Tung Hoang - Portfolio May 2020

Page 1

PORTFOLIO

TUNG HOANG -

PREFERRED NAME : TOM ---------------------------------------------------TUNG.HOANG.2406@GMAIL.COM CONTACT NO 0420240687

--------------------------------------------------Applying Positions GRADUATE ARCHITECT URBAN DESIGNER 3D VISUALISER

TUNG HOANG ‘S PORTFOLIO


EDUCATION AND HONOUR

ABOUT

• Golden Key International Honour Society in Deakin University

[2017 - current]

• Master of Architecture of Deakin University, VIC, Australia

[2017 - 2018]

• MBA of Wolverhampton University UK, Singapore

[2012 - 2013]

• Bachelor of Regional Urban Planning in

[2005 - 2011]

Ho Chi Minh City University of Architecture, Vietnam

KEY EXPERIENCE

TUNG HOANG -

PREFERRED NAME : TOM ---------------------------------------------------TUNG.HOANG.2406@GMAIL.COM CONTACT NO 0420240687 HOBBY TENNIS, SOCCER, MUSIC, TRAVEL, DRINKING

---------------------------------------------------

Graduate Architect - Bruce Henderson Architects, Melbourne

[2018 - Current]

Urban Designer - CPG Consultants Pte Ltd, Singapore

[2013 - 2016]

Architect Associate - Hai An Ltd. Company, Vietnam

[2011 - 2012]

PARTLY RESPONSIBLE FOR FOLLOWING AWARDS • Best Green Development in Vietnam, VanGiang Ecopark, Hanoi, Vietnam, 2014 • 1st Prize for Nanjing Eco High-Tech Island, 2013 • 1st Prize for Ecopark Onemarket District and Promenade Development, 2015 • 2nd Prize for Xiamen Line 1 Jiangjunci station - Traffic Oriented Design (TOD) Planning, 2015 • Merit Arward Van Giang Southern Gateway Urban Design and Landscape Plan - Singapore Institute of Planner (SIP) Planning Awards 2015

SKILLSET Autodesk AutoCAD Autodesk Revit Architecture Sketch Up Adobe Photoshop Adobe InDesign Adobe Illustrator Vray in 3DsMax Enscape 3D rendering (Sketch up) Lumion3D (Sketch up) Professional Presentation

RESUME


3D VISUALISATION

3D ARTIST WORKS -

SOLFWARE PLATFORM ---------------------------------------------------3D SKETCH UP AUTODESK 3DSMAX VRAY IN 3DSMAX 3D ENSCAPE 3D LUMION POST-EDITED PHOTOSHOP

--------------------------------------------------FREELANCER

More 3D rendering, click here: https://issuu.com/tunghoang2406/docs/knht_20portfolio

WORK PERFORMED AS 3D VISUALISER

3D VISUALISATION WORK

3


SELECTED WORK

BRUCE HENDERSON ARCHITECTS

CPG CONSULTANTS URBAN PLANNING DIVISION

HAI AN LTD. COMPANY

GRADUATE ARCHITECT ---------------------------------

URBAN DESIGNER ---------------------------------

ARCHITECT ASSOCIATE ---------------------------------

HARMONY T. [A]

O. MARKET DI. [A-C]

SUNBAY SG. [A]

BRUCE ST. [A-C]

O. MARKET DI.[A]

ECO X. [A]

MIC T. [A]

MA. ARC [A]

CHRUCH ST. [A]

HYPERLOOB SC. [MP]

HY. HOTEL [A]

TAI-YU [MP]

MILTON PA. [A]

JIANJUNCI STN. [MP]

CP. CAFE [A]

CHAOA. [MP]

MIPEC SH. [A]

PHU H. [MP]

HOSIER L. [A]

BACH VI. [MP]

[DEC 2018 - CURRENT]

[APRIL 2013 - SEPT 2016]

[JUNE 2011-JULY 2012]

SEN H. [MP] VINH C. [MP]

