BRIDGE OVER WATER PROJECT
TPA Pontoons provides floating access solution for a high profile bridge installation
New Bridge Over Water Project Floating Pontoon Installation
Two of VP’s new additions joined forces to provide temporary access solutions for a number of high profile bridge installations across the UK; using the S15 spider lift from Higher Access and floating modular plastic pontoons from TPA. T: 0870 240 2381
W: www.tpa-ltd.co.uk
Using the S15 spider lift from Higher Access and Modular Plastic Pontoon from TPA they were able to provide a more versatile working platform.
The combination of these two Vp divisions were able to provide a highly versatile working platform for operatives to work from. Deployed direct from GF Wigan, seventy two square metres of TPA’s modular plastic pontoon was installed by three of their newly trained depot operatives from TPA Winslow; the combined system went out on hire for a total of six weeks.
Such is the success of this hire access system, the equipment is now back on site as this goes too print with the same client for an extended hire until the middle of December 16.