YuHyun Oh / 2020 Architecture Portfolio

Page 1

1


2


YUHYUN_OH PORTFOLIO

uhyuno@outlook.com +1 513 307 0808 issuu.com/uhyuno

I


이력서

E D U C AT I O N

U N I V E R S I T Y O F C I N C I N N AT I /

cincinnati, ohio

Bachelor of Science in Architecture (Class of 2020) Dean’s List / Spring 2019 ~ onwards Student Technology Lab Pro Maintaining STL Lab for laser cutting + 3D printing

H O C H S C H U L E F Ü R T E C H N I K S T U T TG A R T /

stuttgart, germany

International Master of Interior-Architectural Design (IMIAD) UC Student Exchange Program 2019 Fall Semester

RECOGNITION

SCHOLARSHIPS UC Global Scholarship / UC International Admissions UCI Study Abroad Scholarship / UC International Services SAID Scholarship / UC DAAP Lewis Franklin Palmer and Marjorie Stewart Palmer Scholarship / UC DAAP Baden-Württemberg-Stipendium / Baden-Württemberg Stiftung

SKILLSETS

RHINO * Modelling / Vray ADOBE * Illustrator / Photoshop / InDesign AUTODESK * Revit / AutoCad / 3ds Max MICROSOFT * Word / Powerpoint / Excel MACHINE * Lasercutting / 3D Printing LANGUAGE * English (Fluent) / Korean (Fluent) / German (Basic) ETC * Sketching / Photography / Graphic Design

II


prof.

EXPERIENCE

S O LO M O N CO R DW E L L B U E N Z /

chicago, illinois

Architectural Intern (May 2019 ~ Aug 2019) 320 W Huron / CHICAGO, IL * Modelled iterations of exterior massing and details * Modelled site and surrounding neighborhood to create context renderings * Modelled and rendered landscape planning designs * Made schematic and site diagrams * Made 3D printed iterative models for client meetings * Prepared for and attended client meetings 320 N Sangamon / CHICAGO, IL * Made schematic and site diagrams * Modelled and rendered exterior facade modules 2nd & Van Buren Mixed Use Complex / PHOENIX, AZ * Made axonometric programming and site diagrams * Conducted parking studies and calculations

KO H N P E D E R S E N F OX A S S O C I AT E S /

n ew y o r k , n ew y o r k

Architectural Intern (Aug 2018 ~ Jan 2019) Mixed Use Towers and Podium / SHENZHEN, CHINA * Created iterations of tower massings based on area calculations and client requirements * Designed and adjusted details and components of facade modules for towers and podium * Made schematic and site diagrams for weekly design meetings with client * Configured interior floorplans of residential tower * Rendered and post-edited views of interior spaces and exterior details

GBBN ARCHITECTS /

cincinnati, ohio

Architectural Intern (Jan 2018 ~ May 2018) Riverside Concert Venue / CINCINNATI, OH * Produced experiential renders of interior concert hall during competition phase (won by GBBN) North Kentucky University Tennis Center / HIGHLAND HEIGHTS, KY * Iterated main lobby of tennis center based on NKU’s branding and tennis history * Developed early-stage contruction documents of complex University of Cincinnati Marian Spencer Hall / CINCINNATI, OH * Made schematic and site diagrams of multi-use dormitory hall * Punchlisting on-site Miami University Stanton Hall / CINCINNATI, OH * Took on-site measurements and documentation of dormitory hall renovation project * Developed Revit model and populated construction documents based on original blueprints LEED Credits * Researched, documented, and input LEED credits for multiple projects

other.

EXPERIENCE

A S S O R T E D WO R K ( 2 0 1 4 ~ ) * /

s e o u l & b u s a n , s o u t h k o re a

*Due to financial difficulties I worked for 3½ years between 2014~2017 to independently fund my education.

