ARCHITECTURE PORTFOLIO
TRISHA OLIVEROS UNIVERSITY OF THE PHILIPPINES | SELECTED WORKS 2020 - 2022
Trisha is a young creative fresh out of architecture school. Her love of learning and new experiences led her to various paths -- from being a student-athlete to a student council member to a working student. While in school, she had a short experience with working in a small architectural design firm, started freelance work, and started working at Legazpi City Hall on her last semester while finishing her thesis project. Her architecture experience is rooted not only in solving spatial issues but as well as understanding how the built environment affects human emotions. This allows her to approach each project as an opportunity to learn and evolve as a designer. She would love to work with a team of creatives at a multi-disciplinary design firm. As of now, she is working freelance and is always interested in a challenge. Reach out to trishaaoliveros@gmail.com to connect!
2
Fishyalan Project Professional
Friendship Pocket Park Professional
CropxFreight Academic
Astro Sciences Institute Academic
Bamboozle Academic
Warming
Competition
Photography Resume
3
F I SHYA L A N P RO J E CT Year: 2021-2022 Firm: City Engineer’s Office Location: Legazpi City, Albay This is a proposal for a new public space project that provides an avenue for the local community to relax and enjoy leisure activities by Legazpi City’s boulevard. The design must accomodate commercial spaces, boardwalks traversing the mangrove area, and small cottages for hanging out. The project is divided into two phases, the main building + boardwalk (phase 1) and the cottages + boardwalk (phase 2) spread out over a hectare of mangrove swamp area. Contribution: conceptualization, schematic design, 3d modelling, rendering, and visualization of the entire development, and production of working drawings for phase 2 under the supervision of City Architect Reynaldo Acosta, FUAP Tools: Sketchup, AutoCAD, Grasshopper, Lumion, Photoshop
5385
300
470 3600 590
2" x 2" WOOD LATTICE WORK 2" x 3" GOOD LUMBER PURLINS SPACED @ 600MM O.C. 3" x 6" TOP CHORD
1800
2" x 4" GOOD LUMBER RAIL GUARD 350 x 250MM R.C. BEAM
HIGHEST TIDE LINE
HIGHEST TIDE LINE
300x300MM R.C. COLUMN 6-16MM Ø RSB W/ 10MM TIES SPACED 4 @ 50MM, 4 @ 100MM; REST @ 150MM
300x300MM R.C. COLUMN 6-16MM Ø RSB W/ 10MM TIES SPACED 4 @ 50MM, 4 @ 100MM; REST @ 150MM
SEABED LINE
SEABED LINE
16 MM Ø RSB SPACED @ 200MM B.W. BASE BARS
1500
1500
TYPICAL FRONT ELEVATION SCALE
1: 100 MTS
6 S-1
C I T Y OF L E G A Z P I
CITY ENGINEER'S OFFICE DEPARTMENT OF ENGINEERING AND PUBLIC WORKS
TRISHA ANNE S. OLIVEROS
RANDY A. VALLADOLID
DRAFTSMAN
ENGINEER III
1500
1500
TYPICAL SIDE ELEVATION SCALE
7 S-1
1: 100 MTS
PROJECT TITLE:
PREPARED BY:
16 MM Ø RSB SPACED @ 200MM B.W. BASE BARS
250
1000
16 MM Ø RSB SPACED @ 200MM B.W. BASE BARS
1000
HIGHEST TIDE LINE 300x300MM R.C. COLUMN 6-16MM Ø RSB W/ 10MM TIES SPACED 4 @ 50MM, 4 @ 100MM; REST @ 150MM
250
1000
1" x 6" CEMENT BOARD FASCIA BOARD
00
36
250 1000 100
2" x 4" GOOD LUMBER RAIL GUARD 350 x 250MM R.C. BEAM
SEABED LINE
250
4660
3600
2" x 3" GOOD LUMBER PURLINS SPACED @ 600MM O.C.
1800
350 x 250MM R.C. BEAM
MIGUEL LOPEZ DE LEGAZPI BOULEVARD, DAP-DAP, LEGAZPI CITY TEL. NO. (+63) 0917 1344 453
1: 100 MTS
3" x 6" TOP CHORD
3" x 6" TOP CHORD 2" x 4" GOOD LUMBER RAIL GUARD
5 S-1
KIOSK PLAN SCALE
0.90 x 1.80 CORRUAGATED ONDULINE BITUMEN ROOFING SHEET 0.90 x 1.80 CORRUAGATED ONDULINE BITUMEN ROOFING SHEET
250 1000 100
250 1000 100
2" x 3" GOOD LUMBER PURLINS SPACED @ 600MM O.C.
