Taisei Manheim Environmental Learning Center
Concept Statement: The building is located at Phillips Park in Carrick and before becoming a park, the site was known as Dilly’s Grove which was an amusement park that had roller coasters, merry go-rounds, and other attractions. The theme park was intended to attract people to the end of the train line from Downtown Pittsburgh and the rest of Pittsburgh. In 1904 the land was purchased by John McFarlane Phillips and he had hundreds of different types of trees native to Pennsylvania planted in the park. However, he got sick and his replacement cut down most of the trees. This project proposes to replant all of the native trees of Pennsylvania within the part and implement a bike powered roller coaster ride that weaves through all of the different trees so that people could learn more about the plants native to Pittsburgh in a way that ties in with its amusement park past. The Environmental Learning Center is placed near the intersection of Spokane Avenue and Parksfield Street in order to be accessible and visible to the Carrick community. The building has two wings: one which is mainly public spaces like the cafe and event space and the other as an educational space with classrooms and think tanks. Both wings offer views into the park and the public wing is closer to the street for easier accessibility, while the educational wing is further into the park for insulate it from the noise from the street. The building serves as a gateway into the park and visitors to the park are funneled through a thick stone wall and between these two wings into the park with a framed view of the park and the ride. As you proceed through the building and into the park the building transitions from a thick stone wall that faces the North side and wood claded walls on the East and West sides into a glass facade on the South side with columns that extend past the facade holding up the large overhang that sticks into the park. These columns make ambiguous the edge condition of the building and transition into more natural forms as they extend further into the park. The overhang starts to open up on certain areas as it sticks out further into the park to represent the transition from the roof to the sky.
Th Ta ink nk
Ba
th r
oo
m
El
ev at or
Co nfe ren
Clas
sroo m
ce R
oo m
Bath room Clos
et
Offic e Offic e
Clas
sroo m
Co p y Ro om
Offices and Services
Eve nt S pac
e
Education
Public Spaces
N
1” = 128’
Sky Cycle
Hotchkiss Bike Monorail
Carl Eugen Langen Bike Monorail
N
Th Ta ink nk
Ba th ro om
El ev at or
Co n fe re n ce Ro o
Clas
sroo
m
m
Bath
r o om Clos
et
Offi
ce Offi
Clas
sroo
ce Cop
m
Eve
nt S
y Ro
om
pac e
Second Floor 1/8” = 1’
N
Th Ta ink nk
Ba th r
oo m El ev at or
Clas
sroo
m
Bath
r o om Kitc
hen Caf
Clas
sroo
Livin
m
Eve
Ba se m en t
St or ag e
e
nt S
gR oom
pac e
Ba th ro om El ev at or Ele Ma vato Ro chin r om e
Lo ck er Ro om
B Ro ike om
First Floor 1/8” = 1’ Fir Pro e Ro tect om ion
Bath Sto r
r oo m
ag e/I T Ele Ro ctric om al
Clos
et Loc k er
Roo m
B as e Mec ment Roo hanica l m
Basement 1/8” = 1’
N
North Elevation 1/8” = 1’
South Elevation 1/8” = 1’
East Elevation 1/8” = 1’
West Elevation 1/8” = 1’
1/8” = 1’
Th Ta ink nk
Ba
th r
oo
Th Ta ink nk
m
El
Ba
th r
oo
m
El
ev at or
ev at or
Co nfe ren
Clas
sroo m
Clas
Bath room
sroo m
ce R
oo m
Bath room Clos
Kitc hen
et
Offic e
Ca f e Clas
Livin
sroo m
Eve nt S pac
First Floor Structure
Offic e
gR
Clas
oom
e
sroo m
Co p y Ro om
Eve nt S pac
1/16” = 1’
Roof Structure
e
1/16” = 1’
N
Lighting Simulation
Energy Simulation
Clipped on Stone Veneer Vented Air Space 1" Minimum 6" Rigid Insulation Air Barrier 8" Concrete Masonry Unit Metal Lash Mortar Setting Bed Adhered Stone Veneer 2 Piece Adjustable Veneer Tie Protection Board that extends 6" below grade
Structural Connection 3/4" Engineered Hardwood 1/16" AcoustiTECH VP 30mm Fermacell E-32 (2 x 10mm Gypsum Fiberboard + 10mm mineral wool) 60 mm Honeycomb Fermacell filled with Honeycomb Infill granules CLT 5-Ply (7") 18" Glulam Beam
Concrete Masonry Unit Filter Fabric Surrounding Coarse Gravel 6" Rigid Insulation Perimeter Drain System Capillary break between footing and foundation wall Isolation Joint Concrete Footing Reinforcing Per Code 4" Concrete Slab Vapor Retarder 4" Gravel Drainage Layer
Scale: 1/2” = 1’
N