Tirth Patel Undergraduate Architecture Portfolio 2019 Nirma University

Page 1

Architectural Portfolio Tirth Patel


Resume Indian 17th March, 1998 B/501, Saubhagya Appt., Near Sola Over Bridge, S G Highway, Thaltej, Ahmedabad-380054, Gujarat, India. 16BAR014@nirmauni.ac.in Institute of Architecture and Planning, Nirma University, Ahmedabad

TIRTH

PATEL

+91 84603 70103

I am an architecture undergraduate student at Institute of Architecture and Planning, Nirma University, Ahmedabad, India. To intern at a firm is a chance to maximize my knowledge in all the aspects of architectural design. I would like to take this practical training as an opportunity and as a platform to learn the design process and how it is being translated into reality sensitively. Coming up next is the selected collection of my architecture, design and individual works that mirrors my vitality for creation and aspiration to change over that enthusiasm into reality.

Good design comes with explorations.

-Tirth


Education

Skills

2016 - ongoing : Undergraduate Architecture (4th year : PPI - 8.35) Institute of Architecture and Planning, Nirma University , Ahmedabad , India. 2014 - 2016

: Higher Secondary (hsc.) , (Central Board : 86%) Amrita Vidyalayam , Gujarat , India

2011 - 2014

: Secondary (ssc.) , (Central Board : 87%) Amrita Vidyalayam , Gujarat , India

Software skills :

Autocad

Revit

Rhinoceros

Lumion

Microsoft Suite

Photoshop

Indesign

Illustrator

Sketchup

Grasshopper

Model making

Sketching

Hand drafting

Photography

Team work

Time management

3D printing

Laser cutting

Origami

Carpentry

Other skills :

Study Tour December 2016 : Coorg , Karnataka , India Documentation

July 2017

: Delhi | Chandigarh | Agra Architectural study visit

December 2017 : Banaras , Uttar Pradesh , India Documentation

July 2019

: Chandigarh , India City Reading

Languages English , Hindi , Gujarati

Worshops 2016

:

Origami

2017

:

Building Materials Hands on , Brick Dome , Brick Arch , Brick Partition wall

2018

:

Photography

2018

:

Building Energy Calcuation

2018

:

Green Builing Architecture

2018

:

Mud and Mirror Work

2019

:

Stage and Set Design

Achievements 2017

: Consistence Studio Performance

2012

: Karate Black Belt (DAN 1)

Personal Interests Karate (Int. Player, Black Belt Dan 1)

Sketching

Volleyball

Music

Movies

Games

Travelling

Swimming


Content

01

02

03

Institution, Working Drawing Semester V & VI

Mass Housing Semester IV

Material Studio Semester III

6 - 19

20 - 25

26 - 31


04

05

06

RSP All Semesters

Other Works All Semesters

Sketches & photograpgy All Semesters

32 - 37

38 - 45

46 - 51


01

SEMESTER 5 & 6

The aim of the studio was to understand the The program was to design th The studio commenced with


INSTITUTION

HOUSE OF SPORTS

e scale of different institutional building and how it comports with the circumventing context. he “House of Sports” which was anextension of the subsisting C.N. Vidhyalay. the visit of Seth C.N. vidhyalay and understanding its features and context.


SITE

INFORMATION

The site is situated in Seth C.N. Vidhyalay which is situated at Ambawadi, Gujarat, India which is lush with trees and is known as the core of the city.

2 5

The campus has many study programs for every one of the understudies with shifting age gatherings. It has various structures, such as the Bal Vidhyalay, Kishor Vidhyalay and Arts College. This structures are planned complementing the nature and its effect on it. The campus has mainly 2 entry gates, one towards the Art college and other is near the Derasar.

3

4

REQUIREMENTS

KEY PLAN

LEGEND 1. Sabarmati River 2. Seth C.N. Vidhyalaya 3. Parimal Garden 4. Rasala Nature Park 5. Ambavadi Circle 1

CONCEPT

Creating Journey

Centrality Page 8

Journey with levels

Levels


SITE

LOCATION

The site has numerous nodes which are mostly utilized by the individuals. So, for the placement of my design, I chose the site which has a particular node that connects different sports. So, my design plays a significant role of junction before dispersing for different sports.

MASSING

OPTIONS

Page 9


CONCEPT

Page 10

CREATION

1

Here the circle is treated as a single entity.

2

The circles combine with one or two circles and form different clusters.

3

The arcs are used to form the spaces.

4

The circles are carved out from a huge cubical chunk.

5

A single large circle with partitions inside.

6

Iin this the line of the wall should not break in between.


INSPIRATION I decided to take inspiration from organic curves (water ripples).

MAKING FORMS Tracing the water ripples with the thought of making different spaces.

MAKING SPACES Made the spaces with proportionate area proposals.

LANDSCAPE Added organic curves in the form of landscape.

Page 11


GROUND

Page 12

FLOOR

PLAN


SECTIONS

AND

VIEWS

SECTION AA’

SECTION BB’

Page 13


WORKING DRAWING 1

3

2 7100

6755

5

4 1175

6

11140

8

7

1040 2495

1445

(Semster 6)

9

10 11

2540

5320

12

1410

1 A201

11275

15 16 17 18 19

13 14

1 A301

11270

1415

5320

2540

1445

20 21

2495 1040

11140

1175

GENERAL NOT

23

22 6755

THIS DRAWING AND PROPERTY OF TIRTH TRACED, COPIED, LE OR MADE UNAUTHO WITHOUT THE WRITTE

7095

1. 2.

103385

3. 4. 5.

ALL THE DIMENSIO ALL THE DIMENSI SCALED. DIMENSIONS IN D SHALL TAKE PRE SMALLER SCALE. ALL THE DIM DIMENSIONS UNLE ALL AMBIGUITY NOTICE OF ARCHI

KEY PLAN/ LOC

Q

Q 4240

4240

DN

DN

P +0075LVL. +0000LVL.

C1

5835

3845 4125 4125

12790 5130

BOXING 10000 x 20000 +0575LVL. +0500LVL.

3845

WOMEN TOILET

D8 A703 W1 C1 F5

2150

C19

W2 A704

YOGA R 5700

DN

C1

C1

W2 A704

3550

C1 3775

C2

C1 3740 C2

C1

C1 2150

UP

7840

+0575LVL. +0500LVL.

GYM R 5700

W8 A707

C2

C2

C2

-0425LVL. -0500LVL.

