Statement of Qualifications

Page 1


“Delivering the complete solution for a better quality project....” Website: www.tkeengineering.com

Email: “Architects and engineers are among the most fortunate of men since they build their own monuments with public consent, public approval and often public money.” - John Prebble

admin@tkeengineering.com

Corporate Office: 2305 Chicago Avenue Riverside, CA 92507 Phone 951.680.0440 Fax 951.680.0490


Michael P. Thornton, P.E., P.L.S., M.S. President of TKE Engineering

“Infrastructure is the foundation upon which both our quality of life and our economic future rests. TKE was established with the mission of delivering the infrastructure for our future by providing high value professional Architectural, Engineering, and Construction industry services, with a personal touch. By fulfilling this mission, we will always be remembered by the contributions we made to our community and we can be proud of our legacy of being a lasting benefit to society.”

Corporate Office 2305 Chicago Avenue, Riverside, CA 92507 Phone 951.680.0440 Fax 951.680.0490

“We

are a highly motivated, dynamic firm with the goal of being the preferred consultant for Southern California.” - Jeffrey Scott, Principal of Planning


Company History TKE Engineering and Planning was established in 2000, and since our founding has developed into one of Southern California’s premier full service, multi-disciplinary Architectural, Engineering and Construction industry consulting firms. Our firm was established with the goal of providing high value, turnkey professional services with a personal touch in order to be a lasting benefit to society. One thing that differentiates our firm is that we approach our mission with a belief that understanding and meeting the needs of the community is vital to completion of a successful project. This approach, instilled by TKE’s management team and personified by TKE’s staff, ensures that our clients receive highly personal service on each and every project. As a result of the focus of the firm on our mission, we have earned a reputation for thoroughness, rapid turnaround, cost efficiency and overall outstanding quality of work. At TKE, we are committed to creating value and taking ownership in each task that we perform. As such, we have created a professional culture wherein each member of our staff constantly strives for increased efficiency, ultimately allowing us to provide highly professional services at competitive rates. Our culture of community building and constant value creation ensures that the services provided by TKE will always mean good stewardship of public and private resources. It is this commitment to service and diverse array of offerings that make us unique and drives our long-standing relationships with our clients, and it is these same qualities that make us the right fit for you.



Disciplines At TKE, we believe that the highest value for our clients is created when a single team moves a project or program from conception to completion. As such, we have created a sole source firm for project completion, whose comprehensive experience with all phases of project development and delivery allows you the ability to approach us with a problem, and working together, we are able to create a working and sustainable solution. Our multi-disciplinary team of professionals can work from your initial needs, determine solution alternatives, locate and acquire funding sources for implementation, design the preferred solution, manage its construction and ultimately deliver a finished product that exceeds your expectations. TKE Engineering and Planning’s team provides the following services:

• Civil Engineering • Traffic Engineering • Surveying, Mapping, and Right-Of-Way Engineering • Construction Management and Inspections • Planning • Construction/Design Build

• Architecture • Landscape Architecture • Environmental Planning and Sciences • Grant Writing, Funds Acquisition and Management • Project and Program Management • Municipal Consulting Services

“TKE’s multi-disciplinary team allows us to provide comprehensive solutions for all your needs.” - Terry Renner, Vice President of TKE


Civil Engineering TKE provides the highest quality in civil engineering project development, planning, and implementation. We take pride in the knowledge that our projects will serve to enhance the quality of life for the communities in which we live and work on a daily basis. We are committed to thorough and sustainable designs that allow for expedient and cost effective construction, ensuring that your resources are utilized in the most efficient manner. Our approach has resulted in recognition through several awards, including ASCE’s Public Improvement Project of the Year Awards in 2007 and 2009 for our work on Allesandro Boulevard in the City of Riverside and the San Bernardino Avenue Trunk Sewer for the Inland Empire Utility Agency. TKE’s founder, Michael Thornton, has been recognized by ASCE in 2007 as Civil Engineer of the Year for the State of California.

Services Include: TRANSPORTATION DESIGN

LAND DEVELOPMENT

• Construction plans, specifications, and estimates • Street and highway design • Project study reports • Project reports • Intersection geometrics • Signing and striping plans • Construction detour plans • Work area traffic control plans • Traffic management plans (TMP) • On-site circulation design • Traffic calming design • Drainage design

• Planning and zoning entitlement • Site design • Grading, street, sewer, water and storm drain pipe plan preparation • Final site and precise grading plan preparation • Wall and retaining wall plan preparation • Utility coordination • Cost estimating

“Without a strong and vibrant infrastructure, our nation will fall behind our competitors in productivity — and lose the high quality of life Americans have enjoyed for decades.” - Governor Ed Rendell and Senator Jim Inhofe


WATER RESOURCES

WATER AND WASTE WATER SYSTEMS

UTILITY COORDINATION AND DESIGN

DRAINAGE

• Water resources management • Feasibility and rate studies • Master planning and computer modeling • Construction plans, specifications and estimates • Hydrology and hydraulic analysis • Energy management services • Water quality management program (WQMP) • Storm water pollution prevention plan (SWPPP)

• Energy management services • Feasibility and rate studies • Master planning and computer modeling • Construction plans, specifications and estimates • Project budgeting

• Records research • Feasibility Studies • Dry Utility Design • Agency Coordination • Cost Estimating

• Regional and sub-regional master drainage plans • Area drainage plan updates • Stream bank revetment and protection • Landscape multi-use facilities • Construction plans, specifications, and estimates • Hydrologic modeling • Hydraulic floodplain analysis • Floodplain modification design • FEMA CLOMR updates • FEMA LOMR updates • Water quality management plan (WQMP)

“Civil Engineering is a great profession. There is the satisfaction of watching a figment of the imagination emerge through the aid of science to a plan on paper. Then it moves to realization in stone or metal or energy. Then it brings jobs and homes to men. Then it elevates the standards of living and adds to the comforts of life. That is the engineer’s high privelege.” - Herbert Hoover


Traffic Engineering California continues to attract the business, industries and workforce needed to support and maintain its economic expansion. As a result cities, counties and local communities are increasingly forced to keep pace with the mounting demands and stresses created by added congestion on roadways, highways and neighborhood streets. TKE’s traffic engineers blend practical approaches with technical innovation to create solutions that will alleviate the demands caused by the additional growth of our community. Our focus is on improving system performance to provide our clients with the best value for enhancing capacity and solving simple and complex operational problems, ultimately decreasing the stress on our community’s residents and economies.

