Architectural Portfolio

Page 1

VALONIA OCTAVIA

achitectural portfolio


K24 HQ Office

THE ALFRED STABLES Office


STAGE OF PROJECT Sketch Design

4 BAYVIEW RD Single Residenatial

17 NEVILLE ST Single Residenatial

10 ALVINA ST Multi Residenatial PROJECT TITLE 4 Bayview Rd Seddon

TITLE Render

DATE 11/03/2022

PROJECTS achitectural portfolio


THE ALFRED STABLES, MELBOURNE Project: 3-storey Office Building for Hospital Type: Alteration+Addition Heritage Listed Building Status: Construction Completed Cost: $8.6million Area: 1947m2

The brief was to bring in new value to an existing building that were mostly use storage and workshop, to turn it into healthy workplace for administration arm of Alfred Hospital. It started as a limited interior alteration to the first floor to the entire building, which provided a unique challenges to expand the design narrative in the midst of finishing the detailed designed of the initial scope. Each floor was designed to different level of privacy experience connected by common circulation path. Ground floor was designed with to be welcoming to visitors, with partial visual connection towards the office space, first floor was designed to have fully private work pods and secondfloor to be the most transparent with fewer private zones. Budget was being strategized with emphasis towards restoring the heritage building and improving its thermal comfort.


1

2

3

2620

2035

+23.990 SOFFIT OF ROOF TRUSS

3

4

EX. STEEL BEAM 8

9

8 10

2 5

6

7

11

8

9

11

11

11

GL1

11

MT2

3880

MT2

1

ALFRED LANE

KEY 1 2 3 4 5 6 7 8 9 10 11

Ground Floor Plan

ENTRY RECEPTION COMMS ROOM TOILETS HOTDESK BREAKOUT AREAS PRINTING ROOM OFFICE MEETING ROOM KITCHENETTE WORKSTATIONS

N

STEEL PLATE RISER TO BUTT AGAINST AND FLUSH EX. TIMBER FLOOR

EX TIMBER FLOOR

1000mm HT 12mm THK STEEL PLATE BALUSTRADE IN MT1 FINISH, FULLY WELDED TO STRINGER TO STRUCTURAL ENG'S DWGS

SCALE

+20.110 LEVEL 2 GL1

0

0.5

1

2

5

M

1000

EX. STEEL BEAM

MT1

17

6 4

3

2

5

5

3

SCHINDLER 5500 (1.0 ms 750 kg) GLASS LIFT AS SPECIFIED. TO BE INSTALLED AS PER MANUF'S INSTRUCTION. LIFT SHAFT TO REFER TO STRUCT'S ENG'S DOCS.

5

4 6

15

14

13

6

6

6

4270

7 6

16

1 6

6

6

6

11

10

9

6

1

MT1

12

STEEL TREADS AND RISER IN MT1 FINISH TO STRUCT. ENGS DRAWINGS

GL1

6 8

5

5

5 7

6

TREAD 250

300 FLAT

6

6

MT2 5

MT1

STEEL PLATE RISER TO BUTT AGAINST AND FLUSH EX. TIMBER FLOOR

3

ALL STEEL STRUCTURES IN MT3 FINISH, REFER TO STRUCT. ENG'S DWGS

KEY 1 2 3 4 5 6 7

First Floor Plan

RECEPTION MEETING ROOM KITCHEN TOILET PERSONAL ASSISTANT DESK OFFICE PRINTING & STORAGE

900

MT1

ALFRED LANE

EX TIMBER FLOOR

1000

4

2

1

+15.840 LEVEL 1 N

1000mm HT 12mm THK STEEL PLATE BALUSTRADE IN MT1 FINISH, FULLY WELDED TO STRINGER TO STRUCTURAL ENG'S DWGS

SCALE EX. STEEL BEAM 0.5

1

2

5

MT1

M

1000

0

GL1 21

SCHINDLER 5500 (1.0 ms 750 kg) GLASS LIFT AS SPECIFIED. TO BE INSTALLED AS PER MANUF'S INSTRUCTION. LIFT SHAFT TO REFER TO STRUCT'S ENG'S DOCS.

20

19

18

17

4

3 9

9

9

9

MT1

16

4 1

8 4890

15

14

13

STEEL TREADS AND RISER IN MT1 FINISH TO STRUCT. ENGS DRAWINGS

10

MT2 GL1

12

11

10

9

7

5

5

11

11

11

11

11

11

MT2

8

7

MT1

7

250 TREAD

300 FLAT

6

5 6

8

5

ALL STEEL STRUCTURES IN MT3 FINISH, REFER TO STRUCT. ENG'S DWGS

4

900

3

2

ALFRED LANE

HANDRAIL

2

1

KEY 1 2 3 4 5 6 7 8 9 10 11

Second Floor Plan

+10.950 LEVEL 0

RECEPTION WAITING AREA KITCHENETTE TOILETS MEETING ROOM COMMS ROOM BREAKOUT AREA PRINTING & STORAGE OFFICES KITCHEN WORKSTATIONS

N 620

SCALE 0

0.5

1

1415

620

2620

1

CD 5.1.07

2

5

M

2035

DETAILS - STAIRCASE - LIFT - SECTION 2

NOT FOR CO

1 : 20

Staircase Detail

REV

DATE

DESCRIPTION

2

23/08/18

Construction Issue

Consultants :

Client :

Consultants :

Architects

Level 2, 118 Langridge Street, Collingwood VIC 3066 Australia BUILDER TO CONFIRM

CD 4.1.02

3

2

3

2

2

3

DETAILS - ENTRY ELEVATION 2

CD 4.1.01

Builder :

3

2

2

Consultants : INSIDE

Consultants :

120 300

2520

Telephone: 1300 360 382 Facsimile:615 03 9824 0843 Email: office@eatas.com.au Website: www.eatas.com.au

100

200

MT2

MT2 50

NOOK

250

MT2

100

SLANTED CEILING

2

3

Drawing Tile

DETAILS - STAIRC (STAGE1)

150

835

FORM INTERNAL STRUCTURE TO SUIT

2

© COPYRIGHT All rights reserved. These drawings remain the property of Architects EAT and is only to be used for its commissioned purpose. no part of this document may be reproduced modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

D 0.02

OPENING NOOK ABOVE SHOWN DASHED

2

ALFRED THE STA 11 ALFRED LANE YARRA

NOOK

OPENING NOOK ABOVE SHOWN DASHED

2

4

EXISITNG OPENING SIZE ON SITE WITH ARCHITECTS. NEW ENTRY DOOR TO FIT WITHIN EXISTING OPENING

3755

NOM 3020 COS EXISTING OPENING 100

BIRRUS DURAGRID RECESSED IN-FLOOR DRAINAGE WITH BIRRUS DURAGRIT ENTRANCE MATTING OVER

Project Name

General Notes Do not scale from this drawing. use marked dimensions. Drawings to be read in conjunction with all other Architect's and Engineer's drawings. Architects EAT are to be notified about any discrepancies.

FRAMELESS MOTORISED SLIDING GLASS DOOR REFER D/W SCHEDULE

2

MT2

A

3

MT2 CAULK AND PACK EXISTING WALL OPENING TO ENSURE WATERTIGHTNESS

EXISTING BLUESTONE WALL

1200

SLIDING DOOR OPERATOR INSTALLED AS PER MANUF. INSTRUCTION, REFER TO DOOR / WINDOW SCHEDULE 50

1393

465

1300

FALL

650 SLANTED

1

MT2

3mm THK. FOLDED STEEL PLATE ON 10mm THK. EXTERNAL GRADE PLYWOOD SUBSTRATE

615

150

250

1

1

OUTSIDE

Section BB

FRAMELESS MOTORISED SLIDING GLASS DOOR REFER D/W SCHEDULE

MT2

MT2

NOOK

FORM OPENING NOOK IN STEEL PLATE WALL

MT2

150

FORM INTERNAL STRUCTURE TO SUIT

286

340

SLANTED CEILING

MT2

D 0.02

OPENING NOOK ABOVE SHOWN DASHED

ALFRED ALFRED LANE LANE

1

LED

DOOR SWIPE ACCESS PANEL, TO CLIENT'S CONFIRMATION

SLANTED CEILING

KEY

KEY

KEY

1 2 3

1 2 3

1 2 3

MEETING ROOM OFFICE WORKSTATION

SCALE 0

0.5

1

MEETING ROOM OFFICE WORKSTATION

SCALE 2

5

M

0

0.5

1

MEETING ROOM OFFICE WORKSTATION

5

MT2

2 CD 4.1.01

DETAILS - ENTRY - PLAN

1

2

Entry - Plan Detail

M

0

0.5

1

D 0.01

+10.950 LEVEL 0

MT2

CD 4.1.01

SCALE

2

BIRRUS DURAGRID RECESSED IN-FLOOR DRAINAGE WITH BIRRUS DURAGRIT ENTRANCE MATTING OVER

MT2 50

NOOK

100

1

MT2

1 CD 4.1.02 650

ALFRED ALFRED LANE LANE

150

SLANTED

OUTSIDE

DETAILS - ENTRY ELEVATION 1

OPENING NOOK ABOVE SHOWN DASHED

50

MT2

OPENING NOOK ABOVE SHOWN DASHED

Section AA

150

ALLOW RECESS NOOK FOR SWIPE ACESS

MT2

NOOK

500

RECESSED LED STRIP

MT2

100

200

MT2

NOOK

MT2

2520

835

BIRRUS DURAGRID RECESSED IN-FLOOR DRAINAGE WITH BIRRUS DURAGRIT ENTRANCE MATTING OVER

300

54

NOM 3020 COS

CP2

EXISTING OPENING 100

150

3mm THK. FOLDED STEEL PLATE ON 10mm THK. EXTERNAL GRADE PLYWOOD SUBSTRATE

ALFRED LANE

CAULK AND PACK EXISTING WALL OPENING TO ENSURE WATERTIGHTNESS

880

120

1

1200

3755

INSIDE

ALFRED LANE 4 BUILDER TO CONFIRM EXISITNG OPENING SIZE ON SITE WITH ARCHITECTS. NEW ENTRY DOOR TO FIT WITHIN EXISTING OPENING

?

TYP. 934

ALFRED LANE 1 LANE ALFRED

1

2

150

1 2

NOOK

1

DETAILS - ENTRY ELEVATION 2

CD 4.1.01

2500

MT2

2 ALFRED LANE

ALFRED LANE 2

3

?

MT2

CD 4.1.02

2

CD 4.1.01

1 : 10

5

DETAILS - ENT 1 : 20

M

KEY KEY MEETING 1 MEETING ROOM ROOM OFFICE 2 OFFICE WORKSTATION 3 WORKSTATION

MT2 CAULK AND PACK EXISTING WALL OPENING TO ENSURE REV WATERTIGHTNESS

0.5

12

2

5

M

5

5

5 5

5 5

5 5

FALL 465

6

3

8 8

650 SLANTED

?

150

4

4 44

5

5 55

1

6

6

650

FORM OPENING NOOK IN STEEL PLATE WALL

50

2

Section CC

DETAILS - ENTRY - PLAN

MT2

MT2

NOOK

NOOK

BIRRUS DURAGRID RECESSED IN-FLOOR DRAINAGE WITH BIRRUS DURAGRIT ENTRANCE MATTING OVER

1 RECEPTION KEYHOTDESK MT2 2 KEY 3 BREAKOUT AREA 4 OFFICE 1 RECEPTION 5 MEETING ROOM 2 HOTDESK 1 RECEPTION 1 RECEPTION 6 WORKSTATIONS 3 BREAKOUT 2 HOTDESK 1 RECEPTIONAREA 2 HOTDESK 7 PRINTING STORAGE 4 OFFICE & AREA 3 BREAKOUT 2 HOTDESK 3 BREAKOUT AREA 8 KITCHEN 5 MEETING ROOM 4 OFFICE MT2 3 BREAKOUT AREA 4 OFFICE 6 WORKSTATIONS 5 MEETING 4 OFFICE ROOM 5 MEETING ROOM 7 PRINTING & STORAGE 6 WORKSTATIONS 5 MEETING ROOM 6 WORKSTATIONS 8 KITCHEN 7 PRINTING & STORAGE 6 WORKSTATIONS 7 PRINTING 8 KITCHEN & STORAGE

KEY KEY

CD 4.1.01

2850

EXISTING OPENING

TO UNDERSIDE OF CEILING NOM 2884 COS

LED

LED

MT2

KEY

MT2

150

SLANTED

FRAMELESS MOTORISED SLIDING GLASS DOOR REFER D/W SCHEDULE RECESSED LED STRIP

INSIDE

DOOR SWIPE ACCESS PANEL, TO CLIENT'S CONFIRMATION

SLANTED CEILING

MT2

REMOVABLE CEILING PIECE FOR SLIDING DOOR OPERATOR MAINTENANCE ACCESS, AS PER MANUFS SPECIFICATIONS

6 66

CD 4.1.02

OUTSIDE

100

MT2

OUTSIDE 340

5DETAILS - ENTRY ELEVATION 1

150

SLANTED

MT2 1200

4

2

2 2

500

RECESSED LED STRIP

286

3 3 3

4

340

3

3 3 3

4 44

1

4

NOOK

3

4 44

© COPYRIGHT

All rights reserved. These drawings remain the property of Architects EAT and is only to be used for its commissioned purpose. no part of this document may be reproduced modified or transmitted in any form or by any means withou the explicit written authority of Architects EAT. Unauthorize use of this document in any form what so ever is prohibited

54

1

1 1

OPENING NOOK ABOVE SHOWN DASHED

7

54

ALLOW RECESS NOOK FOR SWIPE ACESS

7 77

4

150

150

2

NOOK

NOOK

1

4 44

4

MT2

4

1 11

General Notes

Do not scale from this drawing. use marked dimensions. Drawings to be read in conjunction with all other Architect's and Engineer's drawings. Architects EAT are to be notified about any discrepancies.

ENSURE CONCEALED GLAZING CHANNEL FLUSHED WITH UNDERSIDE OF CEILING

1564

MT2

4

SCALE SCALE

2

5

M

0

2

5

M

0

0.5

0.5

1

1

D 0.01

D 0.02

MT2

FORM OPENING NOOK IN STEEL PLATE WALL

+10.950 LEVEL 0

7 PRINTING 8 KITCHEN & STORAGE 8 KITCHEN SCALE

SCALE SCALE

DOOR RELEASE BUTTON 880

4 44

7

office@eatas.com.au www.eatas.com.au

SLIDING DOOR OPERATOR SENSOR AS MANUF'S SPECIFICATION

MT2

2800

7 77

1

4

Email: Website:

3mm THK. FOLDED STEEL PLATE ON 10mm THK. EXTERNAL GRADE PLYWOOD SUBSTRATE

250 SLANTED

TYP. 934

4

150

1 : 10

150

?

SLIDING DOORTelephone: BEAM TO1300 360 382 03 9824 0843 STRUCT. ENG'SFacsimile: DRAWINGS SLIDING DOOR OPERATOR INSTALLED AS PER MANUF. INSTRUCTION, REFER TO D/W SCHEDULE

3mm THK. FOLDED STEEL PLATE ON 10mm THK. EXTERNAL GRADE PLYWOOD SUBSTRATE

286

7

1 11

MT2

1

MT2

1

1

Architects

SLIDING DOOR OPERATOR EL301 COMPACT PROFILE

?

Consultants :

CP2

7

CD 4.1.01

?

50

Consultants :

?

880

3mm THK. FOLDED STEEL PLATE ON 10mm THK. EXTERNAL GRADE PLYWOOD SUBSTRATE

8 8

MT2

6 6

3

Consultants :

835

Builder :

MT2

8

6 6

3 33

5 5

Consultants :

465

Level 2, 118 Langridge Street, Collingwood VIC 3066

50

M

2500

5

CAULK AND PACK EXISTING WALL OPENING TO ENSURE WATERTIGHTNESS

EXISTING BLUESTONE WALL

Client :

2500

0

0.5

1

2

5

M

0 0

0.5 0.5

1 1

2 2

5 5

M M

Entry - Section Detail 2

CD 4.1.01

DETAILS - ENTRY - SECTION 1 : 20

\190614-RVT19-ALFRED-CENTRAL_valonia.o.rvt

01

REVISION DESCRIPTION

1200

1393

0.5

1300

0

A DATE

SLIDING DOOR OPERATOR INSTALLED AS PER MANUF. INSTRUCTION, REFER TO DOOR / WINDOW SCHEDULE

34

1 2 3

SCALE SCALE

16 84

A

EXISTING BLUESTONE WALL


OBJECTIVE

2 3 2 2

WORKSHOP

RESPONSE East-West aspect is the least likely to get built.

3 3

1 2

3

2

2

3

To inform streetscape and how our building will interact with surroundings.

2 4

2

2

BUILDING HEIGHT & ZONING

7 2 5

2

3

3

5

N 8

HOTEL

LEGEND

5

BUILDING HEIGHT

5

LEGEND

1-2 STOREYS

BUILDING HEIGHT 1-2 STOREYS

3-4 STOREYS

5

3-4 STOREYS >5 STOREYS

>5 STOREYS

OBJECTIVE

NEIGHBOURING FUNCTIONS

RESPONSE Nature respite required, opportunity for cafe accessible to anyone, with potential to spill out to enjoy courtyard/garden.

To inform if we are adding the right program into our building: is additional foodcourt required? Or destination restaurant? Or bonus leaseable space.

N

LEGEND NEIGHBOURING FUNCTIONS

WARUNG / FOOD STALL BENGKEL / WORKSHOP LEGEND

HARDWARE STORE

NEIGHBOURING FUNCTIONS

WARUNG / FOOD STALL

CONVENIENCE STORE

BENGEKEL / WORKSHOP HARDWARE STORE

OFFICES

CONVENIENCE STORE OFFICES

PHARMACY

PHARMACY

THE CONTEXT

OBJECTIVE Planning control and sun study particularly on our site.

RESPONSE

(OHFWULFLW\ 3ROH

0XQLFLSDO 7UHH

7HOHSKRQH 3ROH

0XQLFLSDO 3ODQWHUER[

/(*(1'6

/LJKW 3ROH

Building mass spans across west to east, longer facade along north and south to minimise solar heat gain.

$ 6&$/(

6,78$7,21 3/$1

6,7( &217(;7 (/(9$7,21

$ 6&$/(

(;,67,1* 6,7( 3/$1

$ 6&$/(

-$/$1 0$*(/$1*

6,7( :,'7+

6,7( 6(&7,21

$ 6&$/(

1

1

PXO\R

'JQ

-DODQ -DWL

N

Site Analysis END USERS

END USERS

Maintenance

Maintenance Secondary Users

The stakeholder map helps us understand the intended users of the space and brand. We can then unearth who will be interacting with what part of the brand and offering to design and Primary target accordingly. Users

Office Suppliers (stationery, pantry, essentials,

Restaurants/ Cafe

Secondary Users

• Core Demographic • Primary Focus • Individuals who would interact with space & brand with intention

Office Suppliers (stationery, pantry,Advertising essentials, & Media

Venue Management

Restaurants/ Cafe Executives’ Family

Primary Users • Core Demographic Secondary Users • Primary Focus • Secondary Focus • Individuals who would interact •with Primary Focus space & brand with intention • Individuals who would interact

Executives’ Family

Business Partners

General Staffs Executives

Venue Management Visitors

Executives

Lot size: 10600 sqm Floor Area: 78000 sqm 39-storey + Basement Workspace: 75530 sqm Wellness: 534 sqm Retail (others): 2470 sqm Lift: 23Nos (21 Passager + 2 Service Lift) Capacity: 6290 people Wellness vs Floor Area : Wellness vs Workspace : Wellness Rate: Workspace Rate: Nos Lift vs Floor Area : Retail (others) vs Floor Area:

1% 1:141 0.08sqm/p 12sqm/p 1: 3284 3.1%

Parking: Basement (6 Levels) Workspace: Meeting Rooms Desks Toilets Circulations (lift / staircase) Wellness: Outdoor terrace Prayer room Retail (others): Retails + FnB Support spaces (locker, kitchen, loading bay)

WHAT WE LIKE

Efficient circulation Clear access separation between primary and secondary users and occasional visitors. Basement parking to allow green/ outdoor space above

WHAT WE DON’T

Advertising Security& Media

Catering Services Business Partners

General Staffs

PROGRAMS

AREA SUMMARY

Other Users

The stakeholder map helps us understand the intended users of the space and brand. We can then unearth who will be interacting with what part of the brand and offering to design and target accordingly.

with the space and brand on a more casual basis. Perhaps for a particular service offering.

SEQUIS TOWER, JAKARTA

Other Users

Lack of activity and interaction between the outdoor space and the building, although the area is sizeable. Tall mass without any breakout space in between Dark spots in the centre of buildings

Church Organisation

Visitors

Secondary Users • Secondary Focus Other Users • Primary Focus • Potential individuals who are • Individuals who would interact involved but are not seeking a service. with the space and brand on a more casual basis. Perhaps for a particular service offering.

Events

Catering Services

Indirect Suppliers (electricity, water, and gas management, real Security estate agency)

Church Organisation

DYSON HQ, SINGAPORE Building Services

Other Users • Potential individuals who are involved but are not seeking a service.

Events

Indirect Suppliers (electricity, water, and gas management, real estate agency)

Building Services

PROGRAMS

AREA SUMMARY

Lot size: N.A. Floor Area: 13235 sqm 4-storey Workspace: 9935 sqm Wellness: 3300 sqm Retail (others): 294 sqm Lift: 5 Nos (4 Passanger + 1 Service Lift) Capacity: 700 people

Parking: Street Parking

Wellness vs Floor Area : Wellness vs Workspace : Wellness Rate: Workspace Rate: NosLift vs Floor Area :

Wellness: Collab zone Focus spaces Breakout zone (indoor + outdoor) Nursing Room Prayer Room Cafetaria

Workspace: Meeting Rooms Desks Agile Work Space (Hot Desks) Toilets Circulations (lift / staircase)

CASE STUDY

Retail (others) vs Floor Area: Basement Levels:

25% 1: 3 5 sqm/p 14 sqm/p 1: 2650 N.A. N.A.

Retail (others) : N.A.

WHAT WE LIKE

OUTLET EXPANSION

MANANGEMENT DEVELOPMENT PROGRAM

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

LEGAL

GENERAL SUPPORT

Efficient office floor plate Greenery cleverly intergrated although sit has no surrounding garden area. Plenty of daylight from skylights introduced promoting hvealthier and more comfortable workspace Plenty of breakout spaces and wellness / fun zone

K-24 KLIK

ALWAYS UP

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

MARKETING

FINANCE & ACCOUNTING

WHAT WE DON’T

Not much dialogue with public on ground floor

POINT 92, MALAYSIA

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

PROJECT & MAINTENANCE

HUMAN RESOURCE DEPARTMENT

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

FINANCE & ACCOUNTING

ORGANISATIONAL SYSTEM MANAGEMENT

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

OPERATIONS

K-24 KLIK

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

IT

IT

WHAT IS THE WORKING STYLE LIKE?

WHAT IS THE WORKING STYLE LIKE?

Workshop Cards + User Analysis K24 HQ, INDONESIA Project: 10-storey Private Office for Pharmaceutical Company Scope: New Built Status: Concept Cost: Non-disclosed Area: 11497m2

WHAT IS THE WORKING STYLE LIKE?

POINT 92, MALAYSIA AREA SUMMARY POINT 92, MALAYSIA Lot size: 3723 sqm POINT 92, MALAYSIA Floor Area: 18580 sqm AREA SUMMARY

13-storey + Basement Lot size:SUMMARY 3723 sqm AREA Workspace: 17993sqm Floor Area: 18580 Lot size: 3723 sqmsqm AREA SUMMARY Wellness: 13-storey +3041sqm Basement Floor Area: 18580 sqm Lot size: 3723 sqm Retail (others): 294 sqm Workspace: 17993sqm 13-storey + 18580 Basement Floor sqm + 1 Service Lift) Lift: 6 Area: Nos 3041sqm (5 Passanger Wellness: Workspace: 17993sqm 13-storey + Basement Capacity: 1500 people Retail (others): 294 sqm Wellness: 3041sqm Workspace: Lift: 6 Nos (517993sqm Passanger Retail (others): 294 sqm + 1 Service Lift) Wellness: 3041sqm Wellness vs Floor Area : 15% Capacity: 1500 people Lift: 6 Nos (5 Passanger Retail (others): 294 sqm :+ 1 Service Lift) Wellness vs Workspace 1: 6 Capacity: 1500 people + 1 Service Lift) Lift: 6 NosRate: (5Floor Passanger Wellness 2 sqm/p vs Area : 15% Capacity: vs 1500 people : Workspace Rate: 12 sqm/p Wellness Workspace 1: 6 Wellness vs Floor Area : 15% Nos Lift vsRate: Floor Area : 1: 3097 Wellness 2 sqm/p Wellness vs Workspace 1: 6 Wellness vsRate: Floor Area Area: :: 15% Retail (others) vs Floor 1.5% Workspace 12 sqm/p Wellness Rate: 2 sqm/p Wellness Workspace 1: 6 Basement Levels: Nos Lift vsvs Floor Area : : 1:sqm/p 3097 Workspace Rate: 12 Wellness Rate:vs Floor Area: 2 sqm/p Retail (others) 1.5% Nos Lift vs Floor Area : 1:sqm/p 3097 Workspace Rate: 12 WHAT WE LIKE Basement Levels: 6 Retail (others) vsArea Floor: Area: Nos Lift vs Floor 1: 1.5% 3097 Efficient office floor plate Basement Levels:Floor Area: 6 Retail (others) 1.5% Outdoor / greenvsspace on ground and mid

PROGRAMS

Parking: Basement (6 levels)

PROGRAMS

Workspace: Parking: Basement (6 levels) PROGRAMS Meeting Rooms Parking: Basement (6 levels) PROGRAMS Desks Workspace: Parking: Basement (6 levels) Toilets Meeting Rooms Workspace: Circulations (lift / staircase) Desks Rooms Meeting Workspace: Toilets Desks Meeting Rooms Circulations (lift / staircase) Toilets Desks Wellness: Circulations (lift / staircase) Toilets Outdoor Terraces

CASE STUDY

Circulations Prayer room(lift / staircase) Wellness: Outdoor Terraces Wellness: Retail Prayer(others): room Outdoor Wellness:Terraces Cafe Prayer room Outdoor Terraces Retail (others): Prayer room Cafe Retail (others): Cafe Retail (others):

Cafe level interacts with visitor and office WHAT WE LIKE Basement Levels: 6 personals Efficient floor plate WHAT office WE LIKE Direct access to space privateon zone Outdoor / green ground and mid level interacts with visitor and office Efficient office floor plate WHAT WE LIKE Separate service lift personals Outdoor office / green space on ground and mid level interacts with visitor and office Efficient floor plate Direct access to private zone personals Outdoor / service green space ground and mid level interacts with visitor and office Separate lift on WHAT WE DON’T Direct access to private zone personals Typical Office to lease Separate service lift Direct access to private zone Cafe space onDON’T ground level, however no clear access from the streets, does WHAT WE Separate service lift not promote with visitors nor surroundings/ Typical Office to lease WHAT WEengagement DON’T Cafe space ontoground Typical Office lease level, however no clear access from the streets, does WHAT WEengagement DON’T not promote with visitors nor surroundings/ Cafe space ontoground Typical Office lease level, however no clear access from the streets, does not engagement with visitors no norclear surroundings/ Cafepromote space on ground level, however access from the streets, does not promote engagement with visitors nor surroundings/

Precedents CASE STUDY CASE STUDY CASE CASE STUDY STUDY

The project aims to provide the client with innovative workplace to house all their existing departments and to act as a green retreat in the highly built-up area. The office building needs to not only function well for them, but also responding well to the local climate, which is hot and humid. Extensive research on precedents and workshop with clients on how the company functions were critical to successfully delivering their brief. Relationships among department sare reflected in the spatial planning, they are typically connected outdoor and indoor communal zone to encoruage interactiosnThe design also employs strategy to reduce heat load from direct sun exposure and to cool the building passively with reduced reliance on mechanical ventilation. This also provides opportunity for outdoor interaction zone and planting which would further reduce the heat load to building, and support healthier working environment.


MAX

OPTION 1

6.4 3.6 OPTION 1

MAX N

N

STAIR

OPPORTUNITIES 808.8 M2

VOID OVER

LIFT LIFT

N

PLOT RATIO GARDEN 658.6 M2

GARDEN 741 M2

STAIR

SERVICES

STAIR

WELLNESS 224.3 M2

LOBBY 227 M2

OPPORTUNITIES (SUNKEN GARDEN)

JL. MAGELANG - YOGYAKARTA

JL. MAGELANG - YOGYAKARTA

JL. MAGELANG - YOGYAKARTA

OPPORTUNITIES 223.7 M2

OPTION 3

6.4 4.2

OPTION 2

PLOT RATIO

LINE OF BUILDING OVER

STAIR

OPPORTUNITIES (SUNKEN GARDEN)

PLOT RATIO

6.4 4.2

OPTION 3

PLOT RATIO

GARDEN

OPTION 2

MAX

OPTION 1

6.4 3.6 OPTION 2

OPTION 3

PLOT RATIO

OPTION 2

MAX

MAX

6.4 4.2

VOID OVER OPPORTUNITIES (SUNKEN GARDEN)

LIFT

LIFT

OPPORTUNITIES 486.9 M2

STAIR LIFT

LIFT LOBBY 147 M2

LIFT LIFT

GARDEN 623.6 M2

GARDEN

NOTE

NOTE

LEGEND

NUMBER OF LIFTS: 4

PRIVACY + FUNCTION SEPARATION - OFFICE LIFT, GOODS LIFT & PUBLIC LIFT

OPTION 1 - GROUND FLOOR PLAN

LEGEND

NUMBER OF LIFTS: 4

CIRCULATION

REASON

LEGEND

NUMBER OF LIFTS: 4

CIRCULATION

REASON

VEHICULAR

PRIVACY + FUNCTION SEPARATION - OFFICE LIFT, GOODS LIFT & PUBLIC LIFT

OPTION 2 - GROUND FLOOR PLAN

PEDESTRIAN

NOTE

CIRCULATION

REASON

VEHICULAR

VEHICULAR

PRIVACY + FUNCTION SEPARATION - OFFICE LIFT, GOODS LIFT & PUBLIC LIFT

OPTION 3 - GROUND FLOOR PLAN

PEDESTRIAN

PEDESTRIAN

AREA SCHEDULE - OPTION 1

UMMARY

IKE PAR

K

OPPORTUNITIES (SUNKEN GARDEN) 198.8 M2

PROGRAM OPPORTUNITY OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RESIDENCE BASEME 1160.7 NT M WELLNESS PLANT 11 2

NLA 873.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.810m2 STAIR 661.8 m2 301.6 m2 6469.6 m2

N PLOT RATIO (KLB) 0.49 LEVELS 0.37 OPT3 - L0 0.37 OPT3 - L1 0.37 OPT3 - L2 0.37 OPT3 - L3 0.37 OPT3 - L4 0.37 OPT3 - L5 0.37 OPT3 - L6 OPT3 - L7 0.37 OPT3 - L8 0.17 OPT3 - L9 3.61

PROGRAM OPPORTUNITY OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RESIDENCE WELLNESS PLANT

18

DROP-OFF / LOBBY 81.3 M2

NLA 873.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 301.6 m2 6469.6 m2

PLOT RATIO (KLB) 0.49 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.17 3.61

LOBBY 18.2 M2 PUMP

LIFT LIFT

BIN

LIFT LIFT

LINE OF BUILDING OVER

1

STAIR

OPPORTUNITIES (SUNKEN GARDEN) 118.3 M2

AREA SUMMARY

1794 m2 6469.6 m2 9-storey E - OPTION 1 + Basement 260 people 4 Nos - 3 Passager + 1 Service

NLA

e: 73.8 m2 e Target:

Wellness vs Floor Area : 10.2% Wellness vs Workspace : 1: 6 Wellness Rate: 2.5 m2 /p Wellness Rate Target: 5 m2 /p Workspace Rate: 15.3 m2 /p AREA SCHEDULE - OPTION 2 Workspace Rate Target: 15 m2 /p PLOT RATIO (KLB) Nos Lift vs Floor Area : 1: 1617 3970.8 m2 OPTION 1 - BASEMENT FLOOR PLAN 0.49 Opportunities vs Floor Area: 13.5% 3900 m2 LEVELS PROGRAM NLA 661.8 m2 0.37 1300 m2 OPT3 - L0 223.7 m2 OPPORTUNITY 0.37 873.8 m2

SERVICES

61.8 m2 Target: 61.8 m2 ty: WELLNESS OPT3 - L0 0.37 61.8 m2 0.37 61.8 m2 OFFICE OPT3 - L0 LEGEND 0.37 61.8 m2 OPPORTUNITY OPT3 - L1 OPPORTUNITIES DOES 61.8 IT m2OFFER?0.37 WELLNESS OPT3 - L1 OFFICE 0.37 61.8 m2 OFFICE OPT3 L2 ity on street levels 0.37 for active 61.8creates m2 oppportunity WELLNESS arden OPPORTUNITY OPT3 - L2 01.6 m2 ce, a gathering space0.17 or education RESIDENCE OFFICE OPT3 - L3 green throughout, 3.61 469.6area m2and daylight

OPT3 - L3 g dark spots via central void PLANT y for roof level open space that can be OPT3 - L4 fice / private functions (event, talk, church) OPT3 - L4 space for office functions MAX

OPT3 - L5

WELLNESS OFFICE WELLNESS OPTION 1 OFFICE 10.2% 1: 6 WELLNESS OFFICE 2.5 m2 /p 5 m2 /p OFFICE 15.3 m2 /p 15 m2 /pRESIDENCE 1: 1617PLANT

6.4 3.6

m2 m2 ent ple ce

Wellness vs Floor Area : OPT3: - L5 Wellness vs Workspace OPT3 - L6 Wellness Rate: Wellness Rate Target: OPT3 - L7 Workspace Rate: 1 OPT3 - L8 Workspace Rate Target: AREA SCHEDULE - OPTION 1 (KLB) Lift vs Floor Area : m2 PLOT RATIONos OPT3 - L9 0.49 2 PROGRAM LEVELS Opportunities vs FloorNLAArea:PLOT RATIO (KLB) 13.5% m 0.37 0.49 OPPORTUNITY 873.8 m2 OPT3 - L0 m20.37 0.37 661.8 m2 OFFICE OPT3 - L1 0.37 0.37 661.8 m2 OFFICE OPT3 - L2 2 m 0.37 0.37 661.8 m2 OFFICE OPT3 - L3 - OPTION 1 OFFICE 0.37 661.8 m2 OPT3 - L4 m2 0.37 0.37

TION 1

0.37 0.37 0.17 3.61

OPT3 - L5 OPT3 - L6 OPT3 - L7 OPT3 - L8 OPT3 - L9

PLOT RATIO

OFFICE OFFICE RESIDENCE WELLNESS PLANT

661.8 m2 661.8 m2 661.8 m2 661.8 m2 301.6 m2 6469.6 m2

0.37 0.37 0.37 0.37 0.17 3.61

331.8 m2 309.5 m2 223.7 m2 331.8 m2 641.3 m2 223.7 m2 641.3 m2 223.7 m2 641.3 m2 223.7 m2 641.3 m2 223.7 m2 641.3 m2 641.3 m2 641.3 m2 641.3 m2

LEVELS OPT3 - L0 OPT3 - L0 OPT3 - L0 - L1 PLOT RATIOOPT3 (KLB) OPT3 - L1 0.12 OPT3 - L2 0.18 OPT3 - L2 0.17 OPT3 - L3 OPT3 - L3 0.12 OPT3 - L4 0.18 OPT3 - L4 0.36 OPT3 - L5 0.12 OPT3 - L5 OPT3 - L6 0.36 OPT3 - L7 0.12 OPT3 - L8 0.36 OPT3 - L9

0.12 0.36 0.12 0.36 0.36 0.36 0.36

14

OPPORTUNITIES (SUNKEN GARDEN) 309.1 M2

Wellness vs Floor Area : 10.2% Wellness vs Workspace : 1: 6 Wellness Rate: 2.5 m2 /p Wellness Rate Target: 5 m2 /p Workspace Rate: 15.3 m2 /p - OPTION 3 Workspace Rate Target: AREA SCHEDULE 15 m2 /p OPTION Nos Lift vs Floor Area : 2 - BASEMENT 1: 1617FLOOR PLAN Opportunities vs Floor Area: 13.5%

