Architecture Portfolio 2020 Xiang Yu

Page 1

XIANG YU

ARCHITECTURE PORTFOLIO 2016-2020 Work Type

1


JOB CONTENTS • • • •

2

Prepared bilingual drawings, specifications, programs, reports and document translations; Kept daily transmittals, RFI files logs and meeting notes; Built 3D model for machinery and piping system design; Room layout configurations, visual studies, interference checks between different disciplines

PROFESSIONAL EXPERIENCE


��� - PROGRESS SET Wuxi Taihu Show Theatre Wuxi, Jiangsu Province, China - Completed 2019 NOTE:

��:

1)

2 AG08

1

F

AG

F

F

F F

F

������: x 2.45kN ������ (250kg) (550�) ���� x 7.35kN ���������� (750kg) (1654�) � ��� x 6.37kN� ��������� (650kg) (1435�) � ������������������ LED ���������� +12M (1���): x 30.6KN ������ (3120KG) (6878�) x 8.0 KN/M ������(821KG/M) (550�/FT) x

�����LED������ + 12M ���: x ������ - 69,470��31,511 ���309.0 KN

x L

�������������� (඾ᆺ )

HATCH INDICATES PERFORMER CATWALK LOADING ZONE (TYP)

K

������ - 2,785�/���4,151��/����2���� �����

B

TECHNICAL ZONE: x 7.35kN/M² UNIFORM LOAD (750kg/M²) (150#/Ft²)

E

PERFORMER CATWALK LOADING: x 7.35kN/M² UNIFORM LOAD (750kg/M²) (150#/Ft²)

F

L I

K

1 AG09 L

������ +12.0M - ������ UPPER CATWALK LEVEL +12.0M - LOADING PLAN 1:500

�������

�������� �����������

����������+ 12M���: x ������ - 139,120��63,104���618.8KN x ����������� - 30,880��14,007���137.4KN

LOADING:

I

F

1

��LED��������������19��������������� ������

LED ��������������� x 111.2KN ������ (11,340KG) (25,000�) x 29.3 KN/M �3.8M(12.5��)������ (2984KG/M) (2,000 �/FT)

x

F

F

������� (�����) x 7.35kN/M²� ���� (750kg/M²) (150�/Ft²)�����

K

F F

���: x 7.35kN/M² ���� (750kg/M²) (150�/Ft²)

E

I

��������������� �������DRAGONE������������� ACROBATIC DROP FRAME, HORIZONTAL AND VERTICAL LOADING. LOCATION SUBJECT TO CHANGE BASED ON DRAGONE PRODUCTION REQUIREMENTS.

F

ALL TSE LOADS ARE ALLOWANCES TO BE USED BY THE STRUCTURAL ENGINEER FOR COMPLETING THEIR WORK. INDUSTRY STANDARD STRUCTURAL SAFETY FACTORS ARE NOT INCLUDED.

B

����������������� REFERENCE SECTION DETAIL FOR CATWALK RAILING TYPICAL LOADING CRITERIA

6A

1)

��:

19���LED�������� ���� LED����������� ���������������������� �������������������� 79.8������+4.15������105�� PATH OF MOVEMENT FOR 19 MOTORIZED LED SCREEN. ALL MOTORIZED LED SCREENS MOVE ALONG ARC. SCREENS CAN BE EVENLY SPACED, OR GROUPED TOGETHER AS A CONTINUOUS LOAD. WHEN GROUPED THE LINEAR LENGTH AT THE CATWALK IS 79.8 METERS, AND AT THE +4.15 LEVEL IS 105 METERS.