DN

CANTEEN 4000 x 4700

C2

W8 A707

DN

+1075LVL. +1000LVL.

11140

1040 2495

1445

2540

5320

1410

11275

11270

1415

5320

2540

1445

2495 1040

11140

1175

6755

7095

103385

1 GROUND FLOOR PLAN SCALE 1:200

Page 14

1

2

3

4

5

6

7

8

9

10 11

12

1 A201

6125 x 2450

W5

8440 x 2470

W6

6960 x 2140

W7

0650 x 1060

W8

9450 x 2465 2020 x 1100

W10

3400 x 2300

W11

1555 x 0950

FINISHES SCHE

2 A201

K

F1 - 12MM THK. 600 x 6

J

F3 - 20MM THK. 600 x 6

I

F2 - ROUGH CONCRET

F4 - 12MM THK. 300 x 3

F5 - 8MM THK. WOODE

WALL FINISHES

W1 - 20MM THK. DOUB

W2 - 12MM THK. 50 x 50

W3 - 12MM THK. 300 x 3

G F E

CELLING FINISHES

C1 - 15MM THK. SINGLE

COLUMN SCHE COLUMNS

DIMEN

400MM

C1

230 x 2

C2 C3

300MM

C4

400-800

C5

230 x 3

200MM

REFERENCE DR A 102 S 101

B

CENTRES

4240

1175

4985 x 2450

W4

C

A 6755

W3

S 103

DN

7100

3000 x 3000

3000 x 3000 1000 x 2400

DRW. NO.

DN

+0575LVL. +0500LVL.

+0075LVL. +0000LVL.

DN

W2

2000 x 2400

D9

C6

C2 C2

2820 x 2420

D

+0575LVL. +0500LVL.

C2

8260

W1 C1 F5

C20

W2 A704

+0575LVL. +0500LVL.

-1425LVL. -1500LVL.

MEN TOILET

D8 A703

3585

-2825 LVL. -2900 LVL.

C18

C1 C1

4785

W5 A706

C17

C1

SIZE

W1

7840

+0575LVL. +0500LVL.

C1

2920 x 3000

MARK

H

DN

925

C1 C1

2230 x 3000

D8

8260

925

W2 A704

-0425LVL. -0500LVL.

C10

C4 DN

DN

C16

C9

2445

C4

B

W1 C1 F5

C5

C1

C1

-0425LVL. -0500LVL.

C

1520

1595 545

C5

3985 x 3570

D5

FLOOR FINISHES

DN

C7

5835

4785

3845

1390 x 2400

D4

M

1 A302

C8

DN

C1

C15

D

4125

1290 x 2100

D3

N

L

W5 A706

C5

D2

W9

DN

C1

0870 x 2100

D7

+0575LVL. +0500LVL.

-0025LVL. -1000LVL.

C1

W5 A706

4520

E

4125

C11 W1 C1 F5

C14

-2825 LVL. -2900 LVL.

3845

570

DN

2445

F

5835

W3 A704

C1

C6

C1

C5

SIZE

D1

WIND

-1425LVL. -1500LVL.

ROBOTICS R 4250

W1 C1 F3

SPORTS ARENA R 11250

545 1595

84165

H G

4940

C13

C5

545 1595

+0575LVL. +0500LVL.

6075 C1

DN

3005

KARATE 1000 x 20000

3745

I

2445

J

2 A201

C12 3405

DN

W4 A705

+0575LVL. +0500LVL.

W5 A706

2875

K

PASSAGE 1000 x 20000

C4

C1 2 A301

W1 C1 F5

C1 DN

C4

DN

12330

C1

DN W4 A705

W4 A705

84165

C1

1595 545

C1

MARK

D6

W1 C1 F5

+0575LVL. +0500LVL.

C1

+0575LVL. +0500LVL.

DN

W4 A705

C3 CARROM R 4250

BOARD GAMES C4 R 4250

3 A301

13 14

15 16 17 18 19

20 21

22

23

NO.

RADIUS

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20

6000 4500 4500 4500 4500 11240 20700 6550 20700 6550 20700 6550 20700 6550 5470 6530 5470 6530 6000 6000

X AND Y COORDINATES O,12 N,10 L,8 N,14 L,16 K,12 J,13 K,19 I,20 H,18 J,11 K,5 I,4 H,6 F,9 E,8 F,15 E,17 D,10 D,14

4240

1520

UP

DN

W1 C1 F5

W3 A704

O

12330

W1 C1 F5

+0575LVL. +0500LVL.

-1425LVL. -1500LVL.

DN

5835

6075

N

W3 A704

C1

DN

C2 CHESS R 4250

DOO W1 A704

2445

5130

W1 C1 F5

C1

C1

DOOR/WINDOW

C1

2875

W1 A704

W3 A704

O

+0275LVL. +0200 LVL.

DN

W1 A704

RECEPTION R 6000

3745

12790

C1

W1 C1 A704

L

+0000LVL. -0500LVL.

D4 A702

C1

M

DN

4520

P

NO.