0.18 331.8 m2 VEHICULAR Workspace: 3970.8 m2 0.17 309.5 m2 PEDESTRIAN Workspace Target: 3900 m2 0.12 223.7 m2 PROGRAM LEVELS Wellness: 661.8 m2 0.18 331.8 m2 Target: Wellness 1300 m2 OPPORTUNITY OPT3 - L0 Opportunity: 873.8 m2 0.36 641.3 m2 OFFICE OPT3 - L1 0.12 223.7 m2 OFFICE OPT3 - L2 0.36 641.3 m2 LEGEND 0.12 223.7 m2 WELLNESS OPT3 - L3 OPPORTUNITIES 641.3 m2 DOES0.36 WHAT IT OFFER? WELLNESS OPT3 - L4 0.12 223.7 m2 OFFICE OFFICE OPT3 L4 Permeability on0.36 street levels 641.3 m2 Sunken Garden creates oppportunity for active OPT3 WELLNESS WELLNESS - L5 0.12 223.7 m2 public space, a gathering space or education 0.36 641.3 m2 OFFICE OPT3 RESIDENCE - L5 Access to green area and daylight throughout, 641.3 m2 dark0.36 minimising spots via central void OFFICE OPT3 PLANT - L6 641.3 m2 for 0.36 Opportunity roof level open space that can be OFFICE OPT3 L7 641.3 used m2 for office / 0.36 private functions (event, talk, church)

RESIDENCE OPT3 - L8 OPTION 1 PLANT OPT3 - L9

Wellness for office functions 7445.1 m2space4.15

MAX

6.4 3.6

AREA SUMMARY

OPTION 1

PLOT RATIO

4.15

BASEMENT 1000 M2 1

LIFT

NLA 681.4 m2 826.5 m2 826.5 m2 826.5 m2 348.8 m2 610.5 m2 348.8 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2

7521.7 m2

0.34 0.34 0.34 0.34 0.34 4.19

LIFT STAIR

LIFT

LIFT

PUMP

BIN 18

12

18

MOTORBIKE PARK (UNDER) SUBSTATION

AREA SCHEDULE - OPTION 3 LEGEND PROGRAM OPPORTUNITY OFFICE OFFICE WELLNESS WELLNESS OFFICE WELLNESS OFFICE OFFICE OFFICE RESIDENCE PLANT

LEVELS OPT3 - L0 OPT3 - L1 OPT3 - L2 PLOT RATIO (KLB) OPT3 - L3 0.38 OPT3 - L4 0.46 OPT3 - L4 0.46 OPT3 - L5 0.46 OPT3 - L5 OPT3 - L6 0.19 OPT3 - L7 0.34 OPT3 - L8 0.19 OPT3 - L9

13

8

7

DROP-OFF / LOBBY 80.3 M2

SERVICES BASEMENT 1047.4 M2

Wellness vs Floor Area : 17.9% Lot size: 1794 m2 Wellness vs Workspace : 1: 3 Floor Area: 7445.1 m2 AREA SCHEDULE - OPTION 2 5.1 m2 /p Wellness Rate: Levels: 9-storey + Basement LEVELS PROGRAM NLA Wellness Rate Target: 5 PLOT m2RATIO /p (KLB) 0.12 OPPORTUNITY 223.7 m2 OPT3 - L0 Capacity: 260AREA people SCHEDULE - OPTION 2 0.18 m2 /p 331.8 m2 15.9 WELLNESS OPT3 - L0 Workspace Rate: Lift: 4 Nos - 3 Passager + 1 Service 0.17 309.5 m2 OFFICE OPT3 - L0 2 0.12m /p OPPORTUNITY 223.7 m2 - L1 Workspace Rate Target: 15 LEVELS PROGRAM NLA PLOT RATIOOPT3 (KLB) 0.18 331.8 m2 WELLNESS OPT3 - L1 0.12 OPPORTUNITY 223.7 m2 OPT3 - L0 Nos Lift vs OPT3 Floor : 1:0.361861 641.3 m2 OFFICE - L2 Area 0.18 WELLNESS OPT3 - L0 Workspace: 4157.3 m2 331.8 m2 0.12 OPPORTUNITY 223.7 m2 OPT3 - L2 Opportunities Area:641.3 m2 9% 0.17 309.5 m2 OFFICE 2 OPT3 - L0 0.36 OFFICE OPT3 -vs L3 Floor Workspace Target: 3900 m 0.12 223.7 m2 WELLNESS OPT3 - L3 0.12 OPPORTUNITY 223.7 m2 OPT3 - L1 0.36 641.3 m2 OFFICE OPT3 - L4 AREA SCHEDULE - OPTION 2 0.18 WELLNESS OPT3 - L1 AREA SCHEDULE - OPTION 1 Wellness: 1334.7 m2 331.8 m2 0.12 223.7 m2 WELLNESS OPT3 - L4 0.36 641.3 m2 OFFICE 2 OPT3 - L2 0.36 641.3 m2 OFFICE OPT3 - L5 Wellness Target: 1300 m 0.12 OPPORTUNITY 223.7 m2 OPT3 - L2 WELLNESS OPT3 - L5 0.12 LEGEND 223.7 m2 AREA SCHEDULE - OPTION Opportunity: 1 0.36 LEVELS OFFICE OPT3 - L6 641.3 m2 0.36 641.3 m2 OFFICEm2 OPT3 - L3 671.1 PROGRAM NLA PLOT RATIO (KLB) 2 AREA SCHEDULE - OPTION PROGRAM NLA PLOT RATIO (KLB) 0.36 OFFICE OPT3 - L7

7445.1 m2

PUMP

STAIR

MOTORBIKE PARK

1794 m2 Floor Area: 6469.6 m2 Levels: + Basement PROGRAM NLA PLOT9-storey RATIO (KLB) LEGEND Capacity: 260 people 0.12 223.7 m2 OPPORTUNITY CIRCULATIONLift: 4 Nos - 3 Passager + 1 Service

WELLNESS OFFICE OPPORTUNITY WELLNESS OFFICE OPPORTUNITY OFFICE WELLNESS OFFICE WELLNESS OFFICE WELLNESS OFFICE OFFICE RESIDENCE PLANT

BIN

LINE OF BUILDING OVER

AREA SCHEDULE - OPTION Lot size: 2

SUBSTATION

SUBSTATION

DROP-OFF / LOBBY 172.1 M2

5

SERVICES

:

N

N

AREA SCHEDULE - OPTION 1

JL. MAGELANG - YOGYAKARTA

MOTORB

LEVELS OPT3 - L0 OPT3 - L1 OPT3 - L2 STAIR OPT3 - L3 OPT3 - L4 OPT3 - L5 1 OPT3 - L6 OPT3 - L7 OPT3 - L8 OPT3 - L9

13

PLOT RATIO (KLB) 0.49 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.17 3.61

6

NLA 873.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 661.8 m2 301.6 m2 6469.6 m2

JL. MAGELANG - YOGYAKARTA

PROGRAM OPPORTUNITY OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE RESIDENCE WELLNESS PLANT

JL. MAGELANG - YOGYAKARTA

AREA SCHEDULE - OPTION 1

ELS L0 L1 L2 L3 L4 L5 L6 L7 L8 L9

CIRCULATION

NLA 681.4 m2 826.5 m2 826.5 m2 826.5 m2 348.8 m2 610.5 m2 348.8 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2

PLOT RATIO (KLB) 0.38 OPTION 3 - BASEMENT FLOOR PLAN 0.46 0.46 0.46 0.19 0.34 0.19 LEGEND 0.34 OPPORTUNITIES 0.34 OFFICE 0.34 0.34 WELLNESS 0.34

7521.7 m2

4.19

VEHICULAR

PEDESTRIAN

LEGEND CIRCULATION VEHICULAR PEDESTRIAN

RESIDENCE PLANT

AREA SUMMARY

MAX

Lot size: 1794 m2 Floor Area: 7521.7 m2 Levels: 9-storey + Basement Capacity: 260 people Lift: 4 Nos - 3 Passager + 1 Service Workspace: Workspace Target: Wellness: LEVELS OPT3 - L0 Wellness Target: OPT3 - L1 Opportunity:OPT3 - L2 OPT3 - L3 OPT3 - L4 OPT3 - L4 OPT3 - L5 OPT3 - L5 OPT3 - L6 OPT3 - L7 OPT3 - L8 OPT3 - L9

PLOT RATIO

4095 m2 3900 m2 OFFICE OPT3 - L1 2 OFFICE OPT3 - L2 1524.1 m PROGRAM NLA PLOT RATIO (KLB) WELLNESS OPT3 - L3 OPPORTUNITY 681.4 m2 1300 0.38 m2 WELLNESS OPT3 - L4 0.46 826.5 m2 SCHEDULE OFFICE OFFICE OPT3 - L4 AREA - OPTION 2 2 m 0.46 826.5681.4 m2 OFFICE WELLNESS OPT3 - L5 AREA SCHEDULE - OPTION 3

WELLNESS WELLNESS OFFICE WELLNESS OFFICE OFFICE OFFICE RESIDENCE PLANT

826.5 m2 348.8 m2 610.5 m2 348.8 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2

0.46 0.19 0.34 0.19 0.34 0.34 0.34 0.34 0.34

OPTION 1

6.4 3.6

Wellness vs Floor Area : 20.3% Wellness vs Workspace : 1: 3 Wellness Rate: 5.9 m2 /p Wellness Rate Target: 5 m2 /p Workspace Rate: 15.8 m2 /p Workspace Target: 15 m2 /p AREA Rate SCHEDULE - OPTION 3 Nos Lift vsPROGRAM Floor Area: 1: 1880 NLA PLOT RATIO (KLB) LEVELS 0.38 681.4 m2 Area: OPPORTUNITY OPT3 - L0 Opportunities vs Floor 9%

OPT3 - L5 OPT3 - L6 OPT3 - L7 OPT3 - L8 OPT3 - L9

OFFICE OFFICE OFFICE RESIDENCE PLANT

826.5 m2 826.5 m2 826.5 m2 348.8 m2 610.5 m2 348.8 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2 610.5 m2

0.46 0.46 0.46 0.19 0.34 0.19 0.34 0.34 0.34 0.34 0.34

AREA SCHEDULE - OPTION 3

NLA PLOT RATIO (KLB) LEVELS PROGRAM NLA PLOT RATIO (KLB) LEGEND LEG PROGRAM NLA PLOT RATIO (KLB) LEVELS 0.12 OPPORTUNITY 223.7 m2 OPT3 - L0 0.49 73.8 m2 AREA SCHEDULE - OPTION 3 0.38 OPPORTUNITY 681.4 m2 - OPPORTUNITIES L0 4.19 7521.7 m2 OPT3 LEVELS 0.18 m2 WELLNESS OPT3 - L0 0.12 223.7 m2 WELLNESS OPT3 - L3 AREA SCHEDULE - OPTION 331.8 3 0.37 61.8 m2AREA SUMMARY 0.12 OPPORTUNITY 223.7 m2 OPT3 - L0 OPPORTUNITIES 0.36 641.3 m2 OFFICE OPT3 - L4 WHAT DOES IT -OFFER? 0.46 826.5 m2 OFFICE OPT3 - L1 0.17 309.5 m2 OFFICE OPT3 L0 0.49 OPPORTUNITY 873.8 m2 OPT3 - L0 AREA SUMMARY 0.12 223.7 m2 - OPTION OPT3 - L4 AREA SCHEDULE - OPTION 1 AREAWELLNESS SCHEDULE 2 0.18 331.8 m2 WELLNESS OPT3 - L0 PROGRAM NLA PLOT RATIO (KLB) LEVELS PROGRAM NLA PLOT RATIO (KLB) LEVELS Wellness vs Floor Area : 10.2% Lot size: 1794 m 0.37 6469.6 61.8 m2Floor OFFICE 0.36 641.3 m2 OFFICE OPT3 - L5 0.46 826.5 m2 OFFICE OPT3 L2 0.12 223.7 m2 OPPORTUNITY OPT3 L1 Wellness vs Workspace : 1: 6 Area: m LEVELS PROGRAM NLA PLOT RATIO (KLB) 0.37 661.8 m2 OFFICE OPT3 - L1 Wellness vs Floor Area : 20.3% Lot size: 1794 m (KLB) OFFICE PROGRAM NLA Floor PLOT RATIO LEVELS WELLNESS OPT3 - L5 0.12 223.7 m2 4.19 m2 Wellness Rate: 2.5 m /p Levels: 9-storey + Basement 0.17 309.5 m2 OFFICE OPT3 - L0 Wellness vs Workspace : 1: 3 0.38 OPPORTUNITY 681.4 m2 OPT3 - L0 Area: 7521.7 m AREA SUMMARY 0.49DOES IT OFFER? OPPORTUNITY 873.8 m2 OPT3 - L0 Permeability on street levels 7521.7 0.37 61.8 m2Capacity: Wellness Rate Target: 5 m /p 260 people 0.18 331.8 m2 9-storey + Basement WELLNESS OPT3 - L1 0.36 m2 OPT3 OFFICE OPT3 - L6 WHAT AREA826.5 SCHEDULE -0.46 OPTION 3 641.3 m2 Wellness Rate: - L3 5.9 WELLNESS m /p Levels: 0.37 661.8 m2 OFFICE OPT3Rate: - L2 Workspace 15.3 m /p Lift: 4 Nos - 3 Passager + 1 Service 0.12 WELLNESS OPPORTUNITY - L0 RATIO (KLB) LEVELS Wellness Rate Target: 5 m /p 0.12 223.7 m2 OPT3 223.7 m2 OPPORTUNITY OPT3 L1Area : OPT3 Capacity: 260 people 0.36NLA NLA OFFICE PROGRAM - L7 PROGRAM 641.3 m2 0.38 681.4 m2 public OPPORTUNITY - L0 Garden Wellness vs Floor 17.9% PLOTPLOT RATIO (KLB) 0.46 826.5 m2 OFFICE OPT3 - L1 Workspace Rate Target: 15 m /p Lot size: 1794 m Sunken creates for active m2 OFFICE OPT3 - L2 oppportunity Workspace 15.8WELLNESS m /p Lift:641.3 4 Nos - 3 Passager +0.36 1 Service 0.37 LEVELS OPT3 661.8 m2 OFFICE OPT3 - L1 61.8 m2Workspace: 0.37 3970.8 m Nos 0.19 348.8 m2 OPT3Rate:- L4 Wellness vs Workspace : WELLNESS 1: 3 active 0.36 RESIDENCE OPT3 - L8 Lift vs Floor Area : 1: 1617 641.3 m2 Floor Area: 7445.1 m Workspace Rate Target: 15 m /p 0.37 661.8 m2 OFFICE OPT3 - L3 0.18 331.8 m2 OPT3 331.8 m2 OPT3 - L1 /p - L0 Wellness Rate: 5.1 mWELLNESS 0.18 WELLNESS OPT3 OPPORTUNITY Opportunities vs Floor Area: 13.5% Workspace Target: 3900 m Levels: m2 9-storey + Basement PLANT 0.36 873.8 OPT3-- L0 L9 OPPORTUNITY 641.3 m2 223.7 Nos Lift vs Floor Area: 1: 1880 0.46 826.5 m2 OFFICE OPT3 - L2 826.5 m2 Workspace: OFFICE - L1a gathering 4095 m space, space 0.12 223.70.46 m2 OPPORTUNITY OPT3 - L2 or education 0.122600.49 m2 OPT3on- street L0OPT3 Wellness Rate Target: 5 m /p m RESIDENCE Permeability levels Capacity: people ation m2Wellness: 0.34 610.5 m2 OPT3vs-Floor L4Area: LEVELS 0.37 661.8 OFFICE - L2 Opportunities 9% OFFICE 0.37 661.8 61.8 Workspace Target: 3900 m PROGRAM NLA PLOT RATIO (KLB) Workspace Rate: 15.9 OFFICE m /p 0.36 309.5 m2 641.3 m2 OPT3 - L2 Wellness Target: 1300 m 0.37 m2 661.8 m2 OFFICE OPT3 - L4 OPT3 Lift: 4 Nos - 3 Passager + 0.37 1 Service RESIDENCE Wellness: 1524.1 m m2 OFFICE7445.1 m2 4.15 661.8 OPT3 L1 0.17 OFFICE Workspace Rate Target: OPT3 15 m /p - L0 0.36 641.3 m2 OFFICE OPT3 L3 0.46 826.5 m2 WELLNESS OPT3 L3 Access to green area and daylight throughout, Opportunity: 873.8 m 0.46 826.5 m2 OFFICE OPT3 L2 Sunken Garden creates oppportunity for active public Wellness Target: 1300 m 0.184157.3 m OPT3 331.8 m2 WELLNESS OPT3 - L0 ghout,m2 Nos Lift vs Floor Area : 1: 1861 0.19m2 348.8 m2 OPT3 - L5 0.37 661.8 OFFICE - L3 Workspace: 0.12 OPPORTUNITY 223.7 m2 - L2 0.37 61.8 0.38 681.4 OPPORTUNITY OPT3 WELLNESS - L0 Opportunity: 681.4 m 0.37 m2 661.8 m2 OFFICE OPT3 - L5 OPT3 Opportunities vs Floor Area: 9% PLANT 0.37 661.8 m2 OFFICE OPT3 L2 Workspace Target: 3900 m 0.12 223.7 m2 WELLNESS OPT3 L3 minimising dark spots via central void 0.19 348.8 m2 WELLNESS OPT3 L4 0.12 223.7 m2 OPPORTUNITY OPT3 L1 space, OPT3 a gathering space or education LEGEND 0.46 826.5 m2 WELLNESS OPT3 - L3 Wellness: m 0.34 610.5 m2 OFFICE OPT3 - L5 0.171334.7 309.5 m2 OFFICE - L0 PLANT 0.36 641.3 m2 OFFICE OPT3 - L3 LEGEND LEGEND 0.37 661.8 OFFICE - L4 0.37 61.8 m2 Wellness Target: 1300 m 0.37 m2 661.8 m2 OFFICE OPT3 - L6 OPT3 0.46 826.5 m2 OFFICE OPT3 L1 0.36 641.3 m2 OFFICE OPT3 L4 0.37 661.8 m2 OFFICE OPT3 L3 Opportunity for roof level open space that can be used 0.34 610.5 m2 OFFICE OPT3 L4 Opportunity: AccessOPT3 to green area and daylight throughout, 0.18 WELLNESS - L1 at can beWHAT DOES IT OFFER? 0.34 610.5 m2 OFFICE OPT3 - L6 0.12 331.8 m2 OPT3 223.7 m2 0.19 348.8 m2 WHAT WELLNESS - L4 0.12 671.1 m OPT3 - L3 OPT3WELLNESS 223.7 m2 OPPORTUNITY - L1 DOES IT OFFER? 0.12 223.7 m2 WELLNESS OPT3 L4 0.37 661.8 OFFICE - L5 0.37 m2 661.8 m2 RESIDENCE OPT3 - L7 OPT3 0.37 61.8 m2 0.46 826.5 m2 OFFICE OPT3 L2 AREA SCHEDULE OPTION 2 for office / private functions (event, talk, church) 0.37 OPT3 - L4 OPT3 661.8 m2 OPT3 - L4 voidOFFICE 0.19 348.8 m2 WELLNESS OPT3 - L5 minimising dark spots via central Permeability on street levels talk, church) 0.36 641.3 m2 OPT3 641.3 m2 OFFICE 0.36 OFFICE - L2 0.34 610.5 m2 OFFICE OPT3 - L7 Permeability on street levels 0.34 610.5 m2 OFFICE L4 0.18 331.8 m2 Sunken Garden creates oppportunity for active WELLNESS OPT3 L1 WHAT DOES IT OFFER? 0.36 641.3 m2 OFFICE OPT3 L5 0.37 661.8 m2 WELLNESS OPT3 L8 0.37 661.8 m2 OFFICE OPT3 L6 Wellness space for office functions 0.17 01.6 m2public space, a gathering Sunken Garden creates oppportunity for active public 0.46 826.5 OPT3OPTION - L3 MAX 2WELLNESS 0.37 OPT3 - L4 661.8 m2 - L5 spaceOFFICE MAX 0.34 610.5 m2 OFFICE OPT3 - L5 space or education Opportunity for roofOPT3 level open that can be 0.12 223.7 m2 223.7 m2 0.34m2 610.5 m2 RESIDENCE OPT3 - L8 0.12 OPPORTUNITY OPT3WELLNESS -OPTION L2 space, a gathering space or education Access to green area and daylight throughout, WELLNESS OPT3 L5 Permeability on street0.36 levels MAX 1 0.12 223.7 m2 LEVELS PROGRAM NLA PLOT RATIO (KLB) 0.19 348.8 m2 WELLNESS OPT3 L5 641.3 m2 OFFICE OPT3 L2 0.17 m2 301.6 m2 PLANT OPT3 - L9 OPT3 Access to green area and daylight throughout, 661.8 RESIDENCE - L7 minimising dark spots via central void Sunken m2 Garden creates oppportunity for active public 0.37 OFFICE OPT3 - L6 (event, 0.34 used0.37 for office / private functions talk, church) 661.8 610.5 m2 OFFICE OPT3 - L6 3.61 0.36 641.3 m2 OFFICE OPT3 - L5 469.6 m2 0.19 348.8 WELLNESS OPT3 PLANT - L4 0.34m2 610.5 m2 OPT3 - L9 - OPTION 1 for roofAREA minimising dark m2 spots via central 0.36 void SCHEDULE - OPTION 1 OFFICE OPT3 Opportunity level open space that can be space, a gathering space or education 641.3 641.3 m2 OPT30.36 OFFICE OPT3 - L3 0.12 - L6 223.7 OPPORTUNITY OPT3 - L0 0.34 610.5 m2 Opportunity OFFICE - L5m2 AREA SCHEDULE - OPTION OPT3 3 for roof level open space that can be used m2 OPT3 - L2 3.61 m2 6469.6 m2 used for office / private functions (event, talk, church) Access to green area0.12 and daylight throughout, OPT3 - L5 WELLNESS Wellness space forOPT3 office functions 0.12 223.7 m2 0.34 610.5 m2 OFFICE - L7 0.37 661.8 m2 RESIDENCE 223.7 - L7OPPORTUNITY 0.37 661.8 WELLNESS OPT3 - L8 0.34 610.5 m2 OFFICE OPT3 - L4 for office / private functions (event, talk, church) AREA SCHEDULE - OPTION 2 0.36 OFFICE OPT3 L7 Wellness space for office functions 641.3 m2 minimising dark spots via central void 0.18 331.8 m2 WELLNESS OPT3 L0 4.19 7521.7 m2 MAX OPTION 1 0.12 WELLNESS OPT3OFFICE - L3 for office functions MAX MAX OPTION 2 0.36 223.7 m2 OPT3 610.5 m2 Wellness space0.34 OFFICE - L6 Opportunity for roof level open space that can beOPT3 - L6 m2 2 m2 OPT3 - L3OPT3 - L8OFFICE 0.34 610.5 m2 RESIDENCE OPT3 -OPTION L8 3 AREA SCHEDULE - 641.3 OPTION 0.37 661.8 m2 0.36 WELLNESS 641.3 AREA SCHEDULE - OPTION 3348.8 m2 0.17 301.6 m2 PLANT OPT3 L9 0.36 RESIDENCE OPT3 L8 AREA SCHEDULE OPTION 1 641.3 m2 0.19 0.17 309.5 m2 WELLNESS OFFICE OPT3 L5 OPT3 L0 used for office / private functions (event, talk, church) AREA SCHEDULE OPTION 1 NLA PLOT RATIO (KLB) PROGRAM NLA PLOT RATIO (KLB) LEVELS PROGRAM NLA PLOT RATIO (KLB) LEVELS 0.36 OFFICE OPT3 - L4 0.36 641.3 m2 OPT3 Wellness space for office functions 641.3 m2 610.5 m2 OFFICE - L7m2 0.34 610.5 m2 PLANT OPT3 - L9 223.7 m2 OPT3 - L3OPT3 - L9WELLNESS 0.17 OPT3 - L7 NLA OFFICEPLOT RATIO 301.6 m2 0.12 PLANT PLANT 0.36 OPT3 641.30.34 m2 0.12 - L9 OPPORTUNITY 223.7 OPT3 - L1 AREA 873.8 SUMMARY 3.61 6469.6 m2 LEVELS PROGRAM (KLB) 0.34681.4 m2 m2 OFFICEOPT3 - L0 610.5OPPORTUNITY OPT3 - L5 0.49 73.8 0.36 RATIO 0.38 0.49 m2 PT3 m2 - L0 OPT3 - L8 641.3 LEVELS PROGRAM NLAm2 PLOT (KLB) 223.7 m2 OPT30.12 WELLNESS OPT3RESIDENCE - L4 OPTIONOPPORTUNITY 1 PLOT RATIO AREA -LEVELS OPTION 3 PROGRAM SUMMARY 0.34 NLA PLOT RATIO (KLB) 610.5 m2 OPTION RESIDENCE - L8m2 PLOT 0.18 RATIO 331.8 WELLNESS 4.19 OPT3 - L1 7521.7 m2 3 SCHEDULE PLOT RATIO 3.61 641.3 m2 - L4 6469.6 m2 0.36 OPTION 2OPPORTUNITY 4.15 AREA 7445.1 m2 PROGRAM NLA RATIO (KLB) OPT3NLA LEVELS PLOTOFFICE RATIO (KLB) OPT3 LEVELS PLOTPROGRAM 0.12 223.7 223.7 m2OPPORTUNITY - L0 0.34826.5 m2 m2 OFFICEOPT3 - L1 610.5OFFICE OPT3 - L6 0.36 OPT3 -- L0 L9 641.3 m2 m2 0.46 0.12 OPT3 0.37 61.8 0.37 661.8 m2 OFFICE PT3 m2 - L1 0.36 641.3 OFFICE OPT3PLANT - L5 0.36 641.3 OFFICEm2 OPT3 OPT3 - L2 0.38 OPPORTUNITY 681.4 m2 OPT3 - L0 2 610.5 m2 PLANT - L9m2 m2Wellness OPPORTUNITY OPT3 0.12 WELLNESS OPT3 - L4 0.49 873.810.2% m2 - L0 0.49 vsOPPORTUNITY Floor Area : Lot size: - L0 1794873.8 mOPT3 AREA SCHEDULE - OPTION 3 0.34 AREA SCHEDULE -223.7 OPTION 0.18 m2m2 OPT3 - L0331.8 m2WELLNESS 0.18 331.8 4.15 7445.1 WELLNESS OPT3 - L0m2 2 0.46 826.5 m2 - L2 0.34 610.5OFFICE m2Floor Area OFFICEOPT3 OPT3 - L7 0.37 61.8 2 0.37 661.8 m2 OFFICE PT3 m2 - L2 0.12 223.7 m2 OPPORTUNITY OPT3 L2 Wellness vs : 20.3% 2 Lot size: 1794 m WELLNESS OPT3 L5 0.46 826.5 m2 OFFICE OPT3 L1 PROGRAM NLA PLOT RATIO (KLB) 0.12 LEVELS 223.7 m2 vsOFFICE Workspace : Floor Area: 6469.6661.8 mOPT3 m2Wellness OFFICE OPT3 - L1 0.37 661.81:m2 - L1 0.37 0.36 641.3 OFFICE OPT3 -6L5 4.19 0.17 m2 AREA SUMMARY 0.46 826.5 m2 WELLNESS OPT3 - L3 2 AREA SUMMARY AREA SUMMARY 7521.7 m2 OFFICE OPT3 - L0309.5 m2OFFICE 0.17 309.5OPT3 OPT3 - L0m2 0.34 610.5 m2 RESIDENCE 2 OPT3 L8 Wellness vs Workspace : 1: 3 0.36 641.3 m2 OFFICE - L3 Floor Area: 7521.7 m 0.37 61.8 Wellness Rate: 2.5 m /p 0.37 661.8 m2 OFFICE PT3 m2 - L3 Levels: 9-storey + Basement 0.46 826.5 m2 OFFICE OPT3 L2 0.36 OFFICE OPT3 - L6 0.38 681.4- m2 OPPORTUNITY L0 641.3 m2 661.8 m2 - L2 0.37 OFFICE OPT3 - L2 0.12 223.7 m2 OPPORTUNITY - L1 0.37 WELLNESS 661.8 m2 OFFICE OPT3 OPT3 - L5 PROGRAM OPT3 -NLA PLOT RATIO (KLB) LEVELS 0.12 223.7 LEVELS PROGRAM OPT3 PLOT RATIOOPT3 (KLB) 2 Wellness Rate: 5.9 m2 /p 0.19 WELLNESS OPT3 - L4 Levels: + Basement 0.12 223.7 m2 WELLNESS OPT3 - L3 Wellness Rate Target: 5m /p Capacity: 260 people 0.12 223.7 m2 OPPORTUNITY -NLA L1m2 0.34348.8 m2 610.5 OPT3 -WELLNESS L99-storeyPLANT 0.37 61.8 0.46m2 826.5 m2 OPT3 - m2 L3 0.37 m2 OFFICE PT3 m2 - L4 AREA 0.36 0.18 331.8 m2 OFFICE WELLNESS OPT3 - L7 OPT3 - SUMMARY 0.46 826.5 OPT3 641.3 661.8 m2Workspace OPT3661.8 - L3 Floor Area : 17.9% 260 people WellnessOFFICE Rate Target: 5 m2 Lot /p size: 661.815.3 m2 OFFICE OPT3 - L3 0.37 2 Capacity: 2 0.38 Wellness vs 0.36 OFFICE OPT3 L6 0.34 610.5 m2 OPT3 - L4 0.36 641.3 Rate: m2 /p Wellness vs Floor Area L1 : 331.8 10.2% OFFICEm2 OPT3 - L4 Wellness vs Floor Area : 681.4- L1 m21794 mOFFICE - L0m2 LotOPPORTUNITY Lift: 4 Nos - 3OFFICE Passager + 1 Service Lot size:0.37OPPORTUNITY 1794 mm2 641.3 m2 0.12 223.7 OPT3 -- L0 1794 m2 size: 0.18 641.3OPT3 m2OFFICE WELLNESS OPT3 - L1 0.19 m2 348.8 m2 Workspace OPT3 - L44 Nos 4.19 7521.7 0.37 61.8 0.36 m2 OPT3 - L2 2 Wellness vs Workspace 1: 3 OFFICE PT3 m2 - L5 Rate: 15.8 m2 /p Area: 2 Lift: 3 Passager + 1 Service 2 661.8 m2Workspace 0.36 OPT3661.8 - L4 m2 OFFICE0.37 RESIDENCE OPT3 0.46 826.5 m2 : -WELLNESS OPT3 641.3 m2 OPT3 0.37WELLNESS Rate Target: /p Area: 661.815m2 Wellness vs Workspace : 1:-6L8 OFFICE OPT3 - L4 0.37 Wellness vs Workspace : Floor 6469.6 mm2 0.12 223.7 m2 Floor WELLNESS OPT3 - Wellness L4 7521.7 m2 Area: 7445.1 mOFFICE 0.19 348.8 m2 Floor WELLNESS OPT3 - L5 0.36 OFFICE OPT3 L7 0.46 Wellness Rate: 826.5- L2 m2 OFFICE - L1 641.3 0.18 331.8 OPT3 --m L0 2 17.9% 5.1 m2 /p 0.34 Rate Target: 610.5 m2 Workspace OFFICE OPT3 - L4 15 mLevels: /p 0.361794 OFFICE - L2m2 0.12 vs Floor Area : 223.7 m2 OPT3 - L2641.3 m2OPPORTUNITY size: m2OPT3 0.37 61.8 vs OFFICE Floor Area : 1617 Wellness Rate:Lot 2.5 m2 /p Wellness Rate: Workspace: m2OPT3 Levels: 0.37 9-storeyOPT3 + Basement OFFICE PT3 m2 - L6 9-storey + Basement m2Nos OPT3661.8 - L5 m2 OFFICE0.373970.8661.8 9-storey +L3 Basement 0.36 641.31:m23 Levels: OFFICE - Wellness L5 661.81:m2 - L5Lift 0.37 PLANT 0.36 OPT3 L9 0.46 826.5 m2 WELLNESS OPT3 641.3 m2 0.34 610.5 m2 OFFICE OPT3 L5 2 vs Workspace : 0.36 RESIDENCE OPT3 OPT3 L8 Target: 5 m /p vs Floor Area: 1: 1880 826.5 260 m2 people 0.46 Wellness Rate OFFICE OPT3 - L2 641.3 m2 Wellness 0.17 309.5 -- L0 Workspace: 4095 m2 m2 Nos Lift 0.36 641.3 m2 OPT3Area: - L3223.7 m2OFFICE 7445.1 m2OPT3 0.19 348.8 WELLNESS OPT3 - L5 vs Floor Area: OPT3 13.5% Rate Floor Target: 5 m2 /p 0.12 Wellness Rate Target: Workspace m2 m2Opportunities Capacity: OFFICE 260 people OPPORTUNITY Capacity: 260 people - L2m2 2Capacity: WELLNESS - Wellness L5 0.37 0.12 61.8 223.7 m2 0.37 OPT3661.8 - L6Target: m2 OFFICE0.37 3900661.8 RESIDENCE PT3 m2 - L7 2 Rate: 5.1 m /p 0.37 661.8 m2 OFFICE OPT3 L6 2 0.34 610.5 m2 OFFICE 0.19 348.8 m2 WELLNESS OPT3 WorkspaceWorkspace Rate: 15.9 m /p 3900OPT3 Opportunities vs Floor Area: 9% Lift: m m2- L6 4.15 7445.1 m2 OPT3 Levels: 9-storey + Basement 0.12 223.7 m2 WELLNESS OPT3 - L3 Rate: 15.3 m2 /p Workspace Rate: Wellness: 661.8 m2 Lift: 4 Nos - 3 Passager + 1223.7 Service PLANT 0.36 OPT3 -- L1 L9 826.5- +L4 m2 WELLNESS - L3 641.3 m2 Workspace 4 Nos - 3 Passager + 1 Service 0.12 m2 OPPORTUNITY OPT3 0.34 4 Nos - 3 Passager 1 Service 0.46 610.5 OPT3 - L5Target:OFFICE 2 2 Lift: 0.36 OFFICE OPT3 L6 641.3 m2 Wellness Rate Target: 5 m /p 0.36 641.3 m2 OFFICE OPT3 L3 2 0.37 661.8 m2 RESIDENCE OPT3 L7 0.37 61.8 m2 2 Workspace Rate Target: 15 m /p 0.37 661.8 m2 RESIDENCE 0.37 1300 m2OPT3 - L7 661.8 m2 WELLNESS PT3 - L8 0.34 610.5 m2 OFFICE - L7 Wellness: 1524.1OPT3 m Capacity: Workspace Rate Target: 15 m /p 260 people Workspace Rate Target: Wellness Target: 0.34 610.5- m2 OFFICE OPT3 - L4 0.36 641.3 m2 Workspace OFFICE OPT3 - L4 0.34 610.52 m2 OFFICE OPT3 L6: 0.19 348.8 m2 WELLNESS OPT3 L4 0.36 Rate: 15.9 m2 /p 0.18 331.8 m2 WELLNESS OPT3 L1 OFFICE OPT3 - L7 641.3 m2 4.15 7445.1 m2 Nos Lift vs Floor Area 1: 1861 2 2 0.12 223.7 m2 WELLNESS OPT3 L3 Wellness Target: 1300 m 2 Lift: 4 Nos - 3 Passager m2 - L8 0.37 OPT3301.6 - L8 m2 WELLNESS Nos Lift vs Floor Area -: L4 1: 1617 + 1 Service 0.37 Nos Lift vs Floor Area: 661.8 m2 Workspace: WELLNESS Opportunity: m OPT3 3970.8 m 0.34 0.17 610.5 m2 Workspace: 01.6 RESIDENCE OPT3 - L8 4095 m2 0.17 873.8661.8 4157.3 mWELLNESS PLANT PT3 m2 - L9 0.12 223.7 m2 Workspace WELLNESS OPT3 0.19 348.8 m2 OPT3 - L5 Rate Target: 15 m2Workspace: /pOFFICE 2 m2 0.36 0.34 610.5 OFFICE OPT3 L7 RESIDENCE OPT3 L8 641.3 m2 Opportunities vs Floor Area: 9% 2 0.34 610.5 m2 OPT3 L4 Opportunity: 681.4 m 2 0.36 641.3 m2 OFFICE OPT3 L2 2 Opportunities Floor-Area: 13.5% 0.36 Opportunities vs Floor Are 3900 m 3900 m Workspace Target: 3900 m 301.6 m2 - L9 0.17 OPT36469.6 - L9 OFFICE vsOPT3 OPT3 - L4 0.34 Target: 610.5 m2 Workspace 0.17Target: PLANT 301.6 m2 Workspace OPT3 - L9 PLANT OPT3 0.36 641.3 m2 L5641.3 m2OFFICE 3.61 Area : 469.6 m2 m2PLANT 3.61 2OPT3 - Nos PLANT L9 Lift vs Floor 2 641.3 1: m21861 0.36 0.34 610.5 m2 OFFICE OPT3 L5 0.34 610.5 m2 RESIDENCE OPT3 L8 2 2 Workspace: 4157.3 m Wellness: 661.8 m Wellness: 1524.1 m 1334.7 m 0.19 348.8 m2 WELLNESS OPT3 - L59% Wellness: 0.12 223.7 OPT3 L2 OPT3 - L5 0.12 223.7 m2 Opportunities 3.61 vs Floor Area: 6469.6 m2 0.123900 m2WELLNESS WELLNESS OPT3 - L4m2 3.61OPPORTUNITY 6469.6- m2 4.19 7521.7 m2 2 2 Workspace223.7 Target: m2 4.15 Target: 7445.1 m2 Wellness 0.34 610.5 m2 PLANT OPT3 - m2 L9 Wellness Target: 1300 m2 LEGEND Wellness Target: 1300 m 0.34 610.5 OFFICE OPT3 L6 1300 m 0.36 OPT3 - L6 0.34 610.5 m2 OFFICE OPT3 - L5 641.3 0.36 641.3 m2 OFFICE OPT3 - L3 2 2 1334.7 m2 m2 641.3 m2OFFICE 0.36 OFFICE Wellness: OPT3 - L5 Opportunity: 873.8 m2 Opportunity: 681.4 m Opportunity: 671.1 m 4.19 7521.7 m2 LEGEND 0.34 610.5 m2 OFFICE OPT3 0.36 OFFICE OPT3 - L7 641.3 0.34 610.5- L7 m2 OFFICE OPT3 - L6 OPPORTUNITIES Wellness Target: 1300 m2 m2 0.12 223.7 m2 WELLNESS OPT3 OPT3 - L3 WELLNESS L5 0.12 223.7 m2 AREA WHAT SUMMARY DOES IT OFFER? AREA SUMMARY 2 m2 0.36 WHAT IT OFFER? RESIDENCE 671.1 OPT3 - L8 641.3 AREA SUMMARY 0.34 610.5DOES m2 RESIDENCE OPT3 Opportunity: m AREA SUMMARY 0.34 610.5- L8 m2 OFFICE OPT3 - L7 0.36 641.3 OFFICE OPT3 - L4 OPPORTUNITIES OFFICE OPT3 - L9641.3 m2PLANT 0.36 641.3 m2 OPT3 - L6m2 0.36 OFFICE LEGEND 0.34 610.5SUMMARY m2 PLANT OPT3 AREA 0.34 610.5- L9 m2 RESIDENCE OPT3 - L8 0.12 223.7 WELLNESS OPT3 - L4 Permeability on street levels 0.36 7445.1 m2 Lot size: 1794 Lot m2 size:Wellness vs Floor Area : 1794 OFFICE OPT3 - L7m2 WHAT DOES OFFER? Permeability on street levels Wellness vs Floor Area : 10.2% 641.3 m2 m2 10.2% 4.15 Wellness vs FloorIT Area : 17.9% Wellness 20.3% OFFICEvs Floor Area : Lot size: 1794 m2 2 Lot size: 1794 m 2 4.19OPPORTUNITIES 7521.7 m2 Wellness vs Workspace6469.6 : Floor Area: 6469.6 mactive Sunken Garden creates oppportunity forFloor WHAT DOES IT OFFER? 0.34 m21: 3 PLANT OPT3 - 2L9 WELLNESS 0.36 641.3 OFFICE OPT3 Wellness vs Workspace : 1:-6L8m2 Area: m2 1:-6L5 Wellness vs Workspace610.5 : Wellness vs Workspace : 1: 3 Sunken Garden creates oppportunity for active public Floor Area: 7521.7 m2 0.36 RESIDENCE OPT3 641.3 IT m2OFFER? WHAT DOES IT OFFER? Floor Area: 7445.1 m 2 2 2 WHAT DOES Wellness vs9-storey Floor Area : 20.3% m /p Levels: 9-storey + Basement Lot size: 1794 m Wellness Rate: 2.5 mm2 /p Levels: Wellness Rate: 9-storey + Basement public space, a gathering space or education Wellness Rate: 5.1 m2 /p 4.19 Wellness Rate: 5.9 m2 /p WELLNESS Levels: + Basement Permeability on street levels space, a gathering space or education WELLNESS OPT3 OPT32.5 - L5 0.12 223.7 7521.7 m2 Levels: 9-storey + Basement PLANT AREA SUMMARY 0.36 2 RESIDENCE 641.3 m2 Wellness vs Workspace Wellness Rate Target: 260 people 5 m2Wellness /p OFFICE7521.7 Capacity: 260throughout, people Floor Area: m2 Rate Target: 5 -mL9 /p Capacity: Wellness Rate Target: 5 m2for /p active public Rate 5 m2 /p Capacity: 260: people 1: 3 Wellness Access to green area and daylight Permeability onTarget: street levels Sunken Garden creates oppportunity Access to green area and daylight throughout, Capacity: 260 people 2 0.36 OFFICE OPT315.3 - L6 2 641.3 m2 Permeability on street levels 2 Wellness Rate: 5.9 m /p Workspace Rate: m2 /p Lift: 4 Nos - 3 Passager + 1 Service Levels: 9-storey + Basement Workspace Rate: 15.3 m /p Lift: 4 Nos 3 Passager + 1 Service RESIDENCE Permeability on street Workspace Rate: 15.9 m /p Workspace Rate:creates oppportunity 15.8for m2active /p Lift: 4 Nos - 3 Passager + 1 Service 7445.1 m2levels4.15 minimising dark spots via central void Sunken Garden public Lift: 4 Nos - 3 Passager + 1 Service 2 space, a gathering space or education 2 minimising voidpeople PLANT WELLNESS Wellness Rate Target: 5 m2Workspace /p Workspace Rate Target: 15- m /p Sunken Garden creates Capacity: dark spots via central 260 Workspace Rate Target: oppportunity 15for m2active /p 0.36 OFFICE OPT3 L7 15 m /p 641.3 m2 Rate Target: 15 m2 /p Wellness vs Floor Area : 17.9%Workspace Rate Target: Sunken Opportunity for roof level open space space, a gathering space or education Lot size: Garden creates oppportunity 1794for m2active public 2can be Access to green area and daylight1:throughout, Opportunity for roof- 3level open space that can beWorkspace used Rate: m2PLANT /p Nos Lift vs Floor Area : 3970.8 m2 1: 1617 Workspace: 3970.8that m 2 15.8Nos Lift: 4 Nos Passager + 1 Service Nos Liftspace, vs Floor Area : space or education 1: 1617 Workspace: public a gathering Nos Lift vs Floor Area : 1861 Lift vs Floor Area: 1: 1880 Wellness vs Workspace : 1: 3 Workspace: 4095 m 2 2 0.36 space, a gathering space or education RESIDENCE OPT3 - L8 641.3 m2 4157.3 m 2 Floor Area: 7445.1 mWorkspace: 2 used for office / private functions (event, talk, church) Access to green area and daylight9% throughout, Rate Target:3900 m2 15 mOpportunities /p Opportunities vs Floor Area: Workspace Target: 3900 m 2 minimising dark central void for office / private functionsRESIDENCE (event, talk,Workspace church) Workspace Opportunities vs area Floorand Area: 13.5% Workspace Target: 3900 m2 13.5% vs spots Floor via Area: 9% vs Floor Area: Wellness Rate: /p Target: Access to green daylight throughout, 2 5.1 m Opportunities Workspace Target: 3900 m Access to green area and daylight throughout, Levels: 9-storey + Basement 2 PLANT 0.36 - L9 641.3 m2 Nos Lift vs Floor Area:1524.1 m2 1: 1880 Wellness: 661.8 m 2 Wellness space for office functions minimising dark spots via central void Workspace: 4095 m2 Wellness: 661.8OPT3 m2 for roof level open space that can be Wellness space for office functions Wellness Rate Target: Wellness: 2 5 m /pOpportunity minimising dark spots via central void MAX OPTION 1 Wellness: 1334.7 m Capacity: 260void people 2 PLANT 3900 m2 minimising dark spots via central Opportunities vs Floor Area: Wellness Target: 1300 m 2 Workspace Target: Wellness Target: 1300 m2 LEGEND that can be used Workspace Rate: /p for office / private functions (event, talk, church) Wellness Target: 1300 m2 9% Opportunity for roof level open space 2 15.9 mused 4.15 7445.1 m2 OPT3 - L8 OPT3 - L9

