San Antonio BRAC Program RANDY HOLMAN Joint Program Management Office U.S. Army Corps of Engineers
1
BRAC 2005 MAJOR REQUIREMENTS • Consolidate inpatient care in San Antonio • Integrate all enlisted medical training at Fort Sam Houston • Relocate Installation Management Command and field agencies to Fort Sam Houston 2
JOINT PROGRAM MANAGEMENT OFFICE Joint Program Management Office (JPMO) • U.S. Army Corps of Engineers
• Air Force Center for Engineering and the Environment • U.S. Naval Facilities Engineering Command • Private-sector contractors
78 major facilities; more than 6 million square feet of facilities BRAC deadline of September 2011
3
METC
4
PROGRAM OUTLOOK
5
CONTRACTING
FY 08 AWARDS > $1.2 BILLION FY 09 AWARDS ~ $700 MILLION FY 10 AWARDS ~ $700 MILLION
6
WHERE TO BEGIN LOOKING‌
Contracting Opportunities The current edition of the San Antonio Military Construction Program Outlook Storyboard can be accessed by clicking the link: San Antonio Military Construction Storyboard
www.sanantonio.gov/oma 7
BRAC CONSTRUCTION STORYBOARD
8
BASIC REQUIREMENTS
•Register with CCR, http://www.ccr.gov. •Obtain DUNS number, http://fedgov.dnb.com. •Complete ORCA application, http://www.bpn.gov.
9
OFFICIAL SOLICITATION INFORMATION •CONTRACTING DIVISION, U.S. Army Corps of Engineers, Fort Worth District http://ebs.swf.usace.army.mil •CONTRACTING DIVISION, Air Force Center for Engineering and the Environment -www.afcee.brooks.af.mil/pkv •FEDERAL BUSINESS OPPORTUNITIES (FedBizOpps) - http://www.fbo.gov 10
BRAC TIMELI NE
BRAC TIMELINE BRAC Passed Nov. 2005 / BRAC Deadline Sept. 2011 Total Days = 2136.00
11
THANK YOU! Joint Program Management Office