Smatrix pulse base and fluvia15

Page 1

Š

Copyright Uponor Limited

Copyright in this drawing belongs to Uponor Limited. This drawing may not be used, sold, licensed, transferred, copied or reproduced in whole or in part or in any manner or form other than with the prior written consent of Uponor Limited.

Thermostat wiring options Individually connected

Daisy chain connected. T145

T146 / T148

DRAIN

A B

optional controller link for more than one controller

Electrical Schematic

T143 A B-

+ -

Smatrix Pulse Base with FLUVIA 15 (Wired) Ref: SPB-1.0A

OR A B+ -

A B+ -

Uponor reserve the right to alter specifications and operating parameters for all their systems at any time as part of their policy of continuous product development.

A B+ -

connection to controller (indiviual)

Connections to the controller can be made in any combination of daisy chain or individually. But you must connect:-

to to to to

A B+ -

A B + -

N

A B + -

connection to controller (Daisy Chain)

The bare drain wire must be earthed at one end only. N

L N E 230V Supply From 3 Amp Fused Spur

Connect to boiler demand. (refer to boiler manufacturer for details). OR OPTION: If using multiple boxes use boiler relay on master controller.

RJ-45 supplied cable

A B+ -

A B-

A B + - Upto 6 additional

zones

RELAY 1 (PUMP)

RELAY 2 (Boiler)

OK

a 1 b

Transformer

a 2 b

3

4

5

7

6

Base Controller (X-245) Upto 8 x 24V Uponor actuators (only one actuator per terminal).

Slave Module Unit (M-242) Plugs into the end of the base module .

8

9

10

11 12

Upto 6 additional 24V Uponor actuators (only one actuator per terminal).


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.