Architecture Portfolio
Urmi Gohel Selected works 2014-2019
1
2
Curriculum Vitae
A graduate from Academy of architecture and an enthusiast in life, architecture has given me a suitable platform to channelize my energy and thoughts. Just like a story or poem, every space has a tale to narrate. Thus, attempting to balance emotions, senses and functionality forms the crux of my design process. Believing that hard work always pays off, I strive to push myself the extra edge to focus better and create a deeper understanding of things that can help me progress.
Education 2012 SSC Carmelite Convent English High School, Vasai 2014 HSC Vartak college of science, Vasai 2018 B.arch Academy of Architecture, Prabhadevi
Skills Vectorworks Sketchup Auto cad In design Photoshop V ray
Work experience
Revit
November 2017 - April 2018 I M Kadri Architects, Worli
Microsoft office suite
Urmi Gohel
Competitions
Extra curriculars Design Architecture Committee ( DAC) Committee head
Contact information
2014 2015 2016
Vasai, Maharashtra 5th September, 1996
urmig96@gmail.com 9503283140
School design Site visitor’s center IGBC
Comitted in achieving the set goals Eager to learn new things Confident and articulate in public speaking Reliable and productive in team work Ability to manage diverse groups of people
Niche - College magazine Feature writer and editor NASA culturals trophy (dance) Runner up Dance club Committee head Public relations Committee Member of the heading team Class representative Final year, second year Joint team foundation Feature writer
3
4
Contents
Academic 01
Performing arts institute
11
Symbiosis, Pune
02
Logistics hub
12
JSW primary school, Bangalore
Specialized in multiple dance forms Thesis project Warehouse - Training center Architecture design
03
Senior citizen housing
04
Studio + Residence
05
Art and craft center
06
Interior design
07
Working drawing
08
School design
Housing plaza with amenities Architecture design
Site visitor center
09
Competition 2015
and economic purposes. Many individuals and communities often tend to lose their homelands because of this fictitious redeveloping of the village.
V I E W
A similar case has been observed in where
IGBC Competition
10
rehabilitation of the inhabitants has taken place, having them shifted to the outskirts of the national park.
Competition 2017
Thus paying attention on their sympathetic condition, we have chosen this village as it collaborates with the criteria of the brief. Thus freeing
of economy starting back again was the
ANN
UAL
GFC drawings for landscape
Once set in the heart of the National park, Chandoli has now been shifted to a new un welcoming home on the outskirts. Without enough sugarcane farms or the means to get an efficient job ,the villagers have sought to labour jobs and have been living a degraded life.
dams,Creating national parks for commercial
and getting the chain
Doctor’s housing complex
Competition 2014
migration.It has been largely
concrete world provided
13
Book cafe along with a cafeteria
associated with the construction of
the villagers from the
Design and detail drawings for tender submission.
Gallery and working space for the embroidey workers of Jaisalmer Architecture design
Displacement due to development induction is a
Chandoli, Maharashtra
Interior design - concept stage
Designed for a yoga expert Architecture design
Introduction subset of forced
Professional
RAIN
FALL
GRA
PH
SUN PATH AND WIND DIRECTION
VENTILATION DIAGRAM
O F O R I G I N A L S I T E
main aim.
5
6
Academic
7
01 PERFORMING ARTS INSTITUTE (DANCE) 1. Today, dance has become a form of commercial bollywood business instead of a form of art. Higher education gives a perfect opportunity to an interested individual to explore this as a form of art and expand their horizon. 2.Being Trained in a degree, prepares the individual in all aspects of the dance from ranging from practical to theory and also helps the performer to take it to an international level and represent the country on a higher level. 3. Almost none of the institutes in insia offer a platform that allows a practice of classical and western dance form togther under a single roof. For both these dance forms to floruish its important that they co-exist and amalgamate to create better content that can be showcased to the world.
8
CURRENT SCENARIO IN DANCE EDUCATION When asked for thoughts on education in dance and opportunity for dance as a career in a survey, following were the answers derived.
Basic infrastructure is not developed.
Performing arts can play an important role in an individual’s life and makes their personlaity verstatile. Requires more visibility and encouragement. Its growing but pace is slower. Parents should be supportive about this art. Encourage art just as we encourage engineering. Should be considered as a compulsory subject. Fees should be nominal
DESIGNED PROGRAM PRIVATE
PUBLIC
Based on the subjects required for dance to be learned professionally in a university, certain fucntions are essential to be incuded in the program. All of these functions contribute to the wholesome growth of the dancer and allows him/her to expand their knowledge through interaction, collaboration and theoretical knowledge. Since the institute accomodates various dance forms, for every dance form to flourish it is important that the studets thrive on its original culture as well as form a new culture that signifies the amalgamation of two different dance forms together. Individual dance studio for Dance each dance form.
More information should be provided to the common man
Fitness
Basic motivations and opportunities are required since school time.
Music
Music room Recording studio
Theory
Lecture rooms - Library - Computer room
There should be more performances done to art encourage the art.
Gymnasium - Yoga Mediation space
A dance institute thrives not only only the studio spaces but also on what amount public interaction dose it offer. For the dancers to flourish in their careers, a showcase of their talent is extremely important. Thus, the different auditoriums become a vital part of the institute that help the students in expanding their horizon. Along with this, the auditoriums play a role in helping the institute to sustain and manage their finances by being let out for different events and organizations.
DANCE FORMS Different types of theaters. Black box theater Thrust stage auditorium Proscenium theater
The institute accomodates dance forms that ar classical as well as western. All of these dance forms have a good potential to mingle and share a cultural background. This can help the students in learning a new art and developing their skills better all around. Odissi
Bharat natyam
Kathak
Contemporary
Kathakali
Hip hop
Ballet
Mohini yattam
Interactions Varying performance spaces.
Jazz
SITE Kalina university, Santacruz PLOT AREA 36,200 sq.m - 8 acres
AERIAL VIEW OF THE INSTITUTE
Kuchipudi
9
DESIGN PROCESS
The site has two main entries1. Hans- Burg marg
CANOPY SHADED OVER AN OPEN PRACTICE COURTYARD FOR STUDENTS
2. The internal road from kalina university.
Scooping out courtyards
OPEN COURTYARD
CANOPY OVER THE CANTEEN
As per the requiremnt of the functions, the program has been bifracated into two sections. 1. Public services Allowing cross ventilation throughout
2. Private institue affliated with Mumbai university.
Understanding the wind flow
Building an entrance
PERFORMING ARTS INSTITUTE DANCE STUDIOS
Built form Circulation Softscape around the studios
10
Common rooms Locker rooms
Kathakali studio Elongated due to the practice with costumes and the space it occupies.
Hip hop - contemporary Increased height for better effect and flexibility of the body movements.
Bharat natyam - Odissi Kuchipudi - Jazz Stepping down to a more concentrated space.
Kathak - Ballet Linear due to the movements of the dance form.
Mohini yattam studio The porous faacde allows the dancer to view 360 degree of the studio
GROUND FLOOR PLAN The institute serves two purposes of performance areas that can be let out as well as dance studios for students to practice.
11
DESIGN FEATURES
Varying heights making every space a different experience throughout the institute.
The shadow play of the jalis also intitate various moods in the entire institute .
The waffle slab canopy contributes hugely to the space making it feel more lively and interesting.
The central open courtyard acts a space where people coming from outside as well as the students to mingle and interact with each other. It also forms a good transparency for the people visiting the institute to see how it functiond and form an experience of the space that can be flourished further,
CENTRAL COURTYRAD VIEW
The entrance of the institute itself has a doube height that creates the massive grandeur required. Along with this, the play of light and shadow due to the jali adds to the beauty of the space.
DANCE INSTITUTE INTERIOR ENTRANCE 12
VIEW OF THE CENTRAL COURTYARD The central space can be used as an informal performing spacce as well as a space for dancers t practice their individual rotines.
13
VIEW OF THE CENTRAL COURTYARD The central space can be used as an informal performing spacce as well as a space for dancers t practice their individual rotines. 14
LIGHT - VENTILATION - SPACE ALLOCATION
Studio
ENTRANCE OF THE INSTITUTE
The south west winds are captured in each studio via the fenestrations and cross ventilation has been made possible by the use of jalis. This will ensure that the studio has ample amount of fresh air coming in at all times.
Common room
Locker room
In an institute with various cultures developing in every studio, interaction among the all dancers is a very important part. Along with the buffer spaces, the locker rooms and changing rooms of every two dance forms have been kept common, in order to intitate this interaction.
VIEW OF THE CENTRAL STAIRCASE
SECTION
15
02 LOGISTICS HUB WAREHOUSE AND TRAINING CENTER The selected plan is a part of the master plan designed by us in which we chose to detail out the highlighted portion. The program was designed in a way to make the make the entire process of porduction more customer friendly. It also aims towards being able to educate people in the required feid so they can work better. The design aims at creating a safer space in primary since such loactions can be intimidating. Thus, using containers as a facade even in the education space breaks the monotonous tone of a warehouse dominated site and makes it more lively. The program has been designed to function efficiently for user of any age and social class along with close proximity and being acessible.