“In this business there are very few problems that can’t be solved with some yellow paint and a little bit of common sense.” - Henry Barnes

Services Include: • Traffic signal systems design • Traffic control plans • Intelligent transportation systems (ITS) • Traffic signal coordination • Signal interconnect design • CCTV system design • Fiber optic systems

• Communication systems • Signing and striping plans • Signal warrant analysis • Highway lighting • Electrical design • Cost estimating • Construction plans, specifications, and estimates • Full specifications


Surveying, Mapping, and Right-Of-Way-Engineering Services Include: • Boundary, topographic, route, construction, as-built and legal surveys • Construction staking • GIS data acquisition • GPS surveys and aerial mapping surveys • Legal descriptions for easements and real property

• Sub-division and land planning • Survey maps, right-ofway engineering, topographic and plan and profile drawings

Accurate and detailed data collection and thorough establishment of property boundaries, ownership and restrictions are the first step to any successful project. Knowing this, our professional staff established a methodic and thorough approach to data collection and records research, ensuring that TKE collects the right data and the right amount of data, each and every time. During construction, our expert survey personnel take ownership of the project, supplying additional “eyes on the ground” and providing field level constructability review, adjusting construction in the field as required to match existing conditions, ultimately ensuring more expedient construction and reducing potential for future claims.

“Surveying has been an essential element in the development of the human environment since the beginning of recorded history. It is required in the planning and execution of nearly every form of construction. I’ve been and continue to be proud of our team’s ability to provide incredible service to our clients, ultimately continuing the fine tradition of our profession.” - Ron Musser, Director of Surveying


Construction Management and Inspections The construction phase of a project is where the visions, concepts and designs become reality. At TKE, our construction management and inspection staff is proud of our ability to ensure that the product designed for our clients is built as intended and to the highest level of quality. We accomplish this through early involvement during the design phase, throughout the bidding and contract award phase, then continuing through the construction phase to project completion and finalization. At TKE, we have developed a set of contract management and inspection procedures that ensure each construction project is both efficiently run and ultimately successful. Our proven, systematic methods furnish our clients with comprehensive tracking and detailed accounting for each construction project. Additionally, our thorough approach and attention to detail allows TKE to supply our clients with extensive documentation related to the project administration and inspection, ultimately defusing potential problems during construction and alleviating post-construction disputes that can arise with contractors.

“At our company, our Design and Construction Consulting Team not only helps eliminate the risks inherent in the construction process, they typically save our clients 5%10% on overall construction costs. They also help make sure projects come in on time.” - Terry Renner, Vice President of TKE

Services Include:

Project Types Include:

• Construction management • Construction contract administration • Design constructability review and plan checking • Public financing reimbursement documentation preparation and auditing • Coordination with goverment and regulatory agencies • Construction scheduling • Construction inspection

• Roadways and highways • Traffic signals • Storm drains and flood control channels • Detention/retention basins • Sanitary sewer collection • Wastewater treatment plants • Potable, irrigation, and recycled water systems • Distribution and transmission pipelines • Reservoirs • Booster, lift and pressure stations • Parks and streetscapes • Dry utilities


Construction / Design Build Our approach in the design build process is to offer to our clients a comprehensive project delivery system which reduces the risk to the owner. Built into this process is a streamlined endeavour which intertwines the design and construction process. The end result is a delivery schedule which is reduced. Our Construction team is well versed in the industry and has a vast background of projects under their belts. Providing our clientele with a streamlined process, and a single individual which carries through the project from start to finish, TKE offers a comprehensive construction model which eliminates confusion in the field and in the plans. The single point contract person will ease the project from start to finish.

Services Include:

Project Types Include:

• Construction management • Construction contract administration • Design constructability review • Coordination with government and regulatory agencies • Construction scheduling • Construction inspection

• Tenant Improvements • New Construction • Additions • Remodels • Interiors • Parks and streetscapes • Retail • Commercial • Civil Engineering • Restaurants


Municipal Consulting Services Services Include: • Capital Improvement program project development and implementation • Contract city and departmental management

• Staff augmentation • Engineering plan review • Standards and procedures development • Fee structure analysis and development

Successfully serving as extension of staff requires a specific mindset, that being service to community, ownership of direction and dedicated teamwork with existing staff. Municipal Consulting Services require a true partnership between us and our clients, a symbiotic relationship where we are able to directly achieve your goals and provide direct representation to our shared community. At TKE, we recognize the trust inherent in this relationship and we pride ourselves on expanding this trust and successfully serving our shared community. Our broad array of services and in-house team provide you a trusted consultant to turn to in any challenge, no matter how simple or complex. It is this commitment to service and diverse array of offerings that makes us unique and drives our continuing, long-standing relationship with our municipal service client base and it is these same qualities that make us the right fit for you.

“Coming together is a beginning. Keeping together is progress. Working together is success.”

- Henry Ford


Planning Services Include: • Comprehensive plan development • Community planning • Economic and fiscal impact analysis • Environmental planning and documentation • Growth management planning • Land use permits and approvals • Park, recreation, and open space planning

• Policy and regulatory analysis • Public involvement strategies • Site and development feasibility studies • Site and facility master planning • Transportation planning • Zoning and subdivision ordinance development • Urban planning

Innovative planning practice is focused on balancing community needs with limited resources, be it the need for increased transportation capability against open space, or the need for additional housing against an Environmentally Sensitive Area. TKE’s planning staff is committed to community outreach in order to determine the allocation of these resources, ensuring that the end result of the planning process is a comprehensive written path fully backed by the community it affects. Our dedication to this practice is consistent and thorough, whether we are assisting you with a new General Plan, a Specific Plan, or a comprehensive Park and Recreation Master Plan.

“For every site there is an ideal use. For every use there is an ideal site...” - John Ormsbee Simonds


Architecture Great architecture stirs the human spirit, leaving an impression that lasts. TKE’s architects provide elegant design solutions for both simple and complex projects. These solutions balance our client’s needs with project opportunities, resulting in meaningful and appropriate design. Responsive service is the core philosophy of TKE’s architects. At TKE, great architecture is simply the process of listening carefully to our clients and responding with focused solutions, creating a design that is reflective of our client’s vision.

Services Include: • Design and construction documentation for new construction, expansion and renovation projects • Master planning and programming • Feasibility studies and reports • Construction plans, specifications, and estimates

• Sustainable design • Historic preservation • Adaptive reuse • Interior design • 3D visualization and animation • ADA compliance evaluations • Site design

“Design is directed toward human beings. To design is to solve human problems by identifying them, examining alternate solutions to them, choosing and executing the best solutions.” - Ivan Chermayeff


Landscape Architecture Services Include: • Construction plans, specifications, and estimates • Erosion control and revegetation design • Master planning and site planning • Park and trail planning and design • Planting and irrigation design

• Roadside landscape design • Site analysis, assessment and development • Sports facility design • Streambank restoration design • Fuel modification plans

“The smallest patch of green to arrest the monotony of asphalt and concrete is as important to the value of real estate as streets, sewers and convenient shopping.”

