Getting to a Service Catalog Joel A. Manfredo

June 14, 2012

1


Agenda Background

Timeline

Phases 1 - 5

Results

Next Steps

Conclusions and Lessons Learned


County of Orange

$5.6 Billion Budget 7 Programs 32 Agencies / Departments


CEO IT Services Services are delivered through an Internal Service Fund “Running a Service Delivery Business�


Pricing a Service What does internet access cost? Hardware: •Redundant Firewalls •Redundant Routers •Redundant Core Switches •IPS / IDS Hardware •Monitoring (Orion) Servers •Content Filtering Appliances •Content Filtering Report Servers •DNS Servers

Software: •Firewall Security Software licensing •Content Filtering Software licensing & Report Services •Orion Monitoring Software licensing •DNS Software (Unix and Wintel)

Data Center Facilities Contracts: •Redundant Internet Service Providers: 1.TW Telecom 2.VPLS (this is a fail-over service) •IPS / IDS monitoring Service •Redundant WAN Circuit Contracts •Redundant Firewall Maintenance Contract (HW and SW) •Redundant Routers Maintenance Contract HW and SW)

•Redundant Core Switches Maintenance Contract HW and SW) •Content Filtering Maintenance Contract •County ARIN IP and BGP AS Services

Depreciation: •Firewalls - Hardware and software Depreciation associated •Routers - Hardware and software Depreciation associated •Core Switches - Hardware and software Depreciation associated •Monitoring - Hardware and software Depreciation associated •Content Filtering - Hardware and software Depreciation associated

Other CEOIT Services: •Contracts & Procurement Management •Resource Management •Financial and Cost, Budget Analysis •Billing Processing

Labor: •Network Engineering Labor •Security Engineering Labor •Availability Management Analysis •Capacity Management Analysis •Incident Management (Service Desk) •Change Management •Management


Pricing a Service What does internet access cost? Hardware: •Redundant Firewalls •Redundant Routers •Redundant Core Switches •IPS / IDS Hardware •Monitoring (Orion) Servers •Content Filtering Appliances •Content Filtering Report Servers •DNS Servers

Software: •Firewall Security Software licensing •Content Filtering Software licensing & Report Services •Orion Monitoring Software licensing •DNS Software (Unix and Wintel)

Data Center Facilities Contracts: •Redundant Internet Service Providers: 1.TW Telecom 2.VPLS (this is a fail-over service) •IPS / IDS monitoring Service •Redundant WAN Circuit Contracts •Redundant Firewall Maintenance Contract (HW and SW) •Redundant Routers Maintenance Contract HW and SW)

•Redundant Core Switches Maintenance Contract HW and SW) •Content Filtering Maintenance Contract •County ARIN IP and BGP AS Services

Depreciation: •Firewalls - Hardware and software Depreciation associated •Routers - Hardware and software Depreciation associated •Core Switches - Hardware and software Depreciation associated •Monitoring - Hardware and software Depreciation associated •Content Filtering - Hardware and software Depreciation associated

Other CEOIT Services: •Contracts & Procurement Management •Resource Management •Financial and Cost, Budget Analysis •Billing Processing

Labor: •Network Engineering Labor •Security Engineering Labor •Availability Management Analysis •Capacity Management Analysis •Incident Management (Service Desk) •Change Management •Management


The Story… Operational Transformation in the Face of Financial Distress Environment and Results: Organization: 1. 2. 3. 3. 4. 5.

A culture built on Heroics Bad relationship w/ vendor (expiring K) Siloed organization Assigning blame Resistance to change No priorities

How: Combination: 1. 2. 3. 4. 5.

Leadership Soft skills introduction Sustained “drumbeat” The persuader ITSM principles

Method: Results: 1. Moved to top 10% against benchmark 2. Reduced Budget 27% 3. Increased customer satisfaction 16% 4. Reduced SLA exceptions by 77% 5. Reduced incidents by 38% 6. Improved incident resolution from 5 days to 2 days

1. 2. 3. 4.