F

�����TSE������� ����������TSE�� �������������� �������������� ��������

ACROBATIC GATE LOADING: x 2.45kN VERTICAL POINT LOAD (250kg) (550#) PER GATE x 7.35kN POSSIBLE VERTICAL SHOCK LOAD (750kg) (1654#) PER GATE x 6.37kN POSSIBLE HORIZONTAL SHOCK LOAD (650kg) (1435#) PER GATE. HORIZONTAL SHOCK LOAD MAY OCCUR IN ANY DIRECTION. LED SCREEN LOADING AT CATWALK +12M (1 UNIT) x TOTAL HORIZONTAL LOAD - 6,878# (3,120 KG) 30.6 KN x LINEAR LOAD OVER 12.5' (3.8M) - 550#/FT (821 KG/M) 8.0 KN/M x TYPICAL LOADING FOR 1 SCREEN UNIT. 19 UNITS TOTAL. THIS LOAD MAY OCCUR AT ANY POSITION ALONG THE GUIDE RAIL LED SCREEN LOADING AT SUPPORT DURING INSTALLATION x TOTAL VERTICAL LOAD - 25,000# (11,340 KG) 111.2 KN x LINEAR LOAD OVER 12.5' (3.8M) - 2,000#/FT (2,984 KG/M) 29.3 KN/M LED SCREEN HEADER LOADING AT CATWALK +12M: x ESTMATED WEIGHT OF EACH PANEL: 13,894# (6.303KG) 62KN (TYP OF 5 PANELS) x HORIZONTAL LOAD AT TOP OF TILTED SCREEN: 4012# (1,820 KG) 18 KN. THIS LOAD IS RESISTED BY THE CIRCULAR STRUCTURAL RING & IS LIMITED TO HORIZONTAL FORCES ONLY DUE TO LINEAR GUIDES (REF APF_TMV_431/ 1) x VERTICAL LOAD AT THE BOTTOM OF THE TILTED SCREEN (SUSPENDED FROM GRIDIRON): 13894# (6,302 KG) 2 KN x HORIZONTAL LOA AT THE BOTTOM OF THE TILTED SCREEN (BRACED BACK TO THE GRID) 4,012# (1820 KG) 18 KN TRACKED VIDEO WALL PANELS SPANS ONSTAGE RIGGING BEAMS AT 10M & CEILING SLAB AT +12M: x TOTAL LOAD TO STRUCTURE - 139,120# (63,104 KG) 618.8 KN x LOAD PER TRACKED PANEL - 30,880# (14,007 KG) 137.4 KN x CONCENTRATED LINEAR LOAD - 2,785#/LIN. FT (4,151 KG/LIN. M) (2 PANELS SIDE BY SIDE)

LED PANEL LOCATION TO BE

SHOW THEATRE FURTHER STUDIED. AT WANDA WUXI CITY

ISSUED DATE: 08 NOVEMBER 2017

LED面板的位置有待进一步研究

TSE ��������� TSE ABOVE GROUND COORDINATION GUIDELINES REPORT

P e r f o r m i n g A r t s / M e d i a F a c i l i t i e s P l an n i n g a n d D e s i g n

C 2017

PAGE AG-05

普通座席 GENERAL SEATING 950 TYPICAL ROW SPACING

950 典型排间隔

17°

3

2

出口 1

出口 8

1

350

EXIT #1

EXIT #8

500

5

12

1200

11

2

6

SIGHTLINE SECTION - GENERAL SEATING 视线剖面图 - 普通座席 1:100

EXIT #2 出口 2

EXIT #7 出口 7

10

7 LED PANEL LOCATION TO BE FURTHER STUDIED. LED面板的位置有待进一步研究

EXIT #3 出口 3

普通座席

贵宾座席

EXIT #6

V.I.P. SEATING

GENERAL SEATING

1080 TYPICAL ROW SPACING

950 TYPICAL ROW SPACING

950 典型排间隔

1080 典型排间隔

出口 6

STAGE MANAGER POSITION IN AUDIENCE TO BE FURTHER STUDIED

9

1200

8

4 19°

EXIT #5

480

舞台经理在观众中的位置有待进一步 研究

EXIT #4 出口 4

出口 5

17°

3 2 1

500

350

BACKGROUNDS UNDER DEVELOPMENT. SEE TJIAD DRAWINGS FOR LATEST DETAILS. 底图设计进行中。最新细节详见TJAD的图纸

1200

THEATRICAL SEATING PLAN - 剧场座位平面图

1

3

1:250

SIGHTLINE SECTION - VIP 视线剖面图 - 贵宾 1:100

NOTES 备注 NOTE SECTION REFERENCED IN THE DESIGN NUMBER CODE FOR THEATRE AND 备注编号 DESCRIPTIVE NOTE 所涉及剧院设计规范章节及备注说明 1