Private Tutor (3½ years) Freelance Translator & Proofreader (since 2014 and ongoing) Interpreter (5 events) Bennigan’s chef assistant (6 months) Chanel security guard (3 months) Freelance Logo Designer (3 projects) Stage Construction Worker (5 concerts)

R E P U B L I C O F KO R E A A R M Y /

y a n g py e o n g , s o u t h k o re a

Infantry sergeant (Dec 2012 ~ Sep 2014) 20th Mechanized Infantry Division HQ * Performed duties as staff infantry at division logistics department * Provided Korean/English interpretation for high-level meetings between division commander and visiting UK general * Provided Korean/English interpretation between division personnel and German tank engine technicians * Performed duties as squad leader * Trained to be designated platoon medic

III


IV


CONTENTS 06

STUTTGART RESIDENTIAL ESTATE

16

TRAMMEL FOSSIL PARK

28

PRICE HILL RENOVATION

44

SKETCHES

V


266

267

268

270

^N

272

EG


STUTTGART RESIDENTIAL ESTATE stuttgart, germany Stuttgart is the capital and largest city of the Southern

German

state

of

Baden-Württemberg.

Unlike

its

neighboring city, Esslingen am Neckar, Stuttgart was devastated under heavy bombing during WWII, leaving more than half of its buildings

razed.

Consequently,

the

difference

in

urban

composition is clear as day between the two. While Esslingen boasts the picturesque gingerbread aesthetic of a sleepy medieval village, Stuttgart is dominated by the familiar boxy architecture common to many modern cities. To tackle the region’s lack of housing, large housing estates (Großwohnsiedlung), composed of rows of uniform apartment buildings, were built all over Germany. Our case study estate “Neues Heim”, or New Home, was drawn up in 1949. Perhaps the best way to describe its attributes is that it has none. It is mass-produced housing, featureless but efficient. However, it was designed for the family structure of 1950s Germany. It no longer satisfies the wants and needs of the contempory resident of Stuttgart. How can it be adapted? How much cultural identity can post-war Germany tolerate? This is a renovation project. The prompt asks for a housing adaptation for the co-existence of both young and elderly inhabitants.

Fall 2019 / HFT Stuttgart Study Abroad Semester / IMIAD I

7


THE STATE BOUNDARIES OF GERMANY

HAMBURG

BREMEN

BERLIN

FRANKFURT

STUTTGART

STATE OF BADENWÃœRTTEMBERG

PROJECTION LOCATION: STUTTGART

8

100 MILES


(TOP) The project is located in Stuttgart, Germany, on the southeastern state of Baden-WĂźrttemburg. The project location is pictured in this map. To the east runs the Neckar river. City center and the main transportation hubs are located to the south. The neighborhood is a residential area that can be most likened to the suburbs found in the US. (BOTTOM) These are original drawings of the complex dated to the 23rd of June, 1949. The apartment furthest to the West is the building for this project (1701).

9


ADJUSTMENTS TO FORM

EXISTING FORM

NEW FORM

CYAN The existing building is extruded on the North and South sides to give additional space and light to the communal areas found on each end. The three stairwell protrusions on the East facade is reduced to two and the stairs are rotated 90 degrees for better programming purposes. Window dimensions and sizes are changed.

10

MAGENTA A new form for the roof replaces the existing roof. The pitch is steepened to give better living quality to an additional attic level. Dormers provide headspace and light to the rooms. The style and shape are specifically designed to allude to traditional German architecture in order to give a sense of belonging and vernacularism.

YELLOW As the original building lacked insulative qualities, the exterior walls from the ground floor to the second floor (Third Floor in US) is given an exterior treatment of insulation and finish. The basement level is unchanged as insulation is unnecessary as well as to give the impression of ‘floating’ reminiscent of the Bauhaus building.


SELECT FLOORPLANS

BALC KITCHEN

UP

OPEN TO BELOW

DOWN

UP

RR

BR

BR

RR

UP

STRG

BR

BR

UP

DOWN

DOWN

UP

BR

BR

UP

RR

RR

BR

BR

UP

DOWN

DOWN

UP

KITCHEN

KITCHEN

STUDIO STUDIO

RR

STUDIO

RR

RR

RR STUDIO

KITCHEN

UP

KITCHEN

DOWN

DOWN

UP

BR

BR

RR

RR

UP

BR

BR

UP

DOWN

UP

DOWN

BR

BR

STRG UP

RR

BR

BR

RR UP

DOWN

OPEN TO BELOW

KITCHEN

UP

BALC

GROUND

LEVEL 3 M 0

1

2

5

11


12


SECTION PERSPECTIVE *Please refer to the plans on the previous page to see the location of the section cut. (INTERIOR COMMUNAL SPACES) Each communal space is purposefully shared between two levels in order to encourage interaction between the inhabitants. Between 10 to 14 people share each of these spaces. They are located on each end of the building. (EXTERIOR GARDEN) The exterior space is composed of a series of sloping hills inspired by the hilly landscape of the region. They are meant to discourage sports activities that the elderly residents have complained about while replacing them with quieter activities. The winding paths allow both the elderly and small families to casually enjoy the outdoors.