RESIDENCE PLANT

2

641.3 m2 641.3 m2 641.3 m2

0.36 0.36

7445.1 m2

4.15

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

OPPORTUNITIES

2

OFFICE

WELLNESS

RESIDENCE PLANT

6.4 3.6

OPTION 2

Opportunity:

OPTION 11 Option

WHAT DOES IT OFFER?

2 873.8 m Opportunity:

873.8 m2

Opportunity for roof level open space that can be used for office / private functions (event, talk, church) Wellness space for office functions

6.4 3.6

PLOT RATIO

OPTION 1

Permeability on street levels Permeability on street levels Sunken Garden creates oppportunity forSunken active Garden creates oppportunity for active public space, a gathering space or education public space, a gathering space or education Access to green area and daylight throughout, Access to green area and daylight throughout, minimising dark spots via central void minimising dark spots via central void Opportunity for roof level open space that can be Opportunity for roof level open space that can be used for office / private functions (event, used talk, church) for office / private functions (event, talk, church)

OPPORTUNITIES

OFFICE

OFFICE

WELLNESS

WELLNESS

RESIDENCE PLANT

6.4 4.2

6.4 4.2

OPTION 3

PLOT RATIO

6.4 3.6

Wellness: Wellness Target: Opportunity:

Wellness Target: 1300 m Lift: 4 Nos - 3 Passager 1 Service Opportunity for roof level open+ space that can beWorkspace Rate Target:671.1 m2 15 m2 /p Wellness space for office functions Opportunity: used for office / private functions (event, 2talk, church) Nos Lift vs Floor Area : 1: 1861 Workspace: 4157.3 m Opportunities vs Floor Area: 9% Wellness space for office functions Workspace Target: 3900 m2 LEGEND LEGEND Wellness: 1334.7 m2 2 DOES IT OFFER? Wellness Target: 1300 mWHAT OPPORTUNITIES OPPORTUNITIES Opportunity: 671.1 m2 Permeability on street levels OFFICE OFFICE Sunken Garden creates oppportunity for active public WELLNESS WELLNESS space, a gathering space or education WHAT DOES IT OFFER? Access to green area and daylight throughout, RESIDENCE RESIDENCE minimising dark spots via central void Permeability on street levels Opportunity for roof level open space that canPLANT be PLANT Sunken Garden creates oppportunity for active public used for office / private functions (event, talk, church) space, a gathering space or education Wellness space for office functions Access to green area and daylight throughout,

Option OPTION 22

WHAT DOES IT OFFER?

OPPORTUNITIES

PLOTOPTION RATIO 2

MAX

OPTION Option33

PLANT

6.4 4.2

1524.1 m2 Opportunity: 1300 m2 681.4 m2

OPTION 1

6.4 3.6

WHAT DOES IT OFFER?

6.

RESIDENCE

WHAT DOES IT OFFER?

PL

MAXfor office / private OPTION 2 functions (event, talk, church)

681.4 m2

6.4 4.2

Wellness space for office functions

PLOT RATIO OPTION 3

WELLNESS

OPPORTUNITIES

RESIDENCE

PLOT RATIO Sunken Garden creates oppportunity for active public Permeability on street levels Permeability on street levels

OFFICE

space, a gathering space or education WELLNESS Sunken Garden creates oppportunity for active public Access to green area and daylight throughout, space, a gathering space or education RESIDENCE minimising dark spots via central void Access to green area and daylight throughout, Opportunity for roof level open space that can be used PLANT minimising dark spots via central void for office / private functions (event, talk, church) Opportunity for roof level open space that can be used Wellness space for office functions

OPPORTUNITIES OFFICE

LEGEND

PLANT

MAX

OPTION 2


K AC TB SE 6M

Side Setback + View Aspects

Setback + Street Interface

CK & STREET INTERFACE

Cross Ventilation

VOIDS & NATURAL VENTILATION

SIDE SETBACKS & VIEWS

Noon Sun + Shading

SUNSHADING

NEIGHBOUR

Potential Neighbour Built-up

Potential Neighbour Built-up

View + Daylight Accessibility

NORTH & SOUTH FACADE RESPONSE -NEIGHBOUR

NEIGHBOUR

NORTH & SOUTH-NEIGHBOUR FACADE RESPONSE -NEIGHBOUR CADE RESPONSE NORTH & SOUTH FACADE RESPONSE -NEIGHBOUR

West Facing Facade

EST FACADE RESPONSE - SUN

Angled Glazing towards West WEST FACADE RESPONSE - SUN WEST FACADE RESPONSE - SUN

Facade Response to View + Daylight + Heat


C:\Users\apple.h\Documents\230303-RVT22-K24 HQ

F

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

Structural and Civil Engineer

2

2A

3A

3

2

2A

4

5

3A

9

3

6

4

7

5

N

8

9

6

7

2

8

2A

3A

2

A

®

Drawing Name

K24 HQ

3

2A

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

5

3

9

4

6

5

7

9

ARCHITECTS EAT

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

Project Name

Client Address

4

3A

SD02.02A

PLAN - FLOOR - L0 MEZZANINE

Building Surveyor

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

L0 MEZZANINE Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

F

L1

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

8

6

2

7

2

A

B

B

2A

A

A

B

3A

8

A

A

2A

B

B

B

BIN BIN

SUNKEN GARDEN ATM ATM

SERVICE SERVICE VEHICLE VEHICLE

PRAYER PRAY ROOM

PANTRY

SUBSUBSTATION

STORE STORE

STATION

C

C

C

C C

E

F

F

Basement - Floor Plan

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

2

3A

®

2

®

Structural and Civil Engineer

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

3

4

2A

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

PLAN - FLOOR - B1

SD02.01A

Drawing Name

K24 HQ Project Name

9

3

6

4

5

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

7

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

9

D

D

NURSING ROOM

E

E

F

F

L3 - Floor Plan L1 L3 ARCHITECTS EAT

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

Project Name

5

3A

Drawing Name

K24 HQ

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

2A

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

STORE

SD02.02A

PLAN - FLOOR - L0 MEZZANINE

Building Surveyor

L0 MEZZANINE

ARCHITECTS EAT

FLOOR PLAN - B1 1

Structural and Civil Engineer All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited. Building Surveyor

N

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

8

7

8

2 2A

2

1:100 1:10

RAMP 1:4.5

2

FROM

2A

3A

3

4

5

9

6

®

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

6

7

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

D

D

E

C

WATER

TANK ,PUMPS,PUMPS, WATER TANKS, STACKER CABINET STACKER CABINET

2

8

2A

3A 3

3A

2A

3A

STRUC. & CIVIL ENGINEER SERVICES ENGINEER Structural and Civil Engineer

Drawing Name

STRUC. & CIVIL ENGINEER SERVICES ENGINEER Structural and Civil Engineer

Project Name

Scale Drawn by Checked by Issued Date Status

PLAN APOTEK - FLOOR - L3 K24

Client Address

Building Surveyor

Drawing Name

Jalan Magelang, Yogyakata, Indonesia K24 HQ Project Name

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

3

4

5

4

3

SD02.03

PLAN - FLOOR - L1

Building Surveyor

K24 HQ

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized of this All use rights reserved. This document remains document in any form what so is of Architects EAT and is only to theever property prohibited. be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is ® prohibited.

9

5

4

6

9

5

1 : 100 @ A2 Author Checker Scale DD.MM.YYYY 1 : 100 @ A2 CONCEPT Drawn by Author Checker Checked by DD.MM.YYYY Issued Date CONCEPT Status

E

F

F

ARCHITECTS EAT ARCHITECTS EAT

L2L4

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Level 2, 118 Langridge Street, Collingwood 3066 VIC Au P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.c

8

7

6

D E

SD02.05

7

6

9

D C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

FIRE PUMP

ROOM ROOM FIRE PUMP

2

2A

8

7

2

8

2

2A

2A

3A

BASEME

NT

1:4

GARDEN A A

A

A

B

B

A

4500

A

B B B

B

A

A

A

9000

SUNKEN GARDEN

PANTRY B

B

MULTI PURPOSE HALL 250 m2

B

17100

LOBBY 6M SETBACK

C

C

C

THEATER -200 PEOPLE

C

C

C

8100

CAFE STORE 1:4

C

D

F

F

NURSING ROOM

E

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

Structural and Civil Engineer

L3

F

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

6000

11700

®

SD02.05

PLAN - FLOOR - L3

Building Surveyor

Drawing Name

K24 HQ

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

9900

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

Project Name

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

14400

18000

54000

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT 2

2A

3A

Structural and Civil Engineer

3

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

6

5

7

2

8

ARCHITECTS EAT

®

2A

3A

6

7

K24 HQ

4

BUILDING SURVEYOR

ESD CONSULTANT

Structural and Civil Engineer

ESD Consultant

Building Surveyor

5

Rev.

9

Description

6

K24 HQ

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

®

3A

2

2A

3

43

3A

5

9

4

5

6

76 Client Address

9

F F

D

8

STRUC. & CIVIL ENGINEER SERVICES ENGINEER STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT ARCHITECTS EAT

L4 - Floor Plan L4 L6 P: +61 3Street, 8413 5300 E: office@eatas.com.au W: eatas.com.au Level 2, 118 Langridge Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Structural and Civil Engineer

Building Surveyor

Structural and Civil Engineer

2

2A

L1

3A

3

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

8

2

2

®

2A

3A

2A

3A

K24 HQ

9

6

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

3

4

5

4

9

5

6

9

E F F

D

E

ARCHITECTS EAT ARCHITECTS EAT

L5L7MEZ

F

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E:Level office@eatas.com.au eatas.com.au 2, 118 Langridge W: Street, Collingwood 3066 VIC Australia

P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

ARCHITECTS EAT 1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

7

Project Name

3

D

E

SD02.03

Drawing Name

5

D

1 : 100 @ A2 Scale 1 : 100 @ A2 Scale Drawn by Author Drawn by Checked by Author Checker Checked byIssued Date Checker DD.MM.YYYY DD.MM.YYYY Issued DateStatus CONCEPT CONCEPT Status

APOTEK K24 APOTEK K24 Jalan Magelang, Yogyakata, Indonesia Jalan Magelang, Yogyakata, Indonesia

PLAN - FLOOR - L1

Building Surveyor

4

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Client Address

Project Name

Client Address

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

SD02.06 SD02.08

PLAN - FLOOR - L4 Drawing Name PLAN - FLOOR - L6 Drawing Name K24 HQ K24 HQ Project Name

Building Surveyor

Structural and Civil Engineer All rights reserved. This document remains the property of Architects EAT and is only to All rights reserved. This document remains be used for its commissioned purpose. No the property of Architects is onlymay to be reproduced, part ofEAT this and document be used for its commissioned No in any form or by any modified orpurpose. transmitted part of this document may be reproduced, means without the explicit written authority of modified or transmitted in any form by any Architects EAT.or Unauthorized use of this means without the explicit written authority of so ever is document in any form what ® Unauthorized Architects EAT. prohibited.use of this document in any form what so ever is prohibited.

®

C

8

L2

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

7

6

8

7

8

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

1 : 100 @ A1 VO/AH 8 AM 24.03.2023 CONCEPT

Scale Drawn by Checked by Issued Date Status

87

2

2A

3A

A

23

4

2A

3A

5

3

9

6

4

5

7

9

8

6

2

7

2A

8

3A 2

3 2A

3A

A

A

A

A B

A

A

B

A

B

B

2A

A

B

A

2

SD02.02

Drawing Name

Project Name

All rights reserved. This document remains the property of Architects EAT and is only 2 2Ato be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

E E

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia

7

PLAN - FLOOR - L0

Date

D D

F

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

3

STRUC. & CIVIL ENGINEER SERVICES ENGINEER Building Services Engineer

Drawing Name

9

Project Name

L0 Plan MEZZANINE L0 - Floor

FLOOR PLAN - L0

9

SD02.02A

PLAN - FLOOR - L0 MEZZANINE

Building Surveyor

4

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

C

E

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

1500

E

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

1:4.5

RAMP TO BASEMENT

E

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

1:10

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

1:100

D

A

A

B

B

B

B

B

B

B

C

C

C

C

PANTRY C

C

C

PANTRY

E

STORE

SD02.02A

PLAN - FLOOR - L0 MEZZANINE Drawing Name

K24 HQ APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

D F

ARCHITECTS EAT

6

7

7

8

PLAN - FLOOR - L6

Structural and Civil Engineer

Drawing Name

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

F

®

K24 HQ Project Name

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this Level 2, 118 Langridge Street, Collingwood document 3066 VIC in Australia any form what so ever is ® prohibited. P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

2A

2

2A

2

2

3A

3

3A

3

Structural and Civil Engineer

PLAN - FLOOR - L1

Building Surveyor

Drawing Name

K24 HQ

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

®

Project Name

Building Surveyor

®

2A

3A

2A

3A

4

5

4

5

3

Project Name

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

4

5

9

9

6

4

9

F

E

D F

ARCHITECTS EAT

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

F

®

PLAN - FLOOR - L7

Structural and Civil Engineer

Drawing Name

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Building Surveyor

K24 HQ Project Name

STRUC. & CIVIL ENGINEER SERVICES ENGINEER Structural and Civil Engineer

®

2

8

2

2

2A

8 8

2

Building Surveyor

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this Level 2, 118 Langridge Street, 3066 VIC Australia document in Collingwood any form what so ever is prohibited. P: +61 3 8413®5300 E: office@eatas.com.au W: eatas.com.au

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

2A

3

2

2A

® 3

3A

2A

3A

2A

3A

Project Name

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

4

5

5

9

5

9

E

F

D

E

ARCHITECTS EAT

F

L1 L5 MEZZ Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

8

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this

Level 2, 118 Langridge Street, Collingwood Australia document3066 in any VIC form what so ever is ® prohibited. W: eatas.com.au P: +61 3 8413 5300 E: office@eatas.com.au

2

2A

8

7

8

7

8

2

2A

3A

A

A

STRUC. &

ARCHITECTS EAT

Structural and Civil Engineer

L2

7

7

6

6

D

ARCHITECTS EAT

8

9

9

C

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

6 7

5

5

SD02.02A Scale Drawn by Checked by Issued Date Status 1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

SD02.06

1 : 100 @ A2 Author APOTEK Checker K24 DD.MM.YYYY Jalan Magelang, Yogyakata, Indonesia CONCEPT

6

9

6

4 4

SD02.03

K24 HQScale Drawn by Project Name Checked by Client Address Issued Date Status

Project Name

4

3

3

Drawing Name

K24 HQ Client Address

Scale Drawn by Checked by Issued Date Status

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

PLAN - FLOOR - L4

Drawing Name Building Surveyor

Structural and Civil Engineer

1 : 100 @ A2 Author Checker DD.MM.YYYY F CONCEPT

E

SD02.04

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Project Name

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

3

4

3A 3A

K24 HQ Address

Drawing Name

K24 HQ Client Address

PLAN SERVICES - FLOOR - L1ENGINEER STRUC. & CIVIL ENGINEER SERVICES ENGINEER STRUC. & CIVIL ENGINEER

ARCHITECTS EAT

L1

Drawing Name

Client- L2 PLAN - FLOOR

Building Surveyor

Scale Drawn by Checked by Issued Date Status

PLAN - FLOOR - L0 MEZZANINE

Building Surveyor

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Structuraluse andofCivil Architects EAT. Unauthorized thisEngineer document in any form what so ever is All rights reserved. This remains ® document prohibited. the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

D

SD02.09

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Structural and Civil Engineer

8

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

L7 L0 MEZZANINE L2 L5 - Floor Plan L4

E

ARCHITECTS EAT 1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

7 7

E

ARCHITECTS EAT

7

6

6

Scale Drawn by Checked by Issued Date Status

6 7

5 9

Client Address

D

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

SD02.05

1 : 100 @ A2 Scale Drawn by Author Checker Checked by APOTEK K24 DD.MM.YYYY Issued Date Jalan Magelang, Yogyakata, Indonesia CONCEPT Status

K24 HQ

Project Name

3

SD02.03 Scale Drawn by Checked by Issued Date Status

SD02.02A

Drawing Name

K24 HQ Client Address

1 : 100 @ A2E Author Checker DD.MM.YYYY CONCEPT F

Scale Drawn by Checked by Issued Date Status

PLAN - FLOOR - L3

Drawing Name Building Surveyor

Structural and Civil Engineer

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

D

NURSING ROOM

SD02.08

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

PLAN - FLOOR - L0 MEZZANINE STRUC. & CIVIL ENGINEER SERVICESSTRUC. ENGINEER & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address

ARCHITECTS EAT

8 2

Building Surveyor

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Structural and Civil Engineer

9

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

L6 L1 - Floor Plan L0 Mezzanine L3 L0 MEZZANINE E

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

Scale Drawn by Checked by Issued Date Status

Project Name

Client Address

E

PRAYER ROOM

F

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

F

NGINEER

STORE

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

E

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

D

F

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C

C

E

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C

D

3

A

A

A

A

A

A

A

B

A

B

B

A

B

B

B

B

B

B

B

B

PANTRY

PANTRY

C

C

PANTRY C

C

C

C

C

C

C

STORE

C

C

7

8

6

7

7

L1 L3 2

2A

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

2

®

L6

document in any form what so ever is prohibited.

Structural and Civil Engineer

3 ®

2

2A

2A

3

4

K24 HQ

PLAN - FLOOR - L3 Project Name

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address6

9

3

4

5

5

5

9

9

SD02.05

Project Name

1 : 100 @ A2 Author APOTEK K24 Checker Jalan Magelang, DD.MM.YYYY CONCEPT

F

SD02.06

Checker DD.MM.YYYY CONCEPT

Checked by Issued Date Status

7

9

Scale Drawn by Checked by Issued Date Status

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

7

F

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

Structural and Civil Engineer All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Structural Architects EAT. Unauthorized use of this and Civil Engineer document in any form what so ever is BuildingAll Surveyor rights reserved. This document remains ® prohibited. the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is Structural and Civil Engineer prohibited.

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of

®

document in any form what so ever is prohibited.

Structural and Civil Engineer

2A

®

Project Name

Project Name

Jalan Magelang, Yogyakata, Indonesia

Building Surveyor

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced,Building Surveyor modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

All rights reserved. This document remains the property of Architects EAT and is only to

be used for its commissioned purpose. No Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia part of this document may be reproduced, P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au modified or transmitted in any form or by any

2

K24 HQ

means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

3A

® 3

Drawing Name

PLAN - FLOOR - L4 Drawing Name

Address

Scale Drawn by

Address Checked PLAN - FLOOR - L7 by

Issued Date Status

Drawing Name

K24 HQ Project Name

Project Name

APOTEK K24 Jalan Magelang, 9Yogyakata, Indonesia

Jalan Magelang, Yogyakata, Indonesia

1 : 100 @ A2 APOTEKAuthor K24 CheckerYogyakata, Indonesia Jalan Magelang, DD.MM.YYYY CONCEPT

SD02.06

APOTEK K24Scale 1 : 100 @ A2 Jalan Magelang, Yogyakata, Indonesia Drawn by Author

Client Address

K24 HQ

Client 5 Address

4

SD02.04

K24 HQ Client

Project Name

Address

®

EAT. Unauthorized use this P: +61 3 8413 5300Architects E: office@eatas.com.au W:ofeatas.com.au

APOTEK K24 Client PLAN - FLOOR - L5 MEZZANINE

Building Surveyor

Drawing Name

K24 HQ

APOTEK K24 Client STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EATStreet, Collingwood 3066 VIC Australia Level 2, 118 Langridge

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Drawing Name

STRUC. & CIVIL ENGINEER SERVICES ENGINEER PLAN - FLOOR - L2 STRUC. & CIVIL ENGINEER SERVICES ENGINEER

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia and Civil Engineer P: +61 3 8413 5300 E: office@eatas.com.auStructural W: eatas.com.au

L2 L4

PLAN - FLOOR - L3

Building Surveyor

L3 L5 Mezzanine - Floor Plan L5 MEZZANINE L7 ARCHITECTS EAT

ARCHITECTS EAT

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

6

Checker DD.MM.YYYY CONCEPT

Checked by Issued Date Status

D

E

SD02.05 F

8

2

2A

3A

3

4

5

9

6

7

8

2

2A

3A

3

4

5

9

6

7

8

SD02.07A

7

E

F

ARCHITECTS EAT

L4 L5 MEZZANINE

Level 2, 118 Langridge Street, Collingwood 30 P: +61 3 8413 5300 E: office@eatas.com.au

STRUC

Structural and Civil E

8

2 ®

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

A

A

D

1 : 100 @ A2 Scale Drawn by Author Checker Checked by DD.MM.YYYY Issued Date CONCEPT Status 1 : 100 @ A2 Scale Drawn by Author Checker Checked by DD.MM.YYYY Issued Date CONCEPT Status 1 : 100 @ A2 Scale ARCHITECTS EAT Drawn by Author Checker Checked by DD.MM.YYYY Issued Date CONCEPT Status

SD02.09

8

8

7

F E

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

7

NURSING ROOM

F

D

ARCHITECTS EAT

8

6

6

6

Scale Drawn by Checked by Issued Date Status

SD02.08

Yogyakata, Indonesia

APOTEK K24Scale 1 : 100 @ A2 Jalan Magelang, Yogyakata, Indonesia Drawn by Author

Client Address

K24 HQ

4

3

APOTEK K24 PLAN - FLOOR - L6 Jalan Magelang, Yogyakata, Indonesia Drawing Name

Drawing Name

5

3A

Scale Project Name Drawn Clientby Checked Addressby Issued Date Status

Project Name

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced,Building Surveyor modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

4

2A

3A

3A

®

Drawing Name

Drawing Name

K24 HQ Address

Building Surveyor

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

PLAN - FLOOR - L4

SD02.03 K24 HQ

Surveyor PLAN - FLOORBuilding - L1

Structural and Civil Engineer

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is Structural® and Civil Engineer prohibited.

Client STRUC. & CIVIL ENGINEER SERVICES ENGINEER

All rights reserved. This document remains the property of Architects EAT and is only to

3A

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

Building Surveyor

without the explicit writtenCollingwood authority of Levelmeans 2, 118 Langridge Street, 3066 VIC Australia Architects Unauthorized use of this P: +61 3 8413EAT. 5300 E: office@eatas.com.au W: eatas.com.au

be used for its commissioned purpose. No Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia part of this document may be reproduced, P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au modified or transmitted in any form or by any

8

8

Structural and Civil Engineer

L4

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any

ARCHITECTS EAT

P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au ARCHITECTS EAT

2

ARCHITECTS EAT

ARCHITECTS EAT

E

PRAYER ROOM

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

L1 - Floor Plan

D F

E

STORE

E

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

F

E

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

NURSING ROOM

F E

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

F

SD02.05 Scale Drawn by Checked by Issued Date Status

1 : 100 @ A2 Scale Drawn byAPOTEK K24 Author Checker Checked Jalan by Magelang, Yogyakata, Indonesia DD.MM.YYYY Issued Date CONCEPT Status

Project Name

9

E

SD02.02A

Drawing Name

K24 HQ Client Address

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

F

STORE E

D

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

PLAN - FLOOR - L3

L0 MEZZANINE

E D

D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

NGINEER

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

D

NURSING ROOM D

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

PANTRY

STORE

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. 2A Unauthorized use of this document in any form what so ever is prohibited.

A

A

A

A

A

B

B

A

B

B

B

B

B

B

C

C

C

C

C

PANTRY

Scale Drawn by

PLAN - FLOOR - L6Checked by

Jalan Magelang, Yogyakata, Indonesia

Drawing Name

Issued Date Status

K24 HQ

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

D

D F

D

E

E F

F

E

F

L2 - Floor Plan

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

L2 L4 L6

L7 ®

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

2

2

Drawing Name

K24 HQ

®

2A

3A

2A

3A

All rights reserved. This document remains ® the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Structural and Civil Engineer

AddressBuilding Surveyor

Drawing Name

®

part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of StructuralEAT. and Civil Engineer use of this Architects Unauthorized

PLAN - Checked FLOORby- L7 Drawing Name

Jalan Magelang, Yogyakata, Indonesia

PLAN - FLOOR - L4

Structural and Civil Engineer

Project Name

Project Name

PLAN - FLOOR - L6 Client

Building Surveyor

Address

Drawing Name

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

K24 HQ APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

Client Address 4

5

5

9

9

6

6

SD02.08 Scale Drawn by Checked by Issued Date Status

Project Name

4

Issued Date

K24 HQStatus Client Address

K24 HQ

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

document in any form what so ever is prohibited.