A

DATE

RE

GROUN SCALE: 1:200 SEMESTER: VI

HOUSE

TIRTH PATEL INSTITUTE OF PLANNING, N


OH TANK STAIRCASE CABIN VIEWING DECK GYM

4000

THIRD FLOOR SECOND FLOOR FIRST FLOOR ELEVATION +4350 GROUND FLOOR

TERRACE MENS TOILET 02 MENS TOILET 01

4000

BASEMENT FLOOR B.O.C OF GROUND FLOOR SLAB 4240

12790

5130

6075

STAIRCASE CABIN BOARD GAMES

VIEWING DECK RECEPTION

MARK 2445

2875

3745

4785

925

2445

4520

7840

8260

D1

4240

D2 D3

1000

PLINTH LEVEL

VIEWING DECK ROBOTICS

+0600 12330 +0500

1520

ELEVATION +0500

DOOR

+5250 VIEWING DECK BOXING TABLE TENNIS

Q

1ELEVATION THIRD FLOOR SCALE SECOND 1:200 FLOOR FIRST FLOOR GROUND FLOOR BASEMENT FLOOR

P

4240

N

O

OH TANK STAIRCASE CABIN VIEWING DECK GYM

12790

L

M

TERRACE MENS TOILET 02 MENS TOILET 01

5130

6075

1520

J

K

I

H

VIEWING DECK BOXING TABLE TENNIS

G

F

D

E

A

B

C

D4 D5 D6 D7

VIEWING DECK ROBOTICS

STAIRCASE CABIN BOARD GAMES

DOOR D8

VIEWING DECK RECEPTION

D9 MARK

12330

2445

2875

3745

4785

925

2445

4520

7840

8260

D1 MARK D2

4240

D3 W1

Q

1ELEVATION

P

N

O

L

M

J

K

I

H

G

F

D

E

D4 W2

A

B

C

D5 W3 D6 W4 D7 W5

+13420 +13400

SCALE 1:200

D8 W6 D9 W7 ELEVATION +12350

W9 W10 MARK W11 W1

4000

+9420 +9400

+8670 +8650

W8

B.O.C OF SECOND FLOOR SLAB

ELEVATION +8350

3850 4000

+5270 +5250

4000

TERRACE STAIRCASE CABIN STAIRCASE STAIRCASE

SPORTS ARENA

FLOOR W5

ELEVATION +4350

+9420 +9400

+8670 +8650

W3

FINIS W4

4000

+13420 +13400

VIEWING DECK RECEPTION

W2

B.O.C OF FIRST FLOOR SLAB

+5270 +5250

F1W6 - 12M W7 F2 - RO W8 F3W9 - 20M

B.O.C OF GROUND FLOOR SLAB ELEVATION +12350 B.O.C OF SECOND FLOOR SLAB ELEVATION +0500

F4W10 - 12M W11 F5 - 8M

TOP OF PLINTH ELEVATION +8350 B.O.C OF FIRST FLOOR SLAB THIRD FLOOR SECOND FLOOR FIRST FLOOR ELEVATION +4350 GROUND FLOOR

WALL F FINIS

W1 - 20 FLOOR

W2--12M 12 F1

B.O.C OF GROUND FLOOR SLAB

Q

12790

5130

P

N

O

2 SECTION

6075

1520

12330

L

M

4240

12790

2875

J

K

VIEWING DECK RECEPTION

SCALE 1:200

2445

3745

I

4785

G

H

925

2445

F

4520

E

SPORTS ARENA

5130

6075

1520

12330

7840

8260

D

4240

A

B

C

TERRACE STAIRCASE CABIN STAIRCASE STAIRCASE

W3--RO 12 F2

3850

4240

F3 - 20M ELEVATION +0500

CELLIN F4 - 12M

TOP OF PLINTH

C1 15M F5 -- 8M

THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR

WALL F REFE

W1 DRW - 20

W2 - 12 A

W3 - 12 A

+16570 +16550 2445

2875

3745

4785

925

2445

4520

7840

8260

S

4240

CELLIN S

Q

P

N

O

+13420 +13400

L

M

2 SECTION

C1 - 15M

J

K

I

G

H

+9420 +9400

SCALE 1:200

F

D

E

A

B

C

REFE

DRW

+9420 +9400

A A

+16570 +16550 +5270 +5250 +13420 +13400

ELEVATION +4350

S S

4000

B.O.C OF GROUND FLOOR SLAB +9420 +9400

ELEVATION +0350

NO. +5270 +5250

BOXING SNOOKER

4000

THIRD FLOOR SECOND FLOOR ELEVATION +4350 FIRST FLOOR GROUND FLOOR B.O.C OF GROUND FLOOR SLAB BASEMENT FLOOR

+9420 +9400

-0925 -1000

B.O.C OF BASEMENT FLOOR SLAB

SCALE:

KARATE TABLE TENNIS

SPORTS ARENA

SEMES

HO

-0925 -1000

ELEVATION +0350 B.O.C OF BASEMENT FLOOR SLAB 7095 THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR SCALE 1:200 BASEMENT FLOOR

3 SECTION

23

6755

1175

11140

1445

2540

5320

19 18 17 16 15

21 20

22

1040 2495

1415

11270

14 13

BOXING SNOOKER

11275

1410

5320

11 10

12

SPORTS ARENA

2540

9

8

1445

7

2495 1040

6

11140

5

1175

4

KARATE TABLE TENNIS

6755

3

NO. TIRTH INS PL

7100

2

1

SCALE:

SEMES

HO 7095

3 SECTION

23

SCALE 1:200

6755

1175

11140

1445

2540

5320

19 18 17 16 15

21 20

22

1040 2495

1415

11270

14 13

11275

1410

5320

11 10

12

2540

9

8

1445

7

2495 1040

6

11140

5

1175

4

6755

3

TIRTH INS PL

7100

2

1

GENE

THIS D PROPE TRACED OR MA WITHOU

ELEVATION +19860

3710

TOP OF TENSILE STRUCTURAL

1. 2.

ELEVATION +16150

3. 3800

B.O.C OF THIRD FLOOR SLAB

4.

ELEVATION +12350

5. 4000

B.O.C OF SECOND FLOOR SLAB

ALL ALL SC DIM SH SM ALL DIM ALL NO

KEY

ELEVATION +8350 B.O.C OF FIRST FLOOR SLAB 4000

+0500 +0500

+5270 +5250

ELEVATION +4350

4000

B.O.C OF GROUND FLOOR SLAB +0300 +0200

PLINTH LEVEL

1000

ELEVATION +0500

THIRD FLOOR SECOND FLOOR FIRST FLOOR GROUND FLOOR BASEMENT FLOOR 7095

6755

1175

BOXING TABLE TENNIS 11140

TERRACE MENS TOILET 02 ROBOTICS 1040 2495

1445

OH TANK MACHINE ROOM / STAIRCASE VIEWING DECK CABIN RECEPTION

PASSAGE VIEWING DECK BOARD GAMES

2540

5320

1415

11270

11275

PASSAGE VIEWING DECK CHESS 1410

5320

TERRACE WOMENS TOILET 02 CARROM 2540

1445

KARATE SNOOKER 11140

2495 1040

DOOR 1175

6755

7100 MARK D1

1ELEVATION

23

SCALE 1:200

22

19 18 17 16 15

21 20

14 13

12

11 10

9

8

7

6

5

4

3

2

D2

1

D3 D4 D5 D6 D7

ELEVATION +19860

D8

TOP OF TENSILE STRUCTURAL 3710

D9 +16570 +16550

ELEVATION +16150 B.O.C OF THIRD FLOOR SLAB

MARK

3800

+13420 +13400

W1 W2

ELEVATION +12350

W3

B.O.C OF SECOND FLOOR SLAB

W4 4000

W5

Page 15

ELEVATION +8350

4000

B.O.C OF FIRST FLOOR SLAB

+5270 +5250

+5270 +5250

W6 W7 W8 W9 W10 W11


WALL IN ELEVATION

100

5 TREAD DETAIL

S.S STEEL PIPE OF 55MM DIA

EDGE OF UNFIN. TREAD

230MM THK. BRICK MASONARY

150

20

100

S.S STEEL PIPE INSIDE THE WALL

185

620

10

5 TREAD DETAIL

150

100MM THK.