--------------------------------PAGE 5-16

[A] ARCHITECTURAL PROJECTS

[A-C] ARCHITECTURAL COMPETITION

--------------------------------PAGE 18-26

[MP] MASTER-PLANNING

--------------------------------PAGE 28-29

TABLE OF CONTENT


ARCHITECTURE

HARMONY T. -

ROLE RESPONSIBILITY ---------------------------------------------------STUDYING SUBJECT SITE FEASIBILITY ARCHITECTURAL DESIGN ASSISTANT DEVELOPING MASSING THROUGH 3D MODELLING 3D DIAGRAM DEVELOPMENT MAKING BILINGUAL REPORT IMPLEMENTING PROJECT SCHEDULE IMPLEMENTING ILLUSTRATIVE SITEPLAN MAKING PROFESSIONAL PRESENTATION BOARDS COORDINATING WITH CLIENT AND STAKEHOLDERS ( IN VIETNAM)

--------------------------------------------------COMPETITION

3D RENDER BY BHA

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

3D RENDER BY BHA

3D RENDER BY BHA

HOSPITALITY PROJECT

5


ARCHITECTURE

BRUCE ST. -

ROLE RESPONSIBILITY ---------------------------------------------------STUDYING SUBJECT SITE FEASIBILITY ARCHITECTURAL DESIGN ASSISTANT DEVELOPING MASSING THROUGH 3D MODELLING IMPLEMENTING PROJECT SCHEDULE IMPLEMENTING ILLUSTRATIVE SITEPLAN MAKING PROFESSIONAL PRESENTATION REPORT

--------------------------------------------------COMPETITION

3D RENDER BY BHA

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

3D RENDER BY BHA

RESIDENTIAL PROJECT

6


ARCHITECTURE

MIC T. -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT IMPLEMENTING INDICATED LAYOUT PLANS APPLYING FIRE SAFETY OF BUILDING REGULATION MAKING BILINGUAL DOCUMENTATION IMPLEMENTING PROJECT SCHEDULE COORDINATING WITH CLIENT AND STAKEHOLDERS ( IN VIETNAM) CHECKING DESIGN TO ENTIRELY MEET CONSTRUCTION LAW

--------------------------------------------------DESIGN DEVELOPMENT

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

3D RENDER BY BHA

3D RENDER BY BHA

MIXED-USE

7


ARCHITECTURE

CHURCH ST. -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING EXISTING APARTMENT PROPOSAL APPLYING TOWNHOUSE SCHEME ENSURE PROPOSED ENVELOP DEVELOPING BUILDING ENVELOP & MAIN FACADE IMPLEMENTING & REVISING INDICATED LAYOUT PLANS ENSURING RESCODE APPLICATION IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES

--------------------------------------------------TOWN PLANNING

3D RENDER BY BHA

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

RESIDENTIAL PROJECT

8


ARCHITECTURE

HY. HOTEL -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING 2 LAYERS-FACADE EXPERIMENTING DIFFERD SPECIFICATION OF PIXELATED FEATURE SCREEN MAKING 3D MODELLING COMPLEXITY OF THE PODIUM FACADE ASSISTING 3D RENDER ARTIST IMPLEMENTING PROFESSIONAL PRESENTATION PRELIMINARY MATERIAL FINISHES

--------------------------------------------------TOWN PLANNING

3D RENDER BY BHA

3D RENDER BY BHA

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

HOSPITALITY PROJECT

9


6600

7500

3449

W.I.R

1800

1800

TERRACE 12m2

2000

TERRACE 12m2 TERRACE 12m2

5.0m2 4250

1200

4975

4850

3430

2350

4900

TH05 73.8m2

10870

9900

9900

1600

TH04 65.9m2

TH03 65.9m2

TH02 73.9m2

3000

ARCHITECTURE

6600

3950

1892

3027

6600

2000

6700

TH01 96.9m2

700

700

1634

SETBACK ADVISED BY PLANNER

1611

3350

700

3100

4350

3250

3D RENDER BY BHA

MILTON PA. -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING SUBJECT SITE FEASIBILITY APPLYING TOWNHOUSE SCHEME ENSURE PROPOSED ENVELOP DEVELOPING BUILDING ENVELOP & MAIN FACADE

REV

Do not scale. All drawings, layouts and area calculations are indicative only and are subject to approval by the relevant Authorities and alterations due to Design Development. Drawings are not to be used for construction. All apartment and balcony areas are calculated as Gross Floor Area in accordance with the Method of Measurement for Residential Property as published by the Property Council of Australia.