4 S-1
1: 100 MTS
300
1450
1450
2" x 2" WOOD LATTICE WORK
1800
3000
TYPICAL ROOF
KIOSK PLAN SCALE
1750
1" x 6" CEMENT BOARD FASCIA BOARD
BUILDING FOOTPRINT
TYPICAL ROOF FRAMING
3 S-1
1: 100 MTS
1750
1750
2" x 6" GOOD LUMBER RAFTERS SPACED AS SHOWN
KIOSK PLAN SCALE
0.90 x 1.80 CORRUAGATED ONDULINE BITUMEN ROOFING SHEET
1500
1160
0.90 x 1.80 CORR. ONDULINE BITUMEN ROOFING SHEET
2" x 3" GOOD LUMBER PURLINS SPACED @ 600M O.C.
TYPICAL FLOOR FRAMING
2 S-1
1: 100 MTS
00
3050
1450
TYPICAL FLOOR PATTERN
36
1175
2" x 6" GOOD LUMBER RAFTERS SPACED AS SHOWN
FB
100MM THK FLOOR SLAB W/ 12MM Ø RSB SPACED @ 150 W/ TEMP BARS SPACED @ 300
KIOSK PLAN SCALE
FB
2500
2950
200 250
1'' x 6 '' x 8 '' TECHWOOD WOOD PLASTIC COMPOSITE PLANKS FLOORING SYSTEM USING HAUSMANN STAINLESS DECKING SCREWS 100MM THK FLOOR SLAB W/ 200MM x 2200MM x 20MM THK WOODTECK DECK FLOOR SYSTEM
1 S-1
250
2500
1160
2" x 6" GOOD LUMBER ROOF TRUSS
7 A-4
2750
250
2" x 4" GOOD LUMBER RAIL GUARD
150
3000
3050
470
250
2500
3000
150
4660
250
1175 3300
590
2500
300x300MM R.C. COLUMN 6-16MM Ø RSB W/ 10MM TIES SPACED 4 @ 50MM, 4 @ 100MM; REST @ 150MM
150
250
200
3400
200
250
3000
FB
3300
150
RECOMMENDING APPROVAL:
PROPOSED FISHYALAN DEVELOPMENT LOCATION: DAP-DAP, LEGAZPI CITY
TYPICAL SECTION SCALE
1: 100 MTS
CONCURRED:
SHEET CONTENT:
SHEET NO: REVISIONS:
NOEL B. ENCINARES SR. OIC- ASST. CITY ENGINEER
4
APPROVED BY:
1500
CLEMENTE A. IBO CITY ENGINEER
CITY MAYOR
S-1
AS SHOWN
NOEL E. ROSAL
CADD BY: TRISH
DRAWN:
CHECKED:
DATE:
F R I END SH I P P OC K E T PA RK Year: 2021 Firm: City Engineer’s Office Location: Legazpi City, Albay
This is a proposal for a small public space at the heart of a busy area in the city. The idea is to provide a resting area for people with transactions within the vicinity which includes malls, government offices, recreation center, and land transportation terminals. Contribution: schematic design, 3d modelling, rendering and visualization, and production of working drawings under the supervision of City Architect Reynaldo Acosta, FUAP Tools: Rhinoceros, AutoCAD, Sketchup, Lumion, Photoshop
PLANT BOX B DETAILS (#5 ALL BLACK PEBBLE WASHOUT FINISH)
1630
WASHOUT FINISH)
1000
1600
1000
1600
1000
1600
1000
1600
1000
1600
1620
2 A-1 LP
OUTPOST
LP
GOLDEN BAMBOO STRIP 3130
OUTPOST DETAILS
FL
FL
WALL DETAIL
2 (300X600 CERAMIC TILE A-1 STONE SERIES FINISH)
LP
2 A-1
1000
BASE OF SCULTPTURE DETAILS
2 A-1
2 A-1
9590
SCULPTURE DETAILS (GRANOLITHIC MARBLE W/ CEMENT FINISH)
2 A-1 (#5 ALL BLACK PEBBLE
16480
8835
SEATING DETAILS (#5 ALL BLACK PEBBLE WASHOUT FINISH)
PLANT BOX A DETAILS
2 A-1
1300
LP - LAMP POST FL - FLOOD LIGHT
12300
1300
4 A-7
1 A-2
POCKET PARK KEY PLAN PER WORK ITEM SCALE
1: 100 MTS
PROJECT TITLE:
PREPARED BY:
DEPARTMENT OF ENGINEERING AND PUBLIC WORKS