- James Felt, Chairman, NYC Planning Commission

Green spaces have long been lauded for their ability to inspire and to provide increased livability and comfort to communities. Regulatory boards have increased their mandates over the years, seeking more sustainable and practical solutions to beautify their communities and jurisdictions. As a result, increased focus has come to green space for its added benefits of environmental protection and its role in sustainable design practices. At TKE, our experienced and committed landscape architecture staff provides the full scope of landscape architectural services. Because our staff has vast experience in landscape construction as well as design, TKE can develop plans that are aesthetically pleasing, technically sound and economically feasible. Our staff truly believes that “Green spaces are like people; each one is unique and has a purpose. Our challenge is being able to delineate and use that space to its full potential so that it can last a lifetime.”


Environmental Planning and Sciences Successful environmental planning and permitting is about the balance between the natural and built environments relative to the values, desires and needs of the community, while remaining in compliance with a regulatory process that can be overwhelming in its complexity. At TKE, we work in partnership with our clients to gain a complete understanding of each project and develop innovative and feasible environmental solutions. Relying upon our extensive experience and knowledge of current CEQA/NEPA requirements and processes, we produce thorough and defensible environmental documents necessary for the success of our clients and community. This commitment to excellence benefits the project applicant as well as the lead agency. Our team also provides a broad range of services that includes technical study preparation and regulatory permitting. Our considerable knowledge of the permitting process and our extensive relationships built over the years with the regulatory agencies provide us unrivaled opportunity to expedite the process, while ensuring compliance with all regulatory statutes.

“We do not inherit the earth from our ancestors, we borrow it from our children.” - Native American Proverb

Services Include: • Biological studies, including assessments and evaluations for sensitive, threatened, and endangered species • Coastal resource plans • Erosion control plans • Fisheries studies • Forest Service special use permits • Habitat conservation plans • Mitigation and monitoring plans • National Pollutant Discharge Elimination System (NPDES) permits

• NEPA/SEPA/CEQA documents, including EAs, EISs, and EIRs • Resource agency consultation • Stormwater pollution control plans • Vegetation and revegetation management studies • Water quality studies


Grant Writing,Funds Acquisition and Management

Services Include: • District formation and administration • GASB 34 and 35 compliance • Management and organization audits • Special tax assessment and administration

• Grantsmanship • Community Outreach • Fee and rate studies • Funding administration

Increasing pressures on both public and private financial resources has necessitated creative new ways to finance much needed community improvements. Recognizing this simple truth, our team has taken a proactive approach to funding acquisition and grant writing. The key to being successful in the grant writing, funds acquisition and management industry is specialized knowledge of funding opportunities and the ability to handcraft a message that is an ideal fit for that opportunity. We have successfully acquired millions of dollars for our clients for a wide range of project types through grants, loans, bond financing, special district formation, as well as special legislation at both the State and Federal level. Our funds acquisition services are enhanced by integration with our design services to facilitate integrated project delivery, expediting project start up and completion and ensuring compliance with funding requirements. Our extensive experience in the acquisition of infrastructure funding allows us to provide our clients with the unique solutions they require.

“People who write winning proposals do two things: they first, as a refresher and a discipline, read the guidelines. They make certain their proposal answers every question, implicit and explicit, they find embedded there. Then they build their argument from the four cornerstones of good grantwriting: tone, content, readability, and credibility.” - Anonymous


Project and Program Management Ownership of the end result of a project or program is the defining characteristic of TKE’s Project and Program Managers. Our results oriented focus and proactive management approach, coupled with our vast knowledge of challenge areas for project and program delivery, provides us matchless opportunities to efficiently deliver projects and carry out effective programs for our clients. We have created methodical and sustainable procedures for project and program execution, guaranteeing that each phase of each item managed by TKE is accomplished at exactly the right time to move the project or program forward. Simply put, at TKE, we succeed only if your project or program succeeds.

Services Include: • Program and project development and implementation • Cost control and schedule management • Design and construction management

• Project controls and documentation • Funding administration • Certification

“Project Management is like juggling three balls - time, cost and quality. Program management is like a troupe of circus performers standing in a circle, each jugglie - three balls and swapping balls from time to time.” - Steven R. Covey


TKE Project Staff TKE has assembled an elite team of professionals that have a depth and range of experience that make them unsurpassed. While we take pride in our history, our focus is on how we are performing on our current project, and how we might improve on our next one. Our team interfaces on a daily basis with top government officials, builders, and contractors, ensuring that we have the most current information at our disposal. We are experts at speeding designs through all the necessary channels, while ensuring that every detail is in order and every requirement met. Our senior staff has over two decades of experience in dealing with everything from intricate designs, tricky sites to bureaucratic red tape and we handle every challenge quickly, effectively and efficiently. It is the depth, breadth and experiences of our team members that have contributed to our reputation and our continued success. TKE has sought out those professionals that want to work in a creative, industrious, and team-oriented environment, and agree that quality service to clients is an abiding principal. After exhaustive background checks, extensive interviews, and often first hand knowledge of their abilities, over 20 professionals with extensive engineering and planning experience have come on-board with TKE.

“When

employees and employers, even co-workers, have a committment to one another, everyone benefits. We have people who have been in business with us for decades. We reward their loyalty to the organization and to our mission. We know that they’ll always be dedicated to what we’re trying to accomplish; excellent client service.” - Michael Thornton, President and Founder of TKE


Mr. Michael P. Thornton, P.E., L.S.

Mr. Terry Renner, P.E. Role: Principal - Civil Engineer

Role: Principal - in - Charge

Educational Experience: MS, Civil Engineering, California State University, Long Beach, CA

Educational Experience: BS, Civil Engineering, California State Polytechnic University, Pomona, CA

BS, Civil Engineering, California State Polytechnic University, Pomona, CA

Mr. Thornton, TKE’s President, is in charge of all TKE projects. He has over 25 years of experience in engineering planning, design, land surveying and construction management for public works projects. He has worked on a variety of public works engineering projects such as street improvements, park improvements, bike trail improvements and many others. Mr. Thornton has been responsible for managing including funding administration, planning, evaluating, and designing these projects and has provided construction engineering and surveying services for many of these same projects.

