planroom to access plans. NOTE: In order to be placed on the Plan Holders List and to receive notifications and updates regarding this bid (such as addenda) during the bidding period, an order must be placed. The cost of each Bid Set will be no more than $23, which is non-refundable. Partial bid packages are not sold. You can view documents on-line (at no cost), order Bid Sets, and access the Plan Holders List on the website at the address listed above. Please verify print lead time prior to arriving One set of the Contract Documents is also available for viewing at the City of Mesa’s Engineering Department at 20 East Main Street, Mesa, AZ. Please call 480-644-2251 prior to arriving to ensure that the documents are available for viewing. In order for the City to consider alternate products in the bidding process, please follow Arizona Revised Statutes §34.104c. If a pre-bid review of the site has been scheduled, details can be referenced in Project Specific Provision Section #3, titled “Pre-Bid Review of Site.” Work shall be completed within 90 consecutive calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten per-cent (10%) of the total bid, payable to the City of Mesa, Arizona, or a certified or cashier’s check. PERSONAL OR INDIVIDUAL SURETY BONDS ARE NOT ACCEPTABLE. The successful bidder will be required to execute the standard form of contract for construction within ten (10) days after formal award of contract. In addition, the successful bidder must be registered in the City of Mesa Vendor Self-Service (VSS) System ( h tt p : / / m e s a a z . g ov / bu s i n e s s / purchasing/vendor-self-service). The successful bidder,

EAST VALLEY BUSINESS

simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, and the most recent ACORD® Certificate of Liability Insurance form with additional insured endorsements. PUBLISH ON TWO CONSECUTIVE SUNDAYS: MARCH 7 AND MARCH 14, 2021 The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the City of Mesa. BETH HUNING City Engineer ATTEST: DeeAnn Mickelsen City Clerk Published: East Valley Tribune Mar 7, 14, 2021 / 36842

Public Notice CITY OF MESA MESA, AZ DESTINATION AT GATEWAY (BERGE) OFFSITE SEWER ALONG WILLIAMS FIELD ROAD MESA, ARIZONA PROJECT NO. M99-2021-003 ADVERTISEMENT FOR BIDS NOTICE IS HEREBY GIVEN that sealed bids will be received until March 25, 2021 at 1:00p.m. All sealed bids will be received electronically. Bids shall be submitted to the following email: EngineeringBids@mesaaz.gov. Bids must be submitted as an unencrypted PDF attachment with a maximum file size of 20MB. Please ensure that your email is smaller than this before sending. Submitted bids that are unable to be opened by City staff will not be considered for award. Bidders may request a single opportunity to verify that a test email and attachment are received and can be opened by City staff. Test emails must be sent to EngineeringBids@mesaaz.gov. Any bid received after the time specified will be returned without any consideration. A non-mandatory Pre-Bid Conference will be held via Telephone on Wednesday, March 17, 2021 at 1:00p.m. The Conference Bridge call in is 1-480644-6120 PIN 366642 in order to join the call. There will not be a pre-bid review of the site. This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: DESTINATION AT GATEWAY (BERGE) OFFSITE SEWER WILLIAMS FIELD ROAD located near the intersection of Signal Butte Road and Williams Field Road as outlined in the Offsite Sewer Plans for E. Williams Field Road. Improvements will include approximately 1,327 Linear Feet of 12-Inch Sanitary Sewer,

2

3,786 Linear Feet of 15-Inch Sanitary Sewer. and associated appurtenances. The Engineer’s Estimate range is $500,000 – $750,000. For all technical, contract, bidrelated, or other questions, please contact Stephanie Gishey at stephanie.Gishey@mesaaz.gov. Contact with City Employees. All firms interested in this project (including the firm’s employees, representatives, agents, lobbyists, attorneys, and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, to assure that contract decisions are made in public, and to protect the integrity of the selection process. All contact on this selection process should be addressed to the authorized representative identified above. Contractors desiring to submit proposals may purchase sets of the Bid Documents from ARC Document Solutions, LLC, at https://order.e-arc.com/arcEOC/ PWELL_Main.asp?mem=29. Click on “Go” for the Public Planroom to access plans. NOTE: In order to be placed on the Plan Holders List and to receive notifications and updates regarding this bid (such as addenda) during the bidding period, an order must be placed. The cost of each Bid Set will be no more than $15.00, which is non-refundable. Partial bid packages are not sold. You can view documents on-line (at no cost), order Bid Sets, and access the Plan Holders List on the website at the address listed above. Please verify print lead time prior to arriving for pick-up. For a list of locations nearest you, go to www.e-arc.com. Construction and installation work shall be completed within Ninety-Five (95) calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Final testing, inspection and acceptance cannot be completed until Paving Improvements to Williams Field Road (not a part of this project) are completed. It is anticipated that the Paving Improvements to Williams Field Road will be completed on January 27th, 2022. See Project Special Provision No. 24 for additional information. Bids must be submitted on the Proposal and Schedule Form provided and be accompanied by a Bid Bond, (PERSONAL OR INDIVIDUAL BID BONDS ARE NOT ACCEPTABLE) for ten percent (10%) of the total amount of the Bid, payable to BCB GROUP INVESTMENTS, LLC., as a guarantee that the contractor will enter into a contract to perform the proposal in accordance with the plans and specifications. The successful bidder will be required to execute the BCB GROUP INVESTMENTS, LLC. Contract and respective Addenda for construction within ten (10) days after formal Notice of Contact Award. Failure by bidder to properly execute the Contract and