DATE

DESCRIPTION

REV

DATE

DESCRIPTION

PROJECT:

128, MILTON PARADE, GLEN IRIS DRAWING TITLE: 0

0.5

1.0

2.0

4.0m

LEVEL1 FLOOR PLAN

© COPYRIGHT Bruce Henderson Architects P/L

MAKING 3D DIAGRAMS FOR DESIGN RESPONSE IMPLEMENTING & REVISING INDICATED LAYOUT PLANS ENSURING RESCODE APPLICATION IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES

--------------------------------------------------TOWN PLANNING

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

RESIDENTIAL PROJECT

10


ARCHITECTURE

CP. CAFE -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING SUBJECT SITE FEASIBILITY INTEGRATING LANDSCAPE CONSULTANT’S PROPOSAL INTO THE DESIGN DEVELOPING BUILDING ENVELOP & MAIN FACADE REVISING STREETSCAPE FURNITURE TO ENSURE ACOUSTIC ISSUE MAKING 3D DIAGRAMS FOR DESIGN RESPONSE IMPLEMENTING & REVISING LAYOUT PLANS IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES

--------------------------------------------------TOWN PLANNING

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

COMMERCIAL PROJECT

11


ARCHITECTURE

MIPEC SH. -

ROLE RESPONSIBILITY ---------------------------------------------------CONSULTING ARCHITECTURAL DESIGN STUDYING SUBJECT SITE FEASIBILITY DEVELOPING BUILDING ENVELOP & MAIN FACADE MAKING 3D DIAGRAMS FOR DESIGN RESPONSE IMPLEMENTING & REVISING LAYOUT PLAN IMPLEMENTING PROJECT SCHEDULE MATERIAL FINISHES

--------------------------------------------------SCHEMATIC DESIGN

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

COMMERCIAL PROJECT

12


ARCHITECTURE

HOSIER L. -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT TAKING OVER TOWN PLANNING PACKAGE REVISING BUILDING ENVELOP & MAIN FACADE REVISING ENTIRE LAYOUT PLANS UPDATING PROJECT SCHEDULE UPDATING 3D VISUALISATION

--------------------------------------------------TOWN PLANNING

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

RESIDENTIAL PROJECT

13


MASTER-PLAN

SEN H. -

ROLE RESPONSIBILITY ---------------------------------------------------TEAM LEADER CONSULTING URBAN PLANNING & URBAN DESIGN WORKS STUDYING SUBJECT SITE CONTEXT DESIGNING & DEVELOPING SELECTED PLANNING SCHEME COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) ENSURING URBAN PLANNING CRITERIA PROJECTING POPULATION DISTRIBUTION ISSUING TECHNICAL DRAWINGS IMPLEMENTING PROFESSIONAL PRESENTATION PRESENTATION INTERPRETER 3D VISUALISATION SPECIALIST

--------------------------------------------------1:500 MASTER PLAN

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

MASTER PLANNING

14


MASTER-PLAN

S.E.VINH C. -

ROLE RESPONSIBILITY ---------------------------------------------------TEAM LEADER CONSULTING URBAN PLANNING & URBAN DESIGN WORKS STUDYING SUBJECT SITE CONTEXT DESIGNING & DEVELOPING SELECTED PLANNING SCHEME COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) ENSURING URBAN PLANNING CRITERIA PROJECTING POPULATION DISTRIBUTION ISSUING TECHNICAL DRAWINGS IMPLEMENTING PROFESSIONAL PRESENTATION PRESENTATION INTERPRETER

--------------------------------------------------1:500 MASTER PLAN

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

MASTER PLANNING

15


SCHOOL ZONE

STREET-SCAPE

MIPEC BO. -

CONFERENCE CENTRE

TEAM LEADER CONSULTING STREET-SCAPE DESIGN STUDYING SUBJECT SITE CONTEXT DESIGNING & DEVELOPING CONCEPTUAL DESIGN COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM)

SHOPPING MALL

ROLE RESPONSIBILITY ----------------------------------------------------

ENSURING CONSTRUCTION LAW IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION 3D VISUALISATION SPECIALIST

PARKING

--------------------------------------------------CONCEPTUAL DESIGN

WORK PERFORMED AT BURCE HENDERSON ARCHITECTS

LANDSCAPE PROJECT

16


SELECTED WORK

BRUCE HENDERSON ARCHITECTS

CPG CONSULTANTS URBAN PLANNING DIVISION

HAI AN LTD. COMPANY

GRADUATE ARCHITECT ---------------------------------

URBAN DESIGNER ---------------------------------

ARCHITECT ASSOCIATE ---------------------------------

HARMONY T. [A]

