Aviation: New York, NY: Delta T4 JFK: 500,000 SQ.FT.
Lead team in simultaneous delivery of design to schematic design and construction documents for 500,000 sq.ft. addition to airport terminal. Assisted client in developing program adjacencies and relationships. Responsible for coordinating with client and engineering needs and design process in a fast paced environment and ever changing program.
Delta T4 JFK
Hospitality, Retail, Food and Beverage: Toronto, ON: Holt Cafe, Bloor Street: 4,800 SQ.FT.
Worked with client to develop design drawings into filing set and construction drawings with a team. Provided construction administration responsibilities. Tracked construction costs and budget.
Holt Cafe, Bloor Street
Hospitality, Retail, Food and Beverage: New York, NY: Intersect by Lexus: 12,000 SQ.FT.
Assisted in developing design drawings into construction drawings for a 3 story, 12,000 square foot, high end hospitality venue. Project Architect role in construction coordinating between the client, contractors and consultants.
Intersect by Lexus
Retail: New York, NY: Adidas 5th Ave. Flagship: 42,000 SQ.FT.
Lead project coordinator from start to finish. Developed design drawings into filing and construction drawings for Adidas largest flagship store in the world (42,000sqft.). Provided construction administration and completed project on time. As project architect, independently developed design and construction drawings for adidas Re-Org project. This project has been published in numerous publications and has received multiple retail awards.
Adidas 5th Ave. Flagship
Commercial: Brooklyn, NY: Atlantic Galleria: 42,000 SQ.FT.
Provide design development, construction documents and construction administration for 3 story ground up landlord shell building. Coordination with Michaels anchor tenant, Blink Fitness, and TD Bank tenants. As Project Manager, I ensured the project was on schedule, coordinated between tenants and consultants, oversaw site meetings, and reviewed finishs for design intent.
r
r
H
I
I
I
I
I
I
----� �� ---_J -----_J_ 1 1 7
----*� --�- -4------ J------L�--�+-----· ,--�-.,---
I
I
I
I
I
I
I
I
��ro----r .........
;:: : - - -� PROOflMG THROOGH-ouJ... TYP., I
RErERTOSTRUCTURAI.
I
I
I
I
I
I
- -
-
I
I I
I
,----------�---=� (,
l
I I
L
w
•
'o
;
B
g: V)
'-' r;:
u .., Q_
::,
z w
Eb:.:
'-' i= z
0�
:s �
I I,
-1.- --- --7-- I
·fri-"""
- -- -�.z;I
--=- �--;;"t
,,.
I
I
I
INTIRIORm-OOTTO r---FJ£.Fll£DUMDEII
I
Eb
D
p
: ���
BOERUM PLACE BOERUM PLACE
ACOUSTICAL SCR[W W INSTALLIDBYOTHERS
cos
''°"°"'"'" :� i
. ���,,-1�� _: ',,,"•·,� ,. I
.,;
I
-�-
�>
'
w ::,
<{
(_)
:s �
;::
z
..
>- w w
G .✓ ,
u� r;:
u
:1:.
TOW[R ROOT, SE(A-311,f3
- --
H•GH PO�T
Eb
BOERUM PLACE /,\, "'(ei
Atlantic Galleria Base building floor plan s for cellar, first, second, and roof.
�>
BOERUM PLACE
◊
0
--
� �� $
--
al
1" INSULATED GLAZING IN DARK BRONZE 2½,"X 7½" STOREFRONT SYSTEM (TYP.)� BY LANDLORD
BRICK VENEER ON STEEL STUD BACKING SYSTEM
y i
.:i.lo·
PARAPET EL. +38'-6" PARAPET EL. +35'-6"
i !
ALUCOBOND PANEL SYSTEM ON STEEL STUD BACKING TYP.
EL.
_., PARAPET
$ ROOF
EL. +32'-0"
I" GLAZING IN DARK BRONZE 21/i"X 7½" STOREFRONT SYSTEM (TYP.) BY LANDLORD -------1---+--�
DOORS
--
-4--
-4
$ SECOND FLOOR
SECOND FLOOR � EL. +16'-0"
OTHER TENANT! SIGNAGE UNDER SEPARATE PERMIT, TYPICAL
311
_,q, "-'-� E�. L �+35='-6-.--
ROOF � +32'-0"
ALUCOBOND PANEL SYSTEM ON STEEL STUD BACKING
Bl-PARTING AUTOMATIC SLIDING
1-f--<'
EL. +16'-0"
VENEER ON RY WALL
14'-9" 18'-6" 16,_4• 6'-8" ,«---------------------�,',«----------,<-,<�---------,r------,�-------,(-
TENANT SIGN ANCHORED TO VERTICAL MULLION
ALUCOBOND PANEL SYSTEM ON STEEL STUD BACKING
BRICK VENEER ON STEEL STUD BACKING SYSTEM
311
PARAPET EL. +38'-6" PARAPET EL. +35'-6" ROOF � EL. +32'-0"
$ T.O. SIGNAGE EL. +25'-0"
-4--
E.I.F.S
I" GLAZING IN DARK BRONZE 2½"X 7½" STOREFRONT SYSTEM (TYP.) BY LANDLORD ALUCOBOND PANEL SYSTEM ON STEEL STUD BACKING
22'-6"
Atla ntic Ga lleria Base building exterior elevations.
22'-0"
11'-3"
7'-5"
7'-10"
6'-4"
7'-10"
,<------,r----,r-----)f
- -G
PRE-FINISHED METAL
�Tl��sw6L.EATS� LAPALLSEAMS4'. ' ,
'-"-51<-
0
---, - - - - - -
_ '':,c <' -'-
A.l.l.YNJHEAl;[)R)O' SVSTEMMEM!JRANECM:R 1/'.!"�0V..S.S $HEATHN)CM:IIMl:TAI. SI\..OS!lAACmAT16'0.C
_ _ f
SLOPE
--
-'"""' >'llf----ffit--
�,c-
~---'-----:r------
CONDFL. EL16'-0"
6'METAL STUD FRAMING PROVlOE BAACNG
0
-
6'METAL STUD FRAMING PROVlDE 6AACING
���l�LATION 6€TWEEN STUDS
---- �����f����6VER 5/8" DENS GLASS SHEATHING OVER METAL ST UDS BRACING AT 16'0.C.
ElRE;AKMl:TAI.AND COl'INGTOMATCH
=
----j-
' ,(, le---- ��tJ�f��o/oveR 5/8" DENS GLASS SHEATHING OVER METAl STUDS 8RACING A16 T '0.C.
1-------h.--1+--rJt:��RAL
R..20 MIN. CONTINUOUS INSULATK)N ENTIRELY ABOVE DECK
DETAILS
R..20 MIN. CONTINUOUS INSULATK)N ENTIRELY ABOVE DECK BRICK VENEER WITH " 1 AlRGAPAND2 LAYERS DENS GLASS ON 3- 5/8' METAL STUD SECURED TO BUILDING STEEL
META!. STUD FRAMING ANDTY?EX GYP BOAAD BY LANDLORD FOR T ENANTS EXCEPT MCHAEL 'S
+--4��-H'lc-- --- tt-''-ti- - - f6!i:i�i�i1 � D Ti BUl.OINGSTEEL tt--lt-- -- �S1 J��7oo BELOW Jl�+<:4A---'\- ROO!'OECK. I Jkb,::;o:j::,---"c---'\--H-1mfF= =- �6rJ��s INSULATK)N
I.!--
SECURE STOREFfiONT SYSTEM TO BUILDING ST EEL.
' 2 x6 ' STEEL TUB€ ATTACHED TO STEEL BEAM ABOVE BY MEANS OF VERTCALSTEEL MEMBERS AT 4'-0' O.C REFER TO ST RUCTURAL ENGINEER FOR DETAlLS. PROVIOE 6'STUDS, 16'O.C. BElWEEN T UBES. R..13 MIN.INSULAT0N BETWEEN STUDS.
-
PROVlOE BLOCKING TO SECURE STOREFRONT SYSTEM TO BUILDING STEEL.
- ����D TY?EX GYP. BOAAO BY LANDLORD FOR TENANT S EXCEPT MICHAEL'S
=
'""'"' .....,_.. """'""'°"'",., """"woo,
r
"-
1.111,. 1
PRE-CAST $TON SILL WITH DRIP EDGE
I'
FlASHNG
•" �
BOND COAT
ON 6€\IEL EDGE. COLOR TO MATCHBfllCK
BASeFLASH,NG'�
I
J
� I
I
I
'
SACKERROOAND
sEALAN
I
''
I
Ra7.5 CONT INUOUS INSULATO<
""'
I
,II
_J
I I
TYPE X GYP. BOAAD
WRAP PRE- FNSIHED META!. FLASHING AAOUND BLOCKNG AND CANT
#4 RE8AR0 32"0.C NI
ALUC060ND ALUMINUM COMPOSITE MATERtALSYSTEMon 5/8"0ENSGLASS SHEATHING
6'CMU BLOCK WITH MIN R-13SLEEVE INSULATION ; �OOA ��� -O �
+----HJ!t.-8M\s:-- --it-'-'if-- - - f6!'6'. i�fui1�DTi BUl.OING STEEL
..
REBAR 048'O.C WELS DRILLNG & PQXY GfiOUND0' 1 IN TO FOUNDATK)NWALL
--�-----d-----"-f
lllr't"--s±l-----'s;-7�J-trr-tt-- - - �Nt��s INSU TION LA
PR OVlOE CONTINUOUS WAT ERPROOFING TYP
I
7
TYP.
"'" T
TYP€ X GYP. BOARD
I �
-►� ..
FOUNDATION WALL MAY BE PARTIALLY EXPOSED ABOVE SIDEWALK MIN.4"- MAX.6'
(Al
=<= I
�
==
THINBRCK TO MATCH FULL BRICK
"'
-
Atlantic Galleria Base building details.
l
l�-
PflOVIOE 6 LOCKING TO SECURE STOREFRONT
�ill� �TEEL. T
-
-����D TYP€X GYP. BOARD BY LANDLORD FOR TENANTS EXCEPT MICHAEL'S
=
""""'""'°"'
6'Ml:TA1.STUDFAAMN)
0
J
0 0
0 0
r..tCHAa"SsPACE OCESNOTGET flNISHIJM..ESSAT A OEMISINGW"llwntt At.OTH€RTENmr
STOREFRONT SYSTEM WITH INSULATED GLASS
=
A.l.l.Y.ooHEREIJR)O' SVSTEMMEMBAN-1:0VEA 1/'.!"0ENSOV..S.SSHEATHN3 CM:RMl:TAI.STI.DSBR.OONG AT16'0.C
0
1/'.!'�0V..S.S $HEATHN).---
ALUC060ND ALUMINUM COMPOSITE MAT ERIAL SYST EM WITH 5/8" DENS GLASS SHEATHING
=
NtZZW/NtFOf'-Uf' /,eyor,J) /1N?O/tf¼)if(f) COf(Nt::,t
f(tftK TO ��-1/f</f</·:l (TYft::,N-CONDl(KJN! /1N?Dft fj()if(f)
f)f(,:;,{. f/Nl!'>/1
WH8u ·moos. MARKET·.,,. 11====#=-===f
/1/,JW/t IX)if(f)
/1N?Dlt: fj()if(f)
1
.