MIGUEL LOPEZ DE LEGAZPI BOULEVARD, DAP-DAP, LEGAZPI CITY TEL. NO. (+63) 0917 1344 453
TRISHA ANNE S. OLIVEROS
REYNALDO S. ACOSTA
DRAFTSMAN
ARCHITECT IV
RECOMMENDING APPROVAL:
6
C I T Y OF L E G A Z P I
CITY ENGINEER'S OFFICE
APPROVED BY:
LOCATION: BITANO, LEGAZPI CITY
CONCURRED:
SHEET NO:
SHEET CONTENT: REVISIONS:
FRIENDSHIP POCKET PARK
NOEL B. ENCINARES SR. OIC- ASST. CITY ENGINEER
CLEMENTE A. IBO CITY ENGINEER
CITY MAYOR
A-2
AS SHOWN
NOEL E. ROSAL
CADD BY: TRISH
DRAWN:
CHECKED:
DATE:
1200
300x300 C STO
500
1200
350 350 100
OLITHIC MARBLE W/ ETCHING WORKS
GRANOLITHIC MARBLE FINISH W/ ETCHING WORKS
500
1 A-8
GRANOLITHIC MARBLE FINISH W/ ETCHING WORKS
RED GRANOLITHIC MARBLE FINISH W/ ETCHING WORKS
700
100
400
350 100
5 A-9
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
100MM THICK SLAB
700
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
400
7 A-9
100 300
400
6 A-9
250
OLITHIC MARBLE W/ RED CEMENT
PLAIN CEMENT CONCRETE FINIS
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
400
4 A-8
3 A-8
#5 ALL BLACK P WASHOUT FI
100
350
2 A-8
FINISH FLOOR LINE (CF COURT)
1200
400
8 A-9
150
400
FINISH FLOOR LINE (CF COURT)
250
12MM Ø RSB SPACED @ 220 B.W.
200
TOP OF BASE
300
350
560
300
350
1860
SCULPTURE RIGHT ELEVATION
SHEET CONTENT:
CITY ENGINEER
DRAWN:
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
1200
TRISHA ANNE S. OLIVEROS MIGUEL LOPEZ DE LEGAZPI BOULEVARD, DAP-DAP, LEGAZPI CITY TEL. NO. (+63) 0917 1344 453
1200
DATE:
CHECKED:
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
1200
300 X 300MM COLUMN
SCALE
AP-DAP, LEGAZPI CITY 453
A-8
SCALE
PROJECT TITLE:
PROJECT TITLE:
4 A-8
1200
DEPARTMENT OF ENGINEERING AND PUBLIC WORKS
TRISHA ANNE S. OLIVEROS MIGUEL LOPEZ DE LEGAZPI BOULEVARD, DAP-DAP, LEGAZPI CITY TEL. NO. (+63) 0917 1344 453
DRAFTSMAN
TRISHA ANNE S. OLIVEROS REYNALDO S. ACOSTA
RECOMMENDING APPROVAL:
ARCHITECT IV
DRAFTSMAN
FRIENDSHIP POCKET PARK FRIENDSHIP POCKET PARK REYNALDO S. ACOSTA ARCHITECT IV
LOCATION: BITANO, LEGAZPI CITY
NOEL B. ENCINARES SR. LOCATION: BITANO, LEGAZPI CITY
OIC- ASST. CITY ENGINEER
300 X 300MM COLUMN
300 X 300MM COLUMN
SCALE
1: 20 MTS
1: 20 MTS
SCALE
A-8
SCALE
CONCURRED: SHEET CONTENT:
RECOMMENDING APPROVAL: CONCURRED: APPROVED BY: APPROVED BY:
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
300 X 300MM COLUMN
C I T Y OF L E G A Z P I
REVISIONS:
OIC- ASST. CITY ENGINEER CITY ENGINEER
CITY MAYOR
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITHI FINISH W/ RE
300 X 300MM COLUMN
300 X 300MM
FLOOR 6 FLOOR PLAN: LEVEL 6PLAN: LEVEL 6 SCALE
A-9
SCALE
1: 20 MTS
1: 20 MTS
1200
1200
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
300 X 300MM COLUMN
300 X 300MM COLUMN
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
C I T Y OF L E G A Z P I
SCALE
AS SHOWN NOEL E. ROSAL
REVISIONS:
CITY ENGINEER'S OFFICE A-8