16
WHAT IS A LOGISTICS HUB
Pedestrian Truck
A logistics Centre is the hub of specific area where all the activities related to transport, logistics and goods distribution - both for national and internatational transit are carried out on a commercial basis by various operators.
Car
Training program for executives in understanding dproduction and disribution of goods to make it more efficient for their facility.
Training center includes discussion rooms, auditorium, a canteen and restaurant.
An executive hotel for the guests to stay in.
SITE Raigad district, Maharashtra BUILT UP AREA 9,400 sq.m
WAREHOUSE
SITE SECTION 17
FIRST FLOOR PLAN OF THE TRAINING CENTER
GROUND FLOOR PLAN OF THE TRAINING 18 CENTER
SITE PLAN
The facade replicate the container yards and create a language similar to theproduction house and warehouse in the vicinity.
VIEW OF THE DISCUSSION ROOMS IN THE TRAINING CENTER
HOTEL The connecting bridge between the hotel and the training center
The entrance over looking the pond that opens up to the scenery in front.
Discussion rooms with a central courtyard
SECTION
19
VIEW OF THE WAREHOUSE AND THE ADMINISTRATION OFFICE
20
FIRST FLOOR PLAN
GROUND FLOOR PLAN
21
03 SENIOR HOUSING SOCIETY The given project has been developed for senior citizens that can stay in this residential park. Thus the program has been designed in a way that all the required amenities can be easily accessible and disable friendly. The design offers various landscape areas for the residents to relax and walk around. The hightlight of the design forms the clubhouse on the terrace that includes a gym, restaurant, swimming pool and other features.
VIEW OF THE INDIVIDUAL GARDENS ON THE GROUND FLOOR FOR EVERY HOUSE 22
SENIOR HOUSING SOCIETY The entire site is ocated on the edge of a highway in Panvel with it being heavily contoured.
Original site
PLAN AT 5.4M In order to make this a better place for senior citizens, all the fcailities like Hospital, bank, clubhouse, guest house, servants quarters have been incorporated in the society park itself. SITE Panvel, Maharashtra
Selected 10 acres
Elevated portion of the site podium
Built portion on site 23
1BHK
2BHK
STUDIO
RESIDENTIAL ELEVATION
TYPICAL FLOORPLATE
THE CLUBHOUSE CREATES A HUGE IMPACT ON THE DYNAMICS OF THE STRUCTURE MAKING IT MASSIVE AND NOTICEABLE FROM THE HIGHWAY END OF THE SITE 24
PLAN AT 8.6M The residential building dominates the entire podium with its scale and the protuding club house on the terrace.The Podium also allows the residents to walk around, sit and relax togther while enjoying the landscape around.
CLUBHOUSE PLAN GYM
ENTRY 1
POOL ENTRY 2
CAFETERIA
ENTRY 3
ENTRY 4 GAMES ARENA
25
CLUBHOUSE SECTION
VIEW OF THE RESIDENTIAL BUILDING 26
The podium also acts like a edge for the residents to relax and walk around
The podium provides parking for the residents below.
Hospital on the adge that can be used by visitors outside the society, also providing ambulance service to the senior citizen housing.
Bank in the buiding park.
The terrace of the building doubles up as a clubhouse accessible by ramps throughout. Gym, restaurant, swimming pool, viewing podium.
27
04 YOGA STUDIO + RESIDENCE Since the user is a well known yoga instructor, the design reflects an amalgamation of the outer surroundings with the ambience inside.The house revolves around the courtyard with major circulation happening through the courtyard to make it a more lively space. The above floors follow the same pattern with the accomodating rooms having a sea face view.A balance has been maintained in open and enclosed spaces to bring an extensive portion of nature in the interiors and create an enviornment suitable for rejuvanating yoga practices.
28
RESIDENCE + STUDIO
SITE Sea face, Worli
The house revives the frehsness that any resident would want to feel living adjacent to the sea, especially a yoga instructor.
PLOT AREA 5000 sq.m
THE HOUSE REVOLVES AROUND THE CENTRAL COURTYARD.
STUDIO WITH THE FACILITY OF AN OFFICE AND CHANGING ROOMS AS WELL AS A GARDEN TO OVER LOOK AT THE SEA.
GROUND FLOOR PLAN THE HOUSE ALSO OPENS UP FOR THE VIEW OF THE SEA AND ADORNES A BEAUTIFUL PITCHED ROOF THAT ELEVATES THE SPACE FURTHER. 29
The entrance of the house is designed to welcome people with the calming view of the lily pond and a partially open garden adjacent to it.The structure steps on the outside towards the sea with the gardens of every room enjoying the serenity of the sea parallel to it.
The cantilevered gardens of every room,also serving as weather protection for the room below.
The intersection between the studio and residence.With a huge window with obstruction to provide enough light as well as to mantain the privacy of the bunglow has been given in the studio.
30
The mezannine in the studio works as a isolated space for the users to practice and meditate in solace.The partial parapet wall works as an open garden for the users to enjoy the view of the sea. Also,the huge height with timber windows adds to the vastness of the space.
The pergola acting as a connection between both the functions.
AERIAL VIEW OF THE BUNGLOW
31
05 ART AND CRAFT CENTER The design was inspired by Gadisar lake itself ,which has beautifully incorporated steps as a medium to travel.Similarly here, effort has been made to make the staircase an exciting space by using it as a display gallery..Also,their work place has been designed to increase interaction with the tourists.The stepped profile going underground has been consciously designed to increase the floor plate and to acheive a cooler work enviornment.The overall facade uses jali work to ensure light coming in at all times and creating an interesting play of shadows to enhance the displayed work.
32
TRADITION AND SKILL Understanding the tradition and skills of Bhil tribes,to incorporate their culture in their work enviornment. The Bhil tribe pratices patchwork embroidery in small scale businesses to produce various types of cushions,beds,material etc. SITE Gadisar lake, Jaisalmer PLOT AREA 300 sq.m
Mud finish Brick
Timber
Timber Timber Mud finish
Mud finish Gravel stones Stone plinth
The circulation of the space forces the users to travel through the entire gallery and see the embroidery on display.
TOP VIEW OF THE GALLERY 33
06 BOOK STORE AND CAFE The idea was to create the old 90’s vintage experience for the readers with antique furniture and posters.The interior has been designed with brick cladding to give it an archaic finess.
34
35
07 WORKING DRAWING
36
• • •
•
•
• •
D3
W1
D3
37
E
D
50 MM DIA MILD STEEL PIPE HAND RAIL
• ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
• ALL THE WRITTEN DIMENSIONS ARE TO BE FOLLOWED AND NOT MEASURED TO SCALE.
FIRST FLOOR
230 MM THK INTERNAL MASONRY WALL 12 MM THK INTERNAL PLASTER
ELEV = + 7.1 M
FIRST FLOOR ELEV = + 6.9 M
5 MM THK MILD STEEL PLATE 16 MM DIA MILD STEEL PIPE
FIRST FLOOR ELEV = + 6.4 M
B39
B37
• PLINTH LEVEL IS + 0.45M.
ALL SHEAR WALLS ARE MADE UP OF R.C.C UNLESS MENTIONED.
5MM THICK MILD STEEL PLATE
RCC CHAJJA
• ALL THE DRAWINGS SHOULD BE VERIFIED BY THE SITE ENGINEER BEFORE COMMENCING THE WORK ON SITE. • GROUND LEVEL IS CONSIDERED AS 0.0M. ALL OTHER LEVELS ARE GIVEN CORRESPONDING TO THE GROUND LEVEL.
• THE STRUCTURE IS A COMPOSITE STRUCTURE WITH STEEL AND CONCRETE USED AS THE STRUCTURAL MATERIALS.
5 MM DIA SCREW
B35
• ANY DISCREPANCIES ENCOUNTERED DURING READING THEN DRAWING SHOULD BE BROUGHT TO THE NOTICE OF THE ARCHITECT BEFORE THE COMMENCEMENT OF THE WORK ON SITE.
ALL COLUMNS AND BEAMS ARE MADE UP OF RCC UNLESS OTHER. SCALE DRAWING WISE SPECIFIED.
20 MM DIA MILD STEEL PIPE
04 DETAIL OF HANDRAIL TO WALL 1 MM DIA SCREWS TO CONNECT SADDLE TO RAILING 5 MM THK STAINLESS STEEL SADDLE FOR RAILING ATTACHMENT
10MM THICK DOUBLE GLASS GLAZING
10 MM THK RAILING ATTACHMENT SCREWED TO BAULSTER CAP
FIRST FLOOR ELEV = + 3.4 M
RCC BEAM 230MM*600MM
B'39
5 MM THK STAINLESS STEEL BALUSTER CAP WITH THREADS
B'37
50 MM DIA STAINLESS STEEL PIPE BALUSTER
GROUND FLOOR
ELEV = + 2.5 M
230MM THK BRICK WALL
GROUND FLOOR ELEV = + 1.9 M
12MM THK CERAMIC TILE FINISH 25MM SCREEDING OVER RCC TREAD 150MM RCC SLAB
04 DETAIL OF HANDRAIL
MIDLANDING
50 MM DIA MILD STEEL PIPE HAND RAIL
RCC TREAD 300MM*1600MM
150MM THK RCC SLAB
3
12MMTHK CERAMIC TILE FINISH 25MM THK SCREEDING
ELEV = + 0.45 M
W
GROUND FLOOR
B
MIDLANDING 1700MM*1900MM
AT EVERY STEP
A4
07
C5
50 MM DIA MILD STEEL BALUSTRADE
RCC STUB COLUMN 300MM*300MM
5M
GROUND FLOOR
ELEV = + 0.00 M
1.
