portfolio
school project
portfolio
school project
portfolio
school project
portfolio
school project
portfolio
school project
school school project project
T O5
How lively a cube can be?
he initial materials are just a solid cube and a plane. The goal is to make the cube more spacious and give it a living feeling. It can or can not be a usable space, it can simulate an architecture or just maybe a sculpture. My design is to make it look less solid as people’s first thinking of the name “cube” and trying to break the borders of inside and outside. “Peeling off ” surfaces and keeping the edges, connect the cube and the plane by the curves of different objects with an opposite kind of materials brings the feeling of the change from inside to outside, unstable to stable, higher to lower.
portfolio portfolio
Materials: foam board, wooden board, sawdust, stretching fabric, zinc bar, spray paint.
portfolio
O6
school project
school school project project
T
he site is located in the bustling city center and has limited visibility, building blocks are designed in accordance with the location of the lan ibility from inside to outside, from outside to inside. The low building have a breathing space, create a clear view and help visitors focus on the build
portfolio portfolio
O7
Th locat with crea spac the q Th the that as w gate tion Th tion as w
school project project school
Opposition
, affecting noise and dust. The nd to solve the problems of visdensity allows the building to ding’s shape.
O8
portfolio portfolio
The main function block is ated underground combined h the courtyard, in order to ate a change in the sense of ce from the bustling streets to quiet exhibition area. The highlight of the project is short-term exhibition block symbolizes the whole shape, well as an impressive welcome that attracts anyone’s attenn. The ground is the only connecn between the two main blocks, well as connecting with visitors.
school project
QUICK DESIGN PROJECT - FASHION EXCHANGE CENTER
“
“O3.
I
Flexibility
mpressive and iconic shapes are the goal of this design. In keeping with the theme of the fashion exchange center, the original concept idea was inspired by the fabric wrinkles and concentric circles, the flexibility of the main material in fashion as well as the nature. The building is divided into 3 main parts, with separate functions: Performance stage blocks, exhibition blocks and living club blocks, closely connected with squares, courtyards, floors, contributed one-way orientation for visitors.
portfolio
O9
portfolio
1O
school project
school project portfolio
PUBLIC OUTDOOR POOL PROJECT
“
11
“O4.
portfolio
12
school project
school project portfolio
13
“O5.
INTERIOR DESIGN PROJEC
school project 14
portfolio
“
CT - BAKERY & COFFEE SHOP
school project
PRE-GRADUATION PROJECT - GENERAL SCIENCES LIBRARY
portfolio
15
“
“O6.
portfolio
16
school project
portfolio 17
school project
portfolio
18
school project
portfolio 19
school project
portfolio
20
school project
portfolio 21
school project
school project 22
portfolio
GRADUATION PROJECT - FILM EXHIBITION CENTER
“
“O7.
portfolio 23
school project
portfolio
24
school project
portfolio 25
school project
portfolio
26
school project
portfolio 27
school project
portfolio
28
school project
portfolio 29
school project
portfolio
30
school project
portfolio 31
school project
portfolio
32
school project
intern project 33
portfolio
RESIDENTIAL AND COMMERCIAL PLANNING
Location: Mỹ Xuân Ward, Tân Thành District, Bà Rịa - Vũng Tàu. Design Year: 2017
“
“O8.
portfolio
34
intern project
intern project portfolio
35
GENERAL CLINIC
OFFICES
RESIDENTIAL SERVICES
portfolio
36
intern project
work in progress
HOUSING PROJECT - MR SON’S HOUSE
Location: District 3, HCMC. Design Year: 2019
portfolio
37
“
“O9.
portfolio
38
work in progress
portfolio 39
work in progress
portfolio
40
work in progress
MAËT CAÉT B - B MAËT CAÉT C - C
GHI CHUÙ CHUNG (GENERAL NOTES) - ÑÔN VÒ THI COÂNG PHOÁI HÔÏP BAÛN VEÕ CUÛA TAÁT CAÛ CAÙC BOÄ MOÂN: KIEÁN TRUÙC, KEÁT CAÁU, CAÁP ÑIEÄN, CAÁP THOAÙT NÖÔÙC, ÑIEÀU HOØA KHOÂNG KHÍ, PCCC,...NEÁU THAÁY SÖÏ KHAÙC BIEÄT, BAÙO CHO ÑÔN VÒ THIEÁT KEÁ BIEÁT ÑEÅ XÖÛ LYÙ.
