North Florida Athletics Facilities Vision

Page 1

ATHLETICS OVERVIEW


UNIVERSITY OF NORTH FLORIDA 100,000+ alumni

70,000

50%

Est. employees in the Jacksonville area

Alumni live in Jacksonville Area post-graduation

#1 FLORIDA PUBLIC UNIVERSITY

% of graduates employed in Fla.

1,800+

University Employees

17,000 TOTAL ENROLLMENT


ATHLETICS

ACADEMIC EXCELLENCE SINCE 2009-2010

330 STUDENT-ATHLETES

3.57 GPA

OVERALL DEPARMENT SPRING 2023 173 STUDENT-ATHLETES ON THE DEAN’S LIST 65 STUDENT-ATHLETES WITH A 4.0 GPA AND 245 OVER A 3.0 GPA 23 STRAIGHT SEMESTERS WITH A DEPARTMENT GPA OVER 3.0 32 ASUN SCHOLAR ATHLETES OF THE YEAR AWARDS


ATHLETICS

COMPETITIVE SUCCESS SINCE 2009-2010

19 DIVISION I PROGRAMS COMPETING IN THE ATLANTIC SUN CONFERENCE 55 CONFERENCE CHAMPIONSHIPS

90 NCAA CHAMPIONSHIP APPEARANCES

8-4-2 RECORD IN THE RIVER CITY RUMBLE vs JU 50 ASUN PLAYER OF THE YEAR AWARDS 37 ASUN COACH OF THE YEAR AWARDS


OUR REACH

241 EVENTS HOSTED IN 2022-23 18% ATTENDANCE INCREASE AT MEN’S BASKETBALL

58,000 Followers

2.28+ million

52% increase from 2021-2022

views on unfospreys.com

46,000

20,723

71,800

Hours watched

Unique viewers

28,577

48,198

Hours watched

Unique viewers

followers

14,600 PAGE LIKES


Athletics Financials SCHOLARSHIPS (FY22 Actuals)

BUDGET COMPARISON (FY22 Actuals per NCAA)

9% = Percentile rank amongst 12 current ASUN

161.20 = Total max scholarships for UNF sponsored

members (11th out of 12)

sports, per NCAA Rules

27% = Percentile rank amongst Division I Basketball-

109.34 = Total scholarships distributed in 2021-22

only schools

14 out of 19 = Number of UNF teams in bottom half

of budgets in the ASUN Conference

4% = Athletics as a % of Institutional Expenditures

(lowest % in the ASUN Conference)

64.6% = University allocated revenue as a % of Total

Revenues (2nd lowest % in the ASUN Conference)

$2,804,647 = Total scholarship funds distributed in 2021-22

230 = Total students receiving athletic aid in 2021-22 Current scholarship funding sources: Auxiliary Budget, Tuition Waivers, Foundation Scholarship Funds, Endowed and Named Scholarships


Athletics Financials FY22 Revenue Breakdown Total Revenue (per NCAA report) = $14,783,497

FY22 Expenses Breakdown Total Expenses (per NCAA report) = $14,456,960

Student Fees = $8,166,493 (55.2%) Contributions = $1,414,779 (9.6%) Other Institutional Support = $1,386,982 (9.4%) Sponsorships = $1,132,988 (7.7%) Other Operating Revenue = $686,825 (4.6%) NCAA Distributions = $672,185 (4.5%) Game Guarantees = $669,422 (4.5%) Conference Distributions = $246,900 (1.7%) Ticket Sales = $235,804 (1.6%) In-Kind = $216,500 (1.5%) Royalties/Licensing = $93,099 (0.6%) Concessions Sales = $38,621 (0.3%) Endowment/Investments Income = -$177,101 (-1.2%)

Coaches’ Salaries = $3,292,405 (22.8%) Student Aid = $2,804,646 (19.4%) Administrative Salaries = $2,471,282 (17.1%) Administrative Expenses = $1,679,288 (11.6%) Team Travel = $1,127,679 (7.8%) Overhead = $571,219 (4%) Uniforms/Equipment = $501,378 (3.5%) Game Expenses = $451,986 (3.1%) Marketing/Fundraising = $394,501 (2.7%) Indirect Institutional Support = $380,092 (2.6%) Other Operating Expenses = $317,391 (2.2%) Recruiting = $168,870 (1.2%) Student-Athlete Meals = $96,533 (0.7%) Medical Expenses = $93,490 (0.6%) Spirit Groups = $49,972 (0.3%) Game Guarantees = $34,581 (0.2%) Rental Fees = $12,850 (0.1%) Memberships/Dues = $8,797 (0.1%)

UNF Athletics Fundraising Reportable Revenue & Donor Count FY23 = $2,672,841 & 2,849 Donors FY22 = $4,251,848 & 1,890 Donors FY21 = $3,050,572 & 1,441 Donors FY20 = $726,815 & 927 Donors FY19 = $437,064 & 652 Donors


Vision for UNF Athletics Facilities


Arena Locker Room Renovations Floor Plan

The Arena Locker Room Project would include the renovation and expansion of key team areas for Volleyball, Women’s Basketball, and Men’s Basketball.