2

5.1.2 PARAGRAPH 4 - POINT OF SIGHT IS TAKEN TO A POINT 0.5m UP AND 1.2m OUT FROM THE EDGE OF THE STAGE. 5.1.2 段落 4 - 视点为舞台边缘上方0.5 米、朝外 1.2米的点。 5.1.3 PARAGRAPH 2 - SEATING LAYOUT IS LATERALLY STAGGERED. 5.1.3 第2段 - 座席错排布置。

NOTE SECTION REFERENCED IN THE DESIGN NUMBER CODE FOR THEATRE AND 备注编号 DESCRIPTIVE NOTE 所涉及剧院设计规范章节及备注说明 3

4

5.1.6 - MAXIMUM ANGLE OF DEPRESSION FOR SIGHT LINE FOR GENERAL SEATING IS 17 DEGREES WHICH IS LESS THAN THE CODE ALLOWED MAXIMUM OF 30 DEGREES. 5.1.6 - 普通座席区视线最大俯视角为17度, 低于设计规范允许的30度最大值。 5.1.6 - MAXIMUM ANGLE OF DEPRESSION FOR SIGHT LINE FOR V.I.P. SEATING IS 19 DEGREES WHICH IS LESS THAN THE CODE ALLOWED MAXIMUM OF 30 DEGREES. 5.1.6 - 贵宾座席区视线最大俯视角为19度 低于设计规范允许的30度最大值。

NOTE SECTION REFERENCED IN THE DESIGN NUMBER CODE FOR THEATRE AND 备注编号 DESCRIPTIVE NOTE 所涉及剧院设计规范章节及备注说明 5

NOTE SECTION REFERENCED IN THE DESIGN NUMBER CODE FOR THEATRE AND 备注编号 DESCRIPTIVE NOTE 所涉及剧院设计规范章节及备注说明

27.97m DISTANCE TO EXIT 1. 27.97m 至1号出口距离.

9

33.56m DISTANCE TO EXIT 2. 33.56m 至2号出口距离.

10

7

24.86m DISTANCE TO EXIT 3. 24.86m 至3号出口距离.

11

33.56m DISTANCE TO EXIT 7. 33.56m 至7号出口距离.

8

24.05m DISTANCE TO EXIT 4. 24.05m 至4号出口距离.

12

27.97m DISTANCE TO EXIT 8. 27.97m 至8号出口距离.

6

24.05m DISTANCE TO EXIT 5. 24.05m 至5号出口距离. 24.86m DISTANCE TO EXIT 6. 24.86m 至6号出口距离.

SEATING TOTALS: 座席总数

GENERAL 普通

VIP 贵宾

TOTAL 小计

1,922

70

1,992

FIXED SEATING - 固定座席 WHEELCHAIR SEATING - 轮椅 TOTAL - 小计

6

2

8

1,928

72

2,000

PROJECT:

WANDA WUXI-2 DRAWING:

SEATING PLAN AND SECTION

C 2017 Auerbach Pollock Friedlander

FOR INFORMATION ONLY

DATE:

1/6/2016 SCALE:

AS NOTED

BY:

EB

REV:

DRAWING No.:

SK-101

3


4

PROFESSIONAL EXPERIENCE


Cirque du Soleil X Theatre

Hangzhou, Zhejiang Province, China - Completed 2019 JOB CONTENTS • • • •

Kept ommunications with owner, architects and design teams; Maintained and updated project data such as transmittals, RFI files and logs on a daily basis; Prepared bilingual drawings and specifications; remote support for checkouts; Gathered and prepared documents for publications

5


6


Guangzhou Yue Show Theatre

Guangzhou, Guangdong Province, China - In Construction

JOB CONTENTS • • • •

Prepared bilingual system and detail drawings as well as specifications, program, reports and document translations; Kept daily transmittals, RFI files logs and meeting notes; Built 3D model for the venue and structural, machinery, lifts, rigging, pool, projection system design; Room layout configurations, accessibility studies, visual studies, interference checks between different disciplines

PROFESSIONAL EXPERIENCE

7


8 2

1/8"=1'-0"

AV SYSTEM LAYOUT PLAN - LEVEL TWO

4

NOT TO SCALE

VIEWS TO STAGE

8'-8" 15'-3"

