Serving our community and growing a city for tomorrow Townsville City Council is committed to delivering projects for the community, from water security and industrial infrastructure to community leisure facilities. These investments will cultivate a thriving, connected, resilient and sustainable community and city for tomorrow.

Mill Road Reconstruction

Funding: TCC Investment: $1.57M Jobs: 30 Status: Stage 1 completed October 2023 Roadworks are now complete, including road pavement reconstruction, bitumen sealing, stormwater drainage upgrades and improvements to property access.

Castle Hill Bushfire Management Pipeline

Funding: AG Investment: $1.3M Jobs: 5 Staus: Completed October 2023 The installation of stainless-steel pipes on Castle Hill for bushfire protection and planned burns management ensures best practice in bushfire management, increased resilience of our prized landmark, and enhanced safety of the community. This project is part of the Australian Government’s Black Summer Bushfire Recovery Grants Program.

Castlemaine Street Road Renewal Funding: TCC, LRCI Investment: $0.9M Jobs: 30 Status: Completed September 2023

The renewal of kerb and channel, pavement, driveway crossovers, pathway, pedestrian refuge, installation of safety bollards, lighting and planter boxes has provided an enhanced road surface and streetscape, improving connectivity and road safety for the community. This project is part of the Australian Government’s Local Roads and Community Infrastructure Program.

Boulder Protection Program Funding: TCC Investment: $2.07M Jobs: 30 Status: In progress

Boulders have recently been installed at Wulguru Park, Greenwood Park, Lakeside Park, Victoria Park, Cutheringa Park and Toomulla Camping Ground for protection from vehicle damage and improved safety for the community. The program will be rolled out at eight parks across Townsville.

Sturt Street Cutting Stabilisation Funding: TCC Investment: $1.9M Jobs: 15 Status: Completed October 2023

Essential stabilisation works to the rockface are complete, minimising the risk of rock fall and ensuring the community can continue to safely use the car park, footpath and road.


Projects delivered

Council continues to service the community with these essential works. Here are just a few of the many works completed across the city in the last two months. Heatley Park, Fulham Road Funding: TCC

Pathway renewal.

Bronze Street Funding: TCC

Road reconstruction and asphalt overlay.

Bahr Court Funding: TCC

Road upgrades.

Saunders Beach Road Funding: TCC

Drainage and road reconstruction.

Fisherman’s Landing Car Park, Balgal Beach Funding: TCC

Description: Drainage treatments and roadworks.

Hazelwood Court Funding: TCC

Road resurfacing.

Cleveland Terrace Funding: TCC

Road resurfacing.

Gregory Street Funding: TCC, BS

Road reconstruction.

Alexandra Street Funding: TCC

Kerb and channel and footpath renewal.

Leichhardt Street Funding: TCC

School Zone Sign Upgrades Funding: TCC

Upgrade of communication infrastructure and controllers of 24 flashing school zone signs and installation of 1 new flashing school zone sign: • Bohlevale State School • Garbutt State School

Ingham Road Funding: TCC

Construction of a new water main.

Dean Street Funding: TCC

Construction of a new water main.

Fulham Road Funding: LRCI

Kerb and channel and footpath renewal.

• Heatley Secondary College • Magnetic Island State School

Pathway renewal.

North View Lagoon Funding: TCC

• Northern Beaches State High School

Baxter Street Funding: TCC

Nathan Street Funding: TCC

Viewing platform renewal.

• The Cathedral School of St Anne and St James

Road upgrades.

Charters Towers Road Funding: TCC

Gilbert Crescent Funding: TCC

Glendale Drive Funding: TCC

Footpath and renewal works on Carr Street, Brodie Street and Yeatman Street.

• Townsville Grammar School (North Ward)

Road resurfacing at Aitkenvale State School car park.

Kerb and channel and road resurfacing.

Cradler Court & Mawson Street Funding: TCC

Road resurfacing.

Top City Reservoir Funding: TCC

Refurbishment of the water reservoir including roof and associated pipework.

• Townsville Junior Grammar School (Annandale) • Vincent State School

Chelsea Drive Funding: TCC

Open drain repairs.

Pathway renewal and road upgrades. Scan here for more information on projects underway

Funding Bodies AG Australian Government TCC Townsville City Council BS Black Spot Program (Australian Government) LRCI Local Roads and Community Infrastructure (Australian Government)

Townsville City Council advises that all content is true and correct at time of printing.


Serving our community and growing a city for tomorrow Projects delivered Balgal Beach Fisherman’s Landing car park drainage treatments and roadworks

Toomulla Toomulla Camping Ground boulder protection program

Saunders Beach Saunders Beach Road drainage and road reconstruction

Bluewater Park Cradler Court & Mawson Street road resurfacing

Bohle Bohlevale State School flashing school zone sign

Deeragun Northern Beaches State High School flashing school zone sign

Heatley Heatley Park pathway renewal Fulham Road pathway renewal Bahr Court road updgrades

Lynam Mill Road reconstruction

Heatley Secondary College flashing school zone sign

Kirwan Castlemaine Street road renewal Greenwood Park and Lakeside Park boulder protection program

Condon Chelsea Drive open drain repairs

Alice River Bronze Street road reconstruction and asphalt overlay


Nelly Bay Garbutt Garbutt State School flashing school zone sign

West End Ingham Road construction of new water main Baxter Street road upgrades

Magnetic Island State School flashing school zone sign

North Ward Cleveland Terrace road resurfacing Gregory Street road reconstruction Alexandra Street kerb and channel and footpath renewal Leichhardt Street kerb and channel and footpath renewal Townsville Grammar School flashing school zone sign

South Townsville Dean Street construction of new water main Victoria Park boulder protection program

Townsville City Top City Reservoir refurbishment Sturt Street Cutting stabilisation

Castle Hill Gilbert Cresent pathway renewal and road upgrades Castle Hill Bushfire Management Pipeline

Hermit Park Footpath and renewal works on Carr Street, Brodie Street and Yeatman Street

Mundingburra The Cathedral School of St Anne and St James flashing school zone sign

Idalia North View Lagoon viewing platform renewal

Annandale Hazelwood Court road resurfacing Townsville Junior Grammar School flashing school zone sign Glendale Drive kerb and channel and road resurfacing

Vincent Vincent State School flashing school zone sign

Aitkenvale Nathan Street road resurfacing and Aitkenvale State School car park

Wulguru Wulguru Park boulder protection program