floor span
0.5000
100mm stub stack
floor span
1.7009
A 1.0000
100mm s.v.p.
1.0000
1.000
0.4000
0.930
Utility
gas fired balanced flue condensing boiler
external ground box for gas meter
Osma manhole
block walls min: 7kgm2 taken to foundation
Study
up
0.4000
Vertical Steel Colomn to support Steel UB in roof
1.0000
Hall
0.4000
2.450
5.1811
Osma manhole
En-suite shower
1.0000
1.975 walk in
2.000
0.4000
450x450x100w x 150deep insitu mass concrete padstone
19.560
heat detector
steel UB
floor span
B
Slate wall covering feature. (Double Height)
steel UB
1.8000
Dining
100mm s.v.p.
floor span
dwalf wall under to carry floor beams
steel UB 7.870
Living
100mm stub stack r.w.p
steel UB
water main entry
Kitchen block walls min: 7kgm2 taken to foundation
electric meter box
2.8106
steel UB
B Client
1.8000
1
2
3
1. This drawing must not be scaled, work to figured dimensions only 2. Dimensions must be verified on site before work is put in hand. 3. All building works to comply with current Building Regulations and British Standards. 4. Any discrepancies must be notified immediately.
0
steel UB
steel UB
dotted line indicates trench fill concrete foundation, depth to suit Building Control Officer
All ground floor doors are 840mm wide
r.w.p
Scale 1:50
Date
August 2008
Drawing Number
NA06-08
e-mail tony.walton4@ntlworld.com
The Old Warehouse, Waterside, Ely, Cambridgeshire. CB7 4AZ. tel 01353 616426
Proposed Ground Floor Plan PLOT 2
Drawing Title
Development at 10 Upherds Lane, Ely.
Project
Mr N. Naggarwal
0.3000
TONY WALTON DESIGN
5.600
0.5186 1.5000
r.w.pipe connect to 100mm drain point and run to soakaway min: 5m from building
100mm s.v.p.
1.0000
9.160
1.2500
0.3000
3.725
r.w.p 0.6558 0.4000
1.220
1.1381 1.5000 1.1381
0.3000
1.8000
0.450
1.8000
1.250
Bedroom
2.5322
2.530
A
0.9500 0.3988
0.3745 0.430 0.5000 1.0000 0.400
new 100mm foul water connection to sewer & neighbouring new dwelling fall max: 1:70
6.4761
glass juliet balconys balcony guard 1100mm high
Bedroom
7.4320
A
100mm s.v.p.
S.A
En-suite
void
5.6106
down
Bedroom
6.5931 Vertical Steel Colomn to support Steel UB in roof
Hall 1.8025
B
3.2765
void
0.5186
4.5831
2.5688
Bedroom
glass juliet balconys balcony guard 1100mm high
1.7143
En-suite
walk in shower
50x220mm floor joists at 400mm c/c
1.5000
1.0000
2.0512 1.2125
all internal partitions to be timber studs with 12.5mm plasterboarded, min: density 10kgm2 with skim finish, insulated with mineral wool min: density 10kgm3
1.9000
Dressing
50x220mm floor joists at 400mm c/c 6.8890
2.2933
walk in shower
0.4000
100mm s.v.p.
Client
1
2
3
1. This drawing must not be scaled, work to figured dimensions only 2. Dimensions must be verified on site before work is put in hand. 3. All building works to comply with current Building Regulations and British Standards. 4. Any discrepancies must be notified immediately.
0
All ground floor doors are 840mm wide
glass juliet balconys balcony guard 1100mm high
Date
Scale 1:50
August 2008
Drawing Number
Project
Drawing Title
e-mail tony.walton4@ntlworld.com
The Old Warehouse, Waterside, Ely, Cambridgeshire. CB7 4AZ. tel 01353 616426
NA07-08
TONY WALTON DESIGN
Proposed First Floor Plan PLOT 2
Development at 10 Upherds Lane, Ely.
Mr N. Naggarwal
2.8210
1.8000
0.4012
1.8000
1.3205
3.6972 1.2000 Slate wall covering feature. (Double Height)
B
2.0757
3.1762 100mm s.v.p.
En-suite
3.4558
2.3354
A
1.3488
0.5000 1.8254
roof tile on 25x50mm trated timber battens on breathable membrane on 50x200 rafters fixed to U.B ridge, at max: 600mm c/c
150mm Celotex in rafter slope, min: 25mm air gap over, with a 500 gauge vapour barrier under rafters 12.5mm plasterboarded ceiling with skim finish
metal gutters, fascias and soffits
22mm floor grade chipboard flooring on 50x220mm fllor joists at 400mm c/c with 100mm mineral wool in floor void min: density 10kgm3
Study
Bedroom
2 0°
65mm reinforced floor screed on 120mm Celotex floor insulation on 1200 gauge dpm on concrete suspended beam and block floor, min: 250mm void below ventilated as manufacturers requirements, conditional approval required.
trench fill concrete foundation
0.6000
2.100
0.6000
2.4000
Dressing
Hall
2.675 0.6000
First Floor exterior to be clad in timber on 25x50 treated timber battens on breathable membrane
Client
1
2
3
1. This drawing must not be scaled, work to figured dimensions only 2. Dimensions must be verified on site before work is put in hand. 3. All building works to comply with current Building Regulations and British Standards. 4. Any discrepancies must be notified immediately.