3

3

Scale Drawn by

Project Name

STRUC. & CIVIL ENGINEER ENGINEER K24 Client SERVICESAPOTEK All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any Surveyor form or by any Building means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

D

SD02.04

PLAN - FLOOR - L2

Building Surveyor

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

All rights reserved. This document remains Level 2, 118 Langridge Street, Collingwoodthe 3066 VIC Australia property of Architects EAT and is only to P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au be used for its commissioned purpose. No

ARCHITECTS EAT

8

8

Structural and Civil Engineer

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

7

7

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

ARCHITECTS EAT

SD02.08 Scale Drawn by Checked by Issued Date Status

APOTEK K24 Jalan Indonesia 1 : 100 @ A2 ScaleMagelang, Yogyakata, Drawn by Author Checker Checked by DD.MM.YYYY Issued Date CONCEPT Status

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

D

E

SD02.05

Project Name

Client Address

C

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

SD02.06

APOTEK K24 Jalan Indonesia 1 : 100 @ A2 ScaleMagelang, Yogyakata, Drawn by Author Checker Checked by DD.MM.YYYY Issued Date 1 : Status 100 @ A2 CONCEPT Author Checker DD.MM.YYYY CONCEPT

7

7

8

8

D

DE

F E

F

SD02.09 Scale Drawn by Checked by Issued Date Status

1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

D

E

F

L6 - Floor Plan L6 L5 MEZZANINE L7 ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

ARCHITECTS EAT

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

®

®

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is All rights reserved. This document remains prohibited. the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

®

STRUC. & CIVIL ENGINEER SERVICES ENGINEER Structural and Civil Engineer

Building Surveyor

Drawing Name

K24 HQ

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Project Name

Client Address

STRUC. & CIVIL ENGINEER SERVICES ENGINEER

PLAN - FLOOR - L5 MEZZANINE

Structural and Civil Engineer

Drawing Name

Building Surveyor

STRUC. & CIVIL ENGINEER SERVICES ENGINEER Structural and Civil Engineer

Building Surveyor

PLAN - FLOOR - L6

K24 HQ Project Name

APOTEK K24 Client - FLOOR - L7 PLAN Address

Drawing Name

Jalan Magelang, Yogyakata, Indonesia

K24 HQ Project Name

Client Address

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

SD02.03

L1

ER APOTEK K24

L3

PRAYER ROOM

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

NURSING ROOM

STORE

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

STORE

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C

C:\Users\apple.h\Documents\230303-RVT22-K24 HQ CONCEPT-CENTRAL_apple.h.rvt

C

APOTEK K24 Jalan Magelang, Yogyakata, Indonesia

SD02.07A Scale Drawn by Checked by Issued Date Scale Status Drawn by Checked by Issued Date Status

SD02.09

1 : 100 @ A2 Author Checker DD.MM.YYYY 1 : 100 @ A2 CONCEPT Author Checker DD.MM.YYYY CONCEPT

E

F

SD02.08 Scale Drawn by Checked by Issued Date Status

ARCHITECTS EAT 1 : 100 @ A2 Author Checker DD.MM.YYYY CONCEPT

L7

Level 2, 118 Langridge Street, Collingwood 3066 VIC Austra P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.a


1

A15.01

2

A15.03

2

A15.01

3

A15.03

3

A15.01

1

A15.03

ARCHITECTS EAT

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

ALVINA ST R

R

A15.04

3

A15.02

2

A15.04

4

A15.02

1

0 10 10

00 20

R

00 44

LOT 57

TH TYPE A

RL +63.05

LOT 58 TH TYPE A

LOT 49

RL +64.60 FT 2

TH TYPE A

LOT 73 TH TYPE A

RL +63.35

RL +64.70

RL +63.30

TH TYPE N LOT 48

585

RL +63.50

LOT 17

TH TYPE G

LOT 60

TH TYPE A

TH TYPE A

LOT 76

LOT 61

RL +64.80

RL +63.55

RL +63.65

LOT 47

RL +63.60 RL +64.80

TH TYPE N LOT 46

585

RL +63.70

TH TYPE D1

RL +63.80 RL +65.00

LOT 45

RL +64.95

RL +64.95

RL +64.85

RL +63.90

RL +64.85

LOT 62

TH TYPE A

TH TYPE G

TH TYPE C7

LOT 65

TH TYPE C3

LOT 66

TH TYPE C3

LOT 67

LOT 68

TH TYPE C3

LOT 69

TH TYPE C3

RL +63.95

RL +64.10

TH TYPE C3

LOT 64

LOT 70

LOT 63

TH TYPE A

LOT 79

LOT 71

LOT 78

TH TYPE A

RL +63.85

TH TYPE L2

TH TYPE C6

RL +63.30

TH TYPE A

LOT 77

TH TYPE A

RL +63.75

RL +64.75

RL +63.30

RL +64.75

LOT 19

RL +64.65

TH TYPE A

SOUTH LANE

277° 49' 19" 137.01 m

TH TYPE L1

97° 49' 19" 136.98 m

LOT 59

TH TYPE A

LOT 75

RL +63.15

TITLE BOUNDARY

LOT 74

TH TYPE A

RL +63.45

TH TYPE D1

LOT 18

LOT 44 RL +65.15

RL +64.20

7805

R

0 20 10

3

17

A15.04

NORTH LANE

18

3 8

A15.02

CENTRE LANE

16

RL +65.35

TH TYPE N2 LOT 43

585

FT 1 R

0 60 10

03 11

RL +63.55

04

TH TYPE L3 06

TH TYPE C4

05

LOT 96

TH TYPE C2

LOT 95

TH TYPE C1

LOT 94

LOT 93

TH TYPE C2

LOT 92

TH TYPE C1

TH TYPE C2

LOT 91

LOT 90

TH TYPE C1

TH TYPE C5

LOT 89

LOT 88

TH TYPE C4

LOT 87

TH TYPE C2

LOT 86

TH TYPE C1

LOT 85

TH TYPE C2

TH TYPE C1

LOT 84

LOT 83

LOT 82

TH TYPE C2

TH TYPE C1

LOT 81

LOT 80

LOT 21 TH TYPE L1

TH TYPE C2

TH TYPE C4

15

LOT 22

RL +65.45

TYPE F LOT 42

07

RL +65.35

RL +65.25

RL +65.20

RL +65.10

RL +65.05

RL +64.95

RL +64.90

RL +64.80

RL +64.65

RL +64.55

RL +64.50

RL +64.40

RL +64.40

RL +64.25

RL +64.15

14

RL +64.05

RL +63.55

RL +64.05

RL +63.65

R

00 82

TH TYPE L2

TYPE F

9

08

09

10

11

12

13

RL +65.45

LOT 41

FT 1

LOT 23

FT 1 49

2

00

34

FT 1

FT 1

A15.02

R

Building Surveyor

3

TH TYPE H

LOT 72

19

TH TYPE H

MSB

TH TYPE L1

FT 1

ESD Consultant

ADP CONSULTING PTY LTD FLOREANCIG SMITH

A15.02

02

01

RL +63.25

RL +63.05

FT 2

LOT 16

WSP AUSTRALIA PTY LTD

Building Services Engineer

31 Dover St Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

2

22

21

20

FT 1

TH TYPE D1

SUBSTATION 6400mm L x 6400mm D

TH TYPE L1

LOT 20

Level 1, 60 Albert Rd South Melbourne, VIC 3205 03 9636 0280 info@arkresources.com.au

A15.04

FT 1

WEST LANE FT 2

LOT 15

WSP AUSTRALIA PTY LTD

Structural and Civil Engineer

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

4

FT 1

71

2

RL +63.05

TH TYPE L3

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

A15.02

FT 1

RL +64.60

TH TYPE K

LOT 50

LOT 51

TH TYPE M

LOT 52

TH TYPE M

LOT 53

TH TYPE M

LOT 54

LOT 55

TH TYPE M

TH TYPE K

RL +64.30

RL +64.20

RL +64.00

RL +63.80

RL +63.70

LOT 56

TH TYPE M2

FT 2

260

260

4

A15.02 A15.04

FT 2

WEST LANE

TITLE BOUNDARY

RL +64.60

RL +63.35

TH TYPE E3

LOT 1

LOT 2

TH TYPE E2

RL +63.30

FT 1

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

1

97° 49' 19" 136.98 m

1

2

FT 2

FT 2

RL +63.35

TH TYPE E1

LOT 3

TH TYPE N

LOT 4

RL +63.35

LOT 5

RL +63.30

TH TYPE E1

RL +63.25

TH TYPE E2

LOT 6

LOT 7

RL +63.25

RL +63.25

TH TYPE E1

TH TYPE E2

LOT 8

LOT 9

RL +63.25

TH TYPE E1

LOT 10

RL +63.10

TH TYPE N

RL +63.15

TH TYPE E1

LOT 11

LOT 12

RL +63.05

TH TYPE E2

LOT 13

RL +63.05

TH TYPE E1

LOT 14

TH TYPE P2

RL +62.95

TITLE BOUNDARY

EXISTING EASEMENT 4500 SETBACK

®

A15.04

7° 49' 09" 147.65 m

R

21

22

00

00

SITE FIRE BOOSTER WATER 2800mm L x METER 800mm D ASSEMBLY 2800mm L x 800mm D

79

24

25

1

A15.04

TITLE BOUNDARY

EXISTING EASEMENT

R

R

63 00

FT 1

R

41

4 35

00

A15.04

EAST LANE

Rev. A

FT 1 FT 1

LOT 40

TH TYPE P

LOT 39

TH TYPE N

TH TYPE D1

LOT 38

TH TYPE G

LOT 37

TH TYPE D1

LOT 36

LOT 35

TH TYPE D1

TITLE BOUNDARY

RL +65.90

RL +65.75

RL +65.75

RL +65.75

RL +65.65

RL +65.55

97° 49' 19" 136.98 m

4500

SETBACK

R

RE S

CO DE

E OD

CO DE

E OD RE

RE S

E OD

CO DE

RE S

EASEMENT

TYPE D1, G, N, N2, P

PEDESTRIAN

TYPE D1, G, J, N, P

ACCESS

1 : 200

4500

Description

ADP CONSULTING PTY LTD FLOREANCIG SMITH ESD Consultant

Description

Date

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

Level 1, 60 Albert Rd South Melbourne, VIC 3205 03 9636 0280 info@arkresources.com.au

WSP AUSTRALIA PTY LTD

WSP AUSTRALIA PTY LTD

ADP CONSULTING PTY LTD FLOREANCIG SMITH

Structural and Civil Engineer

Building Services Engineer

ESD Consultant

Building Surveyor

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

Level 1, 60 Albert Rd South Melbourne, VIC 3205 03 9636 0280 info@arkresources.com.au

31 Dover St Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

ELEVATIONS - PROPOSED SITE - EAST Drawing Name

Date

10 ALVINA ST, OAKLEIGH SOUTH ELEVATIONS - PROPOSED SITE - EAST

Project Name

Client SOUTHLINK PROJECTS PTY LTD 10 ALVINA ST, OAKLEIGH SOUTH Address 10 ALVINA ST, OAKLEIGH SOUTH

Drawing Name

Project Name

Date

Building Surveyor

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

TYPESOUTHLINK K, M, M2 Client PROJECTS PTY LTD Address 10 ALVINA ST,SITE OAKLEIGH SOUTH ELEVATIONS - PROPOSED - EAST Drawing Name

10 ALVINA ST, OAKLEIGH SOUTH

31 Dover St Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

Project Name

Client Address Rev.

Description

SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY

NO.09A NO.09A NO.09A NO.09A

NO.09 NO.09

SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY

NO.09 SITE BOUNDARY

NO.09

NORTH LANE

NO.08

SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY SITE BOUNDARY

FOOTPATH FOOTPATH

FOOTPATH

4500

NGL +64.89

SETBACK

ACCESS ROAD

Rev.

SETBACK

NGL +64.61

TYPE K, M, M2

NGL +63.33

FOOTPATH

Description

Rev.

NATURE STRIP

WSP AUSTRALIA PTY LTD Building Services Engineer

FOOTPATH

WSP AUSTRALIA PTY LTD

03 9429 7798 31 Dover St info@floreancigsmith.com.au Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

4500

NO.08

FOOTPATH FOOTPATH

TYPE K, M, M2

TYPE K, M, M2

Rev.

NGL +63.27

31 Dover St

Building Surveyor

SITE BOUNDARY

NORTH LANE NORTHNORTH LANE LANE NORTH LANE

FOOT PATH FOOT PATH FOOT PATH

NATURE STRIP NATURE STRIP NATURE STRIP

VISITOR PARKING VISITOR PARKING VISITOR PARKING VISITOR PARKING VISITOR PARKING VISITOR PARKING

FOOTPATH FOOTPATH

ACCESS ROAD ACCESS ROAD ACCESS ACCESS ROAD ROAD

NATURE STRIP NATURE STRIP NATURE STRIP

FOOTPATH FOOTPATH

NATURE STRIP NATURE STRIP NATURE STRIP

FOOTPATH Building Surveyor

Structural and Civil Engineer

03 9636 0280 Level 1, 60 Albert Rd info@arkresources.com.au South Melbourne, VIC 3205 03 9636 0280 info@arkresources.com.au

NATURE STRIP

Level 1, 60 Albert Rd

VISITOR PARKING

FOOTPATH FOOTPATH

FOOTPATH FOOTPATH

FOOTPATH

NATURE STRIP

NORTH LANE NORTHNORTH LANE LANE

VISITOR PARKING

FOOT PATH

FOOTPATH

VISITOR PARKING

SOUTH LANE SOUTHSOUTH LANE LANE

NATURE STRIP

FOOTPATH FOOTPATH FOOTPATH

CO DE

SOUTH LANE

NATURE STRIP NATURE STRIP NATURE STRIP

EASEMENT

RE S

NATURE STRIP NATURE STRIP NATURE STRIP

CO DE

RE S CO DE RE S

NATURE STRIP

NO.09 POS

EASEMENT

CO DE

RE S

CO DE

RE S

EASEMENT

NO.03 POS

NATURE STRIP

SOUTH LANE SOUTHSOUTH LANE LANE SOUTH LANE

FOOTPATH FOOTPATH FOOTPATH

VISITOR PARKING VISITOR PARKING VISITOR PARKING

NATURE STRIP NATURE STRIP NATURE STRIP

EASEMENT

NO.13 POS NO.13 POS

SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY

EASEMENT EASEMENT EASEMENT

SITE BOUNDARY

NO.13 POS SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY

CO DE

RE S

NO.09 POS NO.09 POS

EASEMENT EASEMENT

NO.09 POS

SITE BOUNDARY SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY

CO DE RE S

NO.03 POS NO.03 POS

EASEMENT EASEMENT

SITE BOUNDARY

NO.03 POS

EASEMENT

CO DE

RE S

ESD Consultant

ESD Consultant

03 9412 5100 Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

4500

SETBACK

NGL +63.33

Date

SOUTHLINK PROJECTS PTY LTD 10 ALVINA ST, OAKLEIGH SOUTH

ELEVATIONS - PROPOSED SITE - EAST Drawing Name

10 ALVINA ST, OAKLEIGH SOUTH Project Name

Client Address

GENERAL LEGEND

NGL +63.33

E OD

®

ACCESS ROAD

NGL +64.89

NGL +64.61

SC

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

ADP CONSULTING PTY LTD FLOREANCIG SMITH South Melbourne, VIC 3205 Cremorne VIC 3121 ADP CONSULTING PTY LTD FLOREANCIG SMITH

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

ACCESS ROAD

NGL +65.27

NGL +64.89

NGL +64.61 NGL +63.33

RE

®

ARCHITECTS EAT

NGL +62.64 Place Level 15, 28 Freshwater

Southbank, VIC 3006 WSP AUSTRALIA PTY LTD Building Services Engineer

SETBACK

TYPE N2

E OD

WEST LANE - ELEVATION 1

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia A15.02 1 E: : 200 P: +61 3 8413 5300 office@eatas.com.au W: eatas.com.au

NORTH LANE

SC

WSP AUSTRALIA PTY LTD Building Services Engineer

4500

RE

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

WSP AUSTRALIA PTY LTD

Site Elevation - West Lane

TYPE C3, C6, C7

ACCESS ROAD

Structural and Civil Engineer

Level 15, 28 Freshwater Place Southbank, VIC 3006 WSP AUSTRALIA PTY LTD Structural and Civil Engineer 03 9412 5100 Level 15, 28 Freshwater Place Southbank, VIC 3006 TYPE E1, E2, E3, N, P2 03 9412 5100

4500 SETBACK

TYPE N2

E OD

®

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this All rights reserved. This document remains the document in any form what so ever is prohibited. property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

SETBACK

TYPE N2

NGL +64.91 +64.91

SC

1 : 200

TYPE N2

NORTH LANE

RE

WEST LANE - ELEVATION 1

4 ARCHITECTS EAT A15.02

4500

E OD

NGL +62.64

TYPE E1, E2, E3, N, P2

NGL +65.27

NGL +64.91 +64.91

SC

NGL +63.27

TYPE E1, E2, E3, N, P2

4500

SETBACK

RE

TYPE E1, E2, E3, N, P2

E OD

NGL +63.27

NGL +65.27

NGL +64.91 +64.91

SC

ACCESS

NGL +65.27

NGL +64.91 +64.91

RE

PEDESTRIAN

NGL +62.64

®

E OD

TYPE A

ACCESS

4500

ARCHITECTS EAT

SC

PEDESTRIAN

4500

SETBACK

TYPE F

NORTH LANE

ACCESS

SETBACK

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

RE

TYPE A

NORTH LANE

SETBACK

TYPE F

NGL +64.74 +64.74 TYPE C3, C6, C7

NGL +63.27

A15.02 P: +61 3 8413 5300 office@eatas.com.au W: eatas.com.au 1 E: : 200

E OD

TYPE C3, C6, C7

NGL +62.64

SETBACK

SC

TYPE C3, C6, C7

ACCESS

PEDESTRIAN

4500

WEST LANE - ELEVATION 1 4 Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia

4500

NORTH LANE

NORTH LANE

ACCESS

PEDESTRIAN

TYPE A

ACCESS

SOUTH LANE

4500 ARCHITECTS EAT

RE

PEDESTRIAN

TYPE A

WEST LANE - ELEVATION 1 1 : 200

E OD

TYPE A

ACCESS

SETBACK

A15.02

SC

PEDESTRIAN

SETBACK

A/C CONDENSER AUSTRALIAN HEIGHT DATUM CEILING HEIGHT CLOTHESLINE CONFIRM ON SITE DOWNPIPE EXPANSION JOINT E E E EQUAL OD OD OD EXISTING SC SC SC RE RE RE EXTERIOR FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FLOOR DRAIN GAS METER 10MM GROOVE LINE HOT WATER SERVICE LETTER BOX TYPE 1 LETTER BOX TYPE 2 NATURAL GROUND LEVEL OVERALL OVERFLOW PHOTO VOLTAIC (SOLAR) PANEL PRIME COST PROPOSED GROUND LEVEL PROVISIONAL SUM RAINWATER HEAD SOLAR BOOSTED HOT WATER SPREADER STRUCTURAL SURFACE LEVEL TILE EXPANSION JOINT TOP OF WALL WATER METER

PEDESTRIAN

TYPE A

SETBACK 4500

DOOR TYPE

PEDESTRIAN

TYPE A

SETBACK 4500

NGL +64.74 +64.74

CENTRE LANE - ELEVATION 1 1 : 200

WINDOW TYPE

TYPE A

ACCESS

SOUTH LANE

TYPE L2

AC AHD CH CL COS DP EJ EQ EX. EXT FCL FFL FD GM GRV HWS LB1 LB2 NGL O/A O/F PV (PC) PGL (PS) RWH SHW SPRD'R SSL TEJ TOW WM

SETBACK

FINISH TYPE

A15.02

1 : 200

TYPE F

TYPE F

NGL +64.74 +64.74

Site Elevation - Centre Lane A15.02

4500

NORTH LANE

NORTH LANE

NGL +64.74 +64.74

NGL +63.09

4500

JOINERY TYPE

SOUTH LANE

TYPE C1, C2, C4, C5

D102

1 : 200

SOUTH LANE

WALL TYPE

TYPE L2

TL#

A15.02

SETBACK

W100

3

CENTRE LANE - ELEVATION 1

4500

1 : 200

FENCE TYPE

NGL +63.09

TYPE L2

CENTRE LANE - ELEVATION 1

J0#

TYPE L2

CENTRE LANE - ELEVATION 1

3

CHANGE IN LEVEL

SETBACK

3

A15.02

TYPE C1, C2, C4, C5

SPOT LEVEL

4500

ACCESS

EAST LANE

WX #

NGL +63.09

PEDESTRIAN

NEW ACCESSWAY

FT #

NGL +63.09

4500

SETBACK

TYPE C1, C2, C4

TYPE C1, C2, C4, C5

TYPE C1, C2, C4, C5

NOM. SETDOWN

1 : 200

SOUTH LANE

GENERAL NOTES

TYPE L3

ACCESS

EAST LANE

REFER TO GENERAL NOTES ON SHEET A01.00

4500

SETBACK

PEDESTRIAN

NEW ACCESSWAY

ALL LOT SIZE REFER TO SITE PLAN

A15.02

1 : 200

EAST LANE - ELEVATION 1

ACCESS

EAST LANE

TOWNHOUSE SETOUT REFER TO TYPICAL TOWNHOUSE DRAWINGS UNLESS NOTED OTHERWISE TO REFER TO SITE PLAN

EAST LANE - ELEVATION 1

2

A15.02

TYPE C1, C2, C4

NEW ACCESSWAY PEDESTRIAN

NEW ACCESSWAY

NOTES

SOUTH LANE

ACCESS

EAST LANE

RETAINING WALL LOCATION, REFER TO CIVIL ENGINEER'S DRAWINGS

TYPE L3

PEDESTRIAN

FENCE TYPE AROUND SITE AND REFER TO A.14.03. FENCE TYPE FOR TOWNHOUSE TYPE WITH VARYING LOT SIZES TO REFER TO A14.03

SETBACK

1 : 200

LEVELS TO BE CROSS REFERENCE WITH CIVIL ENGINEER'S DRAWINGS

EAST LANE - ELEVATION 1

NUMBER OF STEPS FOR TOWNHOUSES WITH STEPS ENTRY TO BE CONFIRMED ON SITE

2

A15.02

REFER TO LANDSCAPE ARCHITECT'S DRAWINGS FOR SITE LEVEL LANDSCAPE AND FOOTPATH, TYPICAL TOWNHOUSE DRIVEWAY, FOOTPATH, POS AND LANDSCAPE

1 : 200

Site Elevation - East Lane

REFER TO SERVICES ENGINEER'S DRAWINGS FOR SITE AND TOWNHOUSE SERVICES

A15.02

TYPE C1, C2, C4

TYPE C1, C2, C4

REFER TO CIVIL AND STRUCTURE ENGINEER'S DRAWINGS FOR RETAINING WALL, FINISHES FOR BLOCKWORK RETAINING WALLS REFER TO FINISHES SCHEDULE

SOUTH LANE

SOUTH LANE

4500

REFER TO CIVIL DRAWINGS FOR SEWER, STORMWATER AND DRAINAGE

As indicated @ A1 VO 16/10/2020 TENDER

A14.03 REV.A

Scale Drawn by Checked by Issued Date Status

TYPE L3

TYPE L3

4500 SETBACK

REFER TO STRUCTURE ENGINEER'S DRAWINGS FOR TYPICAL TOWNHOUSE STRUCTURES

4500

SETBACK

EAST LANE - ELEVATION 1

RE

1 : 200

TYPE D1, G, J, N, P

ACCESS

E OD

SITE ELEVATION - EAST

PEDESTRIAN

SC

TYPE D1, G, N, N2, P

RE

NO.13 POS

SETBACK

1 : 200

NO.08

NO. 17 P.O.S.

SITE ELEVATION - EAST 4500

2

NO.17 P.O.S.

4500 SETBACK

NO.08

EASEMENT

SC

ACCESS

SOUTHLINK PROJECTS PTY LTD 10 ALVINA ST, OAKLEIGH SOUTH

NGL +64.61

A15.02 A15.02

Scale Drawn by Checked by Scale Date Issued Drawn by Status Checked by Issued Date Status Scale Drawn by Checked by Issued Date Status

4500

SETBACK

A15.02

A15.02

Scale Drawn by Checked by Issued Date Status

NGL +64.89

1 : 200 @ A1 VO 1 : 200 @ A1 16/10/2020 VO TENDER 16/10/2020 TENDER 1 : 200 @ A1 VO 16/10/2020 TENDER

1 : 200 @ A1 VO 16/10/2020 TENDER

Client’s brief was to strategize architectural improvement opportunities and cost management to project purchased with planning approval and to execute delivery of the project. This involved thorough review of the design package and secondary consent application to council and coordination with all consultants and stakeholders. Main challenge was to workshop with client to ensure architectural improvement are inline with identified target market without compromising quality of built.

C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

EASEMENT EASEMENT

SC SETBACK

TYPE D1, G, J, N, P

SETBACK

A15.02

4

RE

1 : 200

NO.17 P.O.S. NO.17 P.O.S.

CO DE RE S

SC

NO. 17 P.O.S. NO. 17 P.O.S.

RE

SITE BOUNDARY SITE BOUNDARYSITE BOUNDARY

E OD

NO. 17 P.O.S.

SC

SITE BOUNDARY

RE

TYPE D1, G, J, N, P

2.1 , PALING FENCE

PEDESTRIAN

SITE ELEVATION - EAST

1

A15.02

1

1

4

A15.01

TYPE D1, G, N, N2, P

4500

A15.02

3

2

PEDESTRIAN ACCESS

Site Elevation - East

2

A15.03

4500 TYPE D1, G, N, N2, P

SETBACK

SETBACK

A15.02

1

2

A15.01

3

A15.03

3

A15.01

SETBACK

4500

SITE BOUNDARYSITE BOUNDARY SITE BOUNDARY

45

1

A15.03

PLAN - PROPOSED SITE - GROUND FLOOR

Drawing Name

SOUTHLINK PROJECTS PTY LTD 10 ALVINA ST, OAKLEIGH SOUTH

10 ALVINA ST, OAKLEIGH SOUTH

Client Address

Project Name

4500

SETBACK

SITE BOUNDARY

20 00

Date 2020.10.XX

2.1 , PALING FENCE

2.1 , PALING FENCE 4500

NO.17 P.O.S.

LOT 34

TH TYPE N

TH TYPE J

LOT 33

LOT 32

TH TYPE N2

LOT 31

TH TYPE D1

TH TYPE N

LOT 30

LOT 29

TH TYPE G

TH TYPE N

LOT 27

LOT 28

TH TYPE D1

LOT 26

TH TYPE D1

TH TYPE D1

277° 49' 19" 137.01 m 1

A15.02

2.1 , PALING FENCE

SITE ELEVATION - EAST

1

TITLE BOUNDARY 187° 48' 19" 72.30 m

TITLE BOUNDARY

187° 48' 19" 72.30 m

Site Plan

C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

10 ALVINA ST, OAKLEIGH SOUTH Project: Multi Residential, 96 Townhouses Type: New Built Status: 90% Construction Completed Cost: $35million Area: 20400m2

RL +65.30

RL +65.30

RL +65.10

RL +64.95

RL +64.85

RL +64.70

RL +64.50

RL +64.35

RL +64.15

RL +64.05

LOT 25

LOT 24

TH TYPE P

TITLE BOUNDARY

RL +64.00

FT 1

Description Tender

FT 1

EXISTING EASEMENT TITLE BOUNDARY 187° 48' 19" 72.30 m


DOOR

198 EXTERNAL

EXTERNAL

92 44 INTERNAL

INTERNAL

3

FT 1

INTERNAL

3502700

2700

2700 125 363

WINDOW 43 92 3101

WINDOW 3101

WINDOW 3101 92 63

350

350 43 92

43 92

125 3632700

125 363

2700361 152

2700

WINDOW WINDOW WINDOW 92 63 238 90092 1843 238 92 184392 44 90092 63 238900 92

A20 L.21

A20 L.21

A20 L.21

3

3

3

361 152 EXTERNAL

361 152 EXTERNAL

EXTERNAL

1843 92 44 152 152 44 152 92INTERNAL INTERNAL

LOT BOUNDARY - REFER TO OVERALL SITE PLAN SPECIFIC LOT DIMENSIONS LOT BOUNDARY VARIES LOT-BOUNDARY REFER TO OVERALL VARIES - REFER SITE PLAN TOVARIES OVERALL FOR SPECIFIC SITE PLAN LOT DIMENSIONS FOR SPECIFIC LOTFOR DIMENSIONS

3175

INTERNAL

3175

3175

3440

A20 L.21

A20 L.21

A20 L.21

3

3

3

CAPPING

CAPPING

3440

3440

136

136 EXTERNAL

136 EXTERNAL

NOTE: NOTE: NOTE: REFER TO LANDSCAPE REFER TO LANDSCAPE REFER TO LANDSCAPE ARCHITECT'S ARCHITECT'S DRAWINGS DRAWINGS ARCHITECT'S DRAWINGS FORFOOTPATH, DRIVEWAY, FOOTPATH, FOR DRIVEWAY, FOR DRIVEWAY, FOOTPATH, POS AND LANDSCAPE POS AND LANDSCAPE POS AND LANDSCAPE

FT 1

AC

CAPPING

CAPPING

CAPPING

92

350 EXTERNAL

2700

WINDOW

WINDOW

2700 250 253

390 118

3315

3315

Rev. EQ EQ WSP AUSTRALIA PTY WSP AUSTRALIA PTY ADP CONSULTING PTY LTD FLOREANCIG WSP AUSTRALIA WSP AUSTRALIA PTY LTD PTY LTD WSPLTD AUSTRALIA WSP AUSTRALIA PTY LTD PTY LTD ADPLTD CONSULTING ADPEQCONSULTING PTYEQLTD PTY FLOREANCIG LTD FLOREANCIG SMITHSMITHSMITH Building Services Engineer Building Services Building EngineerServices Engineer

All rights reserved. This document remains the All rights reserved.AllThis rights document reserved. remains This document the remains the Architects is only property of Architects property EAT of and Architects is property only toEAT beofused and isforonly EAT to beand used for to be used for commissioned No part of this document its commissioned its purpose. commissioned No partitsof purpose. this document No partpurpose. of this document may modified be reproduced, modifiedinorany transmitted in any may be reproduced, may modified be reproduced, or transmitted in any or transmitted form orwithout by anythe means without the explicit written form or by any means form without or by any themeans explicit written explicit written authority of Architects EAT. Unauthorized use of this authority of Architects authority EAT.ofUnauthorized Architects EAT. use Unauthorized of this use of this document any form what so ever is prohibited. document ® in any form document what® so in any ever form is prohibited. whatinso ever is prohibited.

ESD Consultant ESD ConsultantESD Consultant

1L.04 : 50

1 : 50

1 : 50 L.04

Rev. Description

Description

EQ EQ EQ EQ EQRd EQ Level EQ PlaceLevel 15, 28 15, 28 Freshwater PlaceLevel 1, 60 Level 1, 60 Albert Level Freshwater 15, 28 Freshwater Place Place Level Albert 1, Rd 60 Albert RdEQ 31 Dover St 31 Dover31 St Dover St Southbank, South Melbourne, Southbank, Southbank, VIC 3006 VIC 3006VIC 3006 South Melbourne, South Melbourne, VIC 3205 VIC 3205VIC 3205450 CremorneCremorne VIC 3121Cremorne VIC 3121VIC 3121 EQ EQ EQ EQ 03 9412 5100 03 9636 0280 03 9429 7798 03 9412 5100 03 9412 5100 03 9636 0280 03 9636 0280 03 9429 7798 03 9429 7798 450 info@arkresources.com.au info@floreancigsmith.com.au info@arkresources.com.au info@arkresources.com.au info@floreancigsmith.com.au info@floreancigsmith.com.au

800 800 800

800

1423 600 600

ROBE BULKHEAD 600 EQ

EQ

600

1300

DSW1 EQ

500

RWH 200 EQ

1000

EQ

EQ

EQ

1000

1 : 50

1321 EQ

800 EQ

CAPPING

CAPPING

BEDROOM

its commissioned purpose. No part of this document ®may document in anymodified form what so ever is prohibited. be reproduced, or transmitted in any

CAPPING

CB1

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

500

FIRST FLOOR FFL FIRST FLOOR FFL +3.100 GROUND FLOOR FFL +3.100 +0.000

®

FIRST FLOOR FFL +3.100

WB3

PJ

1

TYPE L1 (LOT19) - ELEVATION 2

1

TYPE L1 (LOT19) - ELEVATION 2

FEN

1 : 50

FC1

DSL8

CE IN

FOR

EGR

OUND

DSL8 OUND EGR

CL RWT1

FEN

GROUND FLOOR FFL +0.000

GROUND FLOOR FFL +0.000

CE

DG1

WM

LB2 GROUND FLOOR FFL +0.000

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

Level 1, 60 Albert Rd South Melbourne, VIC 3205 03 9636 0280 info@arkresources.com.au

31 Dover St Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

TERRACE PRIVACY SC TYPE 2

FC1

WA8

FIRST FLOOR FCL +5.700

RM1

CAPPING

FC1

PARAPET +6.800

WB3

CAPPING

RM1 FIRST FLOOR FFL +3.100

CAPPING

WS1

FC1

RM1

CB1

WB3

WB3

WS2 GROUND FLOOR FCL WB3 +2.600

WB3

RWH

CB1

CAPPING

RM1

1000

RM1

CL RWH

PARAPET +6.800

200

FIRST FLOOR FFL +3.100 GROUND FLOOR FCL +2.600

MT01

CAPPING

BOUNDARY LINE

700 1000

FC1

WA8

WS2

WS1 CAPPING

1000

FC1

MT01

RWH

BOUNDARY LINE

CAPPING BOUNDARY LINE

CAPPING

WB3

RWH

200

FC1

TM01 WB3

2

A20 L.22

WA29

FC1

POS

FC1

FIRST FLOOR FFL +3.100

WB3

FC1

WB3

1

GROUND FLOOR FCL +2.600

FC1

A20 L.31

1 : 50

TYPE L - SECTION 1 1 : 50

FINISHES NOTES

RWT1

ALL COLORBOND FLASHING AND CAPPING TO CLADDING MATERIAL TO MATCH THE CLADDING MATERIAL FINISH UNLESS OTHERWISE NOTED

RWT1 HWS

1 : 50

CL

DSL8

LB2

WM GM

FEN

CE IN

FOR

EGR

OUND

FC1

HWS

DSW2 CL RWT1

FEN

CE IN

DSL8 OUND EGR

FC1

ALL COLORBOND FLASHING TO FENESTRATIONS IN MT3 FINISH

DSW2

FOR

AC

ARCHITECTS EAT All rights reserved. This document remains the property of Architects EAT and is only to be used for

GROUND FLOOR FFL

WSP AUSTRALIA PTY LTD

WSP+0.000 AUSTRALIA PTY LTD

ADP CONSULTING PTY LTD FLOREANCIG SMITH

Structural and Civil Engineer

Building Services Engineer

ESD Consultant

Building Surveyor

Level 15, 28 Freshwater Place Southbank, VIC 3006

Level 15, 28 Freshwater Place Southbank, VIC 3006

Level 1, 60 Albert Rd South Melbourne, VIC 3205

31 Dover St Cremorne VIC 3121

GROUND FLOOR FFL Description +0.000Rev.

A Rev.

