timothy logan | work samples
spring 2012
Located in the 22 Aroba district of Barcelona, the project aims to provoke the development of an urban strand reclaimed from the areas industrial past in order to unify programmatic concentrations within its proximity. Experimenting on a single city block as a catalyst for future growth, the projects focus turns its attention to the sensual perception of the railroad and the manner in which it bisects the site. Gallery, commercial, residential, and communal programs are placed in a dialogue of cause and effect between solid and void. 2
01. push:pull:divide:connect usc|bcn_fall 2011
kim coleman + mark cigolle
3
01. push:pull:divide:connect
4
usc|bcn_fall 2010
5
01. push:pull:divide:connect
6
usc|bcn_fall 2010
7
01. push:pull:divide:connect
8
usc|bcn_fall 2010
9
10
Drawing from the process of skin and bone grafting in which cells or tissue fill in a mesh or framework based on growth conditions, the different programs of the tower are organized will be “grafted� into the tower. In keeping with the biological language, program is broken down into its elementary cells or components and arranged according to conventional organizations, aggregated texture, and forces of the physical environment. Just as a skin mesh is gradually filled in with tissue, these cells are plugged into a structural/infrastructural framework. Similarly, the different formal and physical conditions surrounding the site are negotiated as the tower grafts itself to the urban fabric.
02. grafting an urban landscape vetical urban studio_spring 2011
david gerber + scott fain
11
02. grafting an urban landscape
section b_1/64” = 1’-0”
12
section
vertical urban studio_spring 2011 offices - 40 floors - public + private sky gardens, meeting spaces - access to hotel and residential amenities hotel - 100 keys - rooftop bar/lounge - pool + bar - spa + fitness center - meeting spaces - outdoor restaurant residential - 50 units - private library - private meeting spaces - rooftop pool - private sky gardens - day care/pre school
elevations: north, south, east, west retail space - retail - dining
13
02. grafting an urban landscape
14
vertical urban studio_spring 2011
15
02. grafting an urban landscape
16
vertical urban studio
spring 2011
17
Exploring the ways in which the layering or embedding of networks and activity can improve an urban landscape currently disconnected by a series of large-scale programs and fragmented infrastructures.
18
la:identity_fall 2011
03. scattered infiltration la:identity_fall 2011
chris warren
19
03. scattered infiltration
20
la:identity_fall 2011
21
03. scattered infiltration
22
la:identity_fall 2011
23
03. scattered infiltration
SECTION A_RESIDENTIAL WATERFRONT A. SUBMERGED VEHICLE CIRCULATION B. MIXED RESIDENTIAL/COMMERCIAL PROGRAM C. FARMER’S MARKET/PUBLIC EVENT SPACE D. COMMUNITY CENTER E. PUBLIC PARK SPACE F. BICYCLE/JOGGING PATH
SECTION D_RESIDENTIAL A. MIXED RESIDENTIAL UNIT TYPES B. RETAIL PROGRAM C. COMMUNAL COURTYARD D. COMMUNAL ROOFTOP SPACE E. ELEVATED PEDESTRIAN BRIDGE F. ROOFTOP ACCESS G. BURIED RESIDENTIAL PARKING
SECTION C_CONVENTION CENTER A. METRO BLUE LINE/LONG BEACH BOULEVARD B. LONG BEACH CONVENTION CENTER MEETING ROOMS AND BALLROOMS C. HOTEL PROGRAM D. RETAIL PROGRAM E. MIXED USE COMMERCIAL/RESIDENTIAL PROGRAM F. LONG BEACH CONVENTION CENTER EXHIBIT HALLS G. CONVENTION CENTER/ARENA PARKING H. RESIDENTIAL PARKING I. PEDESTRIAN WALKWAY/GATHERING SPACE
24
la:identity_fall 2011
SECTION E_PARK AND RECREATION A. QUEEN MARY B. BICYCLE/JOGGING PATH C. WALKING/EXERCISE PATH D. QUEENSWAY BAY LIGHTHOUSE E. WILDLIFE REFUGE
SECTION B_CRUISE SHIP TERMINAL AND LONG BEACH SPORTS ARENA A. LONG BEACH SPORTS ARENA MAIN HALL B. TERMINAL/ARENA SHARED FACILITY SPACES C. TERMINAL WAITING AREAS D. TERMINAL/ARENA LOADING AREA E. BICYCLE/JOGGING PATH F. TERMINAL PARKING G. PASSENGER DROPOFF/LOADING AREA H. BAGGAGE SCREENING AREA I. MAIN TERMINAL SPACE J. LONG BEACH CENTER FOR THE PERFORMING ARTS K. METRO BLUE LINE TERMINUS L. MIXED USE RESIDENTIAL/COMMERCIAL/HOTEL PROGRAM
25
03. scattered infiltration
26
la:identity_fall 2011
27