AS SHOWN TRISHA ANNE S. OLIVEROS
CADD BY: TRISH MIGUEL LOPEZ DE LEGAZPI BOULEVARD, DAP-DAP, LEGAZPI CITY
MIGUEL LOPEZ DE LEGAZPI BOULEVARD, DAP-DAP, LEGAZPI CITY CITY MAYOR CITY ENGINEER TEL. NO. (+63) 0917 1344 453 CHECKED: DRAWN:
DATE:
TEL. NO. (+63) 0917 1344 453 CHECKED: DRAWN: DRAFTSMAN
PROJECT TITLE:
PROJECT TITLE:
8 A-9
RECOMMENDING APPROVAL:
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITH FINISH W/ RE
300 X 300MM COLUMN
300 X 300MM
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHI FINISH W/ WH
FLOOR 8 FLOOR PLAN: LEVEL 8PLAN: LEVEL 8 SCALE
A-9
SCALE
1: 20 MTS
1: 20 MTS
RECOMMENDING APPROVAL: CONCURRED: APPROVED BY: APPROVED BY:
CONCURRED: SHEET CONTENT:
SHEET CONTENT: SHEET NO: REVISIONS:
A-8
TRISHA ANNE S. OLIVEROS REYNALDO S. ACOSTA CADD BY: TRISH DATE: IV ARCHITECT
1: 20 MTS
1: 20 MTS
PREPARED BY:SHEET NO:
DEPARTMENT OF ENGINEERING AND PUBLIC WORKS
DEPARTMENT OF ENGINEERING AND PUBLIC WORKS
CLEMENTE A. IBO NOEL E. ROSAL
A-9
1: 20 MTS SCALE
SHEET PREPARED BY:SHEET NO: CONTENT:
CITY ENGINEER'S OFFICE NOEL B. ENCINARES SR. CLEMENTE A. IBO
CITY ENGINEER
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
A-9
1: 20 MTS
6 A-9
CLEMENTE A. IBO
1200
OIC- ASST. CITY ENGINEER
1200
1200
FLOOR 4 FLOOR 4 7 FLOOR PLAN: LEVEL 4PLAN: LEVEL FLOOR PLAN: LEVEL 7PLAN: LEVEL 7 7
C I T Y OF L E G A Z P I
CITY ENGINEER'S OFFICE
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
1200
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
A-9
1: 20 MTS SCALE
A-9
1: 20 MTS
300 X 300MM COLUMN
1: 20 MTS
1: 20 MTS
PREPARED BY:
SCALE
1200
300 X 300MM COLUMN
SCALE
A-8
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
1200
300 X 300MM COLUMN
FLOOR 3 FLOOR PLAN: LEVEL 3PLAN: LEVEL 3
PREPARED BY: PI
'S OFFICE
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
1200
1200 3 A-8
SCALE
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
FLOOR 2 FLOOR 2 5 FLOOR PLAN: LEVEL 2PLAN: LEVEL FLOOR PLAN: LEVEL 5PLAN: LEVEL 5 5 1200
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
C MARBLE HITE CEMENT
2 A-8
1200
1200
ND PUBLIC WORKS
1: 20 MTS
1: 20 MTS
1200
A-8
SCALE
NOEL B. ENCINARES SR. LOCATION: BITANO, LEGAZPI CITY
ARCHITECT IV
1200
FLOOR 1 FLOOR PLAN: LEVEL 1PLAN: LEVEL 1
REYNALDO S. ACOSTA
1200
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
300 X 300MM COLUMN
1 A-8
DRAFTSMAN
1200
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
1200
GRANOLITHIC MARBLE FINISH W/ RED CEMENT
1200
CADD BY: TRISH
CITY MAYOR
1200
C MARBLE HITE CEMENT
AS SHOWN
NOEL E. ROSAL
FRIENDSHIP POCKET PARK
DEPARTMENT OF ENGINEERING AND PUBLIC WORKS
1200
CLEMENTE A. IBO
1200
OIC- ASST. CITY ENGINEER
GRANOLITHIC MARBLE FINISH W/ WHITE CEMENT
APPROVED BY:
RECOMMENDING APPROVAL:
C I T Y OF L E G A Z P I
CITY ENGINEER'S OFFICE
A-5
1200
NOEL B. ENCINARES SR.