O. MARKET DI. [A-C]

SUNBAY SG. [A]

BRUCE ST. [A-C]

O. MARKET DI.[A]

ECO X. [A]

MIC T. [A]

MA. ARC [A]

CHRUCH ST. [A]

HYPERLOOB SC. [MP]

HY. HOTEL [A]

TAI-YU [MP]

MILTON PA. [A]

JIANJUNCI STN. [MP]

CP. CAFE [A]

CHAOA. [MP]

MIPEC SH. [A]

PHU H. [MP]

HOSIER L. [A]

BACH VI. [MP]

[DEC 2018 - CURRENT]

[APRIL 2013 - SEPT 2016]

[JUNE 2011-JULY 2012]

SEN H. [MP] VINH C. [MP]

--------------------------------PAGE 5-16

[A] ARCHITECTURAL PROJECTS

[A-C] ARCHITECTURAL COMPETITION

--------------------------------PAGE 18-26

[MP] MASTER-PLANNING

--------------------------------PAGE 28-29

TABLE OF CONTENT


ARCHITECTURE

O. MARKET DI. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING DESIGN LEADER SUTYDING EXSITING URBAN CONTEXT DEVELOPING ARCHITECTURAL IDEAS THROUGH 3D MASSING STUDYING VIEWING ORIENTATION OF TOWERS STUDYING SHADOW DIAGRAMS COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) APPLYING URBAN DESIGN PARAMETERS ENSURING POPULATION DISTRIBUTION

3D RENDER BY CPG

IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION PRESENTATION INTERPRETER

--------------------------------------------------COMPETITION (AWARDED)

WORK PERFORMED AT CPG CONSULTANTS

RESIDENTIAL PROJECT

18


ARCHITECTURE

O. MARKET DI. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING DESIGN LEADER SUTYDING EXSITING URBAN CONTEXT DEVELOPING ARCHITECTURAL IDEAS THROUGH 3D MASSING STUDYING VIEWING ORIENTATION OF TOWERS STUDYING SHADOW DIAGRAMS COORDINATING WITH CLIENTS AND STAKEHOLDERS (IN VIETNAM) APPLYING URBAN DESIGN PARAMETERS ENSURING POPULATION DISTRIBUTION IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION

--------------------------------------------------DESIGN DEVELOPMENT

WORK PERFORMED AT CPG CONSULTANTS

RESIDENTIAL PROJECT

19


Rooftop garden

ARCHITECTURE

MA. ARC

Service apartment

Image. Semi-basement plan

Image. Ground floor plan - Access

Image. Ground floor plan - Uses

Image. 2nd floor plan - Uses

Image. 3rd – 9th floor plan - Uses

Image. 10th floor plan - Uses

-

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING DESIGN LEADER SUTYDING EXSITING URBAN CONTEXT DEVELOPING ARCHITECTURAL IDEAS THROUGH 3D MASSING STUDYING VIEWING ORIENTATION OF 2 BUILDINGS STUDYING BUILDING FUNCTIONS COORDINATING WITH IN-HOUSE LANDSCAPE TEAM AND STAKEHOLDERS

Green balconies

APPLYING URBAN DESIGN PARAMETERS IMPLEMENTING PROFESSIONAL BILINGUAL PRESENTATION PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION

Shops/ Restaurants

--------------------------------------------------DESIGN DEVELOPMENT

Semi basement

3D RENDER BY CPG

WORK PERFORMED AT CPG CONSULTANTS

COMMERCIAL PROJECT

20


Research

Education

Incubator

Water space

Slow core plaza

Fast core plaza

Material

Material

Material

Material

Material

Material

URBAN PLANNING

THE HYPERLOOP CITY XIAN SCIENCE PARK -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING PLANNING SCENARIOS

Legend 1 Fast Spot A 2 Fast Spot B 3 Slow Spot 4 Fast Spot Green Ramp A 5 Fast Spot Green Ramp B 6 MRT Station 1 7 MRT Station 2 8 Community Centre 9 Commercial Strips

