Caballero | DM2 Pamphlet

Page 1

Efrain Caballero dm2 i Fall 14


Precedent: LM Project Gateway Linked Hybrid

01

Barchitecture Collage Analytical Tracing

Axonometric Compositional Space

table of contents


Linked Hybrid Cable Stayed Structure (Braces Acting Like Cables)221,426 sf Program: 644 Apartments, Public Green SPaces, Commercial Zones, Hotel, Cinemateque, Kindergarten, Montessori School, Underground Parking Architect: Steven Holl Structural Engineer: Guy Nordenson and Associates and China Academy of Building Research Structural System The towers consist of concrete slabs supported by concrete shear walls. They also consist of a grid frame of uniform dimensions and diagonal members.

1

Sky Bridge Resedential and Business Offices Complex Entrance and Shopping Center

Primary Level Plan View NTS

Underground Parking

axonometric view

01

Section 1 NTS


LM Project Gateway Cable Stayed Bridge624,500 sf Office Towers and Civic Spaces Architect: Steven Holl Structural Engineer: Ted Zoli and HNTB Corporation

Bridge Marmormolen Tower Langelinie Tower Anchor Piers and Foundation Ocean Earth Radial Attachment

Structural System Cable Stayed bridges are different from suspension bridges. They don’t need to have two towers or points of anchor. Cables run from the roadway up to a single tower that alone bears all the weight. The one tower absorbs all the compressional forces. They also use more pre-cast concrete.

Anchor Pier

Foundation

Section A - 1 NTS

02


bachitecture


assembly photo final model


Desconstructed Composition Michael Lee-Chin Crystal architect: Daniel Libeskind

the idea de with this project was to create a collage e of o an existing building. By using a variety o of iimages of that complement the form and s structure of this building. r


descontructed composition


Analytical tracing extension lines The extension lines are to be able to act as seperating boundries and be able to define planes.

schema 01 In the first schema, obvious planes were traced and seperated. this was to start creating spaces.

schema 02 The second schema was to identify offsetting spaces away from the focual point.


schema 03 Schema 03 was to underline and create spaces by using opacity and lines.

once all the schemas were finalized, the ending process was to combine all the tracing into one. Now, the existing building is traced and emphasized in a deconstructive way by underlying withing tracing lines and vectoral opacities.

combined schemas


Axonometric

50’


50’

15’

100’

scale 1/16”


compositional space


TOP VIEW

SECTION ON N


elevations

back


Compositional Space


Compositional space



Efrain Caballero Texas Tech University arch 3341- Digital media fall 2014 Intructor: Craig Dixon


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.