professional work
COOK Architectural
hmg south office Interior renovation and addition Kingspark, TN May 2011 Completion Date: August 2011
Program: Layout a mechanical system based on the addition of a new vestibule, break room, and conference room. Responsibilies: -Creating new and as built floor plans for the new design -Various details and sections Media: AutoCADD Revit, Sketchup Pro
COOK Architectural
universal design Interior Renovation and Addition Ferdinand, IN May 2012 Completion Date: TBD
Program: Universal Design wanted to create a new renovation and addition for their firm Responsibilies: -Creating new and as built floor plans for the new design -Created renderings Media: AutoCADD Architecture, Rhinoceros
WDN Architecture, LLC
crammer residence Residential design and renovation Location: Oak Park, IL May 2012 Completion Date: TBD
Program: The Crammer family, needed a new house in the downtown area of the historic Oak Park community Responsibilies: -Client interaction and representation -Creating new and as-built plans -Sections, interior elevations and detail documentation Media: AutoCADD 2011
WDN Architecture, LLC
809 oak park ave
Program:
commercial renovation and design Oak Park, IL May 2011
A fashion designer and teacher wanted to renovated a once woodshop/ storage facility in downtown Oak Park to create a school and design center for art students/ the community
Completion Date: December 2011
Responsibilies: -Client interaction and representation -Creating new and as-built plans -Sections, interior elevations and detail documentation Media: AutoCADD 2012
TEG Architects, LLC
icu patient room Marketing and Development Jeffersonville, IN June 2013 Completion Date: TBD
Program: Design and develop a state of the art ICU typical and bariatric patient room for marketing. The design will be presented to various clients for consideration. Responsibilies: -Pre-design and design development -Creating floor plans, RCPs and interior elevations -Code research -Interaction with consultants (Guldmann) -Team management Media: AutoCADD Architecture
TEG Architects, LLC
general electric Renovation and Addition Louisville, KY July 2013
Completion Date: May 2014
Program: General Electric needed another light production line included into their Louisville, KY manufacturing plant and so an addition was needed to their building. Responsibilies: -Responsible for creating new and as-built floor plans for the new design -Sections and details -Client liason, DD, CD, construction administration Media: AutoCADD Architecture
TEG Architects, LLC
soccer stadium Marketing and Development Location: confidential June 2013 Completion Date: TBD
Program: Schematic design and design development for a MLS soccer stadium Responsibilies: -Bidding document preparation -Schematic design document preparation -Various details and sections -Code research Media: AutoCADD Architecture
TEG Architects, LLC
wks hospital Hospital design addition Shavenport, LA July 2013 Completion Date: TBD
Program: Design a new womans health center addition to the current willis-knighton hospital campus Responsibilies: -Pre-design and document preparation for bidding -Schematic design document preparation Media: AutoCADD Architecture
TEG Architects, LLC
ksb hospital Hospital Design evaluation Location: Dixon, IL August 2013
Completion Date: November 2011
Program: KSB Hospital required an updated construction administration documents and marketing book on the nurses statistics and post-occupancy evaluation Responsibilies: -ASI documents -Post-occupancy evaluation book creation Media: AutoCADD Architecture, Indesign
TEG Architects, LLC
cornerstone church
Program:
Religious Assembly addition and renovation New Albany, IN May 2013
Cornerstone Church needed a new, more contemporary addition to their already existing building. The program includes a main lobby, sanctuary space and various offices and meeting rooms.
Completion Date: December 2013
Responsibilies: -Client interaction and pre-design -SD and DD document preparation -Construction documents, including plans, sections and details Media: AutoCADD Architecture
TEG Architects, LLC
u of louisville training Soccer Training Facility Location: Louisville, KY May 2013
Completion Date: October 2014
Program: The already designed soccer stadium facility needed interior elevations for graphic designers and ASI documents created Responsibilies: -ASI documents -Construction documents Media: AutoCADD Architecture
TEG Architects, LLC
u of louisville soccer Hospital design Louisville, KY May 2013
Completion Date: October 2014
Program: Already designed and on its way to completion, needed construction administration and basic graphic detailing in the bleachers and interiors Responsibilies: -ASI documents -Construction documents Media: AutoCADD Architecture