Plan Implement Absorb Measure

“Be transparent, or be gone”


Phases of the Journey Method - Plan, Implement, Absorb, Measure Phase 1:

Phase 2:

Phase 3: Phase 4: Phase 5:

ITSM Training DISC (Soft Skills) Training Capacity Management Availability Management Resource Planning Project Prioritization Network & Platform Services Reorganization Service Design Package Monthly MAP meetings

April 2009 May 2009 May 2009 June 2009 June 2009 June 2009 October 2009 November 2009 March 2010

Marketing Brochure (Mini Service Catalog - BRAND) Service Desk re-implementation Network Operations Center ITSM Full Suite (BMC – “AMP”)

October 2010 December 2010 January 2011 March 2011

Re-benchmark AIMM Service Catalog – Version 1 Customer Ranking of Services Service Catalog – Version 2 ITSM Reorganization Service Level Management Further Automate Capacity & Availability

July 2011 October 2011 January 2012 February 2012 Future Future Future



Driving Continuous Improvements

Phase 1

2009 Jan

Feb

Mar Apr

May Jun

Jul

2010 Aug

Sep

Oct

Nov

Dec

NPS Reorganized:

Phase 2

Jan

Feb

Mar Apr

“One Team”

Jul

Aug

Sep

Oct

Incident Mgt Process

SDP Process Capacity Reporting

May Jun

Nov

Dec

Customer Survey (Jul – Dec 09)

-Plan & Design -Build & Transition -Operate & Maintain

Training

Chaos

Phase 3

ITSM Integrated Suite Service Desk

Customer Survey (Jan – Jun 10)

“A journey of a thousand miles begins with a single step”

CTO Portal Certifications: 95

IT Service Management Path to Maturity Availability Reporting ACS Program Executive hired

Ticket Aging Process

AIMM (HP) Report

46

-Technology & Architecture -Mgt Tools & Process Maturity -Culture & IT Staff Maturity -Demand, Supply & IT Governance

Resource Planning

Marketing Brochure “Agency Success is AIMM (HP) Report 34

Communication Team Formed

Performance Audit Report County Connection: OCDC Project Prioritization

Service request turnaround improvements (100%) Incidents – from over 5 days to 1

(DISC)

Not a single failed non-standard RFC Not a single Service Level Breach

Data Center Tour Tech Fest

Our Mission”


Phase 4

Driving Continuous Improvements 2011

Jan

Feb

Mar Apr

May Jun

Jul

Method 2012 Aug

ITSM Integrated Suite Launch – FULL SUITE (CMDB, Change, Release…)

Sep

Oct

Nov

Service Catalog v 1

Dec

Jan

Feb

Mar Apr

May Jun

Jul

Aug

Service Catalog v 2

Customer Survey (Jul – Dec 10)

IT Service Management Path to Maturity AIMM (HP) Report 10 Network Operations Center Launched

Sep

ITSM based Reorganization

Application Monitoring

MSB Planning Success

Phase 5

Service Level Management Customer Grading by Service Virtual Server Farm Replacement

Oct

Nov

Dec


Phase 1


DISC Assessment Phase 1: Dominance, Influence, Steadiness, Compliance


Management Action Plan Results through Present 400 350 300 250 200 150 100 50 0 Nov Mar April May June Jul

Aug Sep Oct Nov Dec Jan Feb Mar Apr May

2010

Cumulative

2011

Monthly Accomplishments

Jul

Aug Sep


Capacity & Availability Reporting Phase 1 Capacity Report Capacity Report Table of Contents Executive Summary............................................................................................................ 4 Dashboard Summary........................................................................................................... 4 Risks.................................................................................................................................... 4 Warnings ............................................................................................................................. 4 Scope................................................................................................................................... 5 Capacity Measurements ...................................................................................................... 5 Network .......................................................................................................................... 5 County Wide Area Network ....................................................................................... 5 Time Warner Internet.................................................................................................. 6 Security ........................................................................................................................... 7 Storage ............................................................................................................................ 8 Tier-1........................................................................................................................... 8 Tier-2........................................................................................................................... 8 E-Mail ........................................................................................................................... 10 Virtual Environment ..................................................................................................... 13 Analysis Additional Capacity ................................................................................... 14 Conclusion ................................................................................................................ 14 Recommendation ...................................................................................................... 14 Power5 Systems............................................................................................................ 15 Mainframe..................................................................................................................... 18 Power ............................................................................................................................ 19 Data Center Space......................................................................................................... 22 Floor Space ............................................................................................................... 22 Office Space.............................................................................................................. 24 Telephone Services ....................................................................................................... 25 APPENDIX – A – Report Data Source and Contributors ................................................ 26 APPENDIX – B – Virtual Environment Cluster Information .......................................... 27