Mr. Renner is the Vice President of TKE and has considerable experience in civil engineering infrastructure projects, including sewer and water improvements, transportation improvements, drainage improvements, facilities improvements and recreation improvements. He has managed numerous projects and has delivered projects for the cities of Fontana, Upland, Riverside, Redlands, Corona, and Rialto. As a project manager, Mr. Renner has been responsible for design production, supervising a sta of engineers and drafters, coordinating work between the production team and the client, and submitting all deliverables in a timely manner. Mr. Renner ensures that plans produced by TKE continue to exceed industry standards.


Mr. Steven Ledbetter, E.I.T.

Mr. Ron Musser, L.S.

Role: Associate Engineer

Role: Director of Survey

Educational Experience: BS, Civil Engineering (Environmental) California State Polytechnic University, Pomona, CA

Educational Experience: Professional Land Surveyor

Mr. Ledbetter has gained vast professional experience over seven years in the civil engineering industry. He has handled various critical and challenging projects from the planning, design to implementation stages; all while ensuring that projects get executed as per specification in stipulated time with quality.

Mr. Musser has over 45 years of experience in performing field and oďŹƒce surveying services for public and private projects including roadway and highway projects. Prior to joining TKE Engineering Inc., Mr. Musser worked as a Partner in an engineering and surveying firm and supervised the mapping department providing mapping and calculations support for the firm’s projects.

He has a well rounded background in the preparation and analysis of street improvements, potable and nonpotable water improvements, sewer master planning and improvements, drainage master planning and improvements, including computerized system modeling, grading plans, erosion and sediment control and feasibility studies.

He has prepared records of survey, parcel maps and tract maps in San Bernardino County, Riverside County, San Diego County, Orange County and Los Angeles County. He has performed boundary, topographic, ALTA, and precise level surveys as well as Global Positioning Surveys.


Mr. Jerey F. Scott, ASLA Role: Principal of Planning, Architecture and Landscape Architecture

Ms. Monika L. Robinson Role: Director of Planning

Educational Experience:

Educational Experience:

BS, Landscape Architecture California State Polytechnic University, Pomona, CA

BS, Landscape Architecture California State Polytechnic, Pomona, CA

Mr. Scott is a Vice President and partnering principal in TKE Engineering and Planning and is responsible for business development, project management on high profile projects, as well as land planning, landscape architectural and architectural design on numerous projects, including design and planning for parks, streetscapes, sports facilities, schools, commercial, residential, and industrial developments. He has over 21 years of experience in land, park planning, landscape architectural, architectural design, and project management and construction management.

Ms. Robinson brings a rich background in the field of fine arts to her work in Landscape Architecture. She has a background of over twenty years in graphics, drawing and design. With over ten years devoted to the field of Landscape Architecture, she incorporates her knowledge of design and aesthetics into creating spaces that enrich the human experience. Ms. Robinson has completed a wide range of design and planning projects including parks and recreation master plans, public park design, streetscapes, institutional campus design, residential community master plans and model home designs. She thrives on taking a team approach to achieving project goals.


Mr. Matt Evans, LEED AP Role: Principal - Director of Architecture

Educational Experience: AA, Architecture/Product Design Chaffey College Alta Loma, CA

Mr. Evans, a licensed Architect in the State of California, has over 25 years of experience in the architecture field. His background includes work from the public realm including Civic and City Park Projects to private, including, office, commercial and religious facilities. Mr. Evans has extensive knowledge and experience in Code Compliance, City/Governing Authority Approval Process, Design and Construction Documentation as well as Construction Administration. Mr. Evans serves as TKE’s Senior Architectural Designer.

Mr. Todd Holmes, ASLA Role: Director of Landscape Architecture

Educational Experience: BS, Landscape Architecture California State Polytechnic University, Pomona, CA

Mr. Holmes, a licensed Landscape Architect in the State of California, has over 23 years of experience in planning, landscape architecture, and project management in a variety of diverse settings. Mr. Holmes was a division-level manager responsible for the budgeting, design and construction of park, trail, and landscape related capital improvement projects in the cities of Chino Hills, Temecula and Pasadena and in the counties of San Bernardino and Sonoma. Mr. Holmes has also been responsible for project planning at all levels, from neighborhood parks to city wide parks, and


Ms. Michelle Arellano

Mr. Ron Hagan Role: Senior Associate of Planning

Role: Plan Check Services

Educational Experience:

Educational Experience:

BS, California State University, Los Angeles, CA

BS, Civil Engineering California State Polytechnic, Pomona, CA

Mr. Ron Hagan is a Senior Associate for TKE Engineering and Planning. He provides services to prepare Park and Recreation Master Plans by acting as Project Manager. Mr. Hagan has been a Community Services professional for over 33 years, serving as Director of Community Services for the cities of Claremont, Fullerton and Huntington Beach, California. Ron provides the bridge between your City staff and the various disciplines at TKE by using his knowledge of how municipalities work and what is needed by staff in a Parks and Recreation Master Plan to make the Master Plan a truly working document.

Ms. Arellano is a licensed Civil Engineer in the State of California with over 20 years of experence in the Engineering field. She has worked on a variety of public works and land development engineering projects including street improvements, drainage improvements, water system improvements, and wastewater system improvements. This knowledge base along with her extensive background in construction projects offers a strong foundation for her ability and thoroughness in the plan checking process.


Mr. Shawn Ryan Role: Vice President of Construction

Educational Experience: BS, Construction Management California State University, Chino, CA

Mr. Ryan, has over 21 years of experience in the construction field. With fourteen years experience with The Bergman Companies specializing in New Construction, Big Box, Design Build, and Tenant Improvements nationwide, Mr. Ryan brings a wealth of experience and leadership abilities to the table. Shawn specializes in complete client service from project review in the design phase through bidding, supervising construction and project ground breaking. He has been acknowledged for his abilities to consistently meet deadlines, exceed quality and stay within budget.



Project Portfolios

TKE’s services have helped to guide the dramatic growth in Southern California. Our achievements are evident in innovative regional infrastructure systems, planning programs and development projects of all types throughout Southern California. This broad range of successful services is best illustrated through the results we have achieved throughout the years. We are pleased to present representative samples of our work and hope that you will take the time to review projects that will convey a sense of how we will approach fulfilling the requirements of your project to your satisfaction.