WALL FINISHES

180

W1 - 20MM THK. DOUBLE COAT MALA PLASTER

20

C1 - 15MM THK. SINGLE COAT SMOOTH FACE PLASTER

125MM THK. BBCC LAYER 125MM THK. BBCC WITH 1:100LAYER RATIO SLOPE

STAIR FINISHES S1 - 20MM THK. POLISHED GRANITE STONE

18050

80

180

55 80

50 80

55

NO. S.S STEEL ROD INSIDE THE WALL

20MM THK. MALA PLASTER

REVISION

50MM FILLET EDGE FOR SAFETY S.S

S.S STEEL ROD INSIDE THE WALL 8650MM FILLET EDGE FOR SAFETY

180

230MM THK. BRICK MASONARY

50 80 30 35

W.DRG. NO.

A406

STAIRCASE DETAIL

50MM FILLET EDGE FOR SAFETY

800MM DIA 800MM DIA AT CENTRE AT CENTRE

86

SCALE: 1:20

KARATE

DATE : 01/05/2019

100MM THK. 2

2

HOUSE OF SPORTS

50MM THK. WOODEN SHUTTER 50MM THK. WOODEN SHUTTER

100MM

1595

TIRTH PATEL 16BAR014 INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY 200

W.DRG. NO.

A406

1 A405

1 BRK. THK. B

60 x 100MM THK. WOODEN FRAME 60 x 100MM THK. WOODEN FRAME STONE 25MM THK. GRANITE 25MM THK. GRANITE STONE 35MM THK. BASE COAT 35MM THK. BASE COAT 100MM THK. CONCRETE SILL 100MM THK. CONCRETE SILL

D6 A703

20 50 20 20

900 520 920

2635 2 20MM THK. C 15MM THK. BASE COAT C3 15MM THK. BASE COAT 55MM T 55MM THK. BED MORTAR 55MM THK. BED MORTAR 3 150MM 4 THK. GRADE SLAB T 150MM THK. GRADE SLAB5150MM 6

70

1

30MM DIA 1.5MM THK. SS STEEL ROD

2

150MM THK. BBCC 150MM THK. BBCC

10MM THK. SOLID SS METAL ROD 16MM DIA NUT

10MM THK. METAL PLATE

-3100 LVL. -3200 LVL.

8MM DIA 120MM LONG ANCHOR BOLT

1

150MM TH

COMPACT EARTH COMPACT EARTH

UP

Page 16

5 RAILING DETAIL SCALE 1:20

1

400MM DIA 400MM DIAAT ENDS AT ENDS

A405

400MM DIA 400MM DIAAT ENDS AT ENDS

30 390 30

3 CURBING WALL AND RAILING DETAIL

10MM THK. SOLID SS METAL ROD

30 390 30

150

92MM THK. EXPOSED RCC TREAD

25

150MM THK. CONCRETE SLAB

150

45

8MM DIA 120MM LONG ANCHOR BOLT

150MM THK. SAND FILLING 150MM THK. SAND FILLING

SNOOKER

200

3 55 20 25

12MM THK. WATER PROOFING LAYER 100MM THK. BBCC

2

A405

9 EQ. 25MM THK.TRE STONE ADS 25MM THK. STONE

100

55MM THK. BED MORTAR

C5

70 25

70MM THK. CURBING WALL 25MM THK. PLASTER

4 PLAN SCALE 1:20

25

25MM THK. PLASTER

72

70

5MM THK. S.S. PLATE 20 MM THK. STONE

6MM THK. TUFON GLASS

300

20 x 100MM S.S HOLLOW BOX SECTION

1 BRK. THK. BRICK MASONARY 1 BRK. THK. BRICK MASONARY 100MM THK. CONCRETE LINTEL 9 EQ. TREADS 100MM THK. CONCRETE LINTEL 35MM THK. BASE COAT 35MM THK. BASE COAT 25MM THK. GRANITE STONE THK. GRANITE STONE 3 25MM 60 x 100MM THK. WOODEN FRAME 4 5 60 x 100MM THK. WOODEN FRAME 6

+0600 LVL. +0500 LVL.

SS STEEL CLAMP FOR HOLDING GLASS

20 x 100MM S.S HOLLOW BOX SECTION

25MM THK. CEMENT PLASTER 25MM THK. CEMENT PLASTER 2635

1

SEMESTER: VI

S.S STEEL PIPE OF 55MM DIA

WELDED JOINT

SCALE 1:10

335

SCALE 1:10

TI I

A406

W.DRG. NO.

REVISION

8 HANDRAIL DETAIL

S.S. CLAMP

50 x 30MM S.S. HOLLOW BOX SECTION

800MM DIA 800MM DIA DESCRIPTION AT CENTRE AT CENTRE

DATE

20MM THK. MALA PLASTER

20 20

10MM THK. TUFON GLASS

7 HANDRAIL DETAIL

TIRTH PATEL INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY

SCALE 1:10

708

30 x 250MM S.S HOLLOW BOX SECTION

H

16BAR014 INSTITUTE OF ARCHITECTURE & 16BAR014 PLANNING, NIRMA UNIVERSITY

HANDRAIL DETAIL

55MM DIA 1.5MM THK. SS STEEL ROD

SE

DATE : 01/05/2019

TIRTH PATEL HOUSE OF SPORTS

NO.

