San Antonio BRAC Program RANDY HOLMAN Joint Program Management Office U.S. Army Corps of Engineers

1


BRAC 2005 MAJOR REQUIREMENTS • Consolidate inpatient care in San Antonio • Integrate all enlisted medical training at Fort Sam Houston • Relocate Installation Management Command and field agencies to Fort Sam Houston 2


JOINT PROGRAM MANAGEMENT OFFICE Joint Program Management Office (JPMO) • U.S. Army Corps of Engineers

• Air Force Center for Engineering and the Environment • U.S. Naval Facilities Engineering Command • Private-sector contractors

 78 major facilities; more than 6 million square feet of facilities  BRAC deadline of September 2011

3


METC

4


PROGRAM OUTLOOK

5


CONTRACTING

FY 08 AWARDS > $1.2 BILLION FY 09 AWARDS ~ $700 MILLION FY 10 AWARDS ~ $700 MILLION

6


WHERE TO BEGIN LOOKING‌

Contracting Opportunities The current edition of the San Antonio Military Construction Program Outlook Storyboard can be accessed by clicking the link: San Antonio Military Construction Storyboard

www.sanantonio.gov/oma 7


BRAC CONSTRUCTION STORYBOARD

8


BASIC REQUIREMENTS

•Register with CCR, http://www.ccr.gov. •Obtain DUNS number, http://fedgov.dnb.com. •Complete ORCA application, http://www.bpn.gov.

9


OFFICIAL SOLICITATION INFORMATION •CONTRACTING DIVISION, U.S. Army Corps of Engineers, Fort Worth District http://ebs.swf.usace.army.mil •CONTRACTING DIVISION, Air Force Center for Engineering and the Environment -www.afcee.brooks.af.mil/pkv •FEDERAL BUSINESS OPPORTUNITIES (FedBizOpps) - http://www.fbo.gov 10


BRAC TIMELI NE

BRAC TIMELINE BRAC Passed Nov. 2005 / BRAC Deadline Sept. 2011 Total Days = 2136.00

11


THANK YOU! Joint Program Management Office