“We recognize that our reputation is built on maintaining high standards on every project every day.” - Michael Thornton, President of TKE



Architecture


Brawley Library Tenant Improvements Brawley, California

The Brawley Public Library is an existing 10,000 square foot library that serves the Brawley community. This existing library is an exceptional example of California Mission Architecture planned in a Greek Cross shape, providing beautiful courtyards for the users of the library to view during their visit. The interior of the library is benefitted by well shaped exposed roof trusses, making for a spacious and inviting interior. This is an interior upgrade project and when construction is complete, it will provide enhanced lighting, circulation, flooring, as well as providing specific uses such as computer stations that are more prevalent in today’s education. In addition to the interior remodel, we are correcting deficiencies in ADA circulation, ensuring that all of Brawley’s citizens will enjoy this enhanced community treasure.

Project Details Client Manager:

Mr. Jeffrey F. Scott

City of Brawley Client Contact: Completion Date: 2010 Project Cost: $310 Thousand

Project Services • Materials board • Construction design • Cost estimates and takeoffs • Tenant improvements

• ADA retrofits • Interior design • Lighting retrofit


Mead Valley Community Center Perris, Ca

Riverside County Economic Development Agency is the owner of the Mead Valley Community Center which is located on Rider Street in the Mead Valley area of Riverside. The project consists of a multi-disciplinary effort that includes surveyors, engineers, planning, landscape architects and architects. TKE worked closely to assist the County in developing site concepts, plans, specifications and construction cost estimates for the Mead Valley Community Center. Following final design and construction this new site will provide over 35,000 sf in new architectural amenities which will include: a new Community Center as well as an onsite Childcare, Food Services, Senior Center and Medical Facilities as well as an adjacent parking lot. Site amenities will include a new Baseball field, soccer field overlay, open space, outdoor amphitheater, perimeter walkway, community garden, tot lots with shade structures, security fencing and maintenance storage. Coordination efforts related to utility undergrounding and relocation as well as engineering related to streets, drainage and site design were a major component of this project too. The primary intention of the design was to mesh with the history of the area as well as provide a LEED compliant design.

Project Details Client Manager: Client Contact: Completion Date: Project Cost: LEED Certification:

Mr. Matt Evans & MR. Jeffrey Scott Riverside EDA 2013 $16 Million Certified

Project Services • New Construction • Site planning • Schematic Design

• Construction Documentation • Agency Coordination • Staking • Construction Management


Renck Community Center and Gymnasium City of Riverside, California

Mr. Scott worked with the City of Riverside to provide a conceptual master plan and construction documents for the Renck community center and Gymnasium. This project consisted of a new 15,000+ square foot community center building, as well as site improvements at Hunt Park. The design includes a new gymnasium, multi-purpose room, computer lab, youth room, and support offices. The facility is currently under construction, and is expected to be complete by November 2010.

Project Details Client Manager:

Mr. Jeffrey F. Scott

Client Contact:

Ms. Ewina Lau, City of Riverside 951.826.2012 Completion Date: 2009 design currently under construction Project Cost: $5 Million LEED Certification: Designed for Silver

Project Services • Multidisciplinary project • Conceptual overall site masterplan • Construction documentation

• Architectural design • Construction of new Community Center and Gym • Site planning and design


Sycamore Canyon Restroom and Maintenance Staff Offices City of Diamond Bar, California

Mr. Scott worked closely to assist the City of Diamond Bar in developing plans, specifications and construction cost estimates for the Sycamore Canyon Restrooms and Maintenance Staff Offices Project. This project consisted of a complete interior remodel of this 1,400 square foot park building including staff office, public restrooms, and a maintenance work room. The project required expanding the existing office and maintenance room and ‘gutting’ the public restrooms to provide new finishes and fixtures on a limited budget for the City’s Parks and Recreation Department.

Project Details Client Manager:

Mr. Jeffrey F. Scott

Client Contact:

Mr. Bob Rose, City of Diamond Bar 909.839.7061

Completion Date: 2009 design currently under construction Project Cost: $300 Thousand

Project Services • Multi disciplinary • Cost estimates and takeoffs • Conceptual design • Survey

• Architectural design and building expansion • Construction documentation • Interior design • Landscape • Irrigation


Civil Engineering


Upland Basin Expansion Retention Basin Expansion Phase 1 and Phase 2 Improvements City of Upland, California

The Upland Basin Project is located in the City of Upland, at the corner of Monte Vista Avenue and Arrow Route, north of the Interstate 10 Freeway. Prior to project design, TKE prepared a parcel map to divide the existing City-owned parcel and reconstruct parcel lines to accommodate the basin construction. The 40-acre, 1,300 acre-foot basin was constructed in two phases, expanding an existing flood control basin. Utilizing State grant and local funding, the project provides for 100-year flood protection and 200 acre-feet of water recharge storage, ensuring the safety of the residents and producing increased water supply for the City’s residents.

Project Details Client Manager: Client Contact:

Mr. Michael Thornton Mr. Bob Critchfield, Principal Engineer 909.291.2946 Completion Date: 2008 Project Cost: $25 Million

Project Services • Pre-project planning • Parcel map preparation • State grant application submission and coordination • Aerial target layout and mapping

• Specifications preparation • Construction management services • Construction staking • Quantity surveying for volume verification • As-built verification


San Bernardino Avenue Trunk Sewer Sewer System Improvements Mulberry Avenue to Cypress Avenue City of Fontana, California

This project consisted of approximately 19,500 linear feet of 48inch and smaller vitrified clay and reinforced concrete pipe sewer, including bore and jacked pipe and casings, two siphons and numerous diversion gates for flow diversion. The trunk sewer was constructed on San Bernardino Avenue between Cypress Avenue and Mulberry Avenue. The facility was constructed to convey 25 million gallons of wastewater to a proposed lift station, which will convey the water to Inland Empire Utility Agency’s regional plant number 4. This project was recognized by the Riverside and San Bernardino Counties Branch of the American Society of Civil Engineers as Public Improvement Project of the Year in 2009.

Project Details Client Manager: Client Contact:

Mr. Michael Thornton Mr. Chuck Hays, Public Works Director 909.350.6530 Completion Date: 2008 Project Cost: $11 Million

Project Services • Conventional surveying • Project management • Construction management • Construction staking

• Inspection • As-built verification • Funding administration • Inter-agency coordination


Foothill Boulevard Street Improvements Street, Sewer and Storm Drain Improvements Ilex Avenue to Redwood Avenue City of Fontana, California The Foothill Boulevard street, sewer and storm drain improvements project is located in the City of Fontana, north of Interstate 10 Freeway and East of the Interstate 15 Freeway from Ilex Avenue to Redwood Avenue. Street widening and sidewalk improvements provided for increased vehicular capacity, corridor beautification, a bike lane extension and improved traffic and pedestrian safety. Turnkey design services were provided by TKE for approximately 11,800 linear feet of street widening, sewer and storm drain improvements, bike lane extension and median improvements. TKE prepared all legal descriptions, right-of-way acquisition plats, temporary construction easement plats and grant and easement deeds for 33 separate parcels, as well as providing construction staking.