55

SC

DATE : 01/05/2019

HOUSE OF SPORTS

SEMESTER: VI

S.S STEEL ROD INSIDE THE WALL

63

30 x 250MM S.S HOLLOW BOX SECTION

SEMESTER: VI

S.S STEEL PIPE OF 55MM DIA

SCALE: 1:20

DETAIL 8 8 HANDRAIL

SCALE 1:10

STAIRCASE DETAIL

SCALE: 1:20

20

150

8

SCALE 1:10

STEEL PIPE OF 55MM DIA

STAIRCASE DETAIL

86

SCALE 1:10 7 HANDRAIL DETAILHANDRAIL DETAIL

1 BRK. THK. BRICK MASONARY 25MMDESCRIPTION THK. STONE CAPPING DATE 25MM THK. STONE CAPPING 15MM THK. BASE COAT 15MM THK. BASE COAT REVISION 25MM THK. STONE SKIRTING 25MM THK. STONE SKIRTING

MALA PLASTER DESCRIPTION NO.20MM THK. DATE

S.S STEEL PIPE OF 55MM DIA

SCALE 1:10 SCALE 1:10

40MM THK. BED MORTAR 40MM THK. BED MORTAR

50MM FILLET EDGE FOR SAFETY 1 BRK. THK. BRICK MASONARY

23485

55

THK. W.P. LAYER S.S STEEL ROD INSIDE 3MM THE WALL

230MM THK. BRICK MASONARY

230MM THK. BRICK MASONARY

86 50

SCALE 1:10

20MM THK. MALA PLASTER WITH 1:100 RATIO SLOPE 100MM

23485

150

5 TREAD DETAIL

DETAIL 7 HANDRAIL 7 HANDRAIL DETAIL

N 32MM THK. WO 3MM THK. W.P. LAYERTHK.

20

SCALE 1:10

230MM THK. BRICK MASONARY

CELLING FINISHES

6 HANDRAIL DETAIL

60

150

300MM THK. CONCRETE BEAM 300MM THK. CONCRETE BEAM

F3 - 20MM THK. 600 x 600MM POLISHED KOTA STONE

SCALE 1:10

150

150

80 20 20

BEAM

F2 - ROUGH CONCRETE FINISH

S.S STEEL PIPE OF 55MM DIA

620

150

25MM THK. EX

FINISHES SCHEDULE:

55

WEDGE SHAPED TREAD

60

WALL IN ELEVATION

SCALE 1:10

30

1400

620

SCALE 1:10

150

WALL FINISHES

70 COAT x 20MM MALA STONE PLASTER AS DRIP HOLE W1 - 20MM THK. DOUBLE 70 x 20MM STONE AS DRIP HOLE 1 BRK. THK. BRICK MASONARY 1 BRK. THK. BRICK MASONARY 25MM THK. PLASTER CELLING FINISHES STONE CUT 25MM THK. THK. PLASTER 125MM BBCC LAYER CELLING FINISHES 125MM THK. BBCC WITH 1:100LAYER RATIO SLOPE C1 - 15MM THK. SINGLE COAT SMOOTH FACE PLASTER WITH 1:100SMOOTH RATIOTHK. SLOPE 3MM W.P. LAYER C1 - 15MM THK. SINGLE COAT FACE PLASTER 3MM THK. W.P. LAYER 40MM THK. BED MORTAR 40MM THK. BED MORTAR STAIR FINISHES STAIR FINISHES 20MM THK. STONE 20MM THK. STONE FLOOR FINISHES S1 - 20MM THK. POLISHED GRANITE STONES1 - 20MM THK. POLISHED GRANITE STONE 150MM THK. CONCRETE SLAB 150MM THK. CONCRETE SLAB F1 - 12MM THK. 600 x 600MM VITRIFIED TILES

6 HANDRAIL DETAIL6 HANDRAIL DETAIL SCALE 1:10

20 20

1400

400MM WALLDIA FINISHES 400MM DIAAT ENDS BED MORTAR AT ENDS

W1 - 20MM THK. DOUBLE COAT MALA PLASTER

80

80 20 20 60

F1 - 12MM THK. 600 x 600MM VITRIFIED TILES F2 - ROUGH CONCRETE FINISH 400MM DIA 400MM DIAAT ENDS SAND FILLING F2 STONE - ROUGH CONCRETE FINISH F3 - 20MM THK. 600 x 600MM POLISHED KOTA AT ENDS S.S STEEL PIPE OF 55MM DIA F3 - 20MM THK. 600 x 600MM POLISHED KOTA STONE

EDGE IS FILLET FOR SAFETY

5 TREAD DETAIL

150

FLOOR FINISHES F1 - 12MM THK. 600 x 600MM VITRIFIED TILES

20MM THK. MALA PLASTER

EDGE OF FIN. TREAD

FINISHES SCHEDULE:

FLOOR FINISHES COMPACT EARTH

20

SCALE 1:10

185

10

WEDGE SHAPED TREAD

S1

S.S STEEL PIPE INSIDE THE WALL

55

55

WEDGE SHAPED TREAD

ST

STONE CUT

FINISHES SCHEDULE:

30

185

30

1400

1400

S.S STEEL PIPE 20 INSIDE 100 THE WALL

200

BBCC LAYER

WALL IN ELEVATION

10

20

STONE CUT

EDGE IS FILLET FOR SAFETY 150

15

620 1400

590

1400

15MM DEEP NOSING

3 PLANCOLUMN DETAIL DETAIL 3 3 COLUMN SCALE 1:20

SCALE 1:50

+1420 SCALE 1:50 +1400

2840

9 EQ. TREADS

2 W2

SC


750

XTERIOR PLASTER

775

ELEVATION +4525 FINISHED TOP OF G.F. BEAM

125

OODEN SHUTTER . WOODEN PLANK

ELEVATION +3750 B.O.C. OF G.F. BEAM

2450

2420

500

. WOODEN PLANK

100

OF 750MM DEPTH

750

25MM THK. EXTERIOR PLASTER

775

1695

ELEVATION +4525 FINISHED TOP OF G.F. BEAM

BEAM OF 750MM DEPTH 125

ELEVATION +3750 B.O.C. OF G.F. BEAM

130

100

598

1695

700

698

2450

M THK. SILL BEAM

ELEVATION +1330 FINISHED TOP OF G.F. SILL ELEVATION +1200 B.O.C. OF G.F. SILL

2420

32MM THK. WOODEN SHUTTER 100MM THK. WOODEN PLANK

100

WOODEN FRAME 20MM THK. STONE

30

500

8MM THK. GLASS

100MM THK. WOODEN PLANK

252

150 102

100

130

700

755598

ELEVATION +0350 B.O.C. OF GRADE SLAB

ELEVATION -0405 FFL OF PLINTH

450

1000

150 455

245 755

150 95 150

150

455

ELEVATION +0602 FFL G.F.