STAIRCASE PLAN 407 SCALE 1: 25 11
RCC TREAD WITH CERAMIC TILING 300MM*1600MM 230 MM THICK BRICK WALL
9
6
7
8
230MM*300MM
C10
2
3
21
20
12MM THK CERAMIC TILE FINISH
1
19
18
17
4
5 MM THK MILD STEEL BASE PLATE
RCC COLUMN
5
16
15
THREADING IN MILD STEEL BASE PLATE
10
12
14
13
C4
25 MM THK SETTING BED 150 MM THK RCC SLAB
50 MM DIA MILD STEEL BALUSTRADE
EXPANSION BOLT 07 A4
B'
04 DETAIL OF HANDRAIL
C9
PLAN 406 STAIRCASE SCALE 1: 25
38
STAIRCASE DETAILS
AT EVERY STEP
A-400 SERIES
WIDTH
TYPE
2100
1100
SINGLE SHUTTER
D3
2100
900
SINGLE SHUTTER
DESCRIPTION
SKETCH
25MM THICK TEAK WOOD DOUBLE PANELLED FLUSHED DOOR VENEER FINISH AND MELAMINE POLISH AND GLASS WINDOW
• ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED. • ALL THE WRITTEN DIMENSIONS ARE TO BE FOLLOWED AND NOT MEASURED TO SCALE.
• ANY DISCREPANCIES ENCOUNTERED DURING READING THEN DRAWING SHOULD BE BROUGHT TO THE NOTICE OF THE ARCHITECT BEFORE THE COMMENCEMENT OF THE WORK ON SITE.
25MM THICK TEAK WOOD DOUBLE PANELLED FLUSHED DOOR VENEER FINISH AND MELAMINE POLISH AND GLASS WINDOW
• ALL THE DRAWINGS SHOULD BE VERIFIED BY THE SITE ENGINEER BEFORE COMMENCING THE WORK ON SITE.
• GROUND LEVEL IS CONSIDERED AS 0.0M. ALL OTHER LEVELS ARE GIVEN CORRESPONDING TO THE GROUND LEVEL.
A4 0
C3
HEIGHT
D2
3
B
NAME
NAME
WIDTH
750
TYPE FIXED WINDOW
600
SKETCH
DESCRIPTION
• PLINTH LEVEL IS + 0.45M.
6MM THICK GLASS
• THE STRUCTURE IS A COMPOSITE STRUCTURE WITH STEEL AND CONCRETE USED AS THE STRUCTURAL MATERIALS.
ADJUSTABLE LOUVERS POLISH AND GLASS WINDOW
ALL SHEAR WALLS ARE MADE UP OF R.C.C UNLESS MENTIONED.
W
2
W2
HEIGHT
ALL COLUMNS AND BEAMS ARE MADE UP OF RCC UNLESS OTHER.
0 A4 D2
W
2
C
A4
04
A
2
SCALE DRAWING WISE SPECIFIED.
FIRST FLOOR
150 mm TOP SUNK 150 MM THICK RCC SLAB
B'31
P 3. OW 8 D * 2 ER .3
D2
RO O
M
400 MM DEEP BEAM
B'35
150 MM THICK INTERNAL WALL LOUVERED WINDOW
230 MM THICK BRICK WALL
200MM* 200MM CERAMIC DADO TILING
NAHANI TRAP
D3
C8
DETAIL B
HEALTH FAUCET
GLASS MIRROR , 900 MM*1050 MM LEGDE WALL, FOR FLUSHING TANK HOT AND COLD WATER MIXER
WALL MOUNTED,DUAL FLUSH WC TISSUE PAPER HOLDER 8 MM THICK INTERNAL PLASTER
150 MM THICK INTERNAL WALL
SELF RIMMING LAVATORY, 520MM*460MM UNDER JET BLACK GRANITE TOP COUNTER JET SPRAY WITH BIB COCK
A4
03
B'
ELEV = + 3.4 M
A'
02
A4
SELF RIMMING LAVATORY, WITH BIB COCK ON GRANITE TOP COUNTER BIG MIRROR , 900 MM*1050 MM
04
WALL MOUNTED,DUAL FLUSH WC 12MMTHICK,NONSKID FLOOR TILES KAJARIA TORONTO CREAMA
A4
C'
300*300 ,CERAMIC NON SKID FLOOR TILES
GROUND FLOOR
SINGLE PANELDOOR,800 MM WIDE
ELEV = + 0.45 M
150 mm TOP SUNK
25MM THICK SCREEDING 150 MM BRICK BAT COBA 150 MM THICK RCC SUNK SLAB 230MM RUBBLE SOLING
FLOOR PLAN 401 GROUND SCALE 1: 25
GROUND FLOOR
ELEV=+ 0.00 M
BACKFILLING
402 SECTION AA' SCALE 1: 25
150 mm TOP SUNK
150 MM THICK RCC SLAB
FIRST FLOOR ELEV = + 3.4 M
400 MM DEEP BEAM
FIRST FLOOR
150 mm TOP SUNK 150 MM THICK RCC SLAB
ELEV = + 3.4 M
400 MM DEEP BEAM
B'31
B'31
150 MM THICK INTERNAL WALL
B'35
150 MM THICK INTERNAL WALL
FIXED WINDOW 200MM* 200MM CERAMIC DADO TILING
HOT AND COLD WATER MIXER 25 MM THK JET BLACK GRANITE TOP SELF RIMMING LAVATORY, 520MM*460MM KADAPPA STONE CEMENT GROUT 100 MM THK CATEYE GRANITE FASCIA STOP COCK FOR SUPPLY
8MM INTERNAL PLASTER
DETAIL A
D2
STAINLESS STEEL BOTTLE CAP
HOT AND COLD WATER MIXER
12MMTHICK, NONSKID FLOOR TILES KAJARIA TORONTO CREAMA
JET SPRAY WITH BIB COCK TISSUE PAPER HOLDER WALL MOUNTED,DUAL FLUSH WC
25MM THICK SCREEDING 150 MM BRICK BAT COBA 150 MM THICK RCC SUNK SLAB 230MM RUBBLE SOLING
SELF RIMMING LAVATORY, 520MM*460MM UNDER JET BLACK GRANITE TOP COUNTER
12MMTHICK,NONSKID FLOOR TILES KAJARIA TORONTO CREAMA
12MMTHICK,NONSKID FLOOR TILES KAJARIA TORONTO CREAMA
GROUND FLOOR
150 mm TOP SUNK
ELEV = + 0.45 M
GROUND FLOOR ELEV=+ 0.00 M
BACKFILLING
25MM THICK SCREEDING 150 MM BRICK BAT COBA 150 MM THICK RCC SUNK SLAB
25MM THICK SCREEDING 150 MM BRICK BAT COBA GROUND FLOOR
150 mm TOP SUNK
ELEV = + 0.45 M
GROUND FLOOR
230MM RUBBLE SOLING BACKFILLING
404 SECTION CC' SCALE 1: 25
TOILET DETAILS
150 MM THICK RCC SUNK SLAB
ELEV=+ 0.00 M
A-400 SERIES
403 SECTION BB' SCALE 1: 25
405
DETAILSECTION OF WASH BASIN SCALE 1: 20
39
08 SCHOOL DESIGN First year - 2014 DESIGN IDEOLOGY 1.Though it is grond structure,the amphitheatre above can be used as a multipurpose space like assembly hall,discussion area,play area,outdoor classroom. 2.The kindergarten buildings are dome structures that give an informal look from the exterior with reading rooms on the upper floors. 3.There are slides and sitting areas on the steps to make the spaces more fun and intteractive.The sports complex has all the required facilities for the all round development of the students. 4.After entering the school only a vast amphitheatre is seen which hides the fact that it is school very efficiently. 5.The structure is designed in a radially outward manner similar to the roots of the tree,the center being the play area and the recreational spaces. 6.The amphitheatre creates a lively and energetic atmosphere for the childrenfor the children as it offers vast open spaces which can be used for various activities.
40
41
09 SITE VISITOR’S CENTER Seond year - 2016
42
43
10 IGBC COMPETITION Third year - 2017 Displacement due to develeopment induction is a subset of forced migration.It has been largely associated with the construction of dams,creating national parks for commercial and economic purposes.Many individuals and communities often tend to lose their homelands because of this ficituous redeveloping of the village. A similar case has been observed in Chandoli,Maharashtra where rehabilitation of the inhabitants has taken place, having them shifted to the outskirts of the national park.Thus paying attention on their sympathetis condition,we have chosen this village as itcollaborates with the criteria of the brief.Thus, freeing the villagers from the concrete world and getting their economic chain started back again was our main aim.
