Part 1 Architecture Undergraduate Portfolio

Page 1

T

Portfolio | Tonderai Prince Maboreke

Part 1 (BA)Architecture



It is the way architecture affects the psyche that intrigues and fascinates me about design. I am an award winning creative graduate with a passion for modern art, design and construction. My mathematical and scientific background has provided me with a pragmatic set of skills and knowledge. I am able adapt to any working context and pride myself on my excellent communication skills. My ‘can do attitude’ enables me to utilise my skills to achieve the best possible outcome.

Tonderai Prince Maboreke ARB Part 1 Architecture Graduate Born:24.01.1994 Email: tpmaboreke@gmail.com Home:02088595803 Mobile: 07801854388


The Future of Biomimicry in Architecture

(BA)Architecture Thesis


01

1 KINGS CROSS (1)

02

ROTARY (13)

03

S.I.C (21)

04

BOX (25)

05

SOYE ACADEMY (31)

06

CORPORIS (35)

07

TAIWAN INTERNSHIP (41)

+

ART WORK (50)


01 1 KINGS CROSS | THE PAST, PRESENT AND FUTURE KINGS CROSS, LONDON, UK

CONCEPT “1 Kings Cross” is a mixed-use development inspired by the past present and future the location. The design is made up of a Hotel, Public Garden (consisting of a suspended market and Elevated track) a Learning Centre and rehousing the existing network rail signal box. The entire master plan anticipates the development of Kings Cross. As the demographic in the area continues to change, my design seeks to create a space where the existing deprived migrant community and new corporates can coexist. During a period of Brexit, the design facilitates the unity of two different demographics.The creative skills of the migrants are on display in the market at the “Gateway to London”. The idea is that people are drawn towards this extra-ordinary building when entering London to see that it is a true reflection of the nation’s multicultural nature. The idea of a “healthier London” is also integrated into the scheme with an elevated track to promote walking.The incorporation of a facade where algae grows from make the building an advert for tackling pollution.

eG Th

y to London atewa

Year 3 Final Project 2018 Kings Cross, London

Regents Cana l

1


Site Area: 4400m2 INE

YL ILL

REG

EN

TS C

AN

AL

D

Commercial

BEDROOM

BAR LOUNGE

BEDROOM

MEETING ROOMS

BEDROOM

MEETING ROOMS

BEDROOM

RESTAURANT

MARKET SIGNAL BOX

LEARNING CENTRE

Social

B.O.H.

Year 3 Final Project 2018 Kings Cross, London

CA PIC

ZONE DIAGRAM

2


Year 3 Final Project 2018 Kings Cross, London

The relationship between the footpath and central courtyard draws is designed to draw people into the market space.

3

Initial Sketch


A

20m

0

20m

40m

A

Year 3 Final Project 2018 Kings Cross, London

NEW STATION EXIT ONTO SITE

4


ISOMETRIC VIEW

A series of models testing the potential arrangement of programmes and forms in relation to the surrounding context. This includes sunpath, views outs of site and private/public access areas. DEVELOPMENT MODELS 5


0

25m

50m

75m

100m

SITE PLAN

125m

Road HO

TEL

HO

TEL

RO O

Co MS

urt

AM

yar d

ENI TI

ES

Views Views CA

NT

Railway

ILE VER Railway

R

VE

E TIL

N

CA

VOLUMETRIC DIAGRAMS

Year 3 Final Project 2018 Kings Cross, London

25m

6


CENTRAL COUTRYARD

MARKET

Year 3 Final Project 2018 Kings Cross, London

A multi-purpose space for the community to socialise, exercise and relax.

7

East Elevation


4 EXPLODED STAIR ISOMETRIC VIEW

3

2

1

EXPLODED ISOMETRIC VIEW 1 Learning Centre 2 Market

SUSPENDED WALKING TRACK

3 Suspended Garden & Track 4 Hotel

8


2

1

6 4

5

3

B

B

Year 3 Final Project 2018 Kings Cross, London

SECTION B-B

9

1 Bedrooms

2 Lobby

3 B.O.F

4 Track

5 Signal Box

6 Terrace

10m

0

10m

20m


6 VOID VOID

6

VOID

2

2

2

3

1

4 1

1

5

6 VOID

6 First Floor

Second Floor

Fourth Floor

1 Bedrooms 2 Lobby 3 Restaurant 4 Meeting Rooms 5 Rooftop Bar 6 Terrace

10


1 2 400mm

4

0

400mm

Galvinised Steel Facade 1 50mm Galvinised Steel Panel

3

4 3 2 5

2 Aluminium Bracket 3 Thermal Break 4 Insulation

1

Ventilation System 1m

0

1m

Welded Diagrid Node Detail 1 Diagrid Steel Tube 2 Vertical Stiffener 3 Side Stiffener 4 Web Stiffener 5 Perimeter Girder Steel Diagrid

DIAGRAM A TYPICAL HOTEL BEDROOM

DA

C

11 SECTION C-C

10m

0

10m

20m

C


LOBBY

YORK WAY SITE ENTRY 12


02 R TARY | EAT, SHARE, LIVE BERMONDSEY, LONDON, UK

CONCEPT A community kitchen in the middle of a Bermondsey Council Estate. Inspired by the surrounding trees, the design provides a space that residents can call their own. It is shared to collectively grow, maintain and indulge in hydroponically farmed vegetables.The design provides a space for the children to still play below.