150 102

1000

COMPACT EARTH

245 450

150MM THK. BBCC 150MM THK. SAND FILLING

ELEVATION -0650 B.O.C. OF PLINTH GRADE SLAB

ELEVATION -0405 FFL OF PLINTH

150 95

150

HK. SAND FILLING

20MM THK. STONE 20MM THK. CEMENT MORTAR 55MM THK. BED MORTAR 150MM THK. GRADE SLAB

150

150MM THK. BBCC

150

20MM THK. STONE CEMENT MORTAR THK. BED MORTAR THK. GRADE SLAB

1 BRK. THK. BRICK MASONARY

ELEVATION +0350 B.O.C. OF GRADE SLAB

ELEVATION +1330 FINISHED TOP OF G.F. SILL ELEVATION +1200 B.O.C. OF G.F. SILL

252

150

100MM THK. SILL BEAM

30

100MM THK. WOODEN FRAME 20MM THK. STONE

150

8MM THK. GLASS

ELEVATION +0602 FFL G.F.

698

BRICK MASONARY

ELEVATION -0650 B.O.C. OF PLINTH GRADE SLAB

COMPACT EARTH

2

2 WALL SECTION 3 WALL SECTION 3 SCALE 1:20 SCALE 1:20

Page 17


1

1

Page 18

The joinery detail of the tappered metal columns with the ground.

2

A pin joint to fix the metal column at the ground.

2


3

3

The joinery of the bale ring with the bolt rope.

4

This is the joinery detail of how the cloths and the bolt rope.

4

Page 19


02

SEMESTER 4

VA

The aim of the studio was to understand how the community open spaces funct The program was to design a m The studio started


HOUSING

AISHNAVA COMMUNITY SETTLEMENT

tion and how the community reacts to the surrounding context. This also teaches how different community people live together. mass housing scheme for the user groups of Vaishnava community in Banaras. with the analysis of the existing buildings and making its collage.


SITE

INFORMATION

The site is situated in Banaras near the banks of holy river Ganga at a distance of 700m. The context of the site includes sweet shops, saree shops, markets, medical stores, schools and temples. There is very little vegetation on the northern boundary of the site. The place around Company garden has a lot of vegetation. It is the only place, in a radius of about 5m, which has this much of vegetation.

CONCEPT

UNIT

Page 22

LEGEND 1. Site 2. Company Garden 3. River Ganga 4. Ram Ghat 5. Rabindranath Tagore Rd 6. Shri Gopal Mandir 7. Nichibagh Market

2 5

1 7

6

4 3

DESIGN

Type A

Type B

Type C

60-70m2

80-100m2

130-140m2


SERVICES G

E

G

E

D'

D'

F

F'

F

F'

A

A'

A

A'

C'

C

C'

C

B

B'

B

B'

G'

G' E'

E'

D

GROUND FLOOR AND

Green Area

D

N

GROUND FLOOR AND

Toilets

N

Solid and Void Page 23


PLAN

Page 24

AND

SECTION


CLUSTER: PLAN

AND

SECTIONS

VIEWS

Page 25


03

SEMESTER 3

The aim of the studio was to understand the im The program wa


MATERIAL

HERITAGE SHELL

mportance of the context for designing a building and how to respond to the existing context. as to design a heritage shell for the heritage city “Ahmedabad”. The client was the Government of Gujarat..


SITE

INFORMATION

2

The site is situated in the old city of Ahmedabad, Gujarat which has many trees and is known as the heart of the city. The site is currently utilized as the parking space for the locals. The site is surrounded by large tall buildings. There is a single entry to the site. It is surrounded by mostly commercial buildings as well as residential buildings. The wind direction is from South-West to North-East.

SITE

ANALYSIS

9 a.m.

12 noon

1 6

5 4 p.m.

4

7 3

LEGEND 1. Site 2. Teen Darwaza 3. Jama Mosque 4. Gandhi Road 5. AMC School 6. Danapith Road 7. Manek Chowk Rd

DESIGN

DEVELOPMENT

Climate orientation of the building.

Page 28

Terrace forming and segragating spaces.

Combining the circulation and the activity space.

Making it compact and increasing the open space.


PROCESS

MODELS

Page 29


GROUND

Page 30

FLOOR

PLAN


SECTIONS

VIEWS

Page 31


04

ALL SEMESTERS

RELA

The aim of this subject was to understand the verna 1) BANARAS 2) AHMEDABAD - Dal ni Pol


ATED STUDIES PROGRAMME ARCHITECTURE STUDY VISIT

acular architecture of the city. Their design, construction methodology, culture and the city planning. (Group Members: Tanisha, Sakshi, Diksha) (Group Members: Zeel, Akash, Sneha, Hemshail, Nikee)


BANARAS SITE

INFORMATION

The site is situated in Banaras located on the banks of the holy river, Ganges. Varanasi experiences a humid subtropical climate with large variations between summer and winter temperatures. Streets with continuous otla, a sitting space on both the sides of roads. Mainly otlas are occupied by the vegetable vendors. Narrow busy streets with shops on ground floor, with vehicular pedestrian and animal traffic. Height to the width ratio of the street to the adjacent building is high, due to which streets are always in shade.

BRACKET DETAIL

+1100.00 LVL

SCALE 1:10

+1100.00 LVL +950.00 LVL

UP

UP

+ 1495.00 LVL

+ 1670.00 LVL +1100.00 LVL

+ 1320.00 LVL ENTRY

+ 1370.00 LVL

+ 1200.00 LVL UP

+ 490.00LVL UP

+ 1100.00 LVL

+ 325.00 LVL

+ 475.00 LVL

+1400.00 LVL

UP

+1227.00 LVL

UP

+ 260.00 LVL +1550.00 LVL +1400.00 LVL

+1400.00 LVL

+1400.00 LVL

+ 420.00 LVL

SITE PLAN

+ 0.00 LVL + 1820.00 LVL

BRACKET DETAIL SCALE 1:10

SECTION AA'

SCALE 1:10 DOOR DETAIL

SCALE 1:10

DOOR DETAIL SCALE 1:10

DOOR DETAIL SCALE 1:10

Page 34


PLAN

AND

SECTIONS BRACKET DETAIL SCALE 1:10

DOOR DETA SCALE 1:10

SECTION AA' SCALE 1:10

SECTION BB'

SECTION AA'

B'