Project Details Client Manager: Client Contact:

Mr. Terry Renner Mr. Felipe Molinos, Principal Engineer 909.350.6571 Completion Date: 2007 Project Cost: $8 Million

Project Services • Street, sewer, storm drain and on-site improvements plans, specifications and estimates • Bidding assistance • Construction staking • As-built verification

• Conventional ground design surveying • Right-of-way documentation preparation • Temporary construction easement preparation


Mission Springs Water District Dos Palmas Water System Replacement Project Phase 1 and Phase 2 City of Desert Hot Springs, California The Dos Palmas Water Replacement Project is located in the City of Desert Hot Springs, north of Dillon Road. TKE provided aerial target layouts and construction document preparation for approximately 36,100 linear feet of water system replacement improvements including pipeline, valves, fire hydrants, meters and appurtenances. System improvements provided replacement for leaky pipelines and services and utilities State grant funding. TKE prepared legal descriptions, right-of-way acquisition plats, temporary construction easement plats and grant and easement deeds for 5 separate parcels. During construction, TKE provided construction staking and as-built verification.

Project Details Client Manager: Client Contact:

Mr. Michael Thornton Mr. Brent Gray, Engineer Manager Mission Springs Water District 760.329.6448 Ext. 151 Completion Date: 2007 Project Cost: $8 Million

Project Services • State grant application submission and coordination • Aerial target layout and mapping • Right-of-way documentation preparation

• Temporary construction easement preparation • Water system replacement improvement plans, specifications and estimates


Stuart Avenue Storm Drain Drainage Improvements Pearl Avenue to Redlands Boulevard City of Redlands, California The Stuart Avenue Storm Drain Improvements Project is located in the City of Redlands, south of the Interstate 10 Freeway, between Texas Street and Orange Street. Drainage improvements provided for 100-year flood protection for downtown businesses. Conventional ground survey, construction documents and construction staking were provided by TKE for approximately 4,400 linear feet of storm drain improvements. TKE prepared legal descriptions, right-of-way acquisition plats, temporary construction easement plats and grant and easement deeds for 2 several parcels.

Project Details Client Manager: Client Contact:

Mr. Terry Renner Ms. Rosemary Hoerning, Director of Municipal Studies City of Redlands, 760.329.6448 Ext. 151 Completion Date: 2009 Project Cost: $2.5 Million

Project Services • Conventional ground design surveying • Right-of-way documentation preparation • Temporary construction easement preparation

• Storm drain improvement plans, specifications and estimates • Construction staking • As-built verification


Landscape Architecture


San Bernardino Avenue Median and Parkway Enhancement City of Fontana, California

The San Bernardino Avenue Streetscape project is located between the streets of Commerce Drive to Cherry Avenue, in the city of Fontana. Median planting and the southern parkway were designed, incorporating both hard and softscape. Existing landscaping at Commerce, was critical and the new streetscape was closely modeled to tie the two areas together. The irrigation system has been designed to maintain all watering within the planter areas and to alleviate overspray and minimize water usage. We are proud that the completion of this project will beautify this primarily industrial area and bring pride to the residents of Fontana.

Project Details Client Manager: Client Contact: Completion Date: Project Cost:

Ms. Monika Robinson Title Agency Currently under design $1.2 Million

Project Services • Construction management • Cost estimates and take offs • Conceptual design and layout • Construction documentation

• Multidisciplinary project • Survey • Civil engineering • Landscape architecture


Tyler Streetscape Median Enhancement City of Riverside, California

The Tyler Streetscape project is located between the streets of Hole Avenue to Wells Avenue. This project addressed the beautification of a street which was also being widened. Medians were designed with alternating planting and pavers, providing a scenic view for the entire 2.0 mile length of the project. The palette was selected to match current standards within the surrounding area and to provide continuity and appealing aesthetics. Close attention to the overall maintenance demand of the medians was taken into consideration and a 12” maintenance band was incorporated into the design to alleviate access constraints. The end result is a streetscape which blends well with surrounding neighborhoods and restores a sense of community pride in a socioeconomically depressed area.

Project Details Client Manager: Client Contact:

Ms. Monika Robinson Mr. Philip Hannawi, Principal Engineer City of Riverside 951.826.5706 Completion Date: Currently under design Project Cost: $700 Thousand

Project Services • Conceptual design • Cost estimates and take offs • Construction administration

• Construction documentation • Hardscape • Landscape • Irrigation


Fullerton Bike Trail City of Fullerton, California

The Fullerton Bike Trail Expansion project is located in the area behind St. Jude Medical Center. The new connection to the existing bike trail was to traverse through existing natural landscape areas as well as a steep slope. Working with the City, the Army Corp of Engineers, as well as the Project team, plant mitigation and landscape design were approached with careful planning. Irrigation was designed to be a temporary water source to establish new planting and to later be abandoned for a natural landscape as plant growth progressed.

Project Details Client Manager: Client Contact:

Mr. Jeffrey F. Scott and Ms. Monika Robinson Mr. Richard Wilson Bureau Veritas North America, Inc. 714.431.4122 Completion Date: Currently under design Project Cost: $3 Million

Project Services • Cost estimates and take offs • Site analysis • Construction documentation • Project management • Plant mitigation


Ruben S. Ayala Park Expansion Project Chino, California

Mr. Scott was responsible for the management and delivery of this 68-acre expansion of Ruben S. Ayala Park in Chino. The project was delivered by a multi-disciplinary team that provided conceptual and final design, as well as construction observation services for this community gem in Chino. The park features four tennis courts, four basketball half courts, and nine soccer fields. Additionally, a synthetic turf field for soccer and football was provided, boasting covered stadium seating for over 300 spectators. Colorful tile mosaics and water misters are just some of the amenities incorporated into the 68-acre park development. A 100’ diameter circular play area with an adjacent brick seat wall was custom designed, with areas for children ages 2-5 and a separate area for ages 5-12.