SITE

Year 3 Negotiated Brief 2018 Bermondsey, London

PLEASE SCAN TO WATCH SHORT VIDEO

13


From my observations I took note of the fact people still liked to play and interact amongst each other.This is something I will consider in my design.

14


Year 3 Negotiated Brief 2018 Bermondsey, London 15

Southwark Councils scheme to preserve the trees in the borough.The abundance of trees in the area influenced my design as I sought to create a design that related to the surrounding context. The intervention allowed for the children to still play beneath the structure whilst the parents watch from the balconies.


SECTION A-A

A

Year 3 Negotiated Brief 2018 Bermondsey, London

A

16


South African Brai

Gathering around a central space.

Allows circulation under the structure.

Lifted the space in response to tree surroundings.

VOLUMETRIC DIAGRAMS

Red - Circulation In/Around Site Blue - Children Playing Beneath Site Purple - Circulation Beneath Site

Year 3 Negotiated Brief 2018 Bermondsey, London

West Elevation

17

10m

0

10m

20m


1

2 3

4 5

Scale 1:10 200mm

0

200mm

400mm

Steel Mast Detail 1 Anchor 2 Pull Cable 3 Block 4 Divertor Pully 5 Steel Cable

STRUCTURE The structure is supported by a central concrete core and tensile steel cables along the perimeter. The cables are attached to steel masts anchored in the ground.

EXPLODED ISOMETRIC VIEW

18


HYDROPONICS HARVESTING

Up

19

Do wn

wn Do

Year 3 Negotiated Brief 2018 Bermondsey, London

Down

Up

FLOOR PLAN

10m

0

10m

20m


2 5

6 1

3 4

1 6

DETAIL SECTION 1 Global Truss 2 Double Skin System 3 Vegitation 4 Water Supply 5 Steel Cable

Scale 1:20 400mm

0

400mm

800mm

1200mm

6 Steel Connection

Year 3 Negotiated Brief 2018 Bermondsey, London

5

20


03 SOCIAL INFORMATION CENTRE (S.I.C) | SMALL BUILDING BANKSIDE, LONDON, UK

CONCEPT An Information Centre proposal on Bankside that acts as a directional map pointing to popular destinations around London. The site is situated in a space where, tourists, commuters and residents often pass by. The new landscape facilitates routes people take in around the site whilst also providing elevated seating areas for people to gather.

-The Barbican -Museum of London -St Pauls

Royal Opera House

Tower of London Buckingham Palace

-Shard -Borough Market

Elevate

Ark Globe Academy

Locate

Solid

Year 1 Project 2016 Bankside, London

Connect

21

American Institute Of Architects Student Award Winner 2016


SITE London, SE1 9JB

American Institute Of Architects Student Award Winner 2016

22


SITE PLAN

STRUCTURE 23

American Institute Of Architects Student Award Winner 2016


Year 1 Project 2016 Bankside, London

ISOMETRIC SECTION

American Institute Of Architects Student Award Winner 2016

24


04 BOX | MASTER PLAN PROJECT ELEPHANT & CASTLE, LONDON, UK

CONCEPT

Year 2 Project 2017 Elephant & Castle, London

A scheme to deveop a masterplan transforming a derelict site in Elephant and Castle into a public swimming pool containing multiple amenities. I designed the restaurant/cafĂŠ to parasitically sits upon the historic bathhouse. The idea was to maximise views out towards the site, solar gain whilst creating a relationship with the surrounding pool.

25


SITE Manor Place Depot, Elephant and Castle, SE17 3BD Located adjacent to a busy commercial Walworth Road and surrounded by multiple residential units. Train line from Elephant and caste runs dirrectly through the site.

Walworth Road Residential

Traintrack

Year 2 Project 2017 Elephant & Castle, London

Commercial

26


SITE SECTION

PROPOSAL The transformation of a derelict site in Elephant & Castle into a public swimming pool with multiple amenities.The master plan provides a place for a multi-cultural community to come together. Also provides a solution to anti-social behaviour problems by providing an activity for the youth to get involved in.