RSP

HOUSE I 7

RSP

COMPILED BY : TANISHA 16BAR006 SAKSHI 16BAR008 DIKSHA 16BAR012 TIRTH 16BAR014 GUIDED BY : FORAM B SUJAN U KRISHNA Y

2017 - 18 BANARAS IAPNU

0

0.5

1

2

2017 - 18 BANARAS IAPNU

GUIDED BY : FO SU KRIS

0

0.5

4M

UP +11.39 m LVL +11.39 m LVL

+11.24 m LVL

+11.39 m LVL

VERANDAH +4.19 mLVL

CHAWK +1.22m LVL

A' +11.39 m LVL

+7.16 m LVL

+11.39 m LVL +11.24 m LVL

+11.39 m LVL

UP

UP

A

+11.39 m LVL

+11.39 m LVL

+11.39 m LVL +11.39 m LVL

+11.39 m LVL

+10.53m LVL

UP

+11.54 m LVL

UP

OTLA +1.40m LVL

+0.00m LVL

HOUSE I 4 THIRD FLOOR PLAN

B

RSP

2017 - 18 BANARAS IAPNU

COMPILED BY : TANISHA 16BAR006 SAKSHI 16BAR008 DIKSHA 16BAR012 TIRTH 16BAR014 GUIDED BY : FORAM B SUJAN U KRISHNA Y

0

0.5

1

2

4M

Page 35

1


AHMEDABAD (DHAL NI POL) SITE

INFORMATION

“Dhal ni Pol” is built on a small hillock, reflected in its name Dhal, which means sloping or slanting. It consists of housing cluster of a particular group linked by caste, profession or religion. Basic material used is wood, because it is weather resistant, requires low maintenance and makes superstructure lighter. It has post and beam construction, in which spanning is done on the narrow side.

Pol - Pana Nagar ni Khadaki Ward No.- Khadia 2 Survey No.- 2348+2349 Material - Wood, brick & conc. Age of House - 50yrs (aprox) Str. System - Composite sys. (load bearing + post & beam)

1659

D' E

C'

5873

D01 OTLA FFL +240.00

2242

CHOKADI FFL +235.00

D02

D03

W01 D05 TOILET FFL +354.00 D04 BATHROOM FFL +354.00

PANIYARU FFL +421.00

D07 KHADKI FFL +354.00

3605

10324

D04

A

RASODU FFL +421.00

A'

UP

D05

D06

ORDO FFL +462.00

3652

B'

C

D E'

B

GROUND FLOOR PLAN NOTES All dimensions are in Millimeters unless specified otherwise

Page 36

REFLECTED GROUND FLOOR PLAN

LEGEND

PROJECT:

Wall Wood cut

wood

Conjectural line

Metal cut

Plumbing

Metal

Distress

UNIVERSITY:

KEY PLAN

SCALE

1 : 50

Documentation of WHC

DRAWING NAME: GROUND FLOOR PLAN

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

DRAWING NO.: PANA NAGAR NI KHADAKI POL WARD NO - KHADIA -2 INSTITUTE OF ARCHITECTURE & PLANNING, SURVEY NO - 2348+2349 NIRMA UNIVERSITY, AHMEDABAD

N

2348+2349/GF/01

DATE:

22/12/2018

DRAWN BY: TIRTH SNEHA NIKEE

16BAR014 17BAR004 18BAR060

CHECKED BY: DATE:

FACULTY MEMBERS

ZEEL AKASH HEMSHAIL

22/12/2018 SHWETA SUHANE VIBHA GAJJAR

16BAR039 17BAR013 18BAR075


800 800

2625

2627 2627

NOT ACCESSIBLE

821 430

NOT ACCESSIBLE

821 2811

2807 2807

2811

519

519

1560

1199 1199

2787

2783 2783

1560 520

2787

520

3276

3296 3296

3276

1932

472

1932

472

SECTION AA'

SECTION CC'

NOTES 490

A'

wood

Wall Wood cut Wall Metal Wood cut Conjectural line Metal Plumbing Conjectural line

Metal cut wood Distress Metal cut Distress

2134

A

SCALE

A'

UNIVERSITY:

1253

SCALE

DRAWING NAME:

KEY PLAN

DRAWING NAME:

Documentation of WHC

DRAWN BY: TIRTH SNEHA

SECTION AA'

1 : 50

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

A'

KEY PLAN

1 : 50

Documentation of WHC PROJECT:

DRAWING NO.:

SECTION AA' 2348+2349/SECTION/07

DRAWING NO.: DATE:

INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY, AHMEDABAD

POL - PANA NAGAR NI KHADAKI WARD NO - KHADIA -2 INSTITUTE OF ARCHITECTURE &2134 PLANNING, SURVEY NO - 2348+2349

2348+2349/SECTION/07 22/12/2018 2771

NIRMA UNIVERSITY, AHMEDABAD

DATE: 22/12/2018

B

A

Metal cut

ZEEL 16BAR039 AKASH 17BAR013 LEGEND 18BAR075 HEMSHAIL

Metal

are inZEEL TIRTH All dimensions 16BAR014 Millimeters unless AKASH SNEHA 17BAR004 CHECKED BY: otherwiseHEMSHAIL NIKEE 18BAR060 DATE: specified 22/12/2018

SHWETA SUHANE CHECKED BY: FACULTY MEMBERS DATE: 22/12/2018 VIBHA GAJJAR SHWETA SUHANE FACULTY MEMBERS VIBHA GAJJAR

B'

Distress

Conjectural line Wall Plumbing Wood cut

wood

Metal

Distress

16BAR039 17BAR013 18BAR075

Metal cut

1 : 50

101

B

DRAWING NO.:

UNIVERSITY:

Documentation of WHC

POL - PANA NAGAR NI KHADAKI WARD NO - KHADIA -2 SURVEY NO - 2348+2349

INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY, AHMEDABAD

101

2348+2349/SECTION/09

DRAWING NAME:

KEY PLAN

SCALE

DRAWN BY:563 TIRTH SNEHA NIKEE

16BAR014 17BAR004 18BAR060

ZEEL AKASH HEMSHAIL

16BAR039 17BAR013 18BAR075

1 : 50

101 CHECKED BY:

DATE:

SECTION CC' 22/12/2018

22/12/2018

DRAWN BY:

SHWETA SUHANE 16BAR014 ZEEL 17BAR004 AKASH 18BAR060 HEMSHAIL VIBHA GAJJAR

TIRTH FACULTY SNEHA MEMBERS NIKEE

DATE:

16BAR039 17BAR013 18BAR075

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

DRAWING NO.:

CHECKED BY:

2348+2349/SECTION/09 1202

2771

POL - PANA NAGAR NI KHADAKI WARD NO - KHADIA -2 SURVEY NO - 2348+2349

Plumbing

563

SECTION CC'

101

PROJECT:

Conjectural line B

DRAWING NAME:

KEY PLAN

SCALE

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

2107 2000

B'

