east valley
Volume 3 Issue 37 Mesa, AZ
March 28, 2021
Famed EV driving school takes new name BY PAUL MARYNIAK Tribune Executive Editor
T
IN THE BIZ
he Bondurant School of High Performance Driving is no more. The storied school on the Gila River Indian Community – just a stone’s throw from Chandler – has been renamed Radford Racing School by owner Stig Investments. The renaming, announced last week, not only brings a new storied name in automobiles to the site but also resolves a three-year legal fight that school founder Bob Bondurant and his wife Patricia waged in a desperate bid to hang on to the debt-ridden school. First, the Bondurants tried to keep the school from being sold at an auction in federal bankruptcy court to pay off some of its $3.5 million in debts. That effort failed when Stig Investments bought it in May 2019 for $1.7 million. Then Patricia Bondurant sued Stig in state Superior Court to stop it from using her husband’s name. That suit was resolved in a settlement three months ago, though the terms are sealed. In renaming the school, Stig has teamed up with another legendary name in the world of automobiles. Radford is a global luxury automotive coachbuilder “with a British heart and soul, creating on-trend vehicles based on classic timeless designs,” according to its website. It has a storied past that has been invoked by the new owners of the Radford brand – English television celebrity Ant Public Notices ............... page 3 © Copyright, 2021 East Valley Tribune
Owner Stig Investments says it has spent millions upgrading what is now called yjr Radford Racing School on Gila River Indian Community land just south of the I-10/Loop 202 Interchange. (Special to the Tribune) Anstead, F1 champion Jenson Button, car designer Mark Stubbs and business partner Roger Behle. Founded more than 75 years ago by Harold Radford, the company made the bodies for luxury cars like Rolls Royce and Bentley. According to autoweek.com, Radford & Co. was particularly famous in the 1960s, when it produced custom Minis for all four Beatles as well as model Twiggy and comic actor Peter Sellers. “The renaming marks the school’s new association with the team behind the Radford brand, a name legendary among auto enthusiasts for its coachbuilding legacy,” (USPS 004-616) is published weekly
Mailing Address: 1620 W. Fountainhead Pkwy., Suite 219, Tempe, AZ 85282
(480) 898-6500 Steven Strickbine, publisher Paul Maryniak, executive editor
Stig said in a release. The four are reviving the Radford name “into a modern lifestyle brand that celebrates auto design and performance, high-performing driving and racing,” it continued. The Radford partners also will be building and testing new vehicles at the school, located just south of the I-10’s intersection with the Loop 202 freeway. “The racetrack is the perfect environment for building and testing Radfordbuilt cars,” said Anstead. The Radford Racing School bills itself as “the only purpose-built driver training faSubscriptions are $26 for 2 years, $14 for one year. Periodicals postage paid at Phoenix, AZ 85026.
POSTMASTER: Send address changes to: East Valley Tribune, 1620 W. Fountainhead Pkwy., Suite 291, Tempe, AZ 85282
cility for performance enthusiasts and the largest driver training center of its kind in the world.” The release said the Radford “heritage brand” means the school is becoming a “destination for international auto enthusiasts, everyday drivers, new drivers, racers, celebrities and influencers.” The Radford Racing School also is the official high performance driving school of Dodge//SRT, the school’s primary sponsors that provides a fleet of high-performance cars for driving instruction. The drag racing course features the 840-horsepower Dodge Challenger SRT Demon, while other high-performance vehicles, including the Challenger SRT Hellcat, Charger SRT Hellcat and Durango SRT are just some of the options available for the on-track performance driving experience. New Dodge//SRT owners also “are among the thousands of students who come to the school annually to learn how to achieve optimum performance of highperformance vehicles in a controlled environment,” the release said. The school also features Ligier JS F4 open wheel vehicles, vintage Dodge Vipers, go karts, and cars used in its special forces, police and military training. General Manager Mike Kessler said among the school’s offerings are openwheel and drag-racing courses. New formula racing courses are in development. He said the name change will “broaden the appeal of the school while retaining its legendary reputation” and positions the facility “as a place for speed, professional race car instruction and experiences, in addition to world-class driving instruction.” He also said Stig’s multi-million-dollar investment has included the main track’s first resurfacing in 30 years, significant upgrades of the visitor center and related facilities, the diversification of course offerings and becoming the first school of its kind to offer professional drag racing instruction to the public and the chance to earn an NHRA Drag License. Radford’s extension into the racing
These are three of the four Radford Racing School partners who are in the midst of reviving a legendary British car name, partly by running a racing school in the East Valley. (Special to the Tribune)
world positions the school “as a place for speed, professional race car instruction and experiences, in addition to worldclass driving instruction,” he noted. The school came close to being evicted by the Gila River Indian Community’s economic development arm in 2018 when the Bondurants failed to pay its rent in 2018. That rent was part of $3.5 million debt that drove the school into bankruptcy. Stig has spent the last year and a half fighting a suit filed by Patricia Bondurant over the school’s use of her husband’s name. The suit was prolonged by Stig’s efforts to depose Bob Bondurant over a claim by his wife that he had revoked the use of his name before the bankruptcy auction. Stig contended that Bondurant had lost that right because he had trademarked his name and the trademarks were part of the auction. Further complicating the suit was the inability of Stig’s lawyers to depose the 87-year-old racing legend because he has been in a care home since at least early 2019, “unable to care for himself or be cared for by his wife,” court papers said.
