1 minute read
LOCAL HOUSING STARTS
LOCAL NEWS
AREA HOUSING STARTS FOR JUNE JUMP NEARLY 50 PERCENT
Advertisement
Area housing starts rose 47 percent over the same period a year ago, records from a local permit tracking service show.
June’s figure was 325, up from 221 in 2019, according to Tulsa-based New Orders Weekly. For the year, housing starts have risen 14.2 percent, going from 1,480 to 1691 in 2020. Broken Arrow topped June starts with 106, followed by unincorporated Wagoner County (35), unincorporated Rogers County (29) and Collinsville (25).
Broken Arrow also leads in home construction for the year with 397 permits, ahead of unincorporated Wagoner County (195), Tulsa (194) and unincorporated Rogers County (128). Tulsa Area Housing Starts TOTALS June/Year-to-Date
Bartlesville 325/1691 Skiatook 2/24 0/9 Collinsville 25/104 Owasso Claremore 12/48 Verdigris 7/35 Sand Spr 3/35 ings Tulsa 21/194 Catoos 0/10 a 3/17 Rogers County 29/128
Sapulpa 9/28
Kiefer 0/3 Tulsa County 15/112 Broken Arrow 106/397
Jenks 17/117
Coweta Glenpool Bixby 10/51 6/43 23/122 Wagoner County 35/195
Wagoner 0/4
Okmulgee 0/2
Source:Home Builders Association of GreaterTulsa
Muskogee 2/13
Tulsa World
SIPS Strategy for 2020! Build with Structural Insulated Panels….. ….add value to your homes….grow your business...& PROFIT!
Why Build with SIPS?
Framing, Sheathing, Insulation, and Sealing, all in one step Cut to Exactly fit any plan
Quick DRY-IN-1-2+ Weeks
Save 55% on Labor vs Stick Glue Gun/Nail Gun Skills Less Supervision of Crew Almost No Job Waste Easier to Meet Building Code More homes finished per year
Why your customers will buy SIPS ?
50%-70% Home Energy Savings More Comfortable, Healthier Home Better (controlled) Indoor Air Quality Spacious, Open, Flexible Floor Plan Soaring Spaces, Naturally Vaulted Timber Beams are easy if desired High end, Rich, Dramatic Look Shorter build time, interest savings Better Performance in Wind & Fire No VOC’s or CFC blowing agents