REST/WR/INT 5/SN
NC/'N-IWNIN0 6'-0" (}/t:f(f1/W6)
Nt::rN-M'N/116 G'-0' (}ltfc/1/'N6 (TYf')
-nr::rN �ron:rr:oNr
MIDDU:SE:X AVE: NUE: E:LE:VAflON
�
� 4i"
"';r e � =-:-... l!!I ...
l!!I,'
6UILPIN$ B
@
i
6UILDIN6 D RETAIL <!,500 SF 6UILDING B
-
...
•
--
43,500 SF
GROCERY STORE CE:NfP,,JL AVE:NUf fLfVA110N
q� Commercial: Metuchen, NJ: The District at Metuchen: 65,000 SQ.FT.
Providing design development, construction documents and construction administration for multiple landlord shell buildings. Completed submission for Whole Foods anchor tenant review and coordination. As Project Manager, I was tasked with completing the design of the exterior facade, coordinating between the landlord and tenant, as well as consultants drawings.
--
:/
. !
6UILDINCS. 6 �
12,000 SF
COMBINED
-+
-;
•
¾' Pl\oWOOO BOARD PRESSURE TREATED WOOOBlOCKNG
PI.ATFORM - - - - -..__f
CANOPY ABOVE COMPACTOR
STO GUAAOM'l A.NOWATEflB.AAAIEA BRO<
ELECTRIC ENTRY POINTS IN THIS AAEA.REFERTOCM_ LJTILJTYPL.ANUT-1FOR ADOITIONALINFORMATION
ANCHORTYP. 1'AIH3A P
MA.SONAYClP
l�EH+="""'171:Ellll-+--
SIGNBY TENANT (SVBJECTTOVARIANCE) ¾' DENSGLASS
l::::llA-1+-
-,
�:F=:�EFERTO SPEC. AW STRVCT\AAI.. DRAWNGS FOl'l GAUGE AW SPACNG 6'BATTHSIJLATION
P,IM--
3½' RIGO NSULATION
'"'-"'""'"ENCLOSURE TO MATCH STOREfRONT __,_�- I
s·xa· STEEL TUBE.
"'"""''" DRAWffiS
Ir-+--- KAROITRIMBOARD
R-22(MINR-20)W/
PAOPOSEOSTAIRTO EOUIPMENTPI.ATFORM
PAEUMINARYMEZZANINE
I
I
I
l1ry-1·
I
I
===1 ;;--i��o=-=t=======t==t=== I
I
I
I
I I
I I
I I
I I
(SUBJECT TO WHOLE
ALUMNJM COPING
NON-COMBUSTABLE CANTSTRIP- - - - - - �
BLOCKASREOUIREO - - �
l::l'lm--1..J_-¾.TYPEXGYP.BOARO
I
CANOPYl\60\IE
T.O. TOWER ROOF
!;;,JI<=�-- ¾' DENSGLASS El(TERIQASHEATHNG i:8i="cf---
---1------�--t-· -·--
8' METAi.FRAMiNG ·REFER TO S PEC.� STRUCTURAL DRAW"NGSFOR GAUGE AW SPACING
FOOOSAPPAOVAL)
, 11 �II w ::::, z w
<( a: _J
=-""""'
,--,t---------,-
w 0
t
I
N
I
5'
·*' N
I
-i-r---r- -
-
-
11 II_ ___ _
I _ _ I ___ _
II
I
11
I
I
l
I _
1 -- --
11 II
I
I
I
- --
-1--= D LING 'A' I I GROCERY STORE
43,
I
I
11 ______ I _____ --�D l,i; SANITARYEXITPOINTINTHIS AAEA.REFERTOCM._UTLITY PI.ANUT-1 FORADOITlONAL INFORMATION -.JI - - -
--
500
SF
I - I I I
I SJ , a=;====,�====-;�=c=--=i --.!-1 .J!�
I
I
I I
I
I
I
I
I------ I
I ---� �
I
�·RJGONSULATION
·1- --- -i- -, -rr---
I I
I
I
I
I I
I I
I I
I
I
I
�'RIGIOINSULATION
'"'-"'""'" ENCLOSURE TO MATCH STOREfRONT
R-22(MNR-20)W/
BREAK METAL EN CLOSURE TO MATO, STOREFRONT
',
R-22(MINA-20)W/
) CANOPY LEADER AOOTEO, BETWEEN CANOPY JOIST Mir,---� DOWN WITHINBRICK PIER
A-50 EL�- ,�?P"' $
11 I I
- 11 --� II>-'--+-
11 11
L,
- ALUMINUM STOREFRONT
WITH 1• INSUlATEDGLASS
11,m��
MIDDLESEX AVENUE
ALUMINUM STOREFRONT WITH 1" INSULATED GLASS
METAL FL.ASHING
3/4" 0 ROD WITH TURNBUCKEL, SEE STRUCT. DWGS.
NON-COMBUSTABLE CANT STRIP
3/4" STEEL PLATE HANGER ROD ATTACHMENTWELOED T O STEEL TUBE-
Fl.ASHING WITH PARAPRO ---�
%" DENS DECK PRIME SLOPED TO ORAJN
PARADIENE 30 FRCR (GREEN COOL ROOF REFLECTIVITY} - - - PARADIENE 20
I 111 I
1)"2° THK. T&G STAINED CLEAR WOOD SLATS
The Dis trict at Metuchen Base build ing ground floor plan, wall sections , and details.
-
-, -
--+-._ %"GYP. BOAADj- - - -
---+-.;
D PAINTED FIRE RATED PL TO MATCH GYP BOARD � VERTICAL STEE TUBE · SEE STRUCTURAL O WINGS-+--+,,,,_-H-_
I
T.O. CANOPY $ 13'·0'
}---@·
V-Jl......laaa.--- 1 LA.YER¾" DENSGLASS SHEATHING v•--�STOG ROAIRAND WATER BARRIER PRESSURE TREATEO WOODBLOCK
Commercial: New York, NY: George Washington Bus Terminal Mall: 85,000 SQ.FT.
As Project Manager I was in charge of coordination between Port Authority of New York and New Jersey, mall tenants, consultants, developers and contractor. Prepared lease outline drawings and brochure for prospective tenants, and provided construction documents and construction administration for Marshalls anchor tenant.
><
W 179TH STREET W2.8 241 SQ.FT. 70'-0" I
B
Do
D □
W2.1 6,231 SQ.FT.
m
37'-7"
122'-0" W2.3B 604 SQ.FT.
> z
38'-5"
<(
W2.3C 705 SQ.FT.
0 f-
I I I
+t
ID
m
ID
icm
ID
ID
I
I
f-
ID
ID
ID
ID
ID
m
W2.2 29,140 SQ.FT.
-+-l_-1
�
ID
W2.4B 709 SQ.FT.
(9
z
ID
I Marshalls. I
-
::;;:
m
0
ID
ID
ID
ID
m
m
40'-3"
l"l
19'-1"
m
,.._ N
37'-6"
m ID
W 178TH STREET
First Level Floor Plan George Washington Bus Terminal Mall Marshalls tenant fit-out coordination.
-
Commercial: Bronx, NY: Walgreens Expansion: 20,000 SQ.FT. Scope of project was to expand an existing Walgreens space. SBLM provided construction documents and administration. As Project Manager my job was to keep the project on schedule and address site related problems expeditiously, as well as coordination between Walgreens design team, consultants and contractor.
-
-
-
-------ďż˝ -
-
ADJACENT TENANT
CO2
E
COO
EOI.P. 000M
a.c.HT:10·-o·
OCIIIXll
CLG.lfl:10'-o"
■
■
□
■
■
■
■
□
NEW GENfRAI STOCK
■ ■
I
■ NQT IN CONTRACT
■
rfMS247596-BP1S __
COi CBfiW.sroa( S-2 O..C.lff:lo'-o"
Walgreens Store Exp a nsion Gr ound Floor (Top); Basemen t (Bottom)
■
■
■
GENERAL NOlES:
1. WORK SHALL CONFORM TO lHE BASE BUILOING RULES ANO REGULATIONS, 200B NYC BUILDING CODE AND ALL OlHER APPLICABLE CODES, LAWS AND REGULATIONS. 2. CONTIRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL NECESSARY INSPECTIONS, CONTIROLLED INSPECTIONS AND CERTIFICATES REQUIRED.
3. CONTIRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS BEFORE START OF CONSTIRUCTION AND SHALL COORDINATE ALL FIELD-VERIFIED INFORMATION. CONTIRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE CONSTRUCTION, FABRICATION OR ORDERING OF MATERIALS OR PRODUCTS. 4. CONTIRACTOR SHALL DElERMINE EXACT LOCATION OF EXISTING UTILITIES BEFORE COMMENCING WORK. NO CHOPPING OR CHANNELING OF BUILDING STRUCTIURE PERMITJED. 5. CONTRACTOR, LICENSED ELECTRICIAN AND LICENSED PLUMBER TO LAYOUT WORK \\11H ARCHITECT PRIOR TO BEGINNING WORK.
6. CONTRACTOR TO SUBMIT TO ARCHITECT FOR APPROVAL TWO SAMPLES OF EACH FINISH AND MATERIAL INDICATEO ON DRA\\1NGS AND SPECIFICATIONS OR REQUESTED IN FIELD.
7. ALL MECHANICAL, PLUMBING AND ELECTIRICAL SYSTEM COMPONENTS SHALL BE TESTED AND CERTIFIED AS TO FITINESS FOR OPERATION PRIOR TO FINAL ACCEPTANCE. 8. FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT REQUIRED TO PERFORM lHE WORK AND AS SHOWN ON lHE DRA\\1NGS.
9. CONTRACTOR SHALL BE GUIDED AT ALL TIMES BY DIMENSIONS SHOWN ON lHE PLANS AND NOT BY lHE SCALE OF DRA\\1NGS, AND CONSULT \\11H lHE ARCHITECT IN CASE OF ANY DISCREPANCY.
10. ALL DEBRIS RESULTING FROM lHE WORK SHALL BE IMMEDIATELY REMOVED FROM lHE SITE AND SHALL NOT BE STORED OR PERMITJED TO ACCUMULATE ON lHE SITE.
11. UPON COMPLETION OF lHE WORK, lHE CONTRACTOR SHALL REMOVE ALL TOOLS, EQUIPMENT, MATERIALS, APPARATIUS, ETC. AND SHALL LEAVE lHE PREMISES CLEAN, NEAT AND ORDERLY. PREMISES SHALL BE BROOM SWEPT. 12. CONTRACTOR TO OBTAIN, READ AND COMPLY \\11H BLDG. MANAGER'S WORK SCHEDULE, CONSTRUCTION RULES AND ALL OlHER REGULATIONS AND INFORMATION, AVAILABLE lHROUGH OWNER OR ARCHITECT.
13. ALL DEBRIS \\1LL BE DISPOSED OF IN A LEGAL AND PROPER MANNER. NO DEBRIS \\1LL BE LEFT IN THE PUBLIC HALLWAYS. DUST SHALL BE CONROLLED \\1TH lHE USE OF DROP CLOlHS.
ADDRESS: 217 HAVEMEYER STIREET BROOKLYN, NEW YORK 11211
S 51H STREET
BLOCK:2460 ZONE: C4-3 LOT:8 MAP: 120 COMMUNITY BOARD:301 NO CHANGE TO USE, EGRESS OR OCCUPANCY.
I - - - J
CONTIROLLED INSPECTIONS: FlNAL, FlRESTOPPING, AND ECC
SCOPE OF PROJECT INCLUDES DEMOLITION OF PARTITIONS ON lHE 3RD AND 41H FLOOR. FILING SH SUBMITTAL
A-DDl.00 A-002.00 A-D03.00 A-D04.00 DM-001.00 DM-002.00 M-001.00 E-001.00 P-001.00 FP-001.00
PLOT PLAN AND GENERAL NOTES 3RD FLOOR PLAN 4lH FLOOR PLAN REFLECTED CEILING PLAN 3RD FLOOR DEMOLITION PLAN 41H FLOOR DEMOLITION PLAN MECHANICAL PLAN ELECTRICAL PLAN PLUMBING PLAN FIRE PROTECTION PLAN
- _J
14. CONSTRUCTION HOURS \\1LL BE FROM 9:0D AM TO 4:00 PM, MONDAY lHROUGH FRIDAY. lHERE \\1LL BE NO CONSTRUCTION WORK DURING lHE EVENING HOURS AND WEEKENDS. ANY PROCEDURE lHAT INVOLVES LOUD NOISE DURING WORK HOURS MUST FIRST BE APPROVED BY lHE BUILDING MANAGER
L.·-··-··-··-··-··-··-··-··-··-··-·
BROADWAY
G) PLOT PLAN
15. ALL EXISTING FIRE PROTECTION AND LIFE SAFTEY SYSTEMS INCLUDING FIRE ALARM DrnCES MUST BE MAINTAINED. COORDINATE TEMP. INTERRUPTION OF SYSTEM \\11H BUILDING AND FA VENDOR.
1
16. FURNITIURE/APPLIANCES TO BE RE-USED REMOVED AND STORED ELSEWHERE ON 71H FLOOR PRIOR TO START OF CONSTRUCTION. COORDINATE \\11H GUTTMACHER INSTITUTE.
SCALE: 1/64" = 1'-0"
17. IF HAZARDOUS MATERIALS, SUCH AS ASBESTOS ARE EXPOSED DURING lHE DEMOLITION OR CONSTRUCTION PROCESS SUCH SUSPICIOUS MATERIAL \\1LL NOT BE DISTIURBED UNTIL ANALYZED BY A CERTIFIED INSPECTOR SUCH AS AN ASBESTOS ENGINEER AND, IF NECESSARY, lHE TENANT/UNIT OWNER MUST FOLLOW LEGAL DISPOSAL MElHODS. lENANT SAFETY PLAN: I. THE AGENT OF OWNER FOR lHE ABOVE PREMISES HEREBY STATES lHAT lHEY \\1LL MAINTAIN ALL SER�CES TO lHE ABOVE BUILDING.
2 DURING lHE CONSTIRUCTION SPECIFlED IN lHE ABOVE ALTERATION, ALL MEANS OF EGRESS FROM lHE BUILDING \\1LL BE FREE OF ANY OBSTRUCTION SUCH AS BUILDING MATERIAL, DEBRIS, ETC.
3. ALL ENTRANCE DOORS AND LIGHTS IN PUBLIC HALLWAYS \\1LL BE KEPT IN WORKING ORDER TO ENSURE PROPER EGRESS IN CASE OF AN EMERGENCY.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRO�DING ADEQUATE FIRE SAFETY TO lHE TENANTS IN ACCORDANCE 111TH lHE FIRE DEPARTIMENT AND lHE BUILDING DEPARTIMENT.
5. ANY EXISTING FIREPROOFING REMOVED OR DAMAGED IN lHE COURSE OF lHE WORK TO BE REPAIRED/REMOVED IMMEDIATELY. RONAUD mm ARGHITECT LLG 210 VARET STREET, #403 BROOKLYN, NY 11206
TEL 718-497-3020
FAX 718-497-3022
LASZLO BODAK ENGINEER, P.C. 45 WEST 36 STREET, 3RD FLOOR NEW YORK, NY 10018
HAVEMEYER TEL 212-643-1444 217 HAVEMEYER STREET FAX 212-643-3456 BROOKLYN, NY 11211
PRIONGSET
NOTES
SEAL AND SIGNATURE DWG TITLE;
PLOT AND DEMOLITION PLANS
FILE NAME: SHT-A-1 JOB NUMBER: 12-04 DR: TIR CH: RE SCALE: AS NOTED DATE: 11 16 2012
PAGE #: 1 OF 6
TENANT TO SUBMIT UST OF EQUIPMENT TO LANDLORD'S ARCHITECT OR ENGINEER TO BE PLACED ON PREMISES.
2.
FLOOR CARPETING OR �NYLE TILE TO BE PICKED FROM BUILDING UST OF STANDARD COLORS AND SAMPLES.
3.
INTERIOR DOORS.
B-SCAN JOB STICKER
r
/
NEW CARPETING o
���if�N �:lH�OM, _/ KITCHEN, JANITOR'S CLOSET, AND STAIRWELL
□
REPLACE EXIST. \\1NDOWS -- TO FILED UNDER A SEPARATE APPLICATION
□
KEY: WALLS D TOEXISTING REMAIN
D
NEW GLASS PARTITION WALL
w
NEW WALL 2HR FIRE RATED WALL DUPLEX RECEPTACLE TO REMAIN NEW DUPLEX RECEPTACLE
RONAUD mm ARCHITECT LLC 210 VARET STREET, 1403 BROOKLYN, NY 11206
Commercial: Brooklyn, NY: Havemeyer Tenant Fit-Out: 15,500 SQ.FT.
1£L718-497-3020 FAX718-497-3022
A five story commercial building in Brooklyn owned by Weinberger Properties was surveyed and as built drawings were produced. Design and construction drawings for tenant fit-out were provided and coordinated between owner, tenant, and engineers. As Project Architect, my responsibilities included surveying of each floor, producing construction documents, coordinating between MEP engineer and client, conducting job site meetings, designing tenant layout, and specifying finishes.
LASZLO BODAK ENGINEER, P.C. 45 WEST 36 STREET, 3RD FLOOR
NEW YORK, NY 10018
NEW QUAD RECEPTACLE 1£l 212-643-1+«
G) FLOOR PLAN NEW COMBINED DATA AND TELEPHONE JACK
F'\!/7 NEW COMBINED DATA AND TELEPHONE FLOOR JACK F @ NEW QUAD FLOOR RECEPTACLE
G <[]) NEW GFl DUPLEX RECEPTACLE 40" AH.
HAVEMEYER 217 HAVEMEYER STREET
FAX 212-643-3456 BROOKLYN, NY 11211
PRIONGSET
1
SEAL ANO SIGNATURE
FLOOR LEVEL:
41H FLOOR
DWG TITLE; FLOOR PLAN FILE NAME: SHT-A-3 JOB NUMBER: 12-04 CH:RE OR: YP SCALE: 1/8" = i'-0" DATE: 11 16 12
SCALE: I /8" = 1'-0"
OWG. #:
A-003.00
PAGE #: 3 OF 6
B-SCAN JOB STICKER
LIGmlNG NOTES: Tl: LIGHTOLIER, COFFAIR II, MODEL/ CFH2GPF214, FLOURESCENT GENERAL LIGHTING (34 UNITS) 12: LIGHTOLIER, MODEL# 506-9, FLOURESCENT WALL WASHERS MID. ON COVE (2 UNITS 8' LONG) Pl: LIGHTOLIER, PENDALYTE, MODEL# 404722XU30K PENDANT LIGHTS (6 UNITS) P2: LIGHTOLIER, LYTESPAN, MODEL# 8632AL PENDANT LIGHTS (7 UNITS) A STANDARD FLORESCENT LIGHT FIXlURE ON A NINE-FOOT CEILING 1\111, FOUR, 40-WATT BULBS IIILL PRODUCE APPROXIMAlELY 50 FOOT-CANDLES OF LIGHT AT 11,E DESKTOP LEVEL. (UNllEO STAlES, COMPUlER WORKSTA]ON). OSHA STANDARDS WANT 11,IRTY FOOT-CANDLE MINIMUMS.
RONALD rnTTS ARCHllECT llC 210 VARET STREET, /403 BROOKLYN, NY 11206
TEL 7 18-497-3020
FAX 718-497-3022
LASZLO BODAK ENGINEER, P.C. 45 WEST 36 STREET, 3RD FLOOR NEW YORK, NY 10018
KEY:
D D NEW WALL D NEW HVAC DUCT
□
EXISTING WALLS TO REMAIN
NEW FLUORESCENT LIGHT
HAVEMEYER TEL 2 12-643-1444 217 HAVrnEYER STREET FAX 212-643-3456 BROOKLYN, NY 11211
CD $
1
NEW SI\ITCH
© NEW DIMMER SIIITCH
SEAL AND SIGNA lURE
0 NEW RECESSED CEILING LIGHT
[TI NEW mERMOSTAT
PRIONGSET
FLOOR LEVEL:
4TH FLOOR
DWG mLE;
REFLECTED CEILING PLAN FILE NAME: SHT-A-3 JOB NUMBER: 12-04 DR: TR CH: RE SCALE: 1/8" = 1'-0" DATE: 11 16 12
FLOOR PLAN
SCALE: 1/8" = 1'-0"
DWG. j:
A-004.00 PAGE #: 4 OF 6
Q!filL
Q!filL
OFFICE
B-SCAN JOB STICKER
Q!filL
� FlLING RM.
[
OFFlCE
DEMO NOlES EXITING HUNG CElLINGS TO BE REMOVED, INCLUDING LIGHTING FlXlURES ANO BRANCH DUCT WORK. 2.
PARTITIONS TO BE REMOVED HAVE BEEN DElERMINED TO BE NON-BEARING. NOTIFY ARCHllECT IF ANY STRUClURAL, ELECTRICAL OR omER UTILITIES ARE ENCOUNTERED IN WALLS BEING REMOVED.
3.
CUT ANO CAP PLUMBING LINES WHERE FlXlURES ARE BEING REMOVED ANO NOT REPLACED, TYPICAL.
4.
CHOPPING OF 11,E SLAB ANO/OR DEMISING PARTITIONS BET'M:EN APARlMENTS TO AllOW FOR NEW ELECTRICAL OR PLUMBING WORK IIILL BE DISAllOl'liD. SIMILARLY, All FlRE RAlED MAlERIALS DISlURBED BY 11,E WORK MUST BE RESTORED TO 11,EIR ORIGINAL RATINGS.
5. 6.
mE ADJOINING FLOOR MUST BE INSPEClEO ANO OOCUMENlEO PRIOR TO ANY WORK TO DElERMINE mE CONDITION OF INlERIOR FINISHES AND FOR ANY EXISTING INlERIOR DEFECTS OR DAMAGES. CUIBACK/CAP EXPOSED PLUMBING AND GAS PIPING WHERE DEMOLITION OCCURS.
RONALD rnTTS ARCHllECT LLC 210 VARET STREET, /403 BROOKLYN, NY 11206
Havemeyer Tenant Fit-Out Pricing Set Drawings: Lighting, HVAC layout, and Demolition Plan
1£l 7 18-497-3020
FAX 718-497-3022
LASZLO BODAK ENQNEER, P.C. 45 WEST 36 STREET, 3RD FLOOR
NEW YORK, NY 10018
OFFlCE
WAITING RM.
KEY:
D EXISTING WALLS TO REMAIN
- WALL TO BE REMOVED
$
OEMD/RELOCAlE SI\ITCH
DUPLEX RECEPTACLE TO REMAIN
<ti) DEMO DUPLEX RECEPTACLE
D MILLWORK/PLUMBING w RELOCAlE lELEPHONE JACK FlXlURES TO BE REMOVED SI\ITCH TO REMAIN
TR 212-643-1+«
HAVEMEYER 217 HAVEMEYER STREET
FAX 212-643-3456 BROOKLYN, NY 11211
EXIST. CEILING MOUNlEO LIGHT -{?- DEMO CEILING MOUNlEO LIGHT
PRIONGSET
SEAL AND SIGNAlURE
CD
EMOVE EXIST. FlXlURES ANO FlTTINGS IN som BAmROOMS TYP.
BROADWAY FLOOR LEVEL.
4TH FLOOR
DWG TITLE;
DEMOLITION PLAN
FILE NAME: SHT-DM-1 JOB NUMBER: 12-04 DR: YP CH: RE SCALE: 1/8" = 1'-0" DATE: 11 16 12
DWG. j:
DEMOLITION PLAN
SCALE: 1/8" = 1'-0"
DM-002.00 PAGE #: 6 OF 6 B-SCAN JOB STICKER
KEY:
WALL TO ���!iN TO BE
D D �t���g D �t��Ji
BE
DUPLEX RECEPTACLE TO REMAIN ACLE <[l) 6
��p�i\��g�
REMOVE WALL TO 12" BELOW CEILING
DEMO BASE AND WALL CABINETS
RETAIN AND PAINT EXISTING CROWN MOULDING TYP.
EXIST. CIRCUITRY TO REMAIN, TYP. SEE ELECTRICAL PLAN E-1.00 FOR MORE INFORMATION
PATCH AND REPAIR SOFFIT WHERE WALL WAS REMOVED BELOW AND RE-USE, AND PAINT EXIST. CROWN MOULDING.
ADDRESS: 125 MAIDEN LANE BLOCK:70 ZONE:C5-5 LOT:7501 MAP:12b COMMUNITY BOARD:IOI NO CHANGE TO USE, EGRESS OR OCCUPANCY. CONTROlLED INSPECTIONS: FlNAL.
SCOPE OF PROJECT INCLUDES RENOVATION OF EXISTING LUNCH ROOM, AND KITCHEN
A-100.00 A-200.00 A-300.00 A-400.00 E-100.00 P-100.00
PLOT AND DEMOLITION PLANS FLOOR AND REFLECTED CEILING PLANS ELEVATIONS DETAILS ELECTRICAL POWER AND LIGHTING PLANS PLUMBING PLAN AND RISER DIAGRAM
7. ALL MECHANICAL, PLUMBING AND ELECTRICAL SYSTEM COMPONENTS SHALL BE TESTED AND I. WORK SHALL CONFORM TO THE BASE BUILDING RULES AND REGULATIONS, 2008 CERTIFIED AS TO FITNESS FOR OPERATION PRIOR TO FINAL ACCEPTANCE. NYC BUILDING CODE AND ALL OTHER APPLICABLE CODES, LAWS AND 8. FURNISH ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT REQUIRED TO PERFORM THE WORK REGULATIONS. AND AS SHOWN ON THE DRA\\1NGS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL NECESSARY 9. CONTRACTOR SHALL BE GUIDED AT ALL TIMES BY DIMENSIONS SHOWN ON THE PLANS AND INSPECTIONS, CONTROLLED INSPECTIONS AND CERTIFICATES REQUIRED. NOT BY THE SCALE OF DRA\\1NGS, AND CONSULT 111TH THE ARCHITECT IN CASE OF ANY DISCREPANCY. 3. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS BEFORE START OF CONSTRUCTION AND SHALL COORDINATE ALL FIELD-VERIFIED INFORMATION. 10. ALL DEBRIS RESULTING FROM THE WORK SHALL BE IMMEDIATELY REMOVED FROM THE SITE CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY DISCREPANCIES BEFORE AND SHALL NOT BE STORED OR PERMITlED TO ACCUMULATE ON THE SITE. CONSTRUCTION, FABRICATION OR ORDERING OF MATERIALS OR PRODUCTS.
4. CONTRACTOR SHALL DElERMINE EXACT LOCATION OF EXISTING UTILITIES BEFORE 11. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL REMOVE All TOOLS, EQUIPMENT, MATERIALS, APPARATUS, ETC. AND SHALL LEAVE THE PREMISES CLEAN, NEAT AND ORDERLY. COMMENCING WORK. NO CHOPPING OR CHANNELING OF BUILDING STRUCTURE PREMISES SHALL BE BROOM SWEPT. PERMITlED. 5. CONTRACTOR, LICENSED ELECTRICIAN AND LICENSED PLUMBER TO LAYOUT WORK 111TH ARCHITECT PRIOR TO BEGINNING WORK.
12. CONTRACTOR TO OBTAIN, READ AND COMPLY 111TH BLDG. MANAGER'S WORK SCHEDULE, CONSTRUCTION RULES AND ALL OTHER REGULATIONS AND INFORMATION, AVAILABLE THROUGH OWNER OR ARCHITECT.
6. CONTRACTOR TO SUBMIT TO ARCHITECT FOR APPROVAL TWO SAMPLES OF EACH 13. ALL DEBRIS \\1LL BE DISPOSED OF IN A LEGAL AND PROPER MANNER. NO DEBRIS \\1LL BE FINISH AND MATERIAL INDICATED ON DRA\\1NGS AND SPECIFICATIONS OR LEFT IN THE PUBLIC HALLWAYS. DUST SHALL BE CONROLLED 111TH THE USE OF DROP CLOTHS. REQUESTED IN FIELD.
RONALD mm ARCHITECT LLC 2IO VARET STREET, #403 BROOKLYN, NY 11206
TEL 718-497-3020 FAX 718-497-3022
GUTTMACHER INSTITUTE
125 MAIDEN LANE, 7th FLOOR NEW YORK, NY 10038
-Ir LUNCHROOM
PRIONGSET
14. CONSTRUCTION HOURS \\1LL BE FROM 9:00 AM TO 4:00 PM, MONDAY THROUGH FRIDAY. THERE \\1LL BE NO CONSTRUCTION WORK DURING THE EVENING HOURS AND WEEKENDS. ANY PROCEDURE THAT INVOLVES LOUD NOISE DURING WORK HOURS MUST FIRST BE APPROVED BY THE BUILDING MANAGER
15. ALL EXISTING FIRE PROTECTION AND LIFE SAFlEY SYSTEMS INCLUDING FIRE ALARM DrnCES MUST BE MAINTAINED. COORDINATE TEMP. INTERRUPTION OF SYSTEM 111TH BUILDING AND FA VENDOR.
16. FURNITURE/APPLIANCES TO BE RE-USED REMOVED AND STORED ELSEWHERE ON 7TH FLOOR PRIOR TO START OF CONSTRUCTION. COORDINATE 111TH GUTTMACHER INSTITUTE.
17. IF HAZARDOUS MATERIALS, SUCH AS ASBESTOS ARE EXPOSED DURING THE DEMOLITION OR CONSTRUCTION PROCESS SUCH SUSPICIOUS MATERIAL \\1LL NOT BE DISTURBED UNTIL ANALYlED BY A CERTIFIED INSPECTOR SUCH AS AN ASBESTOS ENGINEER AND, IF NECESSARY, THE TENANT/UNIT OWNER MUST FOLLOW LEGAL DISPOSAL METHODS. SEAL AND SIGNATIURE
-Ir
EXISTING CAPPED SPRINKLER HEAD TO REMAIN, TYP. OF 4
LUNCH ROOM
DEMOLITION PLAN SCALE. 1/4" = 1'-0"
GENERAL NOTES:
PRO�DE AND INSTALL NEW MAPLE HIGH CABINETS-- FlNISH TO MATCH KITCHEN CABIENTS
*
\_EXIST. VCT FLOOR TO REMAIN PATCH AND REPAIR WHERE \ NECESSARY
PRICING SET SUBMITTAL
NDING MACHINE OUTLET, COORDINATE VOLTAGE/AMPS REQ'JS. NEW 1/2" WATER SUPPLY LINE TO WATER COOLER
S\\HCH TO REMAIN
$ ��6�A�i BE
PATCH AND REPAIR WHERE WALL WAS REMOVED TYP.
NEW "K[NSHO" SILESTONE BAR HEIGHT COUNTERTOP
FLOOR LEVEL: SEVENTH FLOOR DWG TITLE; PLOT AND DEMOLITION PLANS FILE NAME: SHT-A-1 JOB NUMBER: 10-08 DR: GKC CH: RE SCALE: AS NOTED DATE: 4 21 2011
DWG. #:
A-100.00 PAGE #: 1 OF 6 B-SCAN JOB STICKER
EXIST. DROPPED CEILING TO REMAIN, TYP.
t
*
-Ir
-Ir
-lie
l
-fie
*
PRO�DE AND INSTALL NEW MAPLE BASE CABINETS
EXISTING CROWN MOULDING TO REMAIN, TYP.
*
TELEPHONE JACK TO REMAIN CARBON MONOXIDE DElECTOR TO REMAIN STROBE
3. ALL ENTRANCE DOORS AND LIGHTS IN PUBLIC HALLWAYS \\1LL BE KEPT IN WORKING ORDER TO ENSURE PROPER EGRESS IN CASE OF AN EMERGENCY.
THERMOSTAT TO REMAIN
EXIST. RECESSED CEILING LIGHT TO REMAIN
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRO�DING ADEQUATE FlRE SAFETY TO THE TENANTS IN ACCORDANCE \\1TH THE FIRE DEPARTMENT AND THE BUILDING DEPARTMENT. 5. ANY EXISTING FIREPROOFING REMOVED OR DAMAGED IN THE COURSE OF THE WORK TO BE REPAIRED/REMOVED !MEDIATELY
RONALD E�TTS ARCHITECT LLC 210 VARET STREET, /403 BROOKLYN, NY 11206
TEL 718-497-3020 FAX 718-497-3022
GUTTMACHER INSTITUTE
125 MAIDEN LN., 7TH FLLOR NEW YORK, NY 10007
S\\1TCH TO REMAIN
$
NEW S\\1TCH
$
DUPLEX S\\1TCH TO BE RELOCATED DUPLEX S\\1TCH TO REMAIN DUPLEX RECEPTACLE TO REMAIN
<[l) NEW DUPLEX RECEPTACLE
A lunch room for the staff at The Guttmacher Institute was renovated to make it more spacious and inviting. The wood cabinets gave the space warmth, and a recycle center helped organize the recyclables, and made the users eco-conscious. As Project Architect, my responsibilities included design development, producing construction documents, meeting with the client, selecting finishes, coordinating with MEP engineer and contractor, and conducting job site meetings
NEW UNDER CABINET MICROWAVE OUTLET COORDINATE VOLTAGE/AMPS REQ'JS.
NEW 3/8" WATER SUPPLY LINE TO WATER FRIDGE
FLOOR PLAN SCALE: 1/4" = l'-0"
ADD ALTERNATE 1.:
PROVlDE AND INSTALL NEW APPLIANCES IN LIEU OF RE -USING EXISTING APPLIANCES: 1 GE PROFILE REFRIGERATOR, MODEL# PTS25SHSSS 1 GE PROFILE DISHWASER, MODEL# GLD2850TCS
◊ NEW UNDER CABINET LIGHT
D EXIST WALL TO REMAIN D NEW WALL VCT FLOOR TILES, D REPLACE ARMSTRONG #52513, "CIRQUE WHITE" PRIONGSET
Before #2 Institutional: New York, NY: Lunch Room Renovation: 200 SQ.FT.
PRO�OE AND INSTALL NEW ADA COMPLIANT SINK BY ELKAY MODEL# ELUHAD2115 W/ ELKAY DRIAN AND OFFSET TAILPIPE MODEL# LKAD174 OR APPROVED EQUIV.
RE-USE/RELOCATE EXIST. T.V. AND BRACKET--PRO�DE BLOCKING BEHIND SHEETROCK TO SUPPORT BRACKET
EXIST. SPRINKLER TO REMAIN
2. DURING THE CONSTRUCTION SPECIFIED IN THE ABOVE ALTERATION, ALL MEANS OF EGRESS FROM THE BUILDING \\1LL BE FREE OF ANY OBSTRUCTION SUCH AS BUILDING MATERIAL, DEBRIS, ETC.
PRO�DE AND INSTALL NEW ACCESSABLE FAUCET BY KOHLER, CORALAIS MODEL#K-15160
PRO�DE AND INSTALL NEW HAFELE UNDER-CABINET LIGHT MODEL# 823.29.750 TYP. OF 6 W / SURFACE MOUNTED RING MODEL# 823.29.781 OR APPROVED EQUIVALENT
KEY:
I. THE AGENT OF OWNER FOR THE ABOVE PREMISES HEREBY STATES THAT THEY \\1LL MAIN!AIN ALL SER�CES TO THE ABOVE BUILDING.
DISHWASHER
PRO�DE AND INSTALL "KENSHO" SILESTONE COUNTERTOP
tl.Q]L SEE E-1.00 FOR DETAILED ELECT. PLAN lENANT SAFETY PLAN:
EXIST. VCT FLOOR TO REMAIN ) INCLUDE UNIT PRICE IN BID FOR (TILE REPAIR IN OTHER OFFICES. KITCHENETTE
EXISTING HVAC DIFFUSERS TO REMAIN, TYP. OF 5
t
MICROWAVE OUTLET AT WALL CABINET HEIGHT, COORDINATE VOLTAGE/AMPS REQ'JS. EXIST. PLUMBING CHASE
LUNCH ROOM
SEAL AND SIGNAT\JRE
FLOOR LEVEL: SEVENTH FLOOR DWG TITLE;
FLOOR AND REFLECTIED CEILING PLANS
FILE NAME: SHT-A-2 JOB NUMBER: 10-05 DR: TR CH: RE SCALE: 1/4" = l'-D" DATE: 4 21 2011
DWG. #:
A-200.00 PAGE j: 2 OF 6 B-SCAN JOB STICKER
Before #3
GREEN "CHROMA" RESIN PANEL BY 3FORM
RE-USE AND PAINT EXIST. CROWN MOU LDING
EW BLOCKING AND PTO. GYP. BOARD AT FACE OF CABINET DOOR
NEW MAPLE WALL CABINETS TO MATCH KITCHEN CABINETS
NEW HAFELE UNDER CABINET LIGHT MODEL: 823.29.750 TYP OF 6 W/ SURFACE MOUNTED RING MODEL: 823.29. 781 OR APPROVED EQU. NEW MAPLE UNDER CABINET APRON
NEW ST. ST L . DROP-IN ADA COMP L IANT SINK BY ELKAY, MOOEL: L RADQ2521 W/ EL KAY DRAIN ANO OFFSET TAILPIPE MODEL: LKAD174 OR APPROVED EQUIV ,If' EASED EDGE, TYP.
INSULATE UNDERSIDE OF SINK AND EXPOSED PIPES TO BE ADA COMPLIANT NEW P L UMBING LINES \'!THIN BASE CABINETS GOING BACK TO RISER - - SEE P-100.00
, ..
LATICRETE 9235 WATERPROOF M E MBRANE ON CONCRETE SUBFLOOR UND E R VCT TILES AND BEHIND PTO. GYP. BOARD
PL ASTIC RECYCL E BINS FOR COFFEE CARTRIDGES. K-CUPS ANO BATTIERIES
'S-h'== === = =::;;:!,e:=::= =:::'.:=+=;:j_
�------�---� ADD ALTERNATE 2: RUN ALL PLUMBING SUPPLY, VENT AND WASTE LINES BEHIND KITCHEN STUD WALL AND ENCLOSE �TH PTD. GYP. STUD WALL
CD
:c��:
N EW GREE N 3FORM "CHROMA" RE SIN SHELF NEW OUTLE TS 4" ABOVE COUNTER TYP. OF 2
HINGED MAPLE CABINET DOOR W/ ATTACHED TOE KICK
ST. STL. BRACKET SUPPORTING 3FORM SHELF - - SUBMIT 'EC. FOR APPROVAL
TRASH BAG HOLDER OR CLEAR P LASTIC BINS BEHIND DOORS
CABINET DOOR HINGE
EW TRANSLUCENT ACRYLIC BASE CABINET OOORES W/ MAPLE FRAME TO MATCH KITCHEN WALL CABINETS
SEAL ANO SIGNATURE
;�N=K =�-CTION LOOKING SOUTH I
NEW GREEN 3FOR "CHROMA" SHELF 1.1'!--
FLOOR LEVEL:
DETAILS
_,,
W'ITH MAPLE HINGED
WEST INT. ELEV.
3
SCALE: 1/4" = 1'-0"
I
A-400_00
:����f
DEADBOLT LOCKSET W/ KEY. -- SUBMIT CUT FOR APPROVAL
NEW 1-)1" THICK "KENSHD" SILESTONE COUN TERTOP
NEW ADJUSTABLE SHE L�NG BE TWE EN HIGH CABINET AND BASE CABINET, UN DER COUNTERTOP
PRO�DE AN D INSTALL NEW BRACKET BY SUGATSUNE MODEL #81-300 OR APPROVED EQUIV, TYP OF 3 rPAINT WALLS _/ / AND TRIM TYP.
RELOCATE AND REUSE FRIDGE - - RE-HINGE FRIDGE DOOR TO RIGHT SIDE
NEW TRASH BA HOLDER OR CLEAR PLASTIC RECYCLE BIN
2.
RECYCLE CENTER NORTH SECTION
SCALE I" = 1'-0" OWG #:
A-400.00
PAGE /: 4 OF6
3.
4.
5.
6. 7.
SOUTH INT. ELEV.
SCALE: 1/4" = 1'-0"
--f'<"===;,-= -::,c,-PRO�DE AN D INSTALL NE W MAPLE WALL CABINE T - - SEE DETAIL 2 AND 3 ON SHEET A-400.00 ---r-.JFORM CHROMA SHELF
�i��J------t::usTOM MAPLE PANEL W/ CUT-OUTS
EW MAPLE BASE CASINI
PRO�DE AN D INSTALL NEW EXIST. BASEBOARD AN D CHAIR RAIL TRIM TO REMAIN BAR HEIGHT "KENSHO" - - FINISH E DGE OF TRIM SILESTONE COUNTERTOP
CABINET NOTES:
NEW CUSTOM MAPLE BASE CABINET TO MATCH KITCHEN CABINETS
3
EW 2"X2" GLASS TILE BACKSPLASH TYP.
NEW CUSTOM ADA COMPLIANT BASE CABINET,
DOO H N EW MAPLE WALL CABIN ETS W/ TRANSLUCENT tT�, %��6� ��� G-LAs s TO_MATCH BASE CABINETS ,=-�FO�R�A�P�PR�O�VAL� � � -- _ _ _ _ ����� 74�� RE LOCATE """'\ \ / �� E L E o �l�H�; ;�� �- - - - -rr=;T,\cc\'rr'=;T,=;-r;=;-r;=;r;=sr;==;\;c=;i;#a;=;-r;=;rr-,-:rl :1����1� �;JE:IG PE31DM-- PRO�DE HARDWARE WATER COOLER TO HANG MICORWAVE BELOW BOTTOM OF WALL CABINET N
NEW 3FORM GREE ''c ROMA" RESIN H COUNTE RTOP
SEVENTH FLOOR
DWG TITLE:
��+t--
LINE OF N EW SOFFIT,MODIFY, REINSTALL AND -�,-<r7' _ _OW _ N MO_ U_LD_ IN_ _G _ _ _ ---:;'v"'-RELOCATE AN D -P_AI_N T_ _EX_IS_T. _ CR -----rRE-INSTALL T.V, BOOKCASE AND DVD PLAYER
N
NEW MAPLE WALL CABINET TO MATCH KITCHEN CABINETS
NEW MAPLE PANEL W/ SHAPE CUT-OUTS- FINISH TO MATCH NEW KITCHEN CABINETS. TYP.
MAPLE TRIM TO MATCH BASE CABINETS
BLOCKING FOR CURB AS REQ'D
EW STAINLESS STEEL COUNTERTOP BRACKET BY SUGATSUNE MODEL# BT-300 OR APPROVED EQUIVALENT
XIST. TRIM TO RE MAIN
E
NEW MAP LE WAL L CABINETS
N EW POLISHED C ROM E H ADA COMPLIANT FAUCE T BY KOHLER, MODEL:CORALAIS K-1 56 1 0
NEW BAR HEIGHT "KENSHO" SILESTONE COUNTERTOP
�-+-
4
FRAMELESS BASE CABINETS TO BE MADE OF MAPLE VENEER PL YWOOD 111TH CLEAR FIN ISH. FULL OVERLAY DOORS W/ EUROPEAN HI NGES
EAST INT. ELEV.
SCALE 1/4" = 1'-0"
2
FRAMELESS WALL CABINETS TO MADE OF MAPLE VENEER PLYWOOD 111TH C LEAR FIN ISH. CABINET DOORS TO HAVE FRAMED TRANSLUCET GLASS DOORS PRO�DE AN D INSTALL SELF-CLOSING DRAWER HARDWARE.
GLASS TO BE 1/4" TE XTURED ("iN DUSTRE X"-- SEE ARCHITECT'S SAMPLE ) OPEN SHEL�NG TO
BE
MAPLE VENEE R PLYWOOD 111TH CLEAR FIN ISH.
TALL PANTRY CABINE TS TO BE MAPLE VENE ER PLYWOOD 111TH CLEAR FIN ISH.
HAN DLES TO BE STAIN LESS STEEL BY HAFELE ITEMS# 101.20.729/720/721/723 OR APPROVED EQUIVALENT
PAINT N OTES,
PRIME AN D PAIN T WALLS 2 COATS, BEN JAMIN MOORE, AURA LINE , PALE ALMOND OC-2 TYP. LATEX, EGGSHE LL FINISH
PRIME AN D PAIN T CROWN MOULDING, CHAIR RAIL AN D B ASE BOARD 2 COATS, BEN JAMIN MOORE,AURA LINE,WHITE DC-112 TYP. LATEX, SE MI-GLOSS FINISH
SEAL ANO SIGNATURE
FLOOR LEVEL:
SEVENTH FLOOR
DWG TITLE:
ELEVATIONS
NORTH INT. ELEV.
SCALE 1/4" = 1'-0"
OWG #:
A-300.00
PAGE #:30F6
S T S A3 H H 3. PRO�DE 24''x24" (MIN) COLOR SAMPLE ON NORTH WALL FOR APPROVAL 8. SUBMIT SHOP DRAll1 N GS AN D FIN ISH SAMPLES FOR APPROVAL ��: ����ER i�- 0 54 ��: ���iER I � �� B-SCAN JOB STICKER B-SCAN JOB STICKER R I" DR: TR CH: R E � .� E rnns L L GUTTMACHER INSTITUTE ARCHITECT llC RON A D GUTTMACHER INSTITUTE RON A D mm ARCHITECT llC = = ��� � 1' � 1'-0" SCALE: 1/4" 9 3020 125 MAIDEN LN., 7TH FLLOR TEL718-47210 VARET STREET,#403 210 VARET STREET,#403 TEL718-47L 9 3020 125 MAIDEN LN., 7TH FLLOR T E: 0A 4�2_ 1�2_ 011 0 , 00 N Y 7 OR K NE W Y 0 O 1 E , N N Y 12 OR AT KL O 0 N B B W 00 0 R KL R K Y 11 0 Y N N Y E 1 2 Y 4 2 2 _ 11 7 : 0 _ _ _ _ 0 __ � __________ � 7 1 __ �-------------------------�--------� _ 7 _ l _ _ 1 _ _ _ _ = _ 2� = � _ D_ _ _ � ._ _ _ _ 6___ �F=AX�7=8-� 49=7-= J2 =0 2 � �_ _ _ _ _ = _ _ l _ _ _ __�-------------------------�--------� _ _ _ _� _� _ _ __�----------�� _ D_ _ Y _ . =N _ _ _ _ 6___ �F= A X= =8 = 4 = 9 = J= 2
PRI a NG SET
After #1 Lunch Room Renovation Pricing Set Sections and Elevations
PRI a NG SET
After #2
After #3
',
\
' '-
EXTENT OF SITE
,-....
I
\
,,-
UNDERGROUND
STORMWATER RETENTION CIST
I
__, \
0,000 SF
-- ---'(
'
Mixed Use: Brooklyn, NY: Brooklyn Navy Yard Competition: 75,000 SQ.FT. A mixed use building was designed to attain a LEED rating of gold for the Brooklyn Navy Yard. It includes a roof garden, wind turbines, photovoltaic terra cotta roof tiles, and photovoltaic awning. Emphasis was given to below grade electrical lines, which justified the development of a loading dock for delivery of goods and materials. As Project Architect my responsibilities included design development, preparing RFP documents, reviewing presentation materials, coordinating between sub-consultants, and attending job site meetings.
\
\
\
\
'
\
\
\
\
\
\
'
', '
i
J
''
''
''
'' ''
''
''
''
j
i ''
------------EXISTING SECURITY ,._____/CHECKPOINT
--BNYOC PROPOSED SECURITY CHECKPOINT
>�= �,�-�
-----NEW SIDEWALK BY BNYDC
''
------
''
''
.J
''
''
''
''
''
CD ''
''
_J
''
2ND FLOOR TERRACE BELOW
''
------
''
''
''
------------- ----
� '
'
BNYDC PROPOSED SECURITY CHECKPOINT
=
>�= �,�--
-----NEW SIDEWALK BY BNYDC
''
------
''
''
''
------
''
''
''
-------
� '
'
EXISTING SECURITY .___/CHECKPOINT
BLDG#121 PAYMASTER
BLDG #121
PAYMASTER
2ND FLOOR PLAN SCALE: 1/32"=1'-0"
SANDS STREET BUILDING, BROOKYLN NAVY YARC BROOKLYN, N'r' r.e.a.l. ronald evitts architect lie n-:i. Al Ir::! l�T ?nnQ
3RD FLOOR PLAN SCALE: 1132"=1'-D"
SANDS STREET BUILDING, BROOKYLN NAVY YARC BROOKLYN, NY r.e.a.l ronald evitts architect lie n� Al 1�111-:T ?nnQ
VERTICAL AXIS WIND � TURBINES /
VERTICAL AXIS WINO TURBINES
ROOFTOP CHILLERS, FANS. VENTS r-7r-7
POWDER-COATED CORRUGATED ALUMINUM CLADDING INSULATED GLA2ING, LOW-E, ARGON FILLED
BKNY Competition Submission Material
MAIN BUIUOING ENTRANCE
.GREYWATER _/ DISTRIBUTION
Front Elevation
\
\
I I I I
i
□□
EXECUTIVE OFFICE I 3'-5" X 9'-5"
I I EXECUTIVE OFFICE I I ' IO" X I 3'-0" I I
iaJ
:
:CO I I I I I
(
\
I
I
WORK STATIONS 40'-2" X 27'-0"
□ □
___,c_--_ -G I I I I I
EXECUTIVE OFFICE I 8'-4" X 9'-I "
MECH. ROOM
B
I I EXECUTIVE OFFICE I I I -' IO" X I 0'-4" I
OJ
I
RECEPTION
D
□
DN>--+--+-t--+--+-<t-+--+-�
CHAIRMAN OFFICE I 8'-5" X I I '-I "
OFFICE FLOOR PLAN
LOBBY/ ELEVA TORS
UP RECEPTION
LOBBY FLOOR PLAN
Commercial: New York, NY: Tenant Fit-Out: 1,300 SQ.FT. Scope of work included surveying and generating design and construction plans of floor and lobby in a commercial building, and filed with the New York City Department of Buildings. Also hired to facilitate tenant fit-out and coordinate between building owner, tenant, and MEP engineers.
exist. tree stump
Residential: Tenafly, NJ: Deck Design: 1,200 SQ.FT.
The scope of this project was a two level deck, pool, hot-tub, landscaping, and outdoor shower. Also incorporated was a seating/stair facing the tennis court, and integrated bench seating at the deck levels. This project was to be built in three phases. Deck, Pool, and Outdoor Shower.
deck seating with integrated planters
+ + + + + + + + + ? + + + + + + + + ? + + ? + + + + + + + + + + + + +
.
I I
\ÂŽ I
I
I
\
I
I
I
I
I
I I I
I
I I
F ML R
M
DN
GARAGE
I I
D
Q
---\'-----
D s�rawi g
Residential: Nyack, NY: House Addition: 1,300 SQ.FT. An addition to the rear and side of this corner lot house had to be considerate of the views from the street. The front and side facade maintained the vocabulary of the neighborhood, while the rear addition celebrated the connection to the outside with a glassy facade. The addition comprised of a Kitchen, Dining Room, and Porch on the first floor and Master Bedroom and a Bedroom on the second floor. As Project Architect, my responsibilities included design development, producing and reviewing construction documents, meeting with the client, conducting job site meetings, and coordinating with the structural engineer and building department.
12'-41 2"
-w
NEW DISHWASHER
PTO. WOOD TR I M TO MATa-1 EXISTING,T'!?
T£RRACOTTA 16
(8)
,s
-4�
EW CLO SET ROO ANO SHELf
N
T
�
tAM!l.1.fillQM.
KEY, -EXISTING Wi\U.TO REMAIN
♦-NEWOUAD OUTLET �-NEW OOTLET
-EXISTINGOOTLET TOBE UPGRADED
$-NEWSWITCH
-EXISTING SWITCt1 TO REMAIN
� E
N W
E
N W
� -NEWOlt.!MER
-EXISTING OI Mt.!ER TO REMAIN
-¢--NEWSURFACE MOONTED L GHT I
-EXISTINGSURFACEMOONT'EOUGHT
<> -NEWUNDER CAB INET UGHT
Cl)
w
O:::'.
w
....J <(
C)
O REMAIN
4" PTD.WOOOQJARDRAIL
Q-NEWSCONCE Q-NEWRECESS£0LI GHT
1"X6" 1PE OECK ING
NE.lt..B..illQt NEW MA$TfR BEDROOM
NEW CERAMI CFLOOR TILE ON BATHROOMflOOR NEW CERAMI C TIJLH XTURE
[? � !!!iv
�
(§l
Cl)
� D
d
....J <(
C)
SECONO FLOOR PLAN
KEY:
♦- -NEW QUAD OUTLET
ASPHALT SHINGLES TO MATCH EXISTING (fl?.) COLOR:CHARCOAL
-EXISTING OUTLIT TO BE UPGRAOED
$-NEWS\\ITCt1
-EXISTINGSWITCH TO REMAIN
�:�
��-�:f
NEW PTO. CEDAR SI D ING OR HARDY BOARD TO MA TCH EXISTING COLOR:BENJAMIN-MOORE OC-64{"PURE\\ttlTE"}
+-
PTO. CEDAR OR HARDYBOARO SHINGLE SI DI NG
r 2 .E_Fl.�F_ N
I
�NG�OCf �
Xl
l SH �()(!_ :� � � � O .
'-----
EXISTING HOIJSE
- � �ISH_I $ t��
���-:rN
NI
� F�
�
_J
SCALI:1/4"=1'-0"
E CHEYENNE CO. TU S CAN FRP COLUMN COVER, W/ 6"X 6" WOOD POST INSIDE, fl?
N W
J
Nyack House Addition Approved Filing Set Drawings: Proposed Floor Plans and Elevations
+
NI
-�:��/
� fl�
�
SCALI: 1/4" • 1'-o•
-fXISTlNGWALL
W-NEWT ELEPHONEJACI( [j -NEW CABt.£ JACK
lrr�;�;����--=--=;"""i'±li?EF?-":
�-
� �- �� :: �:�i .
SECOND FLOOR
@-oooos
�-NEWWi\U.
,ODrno«
IN
WEST ELEVATION
II
<> -NEWUNDER CAB INE TUGHT
0 -NEW SCONCE
@-'MNDOWS
t
ARVIN CLAO ULTIMATE S LI D I NG FRENCH OOORS COLOR: "STONE Wl11TE", T EMPERED GLAS S
EW Of'ERABLf MARY1N CLAD ULTI MATE DOUBLE-HUNG\\1NDOWS CQOR: "STONE Wl11TE"
'-----
S�L� C�NG_ _,/ � EL. 92.37'
I
-£XISTINGSURFACE MOONT£0LI GHT
l1�
+-
-
-¢- -NEWSURFACE MOUNT£D UGH
� -NEW OUTLE T
-EXISTINGDMMER I TO REMA I N
/ �A ����
w
�
[j-NEWCABlfJACK
_/
O:::'.
D
� -NEW OI MMER
NEW FIXED MARVIN CLAD DIRECT GLAZE ROUNDT Of' WINDOW. CQOR: "STOOEWl11T£"
w
11' V.I.F.
A-3
w-NEWT ELEPHONE JACK
EW ANOOI ZED 4" ALUMNINUM LEADER CQOR: 'M-II TE
w u z w 0
NEWS INKS, FAUCE TS ANO COONT£R TOP W /2 RECE SS£D MEDI C I NE CAB I NE TS ,���;;����t!'ABOVE ���i��i;��
l
FIRST FLOOR PLAN
SCALI:1/4"•1'-0"
@-oooos
�
NEW CERAMI C BATHTUB FlXTURE ANDFAUCET W/ SHOWER CURTAIN AND ROO
FIRST FLOOR
@-'MNOOWS
-w
OPEN TO ABOVE
�
(
T£RRACOTTA PORCH f.F.EDGE
� -NEWWALL
w u z w 0
>-"
EW OPENING THROOGH EXIST.WALL -- 4"Xf POSTS TO E I THER S I OE'M/ DOUBLE2"X10" HEADER
�
12'-41 2"
"
L
EXIST. HOOSE CORNER POST TO REMAIN
XTEND DRCPPED SOfflT
'--�f:
4'-0
NEWWOOOflOOR TO-f------ll+-f---� MATCH £XISTINGOO NEW WOOOFRAMING
E.A]_Q_
BILCO SCAPEWEL
4"-0 "
"'-
��;i;;:,\::;;;;;;;�;:;,;;;,;,;,l!,t,_ •// I
'-----
I
/
I
1 _ sr �
c �- �;7��
lfilJLJLFIN
�L.��� _gjEN _D.R N f ��
KIT
/
- ---=-- - - - - ���=�:���������t�-L--::::--_j_p�L� �7:-➔ ----:::--::-:-,-----------������� MARV N CLAD UL MATE \\1 + I
-
-rL.VARtfS - -
TI
�t��
INS
FRENCH D�() ��;�:� R
N
_J
-
5£
� ��.\ �:�
A-4
ROOF il_
12'-4½"
+
r2ND FLOOR CEILING / !!!GI!_ P�IN!_ ___ _/
12'-4½"
A-1
--
EL. 163.47'
83 SEATING
KRAFT-FACED FIBERGLASS BATT IN SULATION, 5j" THICK, R-21 (CLASS II VAPOR RETARDER AS PER N1102.5) BY OWEN S CORNING
ARE
==
�--t;ei,==
="'�="'��'m
' '-------
l" WOOD PANEL
N EW PTO. W OOD SHIP LAP SIDING TO MATCH EXISTING. COLOR: BENJAMIN-MOORE
CEILING
' 2"X8" WOOD JOISTS 16" O.C., TYP. FOR 1 ST FLOOR "X10" RIM BEAM
I NEW MARVIN CLAD SLIDING FREN CH : DOOR. SEE D-2 FOR DETAILS ' NEW 1 3 j" WOOD CASING ' I j LOLY COLUMNS W/ : CONCRETE FOOTING
i---j '
: I : I
I
I 6" OF j" CRUSHED STONE 10 MILL POLYETHYLENE j WATERPROOFING MEMBRANE 4" CONCRETE SLAB
ir:i
PTD . WOOD SCREEN FRAME DOOR W/ P C V MESH INSIDE
2'-6"x1'-3" PATIO 1" THICK CONCRETE PAYERS ON CRUSHED STONE BASE W/ SAND FILLED JOINTS
EXISTING 4" SLAB ON GRADEN EW 4" SLAB ON GRADEO l::::::::::====':!.ED ���t
EXISTING HOUSE � FOUNDATION WALL AND__,,,/ " F OOTING
�OO' �
EW
�:;�:f.
"-�
i
[XISTINGHOOSE
�
------- ----
NEW PTO. WOOD SHUffiRS TO MATCH EXJST ING I N STYLE :Cl\.OR: BENJAMIN-MOORE 2119- 10 ("SPAQ BLACK")
-j--EJ=:;;;:;;:=;,;�;;;;;;;�r,;e;;;;;;;��=l
NEW OPERABLE MAR"1N CLAD ULT IMATE DOUBLE-HUNG \\1NOOWS COLOR: "STONE'M-IITE"-t-1-
--
-□-
NEW ANOO I IED ALUM INUM GUTTER,TYP COLOR: BENJAt,mH,WORE OC-64 ("PURE l™ITE")---4'as::;:!;:;:;:;:::: =========::j
➔
NEW PVC MESH SCREEN, COLOR:CHARCOAL __--tl /lt--
NEW PID. WOOll SCREEN ffiAME,CQOR: BENJAM I N-MOORE OC-64
("PURE'M,ITE") ___
NEW ANODIZED 4" ALUMN INUM LEAD£R.COLOR:'M-IITE NEW BRICK RIM COURSE TO t,!ATCH EXISTING
_/
--.._i,
1'-6"
mn IDlI]I
--NO GUTTER
�
EA�OC-�XIS ) ��
/
�ex;,,
�TTI£_FI N?
� . ��
� Xl�G �00' � -�o�f �
+-;:_�o�r
+-:��- �-�
�00<-
'--- .,---
C�LJN� _,,✓
;-tr
/
/ /r
_/I
- _/
l � F�FIN � .� � L _!2TC�N
r
� [���-� E
_r.R:�v��:;,,_
�;���-[h_R
I �SH __/
F
AOOITIOO _/
EA�lf W � �
f:�
NEW ASPHALT Sl1 INGLES TO MATCH EXISTING(TYP.} OLOR:CHARCOAL NEW MARVIN CLAD FIXED POLYGON 1'11NDOW O LOR:"STONE'M-I ITE"
NEW OPERABLE MARVIN CLAO U LTIMATE DOUBLE-HUNG \\1NOOW. COLOR:"STONE'M-IITE"_________ __
NEW ANOD IZED ALUMINUM GUTTER. TYP COLOR:BENJAMI N-MOO<E OC-64 {"PURE'M1 I TE"}
7"_--ii-.�
NEW PTD.WOOD 511 I P LAP SI D I NG TO MATCH EXI ST ING COLOR BENJAM I N-MOO<[ OC-64{"PURE'M1 I TE"}
f=
NEW OPERABLI MARVI N ULT IMATE OOUB LI-HUNGl'1l NDOW LOW"E' I NSU LATEO GLAZING. -Ht--+H---1-�0LOR: "STONE'M-I ITE" NEW PID. CEDAR SHAKE OR �;;;;;;;;J;;;;;;��a!,i=:/-+---J,AROY BOARD Sl1 I NGLE S I DI NG PTO.WOOD TR IM, TYP COLOR:BENJAM IN-MOO<E OC-64("PURE'M-I I TE")
1-=--- - - JL - �__lij__----,-1:'.:'.:::====:::'.:il..\-__jl;;:=====�=�=���=;;;;;;;;;;;;;;;;=;;;;;!(:'.='1==--
NORTH ELEVATION SCALI: 1/4�" 1 '-o•
1/4" = 1'-0"
t
��:-4]_ _____________ :tFWfl[TT�c'f1I ,!!;;;;;;;'.;;;;;;l;;;;;;'.;;;;; ;;l!Lj)!;;j;�;l;;;;;;!;;;;;;;,
ST LF � C�N� _/ � _ EL.92.37"
SCALE:
!-- - - - - - - - �
NEW PTD. WOOD GUARDRAl L. W/ 4· POSTS AND 1·BALUSTERS CO LOR: BENJAM I N �;: : (
...t,__IB__ADE_FlN� ___/ \fl EL.VAR I ES
Nyack House Addition Approved Filing Set Drawings: Sections and Elevations
EXISTINGHOOSE ,
'----
'
WEST BUILDING SECTION
2
SCALE: 1/4" = 1'-0"
t
r-------
s1� ��i�i
NORTH BUILDING SECTION
ADDITION
("PURE WHITE")
/
l
'' NEW KITCHEN FURNITURE '' : AND p '' i BATT '' l TION ''' LEVATIONS FOR DE � S �::��: ' :� PERF '' '' DRAINAGE PIPE, '' SEEA-2 ''' '' ' ''
i
O C-64
NEW MARVI N CLAD OUTS\\1NGING FRENCH D00< CUOF 30 07CO 0 LOR: "STONE WrllTE" W LOCKSET / ESCUTCHEON LIVER 1053 I N EUROPEAN PEWTER FlN I SH.COLOR:"STONE'M1 I TE",TEMPERED GLASS
\ I NEW PTO . WOOD 1r � RAI UNG l_fctx.OR:BENJAM IN-MOO<E OC-64{"PURE'M-IITE"} I
INEW CONCRETE STEPS SEE A-9FOROETAILS I
n<.ElJ..lll.
NEW MARv1N ESCUTCHEON RECTENGULAR LOCKSET,MOOEL RROND I E3352,FINI Sl1:EUROPEAN EWTER
A
ROOf/i '
L
A
�::N�� ��i ��;:.�:i I TE",TEMPERED G LASS
I I I :
I I
L _______________________________ �
EW CONCRETE STEPS.SEE A-9
FODETAILS R
2"X4" WOOD HAN DRAIL 4"X4"X3'-6" WOOD POST 2"X2" WOOD BALUSTERS SPACED @ 3 j"
EXTEN D RAILIN G POST DOWN TO BOTTOM OF 2N D FLOOR JOIST. BOLT AS REQ'D. BLOCK BETWEEN JOISTS AS NECESSARY. PRO�DE 3 THRU BOLTS MIN. PER POST
RIGID IN SULATION SLOPE TO DRAIN j" PlYWOOD SHEATHING
H6 TIE @ JACK STUDS
2"X1O" BLOCKING
N EW ANODIZED ALUMINUM GUTTER COLOR: BEN JAMIN-MOORE OC-64 "PURE WHITE"
¼ X 9¼" PSL HEADER XTERIOR PlYWOOD
BASE FLASHING OVER MEMBRANE
2"X4'' WOOD BOTTOM RAIL
2"X6" WOOD PLATE
I
BLOCKING AS REQUIRED
\__ R-21 BATT INSULATION
MAR�N CLAD SLIDING PATIO DOORS FRAME -
-
-
N
MAR�N CLAD ULTIMATE DOUBLE-HUNG IIINDOW FRAME
WEEP FOR WAITR DRAINAGE
PVC MESH INSIDE DOOR FRAME
2"X4'' WOOD BLOCKIN G
G
- �:�i Dg6�� �t���
6"X6" WOOD POST 2"X6" WOOD BASE PLATE
DOOR DETAIL (I) SLIDING SCALE 1 1/2" : 1'-0"
(3)2"X6" WOOD STUDS
WOOD POST IN SIDE COLUMN ENCLOSURE
HDCI0/4-SDS2.5 SIMPSON HOLDOWN W/ i" ANCHOR BOLT
(2) 2"X6" WOOD LINTELS ABOVE IIINDOW
(3) 5¼ X 9¼ PSL DIST
j" THICK HURRICANE TIE PLATES W/ j" • THROUGH BOLTS
PTD. WOOD SCREEN FRAME FASTEN ED TO WOOD STUDS W/ PTD. WOOD DOOR FRAME FASTEN ED TO WOOD SCREEN FRAME
EAVE DETAIL
SCALE: 1 1/2" = 1'-o•
COLUMN SOFFIT DETAIL SCALE 1 1/2" : 1'-0"
KRAFT-FACED FIBERGLASS BATT INSULATION, 5j" THICK, R-21 (CLASS II VAPOR RETARDER AS PER N II02.5) BY OWENS CORNING
2"X6" WOOD STUDS
r
BILCO SCAPEWELL, MODEL# 4048-42
2"X6" WOOD PLATE j" ZIP SYSTEM R SHEATHIN G 1" PTO. WOOD SIDIN G COLOR: BENJAMIN-MOORE OC-64 "PURE WHITE"
EXISTIN G CHIMNEY WALL 2'X2' TERRACOTTA Tll� W/ MORTAR @ 1/4" JOINTS
I � j" WOOD HEAD JAMB
V I I I
CONCRETE LANDIN G
4" SLAB ON GRADE
,(
I" WOOD SILL 10" CONCRETE FOUNDATION WALL W/ 14 BARS GROUITD SOLID @16" O.C.