Lawyers could not even visit with him since early last year because the pandemic had forced the care home to prohibit visitors. Inducted into the Corvette Hall of Fame in 2016, Bondurant’s racing accomplishments in Corvettes and Selby’s between 1959 to 1965 earned him numerous accolades both in the U.S. and abroad. He founded the school in California in 1968 but relocated in 1990 to the Gila River Indian Community site. Over the years the school has taught beginners how to drive and trained thousands of race car enthusiasts, professional drivers and law-enforcement and military personnel advanced-driving skills. Court papers alleged that his wife assumed day-to-day control of the school several years before the bankruptcy and Stig alleged it was “financially mismanaged for the past several years, which coincides with Patricia Bondurant’s time running the school.” Information: RadfordRacingSchool. com or 480-403-7600.
The latest breaking news and top local stories in Mesa!
www.TheMesaTribune.com .com EAST VALLEY BUSINESS
2
MARCH 28, 2021
JUST A CLICK AWAY
Public Notice NOTICE TO CREDITORS: In the Matter of the ESTATE OF LOUISE MILLER, Deceased ... NOTICE IS HEREBY GIVEN that the undersigned has been appointed as the Personal Representative of this Estate. All persons having claims against the Estate are required to present their claims within four (4) months, after the date of the first publication of this Notice or the claims will be forever barred. Claims must be presented by delivering or mailing a written statement of the claim to undersigned Personal Representative at 1510 South 171 st Street, New Berlin, Wisconsin 53151. Ronald Gadberry, /s/ Ronald Gadberry. DATED this 4th day of March, 2021. Published: East Valley Tribune, Mar. 14, 21, 28, 2021. / 36967
Public Notice In accordance with Sec. 106 of the Programmatic Agreement, AT&T plans a new pole at 615 west 1st street, Tempe, AZ 85281. Please direct comments to Gavin L. at 818-898-4866 regarding site PHX37_021. 3/28, 4/4/21 CNS-3452587#
Public Notice CITY OF MESA, ARIZONA ENGINEERING DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) NOTICE IS HEREBY GIVEN that the City of Mesa is seeking a qualified firm or team to act as the Construction Manager at Risk for the following: MONTEREY PARK SPORTS FIELDS 7045 E. Monterey Road PROJECT NO. CP0914 The City of Mesa is seeking a qualified Construction Manager at Risk (CMAR) to provide PreConstruction Services assistance and complete Construction Services as the CMAR for the Monterey Park Sports Fields Project. All qualified firms that are interested in providing these services are invited to submit their Statements of Qualifications (SOQ) in accordance with the requirements detailed in the Request for Qualifications (RFQ). The following is a summary of the project. The required tasks will be reviewed with the selected CMAR and defined to meet the needs of the project as part of the contract scoping. The project scope includes: • Construction of four (4) LEDlighted youth baseball/softball fields, LED-lighted parking lot, restroom building and associated infrastructure improvements; • Shipping container to be repurposed as a pop-up library including associated site improvements. The estimated construction cost is $7,000,000. The City anticipates completing construction in Winter 2022. An electronic Pre-Submittal Conference will be held on April 1, 2021 at 8:30 am through
Microsoft Teams. If you would like to participate, please send an email to Donna Horn at donna. horn@mesaaz.gov to request an invitation. At this meeting, City staff will discuss the scope of work and general contract issues and respond to questions from the attendees. Attendance at the Pre-Submittal Conference is not mandatory and all interested firms may submit a Statement of Qualifications whether or not they attend the conference. All interested firms are encouraged to attend the Pre-Submittal Conference since City staff will not be available for meetings or to respond to individual inquiries regarding the project scope outside of this Conference. In addition, there will not be meeting minutes or any other information published from the Pre-Submittal Conference. Contact with City Employees. All firms interested in this project (including the firm’s employees, representatives, agents, lobbyists, attorneys, and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, to assure that contract decisions are made in public, and to protect the integrity of the selection process. All contact on this selection process should be ad-dressed to the authorized representative identified below. RFQ Lists. The RFQ is available on the City’s website at http:// mesaaz.gov/business/engineering/ construction-manager-at-risk-andjob-order-contracting-opportunities. The Statement of Qualifications shall include a one-page cover letter, plus a maximum of 10 pages to address the SOQ evaluation criteria (excluding resumes but including an organization chart with key personnel and their affiliation). Resumes for each team member shall be limited to a maximum length of two pages and should be attached as an appendix to the SOQ. Minimum font size shall be 10pt. Please provide one (1) electronic copy in an unencrypted PDF format to Engineering-RFQ@ mesaaz.gov by 2 pm on April 15, 2021. Please refer to the City’s website (listed above) for the most current information regarding submissions of SOQs. The City reserves the right to accept or reject any and all Statements of Qualifications. The City is an equal opportunity employer. Firms who wish to do business with the City of Mesa must be registered in the City of Mesa Vendor Self Service (VSS) System ( h tt p : / / m e s a a z . g ov / bu s i n e s s / purchasing/vendor-self-service). Questions. Questions pertaining to the Construction Manager at Risk selection process or contract is-sues should be directed to Donna Horn of the Engineering Department at donna.horn@ mesaaz.gov. BETH HUNING City Engineer ATTEST: DeeAnn Mickelsen