1200
CITY
PROJECT TITLE:
PREPARED BY:
SHEET NO:
2 A-
1: 30 MTS
1200
CONCURRED:
REVISIONS:
SHIP POCKET PARK
SCULPTURE STRUCTURAL DETAIL SCALE
1200
APPROVED BY:
RECOMMENDING APPROVAL:
1 A-7
1: 20 MTS
1200
SCALE
1200
2 A-5
DRAFTSMAN
FRIENDSHIP POCKET PARK FRIENDSHIP POCKET PARK REYNALDO S. ACOSTA ARCHITECT IV
LOCATION: BITANO, LEGAZPI CITY
NOEL B. ENCINARES SR. LOCATION: BITANO, LEGAZPI CITY
OIC- ASST. CITY ENGINEER
NOEL B. ENCINARES SR. CLEMENTE A. IBO OIC- ASST. CITY ENGINEER CITY ENGINEER
CITY MAYOR
CITY ENGINEER
A-9
AS SHOWN NOEL E. ROSAL
CLEMENTE A. IBO NOEL E. ROSAL
AS SHOWN
CADD BY: TRISH
DRAWN:
CHECKED:
CITY MAYOR
DATE:
DRAWN:
CHEC
C RO P xF R EI G H T D RO N E P ORT Project Details: Thesis Project (2020-2021) University: UP DIiliman Location: Legazpi City, Albay
The Coronavirus pandemic has incurred immense losses which made it difficult for the country to stabilize socially and economically. Food security is a main concern especially due to the mandatory quarantine and lockdown protocols, affecting the Agri-Food Supply Chains, farmers, and distributors. This urged the government to increase cold storage facilities to ensure adequate food supply for consumption and emergencies. This project aims to empower and assist farmers in their logistical and storage concerns, taking into account the unpredictable weather conditions in the city. With this in mind, the site on a mountain top in between the agricultural lands and projected urban center of the city is used for a distribution center, storage, and a drone airport typology. This project sees that agricultural produce on e-commerce platforms will be flourishing in the market 20 years from now. While drones may be in its pilot usage today, in 20 years, it will be established like the land motor delivery system. Tools: Rhinoceros, Grasshopper, Sketchup, AutoCAD, Lumion, Photoshop, Illustrator
8
9
10
Loading Docks Interior Perspective
Lightwell Area Interior Perspective
Basement 3 Floor Plan on Site
Loading and Unloading Process
A S T RO SC I E N CE S I N S T I T U T E Project Details: Architectural Design VII (2020) University: UP Diliman Location: UP Diliman Science Complex, C.P. Garcia
The proposed Astro Sciences Institute will supplement the recently passed Philippine Space Act. Its main goal is not to produce astronauts, rockets, travel to the moon and back, but will focus on the designing of spacecraft and satellites; and studying international aerospace laws and regulations. Due to the lack of precedents which can also be attributed to the confidential nature of the project, the designer had undergone thorough interviews with STAMINA4Space scholars who built the Diwata 1 & 2 microsatellites and research involving non-disclosure agreements. The massing and programming concept of the building uses the lean production approach which involved plotting the different processes on site to reduce wastes and improve efficiency while also considering NASA design guidelines. Tools: Rhinoceros, Sketchup, AutoCAD, Lumion, Photoshop, Illustrator
14
15
STAGES OF MICROSATELLITE PRODUCTION: I. Mission Development Phase (MDP) 1. Kick-Off Meeting - brief presentation 2. Mission Definition Stage - identifying satellite purpose 3. Mission Definition Review - evaluation and presentation II. Engineering Design Phase (EDP) 1. Preliminary Design Review (bus & payload workshop, office) 2. Attitude Testing (electronics laboratory, attitude control, full anechoic chamber, acoustics chamber) 3. Critical Design Review (CDR) - creation of engineering model optical laboratory assembly and integration bays (clean rooms) vibration tests - shake testing prior to launch mechanical shock test - shock testing on launch thermal vacuum chamber - radiative cooling & heating 4. Conclusion of Critical Design Review - presentation and discussion if all issues are resolved. Entire CDR stage may be repeated multiple times until all issues are resolved III. Flight Model Phase *repeat entire Engineering Design Phase*
