Turner ’s Small Caps Group Constructs PVC Unit and Cooling Tower for Formosa
Turner Industries recently worked on the construction of an expanded PVC unit and a cooling tower for Formosa Plastics Corp. in Baton Rouge, Louisiana. The project, which lasted nine months, involved the collaboration of multiple Turner groups and divisions, and Turner self-performed 98%
Project Overview
Turner’s S mall C aps G roup : G eneral C ontractor
Turner’s Decatur, Alabama F acility : S teel, M aterial P rocurement S pecifications, a nd P ipe S upport S hop F abrication
Turner’s Port Allen, Louisiana S hop : P ipe F abrication a nd P aint
Turner’s S IPA G roup : S caffolding, I nsulation, a nd Touchup P aint S ervices O n S ite
Turner Specialty Services : F ield Testing S ervices S uch a s R adiographic Testing a nd P ositive M aterial I dentification
Turner’s C rane a nd R igging G roup : 30- Ton a nd 60- Ton C ranes, Trucks, Trailers, a nd R igging E quipment
Project Quick Facts
Site Preparation/Excavation: Minimal, Closure Welds to Underground Pipe
Civil: Elevated Concrete Floor, Pump P edestal Prepping, Etc.
Structural Steel: More Than 50 Tons of Steel Erected on E xpanded PVC Unit
Equipment: More Than 15 Pumps, 2 Skids, 4 Vessels, 1 Tank, and M iscellaneous Screens, Filters, and Hoopers
Hydro Testing: More Than 6,000 Feet of Pipe Tested
Painting: 4,500 Feet of Paint Touchup
Insulation: 4,000 Feet of Piping I nsulation Plus Several Equipment Units
Scaffolding: Erected and Dismantled Two Truckloads of Materials for Five Months in Various Areas
Piping: More Than 6,000 F eet of Carbon, Stainless 304 and 316, Low-Temp Carbon, and Jacketed Pipe