What is primavera p6 under free online training of primavera p6 training in islamabad

Page 1

What is Primavera P6 under free online training of primavera p6 training in Islamabad?


Oracle Primavera P6 is an integrated management solution project portfolio (PPM) tools specific function of each team member has to fulfill the tasks and skills. The P6-Suite uses a standard Windows interface, client / server architecture, technology-enabled Web, and a stand-alone (Oracle XE) or database-based (Oracle and Microsoft SQL Server) network. The Oracle Primavera P6 suite includes the following software components: Technical Data used in the field explained in primavera p6 training in Islamabad. Project Management (PM) The project management module allows users to track and analyze performance. It is a multi-user, multi-system functions of planning and control of resources with a focus on the features and capabilities of actual data, customizable views, user definable data hierarchies to support projects in various stages of prosecution resources planning. Some more details of primavera p6 training in Islamabad. The module is ideal for companies that need the same time to manage multiple projects and to assist a department or entire organization access by multiple users. It supports a project structure Society (EPS)


with an unlimited number of projects, activities, benchmarks, resources, project structure (EDT), structure plans Organisation (OBS), custom code and critical path method (CPM) scheduling and resource leveling. to manage large-scale implementations of the portfolio of business projects with Oracle or SQL Server database project. For smaller installations, you can use SQL Server Express. The PM module also provides centralized resource management. This includes the approval of timesheet resources and the ability to communicate with project resources with the progress Reporter module. In addition, the module provides a comprehensive risk management, issue tracking and management of sleepers. The tracking feature allows users to perform dynamic rollups between projects cost, schedule and income capitalization. Products and working documents of the project can be assigned to activities and managed centrally. The Report Wizard creates custom reports, to extract specific data from the database. For more information on schedules comparison, see "Comparing Projects" on page 337 Installs with PM Schedule comparison module (also appear in the PM client interface Since Digger claim depends on the configuration of the industry, they have chosen during installation) compares two projects, or a project and a base with determining what data they were to be added, deleted or modified from the lists. Select Based on the data fields for the comparison, this feature provides a draft plan comparison report in one of three formats ASCII, CSV or HTML file. SK Training for Skills and Knowledge is the best institute in Rawalpindi Islamabad for Pakistani Students who wants to join primavera p6 training in Islamabad.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.