MARCH 14, 2021


provide the required certification as specified shall be considered a breach of Contract by bidder. BCB Group Investments, LLC shall be free to terminate the Contract or, at option, release the successful bidder. Payment and Performance Bonds will be required for this Work. The successful bidder, simultaneously with the execution of the Contract, shall be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, and a Performance Bond in an amount equal to one hundred per-cent (100%) of the Contract Price. The successful bidder shall name BCB Group Investments, LLC as obligee on both the Payment and Performance Bonds and name the City of Mesa as an additional obligee on the Performance Bond using a Dual Obligee Rider form. An approved Dual Obligee Rider Form is included in Chapter 2 of the Project Manual. The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with BCB Group Investments, LLC, or the City of Mesa. BETH HUNING City Engineer ATTEST: DeeAnn Mickelsen City Clerk Published: East Valley Tribune Mar 7, 14, 2021 / 36880

Public Notice Advertisement of Sale NOTICE IS HEREBY GIVEN that the under-signed intends to sell the personal property described below to enforce a lien imposed on said property pursuant to the Arizona Self-Service Storage Act, Arizona Statutes 33-1704, Section H, Enforcement of Lien. The Undersigned will sell at public sale by competitive bidding on or after March 19, 2021 at 9:00am using an online auction at www. storagetreasures.com, said property has been stored and located at US 60 Self Storage, 1661 S. Alma School Rd., Suite 102, Mesa, AZ 85210. Property to be sold as follows: Misc. household goods, personal items, furniture, clothing, toys and/or business fixtures and items belonging to the following: Tenant Name Unit # Jennifer Eisenbise 203 Vanessa Jordan 309 Mike Bulatoich 342 Christina Carnes 408 Eric Cortez 610 Fernando Macias 628 Mark Czarniecki 743 Bril Powell 806 Tina Ferrari 835 Daniel White 2011 Sale subject to cancellation in the event of settlement between

at Risk (CMAR) to provide PreConstruction Services assistance and complete Construction Services as the CMAR for the MFAC Building Improvements Project. All qualified firms that are interested in providing these services are invited to submit their Statements of Qualifications (SOQ) in accordance with the requirements detailed in the Request for Qualifications (RFQ). The following is a summary of the project. The required tasks will be reviewed with the selected CMAR and defined to meet the needs of the project as part of the contract scoping. The purpose of this project is to complete a major renovation of approximately 28,500 square feet of two (2) Police Department (PD) buildings at 225 North First Street. Multiple PD units are located at this facility including the Mesa Family Advocacy Center (MFAC) unit. The scope of this project includes: 1. Replacement of the existing HVAC systems with new Variable Refrigerant Flow (VRF) HVAC units, add outside-air volume, new ductwork for supply air and re-turn air. 2. Electrical system improvements that include upgrading the existing service entrance section (SES), replacement of electrical panels and various distribution changes. 3. Replacement of the existing drop ceilings (28,500 SF). 4. Replacement of the existing ceiling lighting with LED fixtures. 5. Replacement of the existing carpeting. 6. Tenant improvements of the existing space (10,600 SF). 7. New shower and locker facilities for staff using the onsite workout room. 8. Correct various ADA doorway clearance issues. 9. Correct spacing on the existing safety railing. The estimated range of the construction cost is $1,830,000 - $2,165,000. The City requires construction completion by June of 2022. A Pre-Submittal Conference will be held on March 31, 2021, at 9:00 AM through Microsoft Teams. If you would like to participate, please send an email to Stephanie Gishey at stephanie.gishey@mesaaz.gov to receive the invite. At this meeting, the project team, including City staff will discuss the scope of work, general contract requirements and respond to questions from the attendees. The Pre-Submittal Conference is not mandatory but recommended. All interested firms may sub-mit a Statement of Qualifications whether they attend the conference or not. All interested firms are encouraged to attend the Pre-Submittal Conference since City staff will not be available for meetings or to respond to individual inquiries regarding the project scope outside of this conference. In addition, there will not be meeting minutes or any other information

owner and obligated party. Items sold “as is”, CASH ONLY, and Buyer must pay a security deposit and broom sweep/clean the unit. Go to www.storagetreasures.com to bid on unit(s). Published: East Valley Tribune Mar. 7, 14, 2020 / 36622