NGAØY SÖÛA DATE
FOR ESTIMATE
FOR DESIGN
FOR APPROVAL
(ISSUED FOR)
LOAÏI HOÀ SÔ
SÖÛA REVISION
- KÍCH THÖÔÙC CÖÛA TREÂN BAÛN VEÕ LAØ KÍCH THÖÔÙC LOÏT LOØNG CÖÛA, KHI TC TUØY THEO VAÄT LIEÄU SÖÛ DUÏNG ÑEÅ TÍNH KÍCH THÖÔÙC LOÅ CÖÛA
05
04
03
02
01 STT No.
THIEÁT KEÁ FOR CONSTRUCTION
TRÌNH DUYEÄT
THI COÂNG
SIGNATURE :
AS-BUILT
BAÙO GIAÙ HOAØN COÂNG CHUÛ ÑAÀU TÖ (Investor)
NGUYEÃN HUYØNH DATE :
THIEÁT KEÁ (Designer)
VIEÃN ÑOÂNG
COÂNG TY TRAÙCH NHIEÄM HÖÕU HAÏN TÖ VAÁN - THIEÁT KEÁ - XAÂY DÖÏNG
GIAÙM ÑOÁC (Director)
ÑT: 028 38320918
SOÁ 101/7 NGUYEÃN CHÍ THANH - PHÖÔØNG 09 - QUAÄN 05 - TP.HCM
TRAÀN HÖÕU TÖÔÛNG CHUÛ TRÌ (Presided by)
THIEÁT KEÁ (Designed by)
TH.S-KTS. PHAÏM NGOÏC THAÛO
KS. TRAÀN KHANH VEÕ (Drawn by)
QLKT (Tech. Managed by)
KS. TRAÀN KHANH
NHAØ PHOÁ
COÂNG TRÌNH (Project) :
2/10 CAO THAÉNG , PHÖÔØNG 5, QUAÄN 3 TP.HOÀ CHÍ MINH.
ÑÒA ÑIEÅM (Location) :
XAÂY DÖÏNG MÔÙI
HAÏNG MUÏC (ITEM) :
MAËT CAÉT B - B
TEÂN BAÛN VEÕ (Drawing Title) :
KT 11
KYÙ HIEÄU BAÛN VEÕ (Drawing No.)
GHI CHUÙ CHUNG (GENERAL NOTES)
TKKT
NGAØY HOAØN THAØNH : 02-2020 (Completion Date) GIAI ÑOAÏN : (Stage)
- ÑÔN VÒ THI COÂNG PHOÁI HÔÏP BAÛN VEÕ CUÛA TAÁT CAÛ CAÙC BOÄ MOÂN: KIEÁN TRUÙC, KEÁT CAÁU, CAÁP ÑIEÄN, CAÁP THOAÙT NÖÔÙC, ÑIEÀU HOØA KHOÂNG KHÍ, PCCC,...NEÁU THAÁY SÖÏ KHAÙC BIEÄT, BAÙO CHO ÑÔN VÒ THIEÁT KEÁ BIEÁT ÑEÅ XÖÛ LYÙ.
FOR DESIGN
NGAØY SÖÛA DATE
FOR APPROVAL
(ISSUED FOR)
LOAÏI HOÀ SÔ
SÖÛA REVISION
- KÍCH THÖÔÙC CÖÛA TREÂN BAÛN VEÕ LAØ KÍCH THÖÔÙC LOÏT LOØNG CÖÛA, KHI TC TUØY THEO VAÄT LIEÄU SÖÛ DUÏNG ÑEÅ TÍNH KÍCH THÖÔÙC LOÅ CÖÛA