Date 2020.10.16

Tender Description

Date

WB3

AC AHD CH CL COS DP EJ EQ EX. EXT FCL FFL FD GM GRV HWS LB1 LB2 NGL O/A O/F PV (PC) PGL (PS) RWH SHW SPRD'R SSL TEJ TOW WM

ELEVATIONS Drawing Name

10 ALVINA ST, OAKLEIGH SOUTH Project Name ELEVATIONS

A20 L.22

Scale Drawn by

REV.B 1 : 50 @ A1 VO / HC

A/C CONDENSER AUSTRALIAN HEIGHT DATUM CEILING HEIGHT CLOTHESLINE CONFIRM ON SITE DOWNPIPE EXPANSION JOINT EQUAL EXISTING EXTERIOR FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FLOOR DRAIN GAS METER 10MM GROOVE LINE HOT WATER SERVICE LETTER BOX TYPE 1 LETTER BOX TYPE 2 NATURAL GROUND LEVEL OVERALL OVERFLOW PHOTO VOLTAIC (SOLAR) PANEL PRIME COST PROPOSED GROUND LEVEL PROVISIONAL SUM RAINWATER HEAD SOLAR BOOSTED HOT WATER SPREADER STRUCTURAL SURFACE LEVEL TILE EXPANSION JOINT TOP OF WALL WATER METER

4

A20 L.31

WSP AUSTRALIA PTY LTD

ADP CONSULTING PT

Building Services Engineer

ESD Consultant

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

FINISH TYPE Level 1, 60 Albert Rd JOINERY TYPE South Melbourne, VIC 3205 WALL TYPE 03 9636 0280 FENCE TYPE info@arkresources.com.au CHANGE IN LEVEL

D102

DOOR TYPE

W100

WINDOW TYPE

TL#

J0#

WX # FT #

SPOT LEVEL NOM. SETDOWN

GENERAL NOTES REFER TO GENERAL NOTES ON SHEET A01.00 TM01

FINISHES LEGEND 2PAC1 CB1 CB1a CN1 CN2 CN3 CP1 FC1 FC2 PARAPET +6.800

GL1 GL2 LM1 LM2

ML1 MT1 MT3 FIRST FLOOR FCL PB1 +5.700

DINING

PC1 PT1 PT2 PT3 PT4 PT5

TERRACE

RM1

FIRST FLOOR FFL +3.100

RN1 ST1 ST2 TB1 TB2

RWH

GROUND FLOOR FCL +2.600

TB3 TL3 TL3a TL4 TL5 TL6 VP1

STUDY LB2

WB1 WB2 WB3 GROUND FLOOR FFL +0.000 WB4

TWOPAC - DIESKAU CONCRETE BLOCK CONCRETE BLOCK CONCRETE - SMOOTH CONCRETE -COLOURED CONCRETE - PAVERS SUPERTUFT ESCAPE TWIST, PURE NEW WOOL, TUFTED, ON AIRSTEP SUPA BLUE UNDERLAY (9.5MM RUBBER) EASYTEX FIBRE CEMENT BOARD, PAINTED IN PT1 EASYTEX FIBRE CEMENT BOARD, PAINTED IN PT2 GLASS - CLEAR GLASS - FROSTED LAMINEX OYSTER GREY NATURAL LAMINEX SEASONED OAK (LIGHT SCHEME) | LAMINEX GREEN SLATE (DARK SCHEME) MELAMINE - WHITE ALUMINIUM IN PC1 STEEL IN COLORBOND MONUMENT (MATT) PLASTERBOARD COLORBOND MONUMENT MATT COLORBOND MONUMENT (MATT) GREY PEBBLE (MATT) RATTLESNAKE (MATT) CALF SKIN (MATT) NATURAL WHITE (WALLS - LOW SHEEN; DINING DOORS - SEMI-GLOSS, CEILINGS - FLAT) KLIPLOK 700 HI STRENGTH IN COLORBOND MONUMENT REMOVED FINISH CAESARSTONE EMPIRA WHITE (LIGHT SCHEME) | CAESARSTONE TURBINE GREY (DARK SCHEME) CAESARSTONE STATUARIO MAXIMUS PALING FENCE FLOORBOARD - STOCKHOLM EUROPEAN OAK PLANK (P3) SPOTTED GUM TIMBER DECKING TILE - WHITE MATT (VERTICAL) TILE - WHITE MATT (HORIZONTAL) TILE - PITCH SIGN MATT (R10) TILE - MOON GREY MATT (R11) TILE - MOSAIC BUILT DAM MATT VGROOVE PANEL - EASYVJ100, IN 2PAC1 FINISH SCYON AXON CLADDING PANEL IN PT1 SCYON AXON CLADDING PANEL IN PT2 SCYON AXON CLADDING PANEL IN PT3 SCYON AXON CLADDING PANEL IN PT4

FINISHES NOTES

ALL INTERNAL WALLS AND CEILING TO BE PAINTED IN PT5 FINISH UNLESS OTHERWISE NOTED

DSL8

FC1

FC1

TYPE L3 - ELEVATION 4

GENERAL LEGEND

RWH

TILE - WHITE MATT (HORIZONTAL) TILE - PITCH SIGN MATT (R10) TILE - MOON GREY MATT (R11) TILE - MOSAIC BUILT DAM MATT VGROOVE PANEL - EASYVJ100, IN 2PAC1 FINISH SCYON AXON CLADDING PANEL IN PT1 SCYON AXON CLADDING PANEL IN PT2 SCYON AXON CLADDING PANEL IN PT3 SCYON AXON CLADDING PANEL IN PT4

HWS

Section 2 - Type L3 WB3

RWH

CB1

CB1

WB1 WB2 WB3 WB4

RWH

FC1

500

500

FC1

WA12 RWH

GROUND FLOOR FCL +2.600 CB1

FC1

CAPPING

RWH

WB3

RM1

WA29 GROUND FLOOR FFL +0.000 WB3

TL4

FIRST FLOOR FFL +3.100

FC1

FC1

TYPE L3 - ELEVATION 4

WB3 WA29 WB3

PARTI WALL TO ADJOINING TOWNHOUSE

TM01

FC1 WB3

Elevation 3 - Type L3

TL3a TL4 TL5 TL6 VP1

500

WA29

CL

FC1

FC1

MT01 DSL6a

FC1

CAPPING GROUND FLOOR FFL +0.000 WM

FC1

WA29

FC1 PARTI WALL TO ADJOINING TOWNHOUSE

FC1

PJ

CB1

W64

WM GM

SCYON AXON CLADDING PANEL PT1 TB2 INFLOORBOARD - STOCKHOLM EUROPEAN SCYON AXON CLADDING PANEL INOAK PT2 PLANK (P3) SCYON AXON CLADDING PANEL PT3 TB3 INSPOTTED GUM TIMBER DECKING SCYON AXON CLADDING PANEL PT4 - WHITE MATT (VERTICAL) TL3 INTILE

1000

W64 CB1

LB2

GROUND FLOOR FFL +0.000 WM LB2

2

13250

WB1 WB2 WB3 WB4

FIRST FLOOR FCL +5.700

PJ

GROUND FLOOR FCL +2.600

FIRST FLOOR FCL +5.700

FC1

LB2

TO CLADDING MATERIAL TO MATCH THE CN1 CONCRETE - SMOOTH CLADDING MATERIAL FINISH UNLESS CN2 CONCRETE -COLOURED OTHERWISE NOTED CN3 - DIESKAU CONCRETE -GENERAL PAVERS NOTES TWOPAC CP1 SUPERTUFT ESCAPE TWIST, PURE NEW ON ALL COLORBOND FLASHING TOSHEET A01.00 CONCRETE BLOCK REFER TO GENERAL NOTES WOOL, TUFTED, ON AIRSTEP SUPA BLUE FINISH FENESTRATIONS IN MT3 CONCRETE BLOCK UNDERLAY (9.5MM RUBBER) CONCRETE - SMOOTH FC1 EASYTEX FIBRE CEMENT BOARD, PAINTED CONCRETE IN -COLOURED PT1 CONCRETE - PAVERS FC2 EASYTEX FIBRE CEMENT BOARD, PAINTED SUPERTUFTIN ESCAPE FINIPURE SHENEW S LEGEND PT2 TWIST, WOOL, TUFTED, ON AIRSTEP SUPA BLUE GL1 GLASS RUBBER) - CLEAR UNDERLAY (9.5MM GL2 GLASS - FROSTED FC1 EASYTEX FIBRE CEMENT BOARD, PAINTED 2PAC1GREY TWOPAC - DIESKAU LM1 LAMINEX OYSTER NATURAL IN PT1 CB1 CONCRETE BLOCK | LM2 FIBRE LAMINEX SEASONED OAK (LIGHT SCHEME) FC2 EASYTEX CEMENT BOARD, PAINTED LAMINEX GREEN (DARK SCHEME) CB1aSLATE CONCRETE BLOCK IN PT2 ML1- CLEAR MELAMINE - WHITE CN1 CONCRETE - SMOOTH GL1 GLASS MT1- FROSTED ALUMINIUM INCN2 PC1 CONCRETE -COLOURED GL2 GLASS MT3 OYSTER STEELGREY IN COLORBOND MONUMENT (MATT) CN3 CONCRETE - PAVERS LM1 LAMINEX NATURAL PB1 SEASONED PLASTERBOARD SUPERTUFT LM2 LAMINEX OAK CP1 (LIGHT SCHEME) | ESCAPE TWIST, PURE NEW WOOL, TUFTED, ON AIRSTEP SUPA BLUE LAMINEX SLATE (DARK SCHEME) PC1 GREEN COLORBOND MONUMENT MATT UNDERLAY ML1 MELAMINE WHITE PT1 - COLORBOND MONUMENT (MATT) (9.5MM RUBBER) MT1 ALUMINIUM IN PC1PEBBLEFC1 PT2 GREY (MATT)EASYTEX FIBRE CEMENT BOARD, PAINTED IN PT1 MT3 STEEL MONUMENT PT3IN COLORBOND RATTLESNAKE (MATT) (MATT) FC2 EASYTEX FIBRE CEMENT BOARD, PAINTED PB1 PLASTERBOARD PT4 CALF SKIN (MATT) IN PT2 PC1 COLORBOND MONUMENT MATT PT5 NATURAL WHITE (WALLS - LOW SHEEN; ELEVATIONS GL1 GLASS - CLEAR PT1 COLORBONDDOORS MONUMENT (MATT) CEILINGS - FLAT) - SEMI-GLOSS, Drawing Name GL2 GLASS - FROSTED PT2 GREY PEBBLE (MATT)700 HI RM1 KLIPLOK STRENGTH IN COLORBOND Scale 10 ALVINA ST, OAKLEIGH SOUTH LM1 LAMINEX OYSTER GREY NATURAL 1 : 50 @ A1 MONUMENT PT3 RATTLESNAKE (MATT) DrawnSEASONED by Project Name VO / HC| LM2 LAMINEX OAK (LIGHT SCHEME) RN1 REMOVED FINISH PT4 CALF SKIN (MATT) Client Checked by SLATE (DARK SCHEME) SOUTHLINK PROJECTS PTY LTD LAMINEX GREEN ST1 WHITE CAESARSTONE EMPIRA WHITE (LIGHT PT5 NATURAL (WALLS - LOW SHEEN; Address Issued Date 10 ALVINA ST, OAKLEIGH SOUTH DOORS - SEMI-GLOSS, 21/07/2021 ML1 - MELAMINE - WHITE SCHEME) | CEILINGS CAESARSTONE TURBINE GREY FLAT) Status IN PC1 MT1 ALUMINIUM CONSTRUCTION SCHEME) RM1 KLIPLOK 700(DARK HI STRENGTH IN COLORBOND MT3 STEEL MAXIMUS IN COLORBOND MONUMENT (MATT) MONUMENT ST2 CAESARSTONE STATUARIO PB1 PLASTERBOARD RN1 REMOVED TB1 FINISH PALING FENCE PC1 COLORBOND MONUMENT MATT ST1 CAESARSTONE EMPIRA WHITE (LIGHT TB2 FLOORBOARD - STOCKHOLM EUROPEAN SCHEME) | CAESARSTONE TURBINE GREY OAK PLANK (P3) PT1 COLORBOND MONUMENT (MATT) (DARK TB3SCHEME) SPOTTED GUM TIMBER DECKING PT2 GREY PEBBLE (MATT) ST2 CAESARSTONE MAXIMUS TL3 TILESTATUARIO - WHITE PT3 MATT (VERTICAL) RATTLESNAKE (MATT) TB1 PALING TL3aFENCE TILE - WHITE MATT PT4 (HORIZONTAL) CALF SKIN (MATT) TB2 FLOORBOARD - STOCKHOLM EUROPEAN TL4 TILE - PITCH SIGN (R10) WHITE (WALLS - LOW SHEEN; PT5 MATT NATURAL PLANK (P3) BEDROOM BATHROOM OAKTL5 DOORS TILE - MOON GREY MATT (R11)- SEMI-GLOSS, CEILINGS - FLAT) TB3 SPOTTED GUM TIMBER DECKING KLIPLOK TL6 TILE - MOSAICRM1 BUILT DAM MATT700 HI STRENGTH IN COLORBOND TL3 TILE - WHITE MATT (VERTICAL) MONUMENT VP1 VGROOVE PANEL - EASYVJ100, IN 2PAC1 TL3a TILE - WHITEFINISH MATT (HORIZONTAL) RN1 REMOVED FINISH TL4 TILE - PITCH SIGN MATT (R10) CAESARSTONE EMPIRA WHITE (LIGHT WB1 SCYON AXONST1 CLADDING PANEL IN PT1 TL5 TILE - MOON GREY MATT (R11) SCHEME) | CAESARSTONE TURBINE GREY WB2 SCYON AXON CLADDING PANEL IN PT2 TL6 TILE - MOSAIC BUILT DAM MATT (DARK SCHEME) WB3 SCYON AXON CLADDING PANEL IN PT3 VP1 VGROOVE PANEL - EASYVJ100, 2PAC1 ST2 IN CAESARSTONE STATUARIO MAXIMUS WB4 SCYON AXON CLADDING PANEL IN PT4 FINISH TB1 PALING FENCE

WB3

WA29 RWT1

CB1

A20 L.21

Date

MT01 CAPPING

CAPPING

1000

+6.800

200

FC1

TERRACE PRIVACY SC TYPE 2

FIRST FLOOR FFL +3.100

Rev.PARAPET Description

200

WB3

L.31

BOUNDARY LINE

Building Surveyor

WB3

200

REFER TO A52.04 FOR TERRACE PRIVACY SC TYPE 2 DETAIL

FIRST FLOOR FCL +5.700

BOUNDARY LINE

ESD Consultant

200

®

ADP CONSULTING PTY LTD FLOREANCIG SMITH

Building Services Engineer

REFER TO A52.04 FOR TERRACE PRIVACY SC TYPE 2 DETAIL

FIRST FLOOR FCL +5.700

Section 1- Type L3

1 : 50

WSP AUSTRALIA PTY LTD

Structural and Civil Engineer

CB1

RWH

CB1

PAINTED INSPOT PT5 FINISH LEVEL UNLESS OTHERWISE TWOPAC - DIESKAU NOTED CONCRETE BLOCK

FC1 2PAC1 CB1 CB1a CN1 CN2 CN3 CP1

TYPE L - SECTION 2 2ELEVATION TYPE L2 -A20 2 1 : 50

2

WSP AUSTRALIA PTY LTD

WA12

ALL COLORBOND FLASHING AND CAPPING NOM. SETDOWN BLOCK FINISHESCB1a LEGECONCRETE ND

PJ CAPPING

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

1 : 50

L.21

A20 L.21

BOUNDARY LINE

BOUNDARY LINE

CAPPING

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

Elevation 2 - Type L3

TYPE L2 - ELEVATION TYPE3L1,L2,L3 - ELEVATION 1 1 A20 1 : 50

4

A20 L.21

1 : 50

700

PARAPET +6.800

TYPE L - SECTION 1 TYPE L1, L3 - ELEVATION 3 1 : 50

ARCHITECTS EAT

BOUNDARY LINE

BOUNDARY LINE

1 3

A20 L.31 A20 L.21

PARAPET +6.800

A20 L.22

2PAC1 CB1

WA3

1 : 50

Elevation 1 - Type L3

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

BOUNDARY LINE

BOUNDARY LINE

BOUNDARY LINE DSW1

LB2

GROUND FLOOR FFL +0.000

GM

REFER TO GENERAL NOTES ON SHEET A01.00

INT

PJ

GROUND FLOOR FCL +2.600

FC1

FC1

GENERAL NOTES

Level 15, 28 Freshwater Place Southbank, VIC 3006 03 9412 5100

GARAGE

LB2

FC1

Drawing Name Project Name

STUDY

DSW2

TL4

NOM. SETDOWN

SECURITY

CAMERA DOORBELL

LIVING 10Client ALVINA ST, OAKLEIGH SOUTH SOUTHLINK PROJECTS PTY LTD Project Name Address 10 ALVINA ST, OAKLEIGH SOUTH Client by SOUTHLINK PROJECTS PTY LTD SSCONSTRUCTION AllWB3 rights reserved. This document remains theChecked Status NOM. SETDOWN WX WALL TYPE CAPPING 10 ALVINA ST, OAKLEIGH Address Issued SOUTH property of Architects EAT and is only to be used for Date # 21/07/2021 Status its commissioned purpose. No part of this document FT CONSTRUCTION FENCE TYPE # may be reproduced, modified or transmitted in any GENERAL form or by any means without the explicit writtenFININOTES SHES LEGENFINISHES D CHANGE IN LEVEL REFER NOTES ON SHEET A01.00 NOTES authority of Architects EAT. Unauthorized useTO ofGENERAL this ® document in any form what so ever is prohibited. ALL INTERNAL WALLS AND CEILING TO BE

DINING

FIRST FLOOR FFL +3.100

GROUND FLOOR FCL +2.600

AC GROUND FLOOR FFL GROUND FLOOR FFL +0.000 +0.000

200 700

FIRST FLOOR FFL +3.100

DSL6a FC1

WA29

A20 L.13 WSP AUSTRALIA PTY LTD A20 L.13

FC1

Drawing Name

PLAN - RCP ST, OAKLEIGH SOUTH 10 ALVINA

MT01

CB1

FC1

IN FOR

PLAN - RCP

Date Date CAPPING

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia RWH P: +61 3 8413 5300 RWH E: office@eatas.com.au W: eatas.com.au

PJ

HWS

DSW2

Description

Description

CB1

2000 MIN.

POS

200 TM01

WA12 HWS

BOUNDARY LINE

200 500

WB3

RWH

CB1

CL

Rev.

Rev.

WB3

GROUND FLOOR FCL FC1 +2.600

RWT1

CL

200

Building Surveyor

Cremorne VIC 3121 TERRACE 31 03 Dover St7798 9429 Cremorne VIC 3121 info@floreancigsmith.com.au TM01 03 9429 7798 info@floreancigsmith.com.au

Building Surveyor

FC1

RWH

GROUND FLOOR FCL +2.600

+2.600 +2.600 GROUND FLOOR FFL +0.000

500 500

FIRST FLOOR FFL +3.100

FC1

FC1

ESD Consultant

South Melbourne, VIC 3205 DINING Level 60 Albert 03 1, 9636 0280 Rd South Melbourne, VIC 3205 info@arkresources.com.au 03 9636 0280 info@arkresources.com.au

ESD Consultant

CAPPING

CAPPING

form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

RWH

GROUND FLOOR FCL GROUND FLOOR FCL

Building Services Engineer

Southbank, VIC 3006 Level 285100 Freshwater Place 03 15, 9412 CAPPING Southbank, VIC 3006 03 9412 5100WB3

Building Services Engineer

CAPPING

FIRST FLOOR FCL +5.700

ARCHITECTS EAT

WSP AUSTRALIA PTY LTD ADP CONSULTING PTY LTD FLOREANCIG SMITH WA29 DSL6a WA29 FC1 FC1 FC1 RWH Level AUSTRALIA 15, 28 Freshwater Place LevelCONSULTING 1, 60 Albert Rd 31 Dover St WSP PTY LTD ADP PTY LTD FLOREANCIG SMITH

Structural and Civil Engineer

Level 15, 28 Freshwater Place WSP AUSTRALIA PTY LTD Southbank, VIC 3006 Level 285100 Freshwater Place BATHROOM 03 15, 9412 Southbank, VIC 3006 FC1 03 9412 5100 Structural and Civil Engineer

PARAPET +6.800

WB3

FIRST FLOOR FCL +5.700

200

FC1

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document mayreserved. be reproduced, modified remains or transmitted All rights This document the in any WA3 formoforArchitects by any means without the to explicit written property EAT and is only be used for authority of Architects EAT. Unauthorized use of this

DSW1

200

WA29

CB1

WB3

PARAPET +6.800

A20 L.31

1000

WSP AUSTRALIA PTY LTD

WA3

DSW1 FC1

WA29

RWH

GROUND FLOOR FCL +2.600

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia LB2 P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

CAPPING

500

ARCHITECTS EAT FC1 ARCHITECTS EAT

WB3

FIRST FLOOR FCL +5.700

500

700 1000

FIRST FLOOR FCL +5.700 WB3

RWH

TYPE L - 3D1

3

CAPPING

WB3

RWH

1000

FC1

WB3

WB3 WB3

RWH

3d View

1000

1000

WB3

CAPPING

CAPPING

1 : 50

WB3 MT01

WB3

CAPPING

LB2

2

CAPPING

FC1

TYPE L3 - FIRST FLOOR RCP 1 : 50 L3 - FIRST FLOOR RCP TYPE

BOUNDARY LINE

PARAPET +6.800

CAPPING

TERRACE PRIVACY SC TYPE 2

2

A20 PARAPET L.13 +6.800 A20 L.13

FC1

RWH

BOUNDARY LINE

CAPPING

CAPPING

WB3

FC1

BOUNDARY LINE

MT01

CAPPING

WB3

BOUNDARY LINE

200

BOUNDARY LINE BOUNDARY LINE 200 700

TERRACE PRIVACY SC TYPE 2

TYPE L3 - GROUND FLOOR RCP TYPE L3 - GROUND FLOOR RCP

FIRST FLOOR FCL FIRST FLOOR FCL +5.700 GROUND FLOOR FCL +5.700 FIRST +2.600FLOOR FFL +3.100

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

WB3 RWH

First Floor RCP - Type L3

CAPPING

RWH

2415

EQ

REFER TO A52.04 FOR TERRACE PRIVACY SC TYPE 2 DETAIL

REFER TO

VILLABOARD PAINTED IN PT1 FINISH UNLESS ALL PLASTERBOARD IN WET AREAS TO BE OTHERWISE NOTED. MOISTURE RESISTANT ALL PLASTERBOARD IN WET AREAS TO BE MOISTURE RESISTANT

BOUNDARY LINE

800

500

800

PJ

1000

200

CAPPING

1321

PJ

EQ EQ

BOUNDARY LINE

BOUNDARY LINE

800

PJ

PJ

PJ

PJ

800

PLASTERBOARD PAINTED IN PT5 FINISH UNLESS NOTED.TO BE 13mm THK ALLOTHERWISE INTERNAL CEILING PLASTERBOARD PAINTED IN PT5 FINISH UNLESS ALL EXTERNAL CEILING TO BE 9mm THK OTHERWISE NOTED. VILLABOARD PAINTED IN PT1 FINISH UNLESS NOTED. TO BE 9mm THK ALLOTHERWISE EXTERNAL CEILING

EQ

EQ

EQ

EQ

A20 L.21

500 500

EQ

WB3

A20 L.22

CEILING NOTE ALL INTERNAL CEILING TO BE 13mm THK

800 EQ EQ

TYPE L2 - ELEVATION 2

2

DL1

CEILING NOTE

BOUNDARY LINE

DL1

EQ EQ 1000

DL1

Ground Floor RCP - Type L3

A20 L.22

PJ

PJ

EQ EQ

500 500

EQ

BOUNDARY LINE

DL1

EQ

1

DL1

MT01

WALL TYPE FENCE TYPE

DOORBELL WB3 INTERCOM PANEL - INT= INTERNAL UNIT - EX= EXTERNAL INTERCOM PANEL UNIT FINISHES LEGEND INT - INT= INTERNAL UNIT - EX= EXTERNAL UNIT GENERAL LEGEND MASTER SECURITY CONTROL PANEL MSCP 2PAC1 TWOPAC - DIESKAU AC A/C CONDENSER MASTER CONTROL PANELCONCRETE CB1 AHDSECURITY AUSTRALIAN HEIGHT DATUM BLOCK MSCP MOTION DETECTOR - CEILING CH CEILING HEIGHT CB1a MOUNTED CONCRETE BLOCK CL CLOTHESLINE CN1 CONCRETE - SMOOTH MOTION - CEILING COSDETECTOR CONFIRM ON MOUNTED SITE CN2MOUNTED CONCRETE -COLOURED MOTION DETECTOR - WALL DP DOWNPIPE EJ LEGEND EXPANSIONCN3 JOINT CONCRETE - PAVERS GENERAL MOTION - WALL MOUNTED CP1 SUPERTUFT ESCAPE TWIST, PURE NEW EQ DETECTOR EQUAL AC A/C CONDENSER MOTION DETECTOR - ARMING PANEL WOOL, TUFTED, ON AIRSTEP SUPA BLUE EX. EXISTING AHDSEC AUSTRALIAN HEIGHT DATUM UNDERLAY (9.5MM RUBBER) EXT EXTERIOR CH CEILING HEIGHT- ARMING PANEL MOTION DETECTOR FCL FINISHED CEILING LEVEL FC1 EASYTEX FIBRE CEMENT BOARD, PAINTED CL CLOTHESLINE MOTION DETECTOR - SIREN & ALARM SEC IN PT1 FFL FINISHED FLOOR LEVEL COS CONFIRM ON SITE FD FLOOR DRAIN FC2 EASYTEX FIBRE CEMENT BOARD, PAINTED DP DOWNPIPE MOTION DETECTOR - METER SIREN & ALARM GM IN PT2 EJ EXPANSIONGAS JOINT GRV 10MM GROOVE EQ EQUAL GL1 LINEGLASS - CLEAR HWS WATER SERVICE EX. EXISTING HOT GENERAL LEGEND MECHANICAL VENTILATION GL2 GLASS - FROSTED LB1 LETTER BOX TYPE 1 EXT (CEXTERIOR = CEILING MOUNTED,AC W = WALL A/C CONDENSER LM1 OYSTER GREY NATURAL LB2 LETTERLEVEL BOX TYPE 2LAMINEX FCL MECHANICAL FINISHEDVENTILATION CEILING MOUNTED) AHD AUSTRALIAN HEIGHT DATUM LM2 LAMINEX SEASONED OAK (LIGHT SCHEME) | NGL NATURAL GROUND LEVEL FFL (C = CEILING FINISHED FLOOR LEVEL MOUNTED, WCH = WALL LAMINEX CEILINGGREEN HEIGHT SLATE (DARK SCHEME) O/A OVERALL FD R/A#MOUNTED) FLOOR DRAIN CL CLOTHESLINE O/F MELAMINE - WHITE GM GAS METEROVERFLOW AC - RETURN AIR GRILLE/ML1 EXHAUST COS CONFIRM ONPC1 SITE PV PHOTO PANEL GRV 10MM GROOVE LINEVOLTAIC MT1 (SOLAR) ALUMINIUM IN R/A# DP DOWNPIPE (PC) PRIME COST HWS HOT WATER S/A#AC - RETURN MT3 STEEL IN COLORBOND AIR SERVICE GRILLE/ EXHAUST JOINT MONUMENT (MATT) PGL LEVEL LB1 LETTER BOXPROPOSED TYPE 1 EJ GROUNDEXPANSION AC - SUPPLY AIR DIFFUSER EQPB1SUM PLASTERBOARD EQUAL (PS) PROVISIONAL LB2 LETTER BOX TYPE 2 S/A# PC1 EX. EXISTING MONUMENT MATT RWH RAINWATER HEAD COLORBOND NGL T AC - SUPPLY NATURALAIR GROUND LEVEL DIFFUSER EXT EXTERIOR SHW SOLARCONTROL BOOSTED WATER MONUMENT (MATT) PT1 HOT COLORBOND O/A OVERALL AC - THERMOSTAT FCL FINISHED CEILING SPRD'R O/F OVERFLOW SPREADER PT2 GREY PEBBLE (MATT)LEVEL T FFL PANEL FINISHED LEVEL SSL STRUCTURAL LEVELFLOOR PV PHOTO VOLTAIC (SOLAR) PT3SURFACE RATTLESNAKE (MATT) AC - THERMOSTAT CONTROL FD SYSTEM FLOOR DRAIN TEJ TILE EXPANSION JOINT (PC) PRIME COST AC - WALL MOUNTED SPLIT PT4 CALF (MATT) GM GASSKIN METER TOW OF WALL PGL PROPOSED TOP GROUND LEVEL PT5 NATURAL WHITE (WALLS GRV 10MM GROOVE LINE - LOW SHEEN; WM WATER METER (PS) AC - WALL PROVISIONAL SUM MOUNTED SPLIT SYSTEMDOORS - SEMI-GLOSS, CEILINGS - FLAT) HWS HOT WATER SERVICE RWH RAINWATER AC - EXTERIORHEAD CONDENSER LETTER700 BOX 1 RM1 KLIPLOK HI TYPE STRENGTH IN COLORBOND SHW SOLAR BOOSTED HOTLB1 WATER D102 DOOR TYPE LB2 LETTER BOX TYPE 2 MONUMENT SPRD'RAC - EXTERIOR SPREADERCONDENSER NGL NATURALFINISH GROUND LEVEL SSL STRUCTURAL SURFACE LEVEL RN1 CEILING MOUNTED SWEEP FAN REMOVED W100 WINDOW TYPE O/A OVERALL TEJ TILE EXPANSION JOINT ST1 CAESARSTONE EMPIRA WHITE (LIGHT OVERFLOW TOW CEILING TOPMOUNTED OF WALL SWEEPO/F FAN SCHEME) | CAESARSTONE TURBINE GREY TL# VENT1 FINISH EXHAUST TYPE PV PHOTO VOLTAIC (SOLAR) PANEL WM WATER METER WET AREA CEILING FAN (DARK SCHEME) CAPPING (PC) PRIME COST ST2 CAESARSTONE STATUARIO MAXIMUS JOINERY TYPE VENT1 J0# PGL PROPOSED GROUND LEVEL AREA CEILING EXHAUST FAN D102 WET DOOR TYPE TB1 PALING FENCE SUM (PS) PROVISIONAL WX WALL TYPE TB2 FLOORBOARD STOCKHOLM EUROPEAN RWH RAINWATER -HEAD # W100 WINDOW TYPE WB3 OAK PLANK (P3) SHW SOLAR BOOSTED HOT WATER FT FENCE TYPE SPRD'R SPREADER # TB3 SPOTTED GUM TIMBER DECKING TL# FINISH TYPE SSL STRUCTURAL SURFACE LEVEL TL3 TILE - WHITE MATT (VERTICAL) CHANGE IN LEVEL TILE EXPANSION JOINT TEJ JOINERY TYPE TL3a TILE - WHITE MATT (HORIZONTAL) J0# TOW TOP OF WALL TL4 TILE PITCH SIGN MATT (R10) WM WATER METER WX WALL TYPE SPOT LEVELTL5 # TILE - MOON GREY MATT (R11) FT TL6 TILE - MOSAIC BUILT DAM MATT FENCE TYPE D102 DOOR TYPE # VP1 VGROOVE PANEL - EASYVJ100, IN 2PAC1 FC1 WA24 NOM. SETDOWN FINISH CHANGE IN LEVEL W100 WINDOW Scale 1SCYON : 50 @AXON A1TYPE Structural and Engineer WB1Civil CLADDING PANEL IN PT1 Drawn by SS / VOAXON TL# WB2 SCYON CLADDING PANEL IN PT2 Scale 1 : 50FINISH @ A1TYPE SPOT LEVEL Checked by NOTES GENERAL WB3 SS SCYON AXON CLADDING PANEL IN PT3 Drawn by Date SS21/07/2021 / VO Issued JOINERY TYPE J0# REFER TO GENERAL NOTES ONSCYON SHEET A01.00 WB4 AXON CLADDING PANEL IN PT4 DB

SL

DL1

DL1 DL1

JOINERY TYPE

SPOT LEVEL THREE PHASE DIRECT WIRED CONNECTION TV

CAMERA SECURITY

DB

WB3

FINISH TYPE

CHANGE IN LEVEL THREE PHASE DIRECT WIRED CONNECTION TELEPHONE

TV

TV

VILLABOARD VILLABOARD SKYLIGHT SKYLIGHT

DL1

EQ

FCL +2.60 FCL +2.60

1 : 50

EXTERNAL

PLASTERBOARD - MOISTURE RESISTANT PLASTERBOARD - MOISTURE RESISTANT

TM01

LB2

DL1

TYPE L1,L2,L3 - ELEVATION 1

FIRST FLOOR FFL +3.100

CAPPING

PLASTERBOARD

EQ

EQ

GROUND FLOOR FFL +0.000

DL1

WL2 WL2

WINDOW TYPE

- AB PURPOSE = ABOVE OUTLET BENCH GENERAL - BB & SINGLE) = BELOW BENCH W100 (DOUBLE = WITHIN CABINET - AB- CB = ABOVE BENCH TL# = FLOOR BOX - BB- FB = BELOW BENCH = JOINERY FACE - CB- JF = WITHIN CABINET = OVERHEAD J0# - FB- OV = FLOOR BOX = SKIRTING - JF- SK = JOINERY FACE = WATERPROOF WX - OV- W = OVERHEAD # - SK = SKIRTING FT = WATERPROOF TEL - W # TELEPHONE

TV

SL

DL1

FCL +2.40 GM

DOOR TYPE

##

#

PLASTERBOARD

FC1

DL1

PURPOSE OUTLET 6 ## CATGENERAL D102 (DOUBLE & SINGLE)

TEL #

CEILING LEGEND

DL1

DL1

FCL +2.40LB2

PARAPET +6.800

CEILING LEGEND

EQ

DL1

DL1

##

PARTI WALL TO ADJOINING TOWNHOUSE

WA3

DL1

CB1

##

SOLAR INVERTER SOLAR PANELS SOLAR PANELS

EQ

FCL +2.60 FCLPJ+2.60

GROUND FLOOR FCL +2.600

DG1

WM

200

EQ

EQ

1900

WL5

DL1

RWH

WB3

WL5

STAIR WALL LIGHT @ 2M ABOVE STAIR BELOW

DL1

CAT6

CAR CHARGING POINT SOLAR BATTERY

500

1000

STAIR WALL LIGHT @ 2M CAPPING ABOVE STAIR BELOW

CB1

FC1

SOLAR

EQ

WB3

CAR CHARGING POINT SOLAR

BAT SOLAR BATTERY SOLAR SOLAR INVERTER

DL1

PAINT FINISH TO MATCH WALLS

P1

BAT

FC1

WA24

P# GARDEN LIGHT PENDANT

P#

SOLAR C C

FC1

265

GENERAL LEGEND

GL# FLOOD/ SPOT LIGHT GARDEN LIGHT

AC A/C CONDENSER AHD AUSTRALIAN HEIGHT DATUM CH CEILING HEIGHT CL CLOTHESLINE COS CONFIRM ON SITE DP DOWNPIPE PENDANT L# EJ WALL GRAZER EXPANSION JOINT STRIP LIGHT/ CONTINUOUS EQ EQUAL L# EX. EXISTING STRIP LIGHT/ CONTINUOUSWS2 WALL GRAZER EXT EXTERIOR # SWITCH FINISHED CEILING LEVEL GANG NO. INDICATED ASFCL CONNECTED FINISHED FLOOR LEVEL SYMBOLS ON DRAWING FFL # SWITCH FD FLOOR DRAIN WS1 -D= DIMMER ON CIRCUIT GANG NO. INDICATED AS CONNECTED GMSWITCH GAS METER - E = ELECTRONIC TIMBER SYMBOLS ON DRAWING RM1 GRV 10MM GROOVE LINE = PNEUMATIC TIMER SWITCH - D -=PDIMMER ON CIRCUIT HWS HOT WATER SERVICE = WEATHERFROPP IP66 - E =- WP ELECTRONIC TIMBER SWITCH LB1 LETTER BOX TYPE 1 - P = PNEUMATIC TIMER SWITCH LB2 LETTER BOX TYPE 2 SWITCHING GROUP IP66 - WP = WEATHERFROPP NGL NATURAL GROUND LEVEL O/A OVERALL SWITCHING GROUP O/F OVERFLOW TRACK PV PHOTO VOLTAIC (SOLAR) PANEL RM1 (PC) PRIME COST TRACK UP# UPLIGHT PGL PROPOSED GROUND LEVEL (PS) PROVISIONAL SUM UP# RWH RAINWATER HEAD WL# UPLIGHT WALL LIGHT SHW SOLAR BOOSTED HOT WATER SPRD'R SPREADER WL# SSL STRUCTURAL SURFACE LEVEL WALL LIGHT OUTLET TEJ TILE EXPANSION JOINT TOW TOP OF WALL CAT6 CAT 6 OUTLET WM WATER METER GL#

BOUNDARY LINE

EQ

EQ

EQ

EQ

EQ

1375 1300

565

S#

RM1

RWT1

265

1900

MT01

EQ

ASE IRC STA

1000

SL

DL1 PAINT FINISH TO MATCH WALLS

DL1

DL1

200

570

170

DL1

565

EQ

DL1

FIRST FLOOR FFL +3.100

WA12

CAPPING

CL

WB3

SL

P1

EQ

3400

ASE IRC STA

3400

FCL +2.60 FCL +2.60

WL5

1500

1500

1200

200

1000

DL1 KITCHEN BULKHEAD

STAIR WALL LIGHT @ 2M ABOVE STAIR BELOW

DL1

DL1

DL1

S1

1060 1060

WL5

DL1

CAPPING

RWH

565

STAIR WALL LIGHT @ 2M ABOVE STAIR BELOW

1800 LOW LEVEL JOINERY LIGHTING 1800 DL1 KITCHEN BULKHEAD

1000

700

FC1

CAPPING

GROUND FLOOR FCL +2.600

DL2

565

SL

570

600 600 1200

EQ

FIRST FLOOR FCL +5.700

DL1

WA29 DL1

WB3

180 180

600 EQ

EQ

DL2 VENT1

FC1

SL

DL1

CAPPING

L1 JOINERY LIGHTING LOW LEVEL

VENT1

DL3

DL1

PAINT FINISH TO MATCH WALLS ROBE BULKHEAD

ROBE BULKHEAD

WB3

EQ

DL2

EQ

EQ

FCL +2.40

FC1

VENT1 DL2

DL1

L1

FCL +2.40

DL3

600

EQ

PARAPET +6.800

140

200

2618

BOUNDARY LINE

140

DL1

EQ

BOUNDARY LINE

BOUNDARY LINE

DL1

FCL +2.60 FCL +2.60

1375

VENT1 LOW LEVEL JOINERY LIGHTING DL1

PAINT FINISH TO MATCH WALLS

170 EQ

L2 LOW LEVEL JOINERY LIGHTING

FCL +2.60

600

1621

L2

FCL +2.60

1621

DL1

CAPPING

FITTED WITH SELF CLOSING FANS • ALLDAMPENERS. CEILING EXHAUST FANS TO BE • FITTED ALL EXHAUST TO BE DUCTED WITH SELFFANS CLOSING TO OUTSIDE AIR WITH DRAFT DAMPENERS. • ALLEXCLUDERS. EXHAUST FANS TO BE DUCTED TO OUTSIDE AIR WITH DRAFT 5. SECURITY EXCLUDERS. NOTE DETAILS OF SECURITY SYSTEM HERE 5. SECURITY 6. DETAILS HEATING NOTE OF SECURITY SYSTEM HERE NOTE DETAILS OF HEATING SYSTEM HERE 6. HEATING 7. DETAILS COOLING NOTE OF HEATING SYSTEM HERE NOTE DETAILS OF COOLYING SYSTEM HERE 7. COOLING 8. DETAILS SOLAROF PANELS NOTE COOLYING SYSTEM HERE NOTE DETAILS OF SOLAR PANELS HERE 8. SOLAR PANELS 9. DETAILS LANDSCAPE LIGHTING NOTE OF SOLAR PANELS HERE • LANDSCAPE LIGHTING TO BE NOMINATED BY LANDSCAPE 9. LANDSCAPE LIGHTING ARCHITECT. • LANDSCAPE LIGHTING TO BE • NOMINATED REFER TOBY LANDSCAPE DRAWINGS LANDSCAPE FOR FURTHER DETAILS ARCHITECT. • REFER TO LANDSCAPE DRAWINGS FOR FURTHER DETAILS

4.