Project Details Client Manager: Client Contact:

Mr. Jeffrey F. Scott Mr. Mike Kolling, Director City of Chino 909.464.0768 Completion Date: 2007 Project Cost: $14 Million

Project Services • Survey • Civil Engineering • Architecture design • Landscape architecture • Site planning

• Lighting • Construction management and observation • Cost estimates and take-offs • Construction documentation


Windsong, Heritage Regency, Marna O’Brien and Perret Park Riverside County EDA, California

Mr. Scott served as the lead designer for the renovation of four park sites in Riverside County. The multi-disciplinary design team of engineers, surveyors and landscape architects provided conceptual designs and plans, specifications as well as construction cost estimates for each of the renovated parks. The park sites ranged from 2.1-acres to 9-acres. Amenities included children’s playground, a basketball court, restroom facilities, decomposed granite walkways, baseball fields, historical art features, tot-lots, arbor structures, a custom gazebo and pier with view area seating, and picnic areas.

Project Details Client Manager: Client Contact:

Mr. Jeffrey F. Scott Mr. Aurelio Aguirre, Regional Manager Director Riverside Community EDA 951.955.6682 Completion Date: 2007 Project Cost: N/A

Project Services • Children’s playgrounds • Basketball courts • Restroom facilities • Decomposed granite walkways

• Baseball fields • Historical art features • Arbor structures • Custom gazebo • Pier with viewing area


Perris Morgan Street Park, Phase 2 Perris, California

The City of Perris is a rapidly growing community in Southern California. When fully constructed, the 48-acre Morgan Park will provide the community with a major recreation facility with an emphasis on Soccer. The design concept for the park was sensitive to needs of families visiting the park. Restrooms are centrally located, while childrens play areas are positioned to allow independent play within the watchful eyes of parents observing events on the field. Phase 2 amenities will complete the western edge of the park and increase parking on the south side of Morgan Street. Each phase has been designed to provide the community with a fully appointed neighborhood park project prior to the completion of the entire master plan.

Project Details Client Manager: Client Contact:

Ms. Monika Robinson Mr. Darren Madkin, Assistant City Manager City of Perris

Completion Date: 2009 Project Cost: $5 Million

Project Services • Cost estimates, and take offs • Site analysis • Park master plan for Ph. 11

• Construction documents • Landscape mitigation • Flood zone coordination • SLE coordination


Construction & Design Build


Mead Valley Community Center Riverside County Economic Development Agency is the owner of the Mead Valley Community Center which is located on Rider Street in the Mead Valley area of Riverside. The project consists of a multi-disciplinary effort that includes surveyors, engineers, planning, landscape architects and architects. TKE worked closely to assist the County in the construction process. Comprehensive construction management on site is currently being performed. This new site will provide over 35,000 sf in new architectural amenities as an adjacent parking lot. Site amenities will include a new Baseball field, soccer field overlay, open space, outdoor amphitheater, perimeter walkway, community garden, tot lots with shade structures, security fencing and maintenance storage.

Project Details Client Manager:

Mr. Shawn Ryan

Client Contact: Riverside County EDA Completion Date: In progress Project Cost:

$2.5 Million LEED Certification: Certified

Project Services • Construction Management • RFI Review • Submittal Review • Site Documentation • Change Order Review

• Weekly Construction Meetings • Agency Coordination • In-House Design Team Coordination • Site Survey

Perris California


Best Buy Long Beach, Ca

This 45,000 square foot Best Buy was located in Long Beach and was a negotiated project based on past construction performance. Following completion of construction the overall project achieved LEED Silver certification. Mr. Shawn Ryan headed up coordination efforts with contractors, local agencies and inspectors. In all projects Mr. Ryan is involved in his approach is that of a team environment. Creating an ease of communication and providing his vast knowledge base related to Big Box construction allows for quick resolve of existing issues in the field. This store was able to open early due to construction being completed ahead of schedule.

Project Details Client Manager: Client Contact: Completion Date: Project Cost: LEED Certification:

Mr. Shawn Ryan Best Buy 2007 $1.1 Million Silver

Project Services • Project Scheduling • 45,000 sq. ft. build out • Cost Estimating • Early grand opening • Sub-Contractor Negotiation • 1009 Best Buy Store Prime Contractor: Bergman Construction Manager: Shawn Ryan


Lakewood Collection Lakewood, California

This 3.1 acre development consisted of 3 buildings, parking lot, switch back ADA ramp and landscaping. The buildings totalled 22,000 square feet of retail space, and included the following clients: Rubios, Corner Bakery, Its a Grind, T-Mobile, Dry Cleaner, Pick up Stix and Hawian BBQ. Mr. Shawn Ryan performed comprehensive construction management services on site. Design team & agency coordination was an on going daily effort which provided an ease of constructability and communication. onsite inspections were coordinated through Mr. Ryan. Value engineering was a continuous process to allow for the most cost savings benefits for the owner. This project was completed on time and under budget.

Project Details Client Manager:

Mr. Shawn Ryan

Silvercreek Properties Client Contact: Completion Date: 2005 Project Cost: $5.4 Million

Project Services • Project Scheduling • Sub-Contractor Negotiation • Ground Up Construction • Site Utilities

• TI for various clients • New Edison Transformer • Cost Estimating

Prime Contractor: Bergman Construction Manager: Shawn Ryan


Planning


Kessler Park Master Plan San Bernardino County Special Districts, California Mr. Scott served as the lead designer and Project Manager and worked in conjunction with the City of Fontana and San Bernardino County Special Districts Department to provide a conceptual master plan for the joint renovation and expansion of the existing neighborhood park and equestrian center. Placing an emphasis upon both active and passive recreation that may be accessed by a broad spectrum of ages and abilities, the master plan proposes the renovation of little league and soccer fields, an equestrian center, tot lot, picni areas, parking, and accessibility to the community center. The proposed expansion incorporates the adjacent capped landfill to provide new soccer and football fields on synthetic turf, parking, additional tot lots, picnic areas, enhanced trail systems, as well as an expanded maintenance and concessions facility.

Project Details Client Manager: Client Contact:

Mr. Jeffrey F. Scott Mr. Greg Bacon County of San Bernardino 909.387.6076 Completion Date: 2008 Project Cost: $60 Thousand

Project Services • Sports park master planning • Site analysis • Cost estimates and take offs • Conceptual exhibits


Diamond Bar Parks and Recreation Master Plan Diamond Bar, California Mr. Scott was responsible for the development of this Comprehensive Parks and Recreation Master Plan for the City of Diamond Bar. The scope of the project consisted of inventory of the city parks, school, and joint use facilities. Public outreach and interviews, statistically valid community phone survey, web based survey, community workshops, recreational programming inventory, as well as demographic analysis and projections were evaluated. Demand and needs analysis, cost and financial analysis, funding analysis, priorities for capital improvements and review of park department ordinances and developments were presented for consideration as well.