14



16


TRAMMEL FOSSIL PARK sharonville, ohio The Trammel Fossil Park is a plot of land in Sharonville, Ohio, known for its abundance in fossils of the Cincinnatian Series – the uppermost rocks of the Ordovician System in North America. The fossils of this series were deposited approximately 450 million years ago. For us, this is a number that is difficult to understand. After all, we ourselves only live around a century at most. The purpose of the structure is for the study and preservation of the Cincinnatian fossils, so I approached the idea of permanence with what is arguably the basis of all architectural design – human scale. I wished for the complex to feel temporary and fleeting, because, in the face of 450 million years, we are truly transient beings. How is this portrayed at a scale that we can understand? How can architecture feel short-lived? My answer to that is scaffolding. In architecture, scaffolding is transience. Therefore, I designed the entire complex to be constructed out of the endless possibilities of scaffolding, forming a temporaral structure that does not disrupt the fossils underneath. Its lack of shelter and inability to moderate

temperatures

creates

a

rugged

and

exposed

environment that is meant to showcase our vulnerability as humans and thus highlight the timelessness of the fossils.

Summer 2018 / University of Cincinnati / SAID 2004

17


SCAFFOLDING DIAGRAM 1of2 Due to file size limitations, modelling every component at the scale of the proposed complex was impossible. However, in order to demonstrate a clear understanding of the components and capabilities of scaffolding, a mock structure (pictured below) was modelled instead. This mock structures contains each and every scaffolding component that is used in the actual proposed complex. For the actual project, simplified poles were used to construct the bare bones of each structure for the purpose of diagramming and rendering.

(A) QUARTER PLYWOOD PANEL The quarter plywood panel is a multi-purpose component that can act as light flooring or ceiling component.

A

(D) HANGING REED WEAVE The handing reed weave is a non-structural component intended to provide layering and translucent partitioning.

D E

(E) TRUSS The truss allows for the spanning of two units without the need for a standard in between. A standard may be added on top of the middle section of the truss.

(I) PLYWOOD WALL Plywood walls are attached to the ledgers with clamps to provide non-translucent sides to the structures.

18

I


FT 0

1

(B) SLACK OVERHEAD FABRIC Slack overhead fabric attached to two ledgers to provide light diffusement.

B (C) TAUT OVERHEAD FABRIC Taut overhead fabric attached to two ledgers to provide shelter from rain and shine.

C

F G (F) WIRE MESH CEILING The wire mesh ceiling is housed in a steel frame and provides a platform for electrical wiring as well as support to hook lighting.

(G) HANGING WHITE FABRIC Exactly as the name implies. This component adds a visual language to the South facing facade while providing shade and partitioning.

H

(H) BRACKET The bracket allows the structure to cantilever beyond the standard. Additional ledgers or other components can be added.

2


( J) STANDARD The standard is a main component of scaffolding. It acts as columns upon which other components can be attached and comes in varying lengths.

J

L

(L) STAIRS Stairs.

N

(N) PARALLEL LEDGER JOINT Parallel ledger joints allow for the attachment of an extra ledger. These ledgers are usually used to attach additional non-structural sub-components.

O

(O) BRACE Diagonal bracing is fitted onto standards for structures higher than one level for lateral stability.

Q

T

SCAFFOLDING DIAGRAM 2of2

20

(T) RAMP TRUSS The ramp truss system provides framework for plywood ramps that hook onto multiple ledgers. Two ramp trusses are required.


K

(K) PLYWOOD PANEL The panel is composed of a steel frame that hooks onto the adjacent structure. It holds a plywood panel in the frame that acts as a floor.

(M) DIAGONAL RAILING Diagonal railing can be fitted onto the standards to provide safety to the stairs.

M (P) LEDGER The ledger is a main component of scaffolding. It spans horizontally between standards and comes in varying lengths.

P

(Q) LAMP This is a lamp for lighting.