600

800

2004 EQ 2004 800 800

EQ EQ

DL1

DL1

PAINT FINISH TO MATCH WALLS

PAINT FINISH TO ROBE BULKHEAD MATCH WALLS

DL1

VENT1

EQ

EQ

DL1 DL1

DL1

DL1

2618

1423

1100

FCL +2.60

FCL +2.60 DL1

EQ

ROBE BULKHEAD

DL2 VENT1

DL1 DL1

FCL +2.60

Concrete setout p an - Lot15-20 A20 A20 L.04A20 L.04L.04

Date

Date

Building Surveyor Building Surveyor Building Surveyor

DL1

ROBE BULKHEAD

L2

L2 1000

1000

FCL +2.60

1100 800

700 700 1020

1020

DL1 DL1

DL2

1

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

Roof Plan - Type L3

3

EQ EQ

EQ

EXTERNAL

3300

L3 - ROOF TYPE TYPE ROOF L3 - ROOF PLAN PLANPLAN 3L3 - TYPE 3 A20 A20

A20 L.04

1 : 50

1 : 50 L.04

3300

1.

1 : 50

First Floor Plan - Type L3 1L.04 : 50

1 A20 L.21

3300

EXTERNAL

EXTERNAL

1 A20 L.21

EXTERNAL

INTERNAL

EXTERNAL

EXTERNAL

A20 146152 L.31

146152

WINDOW

WINDOW

TYPE L - SECTION 1

921110 44 152 92 44 152

2900146152

2900

WINDOW

1

390 118152 92 1110 44

3901110 118

250 253 2900

250 253

WINDOW

EXTERNAL

4710

4710

3502700

L3 - FIRST FLOOR TYPE TYPE FIRST L3 - FIRST FLOOR FLOOR PLAN PLANPLAN 2L3 - TYPE 2 A20 A20

Structural and Civil Engineer Structural and Civil Structural Engineerand Civil Engineer

DL2

ALL COLORBOND TO ALL COLORBOND ALL COLORBOND FLASHING TO FLASHINGFLASHING TO

NOTE: CROSS REFERENCE THIS SHEET WITH ELECTRICAL LEGEND JOINERY AND INTERNAL ELEVATION DRAWINGS FOR CORRECT PLACEMENT OF CLIPSAL ICONIC SERIES OR EQUAL. NOTE: CROSS REFERENCE THIS SHEET WITH GPOS/ OUTLETS ESD NOTES ESDELEVATION NOTES ESD NOTES FITTINGS VIVID WHITE, JOINERY AND INTERNAL • • ALLCOLOUR: WALL / JOINERY GPO'SANTHRACITE TO BE ON COLOURED TO TIMBER WALLS & DRAWINGS FOR CORRECT PLACEMENT OF OR EQUAL. CLIPSAL ICONIC SERIES ALL SANITARY FLUSHING TO TOWHOUSES ALL SANITARY ALL FLUSHING SANITARY TO FLUSHING TOWHOUSES TO TOWHOUSES JOINERY . WHITE, ANTHRACITE FITTINGS 3315 136VIVID • 136 COLOUR: 136 TORAINWATER BE CONNECTED TANK TO BE CONNECTED TO BE CONNECTED TO TO RAINWATER TANKTO RAINWATER TANK AUTHORITY • ON ALL IN FLOOR TOWALLS BE CLIPSAL COLOURED TOBOXES TIMBER & FOR COMPLIACE WITH ENERGY FOR COMPLIACE FOR COMPLIACE WITH ENERGY WITH ENERGY INS62041 JOINERY . OPTILINE 70 LID REQUIREMENT, EXCEPT REQUIREMENT, REQUIREMENT, EXCEPT EXCEPT TH TYPE A,TH H, M TYPE A,THH,TYPE M A, H, M MSBAUTHORITY ELECTRICAL MAIN SWITCH BOARD WITH STAINLESS • ALLALUMINIUM, IN FLOOR BOXES TO BESTEEL CLIPSAL ANDBOOSTED , WHERE SOLAR BOOSTED HOT M2SOLAR AND M2GREY , WHERE AND SOLAR , WHERE HOT BOOSTED HOT TRANSPARENT LIDM2 FINISH,OPTILINE FLUSH. 70 LID INS62041 WATER IS PROVIDED SYSTEM WATER IS SYSTEM PROVIDED PROVIDED MSB ELECTRICALWATER MAIN SWITCH BOARD WITHISSYSTEM • ALUMINIUM, ALL GPOSSTAINLESS ABOVE BENCHES STEEL TO BE TRANSPARENT GREY LID CENTRED AT 250mm ABOVE BENCH FINISH, FLUSH. SOLAR BOOSTED HOT WATER SYSTEM SOLAR BOOSTED SOLARHOT BOOSTED WATER HOT SYSTEM WATER SYSTEM E METER - ELECTRICITY OTHERWISE • ALLFINISH GPOS LEVEL ABOVEUNLESS BENCHES TO BE INSTALLATION AND SPECIFICATION, INSTALLATION INSTALLATION AND SPECIFICATION, AND SPECIFICATION, REFER REFER REFER NOTED.AT 250mm ABOVE BENCH CENTRED TO SERVICES ENGINEER'S TO SERVICES TO ENGINEER'S SERVICES ENGINEER'S DRAWINGS DRAWINGSDRAWINGS E METER - ELECTRICITY • FINISH ALL LEVEL GPOS AT SKIRTING LEVEL TO BE UNLESS OTHERWISE EMERGENCY FITTINGS CENTRED AT 200MM ABOVE FFL NOTED. EM OTHERWISE NOTED. • ALLUNLESS GPOS AT SKIRTING LEVEL TO BE EMERGENCY LIGHT EMERGENCY FITTINGS • CENTRED ALL EXTERNAL GPOS ANDFFL AT 200MM ABOVE EM SWITCHES TO BE COLOURED BLACK. UNLESS OTHERWISE NOTED. EMERGENCY LIGHT • ALL EXTERNAL GPOS AND EXIT EXIT SIGN 2. LIGHT SWITCHES / SENSORS SWITCHES TO BE COLOURED BLACK. • ALL SWITCHES SHALL BE CLIPSAL ICONIC OR EQUAL. ARRANGEMENTEXIT EXIT SIGN - GENERAL PLAN - PLAN GENERAL -PLAN GENERAL ARRANGEMENT ARRANGEMENT 2. LIGHT SWITCHES / SENSORS SMOKE DETECTOR - HARD WIRED & SD • ALL COLOUR: VIVID WHITE, ANTHRACITE Name Drawing Name Drawing Name• Drawing SWITCHES SHALL BE CLIPSAL INTERCONNECTED ON COLOURED TO TIMBER WALLS & ICONIC OR EQUAL. Scale Scale 1 : 50 @ A1 1 : 50 @ A1 1 : 50 @ A1 10 ALVINA ST, OAKLEIGH 10 ALVINA 10 ALVINA ST, OAKLEIGH ST, OAKLEIGH SOUTH SOUTHSOUTH SD SMOKE DETECTOR - Scale HARD WIRED & JOINERY. • COLOUR: VIVID WHITE, ANTHRACITE Project Name Project Name Project Name INTERCONNECTED Drawn by Drawn byDrawn byVO/WSY VO/WSY VO/WSY • ON TYPICAL SWITCHES TO BE CENTRED COLOURED TO TIMBER WALLS & SPEAKER by Client Client Client Checked by Checked Checked by SOUTHLINK PROJECTS VO SOUTHLINK SOUTHLINK PROJECTS PROJECTS PTY LTD PTY LTDPTY LTD VO VO AT 1050MM ABOVE FFL. JOINERY. Issued Date • TYPICAL TWO OR MORE SWITCHES Address Address• Address Issued Date Issued Date ALVINA ST, OAKLEIGH 21/07/2021 10WHERE ALVINA 10ST, ALVINA OAKLEIGH ST, OAKLEIGH SOUTH SOUTH SOUTH 21/07/2021 21/07/2021 SWITCHES TO10 BE CENTRED SPEAKER ARE LOCATED MOUNT AT 1050MM ABOVETOGETHER, FFL. Status Status CONSTRUCTION CONSTRUCTION CONSTRUCTION LIGHT FITTINGS Status ON A COMMON SWITCHPLATE. • WHERE TWO OR MORE SWITCHES (S=SENSOR, EX=EXTERIOR) ARE LOCATED TOGETHER, MOUNT LIGHT FITTINGS 3. SMOKE DETECTORS ON A COMMON SWITCHPLATE. CM#(S=SENSOR, CEILING MOUNTED EX=EXTERIOR) • ALL SMOKE DETECTORS TO BE HARD WIRED & INTERCONNECTED IN 3. SMOKE DETECTORS CM# CEILING MOUNTED DL# WITH NCC AND • ALLACCORDANCE SMOKE DETECTORS TO BE DOWNLIGHT AS3786. HARD WIRED & INTERCONNECTED IN DL# DL# • ACCORDANCE ALL SMOKE WITH ALARMS BE NCCTO AND DOWNLIGHT 755PSMA4 - PHOTOELECTRIC, AS3786. BATTEN LIGHT MOUNT,TO 230V • ALLSURFACE SMOKE ALARMS BE OR EQUAL. DL# 755PSMA4 - PHOTOELECTRIC, S# BATTEN LIGHT 4. FANS SURFACE MOUNT, 230V OR EQUAL. FLOOD/ SPOT LIGHT • ALL CEILING EXHAUST FANS TO BE

1. GPOS/ OUTLETS ELECTRICAL NOTES • ALL WALL / JOINERY GPO'S TO BE

1 A20 L.21

BOUNDARY LINE

43INTERNAL 92

350 EXTERNAL

INTERNAL

4710

43 92

43 92 INTERNAL

EXTERNAL

1 A20 L.21

INTERNAL

1 A20 L.21

BOUNDARY LINE

2

A20 L.04

1 A20 L.21

FENESTRATIONS IN MT3 FINISH FINISH FENESTRATIONS FENESTRATIONS IN MT3 IN MT3 FINISH ELECTRICAL LEGEND

BOUNDARY LINE

EXTERNAL

®

2415

ALL COLORBOND FLASHING AND CAPPING ALL COLORBOND ALL COLORBOND FLASHING AND FLASHING CAPPING AND CAPPING TO CLADDING MATCH THE TO CLADDING TO MATERIAL CLADDING TO MATERIAL MATCHMATERIAL THE TO MATCHTO THE MATERIAL FINISH UNLESS CLADDING MATERIAL CLADDINGCLADDING FINISH MATERIAL UNLESS FINISH UNLESS OTHERWISE OTHERWISE NOTED OTHERWISE NOTED NOTED

NOTE: NOTE: NOTE: ADDITIONAL ADDITIONAL 7.5mm THK 7.5mm THK ADDITIONAL 7.5mm THK TEXTURE BASE CEMINTEL BASE BASETEXTURE CEMINTEL CEMINTEL TEXTURE SHEET IN FC1SHEET FINISHIN FC1 FINISH SHEET IN FC1 FINISH

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

CAPPING RWH

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

335 66

EQ

2415

2415

2415

2415

2459

2431

2459

2431

2459 1100mm HIGH BALUSTRADE 92

2431

ALL INTERNAL WALLS CEILING TO BE ALL INTERNAL ALLWALLS INTERNAL AND WALLS CEILING AND TO CEILING BE ANDTO BE FINISHOTHERWISE UNLESS OTHERWISE PAINTED INOTHERWISE PT5 UNLESS FINISH UNLESS PAINTED INPAINTED IN PT5 FINISH PT5 NOTED NOTED NOTED

FW1 1100mm HIGH BALUSTRADE HIGH BALUSTRADE 1100mm HIGH1100mm BALUSTRADE

CAPPING RWH

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

WE 4

92

FINISHES FINISHES FINISHES NOTES NOTESNOTES

200

EQ

EQ

WB1 WB2 WB3 WB4

TERRACE BELOW TERRACE TERRACE BELOW BELOW

GROUND FLOOR FFL WE 6A +0.000

WE 6A

500

92 130 INTERNAL

INTERNAL

1000 335 66 WINDOW

EQ

EQ EQ

CAPPING

CAPPING

500

922350 196

EXTERNAL

92196

100066 335 WINDOW

2350

FLASHING CAPPING

FLASHING

200

92 130

92196

1376 1000

EQ EQ EQ

FLASHING

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

92 130

WE WE 4 6A

FLASHING

FLASHING

ELECTRICAL NOTES

WINDOW

1376

1100mm HIGH BALUSTRADE

WE 4

WE 4

FALL MIN. 1:100 FALL MIN. 1:100FALL MIN. 1:100 WE 4

FLASHING

POS

CL

DINING

BATHROOM

2000 MIN.

4962350 95 674

1376

TL4

TL4

PJ

92 95

496

1100mm HIGH BALUSTRADE

CAPPING

CAPPING

CAPPING

1100mm HIGH BALUSTRADE

1100mm HIGH BALUSTRADE

2459

2431

2459

2431

DSL6a

FFL -0.10 FFL -0.10

TL4

PJ

9592

674

LOW LEVELDL2 JOINERY LIGHTING

A52.04 FOR A20 TERRACE PARAPET L.13 PARAPET 1 : 50 PRIVACY SC +6.800 +6.800 A20TYPE 2 DETAIL CAPPING 1 : 50 L.13

TB3 TL3 TL3a TL4 TL5 TL6 VP1

PJ

496 674

EQ EQ

DSL6a

FIRST FLOOR FCL +5.700

CAPPING

ST2 TB1 TB2

WM

GM WM

EXTERNAL

SE G

EQ

FIRST FLOOR FCL +5.700

FIRST FLOOR FCL +5.700

13250

RM1

PJ

92

DSL6a

DSL6a

FFL -0.10

TERRACE TERRACE TERRACE

FW1

CAPPING

INTERNAL

3000

WB3

PARAPET +6.800

FC2

ML1 MT1 MT3 PB1 PC1 PT1 PT2 PT3 PT4 PT5

WE 6A

WE 6A

DL2

1

FLASHING

BOX GUTTER - FALL MIN. 1:100

BOX GUTTER - FALL MIN. 1:100

BEDROOM

FC1

GL1 GL2 LM1 LM2

WE 4

WEWE 7C6A

WA29

WE 4

WA29

WE 4

WE 7C

WA29

1100mm HIGH BALUSTRADE

WE WE 6A 7C

RWH

EXTERNAL

3296

3000

DL2

A20 L.21

A20 L.22

RN1 ST1

FCL +2.40 FCL +2.60 S1 FCL +2.40 FCL +2.60 S1

GROUND FLOOR FFL +0.000

A20 L.22 2

2

628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

WA12

LOW LEVEL JOINERY LIGHTING

S1

2

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

WA12

15, 28 Freshwater Level 15, 28 Level Freshwater 15, Level 28 Freshwater Place Place Southbank, Southbank, Southbank, VIC 3006 VIC 3006VIC 3006 03 9412 5100 03 9412 5100 03 9412 5100

CB1

WS1

A20 L.22

PJ

WA12

LB2 WM GM

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia Level 2, 118 Langridge Level 2, 118 Street, Langridge Collingwood Street, 3066 Collingwood VIC Australia 3066 VIC Australia P:5300 +61 3E:8413 5300 office@eatas.com.au W: eatas.com.au P: +61 3 8413P: 5300 +61E: 3 8413 office@eatas.com.au office@eatas.com.au W:E:eatas.com.au W: eatas.com.au

FIRST FLOOR FFL +3.100

2

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

DINING

WE 2A WE 6A

1 : 50

CAPPING

WS1

PJ

DINING

92

92

92 2431

WE 4

WE 6A

INTERNAL

3296

ARCHITECTS ARCHITECTS ARCHITECTS EAT EAT EAT

PARAPET +6.800

FLASHING

?

?

?

FLASHING

WS1

BOX GUTTER - FALL MIN. 1:100

11210

11210

FALL MIN. 1° FALL MIN. 1°

2PAC1 - TWOPAC TWOPAC 2PAC1 - DIESKAU TWOPAC DIESKAU - DIESKAU CB1 CONCRETE BLOCK CONCRETE CB1 CONCRETE BLOCK BLOCK CB1a CONCRETE BLOCK CONCRETE CB1a CONCRETE BLOCK BLOCK CN1 CONCRETE CONCRETE CN1 CONCRETE - SMOOTH - SMOOTH - SMOOTH CN2 CONCRETE -COLOURED CONCRETE CN2 CONCRETE -COLOURED -COLOURED CN3 CONCRETE CONCRETE CN3 CONCRETE - PAVERS - PAVERS - PAVERS CP1 SUPERTUFT ESCAPE TWIST, SUPERTUFT CP1 SUPERTUFT ESCAPE TWIST, ESCAPE PURE TWIST, NEW PURE NEWPURE NEW WOOL,ON TUFTED, ONSUPA AIRSTEP WOOL, TUFTED, WOOL, ONTUFTED, AIRSTEP SUPA AIRSTEP BLUE BLUESUPA BLUE UNDERLAY (9.5MM RUBBER) UNDERLAY UNDERLAY (9.5MM RUBBER) (9.5MM RUBBER) FC1 EASYTEX FIBRE CEMENT BOARD, PAINTED EASYTEX FC1 FIBRE EASYTEX CEMENT FIBRE BOARD, CEMENT PAINTED BOARD, PAINTED IN PT1 IN PT1 IN PT1 FC2 EASYTEX FIBRE CEMENT BOARD, PAINTED EASYTEX FC2 FIBRE EASYTEX CEMENT FIBRE BOARD, CEMENT PAINTED BOARD, PAINTED IN PT2 IN PT2 IN PT2 GL1 - CLEAR GLASS - CLEAR GLASS GL1- CLEAR GLASS GL2 - FROSTED GLASS - FROSTED GLASS GL2- FROSTED GLASS LM1 GREY LAMINEX OYSTER GREY NATURAL LAMINEX LM1 OYSTER LAMINEX OYSTER NATURAL GREY NATURAL LM2 SEASONED LAMINEX SEASONED (LIGHT|SCHEME) | LAMINEX LM2 SEASONED LAMINEX OAK (LIGHT OAK SCHEME) (LIGHTOAK | SCHEME) LAMINEX GREEN SLATE (DARK SCHEME) LAMINEX GREEN LAMINEX SLATE GREEN (DARK SLATE SCHEME) (DARK SCHEME) ML1 MELAMINE MELAMINE ML1 -MELAMINE WHITE - WHITE - WHITE ALUMINIUM IN PC1 ALUMINIUM MT1 ALUMINIUM INMT1 PC1 IN PC1 MT3 IN COLORBOND STEEL IN COLORBOND (MATT) STEEL MT3IN COLORBOND STEEL MONUMENT MONUMENT (MATT) MONUMENT (MATT) PB1 PLASTERBOARD PLASTERBOARD PB1 PLASTERBOARD PC1 COLORBOND MONUMENT MATT COLORBOND PC1 COLORBOND MONUMENT MONUMENT MATT MATT PT1 COLORBOND (MATT) COLORBOND PT1 COLORBOND MONUMENT MONUMENT (MATT) MONUMENT (MATT) PT2 GREY PEBBLE (MATT) GREY PT2PEBBLE GREY (MATT) PEBBLE (MATT) PT3 (MATT) RATTLESNAKE PT3 RATTLESNAKE (MATT)RATTLESNAKE (MATT) PT4SKINCALF SKIN (MATT) CALF PT4 SKIN (MATT) CALF (MATT) PT5(WALLS NATURAL WHITE (WALLS - LOW SHEEN; NATURAL PT5 WHITE NATURAL WHITE - LOW (WALLS SHEEN; - LOW SHEEN; DOORS - SEMI-GLOSS, - FLAT) DOORS - SEMI-GLOSS, DOORS - SEMI-GLOSS, CEILINGS - FLAT) CEILINGS -CEILINGS FLAT) RM1 KLIPLOK 700 HI STRENGTH IN COLORBOND KLIPLOK RM1 700KLIPLOK HI STRENGTH 700 HI STRENGTH IN COLORBOND IN COLORBOND MONUMENT MONUMENTMONUMENT RN1 REMOVED FINISH REMOVED RN1 FINISH REMOVED FINISH ST1 CAESARSTONE EMPIRA WHITE (LIGHT CAESARSTONE ST1 CAESARSTONE EMPIRA WHITE EMPIRA (LIGHT WHITE (LIGHT | CAESARSTONE TURBINE GREY SCHEME) | CAESARSTONE SCHEME) |SCHEME) CAESARSTONE TURBINE GREY TURBINE GREY (DARK SCHEME) (DARK SCHEME) (DARK SCHEME) ST2 CAESARSTONE CAESARSTONE ST2 CAESARSTONE STATUARIO STATUARIO MAXIMUS STATUARIO MAXIMUS MAXIMUS TB1 FENCE PALING FENCE PALING TB1 FENCE PALING FLOORBOARD - STOCKHOLM EUROPEAN FLOORBOARDTB2 - STOCKHOLM EUROPEAN OAK PLANK (P3) OAK PLANK (P3) SPOTTED SPOTTED GUMTB3 TIMBER DECKINGGUM TIMBER DECKING TL3 (VERTICAL) TILE - WHITE MATT (VERTICAL) TILE - WHITE MATT TL3a (HORIZONTAL) TILE - WHITE MATT (HORIZONTAL) TILE - WHITE MATT TL4 MATT TILE - PITCH SIGN MATT (R10) TILE - PITCH SIGN (R10) TL5 MATT TILE(R11) - MOON GREY MATT (R11) TILE - MOON GREY TILEMATT - MOSAIC BUILT DAM MATT TILE - MOSAIC TL6 BUILT DAM VP1 - EASYVJ100, VGROOVEINPANEL VGROOVE PANEL 2PAC1- EASYVJ100, IN 2PAC1 FINISH FINISH SCYON AXON CLADDING PANEL IN PT1 SCYON AXON WB1 CLADDING PANEL IN PT1 SCYON AXON CLADDING PANEL IN PT2 SCYON AXON WB2 CLADDING PANEL IN PT2 SCYON AXON CLADDING PANEL IN PT3 SCYON AXON WB3 CLADDING PANEL IN PT3 SCYON AXON CLADDING PANEL IN PT4 SCYON AXON WB4 CLADDING PANEL IN PT4

C:\Users\VALONIA.o\Documents\210628_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

DINING

REFER TO REFER TO REFER TO A52.02 FOR A52.02 FOR A52.02 FOR BALUSTRADE BALUSTRADE BALUSTRADE WE DETAIL4 DETAIL DETAIL

WE WE 6A 4

DP

DP

DP 3296

300 3000

EQ EQ

FCL +2.60 FCL +2.60

ROOF

ROOF

FALL MIN. 1°

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

ROOF

2PAC1 CB1 CB1a CN1 CN2 CN3 CP1

PJ

LIVING

TILE SETOUT TILE SETOUT TILE SETOUT CENTRED TO CENTRED TO CENTRED TO TERRACE TERRACE TERRACE 2459

3990

3990

4668

4668

STUDY

WE 4

WE 4

LANDSCAPE

1 A20 L.21

TO UT

1 A20 L.21

EQ

VENT1

RM1

RM1

13250

ROOF

ROOF

FALL MIN. 1° FALL MIN. 1°

FALL MIN. 1°

FLASHING

RM1

FLASHING

ROOF FLASHING

RM1

RM1

WS2

FLASHING

RM1

WS2

FLASHING

FLASHING

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

800

DOOR

LEGEND FINISHEFSINLIESGHEEFNSIN DLISEH GEESND

WS2

2721

LIVING

2721

LIVING

3990

STUDY

WE 4

WE 4

STUDY

WE 6A

WE 6A 4668

WE 4

TB2

WE 4

LB2 GM

1

EQ

FCL +2.60 FCL +2.60

CAPPING

FALL MIN. 1:100

613 92 463 470

GROUND FLOOR FCL +2.600

TB2

FT

2000 MIN.

1m HIGH

WI 1

TB2

FT FENCE TYPE FENCE TYPE FENCE TYPE # #

REFER TO GENERAL SHEET A01.00 REFER TO GENERAL REFER TONOTES GENERAL ON SHEET NOTES A01.00 ONNOTES SHEETON A01.00

3

1m HIGH

WI 1

TB2

WX WX WALL TYPE WALL TYPEWALL TYPE # #

SPOT LEVEL SPOT LEVEL SPOT LEVEL

4

1m HIGH WI 1

TB2

JOINERY TYPE JOINERY TYPE JOINERY TYPE J0# J0#

GENERAL GENERAL GENERAL NOTES NOTESNOTES

7

TB2

TL# TL# FINISH TYPE FINISH TYPE FINISH TYPE

FT #

SUMP

6 FIRST FLOOR FFL 5 +3.100

TB2

W100 W100 WINDOW TYPE WINDOW TYPE WINDOW TYPE

WX #

CAPPING

CAPPING

CAPPING

SUMP RWH

118

3

1450

1450 4

D102 D102 TYPEDOOR DOOR TYPE DOOR TYPE

TL# J0#

CHANGE CHANGE INCHANGE LEVEL IN LEVEL IN LEVEL RWH

FLASHING

FLASHING

3132

5

4

3132

6

5

WP 1

WP 1

WP 1

1m HIGH

7202

7202

7202

3525 285

285

800

800

WINDOW

WINDOW

285 800

7

6

3

A20 L.22

118

11178

11178

11178

92 3525

3525

WE 2A W64

WE 2A W64

WE WE 2A2A

UP

7

WE 2A

WA3 WE 2A

1

UP

WINDOW W64

1

UP

8

3132

2

2

9

8

1m HIGH

3

9

118

4

3

A20 L.22 2

2

CAPPING FLASHING

CAPPING

SUMP

12

2721

5

4

3

2 13A20 L.22

WE 2A

6

5

4

OVER

14

WE 2A

7

6

5

WI 1

7

6

OVER

8

9

1m HIGH

7

14

OVER

WI 1

8

WI 1

WI 1

9

15 SKYLIGHT 15 SKYLIGHT

14

D102 W100

NOM. SETDOWN NOM. SETDOWN NOM. SETDOWN

SKYLIGHT SKYLIGHT LOT BOUNDARY VARIES REFER TO OVERALL PLAN FOR SPECIFIC LOT DIMENSIONS 118 -250 600 SITE263 92 883

WINDOW 13218 1555

SKYLIGHT 118 250 600

10

10

8

16

15 SKYLIGHT

CAPPING

WINDOW 13218

DOOR

800

470

SKYLIGHT 263 92 883

800

10

CENTRE CENTRE 11 CENTRE SKYLIGHT TO SKYLIGHT TO SKYLIGHT TO STAIRCASE STAIRCASE 10STAIRCASE

Ground Floor Plan - Type L3

VENT1

4500 NOM.

4500 NOM.

5090 NOM.

5090 NOM.

5090 NOM.

4516 NOM.

4516 NOM.

4544 NOM. 2833

2833

2833

WE 3C

BOUNDARY LINE 613 92 463

613 92 DOOR

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

WE 3C

470 WE 3C SKYLIGHT 263 92 883

WA8 11

FW1

A20 L.21

43 92

EQ

1555 WA8 SKYLIGHT 118 250 600

WI 1

1

WI 1 WI 1

11

17

16

16

WINDOW 13218 1555WA8

WP 1

11

92

11

9

DOOR / DRIVEWAY DOOR / DRIVEWAY DOOR / DRIVEWAY

1 : 50 L.04

WE 3C

663 92

WI 1 WI

663 92

WI 1

900

DOOR

DOOR

900

900 663 92

10000

10000

10000

92 1246

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

LOT BOUNDARY VARIES OVERALL SITE PLAN FOR SPECIFIC LOT1391 DIMENSIONS 92 - REFER TO 1246 92

1391

LOT BOUNDARY VARIES - REFER TO OVERALL SITE PLAN FOR SPECIFIC LOT DIMENSIONS

DOOR

92

92

92 1391 92

WE 2A

1246

WE 2A

WE 2A

12

WI 1

WI 1

WP 1

WP 1

WE 2A

WE 2A

WE 2A WI 1

13

12

A20 L.22

L3 - FLOOR GROUND FLOOR TYPE TYPE GROUND L3 - GROUND FLOOR PLAN PLANPLAN 1L3 - TYPE 1 A20 A20 1L.04 : 50

17

13

A20 L.22 2

2

17

KITCHEN KITCHEN KT.07a KT.07a

KITCHEN KT.07a

FLASHING

FLASHING

FT 2

FT 2

92

300 EXTERNAL

WI 1

12

2 13A20 L.22

TB2

WE 4

130

TO UT SE

43INTERNAL 92

300 EXTERNAL

WI 1

12

10

WE 2A

TB2

TB2

13

8

WE 2A

TB2

12

WI 1

FALL MIN. 1:100

FALL MIN. 1:100

WI 1

WA3 WE 2A

WA3

WI 1

FIRST FLOOR FCL +5.700

493

13

92

LANDSCAPE

493

463

WI 1

WI 1

WI 1

2081

2081

2081

2426

2426

WI 1

WI 1

WI 1

FALL MIN. 1:100

WP 1

WP 1

92 WINDOW 2552

493

CAPPING FLASHING

ROOF BELOW ROOF BELOW ROOF BELOW RWH

CENTRE

CENTRE

SKYLIGHT SKYLIGHT TO WC AND TO WC AND VANITY VANITY UNIT UNIT

14

DIN BU IL

BU IL

43 92 INTERNAL

SKYLIGHT OVER

SKYLIGHT OVER

15

WE 4 TB2

WE 4

LB2

INTERNAL

TL4 CENTRE

16

2237

LANDSCAPE

SKYLIGHT OVER

WI 1

WI 1

WI 1

WI 1

TL4

14

9

DSW1

WI 1

RT.02h

RT.02h

DSW4

DSW4

15

10

DSW1

WI 1

TL4

SKYLIGHT DSP1 DSP1 BATHROOM BATHROOM BATHROOM TO WC AND BT.09M BT.09M BT.09MVANITY UNIT

DSP1 DSW4

16

1

DOOR

FT 2

WI 1

CP1

PARAPET +6.800

RT.04f

RT.04f

DSW4

DSW4

14

BUILDING OVER BUILDING OVERBUILDING OVER

G

SE

L'DRY LT.01

WIDSW7 1

DSW4

CP1

BEDROOM BEDROOMBEDROOM

RT.02h

WE 3C

WE 3C

WE 7C

WE 7C

15

2

EXTERNAL

4516 NOM.

92

WE 2A

SPRD'R WE FLASHING 2A

SPRD'R FLASHING

SPRD'R WE FLASHING 2A

DP

DP

FALL MIN. 1:100

DP

CAPPING

FALL MIN. 1:100

CAPPING

92

92

92

FALL MIN. 1:100

1466

1466

1466

CAPPING

60 92 92149

900

DOOR

DOOR

60 92 900

DOOR

92149

WA29

WA29 FLASHING

WE WE 6A7C

BEDROOM BEDROOMBEDROOM

FALL MIN. 1° FALL MIN. 1°

FALL MIN. 1°

CP1

CP1

CP1

WI 1

WP 1 WI 1

WP 1

1823 92 1000

4978

92

92 1000

1000

1000

DOOR

DOOR

92 239

92

92 239

92

92 239

2237

2237

2459

130

92

REFER TO A14.03 FOR SETOUT DIMENSION

2459

2459

WA29 FLASHING

ROOF

LANDSCAPE LANDSCAPE LANDSCAPE

TO UT

92

ROOF

16

11

DG1

DG1

DSW1

DIN

G

L'DRY LT.01

WI DSW7 1

WE 6A

WE 6A

TL4

TL4

L'DRY LT.01

ST.10

ST.10

DRIVEWAY DRIVEWAYDRIVEWAY

130

ROOF

RT.04f

63

DSW7

WE 6A

DG1

185

185

185

1000

1000

1000

WINDOW

WINDOW

100

100

100

2552

2552

WE 6A

WE 6A

WI 1

WI 1

TL4

GARAGE GARAGE

4978

WP 1

CN1

CN1

WI 1

WE 4

1

RM1

FLASHING

WE 6A

RM1

RM1

WE 6A

WE 6A

1450

WEWE 7C 6A

11210

WA29

WE 7C

92

WA29

CAPPING FLASHING 44 95 FLASHING

SUMP FLASHING

CP1

DSW1a

DSW1a

ST.10

WE 6A

REFER TO A14.03 FOR SETOUT DIMENSION

RT.02b

RT.02b

WI 1

WI 1

DSW1a

CN1

A20 L.04

SUMP

WE 6A

TB2

TB2

RWH

RWH

SUMP

92 792

WI 1

STORAGE STORAGE STORAGE

DOOR

92

92

792

792

92

92 63

63 1000

1000

DOOR

DOOR

TB2

RT.02b

10000

10000

10000

WI 1

WI 1

GARAGE

4978

CP1

CP1

BEDROOM BEDROOMBEDROOM WP 1

1823

1823

CP1

REFER TO A14.03 FOR SETOUT DIMENSION

60 92

TL4

TL4

WI 1

DIN

DSW4

ENSUITE ENSUITE BT.04a BT.04a

ENSUITE BT.04a

BU IL

DSW4

92149

TL4

DSW4

DSW5

DSW5

RWH

DSW2

DSW2

2426

800

WE 6A DSW5

WE 6A

DSW2

WI 1

WE 6A

DSL8

DSL8

900

DP

DP

DP 92 120

DSL8

DOOR

92

92

120

120

800

800

DOOR

DOOR

HWS

HWS

92

WA29

WEWE WE WE 6A 7C 6A 6A CAPPING CAPPING 44 95 44 95

BUILDING OVER BUILDING OVERBUILDING OVER HWS

4544 NOM.

4544 NOM.

5090 NOM.

5090 NOM.

5090 NOM.

5090 NOM.

5090 NOM.

AC

AC

6584 NOM.

CN3

6584 NOM.

POS

CN3

6584 NOM.

POS

CN3

5118 NOM.

5090 NOM.

5118 NOM.

POS FT 2

FT 2

RWT1

RWT1

FT 2

2250

2250

RWT1

5118 NOM.

FT 1

FT 1

FT 1

FT 1

FT 1

5118 NOM.

5090 NOM.

5090 NOM.

5118 NOM.

5118 NOM.

2250

5090 NOM.

FT 1

LANDSCAPE LANDSCAPE LANDSCAPE

GENERAL LEGEND GENERAL GENERAL LEGEND LEGEND

AC A/C CONDENSER ANDTOWNHOUSE IN TYP. TOWNHOUSE FFL FSL AC AC A/C CONDENSER A/C CONDENSER SHOWN AND FSL IN TYP. SHOWN INSHOWN TYP. TOWNHOUSE FFL AND FSL FFL AHD HEIGHT DATUM AHD AHD AUSTRALIAN AUSTRALIAN HEIGHT AUSTRALIAN DATUM HEIGHT DATUM DRAWINGS ARE RELATIVE TO INDIVIDUAL DRAWINGS DRAWINGS ARE RELATIVE ARETO RELATIVE INDIVIDUAL TO INDIVIDUAL EXTERNAL CH CEILING HEIGHT CH CH CEILING HEIGHT CEILING HEIGHT ONLY TOWNHOUSE TOWNHOUSE ONLY TOWNHOUSE ONLY CL CLOTHESLINE CL CL CLOTHESLINE CLOTHESLINE CONFIRM COS COS CONFIRM COS ON CONFIRM SITE ON SITE ON SITE A14.03 REFER TO A14.03 REFERFOR TOREFER EXACTTO FOR EXACT OF FOR OF FFL OF A14.03 FFL FFLEXACT DP DOWNPIPE DOWNPIPEDOWNPIPE TOWNHOUSES THEIR RESPECTIVE TOWNHOUSES TOWNHOUSES ON THEIR RESPECTIVE ON THEIR ON RESPECTIVE LOTS LOTS DP LOTS DP EJEXPANSION JOINT EJ EJ EXPANSION JOINT EXPANSION JOINT ON SITE. ON SITE. ON SITE. EQ EQ EQUAL EQ EQUAL EQUAL EX. EX. EXISTING EX. EXISTING EXISTING EXT EXT EXTERIOREXT EXTERIOREXTERIOR FINISHEDLEVEL CEILING LEVEL FCL FCL FINISHED FCL CEILING FINISHED LEVEL CEILING FINISHED FLOOR LEVEL FFL FFL FINISHED FFL FLOOR FINISHED LEVEL FLOOR LEVEL FD FLOOR DRAIN FD FD FLOOR DRAIN FLOOR DRAIN GM GAS METER GM GM GAS METER GAS METER GRV 10MMLINE GROOVE LINE GRV GRV 10MM GROOVE 10MM LINE GROOVE HWS HOT WATER SERVICE HWS HWS HOT WATER HOT SERVICE WATER SERVICE LB1 LETTER LB1 LB1 LETTER BOX LETTER TYPE 1BOX TYPEBOX 1 TYPE 1 LB2 LETTER LB2 LB2 LETTER BOX LETTER TYPE 2BOX TYPEBOX 2 TYPE 2 NATURALLEVEL GROUND LEVEL NGL NGL NATURAL NGL GROUND NATURALLEVEL GROUND O/A O/A OVERALL O/A OVERALL OVERALL O/F OVERFLOW O/F O/F OVERFLOW OVERFLOW PV PHOTO VOLTAICPANEL (SOLAR) PANEL PV PV PHOTO VOLTAIC PHOTO (SOLAR) VOLTAIC PANEL (SOLAR) (PC) PRIME COST (PC) (PC) PRIME COST PRIME COST PGL GROUND LEVEL PGL PGL PROPOSED PROPOSED GROUND PROPOSED LEVEL GROUND LEVEL (PS) SUM (PS) (PS) PROVISIONAL PROVISIONAL SUM PROVISIONAL SUM RWH HEAD RWH RWH RAINWATER RAINWATER HEAD RAINWATER HEAD SHW SOLAR BOOSTED HOT WATER SHW SHW SOLAR BOOSTED SOLARHOT BOOSTED WATERHOT WATER SPRD'R SPRD'R SPRD'R SPREADER SPREADERSPREADER SSL STRUCTURAL LEVEL SSL SSL STRUCTURAL STRUCTURAL SURFACE LEVEL SURFACE SURFACE LEVEL TEJ TILE EXPANSION JOINT TEJ TEJ TILE EXPANSION TILE EXPANSION JOINT JOINT TOW TOP OF WALL TOW TOW TOP OF WALL TOP OF WALL WM WATER METER WM WM WATER METER WATER METER 4500 NOM.