10 Residential Estates 11 Hospital Core 12 Healthcare Extension Facilities 13 High School 14 Secondary School 15 Primary School 16 Kindergarten 17 Slow Core Square 18 Utility (Electricity) 19 Utility (Heat)

20 Utility (Water) 21 Research Buildings 22 Education Buildings 23 Incubator Buildings 24 Wet land Park 25 Central Park 26 Future wetland 27 Potential & future park developments 28 Potential & future green corridor connectors outside

23

21 27 10

28

24

27

10 15 23

16

10

STUDYING PEDESTRIAN & BICYLE LOOPS THROUGHOUT THE SITE

28 12

ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN & MASSING

9

28

12

8

11

APPLYING URBAN PLANNING CRITERIA INTO URBAN DESIGN PROPOSAL 3

27

IMPLEMENTING PROFESSIONAL PRESENTATION IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS

6

IMPLEMENTING 3D HUMAN VIEWS

21

19

28

ASSISTING IN 3D VISUALISATION

--------------------------------------------------PLANNING SCENARIO

25

23

13 14 8

9

10

15

16

7 10

10

28

5

卫环路 28

28

2

5 28

22

27

22

10

10

10

22

21

18

21

4

10

22

新沣大道

1

17

23

28

4

9

卫环路

PROPOSING URBAN DESIGN GUIDELINES

27

28

27

WORK PERFORMED AT CPG CONSULTANTS

MASTER PLANNING

21


MASTER-PLAN

TAI-YU. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING PLANNING SCENARIOS STUDYING PEDESTRIAN FRIENDLY CONNECTION THROUGHOUT THE SITE DEVELOPING 3D MASSING ENTIRE THE SITE PROPOSING URBAN DESIGN GUIDELINES APPLYING URBAN PLANNING CRITERIA INTO URBAN DESIGN PROPOSAL IMPLEMENTING PROFESSIONAL PRESENTATION

3D RENDER BY CPG

IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS IMPLEMENTING 3D HUMAN VIEWS BY HANDSKETCH ASSISTING IN 3D VISUALISATION

--------------------------------------------------1:500 MASTERPLAN

WORK PERFORMED AT CPG CONSULTANTS

MASTER PLANNING

22


MASTER-PLAN

JIANGJUNCI STN. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING PLANNING SCENARIOS DEVELOPING PEDESTRIAN FRIENDLY CONNECTION THROUGHOUT THE SITE DEVELOPING 3D MODELLING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS ASSISTING IN 3D VISUALISATION

3D RENDER BY CPG

--------------------------------------------------1:500 MASTERPLAN

WORK PERFORMED AT CPG CONSULTANTS

MASTER PLANNING

23


MASTER-PLAN

CHAOA. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING SELECTED PLANNING SCENARIOS ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN AND MASSING DEVELOPING 3D MASSING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING DESIGN DIAGRAMS ASSISTING IN 3D VISUALISATION

--------------------------------------------------1:500 MASTERPLAN

WORK PERFORMED AT CPG CONSULTANTS

MASTER PLANNING

24


MASTER-PLAN

PHU H. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING SELECTED PLANNING SCENARIOS COORDINATING WITH CLIENTS AND STAKEHOLDERS ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN AND MASSING DEVELOPING 3D MASSING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING 3D MASTERPLAN PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION

--------------------------------------------------1:500 MASTERPLAN

Semi-D House

Link House

Shop House

Villa

WORK PERFORMED AT CPG CONSULTANTS

Condominium

Mid-Rise Apartment

MASTER PLANNING

25


MASTER-PLAN

BACH VI. -

ROLE RESPONSIBILITY ---------------------------------------------------ASSISTING TEAM LEADER STUDYING EXSITING URBAN CONTEXT DEVELOPING SELECTED PLANNING SCENARIOS COORDINATING WITH CLIENTS AND STAKEHOLDERS ENHANCING ZONING FUNCTIONS THROUGH THE DESIGN AND MASSING DEVELOPING 3D MASSING ENTIRE THE SITE IMPLEMENTING ILLUSTRATIVE MASTERPLAN IMPLEMENTING 3D MASTERPLAN PRESENTATION INTERPRETER ASSISTING IN 3D VISUALISATION