Availability Report


Capacity & Availability Reporting Phase 1


Resource Planning Key Metrics

3 Week Summary (by organization unit): Values Row Labels

ETC Hours

3 Week FTE

Enterprise Infrastructure Srvcs

13.92

0.12

Networks and Platform Services

523.87

4.37

Security & Bus Continuity Oper

15.50

0.13

553.28

4.61

Grand Total


Resource Planning Key Metrics 3 Week Summary (by project):

Row Labels Disaster Recovery Implementation (FY11-12)

Sum of ETC 336.00

Enterprise Secure File Transfer Migration

33.20

ePages Replacement

22.00

Exchange 2010 Production Build out HR & FS Access Definition Project Schedule Secure FTP Infrastructure Upgrade

Grand Total

112.00 1.50 48.58

553.28

Projects with late tasks: Sum of ETC Row Labels

Grand Total

ePages Replacement

10.00

Grand Total

10.00


Phase 2


Driving Continuous Improvements 2009 Jan

Feb

Mar Apr

May Jun

Jul

2010 Aug

Sep

Oct

Nov

Dec

NPS Reorganized:

Phase 2

Feb

Mar Apr

Chaos

“One Team”

Jul

Aug

Sep

Oct

Incident Mgt Process

SDP Process Capacity Reporting

May Jun

Nov

Dec

Customer Survey (Jul – Dec 09)

-Plan & Design -Build & Transition -Operate & Maintain

Training

Jan

ITSM Integrated Suite Service Desk

Customer Survey (Jan – Jun 10)

“A journey of a thousand miles begins with a single step”

CTO Portal Certifications: 95

IT Service Management Path to Maturity Availability Reporting ACS Program Executive hired

Ticket Aging Process

AIMM (HP) Report

46

-Technology & Architecture -Mgt Tools & Process Maturity -Culture & IT Staff Maturity -Demand, Supply & IT Governance

Resource Planning

Marketing Brochure “Agency Success is AIMM (HP) Report 34

Communication Team Formed

Performance Audit Report County Connection: OCDC Project Prioritization

Service request turnaround improvements (100%) Incidents – from over 5 days to 1

(DISC)

Not a single failed non-standard RFC Not a single Service Level Breach

Data Center Tour Tech Fest

Our Mission”


ITSM Organizational Design Phase 2: Reorganization of NPS

ASG

IRM

Process

Security

NPS

OPS

Plan & Design

Build & Transition

Operate & Maintain

TSD

PMO

BA


Design Validation / Review and Acceptance Procurements Configuration and Installation Update and Audit of Asset Lists/CMDB RFC Execution and Coordination/Communication Rollout Plan Backout Plan Risk Assessment for RFC Ops Training and Handoff QA and Validation of Systems Feedback to Design Team Approval of Rollout from Ops Approval of Rollout from customer Approval of Rollout from Design group Support and monitoring during cool down/warranty period

Operate and Maintain

Overall Architecture and Technologies / Standards* Capacity Requirements Availability Requirements Training Requirements POC requirements Design Diagrams and Requirements MOUs/SLRs Success Criteria TCO Calculations Alternatives Backup requirements Process / Procedure requirements Monitoring requirements Access Requirements Standard Requests Engineering and Ops review and acceptance Continuous improvement or scalability plans Approval of the Design from Peer Groups Approval of the design from Chief Architect Approval of the design from Customer

Build and Transition

Plan and Design

ITSM Organizational Design System acceptance Registering application in ops (contact information, service levels, monitoring and backup information, new or changed procedures, Access levels) Update procedures System lockdown QA and Validation of Monitoring, Backups and Access Assist in Negotiating SLRs/SLAs Freeze and Warranty Period Management


SDR SDP – Issues identified through the process


Phase 3


Driving Continuous Improvements 2009 Jan

Feb

Mar Apr

May Jun

Jul

2010 Aug

Sep

Oct

Nov

Dec

NPS Reorganized:

Jan

Feb

Mar Apr

“One Team”