1114 92 44 INTERNAL

FALL MIN. 1:100

1000 198 EXTERNAL

DOOR 92 92 1114 44

EXTERNAL

294 198 1000

DOOR 1114 92

INTERNAL

1000 294

92

INTERNAL

294

FALL MIN. 1:100

CL

CL

3200 DOOR 3485

EXTERNAL

3

FT 1

3

CL

LEVELS LEVELSLEVELS NOTES NOTESNOTES

LOT BOUNDARY - REFER TO OVERALL SITE PLAN SPECIFIC LOT DIMENSIONS LOT BOUNDARY VARIES LOT-BOUNDARY REFER TO OVERALL VARIES - REFER SITE PLAN TOVARIES OVERALL FOR SPECIFIC SITE PLAN LOT DIMENSIONS FOR SPECIFIC LOTFOR DIMENSIONS

3200 DOOR 3485

A20 L.21

A20 L.21

EXTERNAL

3200 DOOR 3485

92

A20 L.21

EXTERNAL

1909 1546 92

EXTERNAL

1909 43 92 1546 92

INTERNAL

INTERNAL

INTERNAL

EXTERNAL

EXTERNAL

EXTERNAL

1909 43 92 1546

EXTERNAL

LOT BOUNDARY - REFER TO OVERALL SITE PLAN SPECIFIC LOT DIMENSIONS LOT BOUNDARY VARIES LOT-BOUNDARY REFER TO OVERALL VARIES - REFER SITE PLAN TOVARIES OVERALL FOR SPECIFIC SITE PLAN LOT DIMENSIONS FOR SPECIFIC LOTFOR DIMENSIONS

43 92

A20 L.31

ALL INTERNAL WALLS AND CEILING TO BE PAINTED IN PT5 FINISH UNLESS OTHERWISE NOTED

TYPE L - SECTION 2

ALL COLORBOND FLASHING AND CAPPING TO: 50 CLADDING MATERIAL TO MATCH THE 1 CLADDING MATERIAL FINISH UNLESS OTHERWISE NOTED ALL COLORBOND FLASHING TO FENESTRATIONS IN MT3 FINISH


20mm TURNBACK ON FLASHING KERB

20mm TURNBACK ON FLASHING KERB

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

WIRE MESH

WIRE MESH

WIRE MESH

REFLECTIVE FOIL LAMINATE

REFLECTIVE FOIL LAMINATE

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT

EXTERNAL

GUIDE

GUIDE

MIN. 200

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

20mm TURNBACK ON FLASHING KERB

EXTERNAL

EXTERNAL

APRON FLASHING ALLAPRON ROUNDFLASHING TO TURN ALL ROUND TO TURN DOWN BETWEEN DOWN BETWEEN RIBS, AS PER METALRIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE ROOF MANUF'S INSTALLATION GUIDE

WIRE MESH WIRE MESH

FALL

FALL

WIRE MESH

REFLECTIVE FOIL LAMINATE REFLECTIVE FOIL LAMINATE

REFLECTIVE FOIL LAMINATE

INSULATION PER ESD INSULATION AS PERAS ESD REPORT REPORT

INSULATION AS PER ESD REPORT

INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

A51.02

1 : 10

INSULATION AS PER ESD REPORT

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD INTERNAL REPORT

FIXED TO TIMBER BATTEN

OO

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT

INTERNAL

INSULATION AS PER ESD REPORT

INTERNAL

INSULATION AS PER ESD REPORT INTERNAL

TYP. ROOF OO - CEILING G DETAIL 2

A51.01

1 : 10

A51.02

20

D102

DOOR TYPE

W100

WINDOW TYPE

TL#

FINISH TYPE

J0#

JOINERY TYPE

WX #

WALL TYPE

FT #

FENCE TYPE

SYSTEM CAVITY

20 CAVITY SYSTEM

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

A51.02

OO

COLORBOND FLASHING FOLD TO FALL, FINISH TO MATCH RM1, AS PER ROOF SHEETING MANUF'S INSTALLATION GUIDE

W

50

W

20

NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au EXTERNAL

25

FALL

FALL FALL

FALL

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD INTERNAL REPORT

INTERNAL PLASTERBOARD CEILING FIXED TO TIMBER BATTEN INSULATION AS PER ESD FOR INTERIOR REPORT INTERNAL

20

20

CAVITY SYSTEM

CAVITY SYSTEM

PTY LTD WWSP AUSTRALIA W

WSP AUSTRALIA PTY LTD

Structural and Civil Engineer

®

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

WIRE MESH

LIGHTWEIGHT WIRE MESH CLADDING OVER CAVITY BATTEN AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE REFLECTIVE FOIL LAMINATE DRAWINGS, INSTALLED AS PER MANUF'S INSTALLATION GUIDE INSULATION AS PER ESD REPORT

WIRE MESH

WIRE MESH

REFLECTIVE FOIL LAMINATE

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT

MIN. 200

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

FFL FALL FALL

MIN. 200 FLASHING TO APRON APRON FLASHING TO EXTEND MIN. 200 TOTO SUIT EXTEND MIN. 200 SUIT ROOFING PROFILE ROOFING PROFILE

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

FALL

WIRE MESHWIRE MESH

INSULATION INSULATIONAS ASPER PERESD ESD REPORT REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

ESD Consultant

Level 15, 28 Freshwater Place Southbank, VIC 3006 W 03 9412 5100

Level 1, 60 Albert Rd 31 Dover St Cremorne VIC 3121 South Melbourne, VIC 3205 M 03 9636 0280 03 9429 7798 info@arkresources.com.au LIGHTWEIGHT CLADDING AS PERinfo@floreancigsmith.com.au LIGHTWEIGHT CLADDING AS PER

WIRE MESH

WIRE MESH

FFL

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT

INSULATION INTERNAL AS PER ESD REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

HIGH POINT

INTERNAL

INSULATION ASINTERNAL PER ESD REPORT

RM1 METAL ROOF AS PER FINISHES FILL VOID WITH BRADFORD SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION PARTY WALL SEALER GUIDE

RM1 METAL ROOF AS PER FINISHES FILL VOID WITH BRADFORD SCHEDULE, INSTALLED AS PER PARTY SEALER MANUF'S INSTALLATION GUIDE FALLWALL MIN. 1°

REFLECTIVE FOIL LAMINATE

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

FILL VOID WITH BRADFORD PARTY WALL SEALER

FILL VOID WITH BRADFORD PARTY WALL SEALER

INSULATION AS PER ESD REPORT

WIRE MESH

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT

INTERNAL INTERNAL

INSULATION AS PER ESD REPORT INTERNAL

INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN 20

20

20

SYSTEM CAVITY

SYSTEM CAVITY

SYSTEM CAVITY

FFL

FFL

INSULATION AS PER ESD REPORT INTERNAL INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

50

MIN. 100

MIN. 100

MIN. 100

50

20

20

CAVITY SYSTEM

CAVITY SYSTEM

INTERNAL INTERNAL

20

SYSTEM CAVITY

SYSTEM CAVITY

SYSTEM CAVITY

WIRE MESH

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT

INSULATION INTERNAL AS PER ESD REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

HIGH POINT

HIGH HIGH POINTPOINT

HIGH POINT

WIRE MESH

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION ASINTERNAL PER ESD REPORT

MIN 100

MIN 100

HIGH POINT

MIN. 100

HIGH POINT

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INTERNAL

INTERNAL INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN 20

20

CAVITY SYSTEM

CAVITY SYSTEM

HIGH POINT

INSULATION AS PER ESD INTERNAL REPORT

INSULATION INTERNAL AS PER ESD REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN 20

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

CAVITY SYSTEM

REFLECTIVE FOIL LAMINATE

HIGH POINT

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION ASINTERNAL PER ESD REPORT

REFLECTIVE FOIL LAMINATE

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written Level 2, 118 Langridge Street, Collingwood Level 3066 VIC 2, 118 Australia Langridge Street, 3066 VIC Australia authorityCollingwood of Architects EAT. Unauthorized use of this document in any form what ever is prohibited. P: +61 3 8413 5300 E: office@eatas.com.auP: W:+61 eatas.com.au 3 8413 5300®E: office@eatas.com.au W:soeatas.com.au

WSP AUSTRALIA PTY LTD

W 15, 28 Freshwater Place Level Southbank, VIC 3006 All rights reserved. This document remains the property of Architects EAT and is only to be used for 03 9412 5100 its commissioned purpose. No part of this document Structural and Civil Engineer

®

may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.®

REFLECTIVE FOIL LAMINATE

FALL MIN. 1°

FALL

REFLECTIVE FOIL LAMINATE INSULATION AS PER ESD REPORT

WIRE MESH

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT INTERNAL INTERNAL

INSULATION AS PER ESD INTERNAL REPORT PLASTERBOARD CEILING FIXED TO TIMBER BATTEN 20

CAVITY SYSTEM

CAVITY SYSTEM

CAVITY SYSTEM

8

A51.02

INSULATION AS PER ESD REPORT

INTERNAL

INTERNAL

ESD Consultant

Building Surveyor

INSULATION AS PER ESD REPORT INTERNAL INTERNAL

INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

20

20

20

CAVITY SYSTEM

CAVITY SYSTEM

CAVITY SYSTEM

INSULATION AS PER ESD INTERNAL REPORT

INSULATION AS PER ESD REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

TYP. ROOF - PARTIWALL TYP. DETAIL ROOF 5 -8PARTIWALL TYP. ROOF DETAIL - PARTIWALL 5 DETAIL 5 8 A51.02 OO W OO A51.02 1 : 10W 1 : 10 1 : 10

Rev. Description Rev. Date SMITH Description WSP WSPAUSTRALIA AUSTRALIAPTY PTY WSP LTD LTD AUSTRALIA WSP ADP AUSTRALIA CONSULTING PTY LTD PTY WSP PTY LTD LTD AUSTRALIA ADP FLOREANCIG CONSULTING PTY LTD SMITH PTY ADP LTD CONSULTING FLOREANCIG PTY LTD SMITH FLOREANCIG ESD Building Consultant Surveyor

FINISHES LEGEND

REFLECTIVE FOIL LAMINATE

WIRE MESH

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

NOM. SETDOWN

INSULATION AS PER ESD REPORT

WIRE MESH

20

Building Services Engineer

REFLECTIVE FOIL LAMINATE

WIRE MESH

20

Structural and Civil Engineer Building ESD Consultant Services Engineer

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S FALL INSTALLATION FALL GUIDE

WIRE MESH HIGH POINT

W W W M Level 1, 60 Albert31RdDover St M Level Place Level15, 15,2828Freshwater FreshwaterPlace Place Level 15, 28 Freshwater Level Level15, 1, 60 28 Albert Freshwater Rd Place Level 15, 28 Freshwater Level 31 Dover 1,Place 60 St Albert Rd Southbank, Southbank, VIC 3006 Southbank,VIC VIC3006 3006 Southbank, South Melbourne, VIC 3006 VIC 3205 Southbank, VIC 3006 South Cremorne Melbourne, VIC 3121 VIC 3205 South Melbourne, Cremorne VIC 3205VIC 3121 03039412 94125100 5100 03 9412 5100 03 039412 96365100 0280 03 9412 5100 03 039636 94290280 7798 03 9636 0280 03 9429 7798 info@arkresources.com.au info@arkresources.com.au info@floreancigsmith.com.au info@arkresources.com.au info@floreancigsmith.com.au Structural Building and Services Civil Engineer Engineer

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

FALL MIN. FALL 1° MIN. 1° FALL

50

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATIONFALL GUIDE MIN. 1° FALL

INSULATION AS PER ESD REPORT

Typ Roo - Part wa Deta s

ARCHITECTS EAT ARCHITECTS EAT

FALL

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO MATCH RM1

FALL

FALL

INSULATION AS PER ESD REPORT

TYP. ROOF - PARTIWALL TYP. DETAIL ROOF 3 -6PARTIWALL TYP. ROOF DETAIL - PARTIWALL 3 DETAIL7 3 TYP. ROOF - PARTIWALL TYP. DETAIL ROOF 4 -7PARTIWALL TYP. ROOF DETAIL - PARTIWALL 4 DETAIL 4 6 7 A51.02 A51.02 A51.02 OO W OO A51.02 1 : 10W OO W OO A51.02 1 : 10W 1 : 10 1 : 10 1 : 10 1 : 10

ARCHITECTS EAT

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S GUIDE FALL MIN.INSTALLATION 1° FALL MIN. 1°

FALL MIN. 1°

FALL

FALL

INSULATION AS PER ESD REPORT

INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

FALL

FALL

INSULATION AS PER ESD REPORT

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

FALL

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

FALL MIN. 1°

SPOT LEVEL

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE FALL MIN. 1°

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

50

INSULATION AS PER ESD REPORT

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

50

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

FALL

FALL

CHANGE IN LEVEL

TWOPAC - DIESKAU 2PAC1 CONCRETE BLOCK CB1 CONCRETE BLOCK CB1a CONCRETE - SMOOTH CN1 CONCRETE - EXPOSED AGGREGATE CN2 CONCRETE PAVERS - ANSTON MIMOSA CN3 OVER PEDESTAL PAVING SYSTEM CP1 SUPERTUFT ESCAPE TWIST, PURE NEW CP1 WOOL, TUFTED, ON AIRSTEP SUPA BLUE UNDERLAY (9.5MM RUBBER) FC1 FIBRE CEMENT SHEET, RENDERED WITH FC1 RN1 AND PAINTED IN PT1 FC2 FIBRE CEMENT SHEET, RENDERED WITH FC2 RN1 AND PAINTED IN PT2 GL1 GLASS - CLEAR GL1 GL2 GLASS - FROSTED GL2 LM1 LAMINEX OYSTER GREY NATURAL LM1 LM2 LAMINEX SEASONED OAK LM2 ML1 MELAMINE - WHITE ML1 MT1 ALUMINIUM IN PC1 MT1 MT3 STEEL IN COLORBOND MONUMENT (MATT) MT3 PB1 PLASTERBOARD PB1 PC1 COLORBOND MONUMENT MATT PC1 PT1 COLORBOND MONUMENT (MATT) PT1 PT2 GREY PEBBLE (MATT) PT2 PT3 RATTLESNAKE (MATT) PT3 PT4 CALF SKIN (MATT) PT4 PT5 NATURAL WHITE (WALLS - LOW SHEEN; PT5 DOORS - SEMI-GLOSS, CEILINGS - FLAT) RM1 KLIPLOK 700 HI STRENGTH IN COLORBOND RM1 MONUMENT RN1 RENDER OVER FC RN1 ST1 CAESARSTONE EMPIRA WHITE ST1 ST2 CAESARSTONE STATUARIO MAXIMUS ST2 TB1 PALING FENCE TB1 TB2 STOCKHOLM EUROPEAN OAK PLANK (P3) TB2 TB3 SPOTTED GUM TIMBER DECKING TB3 TL3 TILE - WHITE MATT (VERTICAL) TL3 TL3a TILE - WHITE MATT (HORIZONTAL) TL3a TL4 TILE - PITCH SIGN TL4 COLORBOND FLASHING FOLD TO MATT (R10) RM1 MATT (R11) CAP FINISH- MOON TO MATCH TL5OVER,TILE GREY TL5 TL6 TILE - MOSAIC DAM MATT TL6 COLORBOND FLASHING FOLDBUILT TO FALL, PARAPEPANEL AND TURN VP1 CAP OVER VGROOVE - EASYVJ100, IN 2PAC1 VP1 DOWN, FINISH TO MATCH RM1 FINISH COLORBOND FLASHING FOLDSELFLOK TO WB1 WEATHERTEX ECOGROOVE IN WB1 FALL, CAP OVER PARAPET AND EXTEND TOPT1 TURN UP BEHIND CLADDING WEATHERTEX AS PER MANUF'S SELFLOK ECOGROOVE IN WB2 WB2 INSTALLATION GUIDE, FINISH TO PT2 MATCH RM1 WB3 WEATHERTEX SELFLOK ECOGROOVE IN WB3 PT3 RM1 METALWEATHERTEX ROOF AS PER FINISHES WB4 SELFLOK ECOGROOVE IN WB4 SCHEDULE, INSTALLED AS PER PT4 MANUF'S INSTALLATION GUIDE

FALL

MIN. 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

FALLFALL

MIN 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER FALL MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

MIN. 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER FALLGUIDE MANUF'S INSTALLATION

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

FALL

MIN. 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER FALLINSTALLATION GUIDE MANUF'S

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESD REPORT

MIN 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

MIN 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

FENCE TYPE

A51 01

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO MATCH RM1

FALL

WALL TYPE

FT #

FENCE TYPE

A51.01 A51 01

FALL

FALL

50

FILL VOID WITH BRADFORD PARTY WALL SEALER

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & FALL FALL SIDES

JOINERY TYPE

WALL TYPE

WX #

Scale As indicated @ A1 Drawn by VO GENERAL GENERAL NOTES Checked NOTES by REFER TO GENERAL A01.00 REFER TO GENERAL NOTES ON SH Issued Date NOTES ON SHEET 16/10/2020 TENDER Status

SOUTHLINK PROJECTS PTY LTD 10 ALVINA ST, OAKLEIGH SOUTH

FALL

FALL

MIN. 100

FILL VOID WITH BRADFORD PARTY WALL SEALER

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

FALL

FALL

FALL FALL

50

FILL VOID WITH BRADFORD PARTY WALL SEALER

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm PLY TO BASE & FALL NOISE STOP FALL SIDES

FALL

FALL FALL

MIN. 100

FILL VOID WITH BRADFORD PARTY WALL SEALER

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & FALL FALL SIDES

J0#

2PAC1 CB1 CB1a CN1 CN2 CN3

50

FILL VOID WITH BRADFORD PARTY WALL SEALER

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

50

FILL VOID WITH BRADFORD PARTY WALL SEALER

FINISH TYPE

J0#

TOWNHOUSE

FINISHES LEGEND

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

WINDOW TYPE

TL#

JOINERY TYPE

NOM. SETDOWN

MIN. 100

FALL COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

DOOR TYPE

W100

FINISH TYPE

SPOT LEVEL

MIN. 100

FALL

MIN. 100

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

MIN. 100

FALL COLORBOND FLASHING FOLD TO FALL CAP OVER, FINISH TO MATCH RM1 COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

50

FALL FALL

MIN. 100

FALL COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1 COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND TURN DOWN, FINISH TO MATCH RM1

D102

WINDOW TYPE ADJACENT

CHANGE IN LEVEL

INTERNAL

20

50

FALL

DOOR TYPE

TL#

FT #

FFL

MIN 100

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND TURN DOWN, FINISH TO MATCH RM1

D102

WX # CAVITY SYSTEM

DETAIL - TYPICAL CONSTRUCTION DETAILS 1

Client Address

A51 02 A51

W100

20

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

20

MIN. 100

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

A51.02

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

TYP. ROOF - PARTIWALL TYP. DETAIL ROOF 1 -4PARTIWALL TYP. ROOF DETAIL - PARTIWALL 1 DETAIL5 1 TYP. ROOF - PARTIWALL TYP. DETAIL ROOF 2 -5PARTIWALL TYP. ROOF DETAIL - PARTIWALL 2 DETAIL 2 4 5 A51.02 A51.02 A51.02 OO W OO A51.02 1 : 10W OO W OO A51.02 1 : 10W 1 : 10 1 : 10 1 : 10 1 : 10

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND TURN DOWN, FINISH TO MATCH RM1

6

20

LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO MATCH RM1

REFLECTIVE FOIL LAMINATE

ADJACENT TOWNHOUSE

Project Name

WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER FILL VOID WITH BRADFORD MANUF'S INSTALLATION GUIDE FALL MIN. 1° PARTY WALL SEALER FALL MIN. 1°

INTERNAL

ADJACENT TOWNHOUSE

10 ALVINA ST, OAKLEIGH SOUTH

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO FALL RM1 MATCH

INSULATION AS PER ESD REPORT FFL

FFL

INTERNAL

Date

WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

WIRE MESH

HIGH POINT

Description

RM1 METAL ROOF AS PER COLORBOND FLASHING FOLD TO FINISHES SCHEDULE, FALL, CAP OVER PARAPET AND INSTALLED AS PER MANUF'S EXTEND TO TURN UP BEHIND INSTALLATION GUIDE CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO FALL MATCH RM1 50

INSULATION AS PER ESD REPORT

HIGH POINT

COLORBOND FLASHING FOLD TOMETAL ROOF AS PER RM1 FALL, CAP OVER PARAPET AND FINISHES SCHEDULE, EXTEND TO TURN UP BEHIND INSTALLED AS PER MANUF'S CLADDING AS PER MANUF'S INSTALLATION GUIDE INSTALLATION GUIDE, FINISH TO FALL MATCH RM1

MIN. 100

INSULATION AS PER ESD REPORT

WIRE MESH

COLORBOND FLASHING FOLD RM1 METAL ROOF AS PERTO FALL, CAPFINISHES OVER PARAPET AND SCHEDULE, EXTEND TO TURN UP BEHIND INSTALLED AS PER MANUF'S CLADDINGINSTALLATION AS PER MANUF'S GUIDE INSTALLATION GUIDE, FINISH TO FALL RM1 MATCH

INTERNAL

PLASTERBOARD CEILING PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE FOR INTERIOR, TO CONTINUE TO WRAP UP TO FORM WRAP SKYLIGHT UP TO FORM SKYLIGHT

Rev.

WB4

CN3

REFLECTIVE FOIL LAMINATE

Drawing Name

20

INSULATION AS PER ESD REPORT

LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

50

REFLECTIVE FOIL LAMINATE

LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

MIN. 100

REFLECTIVE FOIL LAMINATE

FILL VOID WITH BRADFORD PARTY WALL SEALER

INSULATION AS PER ESD REPORT

Building Surveyor

20

REFLECTIVE FOIL LAMINATE

MIN 100

Building Services Engineer

20

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

4

Structural and Civil Engineer

Level 15, 28 Freshwater Place Southbank, VIC 3006 W 03 9412 5100

MIN 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

3

A51.02

WB3

CONCRETE PAVERS - ANSTON MIMOSA OVER PEDESTAL PAVING SYSTEM SUPERTUFT ESCAPE TWIST, PURE NEW INSULATION AS PER ESD CP1 INSULATION AS PER ESD REPORT REPORT WOOL, TUFTED, ON AIRSTEP SUPA BLUE UNDERLAY (9.5MM RUBBER) FC1 FIBRE CEMENT SHEET, RENDERED WITH WIRE MESH WIRE MESH RN1 AND PAINTED IN PT1 FC2 FIBRE CEMENT SHEET, RENDERED WITH RN1 AND PAINTED IN PT2 GL1 GLASS - CLEAR GLASS - FROSTED ROOF STRUCTURE AS PERGL2 ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS STRUCTURE ENG'S DRAWINGS LM1 LAMINEX OYSTER GREY NATURAL LM2 LAMINEX SEASONED OAK ML1 MELAMINE - WHITE MT1 ALUMINIUM IN PC1 MT3 STEEL IN COLORBOND MONUMENT (MATT) PB1 PLASTERBOARD PC1 COLORBOND MONUMENT MATT PT1 COLORBOND MONUMENT (MATT) INSULATION AS PER ESD INSULATION AS PER ESD PT2 GREY PEBBLE (MATT) REPORT INTERNAL REPORT PT3 RATTLESNAKE (MATT) PLASTERBOARD CEILINGPT4 PLASTERBOARD CEILING CALF SKIN (MATT) FIXED TO TIMBER BATTEN FIXED TO TIMBER BATTEN PT5 NATURAL WHITE (WALLS - LOW SHEEN; DOORS - SEMI-GLOSS, CEILINGS - FLAT) 20 RM1 KLIPLOK 700 HI STRENGTH IN COLORBOND CAVITY SYSTEM MONUMENT RN1 RENDER OVER FC ST1 CAESARSTONE EMPIRA WHITE ST2 CAESARSTONE STATUARIO MAXIMUS TB1 PALING FENCE TB2 STOCKHOLM EUROPEAN OAK PLANK (P3) TB3 SPOTTED GUM TIMBER DECKING TL3 TILE - WHITE MATT (VERTICAL) TL3a TILE - WHITE MATT (HORIZONTAL) TL4 TILE - PITCH SIGN MATT (R10) Date DETAIL - TYPICAL CONSTRUCTION DETAILS 2 TL5 TILE - MOON GREY MATT (R11) GENERAL LEGEND GENERAL LEGEND Drawing Name TL6 TILE - MOSAIC BUILT DAM MATT AC A/C CONDENSER AC A/C CONDENSER Scale VP1 VGROOVESOUTH PANEL - EASYVJ100, IN 2PAC1 10 ALVINA ST, OAKLEIGH AHD AUSTRALIAN HEIGHT DATUM AHD AUSTRALIAN HEIGHT D FINISH FLASHING FOLD TO Drawn by Name COLORBOND FLASHING FOLD Project TO COLORBOND FLASHING CH COLORBOND CEILING HEIGHT CH FOLD TO CEILING HEIGHT WRAP AROUND SKYLIGHT KERB AND WRAP AROUNDPROJECTS SKYLIGHT KERB AND KERB AND WB1CL WEATHERTEX SELFLOK ECOGROOVE IN AROUND SKYLIGHT Client SOUTHLINK PTY LTD WRAP Checked b CLOTHESLINE CL CLOTHESLINE WRAP UP TO PARAPET, FINISH TO WRAP PARAPET, FINISH TO WRAP UP TO PARAPET, FINISH TO PT1 UP TO COS CONFIRM ON SITE COS SITE Date 10 ALVINA ST, OAKLEIGH Address Issued MATCH RM1, AS PER METAL ROOF MATCH RM1, AS PER METAL ROOF SOUTH MATCH RM1, AS PER METAL ROOFCONFIRM ON WB2 WEATHERTEX SELFLOK ECOGROOVE IN AND SKYLIGHT MANUF'S MANUF'S AND SKYLIGHT MANUF'S DP AND SKYLIGHT DOWNPIPE DP DOWNPIPEStatus INSTALLATION GUODE GUODE INSTALLATION GUODE PT2 EXPANSION EJ INSTALLATION JOINT EJ EXPANSION JOINT EQUAL SELFLOK ECOGROOVE IN EQ EQUAL WB3EQ WEATHERTEX EX. PT3 EXISTING EX. EXISTING EXTERNAL EXTERNAL RM1 METAL ROOF AS PER FINISHES RM1 METAL ROOF AS PER FINISHES RM1 METAL ROOF AS PER FINISHES EXTERIOR EXT AS PER EXTERIOR WB4EXTSCHEDULE, WEATHERTEX SELFLOK IN MIN. 250 SCHEDULE, INSTALLED AS PER MIN. 250 INSTALLED AS PER ECOGROOVE SCHEDULE, INSTALLED FCLMANUF'S FINISHED CEILING LEVEL FCL FINISHED CEILING LEV MANUF'S INSTALLATION GUIDE INSTALLATION GUIDE MANUF'S INSTALLATION GUIDE PT4 FFL FINISHED FLOOR LEVEL FFL FINISHED FLOOR LEVE FALL FALL FALL FALL FALL COLORBOND RAIN WATER FD FLOOR DRAIN FD FLOOR DRAIN HEAD IN MT3 FINISH GM GAS METER GM GAS METER GRV 10MM GROOVE LINE GRV 10MM GROOVE LINE BOX GUTTER BEYOND FALL FALL FALL HWS HOT WATER SERVICE HWS HOT WATER SERVICE FALL FALL FALL LB1 LETTER BOX TYPE 1 LB1 LETTER BOX TYPE 1 LB2 LETTER BOX TYPE 2 LB2 LETTER BOX TYPE 2 NGL NATURAL GROUND LEVEL NGL NATURAL GROUND LEV O/A OVERALL O/A OVERALL O/F OVERFLOW O/F OVERFLOW PV PHOTO VOLTAIC (SOLAR) PANEL PV PHOTO VOLTAIC (SOLA Ø90mm COLORBOND DOWN (PC) PRIME COST (PC) PRIME COST PIPE IN MT3 FINISH PGL PROPOSED GROUND LEVEL PGL PROPOSED GROUND L (PS) PROVISIONAL SUM (PS) PROVISIONAL SUM RWH RAINWATER HEAD RWH RAINWATER HEAD SHW SOLAR BOOSTED HOT WATER SHW SOLAR BOOSTED HOT SPRD'R SPREADER SPRD'R SPREADER SSL STRUCTURAL SURFACE LEVEL SSL STRUCTURAL SURFAC TEJ TILE EXPANSION JOINT TEJ TILE EXPANSION JOINT TOW TOP OF WALL TOW TOP OF WALL WM WATER METER WM WATER METER REFLECTIVE FOIL LAMINATE

TYP. RAIN W WATER HEAD DETAIL 7 A51.01 DETAIL TYP. SKYLIGHT DETAIL TYP. SKYLIGHT 3 DETAIL 3 1 : 10 3 3TYP. SKYLIGHT 3 A51.02 A51.02 G G 1 : 10 1 : 10 1 : 10 W

ADP CONSULTING PTY LTD FLOREANCIG SMITH M

20

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

PLASTERBOARD PLASTERBOARDCEILING CEILING FIXED FIXED TOTO TIMBER TIMBER BATTEN BATTEN FOR INTERIOR, FOR INTERIOR, CONTINUE CONTINUE TO TO WRAP WRAP UP TO UP FORM TO FORM SKYLIGHT SKYLIGHT

WSP AUSTRALIA PTY LTD W

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO FALL MATCH RM1

MIN 100

FALL, CAP OVER PARAPET, FINISH TO MATCH RM1

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 FALL 10mm NOISE STOP PLY TO BASE & SIDES

20

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET, FINISH TO MATCH RM1

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

WSP AUSTRALIA PTY LTD W

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any CLADDING AS PER form or by any means LIGHTWEIGHT without the explicit written TYPE SCHEDULE AND TYP. authority of Architects WALL EAT. Unauthorized use of this COLORBOND® FLASHING FOLD TO form TOWNHOUSE document in any what so ever is prohibited. DRAWINGS

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

A51.02

2

FALL MIN. 1°

9mm THK VILLABOARD FINISH IN PT1

TYP. CEILING G EXTERNAL DETAIL 1 6 A51.01 TYP. SKYLIGHT DETAIL SKYLIGHT TYP. SKYLIGHT 2 DETAIL 2 10 2 12:TYP. 2 DETAIL A51.02 A51.02 G G 1 : 10 1 : 10 1 : 10 G

A51.02

FALL

WIRE MESH REFLECTIVE FOIL LAMINATE

10mm DRIP GROOVE

INTERNAL

EXTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

50

ARCHITECTS EAT

INTERNAL

INTERNAL

MIN. 100

Typ Roo - Ce ng Deta s

INTERNAL

WB2

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER CN2 CONCRETE - EXPOSED AGGREGATE MANUF'S INSTALLATION GUIDE

EXTEND CLADDING TO MATCH FINISH CEILING LEVEL

10

REFER TO TYP. TOWNHOUSE DRAWINGS

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

TYP. ROOF OO DETAIL 5 5 A51.01 TYP. SKYLIGHT 1 DETAIL 1 1 1 : 10TYP. SKYLIGHT DETAIL 1 1TYP. SKYLIGHT 1 DETAIL A51.02 A51.02 A51.02 G G 1 : 10 1 : 10 1 : 10 OO

115 SLOT FALL

SARKING TO WRAP IN

CAVITY CLOSER, FINISH TO MATCH RM1 VARIES

9mm VILLABOARD FINISH IN PT1

INTERNAL

MIN. 250

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

INSULATION AS PER ESD INSULATION AS PER ESD REPORT REPORT

SARKING TO WRAP IN

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

10mm DRIP GROOVE

EXTERNAL VARIES INTERNAL REFER TO TYP. TOWNHOUSE DRAWINGS

185

EXTERNAL 20mm TURNBACK ON FLASHING KERB

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

LIGHTWEIGHT CLADDING OVER DIRECT FIX AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

EXTEND CLADDING TO MATCH FINISH CEILING LEVEL

10

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

APRONAPRON FLASHING FLASHING ALL ROUND ALL ROUND TO TURN TO TURN DOWN BETWEEN DOWN BETWEEN RIBS, ASRIBS, PER METAL AS PER METAL ROOF MANUF'S ROOF MANUF'S INSTALLATION INSTALLATION GUIDE GUIDE FALL RM1 METAL ROOF ASRM1 PERMETAL ROOF AS PER FINISHES SCHEDULE, FINISHES SCHEDULE, INSTALLED AS PERINSTALLED MANUF'S AS PER MANUF'S INSTALLATION GUIDE INSTALLATION GUIDE LIGHTWEIGHT CLADDING OVER CAVITY BATTEN AS PER WALL TYPE WIRE MESH WIRE MESH SCHEDULE AND TYP. TOWNHOUSE DRAWINGS, INSTALLED AS PER REFLECTIVE FOIL LAMINATE REFLECTIVE FOIL LAMINATE MANUF'S INSTALLATION GUIDE

REFLECTIVE REFLECTIVE FOIL FOIL LAMINATE LAMINATE

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE FALL

WB1

TWOPAC - DIESKAU CONCRETE BLOCK CONCRETE BLOCK CONCRETE - SMOOTH

CB1a CN1

FALL

A51 02

Description

NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE

APRON FLASHING TO APRON FLASHING TO EXTEND MIN. 200 TO SUIT EXTEND MIN. 200 TO SUIT ROOFING PROFILE ROOFING PROFILE

APRON FLASHING APRON ALL ROUND FLASHING TO TURN ALL ROUND TO TURN DOWN BETWEEN DOWN RIBS, BETWEEN AS PER METAL RIBS, AS PER METAL ROOF MANUF'S ROOF INSTALLATION MANUF'S INSTALLATION GUIDE GUIDE FALL RM1 RM1 METAL METAL ROOF ROOF ASAS PER PER FINISHES FINISHES SCHEDULE, SCHEDULE, INSTALLED INSTALLED AS PER AS MANUF'S PER MANUF'S INSTALLATION INSTALLATION GUIDE GUIDE

SARKING TO WRAP IN

CAVITY CLOSER, FINISH TO MATCH RM1

NON COMBUSTIBLE VELUX FCM

MATCH WINDOW FRAME MATCH WINDOW FRAME FINISH, FINISH, INSTALLED AS PER INSTALLED AS PER MANUF'S INSTALLATIONMANUF'S INSTALLATION GUIDE GUIDE INSULATION AS PER ESD 20mm TURNBACK ON FLASHING KERB 20mm TURNBACK ON FLASHING KERB REPORT

20mm FLASHING KERB 20mm TURNBACK ONTURNBACK FLASHING ON KERB

INTERNAL MIN. 200 APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

20mm TURNBACK ON FLASHING KERB

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL WIRE MANUF'S MESH INSTALLATION GUIDE ROOF FALL FALL

SARKING TO WRAP IN

FALL, CAP OVER PARAPET, FINISH TO MATCH RM1

1 : 10

Rev.