2771

B'

78

16BAR014 17BAR004

NIKEE NOTES DRAWN BY:18BAR060

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

POL - PANA NAGAR NI KHADAKI WARD NO - KHADIA -2 SURVEY NO - 2348+2349

Plumbing

UNIVERSITY:

UNIVERSITY: 563

563

Documentation of WHC

INSTITUTE OF 1202 ARCHITECTURE & PLANNING, 2771 NIRMA UNIVERSITY, AHMEDABAD

22/12/2018 A'

2107

A'

DATE:

22/12/2018 SHWETA SUHANE

FACULTY 2771 MEMBERS

2771

DATE:

VIBHA GAJJAR

A

2107

A

2107

2000

803

INNER DOOR ELEVATION INNER DOOR ELEVATION

C'

C'

FRONT DOOR ELEVATION FRONT DOOR ELEVATION

FRONT ELEVATION FRONT ELEVATION

FRONT ELEVATION

C'

SECTION CC' SECTION CC'

1314

1314

1029

1029

B'

PROJECT:

PROJECT:

wood

Wall A Wood cut

B'

LEGEND

LEGEND

All dimensions are in Millimeters unless specified otherwise

490

B

C

C

SECTION CC'

B

C

SECTION AA'

are in ess rwise LEGEND

are in ess rwise

2625

430

SECTION CC'

SECTION BB'

SECTION BB'

109

PLAN AA'

869 PLAN AA'

PLAN AA'

LEGEND

PROJECT:

Wall Wood cut

wood

Metal

Distress

SCALE

1 : 10

KEY PLAN

DRAWING NAME: DOOR DETAIL 1

DRAWING NO.: 2348+2349/DETAIL 4/16 POL - PANA NAGAR NI KHADAKI WARD NO - KHADIA -2 SURVEY NO - 2348+2349

INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY, AHMEDABAD

1172

1172

1372

1372

DATE: 22/12/2018

PLAN BB'

DOOR DETAIL DOOR 3 DETAIL 3 DRAWN BY: TIRTH SNEHA NIKEE

16BAR014 17BAR004 18BAR060

ZEEL AKASH HEMSHAIL

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

Conjectural line Plumbing

UNIVERSITY:

Documentation of WHC

Metal cut

PLAN BB'

PLAN AA'

DOOR DETAIL 2 NOTES All dimensions are in Millimeters unless specified otherwise

PLAN AA'

681

PLAN BB'

CHECKED BY: DATE: FACULTY MEMBERS

22/12/2018 SHWETA SUHANE VIBHA GAJJAR

16BAR039 17BAR013 18BAR075

NOTES

NOTES LEGEND

LEGEND

All dimensions are in All dimensions are in Millimeters unless specified Millimeters unless specified otherwise otherwise

DOOR DETAIL DOOR 4 DETAIL 4 PROJECT:

Wall Wood cut

Wall wood Wood cut Metal cut

woodConjectural line Conjectural line

Metal

Metal Distress

Distress

MetalPlumbing cut

Plumbing

PROJECT:

UNIVERSITY:

UNIVERSITY:

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

SCALE

KEY PLAN SCALE

1 : 20

Documentation of WHC Documentation of WHC

1 : 20

KEY PLAN DRAWING NAME:

DRAWING NO.: PANA NAGAR PANA NAGAR NI KHADAKI POL POL -NI KHADAKI WARD NO - KHADIA -2 WARD NO - KHADIA -2 INSTITUTE OF ARCHITECTURE INSTITUTE & PLANNING, OF ARCHITECTURE & PLANNING, SURVEY NO - 2348+2349 SURVEY NO - 2348+2349 NIRMA UNIVERSITY, AHMEDABAD NIRMA UNIVERSITY, AHMEDABAD

DRAWING NAME: DRAWN BY:

DRAWN BY:

ZEEL TIRTH 16BAR039ZEEL 16BAR014TIRTH 16BAR014 AKASH 17BAR004 SNEHA 17BAR013AKASH 17BAR004SNEHA DOOR DETAIL 3 AND 4DOOR DETAIL 3 AND 4 NIKEE HEMSHAIL 18BAR075HEMSHAIL 18BAR060NIKEE 18BAR060

\Users\paragmistry\Desktop\project data\AMC-Haritage city\Darshi_FINAL\logos copy copybw.png

CHECKED BY: CHECKED BY: DRAWING NO.: DATE: DATE: 22/12/2018 22/12/2018

2348+2349/DETAIL 6/182348+2349/DETAIL 6/18 SHWETA SUHANE FACULTY FACULTY

DATE:

22/12/2018

DATE:

SHWETA SUHANE

MEMBERS MEMBERS VIBHA GAJJAR VIBHA GAJJAR 22/12/2018

16BAR039 17BAR013 18BAR075

Page 37


05

ALL SEMESTERS

This sector includes the w Other subjects includes - Building Co and Architectural Repre


OTHER WORKS

ARCHITECTURE STUDY VISIT

work done by me in other elective subjects along with the studio projects. onstruction and Technology, Architectural Graphical Skills, Structures, Basic Design esentation Technology. This enhances and helps in our studio projects.


ARCHITECTURAL GRAPHICAL SKILLS Model making of the temple named as Vadakkunnathan Temple, Kerala. The entire model was openable. The model was made in the scale of 1:20.

Front Elevation

BASIC DESIGN The exercise was to make a complex temporary structure which should be derived from the basic shapes. This started with making of complex geometric pattern and then giving it a third dimension.

Page 40

Ground Floor

First Floor


Second Floor

Third Floor

Fourth Floor

The exercise was to make an abstract sculpture using the attributes of a single fruit.

Page 41


BUILDING CONTRUCTION AND TECHNOLOGY Timber Joinery

Page 42


ARCHITECTURAL REPRESENTATION TECHNIQUIES

Page 43


DOME CONSTRUCTION 1

5

INSTALLATIONS

Page 44

2

3

6

7

4


BUILDING INFORMATION AND MODELLING (BIM)

Page 45


06

ALL SEMESTERS


SKETCHES and

PHOTOGRAPHY


SKETCHES

Mysore Palace, Mysore

Fatejpur Sikri, Agra Page 48

Carving Detail


Taj Mahal, Agra

Carving Detail

Humayun’s Tomb, Delhi Page 49


PHOTOGRAPHY

Page 50


Page 51


tirthpatel1703@gmail.com +91 84603 70103

Tirth Patel


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.