Jul

Aug

Sep

Oct

Incident Mgt Process

SDP Process Capacity Reporting

May Jun

Nov

Dec

Customer Survey (Jul – Dec 09)

-Plan & Design -Build & Transition -Operate & Maintain

Training

Chaos

Phase 3

ITSM Integrated Suite – Service Desk

Customer Survey (Jan – Jun 10)

“A journey of a thousand miles begins with a single step”

CTO Portal Certifications: 95

IT Service Management Path to Maturity Availability Reporting ACS Program Executive hired

Ticket Aging Process

AIMM (HP) Report

46

-Technology & Architecture -Mgt Tools & Process Maturity -Culture & IT Staff Maturity -Demand, Supply & IT Governance

Resource Planning

Marketing Brochure “Agency Success is AIMM (HP) Report 34

Communication Team Formed

Performance Audit Report County Connection: OCDC Project Prioritization

Service request turnaround improvements (100%) Incidents – from over 5 days to 1

(DISC)

Not a single failed non-standard RFC Not a single Service Level Breach

Data Center Tour Tech Fest

Our Mission”


It’s working... Phase 3: “Mojo”

- Marshall Goldsmith

November 2009 

Not a single Service Level Breech

Incidents – from over 5 days to 1

Not a single failed non-standard RFC

Service request turnaround improvements (100%)


Marketing Brochure Phase 3: “Mini Service Catalog�


Marketing Brochure Phase 3: “Mini Service Catalog�


Phase 4


Network Operations Center Phase 4 Network Monitoring

Server Monitoring

Handoff/Review Logs

Handoff/Review Logs

Orion Network Dashboard

Orion Server Dashboard

Daily Walkthrough AM/PM

VM Console

IP Monitor Int/Ext/DR

IP Monitor Probation/Int

INMON

HP SIM


Integrated ITSM Suite Phase 4: BMC Suite through the Cloud

Results Custom Written


More Results


Sep-11

Aug-11

Jul-11

Jun-11

May-11

Apr-11

Mar-11

Feb-11

Jan-11

Dec-10

Nov-10

Oct-10

Sep-10

Aug-10

Jul-10

Jun-10

May-10

Apr-10

Mar-10

Feb-10

Jan-10

Dec-09

Nov-09

Oct-09

Sep-09

Aug-09

Jul-09

Jun-09

May-09

Apr-09

Mar-09

Feb-09

Jan-09

Evidence of Improvements

Results

800

Incident Tickets

700

600

500

400

300

200

100

0

Percent Resolved

100%

90%

80%

70%

60%

50%


Evidence of Improvements Results SLA Exceptions Reduced by 77% 500 400 300 200 100 0

CY2009

CY2010


Evidence of Improvements Results Average Days to Resolve Tickets Reduced 75% 14

12 10 8 6 4 2 0 CY2009

CY2010


Evidence of Improvements Results: HP’s Converged Infrastructure Maturity Model


Evidence of Improvements Results: HP’s Converged Infrastructure Maturity Model


Evidence of Improvements Results: HP’s Converged Infrastructure Maturity Model Orange County versus US Public Sector Benchmark July 2011

4.00 3.50 3.00

Orange County US Public Sector

2.50 2.00 1.50 1.00 Technology & Architecture

Tools & Processes

Culture & IT Staff Maturity

Demand, Supply & IT Governance


Evidence of Improvements Results: HP’s Converged Infrastructure Maturity Model Orange County Percent of Characteristics "At or Better" July 2011 100

Head count

Top 10%

90 80

- 27%

70

Better

60

Equal 50 40 30 20 10 0 Dec-09

Jul-10

Jul-11


Evidence of Improvements Customer Survey

Scale: 1 = worst; 4 = best


Phase 5


Driving Continuous Improvements 2011 Jan

Feb

Mar Apr

May Jun

Jul

Method 2012 Aug

ITSM Integrated Suite Launch – FULL SUITE (CMDB, Change, Release…)

Sep

Oct

Nov

Service Catalog v 1

Dec

Jan

Feb

Mar Apr

May Jun

Jul

Aug

Service Catalog v 2

Customer Survey (Jul – Dec 10)

IT Service Management Path to Maturity AIMM (HP) Report 10 Network Operations Center Launched

