6 minute read
Elevation 2 C
MICHIGAN DEPARTMENT OF CORRECTIONS RECORD STORAGE WAREHOUSE FILE NO: 472/19173.CDP
Advertisement
4000 COOPER STREET JACKSON, MI 49201
PROJECT NUMBER: 1904
DELETED DRAWINGS: NONE
DWG # DRAWING NAME ISSUED FOR DATE A00 COVER PAGE A01 DEMO PLAN A02 DEMO ELEVATIONS A03 NEW WORK MAIN LEVEL A04 ENLARGED FLOOR PLAN A05 NEW WORK UPPER LEVEL A06 REFLECTED CEILING PLAN A07 ELEVATIONS A08 SECTIONS A09 ELEVATIONS AND DETAILS A10 DOOR SCHEDULE AND DETAILS 01 ARCHITECTURAL: 11
OWNER:
MDOC & DTMB
1780 E Parnall Rd Jackson, MI 49201 CONTACT: DAVE ALBRECHT ARCHITECT OF RECORD:
STRAUB PETTITT YASTE
STRUCTURAL:
RICHARD KOZLOWICZ
MECHANICAL ENGINEER:
POTAPA-VAN HOOSEAR
48653 VAN DYKE AVE. SHELBY TOWNSHIP, MI 48317 T: 586.997.0922 CONTACT: KARL POTAPA W: kpotapa@pveng.net ELECTRICAL ENGINEER:
TAC ASSOCIATES LLC
4321 EAST CAMDEN RD. OSSEO MI. 49266 T: 517.254.4789 F: 517.254.4886 CONTACT: THOMAS CROW W: http://www.tac-associates.com
CODE DATA:
USE GROUP: B & S-1 SEPARATION REQUIRED: NO SEPARATION CONSTRUCTION TYPE: 11-B EXISTING BUILDING HEIGHT: 22' EXISTING BUILDING AREA: 12,000 GSF BUILDING IS NOT SPRINKLED
106 SHEET INDEX
DELETED DRAWINGS: NONE
DWG # DRAWING NAME ISSUED FOR DATE
S01 STRUCTURAL PLANS & DETAILS 02 STRUCTURAL: 1
M00 MECHANICAL GENERAL INFORAMTION & HVAC EQUIPMENT SCHEDULES
M01 LEVEL 1 MECHANICAL DEMOLITION PLAN M02 LEVEL 1 & LEVEL 2 MECHANICAL ALTERATION PLANS M03 LEVEL 1 & LEVEL 2 PLUMBING ALTERATION PLANS 03 MECHANICAL: 4
.E001 SYMBOL LIST, LIGHTING FIXTURE SCHEDULE, AND DRAWING INDEX
.ED100 FLOOR PLAN - ELECTRICAL DEMOLITION E100 FIRST FLOOR PLAN - ELECTRICAL NEW WORK E101 PARTIAL FIRST FLOOR PLAN - LIGHTING NEW WORK E102 PARTIAL FIRST FLOOR PLAN - LIGHTING NEW WORK E110 SECOND FLOOR PLAN - ELECTRICAL NEW WORK E111 PARTIAL SECOND FLOOR PLAN - LIGHTING NEW WORK E112 PARTIAL SECOND FLOOR PLAN - LIGHTING NEW WORK E201 PARTIAL FIRST FLOOR PLAN - POWER & SYSTEMS NEW WORK
E202 PARTIAL FIRST FLOOR PLAN - POWER & SYSTEMS NEW WORK
E211 PARTIAL SECOND FLOOR PLAN - POWER & SYSTEMS NEW WORK E212 PARTIAL SECOND FLOOR PLAN - POWER & SYSTEMS NEW WORK
E300 POWER ONE-LINE DIAGRAM - DEMOLITION E301 POWER ONE-LINE DIAGRAM - NEW WORK E310 ELECTRICAL SCHEDULES E311 ELECTRICAL SCHEDULES E312 ELECTRICAL SCHEDULES & COMCHECK E400 MISCELLANEOUS WIRING DIAGRAMS AND DETAILS E401 MISCELLANEOUS WIRING DIAGRAMS AND DETAILS E402 MISCELLANEOUS WIRING DIAGRAMS AND DETAILS EX100 FIRST FLOOR PLAN - EMERGENCY EGRESS LIGHTING PHOTOMETRY
EX110 SECOND FLOOR PLAN - EMERGENCY EGRESS LIGHTING PHOTOMETRY 04 ELECTRICAL: 22 TOTAL DRAWINGS: 38
ISSUED FOR BIDS 10/14/19
RECORD STORAGE WAREHOUSE FILE NO: 472/19173.CDP 4000 COOPER STREET JACKSON, MI 49201 MICHIGAN DEPARTMENT OF CORRECTIONS
1904
© 2019 STRAUB PETTITT YASTE