05
04
03
02
01 STT No.
TRÌNH DUYEÄT
FOR ESTIMATE
FOR CONSTRUCTION
THIEÁT KEÁ THI COÂNG
SIGNATURE :
AS-BUILT
BAÙO GIAÙ HOAØN COÂNG CHUÛ ÑAÀU TÖ (Investor)
NGUYEÃN HUYØNH DATE :
THIEÁT KEÁ (Designer)
VIEÃN ÑOÂNG
COÂNG TY TRAÙCH NHIEÄM HÖÕU HAÏN TÖ VAÁN - THIEÁT KEÁ - XAÂY DÖÏNG
GIAÙM ÑOÁC (Director)
ÑT: 028 38320918
SOÁ 101/7 NGUYEÃN CHÍ THANH - PHÖÔØNG 09 - QUAÄN 05 - TP.HCM
TRAÀN HÖÕU TÖÔÛNG CHUÛ TRÌ (Presided by)
KS. TRAÀN KHANH
THIEÁT KEÁ (Designed by)
TH.S-KTS. PHAÏM NGOÏC THAÛO
VEÕ (Drawn by)
QLKT (Tech. Managed by)
KS. TRAÀN KHANH
NHAØ PHOÁ
COÂNG TRÌNH (Project) :
2/10 CAO THAÉNG , PHÖÔØNG 5, QUAÄN 3 TP.HOÀ CHÍ MINH.
ÑÒA ÑIEÅM (Location) :
XAÂY DÖÏNG MÔÙI
HAÏNG MUÏC (ITEM) :
TKKT
KT 12
KYÙ HIEÄU BAÛN VEÕ (Drawing No.)
MAËT CAÉT C - C
TEÂN BAÛN VEÕ (Drawing Title) :
GIAI ÑOAÏN : (Stage)
NGAØY HOAØN THAØNH : 02-2020 (Completion Date)
portfolio
BJ230 BUBBLE JET PRINTER
canon
550
41
work in progress
MAËT ÑÖÙNG BEÂN
TL 1/100
MAËT ÑÖÙNG CHÍNH
TL 1/100
05
04
03
02
01 STT No. LOAÏI HOÀ SÔ
NGAØY SÖÛA DATE
FOR ESTIMATE
FOR DESIGN
FOR APPROVAL
(ISSUED FOR)
THIEÁT KEÁ FOR CONSTRUCTION
SIGNATURE :
AS-BUILT
THI COÂNG
05
04
03
02
01 STT No.
TKKT
KT 09
KYÙ HIEÄU BAÛN VEÕ (Drawing No.)
GHI CHUÙ CHUNG (GENERAL NOTES)
TRÌNH DUYEÄT
LOAÏI HOÀ SÔ
FOR DESIGN
NGAØY SÖÛA DATE
FOR APPROVAL
(ISSUED FOR)
FOR ESTIMATE
FOR CONSTRUCTION
SIGNATURE :
AS-BUILT
THI COÂNG
GIAI ÑOAÏN : (Stage)
TKKT
NGAØY HOAØN THAØNH : 02-2020 (Completion Date)
KT 08
KYÙ HIEÄU BAÛN VEÕ (Drawing No.)
MAËT ÑÖÙNG CHÍNH
TEÂN BAÛN VEÕ (Drawing Title) :
XAÂY DÖÏNG MÔÙI
HAÏNG MUÏC (ITEM) :
2/10 CAO THAÉNG , PHÖÔØNG 5, QUAÄN 3 TP.HOÀ CHÍ MINH.
ÑÒA ÑIEÅM (Location) :
NHAØ PHOÁ
COÂNG TRÌNH (Project) :
QLKT (Tech. Managed by)
KS. TRAÀN KHANH
VEÕ (Drawn by)
KS. TRAÀN KHANH
THIEÁT KEÁ (Designed by)
TH.S-KTS. PHAÏM NGOÏC THAÛO
CHUÛ TRÌ (Presided by)
TRAÀN HÖÕU TÖÔÛNG
GIAÙM ÑOÁC (Director)
ÑT: 028 38320918
SOÁ 101/7 NGUYEÃN CHÍ THANH - PHÖÔØNG 09 - QUAÄN 05 - TP.HCM
VIEÃN ÑOÂNG
COÂNG TY TRAÙCH NHIEÄM HÖÕU HAÏN TÖ VAÁN - THIEÁT KEÁ - XAÂY DÖÏNG
THIEÁT KEÁ (Designer)
DATE :
NGUYEÃN HUYØNH
CHUÛ ÑAÀU TÖ (Investor)
HOAØN COÂNG
BAÙO GIAÙ
THIEÁT KEÁ
SÖÛA REVISION
- KÍCH THÖÔÙC CÖÛA TREÂN BAÛN VEÕ LAØ KÍCH THÖÔÙC LOÏT LOØNG CÖÛA, KHI TC TUØY THEO VAÄT LIEÄU SÖÛ DUÏNG ÑEÅ TÍNH KÍCH THÖÔÙC LOÅ CÖÛA
- ÑÔN VÒ THI COÂNG PHOÁI HÔÏP BAÛN VEÕ CUÛA TAÁT CAÛ CAÙC BOÄ MOÂN: KIEÁN TRUÙC, KEÁT CAÁU, CAÁP ÑIEÄN, CAÁP THOAÙT NÖÔÙC, ÑIEÀU HOØA KHOÂNG KHÍ, PCCC,...NEÁU THAÁY SÖÏ KHAÙC BIEÄT, BAÙO CHO ÑÔN VÒ THIEÁT KEÁ BIEÁT ÑEÅ XÖÛ LYÙ.
