1 minute read

From the General Manager

Next Article
From the President

From the President

Greg Sheara

Tennis Renovations

The current schedule for the tennis renovations will begin on or around January 2 and last for a period of three months. During this time, there will be periodic closures of the Tennis Shop depending on the disruptiveness and safety of the roof work being performed, as well as periodic closures of courts #1 and #2. Please look for future communications that will include specific impacts to tennis operations as we approach the start of construction.

Locker Rooms Closure

The Men’s and Ladies’ Locker Rooms and 19th Hole will close beginning Saturday, September 30, ahead of the Constellation FURYK & FRIENDS Tournament. The locker rooms will not open the week following the tournament, October 9–15, as the Club’s staff clears out all inventory and supplies ahead of demolition which begins Monday, October 16. During this week, should members be interested in obtaining any of the tables, chairs, or furniture from the locker rooms or 19th Hole, please reach out to Greg Sheara at gsheara@timuquana.net. All items will be discarded once demolition commences.

Construction Impact

Beginning Monday, October 16 and for the better part of nine months, a portion of the Pool Parking Lot will be used as a lay-down area for the construction. As we have done with prior renovations, this will impact only five parking spaces. Access to the Pow Wow Room through the pool’s side entrance will also be restricted during this time. Members may access the Pow Wow Room through the Golf Shop or front entrance.

This article is from: