Budget highlights
9
Etwell Street – $300,000 - Road and roundabout renewal
10
Archer/Mint Streetscape Improvement Plan – $3.1 million – Protected bike lanes, tree planting, revitalised Town Centre
OPTUS STADIUM
STATE TENNIS CENTRE 1
MATAGARUP BRIDGE
RIA R PA E
14
Bone/Upton intersection upgrade - $65,000 – Tree planting, road safety upgrade
RIV
13
KD
PATHWAYS ictoria Park Dr pathway renewal – $150,000 V – Landscaping and permanent fencing from Roger Mackay Dr to Marlee Loop
PERTH STADIUM STATION
TO
11
12
1
BELMONT PARK
VIC
The Town has a number of projects and developments planned for the 2022/23 financial year, some of which are detailed on this map.
ROADS
BURSWOOD STATION
Archer/Orrong intersection upgrade – $1.3 million – Fix blackspot
CROWN PERTH
Berwick St Renewal – $633,839 – Road renewal between Balmoral St and Hill View Tce GR
Shepperton/Miller intersection upgrade $700,000 – Fix blackspot
A E T A E
N R E ST
Y W H
D R D O O BURSW
ER TS
12
VICTORIA PARK STATION
OR N RO
ARCHER/MINT 10
D
AR CH
NR
ER
O RT
ST
PE
ST ER LL
MI
ND E AV
LEISURELIFE 5 NT
ST
Higgins Park upgrade - $650,000 – Floodlight upgrade
ST
18
OATS ST STATION
ICK
19
16
KE
17
6 RW
Leisurelife – $126,000 – Air-conditioning replacement, gym equipment upgrades
4 AQUALIFE
Merton St micro park - $5,000 – Planting at micro park site
AL
13
Harold Rossiter Park upgrade - $390,500 – Floodlight upgrade
Y
WELSHPOOL STATION
W
TC
E
9
HW
R JA RA H
3
VIE
19
NY
LL
Town depot – $100,000 – Solar panel installation
EDWARD MILLEN PARK
20
BA
HI
6
RD
7
21
Edward Millen Park upgrades – $6.8 million – As part of the Edward Millen Heritage Redevelopment, works will commence to upgrade the parkland and community recreation zone at Edward Millen Park.
HIGGINS PARK 17
15 11
Hordern St micro park – $15,000 – Landscaping works
T
Harold Hawthorne Community Centre –$95,000 – Air-conditioning replacement, fire service upgrade
20
KENT S
8
Lathlain Precinct Redevelopment Plan $5.2 million – New grandstand, multipurpose centre, function rooms, exhibition space, meeting rooms
8
LA
Kent St Sand Pit - $55,000 – Progress detailed design process
HAROLD ROSSITER PARK 5
CARLISLE STATION T RU
16
PERTH AIRPORT 5KM
14
BE
Aqualife upgrades – $509,000 – Changeroom refurbishment, gym equipment upgrades, 25m pool filter replacement
18
WY
4
Rotary Park renewal - $250,000 - Eco-zoning works to introduce more waterwise garden areas, new paths, upgraded playground
NY H
LAND AND BUILDINGS
A L BA
15
D
LATHLAIN PARK
GR
PARKS
21
7
EP
Watts Pl new pathway - $75,000 – Pathway from Turner Ave to end of Watts Pl
TOVP HQ
SH
3
Rutland Ave new pathway - $2.2 million - Final leg of Shared Pathway between Miller St and Great Eastern Hwy
RO B
2
RD
2
N
ROTARY PARK