44
SITE Chandoli village, Maharashtra
45
46
47
48
Professional
49
11 SYMBIOSIS
50
Assigned to generate options for the reception area of suitable backdrops and mural options on the adjacent walls for the .
51
12 JSW SCHOOL
52
4
5
150
800
100
3
2
1
600
600
600 600
600 600 600
600 600
635
8400
600 600 600
600
4800
J2
DETAIL A SECTION
75 Balance
600
450
450
450
450
3000
4050
430
600
E
3000
DETAIL A PLAN
75 2850
75
75
160 90
90
430
C
600
600
3880
3000( J1,J3 )
FRP SCREEN DETAIL - 3
ELEVATION TYPE 1 OF DETAIL B
SCALE 1:100
ELEVATION OF J1,J2,J3,J4
ELEVATION TYPE 3 OF DETAIL B
SCALE 1:100
SCALE 1:50 3000( J1,J3 )
SCALE 1:100
600
750
200 325
200
2850
3600
4200
160
250 600
600
+0.00 GROUND LVL
75
A
B
RCC jali 600 x 600 x 75 mm
600
+0.6 PLINTH LVL
50
300 170 170
50
B
75
300 170
+4.2 FIRST FLOOR LVL
3000( J2)
3880 A
+0.00 GROUND LVL
Detail Detail B B Type 1Type 1
D
75 75 200 170 75
+0.6 PLINTH LVL
B Detail Detail B Type 2Type 2
RCC jali 600 x 600 x 75 mm
600
600
600
600
600
2400( J4 )
200mm thk brick wall
3000( J1,J2,J3 )
A
4500
FRP SCREEN DETAIL- 4
PLAN OF DETAIL B
SCALE 1:100
kadri consultants pvt. ltd.
and shall not be used for any purpose other than that for which it has been loaned.
12
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation. *Approvals of Finishing Items, etc should be taken before procurement of materials.
11
notes *Written dimensions shall be followed, do not scale the drawing. * For reference of finishing key refer Finishing schedule. Eg. A * Made up ground lvl assumed to be ±0.00m
* All dimensions are unfinished dimensions in mm,unless otherwise mentioned. * All levels are finished level,heights are from finished levels,unless otherwise mentioned.
10
9
8
PLAN OF J1,J2,J3,J4
SCALE 1:100
JSW REALTY & INFRASTRUCTURE PVT. LTD.
job title
6
5
4
Transmittal / Letter No. Date
'MAIN SCHOOL' at Vidyanagar
rev.
HST_T_MS_8.02
Architect
drawing status
kadri consultants pvt. ltd.
2
job no. 640
drg. no.
initial date
4a shivsagar estates, worli, mumbai- 400 018
3
TENDER
640 / KC /
scale: as per design
Toilet and Staircase jali details
drawn by cad file no. Urmi .G.
7
Print For
O
A content
name of client
O
O
SCALE 1:50 north
name of consultants
revisions
This "drawing" is the copyright of
ELEVATION TYPE 4 OF DETAIL B
SCALE 1:100
revisions
A
RCC jali 600 x 600 x 65 mm
170
160
3450
300 170
200 325
75
7800
90 160
200
3600
75
75
170
200
170
3600
300 170 170
50
C
75
SCALE 1:10
600
300 170
+7.8 SECOND FLOOR LVL
+4.2 FIRST FLOOR LVL
ELEVATION TYPE 2 OF DETAIL B
SCALE 1:25
200
SCALE 1:100
B Detail Detail B Type 4Type 4
A
FRP SCREEN DETAIL - 2
8400 ( J1 )
1
4300
A
160
200 mm thk brick wall
600
+0.00 GROUND LVL
Detail B Type 3
A
3900
450
FRP angle section 100 x 50 x 3 mm @ 450mm c/c FRP angle section 50 x 50 x 3 mm @ 450mm c/c
2400 ( J4 )
450
75
450
90
450
50
450
90 160
RCC jali 600 x 600 x 65 mm
170
+0.6 PLINTH LVL
450
75
200
200
1
3450
3600
11400
E
450
200
170
F
SCALE 1:50
350
3600
Balance
75
260
SECTION A-A OF J1
SCALE 1:50
170
3000
SECTION A-A OF J2
SCALE 1:50
600
300 170
+4.2 FIRST FLOOR LVL
SECTION A-A OF J3
SCALE 1:25
A
SCALE 1:25
+7.8 SECOND FLOOR LVL
4800 ( J2 )
DETAIL A ELEVATION
Detail A
7200 ( J3 )
F
2850
3600
580
+11.4 TERRACE LVL
D
G
600
FRP angle section 50 x 50 x 3 mm
600
FRP angle section 50 x 50 x 3 mm
SCALE 1:100
600
600
FRP SCREEN DETAIL - 1
J1
600
4300
600
2750
600
4300
600
2000
600
+0.00 GROUND LVL
450
750
8400
600
600 600
J3
400
G
I
H
600
+0.6 PLINTH LVL
600
7200
3450
3600
+4.2 FIRST FLOOR LVL
3450
3450
11400
H
3600
+7.8 SECOND FLOOR LVL
600
FRP angle section 100 x 50 x 3 mm @ 450mm c/c
FRP angle section 100 x 50 x 3 mm
600
3450
3600
2850
FRP angle section 50 x 50 x 3 mm @ 450mm c/c
450
6
750
7
8
585
9
600
10
600
11
+11.4 TERRACE LVL
500
12
I
750
Assigned to design and detail staircase and various jalis in the school for tender level submission.
1
R0
For TENDER 10 - 02 - 17
53
12
11
10
9
8
7
6
5
4
3
2
1
( G2 )6000
I A
Band in plaster
I
Compound wall light fixture
100 mm thk RCC coping
2500
3000
Ø900
H Finished G.L + 0.00m
450
H
1420
1675
Ø900
A
Scale 1:50
A
INSIDE ELEVATION B
3mm thk M.S .wire mesh, with 25 x 25mm opening.
Band in plaster 3mm thk M.S .wire mesh, with 25 x 25mm opening. 25mm thk granite stone seating
M.S.box section 98x 48 x 4.8mm 900 mm dia hume pipe, 200mm x 70mm thk 3mm thk M.S .wire mesh, with 25 x 25mm opening. M.S.box section 50 x 50 x 3.6mm
200mm x 200mm RCC column 18mm thk plaster
200 mm thk block wall with plaster and paint as approved. Detail A
860
G
25 x 25 x 3.3 mm M.S box section 50 x 50 x 3.6 mm M.S.box for gate 16 x 16 mm M.S. square bar
IN 1100
2200 6000
A
A1
6000
6000
6000
6000
B
A2
B
B
12 x 12 mm M.S. square bar 50 x 10 mm M.S.flat bar for gate No. of circular cutout with out wiremesh No. of circular cutout with wiremesh 50 x 50 x 3.6 mm M.S.box for compound wall 96 x 48 x 4.8 M.S. box
G2 30000 M.S. box section 50mm x 50mm x 3.6mm
LENGTH QUANTITY /PERIMETER IN m.
B
TOTAL AREA IN WEIGHT kg/m sq.m
2
8.517
1.98
33.2
4
92.14
4.98
1835.42
44
43.13
2.01
3813.53
44
43.13
1.1
2087
2
25.135
4.98 9.66
2412.31 4706.35
G
20 20 28 84
17.3 5.8
PLAN
M.S. flat bar 50mm x 10mm
1440
RCC coping 150mm thk
1340
F 250
Scale: 1:50 100
00
B
B
0 00
Detail B G2
A1
50
E
PRIMARY BLOCK (1ST - 5TH) OPEN TO SKY
900 mm dia hume pipe, 200mm x 50mm thk
25mm thk ,granite strip for seating. B
900
M.S.box section 50mm x 50mm x 3.6mm RCC column , with plaster and paint finish.
A2
D
400
A1
B
450
Finished G.L + 0.00m
150
100
Finished G.L + 0.00m
30000
25mm thk ,granite strips
Finished G.L + 0.00m
D
300
B
3mm thk M.S.wiremesh, with 25 x 25mm opening with 6x6xmm square rod frame.
3000
2800
3000
B
2100
2400
B
B
A2
M.S. perforated sheet,3mm thk 200 x 200 x 6mm thk M.S plate fixed toRCC column with 4 nos. 16mm dia,150mm long G.I anchor fastener.
A1
B
A1
900 mm dia hume pipe, 200mm x 50mm thk
3mm thk M.S.wiremesh, with 25 x 25mm opening.
