Usage of renewable sources of energy for district heating system in the village of Nemila
Main goals of the Project:
To improve the living conditions and environment in the municipality Nemila using renewable sources of energy for central heating. Project duration: 2011 – 2013 Total budget: 64 mil CZK (= 2.4 mio EUR) Czech Development Agency contribution: 42 mil. CZK (= 1.55 mil EUR)
Dipl.-Ing. Jaroslav Hubacek,MBA
THE TECHNICAL PARAMETERS OF THE PROJECT 1. Phase (year 05/2012 to 12/2012) 1.1 Construction of hot water piping main backbone ( approx. 7 km) 1.2 Construction of a boiler house on biomass (capacity 3MW) 1.3 Construction of the main biomass storage 2. Phase (year 02/2013 – 10/2013) 2.1 Instalation of the boiler house biomass technology 2.2 Extension of the project „North Part“ (approved by the CDA 1Q/2013)
Dipl.-Ing. Jaroslav Hubacek,MBA
1.1 Construction of hot water piping main backbone - DN 200,100 - Pre – Insulated pipes meets the requirements of the European standards (inclusive of the German Association AGFW / FW401 or EUROHEAT & POWER): EN 253, EN 448, EN 488 and EN 489.
Dipl.-Ing. Jaroslav Hubacek,MBA
Dipl.-Ing. Jaroslav Hubacek,MBA
1.2 Construction of a boiler house on biomass –instalation of technology
Dipl.-Ing. Jaroslav Hubacek,MBA
Dipl.-Ing. Jaroslav Hubacek,MBA
Dipl.-Ing. Jaroslav Hubacek,MBA
1.3 Constructionof the main biomass storage
Dipl.-Ing. Jaroslav Hubacek,MBA
Dipl.-Ing. Jaroslav Hubacek,MBA
2.1 Instalation of the boiler house biomass technology
Dipl.-Ing. Jaroslav Hubacek,MBA
Dipl.-Ing. Jaroslav Hubacek,MBA
Special THANKS to:
U N D P Sarajevo and THE CZECH EMBASSY IN SARAJEVO
Dip.-Ing. Jaroslav Hubacek, MBA