j" FLOOR FINISH
l" PlYWOOD SU BFLOOR
5¼" X 9¼" PSL HEADER
\
fo' �m, .,oc.
r
I;
5/8" GYP. BOARD W/ INTERIOR FIN ISH PAINT
s·
_ 1 I
6"
,
"
g"
,(
6"
,(
R-21 BATT IN SULATION, BY OWEN S CORN ING, OR APPROVED EQUIV TYP.
#4 REBAR TYP. OF 3
OUTSIDE OPERABLE DOU�t:��u:� � ��iwc��� __j_-J -.f . q;..,__r:;:::r;-;i, 2"x 6" WOOD PLATE U l
ro I ;,,
0 Nyack House Addition Approved Filing Set Drawings: Details
3 1/2" PTD. WO. IIINDOW CASIN G
PTD. WOOD SIDING COLOR: BEN JAMIN -MOORE OC-64 "PURE WHITE"
•
15 BAR
�'
2"X6" WOOD STUDS
5/8" GYP. BOARD W/ INTERIOR PAIN T FINISH
KRAFT-FACED FIBERGLASS BATT INSULATION, 5j" THICK, R-21 (CLASS II VAPOR RETARDER AS PER N 1102.5) BY OWENS CORNING
18 ELECTRICAL UPGRADE
Q q
BOILER ROOM
HALLWAY (FIRE RATING, UTILITIES ENCLOSURE, LIGHTING, FIRE SAFTEY)
VISUAL ACCESS OPPORTUNITY
8 POOL EXPANSION/ACCESSABILITY
UPPER GYMNASIUM
ROPOSE:NEW FRAMEOSLAB
UPPER GYMNAS!UM
[ID
� 0
19 GYMNASIUM (FINISHES, JGHTING;
17 IMPROVE FIRE���-< SAFTEY
GYMNASIUM
F.E. PANELS REPAIR (ECB VIOLATION)
*
MOVING WATER/EROSION
. VACUUM LINE LEAK? '7'+-+t---FROM CHECK UNOERMINING/ SLAB SUPPORT
NATATORIUM
AIRLINE RACK IN OOL WALL TILE
�EBAR CORROSION IN
POOL CRAWL SPACE WALL BASEMENT
J r
12 NATATORIUM RENOVATION
SUB-BASEMENT
STRUCTURAL
VISUAL ACCESS OPPORTUNITY
COLLAPSED SLAB WITH OURED CONCRETE FINISH SLAB ABOVE
COLLAPSED SLAB WIT TEMPORARY WOOD FRAME FLOOR ABOVE
W NO WS
2
I
GYMNASIUM
''
NATATORJUM
10 POOL SHELL
ILL
UN�ERMINED . SLAB? (FROM VACUUM LINE LEAKING)
1
f
::::J
HAIRLINE CRACK OBSERVED IN TILE
_]
J
NATATORJUM
•
@HALLWAY (FIRE RATING, UTILITIES ENCLOSURE, LIGHTING, FIRE SAFTEY)
D
GIRLS' LOCKER ROOM
BOILER ROOM
17 I
I
J;
WATER PENETRATION O THIS WALL DURING/AFTER HEAVY RAINFALL
I
-fr=fr
7 r
4
ELEVATORS? LOCATION D
GYMNASIUM
19 GYMNASIUM (FINISHES, LIGHTING)
-i-, __.....,_________________....
�' /� /<9
1_ 1_
STRUCTURAL
! ir
WIN1 0
DIRECTIONAL SIGNS, EMERGENCY LIGHTING (ECB VIOLATION)
6 SLAB REPLACEM \ V
�EOUIF� ROOM
�
SUB-BASEMENT
PHASING
.21
NCOMPACTED OR INSUFFICIENTLY COMPACTED FILL CONTRIBUTING TO SLAB AND PIPE INSTABILITY
::::::J
BASEMENT
l
-u - - u -- - - u- u- -
l���,�-,1
J�
R E -FILING (BUILDING WIDE)
BOYS· LOCKER ROOM
·-=----= ,
I
0oLD FIRE ALARM REMOVAL/
22 SPRINKLER SYSTEM IILDING WIDE)
TEST Pl
SAUt:,JA
DIRECTIONAL SIGNS, EMERGENCY LIGHTING (ECB VIOLATION)
�ELEVATOR? LOCATION 0 i
GYMNASIUM
2
16
":� REPAIR ROOF FAN
NATATORIUM
PHASING
Institutional: Brooklyn, NY: Congregation Beth Elohim (CBE): 42,000 SQ.FT. A master plan for the two Lower Levels of Congregation Beth Elohim, Temple House was completed in 2010. The Master Plan documented issues, deficiencies, opportunities and making recommendations for how best to address these in conjunction with the Congregation long term goals. Above are Structural and Phasing diagrams outlining issues and improvements. Also analyzed were the HVAC, Plumbing, Elevators, Fire Safety System and the Pool.
16 BOILER REPLACEMENT (INCLUDES All INTAKE, EXHAUST UPGRADE, AND ADDING DUAL FUEL
\
\
\
\
\
\ I
I
I
I
I
I
UPPER �NASIUM
VIEWTO GYl'v1
NATATORIUM
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I \
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\ UP
.'(
(°J
l,
-7 ◊ ◊
_ _j
◊ -<:
/
'--------���--------'t.;==.L�----'== ,,,. ,,,.,,,.,,,.,,,.
,,,. ,,,..,,.,,,,,, ',, ......
...............................
I L______________
I'-+-��
L----------------�I
CBE Master Planning Illustrative Natatorium and Boys Locker Room Improvement Plan
?>
D D
/
◊ (}
D
=;===i;k,=;[IIiiiJJ22-=7-=7.C-V.....,
◊
,ffl�ffl, ◊
◊
o·-s 1/2" (ACRYLIC BOX
SLOTS FOR HEAT VENTILATION !
'-4 1/2" (WOOD SCREE )
1 /8" 3FORM ECORESIN BOX
.----....
ATTACH LIGHT BOX TO WALL W/ SIX SCREWS (SHEETROCK OR LUMBER, AS REQ'D .
I
REPLACEMENT 3" PORCELAIN LIGHT SOCKET (PROVIDED BY OWNER)
I
0
z
V5 w "'
b :---0,
z
t:::l
"' u
�
0
r5 w "'
z vi w
.....
�::::-
0
&l "'
=
�
00
I 0
ANTIQUE WOOD SCREENS PROVIDED BY �------� OWNER
G)
I
0
;;:1
0)
_I 0
�
�
o·-s 1/2"
2. INSTALLER - INSTALLER IS RESPONSIBLE FOR WIRING TO EXISITING ELECTRICAL JUNCTION BOX, INSTALLATION OF REPLACEMENT 3" PORCELAIN SOCKETS, AND INSTALLATION OF 2 SHADES (DIFFERENT SIZED) IN POOLHOUSE POWDER ROOM.
1/8" 3FORM CORESIN BOX
SCRIBE RESIN AROUND SOCKET 1/8' -
PLAN OF 3FORM RESIN TOP
3 1/8 (HOLD)
o·
1 1 4"
o·-s 1/2" � -+-SLOTS IN 3FORM ECORESIN TOP FOR VENTILATION
SCOPE: 1. FABRICATOR - USE 1/4" 3FORM ECORESIN "LINEN WHITE" PANEL AND 2 WOOD SCREENS PROVIDED (NOTE: 2 SCREENS ARE DIFFERENT HEIGHTS: 9" AND 8-1/4" HIGH (SEE RED TEXT ABOVE)). CONNECT RESIN PANEL TO WOOD SCREEN WITH A STRONG CLEAR ADHESIVE. CONNECT ECORESIN PANELS TO b EACH OTHER WITH MFG. RECOMMENDED I 0 SOLVENT/ADHESIVE. DRILL HOLES ON BACK PANELS FOR MOUNTING AND CUT SLOTS ON TOP PANEL FOR VENTILATION.
4 ,____,
I
0
WEST SCREEN ELEVATION
EXIST. ELECTRICAL JUNCTION BOX
JOIN 1/8" 3FORM ECORESIN BOX AT CORNERS W/ MFG. RECOMMENDED SOLVENT
z vi w
� a,
1/8" 3FORM ECORESIN TOP
EXIST. ELECTRICAL JUNCTION BOX
I
1/8" 3FORM ECORESIN BOX
ANTIQUE WOOD SCREENS PROVIDED BY OWNER FACE OF 3FORM RESIN BOX (1/2'' SHOWING TYP).
G) SOUTH-WEST AXONOMETRIC 3 --
PANEL GLUED TO 3FORM BOX USING STRONG CLEAR ADHESIVE
ANTIQUE WOOD SCREENS PROVIDED BY OWNER
0
0
REPLACEMENT 3" PORCELAIN LIGHT SOCKET (PROVIDED BY OWNER)
NORTH SECTION
Residential: Tenafly, NJ: Pool House Sconce The client had a set of wooden reliefs they wanted incorporated into the lighting for the bathrooms of the Pool House. Sconce boxes were designed using eco-friendly resin pieces. The top of the box had slits for heat ventilation and the wood relief was adhered to the front, allowing light to pass through the openings.
Photoshop Concept: Based on needs of residents
Interaction of Residence:
Design/Build: Cardboard and PVC tubes
Interaction of Business: BEFORE
Installation: In-front store within Hutong
Interaction of Business: AFTER
Beijing, China - Design 5: Hutong (Neighborhood) Study
Our group assignment in Beijing was to study the Hutongs and provide a design with the 2008 summer Olympics in mind. Our group interviewed and interacted with the residences and various business owners within the Hutong. We designed a landscaping that provided seating, table, and bicycle storage for the residents/patrons of the Hutong to watch the Olympics on T.V., which various businesses within the Hutong would show.
design 5 - beijing china