M.S.square bar 16mm x 16mm
B
A2
A2
18 mm thk plaster M.S.box section 96mm x 48mm x 4.8mm
M.S.square bar 12mm x 12mm
B
A1
0
00
30
200mm thk block work
M.S.box section 50mm x 50mm x 3.6mm
M.S.square box section 25mm x 25mm x 3.2mm
E
30000 RCC coping
30
PLAN
A2
Scale 1:50
F
ELEVATION OF G2
M.S. box section 50mm x50 mm x 3.6mm B
M.S. box section 50mm x50 mm x 3.6mm
DETAIL A ELEVATION
SECTION AA Scale 1:25 1400
A2
0 3000
Scale 1:25
M.S.square bar 16mm x 16mm
B
M.S.square bar 12mm x 12mm
C A1
M.S.flat bar 50mm x 10mm
M.S.box section 50mm x 50mm x 3.6mm B
M.S.box section 25mm x 25mm x 3.2mm
00
B
30
5400
6000
3600
750
A2
1440
0
00
A1
B
30
B
A2
4550
A1
2275
25 x 25 x 3.3 mm M.S box section
G2
B
2275
3mm thk M.S .wire mesh, with 50 x 50 mm opening.
30000
PLAN OF 2G Scale 1:25
kadri consultants pvt. ltd. and shall not be used for any purpose other than that for which it has been loaned.
12
DETAIL B ELEVATION
Scale 1:25
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation. *Approvals of Finishing Items, etc should be taken before procurement of materials.
11
* Made up ground lvl assumed to be ±0.00m
* All dimensions are unfinished dimensions in mm,unless otherwise mentioned. * All levels are finished level,heights are from finished levels,unless otherwise mentioned.
10
9
8
NOTE :
KEY PLAN
Scale 1:50
All M.S. components will be given a paint finish.
Scale 1:500 north
name of consultants
notes *Written dimensions shall be followed, do not scale the drawing. * For reference of finishing key refer Finishing schedule. Eg. A
revisions
This "drawing" is the copyright of
54
DETAIL A PLAN
revisions
A
Finished G.L + 0.00m
600
( G2 )6000
name of client
JSW REALTY & INFRASTRUCTURE PVT. LTD.
content Compound wall and gate details. job title
6
5
4
12 x 12 mm M.S. square bar O Print for 50 x 10 mm M.S.flat bar for gate TENDER No. of circular with O cutout Transmittal/letter out wiremesh 640/KC No. of circular cutout with wiremesh O Print for 50 x 50 x 3.6 mm M.S.box for compound wall 96 x 48 x 4.8 M.S. box as per job no. scale:
' MAIN SCHOOL' at Vidyanagar
2 4
initial date
1
44 44 2 no.
20 20 A
640 rev.
HST_T_MS_8.01 drawing status
kadri consultants pvt. ltd.
2
design
drg. no.
4a shivsagar estates, worli, mumbai- 400 018
3
B
50 x 50 x 3.6 mm M.S.box for gate 16 x 16 mm M.S. square bar
Architect
drawn by cad file no. Maimuna
7
LENGTH QUANTITY /PERIMETER IN
A2
750
1340
00
200
300
M.S.angle section 25mm x 25mm x 5 mm
1130
B
735
SECONDARY BLOCK (6TH - 12TH) OPEN TO SKY COURTYARD .
A1
75 75 75 75 75 75 75 75 75 75 75 75 60 205
B
25 x 25 x 5mm M.S. angle section
B
RCC column
A2
Rammed earth wall M.S.box section 96mm x 48mm x 4.8mm
75 75 75 75 75 75 75 75 75 75 75 75 75 75
0
3mm thk M.S.wiremesh, with 25 x 25mm opening.
M.S.perforated sheet,3mm thk
A1
C
A1
Scale 1:25
R0
For TENDER 10 - 02 - 17
28 84
Detail B
750
55
5
25
Pencil cut edge
40
Riser 10
Tread Motar RCC Step
Tread Motar brick filling
DETAIL D Scale :B 1:5 Detail
DETAIL OF STEPS AT ENTRANCE ScaleDetail : 1:5 B
M.S box section on all four sides 40 x 60 x 3 mm
Varies according to corridor
M.S box section 40 x 40 x 3 mm
300
55
10
13
eq eq eq eq eq eq eq eq eq eq eq eq eq eq eq eq eq eq
15mm thk polish granite riser 25mm thk polish granite tread
M.S. bar 12 x 12mm thk @ 100mm c/c
1200
1100
Detail D
1050
Mortar
150mm thk skirting
150
750
40mm dia,S.S pipe for handrail,8mm thk
100
1745
Balance
Balance
775
1020
20 25
Riser 10
150
13
Pencil cut edge
5 20 5 20 5 30
M.S. perforated sheet 5mm thk
1100
77
13
1000( secondary section )
3
Scale : 1:2
DETAIL B
CORRIDOR RAILING DETAIL
Scale : 1:10
Scale : 1:25
4850 250
200
200
STAIRCASE DETAIL
16mm dia,M.S.round bar hollow coloured box of fiber or roto moulded plastic @ 250mm c/c distance Stopper
3450
3600
Scale : 1:25
M.S box section 40 x 40 x 3mm
16mm dia,M.S.pipe 6mm thk
M.S. box section 40 x 40 x 3mm
M.S.box section 70 x 70 x 5mm
40 40
200mm x 200 mm Hollow coloured box of fiber or roto moulded plastic finish, @ 250mm c/c distance
40
M.S box section 40 x 40 x 3 mm
M.S box section 40 x 40 x 3mm Detail C
SCREEN DETAIL
DETAIL C
Scale : 1:50
12 x 12 mm , M.S square bar
Scale : 1:10
200
40mm dia,S.S pipe 8mm thk 15mm x 15mm M.S. square bar.
1100
750 (for primary section)
M.S box section 40 x 40 x 3mm
40
40
1100
3mm thk, M.S perforated sheet
15mm x 15mm M.S. square bar.
100 40
1200
M.S plate,5mm thk
162
130mm high granite skirting granite flooring 12mm groove in plaster
100x100x6mm thk, MS finish plate anchored to slab M.S. Finish anchor fastener to hold balustrate 12 x 5 mm groove in plaster
1 (for secondary section)
840
40mm dia,S.S pipe 8mm thk
16mm dia ,M.S.pipe 6mm thk
100x100x6mm thk, MS finish plate anchored to slab M.S. Finish anchor fastener to hold balustrate 12 x 5 mm groove in plaster
Reference image for the perforated screen
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation. *Approvals of Finishing Items, etc should be taken before procurement of materials.
HAND RAIL DETAIL FOR SECONDARY
Scale : 1:10
notes
*Written dimensions shall be followed, do not scale the drawing. * For reference of finishing key refer Finishing schedule. Eg. * Made up ground lvl assumed to be Âą0.00m * All dimensions are unfinished dimensions in mm,unless otherwise mentioned. * All levels are finished level,heights are from finished levels,unless otherwise mentioned. 200mm block wall 100mm block wall
TENDER
NOTE :
Scale : 1:10
O Transmittal/letter no.
All M.S. components will be given a paint finish. north
name of consultants
revisions
This "drawing" is the copyright of kadri consultants pvt. ltd. and shall not be used for any purpose other than that for which it been loaned.
HAND RAIL DETAILFOR PRIMARY
revisions
DETAIL A
Scale : 1:10
Reference image for secondary section,where the coloured M.S.hollow box will have alphabets written on it. O Print for
name of client
content
JSW REALTY & INFRASTRUCTURE PVT. LTD.
drawn by Urmi.G
cad file no.
640/KC O Print for
STAIRCASE DETAILS
job title
'MAIN SCHOOL' at Vidyanagar
Architect
kadri consultants pvt. ltd.
4a shivsagar estates, worli, mumbai- 400 018
as per job scale: design no. drg. no.
640
rev.
HST_T_MS_7.04 R0
drawing status For TENDER initial date
10 - 02 - 17
55
12
11
10
9
8
7
6
5
4
3
2
1
I
600
A
A
A
+11.4 SLAB LVL
7500
450
750
1100
I
3600
+2.4
2000
3600 + 2.4
F
+4.2 FIRST FLOOR LVL
24
Mid-Landing R at 150 each T at 300 each
Scale 1:50
G
500
+6.0 Mid-Landing R at 150 each T at 300 each
3600
3000
DETAIL C ELEVATION
1200
37
500
500
Plinth lvl + 0.6m
1000
+6.0 Mid-Landing R at 150 each T at 300 each
2400
36
12
HST_T_SS_7.04
DN
2000
Staircase railing Detail
2000
J1
48
2000
36
DN 300 300 300 300 300 300 300 300 300 300 300
3300
2850 8400
+6.0
3600
F
Detail A 12
J1
J1
4500
4500 2000
Detail B
A
1
600
+0.6 PLINTH LVL
+0.00 GROUND LVL
E
STAIRCASE 3
2400
A
1650
1800
4500
J1
A
G
3300
+7.8 SECOND FLOOR LVL
48
UP 25
H
+7.8 Second floor landing
2150
650 300 300 300 300 300 300 300 300 300 300 300
UP 1
1000
+4.2 First floor landing
300 300 300 300 300 300 300 300 300 300 300
+0.6 Ground floor landing 650
3600
1800
Granite stone dado
H
STAIRCASE 3
STAIRCASE 3
SECOND FLOOR PLAN STAIRCASE 3
GROUND FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
Scale 1:50
Scale 1:50
DETAIL C PLAN Scale 1:50
E
Scale 1:50
SECTION A-A Scale 1:50
B
SECTION AA B
3
2450
W4a
800
W5
600
6400
.5 1.05x1
1.05X1 .5M
1.05X1 .5M
D2
D2
D2
.5
D11
.5
.5
1.05x1
1.05x1
D2
D2
1.05X1 .5M
D2
1.05x1
1.05X1 .5M
D2
D2
.5
.5
1.05x1
.5
D2
1.05x1
D2
1.05X1 .5M
D2
1.05x1
1.05X1 .5M
D2
D2
1.05x1
1.05x1
.5
D2
.5
D2
7200
W6
D7
W6
D7
2400
Up
1850
- -- 3 m W i de C o rri d or ---
W6
800
14400
13050
Rammed 40701 Earth
Up
Classroom 6.0 x 8.0 517 Sq.Ft.