R (R) BASE PLATE & JACK BASE The base plate is a footing that attaches to the bottom of the jack base. The jack base is adjustable depending on minor terrain changes.

S (S) HORIZONTAL RAILING Horizontal railing can be fitted onto the standards to provide safety to the walkways.

FT 0

1

2


FT 0

5

10

20

50

(A) Entry E/V & Egress (B) Gallery 11 (C) Gallery 9 (D) Observation Tower (E) Water Tower (F) Restrooms (G) Visitor Lounge (H) Conference Room (I) Central Hearth ( J) Kitchenette & Staff Lounge (K) Office & Management (L) Media Room

K J L

I

H D C E G B

F

22


COMPLEX COMPONENTS ISO 780

The complex is designed as an experience through a sequence of layers. As if travelling through the multiple sedimentary layers of earth, the complex takes the visitor through combinations of screens, elevations, and penetrating views. Rather than occupy a space, visitors are expected to pass through them. In both material-use and experience, the Trammel Fossil Park complex is meant to be permeable.

770

N

760

750

740

730

720

710

A

23


24



26



28


PRICE HILL RENOVATION cincinnati, ohio 943 Rosemont Avenue is a single-family detached residence with a backyard. It is located in a suburb to the west of downtown Cincinnati, Ohio. The house has 3 bedrooms, 2 bathrooms, and an attic. The market value at the time of the project was valued at $65,000. The house is truly unremarkable in every sense of the word. Multiple renovations have been made over the years, however, it is clear that they have not been successful in raising the property value. The sequence of spaces is awkward. The size and placement of the bedrooms are inadequate and ambiguous. Despite the many south facing windows, the interior manages to be feel dingy and claustrophobic. The project intent is to ‘flip’ the house in a way that would hopefully turn a profit. Major changes in massing and style were avoided in order to maintain the original integrity of the house. Instead, focus was diverted to fleshing out materials, spatial sequences, and accurate construction methods. Although not required, the house was modelled in its entirety. This included the foundation, wood framing, ductwork, sheathing, and wall finishes among many other things. I believe this has provided me with a better understanding of construction and aided in the design process.

Spring 2020 / University of Cincinnati / ARCH 4002

29


30

1

2

3

4

5

5


SPECULATED ORIGINAL FLOORPLANS

BATH KIT 2 3

LIVING

DINING

UP 1

LEVEL 1 ENTRY

W/D

BATH

5 BED 1 DOWN

UP BED 2

BED 3

4

LEVEL 2

STRG

6 DOWN

ATTIC

ATTIC

FT 0 1 2

5

10

31


MASSING CHANGES

G

TIN

S EXI

ION

IT DD

A

32


33


RENOVATED FLOORPLANS

LAUNDRY

KITCHEN RR

MULTI DINING

DOWN

STRG

UTILITIES

UP

UP

LIVING

VEST.

BASEMENT

LEVEL 1

BATH

BATH

BED 1 DOWN

CLOSET

CLOSET

VEST.

CLOSET

DOWN

UP

BED 2

MASTER BEDROOM

LEVEL 2

ATTIC

FT 0 1 2

34

5

10


35


INTERIOR DETAILING After creating the structure and bare bones of the project, attention was made to the interior. The strategic revealing or hiding of the structure was a major driver of design decisions. The spatial experience of transitioning between rooms or moving down a corridor is an essential part of any interior design. Here, the ‘doorways’ were trimmed with hard wood framing to mark the threshold of a transition. The floor structure was completely redesigned to allow for exposed joist ceilings in the corridors, bringing a sense of rhythm to the circulation. The HVAC ductwork system was placed specifically to avoid jarring protrusions from the ceilings. They snake under and above the floor systems and are hidden from view with built in furniture. All in all, I selected my materials carefully, not only emphasizing wood but also using different kinds of wood in different orientations to achieve the desired effect. The result I hoped to create was a home that felt contemporary yet rustic; open yet personal, brightly-lit, and warm.

36


37


38



40



42



44


SKETCHES

45


46


IVIRON MONASTERY / GREEC E

47


48


CATHÉDRALE NOTRE-DAME / F RANC E

49


50


PALMYRA / SYRIA

51


YUHYUN_OH PORTFOLIO

uhyuno@outlook.com +1 513 307 0808 issuu.com/uhyuno

52


END

53


54


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.