27

STRUCTURE


28


1

2

5

Parapet Detail 1 Existing Masonry Wall 2 Installed Floor 3 Lag Bolt 4 6mm Thick Plate

4

5 Con Plate

3

Scale 1:10 200mm

0

200mm

400mm

6

3

2

1

Year 2 Project 2017 Elephant & Castle, London

5

29

4 1 Restaurant 2 Kitchen 3 Gallery 4 Bar 5 Swimming Pool 6 Reception

4m

0

4m

8m

12m


4

1

3

2

5

SECTION

Scale 1:100 0

1

Restaurant

2

Kitchen

3

Gallery

4

Roof Garden

5

Swimming Pool

2m

4m

6m

8m

10m

Year 2 Project 2017 Elephant & Castle, London

2m

30


05 SOYE ACADEMY | INTERNATIONAL FINSA COMPETITION DHAKA, BANGLADESH

CONCEPT The project was set to improve education for those effected by natural disasters, health, displacement and community. Modular structures made of locally sourced bamboo an adapt to situation of flooding.

FINSA Competition 2017 Dhaka, Bangladesh

A brand partnership between Khan Academy and Apple, the online programme empowers learning where ever they are and their situation.

31


Site Location:BANGLADESH, Monsoon Season.

FINSA Competition 2017 Dhaka, Bangladesh

SITE

32


BEFORE BEFORE

DURING DURING

AFTER AFTER

3

4 3

2

1

EXPLODED TEMPORARY STRUCTURE 1 Reinforced Bamboo 2 Steel Columns 3 Finsa Super Pan Tech P5

FINSA Competition 2107 Dhaka, Bangladesh

4 Bamboo Facade

33


Stage 1 Entrance

A

A

Stage 2

Entrance

Stage 3

BLUE - ACCOMODATION GREEN - EDUCATION CENTRE/MEDICAL FACILITIES RED - EDUCATION CENTRE BROWN - WASTE FILTER NETTING Column Detail

If flood rises above 1m the central permanent education centre is left to flood. People will migrate to the 10 surrounding structures to continue their education. The further surrounding 22 are accommodation.

FINSA Competition 2017 Dhaka, Bangladesh

Inflatable rafts are attached to the structures as an insurance package in-case structures collapse.

SECTION A-A

34


06 CORPORIS | DUAL-USE, RESTAURANT/GALLERY SHORDITCH, LONDON

CONCEPT

Year 1 Project 2016 Shoreditch, London

A dual-use Restaurant/Gallery based on the journey food takes during digestion through the human body. The structure and form of the interior immitates various parts of the human anatomy.

35


SITE

Year 1 Project 2016 Shoreditch, London

Village Underground, 54 Holywell Ln, Shoreditch, London EC2A 3PQ

36


Year 1 Project 2016 Shoreditch, London ISOMETRIC SECTION A-A

37 A

A


Ground Floor

Mezanine 1

Mezanine 2

10m

SECTION B-B Red - Gallery Users Blue - Restaurant Users

2m

0

2m

4m

6m

0

10m

20m

8m B

B

Restaurant users are able to view the art work whilst eating their food. Both functions happen simultaneously.

Year 1 Project 2016 Shoreditch, London

DUAL-USE

38


RESTAURANT

GALLERY

39


Year 1 Project 2016 Shoreditch, London

PHYSICAL MODEL

40


07 TAIWAN INTERNSHIP 2018 TAIPEI, TAIWAN

CONCEPT Refurbishment of the Taiwan factory that manufactured 80% of the world cup jersey for Nike and Adidas.

Chen Interior Desig Internship 2018 Taipei, Taiwan

S ew

ing

th

The concept was to create a structure that would tie the new and old frames together similar to a needle and thread.

41

r ture Togethe c u tr eS


42


43

Chen Interior Design Internship 2018 Taipei, Taiwan


44


ChengDu Hotel

Produced details for multiple projects such as the images at the bottom of the page. Structures reaction to lateral forces tested on various softwares.

Location:Taipei

Create a buiding without columns: -Two Steal Plate Sheer Walls -Five Brace Frames Internally

Envision Engineering Internship 2018 Taipei, Taiwan

CONTRIBUTION

45

Box Beam C-Channel I-Beam

Brace Frame -Connection between Beam and X-Brace

-Connection between Wall and Beam


46


Site

Produced initial plans for a luxury Villa in Taiwan at early design stages. My proposed interpretation of the concept to the lead architect.

CONTRIBUTION

47

Tonderai.M


Happier Cafe

Created the graphics for a series of I phone cases based on the firms project ‘Happier Café’.The project and product were displayed in an exhibition in Japan.

JC Architecture Internship 2018 Taipei, Taiwan

CONTRIBUTION

48


49

Art Works


50

Art Works


T 51


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.