Wall
W5
2400
D6
Elec.
W4a
W4a
600
W4a
16400
Up Tread: 300mm Riser: 150mm
C
J4
6400
2000
5800
2500
12850
Up
4981 Entance Foyer 5.9 x 6 .3 400 Sq .Ft.
G1
Up
6500
12100
W5
Classroom 6.0 x 8.0 517 Sq.Ft.
W4a
7850
2000
D7a
2800
Classroom 6.0 x 8.0 517 Sq.Ft.
V2
- -- 3 m W i de C o rri d or ---
2400
W6
D7
6400
D13
V2
W5
IT
ELV
6400
D2
1.05X1 .5M
D2 D2
D2
D2
Sick Room 3.0 x 6.0 194 Sq.Ft.
V2
W4a
Students' Entry (Primary Section)
600 J2 W2
Store 2.85 x 3.7 115 Sq.Ft.
W5
W5
2400
2400
2400
2400
2400
W5
W5
W5
D10
W5
D10
W5
4500
5400
W2
Admin Staff 9.1 x 5 .0 490 Sq .Ft.
V1
W1 Pantry 2.1 x 4 .25 96 Sq.Ft .
His Toilet 2.3 x 1 .55 38 Sq.Ft . V1a
W5
D3
- -- 2 m W i de C o rri d or ---
W2
D2
D5
Stationary Room 5.0 x 9 .7 522 Sq .Ft.
14000
W2
600
W5 2400
Up Tread: 300mm Riser: 150mm
4100 D2
W2
F1
Store 2.85 x 3.7 115 Sq.Ft.
Records Room 5.0 x 4 .0 215 Sq .Ft.
W2
Teacher'sroom 2.85 x 3.7 115 Sq.Ft.
750
F1
3000
F1
W8a
Her Toilet 1.25 x 2 .5 Sq.Ft .
W8a
Biology Lab 12 .0 x 7 .6 982 Sq .Ft.
D534
W8a
W2
W8a
W2
W8a
Physics Lab 12 .0 x 7 .6 982 Sq .Ft.
W3
W8a
- -- 3 m W i de C o rri d or --9600
W2
Teacher'sroom 2.85 x 3.7 115 Sq.Ft. F1
7200
D3
D2
.5
.5
D2
D2
1.05x1
1.05x1 .5
D2
D2
1.05x1 .5
.5
D2
1.05x1
Staff Room 4.25 x 6.0 274 Sq.Ft.
D4
Boys' Toilet 11.75 x 6.0 657 Sq.Ft.
D13
D5
D2
.5
W4a
W6
D7
1.05x1
W7
1.05x1
V2
- -- 2 m W i de C o rri d or ---
D7 D4
V5
800
D7
Tread: 300mm Riser: 150mm
- -- 2 m W i de C o rri d or --W6
W5
Classroom 6.0 x 8.0 517 Sq.Ft.
V5 W7
W2
Up
W4
V2
Up
W4
V2
Up
W4
Up
W4
D2
24520
STAIRCASE 4
Up
D1 3700
W8
V2
V1
V1
V1
V1
V5
V3
W8
W3
W2 10100
Store Room 2.8 x 4 .25 128 Sq .Ft.
D5
W1
V1 W3
Conference Room 5.0 x 5 .1 274 Sq .Ft.
W3
750
W2
Toilet 1.5 X 2.4m
4100
4500
5400
V5
W7
W7
Students' Entry (Secondary Section)
V2
W8
D5
Coordinators's Room 5.0 x 9 .7 522 Sq .Ft.
D2 1.7 x 1 .75
D3 J2
Up
35200 Entance Foyer 6.4 x 6 .3 434 Sq .Ft.
6500
G1
5800
J4 6000
wall
12850
Up
- -- 3 m W i de C o rri d or ---
4500
Tread: 300mm Riser: 150mm Up
16400 Up
16400
Up
W4a
2000
Up
Up
600
V2
V1a
Shower 1.20x1 .5
STAIRCASE 3
Mid-Landing R at 150 each T at 300 each
Up
W4a
Up
W4a
14950
W4a
7850
V2
2500
2000
V2
W4a
W4a
W4a
W4a
+0.6 PLINTH LVL
W5
D7
W6
7200
5400 D3
D13
D2
Maths Lab 8.0 x 6 .0 517 Sq .Ft.
1600
D2
D2
D2
Staff Room 4.25 x 6.0 274 Sq.Ft.
D4
D5
Language Lab 8.0 x 6 .0 517 Sq .Ft.
FD
D7
W6
D7
- -- 2 m W i de C o rri d or ---
- -- 2 m W i de C o rri d or ---
W5
W6
D7
W5 2000 2800
2800
W6
ElectricalRoom 3.0 x 6.0 194 Sq.Ft.
Boys' Toilet 11.75 x 6.0 657 Sq.Ft.
D4
W5 2400
1.05X1 .5M
D2
.5
.5 1.05x1
D2
1.05x1
D2
1.05x1
.5
D2
.5 1.05x1
.5
D2
.5 1.05x1
D2
D2
1.05x1
D2
V2
Art & Drawing Class 8.0 x 6.0 1045 Sq.Ft. 7000
4500
W7
D5
.5
D3
W2
D2 1.05x1
W2 Principal's Room 3.9 x 5 .0 242 Sq .Ft.
Earth ed 7000
2000
2199
Coordinator's Room 6.9 x 7 .6 521 Sq .Ft.
D5
V1a
D5
Tread: 300mm Riser: 150mm Up
Ramm
+2.4
IT
D3
Vice-Principal's Room 5.0 x 3 .9 210 Sq .Ft.
D13
ELV
D5
Teacher'sroomF1 2.85 x 3.7 115 Sq.Ft. .5
ELE
D4
D2
Chemistry Lab 12 .0 x 7 .6 982 Sq .Ft.
F1
W2 D8 D13
D2
Water Cooler
D2
- -- 3 m W i de C o rri d or --9600
- -- 2 m W i de C o rri d or --D10
Store 2.85 x 3.7 115 Sq.Ft.
W2
600
3000
W2
D2
3000
Staff Entry
Covered Courtyard
2100
Open to Sky Courtyard 8.0 x 8 .0 689 Sq .Ft.
14000
33300
59001
Up
10400
6000
11600
3300
Up
W4a
Library 8.0 x 6.0 517 Sq.Ft.
W5
16600 600 8000
3600 900
Up
W4a
ComputerLab 8.0 x 6.0 517 Sq.Ft.
F2
W6
Wall
2000
F2
Server room 1.85 x 2.9 60 Sq.Ft.
35200
500 +2.4 Mid-Landing R at 150 each T at 300 each
16600 Up
W4a
W2
Teacher'srm 2.0 x 2.9 62 Sq.Ft.
D5
4500
Up
Classroom 6.0 x 8.0 517 Sq.Ft.
1575
Shower 1.05x1 .5
- -- 2 m W i de C o rri d or ---
2400
Up
Tread: 300mm Riser: 150mm
7000 6400
600
Up
Up
Up
W5
2400 Up
3700
Tread: 300mm Riser: 150mm
Up
B
Classroom 8.0 x 6.0 517 Sq.Ft.
2800
W6
13500
STAIRCASE 4
GROUND FLOOR PLAN
FIRST FLOOR PLAN
Scale 1:50
Scale 1:50
W7
V4
V4
W7
W7
Up
W4a
D7a W7
Sick Room 3.0 x 6.0 194 Sq.Ft.
Up
Classroom 8.0 x 6.0 517 Sq.Ft.
D2
Store 4.8 x 6.0 310 Sq.Ft.
W4a
1.05X1 .5M
D2
1.05X1 .5M
D2
D2 V2
1.05X1 .5M
.5
D2
D2
1.05X1 .5M
1.05x1 .5
D2
D2
1.05x1
1.05X1 .5M
.5
D2
D2
1.05X1 .5M
1.05x1
V2
600
.5
D2
D2
1.05x1
1.05x1 .5
.5 1.05x1 .5 1.05x1
D11
D2
.5
STAIRCASE 4
SECTION B-B
V2
W4a
D2
J1
50450
B
B
STAIRCASE 4
6400
7000
J2
Classroom 6.0 x 8.0 517 Sq.Ft. W4a
Girls'Toilet 11.75 x 6.0 657 Sq.Ft.