HOUSE LEFT BACK OF BALCONY WITH BALCONY BUMP OUT

HOUSE RIGHT BACK OF BALCONY WITHOUT BALCONY BUMP OUT

20

20

20

20

20

20

20

20

20

7'-0" 20

20

20

20

20

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

22

23

20 21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20 21

21

20

21

20 21

20

21

20 21 20

21 20 21

20 21 20

21

20 21 20

21

20 21 20

21 20

21

21

21

21

21

21

21

21

21

21

21

21

21

22

23

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

22

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

23

21

21

21

21

21

21

21

21

21

22

21

21

21

21

21

21

21

21

21

23

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21 22

22

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21 21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

22

22

22

22

22

22

21

21

21

21

21

21

21

21

21

22

22

22

22

22

22

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20

20

20

20

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20

20

20

20

20

20

20

20

20

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

22

22

22

22

22

22

21

21

21

21

21

21

21

21

21

22

22

22

22

22

22

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

23

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

23

21

21

21

21

21

21

21

21

21

22

21

21

21

21

21

21

21

21

21

21 21 21

21 21

21

21

21

21

21

21

21

21

23

21

21

21

21

21

21

21

21

21

21

21

21

21

21

22

22

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

23

22

20 21

21

22

22

23

22

22

22

23

22

22

23

23

23

23

23

23

23

23

23

22

22

22

22

22

22

22

22

22

22

22

22

22

22

22

21

22

22

22

21

23

23

21

21

22

21

22

22

22

22

22

22

22

22

21

21

23

22

22

23

23

23

22

23

22

22

23

23

22

22

22

23

21

23

22

22

22

23

23

23

21

23

21

23

22

22

21

23

22

22

22

22

23

23

21

23

22

22

22

22

22

23

22

22

22

22

22

23

23

22

23

22

22

22

22

23

22

23

20

20

20

20

20

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

21

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

20

21

21

22

21 21

22

23

22

23

22

23

21

22

23 21

23

23 22

23

21

23

21 22

23 22

23

22

23

23

22 23

21

21

21

23

21

21

21

21

22

21

22

22

22

22

21

23

21

21

21

23

23

21

23

23

22

22

23

23

23

21

21

23

23

22

22

22

22

22

22

23

21

21

22

23

23

22

23

23

23

23

21

21

23

22

22

22

22

23

23

21

22

21

22

22

21

21

22

22

21

21

23

23

23

22

23

22

23

23

22

23

23

23

23

23

22

22

22

23

22

23

23

21

21

21

23

23

23

21

21

23

22

21

21

22

21

22

21

21

21

21

21

23

21

23

23

21

21

22

22

22

23

22

23

22

22 23 23

22

22

22

22

23

22

22

21

23

22

23

23

23

22

22

22

22

22

22

23

22 22 21 21

23

21 22 22

22

21

21

21

21

20

21

21 20

21 20 21

21 20

21

20 21

21

21 20

21

21

22

21

22 22

22

22

22 22 22

23

22

21

23

23

21

21

20

21

20 21

20

21

21

21

21

21

21

21

21

21

21

21

20

22

22

23

23

23 23

21

21

21

21 21 22

21

22

22

21

23

22

22

23

23

22

22

21

23

23 23

22

CENTER ARRAY

21

23

22

HOUSE RIGHT BACK OF PARTERRE WITHOUT BALCONY BUMP OUT

21

7'-2"

USHER RM 101 SF

HOUSE LEFT BACK OF PARTERRE WITH BALCONY BUMP OUT LINE ARRAY

21

23

OMENS 0 SF 2 -

21

22

IMAG LED SCREENS 10'X17'-9" SPEAKER ZONE PRESENTATION LED SCREEN IN THREE DIFFERENT POSITIONS TBD

34'-0"

BAND ZONE

4'-1"

UP

LIGHTING ZONE

8'-8"

20'-0" 5'-0"

1

3 -

CROSSOVER CORRIDOR

1/8"=1'-0"

3

AV SYSTEM LAYOUT ELEVATION

1/8"=1'-0"

AV SYSTEM LAYOUT CENTERLINE / SIGHTLINE SECTION 10'-3"

+0'-0"

3'-0" ROW DEPTH - 12" ROW RISER

3'-3"

6'-0"

1'-4"

26'-8"

+3'-0" GROUND LEVEL

CAMERA POSITION

24'-0"

LEVEL 2 +18'-0"