Project Details Client Manager: Client Contact:

Mr. Jeffrey F. Scott and Mr. Ron Hagan Mr. Bob Rose City of Diamond Bar

Completion Date: 2010 Project Cost: N/A

Project Services • Community outreach and input • Park standards • Site planning • Trail planning

• ADA access • Park design • Master plan documentation • Survey of public


Moreno Valley Parks, Recreation and Open Space Comprehensive Master Plan Moreno Valley, California The Moreno Valley Parks, Recreation and Open Space Comprehensive Plan is the initial comprehensive park planning document for the City. The plan provides a vision for park planning, parks maintenance, operation standards, recreation, open space and an action plan for implementing the vision. The plan includes research and recommendations for short term and long term park planning, park acquistion, recreational programming and funding. Throughout the process, the team was involved in numerous community outreach interviews, presentations to the community and workshops with special interest groups.

Project Details Client Manager: Client Contact:

Ms. Monika Robinson and Mr. Ron Hagan Mr. Mike McCarty, Parks and Comm. Serv. Director, City of Moreno Valley 951.413.3701 Completion Date: 2010 Project Cost: $130 Thousand

Project Services • Master plan documentation and preparation • Park, recreation, and maintenance standards • Funding opportunities

• Community outreach • Design charettes and open space • Park inventory


Surveying


Upland Basin Upland, California

The Upland Basin Project is located in the City of Upland at the corner of Monte Vista Avenue and Arrow Route north of the Interstate 10 Freeway. Prior to project design TKE prepared a parcel map to divide the parcel and reconstruct parcel lines to accommodate the basin construction. The 40-acre, 1,050 acre-foot basin was constructed in two phases expanding an existing flood control basin. Utilizing State grant and local funding, the project provides for 100-year flood protection and 200 acre-feet of water recharge storage. TKE provided aerial target layouts and mapping services by Aero Tech Surveys, construction staking, quantity surveys to verify earthwork volumes moved by the contractor and final as-built verification to ensure basin was constructed to grade.

Project Details Client Manager: Client Contact:

Mr. Ron Musser Mr. Bob Critchfield, Principal Engineer City of Upland 909.291.2946 Completion Date: 2008 Project Cost: N/A

Project Services • Pre-project planning • Parcel map preparation • State grant application submission and coordination • Construction management services

• Construction staking • Quantity surveying for volume verification • As-built verification • Aerial target layout and mapping


Upland Metrolink Depot Upland, California

The Metrolink Station Depot Rehabilitation and ‘A’ Street Improvement Project is located in the City of Upland along ‘A’ Street and Campus Avenue and included construction of historic depot building renovations and street, drainage, and water system improvements. The exterior of the building was completely renovated including removal of lead base paint and restoration of outdoor lighting, ADA access, construction of a patio area and other site improvements to permit commercial reuse of the building. Offsite improvements including construction of 48” diameter storm drain (a portion being bored under the railroad system), 12” replacement waterline, and street improvements. The street improvements included decorative streetlights and enhance concrete sidewalks to beautify the corridor and enhance economic

Project Details Client Manager: Client Contact:

Mr. Ron Musser Mr. Jeff Zwack, Redevelopment Director City of Upland 909.931.4148 Completion Date: 2007 Project Cost: N/A

Project Services • Project management • Construction staking • Program management including processing with local Assistance for Federal TEA Funds

• Design revisions as required by field inspection • As-built verification


San Antonio Community Park Upland, California The San Antonio Community Park Project is located in the City of Upland at the northwest corner of Mountain Avenue and 24th Street. Prior to project design TKE performed an aerial target layout survey and supplemental conventional survey to collect appropriate information for street and parking lot design. TKE prepared construction drawings and specifications for the construction of the street improvements, including retaining walls, sewer improvements, electrical lighting improvements, parking lot, playground, sidewalk and overflow lot grading plans. Park design was prepared utilizing all generated material onsite within a landscape mound feature at the center of the parking lot to avoid any cost for material export. During construction TKE performed construction staking for the approximately 4-acre park site.

Project Details Client Manager: Client Contact:

Mr. Ron Musser Mr. Bob Critchfield, Principal Engineer City of Upland 909.291.2946 Completion Date: 2003 Project Cost: N/A

Project Services • Aerial target layout • Supplemental conventional design surveying • Construction staking

• Grading, street, sewer, electrical, playground and parking lot plan preparation • Specification preparation


San Bernardino Avenue Street Improvements Fontana, California

The San Bernardino Avenue street and storm drain improvements project is located in the City of Fontana north of Interstate 10 Freeway and East of the Interstate 15 Freeway from Commerce Drive to Cherry Avenue. Proposed median and sidewalk improvements minimize turning movements providing for increased vehicular capacity, corridor beautification, and improved traffic and pedestrian safety. Conventional ground survey and construction staking was provided by TKE for approximately 8,800 linear feet of street median, sidewalk and storm drain improvements. TKE provided utility and railroad coordination for the relocation and adjustment of various utility improvements (i.e., power poles, meters, vaults, etc.) and the railroad crossing upgrade. TKE prepared all legal descriptions, right-of-way acquisition plats, temporary construction easement plats and negotiated with property owners for 5 separate parcels.

Project Details Client Manager: Client Contact:

Mr. Ron Musser Mr. Brendon Biggs, Chief Transportation Planning Divison, County of San Bernardino 909.387.8166 Completion Date: 2009 Project Cost: N/A

Project Services • Conventional ground design • Edison, water, gas and Telephone surveying utility relocations and • Railroad crossing upgrade coordination improvements and coordination • Right-of-way documentation Preparation


Tyler Street Widening Project Riverside, California

The Tyler Street widening project is located in the Southwest Riverside area between Wells Avenue and Hole Avenue. Improvements will provide for corridor beautification and improved traffic and pedestrian safety. Conventional ground survey was provided by TKE for approximately 6,200 linear feet of street widening, bike lane extension and median improvements. TKE prepared all legal descriptions, right-of-way acquisition plats, temporary construction easement plats and grant and easement deeds for 49 separate parcels. TKE is providing conventional survey or public and private improvement areas, street improvement and on-site improvement plans, environmental document preparation, right-of-way documentation preparation, and specification and estimate preparation.

Project Details Client Manager: Client Contact:

Mr. J. Scott Petersen Mr. Philip Hannawi, Principal Engineer City of Riverside 951.826.5341 Completion Date: 2009 Project Cost: N/A

Project Services • Conventional ground design surveying • Environmental initial study preparation • Right-of-way documentation preparation

• Temporary construction easement preparation • Street and on-site improvement plans, specifications and estimates


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.