2513
J2
+0.00 GROUND LVL
Classroom 6.0 x 8.0 517 Sq.Ft. W4a
D5
D4
Up
W4a
W i de C orri d or- --
Tread: 300mm Riser: 150mm
D2
D7
1.05x1
W6
.5
W5
D2
D7
- --2 m
D2
W6
W i de C orri d or- --
1.05x1
W5
2800
2400
- --2 m
16600
D7
Up
Up
11600
Up
W4a
W4c
- -- 3 m W i de C o rri d or ---
DETAIL C
Up
12750 18600
14400
W4a
Up
9800
35359 wall Rammed Earth
B
V2
Girls'Toilet 11.75 x 6.0 657 Sq.Ft.
D4
- -- 2 m W i de C o rri d or ---
14950
D2
+0.6 Ground Floor Lobby
Ser . slab
Up Tread: 300mm Riser: 150mm D7
Up
2800 2000
1.05x1
1
2000
V2
Classroom 8.0 x 6.0 517 Sq.Ft.
W6
- -- 2 m W i de C o rri d or ---
15200
12
500
7450
W4a
W5
D7
Tread: 300mm Riser: 150mm
8000
2000
4700
Up
W4a
V2
V2
450 450
UP
12
2000
J1
W6
600
W4c
Earth 14394 Rammed
3600
Detail A
4900
W4a
Classroom 8.0 x 6.0 517 Sq.Ft.
W5 2400
7000
600
12
54050 16400
W4a
STAIRCASE 4
Wall RammedEarth 13365
+ 2.4
300
+4.2 FIRST FLOOR LVL
600
2800
Detail B
5
3300
+ 4.2 First Floor Landing
300 300 300 300 300 300 300
450
HST_T_SS_7.04
24
C
24
300
Staircase railing Detail 600
D +4.2 First Floor landing
450
1800
3600
2750
700
STAIRCASE 3
600
1750
3080
1
J2
4500
3650
DOWN
+7.8 SECOND FLOOR LVL
300 300 300 300 300 300 300 300 300 300 300
750
450
D
Ground floor landing. 1 to 5 in blockwork R at 150 each T at 300 each 2500
1000
+0.6 + 7.8 Second floor Landing
48
KEY PLAN NOTE :
Scale : 1:1000
For Detail A, Detail B refer sheet HST_T_SS_7.04
Scale 1:50
For Staircase railing details refer sheet HST_T_SS_7.04
O
Print For
TENDER
O
Transmittal / Letter No.
O
Date
640 / KC /
A
A
purpose other than that for which it has been loaned.
56
12
11
* Made up ground lvl assumed to be ±0.00m
* All dimensions are unfinished dimensions in mm,unless otherwise mentioned. * All levels are finished level,heights are from finished levels,unless otherwise mentioned. 200mm block wall 100mm block wall
10
north
name of consultants
notes *Written dimensions shall be followed, do not scale the drawing. * For reference of finishing key refer Finishing schedule. Eg. A
9
revisions
kadri consultants pvt. ltd. and shall not be used for any
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation. *Approvals of Finishing Items, etc should be taken before procurement of materials.
revisions
This "drawing" is the copyright of
8
content
name of client
JSW REALTY & INFRASTRUCTURE PVT. LTD.
job title
6
5
4
drg. no.
'MAIN SCHOOL' at Vidyanagar
drawing status
kadri consultants pvt. ltd.
initial date
4a shivsagar estates, worli, mumbai- 400 018
3
2
job no.
HST_T_MS_7.03
Architect
drawn cad file by .G. no. Urmi
7
scale: 1: 50
STAIRCASE DETAIL- 3 and 4
1
640 rev. R0
For TENDER 10 - 02 - 17
300mm thk Rammed earth wall
32600 3300
3300
200
Paint and plaster finish
2520
2380
1870
4200
6000
3300
Finished G.L + 0.00m
Elevation A (wall at the entrance of secondary section) Scale 1:100
300mm thk Rammed earth wall
Detail A
28000 3300
200
Paint and plaster finish
2520
2380
1870 2048
4200
6000
3300
Finished G.L + 0.00m
Elevation B (wall at the entrance of primary section) Scale 1:100
600
600
600
600
600
Elevation A
His
95
300
Her
130
G1
130
300
600mm x 600mm x 65mm Concrete jali block
Elevation B
500
Jali detail.
G1
HST_T_SS_8.02 Her
His
3000
Detail A
Key plan
Scale 1:25
been loaned .
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation. *Approvals of Finishing Items, etc should be taken before procurement of materials.
*Written dimensions shall be followed , do not scale the drawing . * For reference of finishing key refer Finishing schedule . Eg. * Made up ground lvl assumed to be Âą0.00m
* All dimensions are unfinished dimensions in mm,unless otherwise mentioned . * All levels are finished level ,heights are from finished levels,unless otherwise mentioned . 100mm block wall
200mm block wall
revisions
and shall not be used for any
purpose other than that for which it
revisions
This "drawing" is the copyright of
kadri consultants pvt. ltd.
Scale 1:1000 name of consultants
notes
north
name of client
JSW REALTY & INFRASTRUCTURE PVT. LTD. drawn by Urmi.G
cad file no.
content
Entrance wall detail
job title
'MAIN SCHOOL' at Vidyanagar
Architect
kadri consultants pvt. ltd.
4a shivsagar estates, worli, mumbai- 400 018
as per job no. scale: design
drg. no.
640
rev.
HST_T_MS_8 .04 R0
drawing status For TENDER initial date
10 - 02 - 17
57
13 DOCTOR’S HOUSING COMPLEX
58
Assigned to design and prepare GFC drawings for the landscape of the complex and comminucate with the vendors for the procurement of materials.
24
25
26
27
28
21
22
23
17
18
19
20
nal road 6m wide inter
EXIT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
ENTRY
ing 2 wheeler park
9 4
3
5.5
6
5
7
8
9
10
11
12
13
14
15
12 13
7.7
14 15
13.9
16
+0.05 3.8
17
+0.45
29
ENTRY +0.10
3.8
30
3.8 +0.0 +0.10
31
3.8
+0.45
3.8
3.8
+0.10 3.8
1
32 +0.10 3.8
2
33 +0.45
+0.0
3.8
3.8
3
34 1.2
35
+0.45
1.2
4
3.8
36
+0.45 3.8
+0.0 3.8 +0.45 3.8
4
37
3
5
3.4
5.8
+0.0 +0.0
3
2
4
2
3.8 3.8
+0.45
+0.10
3.8
1
2
3
3.8 +0.45 3.8
0
+0.45
+0.45
+0.45
3.8
3.8 0
0
3.8
4.65
0
1
0
0
0
1
0 0
0
+0.10 3.8
64
) BLOCK B (G+7 26
+0.0 3.8
27
+0.45
28
24
25
23
22
3.8
59
38
road 6m wide internal
63
EXIT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
ENTRY
2 wheeler parking 4
3
6
5
7
8
9
10
11
12
13
14
15
12 13
58
39
14
62
15 16
3.8
17
+0 .10
3.8
3.8
30
57
3.8
40
+0 .45
+0.0
29
+0 .05
ENTRY
61
+0 .0 +0 .10
31
3.8
+0 .45
3.8
3.8
+0 .10 3.8
+0.45
32
1
56
+0 .10 3.8
41
3.8
33
60
2
+0 .45
+0 .0
3.8
3.8
34
3
35
55
42
+0 .45
4
3.8
36
+0 .45
5
3.8
+0 .0 3.8
54
37
+0 .45 3.8 +0 .0 3.8 +0 .0 3.8 +0 .45
+0 .10
3.8
2
3
3.8 +0.45 3.8
0
+0 .45
+0 .45
53
1
+0 .45
3.8
3.8
3.8 0
0
4.65
0
1
0
0
1
0
0
0
0
+0 .10 3.8
64
52
BLOCK B (G+7)
+0 .0 3.8
+0 .45 3.8
59
38
63 58
39 62
51
+0 .0 3.8
57
40 61
+0 .45
56
41
3.8
60 55
42
50
54 53
49
)
52
BLOCK A (G+4
51
48
47
50
46
45
49
44
48
46
47
43
BLOCK A (G+4) 45
44
43
PLAN
KEY PLAN
SCALE 1:200
SCALE 1:500
NOTE: TOTAL NUMBER OF 3BHK FLATS-30 TOTAL NUMBER OF 2BHK FLATS-10 TOTAL NUMBER OF 4-WHEELER PARKING- 72
* Indicative Col Location Are Marked On The Plan For Col Ref Structural Drgs
and shall not be used for any purpose other than that for which
* Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation.
* Stilt level to be finished with aluform shutering.
*Approvals of Finishing Items, etc should be taken before procurement of materials.
* Stilt floor PCC to be done after all underground services are in place
kadri consultants pvt. ltd.
it has been loaned.