LEVEL 1 0" CROSSOVER CORRIDOR

27°

STAGE LEVEL

IMAG LED SCREENS 10'x17'-9" +17'-0" BOTTOM OF IMAG

LEVEL 2 18' - 0" CROSSOVER CATWALK

PRESENTATION LED SCREEN +27'-0" MAIN PROSCENIUM +31'-5"

LEVEL 3 +33'-0"

SECOND PROSCENIUM

LEVEL 3 33' - 0"

LINE ARRAY CENTER ARRAY

14'-3"

LOCATIONS FOR DISCUSSION

3'-0" ROW DEPTH 16" ROW RISER

3'-3" LEVEL ROOF 48' - 0" LEVEL UPPER ROOF 59' - 1"

gospel. community. culture.16

Village Church New Worship Centre, Design Review

E

D

C

B

A

Visualization and sightline studies, projection and sound system studies; Prepared study drawings and specifications

• •

JOB CONTENTS

Surry, Canada

Surrey Village Church


JC Group Star Theatre

Hangzhou, Zhejiang Province, China

JOB CONTENTS • •

In concept design phase, helped with developing lifts system for the whole venue; In preliminary design phase, assisted the design team with machinery system model and produced demonstration animations via grasshopper; Prepared bilingual system and detail drawings

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

GENERAL NOTES - TM

备注 - TM A

所有紧固件须采用锁紧垫圈或其他经批准的自锁紧五 金件。 所有暴露元素的表面处理须为平齐、黑色,除非另有 说明。

1. ALL FASTENERS TO HAVE LOCKWASHERS OR OTHER APPROVED SELF-LOCKING HARDWARE. 2. ALL EXPOSED ELEMENTS TO BE FINISHED FLAT BLACK UNLESS NOTED OTHERWISE.

剧场舞台升降机承包商须在核实所有现场尺寸和条件。 3. THEATRICAL STAGE LIFT CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD. 所有设备由剧场舞台升降机承包商,除非另有说明。

B 剧场舞台升降机承包商须核实所有舞台电机尺寸、荷 载和功率要求。 舞台机械和电机控制中心之间的所有电线、导管、接 线盒、穿线盒和终端由剧场舞台升降机承包商核实、供 应和安装。

水平管和天桥栏杆上不允许导管和导管支撑。所有天 桥栏杆从踢脚板顶到水平栏杆顶须无障碍。

C

剧场舞台升降机承包商负责提供所有的驱动和导引机 制以及上层结构和支持升降机框架、地面底物和合同范 围内面饰的相关框架。框架的整合方式须为表面和安装 的装置提供刚性支持。不得存在未支撑或悬臂边缘,以 免升降机系统表面部件之地面或木工件有应力或损坏的 机会。

D

合作设计单位:

4. ALL EQUIPMENT BY THEATRICAL STAGE LIFT CONTRACTOR UNLESS NOTED OTHERWISE. 5. THEATRICAL STAGE LIFT CONTRACTOR TO VERIFY STAGE MACHINERY MOTOR SIZES, LOADS, POWER REQUIREMENTS. 6. THEATRICAL STAGE LIFT CONTRACTOR TO VERIFY, SUPPLY AND INSTALL ALL WIRE, CONDUIT, JUNCTION/PULL BOXES AND TERMINATIONS BETWEEN STAGE MACHINERY AND MCCS.

建设单位:

7. NO CONDUIT OR CONDUIT SUPPORTS PERMITTED ON HORIZONTAL PIPES OR CATWALK RAILINGS, ALL CATWALK RAILINGS TO BE COMPLETELY CLEAR OF ALL OBSTRUCTIONS FROM TOP OF KICK PLATE TO TOP OF UPPER HORIZONTAL RAILING. 8. THEATRICAL STAGE LIFT CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL DRIVE AND GUIDE MECHANISMS, AS WELL AS SUPERSTRUCTURE AND ASSOCIATED FRAMING TO SUPPORT THE LIFT FRAME, FLOORING SUBSTRATES AND FASCIAS THAT ARE APPLIED TO THE LIFT AS PART OF THIS CONTRACT. FRAMING SHALL BE INTEGRATED IN SUCH A MANNER SO AS TO PROVIDE RIGID SUPPORT OF SURFACES AND DEVICES BEING MOUNTED. UNDER NO CIRCUMSTANCES SHALL UNSUPPORTED OR CANTILEVERED EDGE CONDITIONS EXIST, CREATING STRESS AND DAMAGE OPPORTUNITIES FOR APPLIED FLOORING AND/OR CARPENTRY WORK ASSOCIATED WITH THE FINISH COMPONENTS OF THE LIFT SYSTEM.

