6 minute read
Safety Corner
Patrick W. SaltmarsTim Hunt, CHST h Corporate Safety Director Dir. of Envt’l, Health and Safety J. Derenzo Companies W. L. French Excavating Corp.
DRIVE SAFE…WORK SAFE… SAVE LIVES!
The weather is warming up, street work moratoriums are being lifted, and the annual rush to the streets is about to begin. Street work poses a unique set of challenges for contractors. Our projects can often introduce a level of uncertainty to the traveling public. We have probably interrupted their normal driving routine, and often times they may not be very happy about it. Regardless of what their mood may be, it is our responsibility to make sure these drivers get through our newly created work zone without incident. According to the Center for Construction Research and Training, "struck-by incidents are a leading cause of death among construction workers, and since 1992 the leading cause of nonfatal injuries in the construction industry." Struck by incidents are also part of OSHA's Focus Four. The Focus Four hazards are responsible for 64% of all fatalities in construction.
So, what is a struck by hazard? A struck by hazard could be a vehicle or equipment strike, a strike by a flying object, or even something falling. Street work zones expose workers to all of these possible struck by potentials. Street work requires detouring of existing traffic patterns. When the need to detour traffic around work zones arises, traffic management plans need to be put together.
A traffic management plan is a detailed plan designed to keep workers safe from vehicles while working in the streets. Some plans could be as simple as closing a road while others are much more detailed and elaborate. In all cases, the plan needs to show what signage is to be used and where it is to be placed. The plan should include the locations of cones, barrels, and barricades. The lane sizes should be indicated on the plan and any locations of flaggers or police details.
Having a plan is a good start, however, as in any plan, it is the implementation of it that is the most important. The plan needs to be accessible to those in the field and clearly understandable, so that the work zones can be setup properly. The plan is another tool in the toolbox for the crew. The Manual on Uniform Traffic Control Devices (MUTCD) sets the minimum standards for and provides guidance on traffic control. Some states and even certain cities/towns have developed more stringent standards for traffic control.
April 26-30 is the National Work Zone Awareness Week. This event is similar to Construction Safety Week, where it’s a nationwide event designed to raise awareness and spread the message of safety. This year’s theme is Drive Safe, Work Safe, Save Lives. continued on page 59
L. GUERINI GROUP, INC.
SINCE 1917 Material Placement Specialists
CONCRETE PUMPING EQUIPMENT “TELEBELT” MOBILE CONVEYORS STONE SLINGER SERVICE
Pumps Up To 200 yds/hr • Booms Up To 142’ Reach Line Pumps • Grout Pumps Material Placement To 106’
34 Topalian Street PO Box 260187 Boston, MA 02126
(617) 296-0290 www.guerini.com
Have Your Hands Full?
WE’RE HERE TO HELP.
From design and production to fulfillment and everything in between, WebsterOneSource has a variety of services to help you manage your marketing, printing, and logistics needs.
Contact Peter Smith to get started today!
peter@websteronesource.com | 781.447.5484 www.websteronesource.com
Send NSI Your Next Shoring Challenge!
NSI Contracting designs and installs engineered sheet pile shoring for a range of excavation situations
• Seawall Construction & Rehabilitation • Dam Rebuild and Reconstruction • Deep Pump Station Installations • Underground Storage Tank Construction • Building Foundations • Contaminated Soil Removal
NSI Contracting Field Office 6 Wright Avenue • Merrimack NH 03054 603-377-7437 • www.nsicontracting.com
NSI Contracting, a Proud Member of UCANE!
Drive Safe. A reminder that work-zones need everyone’s undivided attention. When approaching a work-zone, motorists should always slow down, follow all posted signs, be alert, and remain calm. Risky driving behavior affects more than just the driver – everyone’s lives and families are at stake.
Work Safe. Technology is helping to make work zones safer by collecting data and automating processes, which can remove workers from dangerous situations and provide motorists with important information. It is also a reminder that work zone safety begins with workers who are dedicated to safety.
Save Lives. If we ALL work together, we can achieve zero deaths on our roads and in our work zones!
Utility work alone is dangerous and filled with unknowns, utility work in the street with the public encountering a new traffic pattern is even more so. Take the time to create a traffic management plan and review the plan with the crew onsite. Ensure that vehicle protection is in place and it is adequate for the traffic expected. Remember, struck-by incidents are a leading cause of death among
construction workers. n
NOW AVAILABLE: BOSTON GRAVEL
PLANT LOCATION:
200 LEGACY BLVD. DEDHAM, MA 02026 Plant: 617-590-0024
OFFICE:
1039 EAST STREET DEDHAM, MA 02026 Office: 781-329-4111 Fax: 781-329-1039
MATERIALS AVAILABLE FOR PURCHASE:
• 1” MINUS PROCESSED GRAVEL • ¾” & 1½” CRUSHED STONE • SCREENED LOAM • SCREENED SAND
MATERIALS ACCEPTED:
• BROKEN ASPHALT • NON & REINFORCED CONCRETE • CONCRETE WITH WIRE MESH • ROCK • BLASTED LEDGE
HOURS OF OPERATION: MONDAY-FRIDAY: 6:30 A.M. – 4:00 P.M. SATURDAY: 7:00 A.M. – 12:00 P.M.
DELIVERIES AVAILABLE ON LARGE ORDERS. PLEASE CALL FOR PRICING.
Avoid Costly Damage and Repairs from U�lity Strikes
Badger Dayligh�ng is North America’s leading provider of risk mi�ga�ng hydrovac excava�on services. Our safety driven operators and highly capable trucks increase produc�vity while protec�ng your valuable assets.
Potholing & Dayligh�ng · Slot Trenching · Interior Excava�on Engineering & Design · U�lity Locates · Debris Removal Pit/Sump Cleans · Storm Drains · Emergency Response Pole Holes · Line Je�ng · Exposing Founda�ons · Culvert Cleaning
Badger Dayligh�ng of Massachuse�s Sco� Robertson 508-277-4111 www. Badgerinc.com
SIMPLE SOLUTIONS FOR COMPLEX
WATER MANAGEMENT NEEDS
BakerCorp Complete Water Management Solutions
BakerCorp is your single-source partner for Construction and Environmental Remediation water management applications.
1-800-BAKER12 | www.bakercorp.com
102 Old Worcester Rd. Oxford, MA 01540 (508) 987-7500
New England’s Only 1st Source Elite Marketer of Chevron Quality Lubricants
On & Off-Road Diesel Fuel, Diesel Exhaust Fluid, Propane & Heating Oil Available in Select Markets of Our Service Area. Complete Line of Lubricants For All Industries:
New England’s Premier DEF Manufacturer of Ocean Blue Diesel Exhaust Fluid
Off Highway & Construction On Highway Fleets Automotive Marine Railroad Industrial Plants
Experienced Sales & Customer Service Personnnel Ready To Help You With Your Lubricant Needs.