Sep

ITSM based Reorganization

Application Monitoring

MSB Planning Success

Phase 5

Service Level Management Customer Grading by Service Virtual Server Farm Replacement

Oct

Nov

Dec


Sorted Top to Bottom (and vice-versa) Sorted by:

Customer

Sorted by:

Ave

A

B

1 Enterprise Time Synchronization 2 Midrange Platform (AIX Platform) 3 Mainframe Platform 4 Enterprise Network Connectivity (WAN) 5 Enterprise Secure File Transfer Services 6 Enterprise RightFax Services 7 SLA1 – Unmanaged Server Hosting 8 Database Mgt – Information Resource Mgt 9 Enterprise Domain Name Resolution 10 Blackberry Services 11 OnBase 12 VTL Replication Service 13 Standard Backup Service 14 Enterprise Email Services 15 Finance Services 16 Enterprise Storage Services (SAN) 17 Enterprise Internet Service Provider (ISP) 18 Technical Consultation 19 Applications Services Group 20 Desktop Support 21 Enterprise Global User Directory Services 22 Publishing Services 23 Enterprise Network Security 24 DeltaCopy Data Protection Servce (DCDP) 25 Business Recovery Center 26 SLA3 Service 27 Enterprise Remote Access Infrastructure 28 OCTNET 29 Project Management 30 Service Desk 31 eGov Services 32 Enterprise Secure Web Filtering 33 Disaster Recovery

96.50 96.50 96.00 94.71 94.20 94.00 94.00 93.67 93.20 92.67 92.60 91.67 91.50 91.33 91.33 91.25 90.86 90.80 90.50 90.00 88.67 88.67 88.50 88.33 88.33 87.80 86.86 86.39 85.00 84.78 83.33 82.50 66.50

Customer Ave

1 Disaster Recovery 2 Enterprise Secure Web Filtering 3 eGov Services 4 Service Desk 5 Project Management 6 OCTNET 7 Enterprise Remote Access Infrastructure 8 SLA3 Service 9 DeltaCopy Data Protection Servce (DCDP) 10 Business Recovery Center 11 Enterprise Network Security 12 Enterprise Global User Directory Services 13 Publishing Services 14 Desktop Support 15 Applications Services Group 16 Technical Consultation 17 Enterprise Internet Service Provider (ISP) 18 Enterprise Storage Services (SAN) 19 Enterprise Email Services 20 Finance Services 21 Standard Backup Service 22 VTL Replication Service 23 OnBase 24 Blackberry Services 25 Enterprise Domain Name Resolution 26 Database Mgt – Information Resource Mgt 27 Enterprise RightFax Services 28 SLA1 – Unmanaged Server Hosting 29 Enterprise Secure File Transfer Services 30 Enterprise Network Connectivity (WAN) 31 Mainframe Platform 32 Enterprise Time Synchronization 33 Midrange Platform (AIX Platform)

66.50 82.50 83.33 84.78 85.00 86.39 86.86 87.80 88.33 88.33 88.50 88.67 88.67 90.00 90.50 90.80 90.86 91.25 91.33 91.33 91.50 91.67 92.60 92.67 93.20 93.67 94.00 94.00 94.20 94.71 96.00 96.50 96.50


Service Catalog ISP


Service Catalog Storage Area Network


Extend ITSM Based Organization Move the Plan & Design Group and the Build & Transition Group “up”


Conclusions and Lessons Learned


Conclusions & Lessons Learned 1. Financial distress clouds have their silver linings in IT environments. a. b.

Working together in the face of a single galvanizing event Speak with “one voice”

2. It Takes an IT mojo-driven strategy to implement sustained continued improvements in financial distress. a. b.

Courage and consistency; buy-in Incremental changes (process, organizational), planning and soft skills provided results

3. New leadership can ignite IT Mojo. a. b.

Common goals Common messages

4. Establish a drumbeat to pace the changes and measure visibly and consistently. a. b.

5.

Messaging consistency Allow the organization to digest changes

Establish key measurements of the categories shown in the customer surveys. a. b.

Report on them Make sure everyone knows what’s being measured

6. Establish a consistent program of accountability . a. b.

Report on them Make sure everyone knows what’s being measured

7. Benchmark the organization before commencing the journey.