备注:

粗略 不用 2018 设 FO PR NO TE

尺寸仅供参考。关键尺寸请参见相关建筑和结构图纸。 9. DIMENSIONS ARE PROVIDED FOR REFERENCE ONLY. REFER TO APPLICABLE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR CRITICAL DIMENSIONS.

E

Moving Stairs System Mechanisim 本图纸的意图仅为提供关于剧场设备的信息。关于建 筑物的建筑或工程信息,请参见建筑或工程图纸

F

20

10. THIS DRAWING IS INTENDED TO PROVIDE INFORMATION REGARDING THEATRICAL EQUIPMENT ONLY. REFER TO APPLICABLE ARCHITECTURAL OR ENGINEERING DRAWINGS FOR ARCHITECTURAL AND ENGINEERING INFORMATION RELATING TO THE BUILDING.

图纸有版权保护 AUERBACH AUERBACH P 独有财产。 ASSOCIAT POLLOCK FRI 禁止对本图纸

1 TM301

ACROBATIC SCENIC PANELS UP-DOWN+ROTATE

杂技布景吊板 上下移动及旋转

ACROBATIC SCENIC PANELS UP-DOWN+ROTATE

杂技布景吊板 上下移动及旋转

ACROBATIC SCENIC PANELS UP-DOWN+ROTATE

ACROBATIC SCENIC PANELS UP-DOWN+ROTATE

杂技布景吊板 上下移动及旋转

杂技布景吊板 上下移动及旋转

SLOPE DOWN

下场门水下入口 AQUA COULISSE SL

水下布景储藏 UNDERWATER SCENIC STORAGE

-3.500

上场门水下入口 AQUA COULISSE SR

-3.500

-5.500

-8.600

+0.050

-0.040

-5.500

-8.000

-8.600

项目设总

湿升降机导引柱(下场门,舞台后区和上场门升降 机均典型2处)(位于沟槽下方) WET LIFT GUIDE COLUMN (TYP OF 2 PER STAGE LEFT, UPSTAGE, AND STAGE RIGHT LIFTS ) (LOCATED BELOW GUTTER)

J

+0.000 -0.075

3550 行程 TRAVEL

-0.040

水下布景储藏 UNDERWATER SCENIC STORAGE

5000 行程 TRAVEL

8000 基坑深度 PIT DEPTH

I

升降机和水下入口之间的填充平台(相同,对称) INFILL PLATFORM BETWEEN LIFT AND AQUA COULISSE (SIM. OPP.)

SLOPE DOWN

+0.050

填充区域表示湿升降机/水池和干舞台之间的沟槽 HATCHED AREA INDICATES GUTTER BETWEEN WET LIFTS/POOL AND DRY STAGE

杂技布景吊板 上下移动及旋转

3 TM421

H +0.000 -0.075

ACROBATIC SCENIC PANELS UP-DOWN+ROTATE

5500 基坑深度 PIT DEPTH

G

DRAWING S THIS DRAW THEREIN ARE PROPE ASSOCIATE POLLO REPRODU DRAWING EXCEPT W CONSENT OF INC. (DBA FRIEDLA

审 审

定 核

T

专 业 负责人 设 制

虚线轮廓表示升降机位于低处的位置 DASHED OUTLINE INDICATES LIFTS IN LOW POSITION

计 图

A

工程名称:

JC GRO HANG 子项名称:

K 图纸名称:

THEATR TRANS

1

L

剧场舞台升降机 - 垂直中线剖面图 1:100

设计阶段 专 业 图 号

THEATRICAL STAGE LIFTS - TRANSVERSE SECTION

1

2

3

4

5

6

7 8 9 PROFESSIONAL EXPERIENCE

10

11

12

13

14

15

9

AP


Detail Samples

NOTE:

��:

1)

Various Projects

�����TSE������� ����������TSE�� �������������� �������������� ��������

1)

ALL TSE LOADS ARE ALLOWANCES TO BE USED BY THE STRUCTURAL ENGINEER FOR COMPLETING THEIR WORK. INDUSTRY STANDARD STRUCTURAL SAFETY FACTORS ARE NOT INCLUDED.