MDP 2
3F
LOUNGE - EXHIBIT AREA
MDP 2
2F
MDP 1 & 3 CDR KITCHEN - LOUNGE
EDP 2.3 EDP 2.4 CDR 1 EDP 1 EDP 2.2 EDP 2.1
CDR 3 CDR 2
GF
Approach Perspective
North and West elevation
Ground Floor Plan on Site
17
18
Entrance Interior Perspective | Main Entrance Approach Perspective | Rear Entrance Perspective
19
BA MB OOZ L E Date: August 2021 University: AA School of Architecture Visiting School (team) Location: Legazpi, Albay
This one month course explores computational methods for designing full-culm bamboo structures. Studio sessions involving physical 3d modelling with bamboo skewers were held online due to the Coronavirus pandemic. Throughout the duration of the program were a series of lectures about the principles of bamboo, bamboo construction, and grasshopper scripting lessons. For the final project, our team came up with a modular system involving a hyperbolic paraboloid bamboo roofing structure that could be put together like a bamboo puzzle. Hence, the name Bamboozle. Contribution: conceptualization, schematic design, grashopper scripting, rendering & visualization Tools: Rhinoceros, Grasshopper, Lumion
20
21
SE E D FA L L Date: August - November 2020 Competition: WARMING (team) Location: various sites
The premise of this competition is designing a response to our changing climate and environment. Seedfall will be when climate change has caused biomes to shift and ecosystems to disappear. The collapse of the earth’s biodiversity prompted humans to create a structure dedicated to the preservation of the earth’s flora and fauna. Floating around the earth, these structures maneuver and position themselves based on different intents. Some are to avoid extreme weather events and position themselves where the climate is most familiar for its inhabitants. They are programmed to enable its inhabitants to live as if the climate didn’t change. They function as living gene banks saving as much as genetic information about to be erased by climate change. Once these hardened ecosystems mature, units of the structure can break off from the whole and descend to the earth to plant patches of mature ecosystems in severely degraded ones. Contribution: conceptualization, schematic design, grashopper scripting, post processing Tools: Grasshopper, Sketchup, Photoshop
22
23
24
RESUME August 2019 - June 2020 UP Diliman Architecture Student Council Fourth Year Batch Representative
PERSONAL DETAILS 0977 843 0154 trishaaoliveros@gmail.com
June 2019 - Present Philippines Swimming League Asst. Secretary Asst. Treasurer
Legazpi City, Albay, PH
EDUCATION 2016-2021 University of the Philippines - Diliman
AFFILIATIONS
BS Architecture
January 2019 - December 2020 UP Junior Finance Association
2015-2016 University of the Philippines - Diliman B Sports Science
June - July 2019 Integrated Coastal Resources Management Office
2011-2015 St. Agnes’ Academy High School
2016 - 2021 UP Iris (Photography Organization)
WORK EXPERIENCE
2015 - 2021 UP Varsity Swimming Team
October 2021 - Present 1300 Tempfence, Australia Freelance 3d modeller & Layout Artist
OTHER November - December 2021 Better Bamboo Buildings Designing Better Bamboo Buildings
January 2021 - February 2022 Legazpi City Engineer’s Office Architectural Assistant
August 2021 Architectural Association School of Architecture Visiting School
June 2020 - Present Freelance Architectural Graphic Artist
Advanced Design Studio for full-culm Bamboo March 2020 Anthology Festival
January - February 2020 RDes+ Consultants Inc Architectural Intern
Live Design Competition
SKILLS
LEADERSHIP EXPERIENCE
Adobe Illustrator, InDesign, Photoshop
August 2020 - June 2021 UP Diliman Architecture Student Council
Autodesk AutoCAD, Revit Rhinoceros + Grasshopper
Vice Chairperson for External Affairs
Sketchup Lumion Goodle Docs, Slides, Sheets
25