EAST VALLEY BUSINESS
City Clerk Published: East Valley Tribune Mar 28, April 4, 2021 / 37214
Public Notice CITY OF MESA MESA, ARIZONA MESA FALCON FIELD AIRPORT (FFZ) RECONSTRUCT HIGLEY RAMP PROJECT NO. CP0918 FAA AIP NO. 3-04-0023-XXX-2021 DAVIS BACON WAGES APPLY ADVERTISEMENT FOR BIDS NOTICE IS HEREBY GIVEN that sealed bids will be received until Thursday, April 15, 2021, at 1:00 p.m. All sealed bids will be received electronically at En-gineeringBids@ mesaaz.gov . Bids must be submitted as an unencrypted PDF attachment with a maximum size limit of 20MB. Any bid received after the time specified will be returned without any consideration. This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: The project will consist of 3 phases. Each phase will consist of reconstructing a portion of the ramp to the limits shown in the project plans. The existing asphalt and base materials will be removed, and a new pavement section will be constructed. The existing aircraft tiedowns in all phases will be removed prior to the pavement removal operation and new aircraft tiedowns will be installed after the new pavement section is constructed. Temporary and permanent pavement markings will be applied to the new asphalt. The Engineer’s Estimate range is $2,700,000 to 3,300,000. For all technical, contract, bidrelated, or other questions, please contact Donna Horn at donna. horn@mesaaz.gov. Contact with City Employees. All firms interested in this project (including the firm’s employees, representatives, agents, lobbyists, attorneys, and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process. This policy is intended to create a level playing field for all potential firms, to assure that contract decisions are made in public, and to protect the integrity of the selection process. All contact on this selection process should be addressed to the authorized representative identified above. Contractors desiring to submit proposals may purchase sets of the Bid Documents from ARC Document Solutions, LLC, at https://order.e-arc.com/arcEOC/ PWELL_Main.asp?mem=29. Click on “Go” for the Public Planroom to access plans. NOTE: In order to be placed on the Plan Holders List and to receive notifications and updates regarding this bid (such as addenda) during the bidding period, an order must be placed. The cost of each Bid Set will be no more than $45, which is non-refundable. Partial bid packages are not sold.
3
You can view documents on-line (at no cost), order Bid Sets, and access the Plan Holders List on the website at the address listed above. Please verify print lead time prior to arriving for pick-up. For a list of locations nearest you, go to www.e-arc.com. One set of the Contract Documents is also available for viewing at the City of Mesa’s Engineering Department at 20 East Main Street, Mesa, AZ. Please call 480-644-2251 prior to arriving to ensure that the documents are available for viewing. In order for the City to consider alternate products in the bidding process, please follow Arizona Revised Statutes §34.104c. If a pre-bid review of the site has been scheduled, details can be referenced in Project Specific Provision Section #3, titled “Pre-Bid Review of Site.” Work shall be completed within 160 consecutive calendar days, beginning with the day following the starting date specified in the Notice to Proceed. Bids must be submitted on the Proposal Form provided and be accompanied by the Bid Bond for not less than ten percent (10%) of the total bid, payable to the City of Mesa, Arizona, or a certified or cashier’s check. PERSONAL OR INDIVIDUAL SURETY BONDS ARE NOT ACCEPTABLE. The successful bidder will be required to execute the standard form of contract for construction within ten (10) days after formal award of contract. In addition, the successful bidder must be registered in the City of Mesa Vendor Self-Service (VSS) System ( h tt p : / / m e s a a z . g ov / bu s i n e s s / purchasing/vendor-self-service). The successful bidder, simultaneously with the execution of the Contract, will be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, and the most recent ACORD® Certificate of Liability Insurance form with additional insured endorsements. The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with the City of Mesa. BETH HUNING City Engineer ATTEST: DeeAnn Mickelsen City Clerk Published: East Valley Tribune Mar 21, 28, April 4, 2021 / 37xxx
MARCH 28, 2021
the tickler
east valley 1620 W. Fountainhead Pkwy., Suite 219, Tempe, AZ 85282
PERIODICALS U. S. POSTAGE PA I D GOODYEAR, AZ 85338