GIAI ÑOAÏN : (Stage)
NGAØY HOAØN THAØNH : 02-2020 (Completion Date)
MAËT ÑÖÙNG BEÂN
TEÂN BAÛN VEÕ (Drawing Title) :
XAÂY DÖÏNG MÔÙI
HAÏNG MUÏC (ITEM) :
2/10 CAO THAÉNG , PHÖÔØNG 5, QUAÄN 3 TP.HOÀ CHÍ MINH.
ÑÒA ÑIEÅM (Location) :
NHAØ PHOÁ
COÂNG TRÌNH (Project) :
QLKT (Tech. Managed by)
KS. TRAÀN KHANH
VEÕ (Drawn by)
KS. TRAÀN KHANH
THIEÁT KEÁ (Designed by)
TH.S-KTS. PHAÏM NGOÏC THAÛO
CHUÛ TRÌ (Presided by)
TRAÀN HÖÕU TÖÔÛNG
GIAÙM ÑOÁC (Director)
ÑT: 028 38320918
SOÁ 101/7 NGUYEÃN CHÍ THANH - PHÖÔØNG 09 - QUAÄN 05 - TP.HCM
VIEÃN ÑOÂNG
COÂNG TY TRAÙCH NHIEÄM HÖÕU HAÏN TÖ VAÁN - THIEÁT KEÁ - XAÂY DÖÏNG
THIEÁT KEÁ (Designer)
DATE :
NGUYEÃN HUYØNH
CHUÛ ÑAÀU TÖ (Investor)
HOAØN COÂNG
BAÙO GIAÙ
TRÌNH DUYEÄT
SÖÛA REVISION
- KÍCH THÖÔÙC CÖÛA TREÂN BAÛN VEÕ LAØ KÍCH THÖÔÙC LOÏT LOØNG CÖÛA, KHI TC TUØY THEO VAÄT LIEÄU SÖÛ DUÏNG ÑEÅ TÍNH KÍCH THÖÔÙC LOÅ CÖÛA
- ÑÔN VÒ THI COÂNG PHOÁI HÔÏP BAÛN VEÕ CUÛA TAÁT CAÛ CAÙC BOÄ MOÂN: KIEÁN TRUÙC, KEÁT CAÁU, CAÁP ÑIEÄN, CAÁP THOAÙT NÖÔÙC, ÑIEÀU HOØA KHOÂNG KHÍ, PCCC,...NEÁU THAÁY SÖÏ KHAÙC BIEÄT, BAÙO CHO ÑÔN VÒ THIEÁT KEÁ BIEÁT ÑEÅ XÖÛ LYÙ.
GHI CHUÙ CHUNG (GENERAL NOTES)
portfolio
42
work in progress
portfolio
artwork & photograpphy
ARTWORK & PHOTOGRAPHY
“
43
“1O.
portfolio
44
artwork & photograpphy
artwork & photograpphy portfolio
45
3RD YEAR PROJECT - URBAN HISTORY RESEARCH
portfolio
46
artwork & photograpphy
portfolio 47
artwork & photograpphy
portfolio
48
artwork & photograpphy
portfolio 49
artwork & photograpphy
portfolio
50
artwork & photograpphy
portfolio 51
end.
artwork & photograpphy
thankyou for watching. portfolio
52
artwork & photograpphy
portfolio
school project