Public Notice TO: Brian James Stebbings 15801 S 48th St., Apt 1127 Phoenix, AZ 85048-0843 The State Medical Board of Ohio 30 E. Broad Street, 3 rd Floor Columbus, OH 43215-6127 In the Matter of: Brian James Stebbings Case No. 21-CRF-0018 On February 21, 2021, the Ohio Medical Board mailed a Notice of Opportunity for Hearing to Brian James Stebbings via certified mail, return receipt requested, at his last known address of record, 15801 S 48th St., Apt 1127, Phoenix, AZ 85048-0843. The Notice was returned to the Board from the postal service marked “return to sender, not deliverable as addressed, unable to forward.” The notice states that the Ohio Medical Board intends to consider denying his application to practice respiratory care in the state of Ohio. Mr. Stebbings is entitled to a hearing in this matter if such hearing is requested within thirty (30) days of the last date of publication of this notice. Mr. Stebbings may appear at such hearing in person, by his attorney, or by such other representative permitted to practice before this agency, or he may present his position, arguments or contentions in writing. At the hearing, Mr. Stebbings may present evidence and examine witnesses appearing for or against him. Please contact the undersigned to ascertain the last date of publication. Any questions or correspondence should be addressed to: Jackie Moore Case Control Office 30 E. Broad Street, 3 rd Floor Columbus, OH 43215-6127 Jackie.Moore@med.ohio.gov Published: East Valley Tribune, Mar. 7, 14, 21, 2021 / 36904

Public Notice CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) NOTICE IS HEREBY GIVEN that the City of Mesa is seeking a qualified firm or team to act as the Construction Manager at Risk for the following: MESA FAMILY ADVOCACY CENTER (MFAC) BUILDING IMPROVEMENTS 222 N. 1st Street PROJECT NO.CP0770 The City of Mesa is seeking a qualified Construction Manager

EAST VALLEY BUSINESS

3

published from the Pre-Submittal Conference. Contact with City Employees. All firms interested in this project (including the firm’s employees, representatives, agents, lobbyists, attorneys, and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, to assure that contract decisions are made in public, and to protect the integrity of the selection process. All contact on this selection process should be addressed to the authorized representative identified below. RFQ Lists. The RFQ is available on the City’s website at http:// mesaaz.gov/business/engineering/ construction-manager-at-risk-andjob-order-contracting-opportunities. The Statement of Qualifications shall include a one-page cover letter that contains current company/firm contact information including a valid phone number and email address, plus a maximum of ten (10) pages to address the SOQ evaluation criteria (excluding PPVF’s and resumes but including an organizational chart with key personnel and their affiliation). Resumes for each team member shall be limited to a maximum length of two pages and should be attached as an appendix to the SOQ. Minimum font size shall be 10pt. Please provide one (1) electronic copy in an unencrypted PDF format to Engineering-RFQ@ mesaaz.gov by April 18, 2021, by 2:00PM. Please refer to our website for the most current information on how to submit SOQs. The City reserves the right to accept or reject any and all Statements of Qualifications. The City is an equal opportunity employer. Statement of Qualifications must include the following information (failure to include may result in rejection of Statement of Qualifications). Firms who wish to do business with the City of Mesa must be registered in the City of Mesa Vendor Self Service (VSS) System ( h tt p : / / m e s a a z . g ov / bu s i n e s s / purchasing/vendor-self-service). Questions. Questions pertaining to the Construction Manager at Risk selection process or contract issues should be directed to Stephanie Gishey of the Engineering Department at stephanie.gishey@ mesaaz.gov. BETH HUNING City Engineer ATTEST: DeeAnn Mickelsen City Clerk Published: East Valley Tribune Mar 14, 21, 2021 / 37028

MARCH 14, 2021


the tickler

east valley 1620 W. Fountainhead Pkwy., Suite 219, Tempe, AZ 85282

PERIODICALS U. S. POSTAGE PA I D GOODYEAR, AZ 85338


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.