��������������� TSE ��/��������� ������������ NOTE: DRAWING INDICATES DESIGN INTENT ONLY. FINAL TSE CONTAINMENT SYSTEM TO BE COORDINATED WITH EACH CONTRACTOR AND FIELD VERIFIED. ��������� HIGH VOLTAGE CABLE TRAY ��������������� TSE ��/������������ ��������� NOTE: DRAWING INDICATES DESIGN INTENT ONLY. FINAL TSE CONTAINMENT SYSTEM TO BE COORDINATED WITH EACH CONTRACTOR AND FIELD VERIFIED.

������� LOW VOLTAGE CABLE TRAY

900

������� ALTERNATE LOCATION FOR LOW VOLTAGE CABLE TRAY

TSE ��� - B.O. TSE ZONE ����� 3200mm - 3200mm AFF ��������� HIGH VOLTAGE CABLE TRAY

150 MIN

���� - CLEAR CATWALK HEIGHT ����� 3000mm - 3000mm AFF

900 �� SEPARATION

ኳ����� (ᇶ��������) (ཧ�����) CATWALK CROSS MEMBERS (WORK OF BASE BUILDING CONTRACTOR) (REFER TO STRUCTURAL DRAWINGS) ኳ������ (ᇶ��������) (ཧ�����) CATWALK HANGER LOCATIONS (WORK OF BASE BUILDING CONTRACTOR) (REFER TO STRUCTURAL DRAWINGS)

������� ALL-THREAD ROD HANGER ��������� HIGH VOLTAGE CABLE TRAY ������� LOW VOLTAGE CABLE TRAY

2000 ���� MINIMUM CLEAR

2000MM�������������������� 2000mm MINIMUM CLEAR HEIGHT. LOCATE TRAYS AS TIGHT TO STRUTURE AS POSSIBLE

��������� HIGH VOLTAGE CABLE TRAY ��������� HIGH VOLTAGE CABLE TRAY

��������������������� CABLE TO BE PROVIDED AND PULLED BY DISCIPLINE SPECIFIC TSE SPECIALTY CONTRACTOR

����� - ������������� VERTICAL CONTAINMENT - PROVIDE CABLE TIE STRAIN RELIEF LADDER WITHIN

������� LOW VOLTAGE CABLE TRAY

1

���������� TYPICAL CATWALK CABLE TRAY DETAIL

1:50

������� C 2017

10

P e r f o r m i n g A r t s / M e d i a F a c i l i t i e s P l an n i n g a n d D e s i g n

2

����������� TYPICAL GRID LEVEL CABLE TRAY DETAIL

1:50

SHOW THEATRE AT WANDA WUXI CITY

TSE ��������� TSE ABOVE GROUND COORDINATION GUIDELINES REPORT

ISSUED DATE: 08 NOVEMBER 2017 PAGE AG-17


Harrington Center for the Arts American Fork, Utah

JOB CONTENTS • •

Supported the theatre consulting team on the design of concept space adjacency and building massing plans, space programming, as well as theatrical systems design and documentation including seating and room configuration throughout the Feasibility and Concept Study phase; Created site and venue models, designed the retractable seating system and visualization

PROFESSIONAL EXPERIENCE

11


REF.

F. RE

REF.

REF.

REF.

REF.

REF.

F. RE

REF.

F. RE

UP DN

DN

F. RE

F. RE

UP

REF.

F. RE F. RE

REF.

REF.

F. RE

DN

DN

F. RE F. RE F. RE

12


NET ZERO PORTLAND

Portland, Oregon

DESIGN NARRATIVE

This net zero strategy design has a sustainable system which includes solar PV panels, highly insulated envelope, self-shading window and facades, solar thermal panels, natural ventilation, water conservation, heat collection and thermal mass in together to contribute to this project. The overall idea of this space has been about how to invite people in, let them stay and let go. The central courtyard, accessible green roof and interior atrium together with community spaces such as common room and gym provide the dwellers with multiple choice for their activities. Material has been carefully selected to have the best performance for the energy saving strategy.