--------------------------------------------------1:500 MASTERPLAN

WORK PERFORMED AT CPG CONSULTANTS

MASTER PLANNING

26


SELECTED WORK

BRUCE HENDERSON ARCHITECTS

CPG CONSULTANTS URBAN PLANNING DIVISION

HAI AN LTD. COMPANY

GRADUATE ARCHITECT ---------------------------------

URBAN DESIGNER ---------------------------------

ARCHITECT ASSOCIATE ---------------------------------

HARMONY T. [A]

O. MARKET DI. [A-C]

SUNBAY SG. [A]

BRUCE ST. [A-C]

O. MARKET DI.[A]

ECO X. [A]

MIC T. [A]

MA. ARC [A]

CHRUCH ST. [A]

HYPERLOOB SC. [MP]

HY. HOTEL [A]

TAI-YU [MP]

MILTON PA. [A]

JIANJUNCI STN. [MP]

CP. CAFE [A]

CHAOA. [MP]

MIPEC SH. [A]

PHU H. [MP]

HOSIER L. [A]

BACH VI. [MP]

[DEC 2018 - CURRENT]

[APRIL 2013 - SEPT 2016]

[JUNE 2011-JULY 2012]

SEN H. [MP] VINH C. [MP]

--------------------------------PAGE 5-16

[A] ARCHITECTURAL PROJECTS

[A-C] ARCHITECTURAL COMPETITION

--------------------------------PAGE 18-26

[MP] MASTER-PLANNING

--------------------------------PAGE 28-29

TABLE OF CONTENT


ARCHITECTURE

SUNBAY SG. -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING EXSITING URBAN CONTEXT DEVELOPING DESIGN CONCEPT OF HOUSING DEVELOPMENT SCHEME DEVELOPING SELECTED DESIGN OPTION IMPLEMENTING DESIGN DEVELOPMENT PACKAGE COORDINATING WITH CLIENTS AND STAKEHOLDERS ISSUING ARCHITECTURAL LAYOUT PLANS 3D VISUALISATION IN SKETCH UP

--------------------------------------------------DESIGN DEVELOPMENT

WORK PERFORMED AT HAI AN COMPANY

RESIDENTIAL PROJECT

28


ARCHITECTURE

ECO X. -

ROLE RESPONSIBILITY ---------------------------------------------------ARCHITECTURAL DESIGN ASSISTANT STUDYING EXSITING URBAN CONTEXT DEVELOPING DESIGN CONCEPT OF HOUSING DEVELOPMENT SCHEME DEVELOPING SELECTED DESIGN OPTION IMPLEMENTING DESIGN DEVELOPMENT PACKAGE COORDINATING WITH CLIENTS AND STAKEHOLDERS ISSUING ARCHITECTURAL LAYOUT PLANS 3D VISUALISATION IN SKETCH UP

--------------------------------------------------DESIGN DEVELOPMENT

WORK PERFORMED AT HAI AN COMPANY

RESIDENTIAL PROJECT

29


STUDENT WORKS

ARCHITECTURE IN URBAN CONTEXT

30


STUDENT WORKS

ONE-ROOF-MARKET (MASTERCLASS)

31


REFERENCE

ROBERTO MELO

GRAHAM MORRISON

CHOMKLIN ANUCHA

DESIGN PRINCIPAL ----------------------------------------------------

GENERAL DIRECTOR ----------------------------------------------------

SENIOR PRINCIPAL LANDSCAPE ARCHITECT ----------------------------------------------------

BRUCE HENDERSON ARCHITECTS, MELBOURNE

BRUCE HENDERSON ARCHITECTS, MELBOURNE

URBAN PLANNING, CPG CONSULTANTS PTE LTD

TEL: +61 3 9860 4000 | +61 4 1285 5101

TEL: +61 3 9860 4000

TEL: +65 6357 4018

EMAIL: rmerlo@bh-architects.com

EMAIL: gbmorrison@bh-architects.com

EMAIL: anucha.chomklin@cpgcorp.com.sg

---------------------------------------------------

---------------------------------------------------

---------------------------------------------------

-

-

-

KATHIK KARKAL -

VICE PRESIDENT ---------------------------------------------------URBAN PLANNING, CPG CONSULTANTS PTE LTD TEL: +65 6357 4662 EMAIL: karkal.karthik@cpgcorp.com.sg

---------------------------------------------------


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.