Arena Locker Room Renovations Project

Provide a visually appealing hallway leading to the team locker rooms while also honoring past team and individual honors.


Arena Locker Room Renovations Project Create a players lounge in each locker room that provides a comfortable space for student-athletes to relax and promotes team bonding.


Arena Locker Room Renovations Project Men’s & Women’s Basketball locker rooms would increase by nearly 600 square feet while Volleyball would increase by 400 square feet. Each locker room would include custom wood lockers for each student-athlete.

Each locker room would include a fueling station with nutritious snacks and beverages.


Arena Locker Room Renovations Project The Athletic Training room would be renovated and expanded to include new finishes as well as the addition of hot and cold tubs.

A new video room would be created that could comfortably seat the entire team while reviewing game film using the latest technology.


Soccer Complex Site Plan The Soccer Complex project would include a fully lit competition field and practice field along with seating for 2,000 and a videoboard.


Soccer Field House Floor Plan


Soccer Complex

The new construction facility would house soccer team operations with a clubhouse that contains locker rooms, coaches offices, and meeting rooms.


Soccer Complex

A soccer-specific facility would open up Hodges Stadium to additional external events such as high school football, lacrosse, battle of the bands, and other events which would drive additional economic impact for the City of Jacksonville and additional exposure for the University of North Florida.


Soccer Complex The lounge would include a fueling station and would promote team bonding.

Each locker room would include a players lounge where student-athletes can relax between class and practice.


Soccer Complex Each locker room would be able to accommodate 35 custom wood lockers.


Soccer Complex The facility would house all team operations for the two soccer programs, including a video room large enough to accommodate the entire team, a conference room, and coaches offices.


Tennis Clubhouse Site Plan The Tennis Clubhouse would fit perfectly into the existing Tennis Complex site and the project would tie together the ten existing courts and common area creating one of the best collegiate tennis facility layouts in the country.


Tennis Clubhouse Floor Plan The project includes the renovation of the existing 3,500 SF to accommodate the coach staff and team operations while removing the existing main tennis court and replacing it with a 6,500 SF facility for the student-athletes.


Tennis Clubhouse The Tennis Clubhouse project would provide well-designed outdoor spaces that would enhance the game day experience.

The project would promote further engagement with the campus and Jacksonville community.


Tennis Clubhouse The new building would include team locker rooms, player lounges, and essential functions for a nationally ranked program.

The hallway of the team area will be used to honor the history and success of the UNF Tennis teams and studentathletes.


High Performance Center Site Plan The Sports Performance Center would be a gateway building to the north side of campus.


High Performance Center Floor Plan The new weight room would be twice as big as the current weight room in Hodges Stadium and would open up to the exterior of the building to provide versatility for strength & conditioning sessions. The athletic training room would be double the current square footage in Hodges Stadium and would include hot and cold tubs as well as all the state-of-the-art rehabilitation equipment.


High Performance Center

The back side of the facility would include a gathering deck that would provide a great viewing area of the Cooper Beach Volleyball Complex as well as an event space.


High Performance Center Beach Volleyball would have their own team operations center in the southeast corner of the facility that would include a locker room, team room, and coaches offices. A fueling station would be centrally located between the Athletic Training Room and Weight Room and would offer nutritious food for the studentathletes.


High Performance Center Part of the Sports Performance Center design is a Heat Lab that provides comprehensive environmental physiology and exercise testing.

The lab would be a replica of the MISSION Heat Lab at UConn’s Korey Stringer Institute and would serve collegiate and professional athletes.


High Performance Center

The northeast corner of the Sports Performance Center would be dedicated to the academic development of the 300 UNF student-athletes and would provide multiple study rooms, conference/tutoring room, and staff offices.


High Performance Center


Baseball Field

Phase 1 of the Baseball Stadium projects would include the replacement of the existing field, the replacement of the outfield wall, and the creation of a fanfriendly viewing area down the left field line.


Baseball Stadium Floor Plan

Phase 2 of the Baseball Stadium Projects is the complete demolition of the existing stadium and the construction of a new stadium designed to support the team operations of a Division I baseball program.


Baseball Stadium The new Baseball Stadium would have seating for over 1,000 with better viewing angles.

The stadium would also include premium seating options.


Baseball Stadium

The new stadium would include an expanded press box to better serve game day and broadcast operations while also providing better amenities for the fans.


SWOOP!


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.