Circulation

View

Solar Power

Residential

Green Space

Commercial & Community

ACADEMIC PROJECT

13


CEDAR HILL RESERVATION

STORER CONSERVATION

RESIDENTIAL

DESIGN NARRATIVE

The 58-acre site is 10 miles from downtown Boston, filled with practical application and demonstration of cutting-edge sustainable agriculture and landscape methods, including a ‘green’ 20,000 square foot building which will act as a front door portal for “all-things sustainable.” Science-based practices will be showcased that benefit the citizenry and economic vitality of the commonwealth.

SITE

BENTLEY UNIVERSITY

DOWNTOWN WALTHAM

Train to Boston

We envision the center as enzymes, by designing this urban sustainability center to connect city and catalyze new activities, interactions and opportunities for the neighborhood and Waltham city. The center will be served as a food hub by providing organic agriculture product, a connector with will integrate with local green way and sustainability incubator to educate people about sustainability, show people more potentials and creative ideas about urban sustainability and inspire people’s thinking about urban agriculture. This project is an outcome of teamwork. I worked with my teammate, Bin Liu, who is from the landscape architecture program. He is in charge of the landscape and I am working on the architecture. It was a great experience to learn cooperation from a project like this.

m

riu

ito

d Au

Learnin g Cente r

Experimental Field

Berry Garden

Community Gardena Tree Square

14

Green

Welcoming Space

Outdoor Kitchen

House

Herb Garden Children's Garden

Rose Garden

CSA Rain Garden

Wild flower Garden

Stock

Existing Pine Tree


Waltham Center for Urban Sustainability Waltham, Massachusetts

ENZYME KEY AND LOCK MODEL

REACTION ENZYME KEY AND LOCK MODEL

ENZYME

ENZYME REACTION

ENZYME

Substrate entering ENZYME active site of enzyme Substrate entering active site of enzyme

Substrate/enzyme ENZYME complex

ENZYME

Substrate/enzyme complex

Reaction happens, products leaving enzyme

REACTION HAPPENS Architecture Architecture

Reaction happens, products leaving enzyme

REACTION HAPPENS

Landscape Landscape NEW POTENTIAL NEW AND POTENTIAL POSSIBILITIES

Sustainability

Sustainability

AND POSSIBILITIES STORM WATER MANAGEMENT

CLEAN ENERGY

ORGANIC AGRICULTURE

Water Clean Wind Energy

MITIGATE POLLUTION

Sustainable Demonstration

Green Roof

ACADEMIC PROJECT

Solar Panel

Rain Garden Permeable Pavement

15


Staircase Design DESIGN NARRATIVE

Inspired by Gordon Matta-Clark Suspended staircase rises from the ruins Towards the “Anarchitecture�

Suspended Staircase, 2015 Acrylic, fishing line, marble tiles, aluminum angles, zinc rods, mixed material

16


Bar Interior and Lighting Design New York, New York

DESIGN NARRATIVE

The bar counter area is lighten up with cooler ambient light while the table seating area is given out a much warmer tone. Curved columns with wood finish, separating the space yet maintaining the visual thoroughness. Elevated bar counter with hidden strip downlight. The shelves are continued to the ceiling, formed a headpiece over the bar area, providing futuristic sense to the space.

ACADEMIC PROJECT

17


Lamp No. 6, 2016 Chopsticks, copper wire, fireproof paper

Foyer Lamp No. 7, 2016 Textured paper, stainless steel rods

Lamp No. 5 over Dining Table, 2016 Copper sheets, stainless steel rods, aluminium flat bar, copper wire

18


Interior Design and Lamp Craft Series Anyang, Henan Provience, China

DESIGN NARRATIVE

The design use recycled wood that has been saved from old houses. Ulmus columns turns into the whole length bookshelves; the door with latch grooves has been made into a reading table; after planking the jujube wood beams, you start to see the rich red core inside of the trunk, which becomes the dining table and coffee table surface; the wall over the dinning area are made from all kinds of fruit tree slices, such as apple, apricot, cherry, peach, pear, pomegranate‌ I took a plank of cypress and sanded it, with the help of clear finish, the board surface stared to show an almost silk-like color tone. My interest in lamp making lead to create custom lamps for the interior design. Chopsticks lamp for reading room; plastic holders for the overflow in heating system become the cover of the pendant lamp in living room; leaves made out of copper sheet strips hanging above the dinning table, textured paper foyer lighting stays simple

19


XIANG YU

413-559-1231 yuxsean@gmail.com

20

Work Type


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.