0
Standard Notes All groundConstruction floor doors are 840mm wide Cavity wall construction:- 100mm facing brick,95mm cavity with full fill dritherm insulation, 100mm inner block, plaster and skim finish
Catnic CN7 steel lintels or similar are required over all openings in external wall, min: 150mm bearing each side, plaster inner face.
Gangnail roof trusses to have 100mmx 19mm timber bracing from eaves to apex, double nailed at each truss all to B.S 5268
Triple floor joists are required under all first floor timber partitions Double floor joists under baths
Timber struting is required where floor joist span exceeds 2.5m
Lateral restraint straps 30x 5x900mm long galvanised m.s are required at rafter and ceiling tie level and to floor joists parallel to walls, all spaced at 2m centres with solid timber noggins at strap position
Wall ties to B.S1243 spaced 900mm horizontially and 450mm vertically and 300mm at unbonded jambs to be 225mm stainless steel
Vertical damp proof courses are required adjacent to all openings in external wall,where cavity is closed
Cavity closings to have Dampcor insulated D.P.M inserted between brick and blockwork
Max: of 100mm between balusters, handrails min:900mm high and guarding to landings designed to resist horizontial force of 0.36Knm All as Approved Doc K
Staircases:- min going 240mm max rise 210mm max pitch 42o, min: width 850mm
Mains operated self contained smoke alarms to B.S5446 are required on each floor interconected to operate each unit on detection,battery backup required. alarms should be wired to a separate fused circuit, all as I.E.E regulations Above ground drainage to B.S 5572 and B.S 8000 with wastes in the following sizes:- basin 32mm, bath, shower and sink 40mm all with 75mm deep seal traps, shower traps to be accessable Below ground drainage to B.S 8301 and B.S 8000 as Osmadrain or similar bedded and surrounded in pea gravel, where drains pass thro walls concrete lintels are required to carry brickwork over
All windows to have sealed unit double glazing and in critical locations to comply with Approved Document Part N with laminated or toughened glass to B.S 6262
All glazing to doors and side lights within 1500mm of floor level and windows within 800mm of floor level to be safety glass as B.S 6206
Dwelling to be provided with a total 'equivalent ventilator area' of 70,000mm2
Ventilation kitchens at 60lts/sec bathrooms, utility rooms at 30lts/sec shall be mechanically ventilated.
Soakaways sited min: 5m from building
Insuation for hot water services as B.S 1566 and 5422, space heating to B.S 5449 All parts of construction to conform to Part M 2004, ramped access, doors, light switches etc, access for disable
Electrical switches etc to be positioned between 450-1200mm from floor level
The following elemental U-values to be achieved Roof 0.16 w/m2k Walls 0.30 w/m2k Floors 0.22 w/m2k Windows and rooflights 1.8 w/m2k
At least 6 new light fittings must be of a type only capable of receiving high efficacy lamps such as fluorescent tubes
SEDBUK efficiencies and commissioning certificates required before completion
Floor joists supported on metal joist hangers require lateral restraint straps at max: 2m centres
Space heating controls and HWS, Commissioning of heating and HWS systems, Operating and Maintenance instructions for heating and hot water systems all in accordance with Approved Document Part L
Electrical:- to conform to Part P installed by registered contractor, commissioning certificates required on completion
Any external lighting shall comply to requirements of Part L, automatically extinguishing when enough daylight, and only be used with lamps an efficacy greater than 40 lumens per circuit watt
TER (target emission rate) and initial proposed DER (dwelling emission rate) demonstrating the design air permeability as specified in Approved Document L1A section1. Provide the final calculation of the DER to reflect any changes in performance between design and construction and to demonstrate that the building as constructed meets the TER. Copies of results of the air permeability tests of dwelling required.
August 2008
Date
Scale 1:50
Project
Drawing Number
Mr N. Naggarwal Drawing Title
Development at 10 Upherds Lane, Ely.
NA08-01
e-mail tony.walton4@ntlworld.com
The Old Warehouse, Waterside, Ely, Cambridgeshire. CB7 4AZ. tel 01353 616426
Cross Section A - A
TONY WALTON DESIGN
South
North
glass juliet balconys
West
East
Rev A 27.06.08 Various revisions Client
1
2
3
4
5
6
SCALE
Notes 1. This drawing must not be scaled, worktofigureddimensionsonly 2. Dimensions must be verified on site beforeworkisput inhand. 3. All building works to comply with current BuildingRegulationsandBritishStandards. 4. Any discrepancies must be notifiedimmediately.
0
natural slate roof
Scale 1:100
June 2008
Date
Mr N.Aggarwal Project
The Old Warehouse, Waterside, Ely, Cambridgeshire. CB74AZ. tel 01353616426 e-mail tony.walton4@ntlworld.com
NA09-08A
Drawing Number
Development at 10 Upherds Lane, Ely.
Drawing Title
Proposed Elevations Plot 2
TONY WALTON DESIGN