* For Door/ Window Sizes Refer Door/Window Schedule * All dimensions are of unfinished surfaces.
date R0
20/04/18
R1
27/04/18
issued to
remarks
1) COMPOUND WALL SHIFTED 8M INSIDE
revisions
notes
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained.
revisions
TOTAL NUMBER OF 2-WHEELER PARKING- 17 notes
This "drawing" is the copyright of
date
issued to
remarks
Stamp
north
name of client
O
JSW REALTY &
INFRASTRUCTURE PVT. LTD. drawn by URMI
cad file no.
655/KC
print for
Execution O
transmittal / letter no.
655 / KC / Soft copy O date
27/04/2018
content job title
Landscape plan JSW - Doctor's Housing Apartments (G+4 )
kadri consultants pvt. ltd.
4a shivsagar estates, worli, mumbai- 400 018
scale
AS MENTIONED
job no.
drg. no.
655
rev.
R1 drawing status initial date
GFC
20/04/2018
59
Detail B FC_1 .04
SGC_DH_G
53 3.4
9.184
9
1.2 10
11
6.2 12
13
14
27
15
3.144
13
15
40.298
7.2
43
2.4
14
5.618
16
29
8.2
4.623
1.2
1
8
12
3.5
7
8.751
11.076
8.454
1.189
17
RY ENT 7.03
5
6.096
6
ng 2 wheeler parki
8.779
11.612
3.888
3.326
10.777
14.148
9.531
5
11.646
17.212 2.287
7.018 4.367
4
9.988
8.089
3
2.4
13.786 1.018
16.653 ing 2 wheeler park
1.311
nal road 6m wide inter
Detail A FC_1 .04 SGC_DH_G
ENTRY
03 4.768
70.016
2.5
EXIT
14
15
16
17
18
19
1
2
3
4
5
6
7
8
2.592
22
23
24
25
26
27
5
28
20
21
9
10
11
12
13
4.2
ng 4 wheeler parki
30
2.5
4.919
31
29.064
3.092
4.439
32
6
1
ng 4 wheeler parki 33
22.646
2
77 16.5
27.874
3
12.97
34
176.15°
3.122
1.413
35
DETAIL C
ng 4 wheeler parki
04
4
SGC_DH_GFC_1.
36 0.62
9
5
4.48
37
8.968
4 4.66
24
2.352
55
2.364
0.8
3.705
2.904
2.0
2.805
4.004
1.91
177.40°
3.705
2.002
2.546
2.002
5 3.3
1.2
9.018 4.494 2.5 4.907
1
8.621
5.88
2
3
ng 4 wheeler parki 0.78
3.171
5.241
1.053
1.469
64
3.402
5
63
13.226
26
27
28
24
25
23
22
road 6m wide internal
EXIT
ENTRY
2 wheeler parking
14.697
4
3
6
5
7
8
9
10
11
12
13
14
15
12 13
2.5
58
14
62
12.501
39
15 16
29
3.8
17
+0 .45
+0 .10
3.8
30
3.8
61
14.316
+0 .05
ENTRY
57
40
13.445
4 wheeler parking
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
59
2.5
ng 4 wheeler parki
38
5 3.099
22 5.6
4.846
+0 .0 +0 .10
3.8
31
+0 .45
3.8
3.8
+0 .10 3.8
1
+0 .10 3.8
33
60
8.423
32
56
2
6.79
+0 .45
+0 .0
3.8
41
12.677
3.8
34
3
55
42
+0 .45
35
4
3.8
36
+0 .45
5
25
3.8
+0 .0 3.8 +0 .45 3.8 +0 .0 3.8 +0 .0
3.397
37
4.94
54
5.319
3.649
3.8
3.414
+0 .10
3.8
3
3.8 +0.45 3.8
+0 .45
+0 .45
+0 .45
3.8
3.8
3.8 0
0
0
1
0
0
1
0
0
0
0
+0 .10 3.8
64
5.0 1
2
BLOCK B (G+7)
+0 .0 3.8
+0 .45 3.8
59
38
63 58
39 62
+0 .0 3.8
57
40 61
+0 .45
56
41
3.8
60 55
42
50
2.903
54
6.895
53
49
3.059
52
33
6
3.726
2.965
9.331
48 51
47
46
50
ng 4 wheeler parki
45
44
49
BLOCK A (G+4)
48
43
2.454
5.5
51
9.423 4.921
53
4.549
3.1 4.732
10.818 5.7
4.65
52
1.273
4.186
1 0
4 wheeler parking
4.212
2.976
4.567
+0 .45
53
5.78
3.203 3.033
47
46
45
44
43
LINEOUT PLAN FOR PATHWAYS AND PARKING
KEY PLAN
SCALE 1:200
SCALE 1:500 NOTE: TOTAL NUMBER OF 4-WHEELER PARKING- 72 ONE PARKING BAY SIZE - 5 X 2.5M
* Indicative Col Location Are Marked On The Plan For Col Ref Structural Drgs
* All dimensions are of unfinished surfaces.
*Approvals of Finishing Items, etc should be taken before procurement of materials.
* Stilt floor PCC to be done after all underground services are in place
it has been loaned.
60
notes
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained. * Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation.
kadri consultants pvt. ltd.
* For Door/ Window Sizes Refer Door/Window Schedule * Stilt level to be finished with aluform shutering.
date R0
20/04/18
R1
27/04/18
issued to
remarks
1) COMPOUND WALL SHIFTED 8M INSIDE
revisions
notes
This "drawing" is the copyright of and shall not be used for any purpose other than that for which
revisions
TOTAL NUMBER OF 2-WHEELER PARKING- 17 ONE PARKING BAY SIZE - 2.4 X 1.2M date
issued to
remarks
Stamp
north
name of client
JSW REALTY &
INFRASTRUCTURE PVT. LTD. drawn by URMI
cad file no.
655/KC
O
print for
O
transmittal / letter no.
Execution 655 / KC / Soft copy O date
27/04/2018
content job title
Landscape- LINEOUT plan JSW - Doctor's Housing Apartments (G+4 )
kadri consultants pvt. ltd.
4a shivsagar estates, worli, mumbai- 400 018
scale
AS MENTIONED
job no.
drg. no.
655
rev.
SGC_DH_GFC_1.03 R1 drawing status initial date
GFC
20/04/2018
7 1.5 1
6 1 1.7
1.557
09
9 1.
1.504
2.883
6.656
88
5.306
5.588
0.829
0.611
0.
54
4
4.732
36
0.
22
2.929
1.6 0.616
0.531
5.712
reference point for 1m grid
5
2.392
1.
85
0.798
2.36
6
1.6
1.044
0.793
6.307
3.36
0.293
0.812
4.012
1.844
3. 87 2
4.049
2.978
2.413
1.211
1.042
1.989
1.519
3.077
2.644
2.286
1.504
0.993
0.516
1.71
2.342
1.104
7.604
3.036
4
9
2 2.9 5.7 6
5
2 4.7
3.72
4. 22 3
6 1.
0.49
DETAIL C LINE OUT PLAN SCALE 1:100
0.394
9.991
3.118
2.5
3.109
4.548
3.107
3.025
0.846
0.971
0.299
0.635
1.087
2.466
1. 9
3.062
3.938
0.4
3
2.03
2.0
1
68
8.922
2.12
7.522
13.873
1.5
2.129
3
78
1.
56
4.013
0.67 0.7
6.011
3.478
3.74
1.996
3.876
2.349
6.768
1.876
1.698
0.623 3.086
3.487
1.684
1
5.47
3
1
19 2.
25
1.
2.495
0.503
9.082
2.501 0.411
DETAIL B LINEOUT PLAN
SCALE 1:100
* Indicative Col Location Are Marked On The Plan For Col Ref Structural Drgs * For Door/ Window Sizes Refer Door/Window Schedule
* Approvals of mouldings, profiles, finishes Samples etc. should be taken before commencement of the item at site or before site assembly/ installation.
* Stilt level to be finished with aluform shutering.
*Approvals of Finishing Items, etc should be taken before procurement of materials.
* Stilt floor PCC to be done after all underground services are in place
* All dimensions are of unfinished surfaces.
date
issued to
remarks
revisions
* Any Descripency In The Drawing Shall Be Brought To The Architects Notice Before commencement of particular item/ job and further instructions or clarifications should be obtained.
SCALE 1:100 notes
revisions
This "drawing" is the copyright of kadri consultants pvt. ltd.
and shall not be used for any purpose other than that for which it has been loaned.
6.716 0.402
DETAIL A LINE OUT PLAN
notes
0.848
reference point for 1m grid
reference point for 1m grid
date
issued to
remarks
north
Stamp
name of client
JSW REALTY & INFRASTRUCTURE PVT. LTD. drawn by URMI
cad file no.
655/KC
O
print for
O
transmittal / letter no.
Execution 655 / KC / Soft copy O date
20/04/2018
content job title
Landscape lineout plan of details JSW - Doctor's Housing Apartments (G+4)
kadri consultants pvt. ltd.
4a shivsagar estates, worli, mumbai- 400 018
scale
AS MENTION
drg. no.
SGC_DH drawing status
61
initial date
2
Urmi Gohel Architecture portfolio Selected works
62