NON COMBUSTIBLEALUM. VELUX FCM SKYLIGHT TO FRAME 31 Dover StSKYLIGHT ALUM. FRAME TO WINDOW SCHEDULE, GLAZING AS WINDOW SCHEDULE, GLAZING Cremorne VICESD 3121 PER REPORT.,AS INSTALLED AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE 03 9429 7798 PER MANUF'S INSTALLATION GUIDE VELUX TRAY TO info@floreancigsmith.com.au VELUX ACCESSORY TRAYACCESSORY TO

MATCH MATCHWINDOW WINDOWFRAME FRAME FINISH, INSTALLED AS AS PERPER FINISH, INSTALLED MANUF'S MANUF'S INSTALLATION INSTALLATION GUIDE GUIDE

20mm TURNBACK ON FLASHING KERB EXTERNAL

EXTERNAL

INSULATION AS PER 20mm TURNBACK ON ESD FLASHING KERB REPORT APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE REFLECTIVE FOIL LAMINATE

Building Surveyor

NON COMBUSTIBLE VELUX FCM

NON COMBUSTIBLE FCM ALUM. FRAME SKYLIGHTVELUX TO Level 1, 60 Albert Rd ALUM. FRAME SKYLIGHT WINDOW SCHEDULE, GLAZING AS TO WINDOW SCHEDULE,AS GLAZING AS South Melbourne, VIC 3205 PER ESD REPORT., INSTALLED PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE 03 9636 0280 PER MANUF'S INSTALLATION GUIDE VELUXVELUX ACCESSORY TRAY TRAY TO TO info@arkresources.com.au ACCESSORY

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

50

A51.02

ESD Consultant

NON COMBUSTIBLE VELUX FCM Level 15, 28 Freshwater Place ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS Southbank, VIC 3006 PER ESD REPORT., INSTALLED AS 03 9412 5100 PER MANUF'S INSTALLATION GUIDE

RN1 ST1 ST2 TB1 TB2 TB3 TL3 TL3a TL4 TL5 TL6 VP1

TWOPAC - D CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE OVER PEDES SUPERTUFT WOOL, TUFT UNDERLAY ( FIBRE CEME RN1 AND PA FIBRE CEME RN1 AND PA GLASS - CLE GLASS - FRO LAMINEX OY LAMINEX SE MELAMINE ALUMINIUM STEEL IN CO PLASTERBO COLORBOND COLORBOND GREY PEBBL RATTLESNA CALF SKIN (M NATURAL W DOORS - SE KLIPLOK 700 MONUMENT RENDER OV CAESARSTO CAESARSTO PALING FEN STOCKHOLM SPOTTED GU TILE - WHITE TILE - WHITE TILE - PITCH TILE - MOON TILE - MOSA VGROOVE P FINISH WEATHERTE PT1 WEATHERTE PT2 WEATHERTE PT3 WEATHERTE PT4

W - PARTIWALL DETAIL 5 W 8OO TYP. ROOF

OO

LIGHTWEIGHT CLADDING OVER DIRECT FIX AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia COLORBOND FOLD TO P: +61 3 8413 5300FLASHING E: office@eatas.com.au W: eatas.com.au

20 CAVITY SYSTEM

ADP CONSULTING PTY LTD FLOREANCIG M SMITH M

Building Services Engineer

Level 15, 28 Freshwater Place

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

REFLECTIVE FOIL LAMINATE

INTERNAL

INTERNAL

INTERNAL

PLASTERBOARD EXTERNAL / CARPORT CEILING FIXED TO TIMBER BATTEN 13mm THK GYPROCK FYRCHEK MR PLASTERBOARD CEILING FIXED TO TIMBER BATTEN, PAINTED IN PT1 FINISH

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

form or by any means without the explicit written

INSULATION AS PER ESD REPORT

INTERNAL

50

MIN. 100

MIN. 100

MIN. 100 MIN 100

50

50

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INTERNAL

INTERNAL

TOWNHOUSE DRAWINGS, INSTALLEDuse of this authority of Architects EAT. Unauthorized VELUX TRAY TO VELUX ACCESSORY TRAY TO AS PERACCESSORY MANUF'S INSTALLATION document in any form what so ever is prohibited. MATCH MATCH WINDOW FRAME GUIDE WINDOW FRAME FINISH, INSTALLED AS PER FINISH, INSTALLED AS PER MANUF'S INSTALLATION MANUF'S INSTALLATION EXTERNAL GUIDE GUIDE

20mm TURNBACK ON FLASHING KERB

FALL

HIGH POINT

FALLFALL MIN. 1°

INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT

HIGH POINT

FALL MIN. 1°

REFLECTIVE FOIL LAMINATE WIRE MESH

1 : 10 W - PARTIWALL DETAIL 4 W 7OO TYP. ROOF G A51.02 OO 1 : 10

NON COMBUSTIBLE VELUX FCM NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO ALUM. FRAME SKYLIGHT TO 3006 Southbank, VIC All rights reserved. This document remains the WINDOW GLAZING AS to be used for WINDOW SCHEDULE, GLAZING AS property SCHEDULE, of Architects EAT and is only 5100 PER ESD REPORT., INSTALLED AS ESD9412 REPORT., INSTALLED AS its commissioned purpose. No of this document PER03 LIGHTWEIGHT CLADDING ASpart PER may be reproduced, modified orGUIDE transmitted in any PER MANUF'S INSTALLATION GUIDE PER MANUF'S INSTALLATION WALL TYPE SCHEDULE AND TYP.

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION EXTERNAL GUIDE

EXTERNAL

FFL

FALL MIN. 1°

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND LIGHTWEIGHT CLADDING, FINISH TO MATCH RM1

ARCHITECTS EAT

CAVITY CLOSER TO CAVITY BATTEN, FINISH TO MATCH COLORBOND FLASHING

FALL

A51.01

1 : 10

FALL

COLOBOND FLASHING EXTENDED BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

TYP. ROOF OO - CEILING G DETAIL 4

4

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

W - PARTIWALL DETAIL 3 W 6OO TYP. ROOF

G

SARKING AS PER WALL SCHEDULE AND CLADDING MANUF'S INSTALLATION GUIDE

INTERNAL

INSULATION AS PER ESD INTERNAL REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

RM1

REFER TO GENERAL NOTES ON SHEET A01.00

FALL

FALL

FALL

35

OO

20 CAVITY SYSTEM

INSULATION AS PER ESD REPORT

FC2 GL1 GL2 LM1 LM2 ML1 MT1 MT3 PB1 PC1 PT1 PT2 PT3 PT4 PT5

FINISHES LEGEND

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S 2PAC1 INSTALLATION GUIDE, FINISH TO MATCH RM1 CB1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINI

SLOT

TYP. ROOF OO - CEILING G DETAIL 3

INTERNAL

FC1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER INSULATION AS PER ESD FALL MANUF'S MIN. 1° INSTALLATION GUIDE REPORT

INTERNAL/ EXTERNAL / CARPORT

INSULATION AS PER ESD REPORT

INTERNAL 13mm THK MR PLASTERBOARD CEILING FIXED TO TIMBER BATTEN, PAINTED IN PT1 FINISH

INTERNAL

CP1

GENERAL NOTES

FALL

300

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

RM1 METAL ROOF AS PER FINISHES FALL SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

FALL MIN. 1°

MIN.110

INSULATION AS PER ESD INTERNAL REPORT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

OO

HIGH POINT WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT

1 : 10

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

2PAC1 CB1 CB1a CN1 CN2 CN3

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

REFLECTIVE FOIL LAMINATE

FALL

UPSTAND

EXTERNAL

HIGH POINT

FALL

MIN.110

INTERNAL

ROOF STRUCTURE AS PER HIGH POINT STRUCTURE ENG'S DRAWINGS

HIGH POINT

INSULATION AS PER ESD REPORT

FALL

FALL

UPSTAND

HIGH POINT WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

INSULATION AS PER ESD REPORT

FALL

FALL FALL

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

MIN 100

WIRE MESH

REFLECTIVE FOIL LAMINATE

INSULATION AS PER ESDRM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER REPORT MANUF'S INSTALLATION GUIDE WIRE MESH REFLECTIVE FOIL LAMINATE

MIN. 100

WIRE MESH

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

RM1 METAL ROOF AS PER FINISHES SCHEDULE, COLORBOND FORMED BOX GUTTER, INSTALLED AS PER MANUF'S FINISH TO MATCH RM1, INSTALLATION GUIDE BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 REFLECTIVE FOIL LAMINATE 10mm NOISE STOP PLY TO BASE & SIDESFALL

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER FALL MANUF'S INSTALLATION GUIDE

MIN. 100 MIN 100

INSULATION AS PER ESD REPORT

MIN 100

INSULATION AS PER ESD REPORT

FALL

INSULATION AS PER ESD REPORT FALL

FALL

FILL VOID WITH BRADFORD PARTY WALL SEALER

FINISHES LEGE

NOM. SETDOWN

FALL FALL

MIN.110

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

FALL REFLECTIVE FOIL LAMINATE

FILL VOID WITH BRADFORD PARTY WALL SEALER

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

FALL FALL MIN. 1°

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

REFER TO GENERAL N

SPOT LEVEL

FALL

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1FALL

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPE AND TURN DOWN, FINISH TO MATCH RM1

NOM. SET

GENERAL NOT

CHANGE IN LEVEL

1 : 10

UPSTAND

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDESFALL

REFLECTIVE FOIL LAMINATE

FALL

MIN 100

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

FALL

FENCE TY

A/C CONDENSER AUSTRALIAN HEIGHT DATUM CEILING HEIGHT GENERAL NOTES CLOTHESLINE CONFIRM ONGENERAL SITE REFER TO NOTES ON SHEET A01.00 DOWNPIPE EXPANSION JOINT EQUAL EXISTING EXTERIOR FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FLOOR DRAIN GAS METER 10MM GROOVE LINE HOT WATER SERVICE LETTER BOX TYPE 1 LETTER BOX TYPE 2 NATURAL GROUND LEVEL OVERALL OVERFLOW PHOTO VOLTAIC (SOLAR) PANEL PRIME COST PROPOSED GROUND LEVEL PROVISIONAL SUM RAINWATER HEAD SOLAR BOOSTED HOT WATER SPREADER STRUCTURAL SURFACE LEVEL TILE EXPANSION JOINT TOP OF WALL WATER METER

W - PARTIWALL DETAIL 2 W 5OO TYP. ROOF

OO

COLORBOND APRON FLASHING, FINISH TO MATCH RM1, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

FILL VOID WITH BRADFORD PARTY WALL SEALER

3

FALL

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1FALL

FILL VOID WITH BRADFORD PARTY WALL SEALER

A51.01

COLOBOND FLASHING EXTENDED BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE CAVITY CLOSER TO CAVITY BATTEN, FALL FINISH TO MATCH COLORBOND FLASHING

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND TURN DOWN, FINISH TO MATCH RM1

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

WALL TYP

FENCE TYPE

FT #

SPOT LEV

AC AHD CH CL COS DP EJ EQ EX. EXT FCL FFL FD GM GRV HWS LB1 LB2 NGL O/A O/F PV (PC) PGL (PS) RWH SHW SPRD'R SSL TEJ TOW WM

EXTERNAL

G

20

SYSTEM CAVITY

1 : 10

MIN 70

FFL

WX #

CHANGE I

OVERFLOW DEVICE AS PER HYDRAULIC ENG'S DRAWINGS

COLORBOND FLASHING FOLD TO CAP OVER, FINISH TO MATCH RM1

WALL TYPE

SPOT LEVEL

INTERNAL

INTERNAL

INTERNAL

OO

SYSTEM CAVITY LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

W - PARTIWALL DETAIL 1 W 4OO TYP. ROOF

COLORBOND FLASHING FOLD TOINTERNAL FALL, CAP OVER PARAPET AND TURN DOWN, FINISH TO MATCH RM1

JOINERY

WX #

1 : 10

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

20

20

A51.02

2

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

SYSTEM CAVITY

OO

FINISH TY

J0#

CHANGE IN LEVEL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

INTERNAL

INTERNAL

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

G

WINDOW

TL#

JOINERY TYPE

WINDOW TYPE

TYP. G SKYLIGHT DETAIL 3

FFL

FFL

WIRE MESH

INSULATION AS PER ESD REPORT

INTERNAL

1 : 10 PLASTERBOARD CEILING

DOOR TYP

FINISH TYPE

DOOR TYPE

FT #

FILL VOID WITH BRADFORD PARTY WALL SEALER

INSULATION AS PER ESD REPORT

WIRE MESH

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN

1

CAVITY SYSTEM

CLADDING AS PER COLORBONDLIGHTWEIGHT FLASHING FOLD TO WALLPARAPET TYPE SCHEDULE AND TYP. FALL, CAP OVER AND TOWNHOUSE DRAWINGS EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO MATCH RM1

20

FILL VOID WITH BRADFORD PARTY WALL SEALER HIGH POINT

FALL MIN. 1°

REFLECTIVE FOIL LAMINATE

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS FFL

INSULATION AS PER ESD REPORT

FFL

HIGH POINT

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, FINISH TO FALL MATCH RM1

FALL

WIRE MESHRM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE FALL MIN. 1°

RM1 METAL ROOF AS PER FINISHES FILL VOID WITH BRADFORD SCHEDULE, INSTALLED AS PER PARTY WALL SEALER MANUF'S INSTALLATION GUIDE

ROOF STRUCTURE AS PER STRUCTURE ENG'S DRAWINGS

HIGH POINT WIRE MESH

TYP. ROOF OO - CEILING G DETAIL 1

A51.01

D102

W100

TL# J0#

D102

W100

C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

INSULATION AS PER ESD REPORT

FALL RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

REFLECTIVE FOIL LAMINATE

WIRE MESH

EXTERNAL

CAVITY SYSTEM

A/C COND AUSTRAL CEILING H CLOTHES CONFIRM DOWNPIP EXPANSIO EQUAL EXISTING EXTERIOR FINISHED FINISHED FLOOR DR GAS METE 10MM GRO HOT WAT LETTER B LETTER B NATURAL OVERALL OVERFLO PHOTO VO PRIME CO PROPOSE PROVISIO RAINWAT SOLAR BO SPREADE STRUCTU TILE EXPA TOP OF W WATER M

Building Surveyor

31 Dover St Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

Rev.

A51.02 A51 02

TWOPAC - DIESKAU CONCRETE BLOCK CONCRETE BLOCK CONCRETE - SMOOTH CONCRETE - EXPOSED AG CONCRETE PAVERS - ANS OVER PEDESTAL PAVING SUPERTUFT ESCAPE TWIS WOOL, TUFTED, ON AIRST UNDERLAY (9.5MM RUBBE FIBRE CEMENT SHEET, RE RN1 AND PAINTED IN PT1 FIBRE CEMENT SHEET, RE RN1 AND PAINTED IN PT2 GLASS - CLEAR GLASS - FROSTED LAMINEX OYSTER GREY N LAMINEX SEASONED OAK MELAMINE - WHITE ALUMINIUM IN PC1 STEEL IN COLORBOND MO PLASTERBOARD COLORBOND MONUMENT COLORBOND MONUMENT GREY PEBBLE (MATT) RATTLESNAKE (MATT) CALF SKIN (MATT) NATURAL WHITE (WALLS DOORS - SEMI-GLOSS, CE KLIPLOK 700 HI STRENGTH MONUMENT RENDER OVER FC CAESARSTONE EMPIRA W CAESARSTONE STATUARI PALING FENCE STOCKHOLM EUROPEAN O SPOTTED GUM TIMBER DE TILE - WHITE MATT (VERT TILE - WHITE MATT (HORI TILE - PITCH SIGN MATT (R TILE - MOON GREY MATT ( TILE - MOSAIC BUILT DAM VGROOVE PANEL - EASYV FINISH WEATHERTEX SELFLOK E PT1 WEATHERTEX SELFLOK E PT2 WEATHERTEX SELFLOK E PT3 WEATHERTEX SELFLOK E PT4

C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

INSULATION AS PER ESD REPORT

LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

COLORBOND FLASHING FOLD TO RM1 METAL ROOF AS PER FALL, CAP OVER PARAPET AND FINISHES SCHEDULE, EXTEND TO TURNMANUF'S UP BEHIND INSTALLED AS PER CLADDING AS PER MANUF'S INSTALLATION GUIDE INSTALLATION GUIDE, FINISH TO MATCH RM1

WIRE MESH FILL VOID WITH BRADFORD PARTY WALL SEALER

MIN 100

REFLECTIVE FOIL LAMINATE

LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. TOWNHOUSE DRAWINGS

COLORBOND FOLD TO REFLECTIVEFLASHING FOIL LAMINATE FALL, CAP OVER PARAPET AND EXTEND TO TURN UP BEHIND CLADDING AS PER MANUF'S INSTALLATION GUIDE, INSULATION AS PER FINISH ESD TO FALL RM1 MATCH REPORT

20

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

REFLECTIVE FOIL LAMINATE

MIN 100

RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

INSULATION AS PER ESD REPORT

20

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. COLORBOND FLASHING FOLD TO TOWNHOUSE DRAWINGS FALL, CAP OVER PARAPET, FINISH TO MATCH RM1 50

MIN. 100

50

COLORBOND FORMED BOX GUTTER, FINISH TO MATCH RM1, BOX GUTTER SIZED AS PER FALL MIN. 1° REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & FALL SIDES

20

A51.02

20

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET, FINISH TO MATCH RM1

FALL

3

1 : 10

MIN. 100

COLORBOND APRON FLASHING, FINISH TO MATCH RM1, INSTALLED AS PER MANUF'S INSTALLATION GUIDE LIGHTWEIGHT CLADDING AS PER WALL TYPE SCHEDULE AND TYP. RM1 METAL DRAWINGS ROOF AS PER TOWNHOUSE FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

20

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET, FINISH TO MATCH RM1

G

20

AC AHD CH CL COS DP EJ EQ EX. EXT FCL FFL FD GM GRV HWS LB1 LB2 NGL O/A O/F PV (PC) PGL (PS) RWH SHW SPRD'R SSL TEJ TOW WM

GENERAL LEGEND NOM. SETDOWN

COLORBOND FLASHING FOLD TO FALL, CAP OVER PARAPET, FINISH TO MATCH RM1

COLORBOND FORMED BOX GUTTER, LIGHTWEIGHT CLADDING AS PER FINISHAND TO MATCH WALL TYPE SCHEDULE TYP. RM1, GUTTER SIZED AS PER TOWNHOUSEBOX DRAWINGS REGULATORY REQUIREMENTS. MIN FALL 1:100 10mm NOISE STOP PLY TO BASE & SIDES

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

TYP. G SKYLIGHT DETAIL 2

2

MIN 100 50

A51.02

G

20

Typ. Skylight Details

TYP. G SKYLIGHT DETAIL 1

50

1

PLASTERBOARD CEILING PLASTERBOARD CEILING FIXED TO TIMBER FIXED TO TIMBER BATTENBATTEN FOR CONTINUE INTERIOR, TO CONTINUE TO FOR INTERIOR, WRAP TO FORM SKYLIGHT WRAP UP TO FORMUP SKYLIGHT

PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

MIN. 100

G

ADJACENT TOWNHOUSE

ADJACENT TOWNHOUSE

INTERNAL

INTERNAL PLASTERBOARD CEILING FIXED TO TIMBER BATTEN FOR INTERIOR, CONTINUE TO WRAP UP TO FORM SKYLIGHT

FALL

FALL FALL

INTERNAL

INTERNAL

INTERNAL

FALL

FALL

FALL

FALL

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

RM1 ROOF METALAS ROOF RM1 METAL PER AS PER FINISHES SCHEDULE, FINISHES SCHEDULE, AS PER MANUF'S INSTALLEDINSTALLED AS PER MANUF'S INSTALLATION GUIDE INSTALLATION GUIDE

AC A/C CONDENSER AHD AUSTRALIAN HEIGHT DATUM COLORBOND FLASHING FOLD TO CH CEILING HEIGHT WRAP AROUND SKYLIGHT KERB AND CL WRAPCLOTHESLINE UP TO PARAPET, FINISH TO COS MATCH CONFIRM ONMETAL SITEROOF RM1, AS PER AND SKYLIGHT MANUF'S DP DOWNPIPE INSTALLATION GUODE EJ EXPANSION JOINT EQ EQUAL EX. EXISTING RM1 METAL ROOF AS PER FINISHES EXT EXTERIOR SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDELEVEL FCL FINISHED CEILING FFL FINISHED FLOOR LEVEL FD FLOOR DRAIN GM GAS METER GRV 10MM GROOVE LINE HWS HOT WATER SERVICE LB1 LETTER BOX TYPE 1 LB2 LETTER BOX TYPE 2 NGL NATURAL GROUND LEVEL O/A OVERALL O/F OVERFLOW PV PHOTO VOLTAIC (SOLAR) PANEL (PC) PRIME COST PGL PROPOSED GROUND LEVEL (PS) PROVISIONAL SUM RWH RAINWATER HEAD SHW SOLAR BOOSTED HOT WATER SPRD'R SPREADER SSL STRUCTURAL SURFACE LEVEL TEJ TILE EXPANSION JOINT TOW TOP OF WALL WM WATER METER

RM1 METAL ROOF AS PER FINISHES MIN. 250SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

MIN. 250

APRON FLASHING TO EXTEND MIN. 200 TO SUIT ROOFING PROFILE

APRON FLASHING TO TO APRON FLASHING EXTENDEXTEND MIN. 200MIN. TO 200 SUITTO SUIT ROOFING ROOFING PROFILE PROFILE

APRON FLASHING ALL ROUND TO TURN DOWN BETWEEN RIBS, AS PER METAL ROOF MANUF'S INSTALLATION GUIDE FALL RM1 METAL ROOF AS PER FINISHES SCHEDULE, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

MIN.110

FALL FALL

FINISH, INSTALLED AS PER AS PER FINISH, INSTALLED MANUF'S INSTALLATION MANUF'S INSTALLATION

20mm TURNBACK 20mm TURNBACK ON FLASHING KERBON FLASHING KERB

20mm TURNBACK ON FLASHING KERB

MIN. 200

UPSTAND

EXTERNAL

GENERAL LEG

GENERAL LEGEND COLORBOND FLASHING FOLD TO WRAP AROUND SKYLIGHT KERB AND WRAP UP TO PARAPET, FINISH TO MATCH RM1, AS PER METAL ROOF AND SKYLIGHT MANUF'S INSTALLATION GUODE

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

VELUX ACCESSORY TRAY TO TRAY TO VELUX ACCESSORY MATCHMATCH WINDOW FRAMEFRAME WINDOW

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

MIN.110

FALL FALL

FALL

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

VELUX ACCESSORY TRAY TO MATCH WINDOW FRAME FINISH, INSTALLED AS PER MANUF'S INSTALLATION GUIDE

UPSTAND

EXTERNAL

EXTERNAL

NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE

NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE

NON COMBUSTIBLE VELUX FCM NON SKYLIGHT COMBUSTIBLE ALUM. FRAME TO VELUX FCM ALUM.GLAZING FRAME SKYLIGHT TO WINDOW SCHEDULE, AS WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER ESD REPORT., PER MANUF'S INSTALLATION GUIDE INSTALLED AS PER MANUF'S INSTALLATION GUIDE

NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE

NON COMBUSTIBLE VELUX FCM ALUM. FRAME SKYLIGHT TO WINDOW SCHEDULE, GLAZING AS PER ESD REPORT., INSTALLED AS PER MANUF'S INSTALLATION GUIDE

A51.02 A51 02

Description Date Date DETAIL - TYPICAL CONSTRUCTION DETAIL DETAILS - TYPICAL 2 CONSTRUCTION DETAIL - TYPICAL DETAILS CONSTRUCTION 2 DETAILS 2 Drawing Name

Drawing Name

Drawing Name

Scale As indicated @ A1 Scale 10 ALVINA ST, OAKLEIGH SOUTH 10 ALVINA ST, OAKLEIGH 10 ALVINA SOUTH ST, OAKLEIGH SOUTH Project Name

Client Address

Project Name

SOUTHLINK PROJECTS Client PTY LTD 10 ALVINA ST, OAKLEIGH SOUTH Address

Drawn by VO Drawn by Project Name SOUTHLINK ClientPROJECTS PTYby LTD SOUTHLINK PROJECTS PTY LTD Checked by Checked 10 ALVINA ST, OAKLEIGH SOUTH 10 ALVINA ST, 16/10/2020 OAKLEIGH SOUTH Issued Date Address Issued Date Status TENDER Status


GENERAL LEGEND

INSULATION AS PER ESD REPORT SARKING AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

INTERNAL LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

INTERNAL

INSULATION AS PER ESD REPORT

INSULATION AS PER LIGHTWEIGHT WALL AS PER ESD REPORT WALL TYPES SCHEDULE

INTERNAL

SARKING AS PER WALL TYPES SCHEDULE

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

INTERNAL

COLORBOND 'T' FLASHING FINISH TO MATCH CLADDING MATERIAL COLOR, CAULK AND SEAL ACCORDINGLY

EXTERNAL MIN. 40

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

INTERNAL INTERNAL INTERNAL

SARKING PER WALL INSULATION ASAS PER TYPES SCHEDULE ESD REPORT

CEMENT SARKING AS PERSHEET WALL CLADDING AS WALL TYPES SCHEDULE, TYPES PER SCHEDULE DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION CEMENT SHEET CLADDING AS GUIDE PER WALL TYPES SCHEDULE, SHEET TO STOP DAMP CEMENT PROOF MEMBRANE AS 10mm BEFORE BLOCKWORK PER MANUF'S INSTALLATION GUIDEWALL, CAULK AND SEAL ACCORDINGLY COLORBOND 'T' FLASHING WALL AS PER FINISHBLOCKVENEER TO MATCH CLADDING WALL TYPESCAULK SCHEDULE MATERIAL COLOR, AND SEAL ACCORDINGLY

INTERNAL

EXTERNAL

GAP

MIN. 40 GAP

INTERNAL

INTERNAL

SARKING AS PER WALL TYPES SCHEDULE INSULATION AS PER LIGHTWEIGHT WALL AS PER ESD REPORT WALL TYPES SCHEDULE CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, EXTERNALINSULATION AS PER DAMP PROOF MEMBRANE AS ESD REPORT PER MANUF'S INSTALLATION GUIDE SARKING AS PER WALL COLORBOND INTERNAL 'T' FLASHING BLOCKVENEER WALL AS PER TYPES SCHEDULE FINISH TO MATCH CLADDING WALL TYPES SCHEDULE EXTERNAL MATERIAL COLOR, CAULK ANDAS SEAL ACCORDINGLY CEMENT SHEET CLADDING PER WALL TYPES SCHEDULE, BLOCKVENEER WALL AS PER DAMP PROOF MEMBRANE AS TYPES SCHEDULE WALL PER MANUF'S INSTALLATION GUIDE

INTERNAL

INTERNAL

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE EXTERNAL AS PER MANUF'S INSTALLATION EXTERNAL GUIDE

EXTERNAL

COLORBOND 'T' FLASHING BLOCKVENEER WALL AS PER FINISH TO MATCH CLADDING WALL TYPES SCHEDULE MATERIAL COLOR, CAULK AND SEAL ACCORDINGLY

MIN. 40 GAP

SARKING AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT CLADDING SARKING PER WALL OVERAS CAVITY BATTEN AS TYPES SCHEDULE PER WALL TYPES LIGHTWEIGHT WALL SCHEDULE AS PER WALL TYPES SCHEDULE

INSULATION AS PER ESD REPORT

INTERNAL

SARKING AS PER WALL TYPES SCHEDULE

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

INSULATION AS PER ESD REPORT

VAPOUR BARRIER AS PER LIGHTWEIGHT CLADDING INSULATION AS PER MANUF'S INSTALLATION GUIDE INTERNAL EXTERNAL ESD REPORT OVER CAVITY BATTEN AS PER WALL TYPES COLORBOND 'T' FLASHING SCHEDULE FINISH TO MATCH CLADDING SARKING AS PER VAPOUR WALL BARRIER AS PER MATERIAL COLOR, CAULK AND BLOCKVENEER WALL AS PER TYPES SCHEDULEMANUF'S GUIDE SEALINSTALLATION ACCCORDINGLGY EXTERNAL WALL TYPES SCHEDULE

INTERNAL

INTERNAL

COLORBOND 'T' FLASHING CEMENT SHEET CLADDING ASBLOCKWORK DOUBLE WALL AS PER TO MATCH CLADDING PER WALL TYPESFINISH SCHEDULE, WALL TYPES MATERIAL COLOR,SCHEDULE CAULK AND EXTERNAL DAMP PROOF MEMBRANE AS SEAL ACCCORDINGLGY PER MANUF'S INSTALLATION

INTERNAL INTERNAL CEMENT SHEET TO STOP 10mm BEFORE BLOCKWORK WALL, CAULK AND SEAL ACCORDINGLY

INTERNAL

GUIDE

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

CEMENT SHEET TO STOP 10mm BEFORE BLOCKWORK CEMENT SHEET TO STOP WALL, CAULK AND SEAL 10mm BEFORE BLOCKWORK ACCORDINGLY WALL, CAULK AND SEAL ACCORDINGLY BLOCKVENEER WALL AS PER CEMENT SHEET CLADDING AS WALL TYPES SCHEDULE PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER BLOCKWORK MANUF'S INSTALLATION DOUBLE WALL AS PER GUIDE WALL TYPES SCHEDULE

EXTERNAL

BLOCKVENEER WALL AS PER BLOCKWORK WALL AS PER DOUBLE WALL TYPES SCHEDULE WALL TYPES SCHEDULE

CEMENT SHEET TO STOP 10mm BEFORE BLOCKWORK WALL, CAULK AND SEAL ACCORDINGLY

EXTERNAL

SARKINGAS ASPER PER WALL INSULATION SCHEDULE ESD TYPES REPORT

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT CLADDING INTERNAL LIGHTWEIGHT WALL ASOVER PER CAVITY BATTEN AS PER WALL TYPES WALL TYPES SCHEDULE SCHEDULE INSULATION AS PER VAPOUR BARRIER AS PER ESD REPORT MANUF'S INSTALLATION GUIDE SARKING AS PER WALL TYPES SCHEDULE COLORBOND 'T' FLASHING SARKING AS PER WALL FINISH TO MATCH CLADDING TYPES SCHEDULE INSULATION AS PER MATERIAL COLOR, CAULK AND EXTERNAL INTERNAL ESDACCCORDINGLGY REPORT SEAL

INSULATION AS PER ESD REPORT

SARKING AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

INSULATION AS PER ESD REPORT

INSULATION AS PER A/C CONDENSER ESD REPORT AUSTRALIAN HEIGHT DATUM CEILING HEIGHT SARKING AS PER WALL CLOTHESLINE TYPES SCHEDULE CONFIRM ON SITE DOWNPIPE LIGHTWEIGHT CLADDING EXPANSION JOINT INSULATION AS PER OVER CAVITY BATTEN AS ESD REPORT PER WALL TYPES EQUAL SCHEDULE EXISTING SARKING AS PER WALL VAPOUR BARRIER AS PER EXTERIOR TYPES SCHEDULE MANUF'S INSTALLATION GUIDE SARKING AS PERCEILING WALL FINISHED LEVEL TYPES SCHEDULE LIGHTWEIGHT CLADDING COLORBOND 'T' FLASHING FINISHED FLOOR LEVEL OVER CAVITY BATTEN AS FINISH TO MATCH CLADDING FLOOR AS DRAIN INSULATION PER MATERIAL COLOR, CAULK AND PER WALL TYPES EXTERNAL ESDGAS REPORT METER SEAL ACCCORDINGLGY SCHEDULE 10MM GROOVE LINE VAPOUR BARRIER AS PER HOT WATER SERVICEMANUF'S INSTALLATION GUIDE EXTERNAL INTERNAL LETTER BOX TYPE 1 COLORBOND 'T' FLASHING LETTER BOX TYPE 2 FINISH TO MATCH CLADDING NATURALWALL GROUND MATERIAL COLOR, CAULK AND BLOCKVENEER AS PER LEVEL SEAL ACCCORDINGLGY OVERALL WALL TYPESEXTERNAL SCHEDULE OVERFLOW DOUBLE BLOCKWORK WALL AS PER PHOTO VOLTAIC (SOLAR) WALLPANEL TYPES SCHEDULE DOUBLE BLOCKWORK WALL AS PER PRIME COST WALL TYPES SCHEDULE PROPOSED GROUND LEVEL BLOCKVENEER WALL AS PER PROVISIONAL SUM WALL TYPES SCHEDULE RAINWATER HEAD CEMENT SHEET TO STOP SOLAR BOOSTED HOT10mm WATER BEFORE BLOCKWORK WALL, CAULK AND SEAL SPREADER ACCORDINGLY STRUCTURAL SURFACE LEVEL CEMENT SHEET CLADDING AS TILE EXPANSION JOINT PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS TOP OF WALL PER MANUF'S INSTALLATION WATER METER GUIDE

AC AHD CH CL COS DP EJ EQ EX. EXT FCL FFL FD INTERNAL GM GRV HWS LB1 LB2 NGL O/A O/F PV (PC) PGL (PS) RWH SHW SPRD'R SSL TEJ 1 : 10 TOW WM

TYP. WALL - PLAN YP WA DETAIL P 2AN DE A TYP. WALL - PLAN YP WA DETAIL P 1AN DE A 3 TYP. WALL - PLAN YP WA DETAIL P 3AN DE A TYP. WALL - PLAN YP WA DETAIL P 4AN DE A 1 2 4 5 A51.03 A5 10 1 : 10 1 : 10 YP WAYP WA P AN DE P AN A DE A YP WAYP WA P AN DE P AN AA51.03 DE 1A:YP YP WA WAYP WA P TYP. ANDE DE P AAN A DE A A51.03 YP PWA YPDE WA P AAN PAN AN ADEDE A YP WA3YP WA P AN DE P AN AA51.03 DE A WA AN DE WALL - PLAN DETAIL YP AN TYP. WALL AWALL - PLAN YP DETAIL WA AN WA DE P AN TYP. DEWALL A - PLAN YP DETAIL WA 3 P YP AN WA DE A 4 P AN TYP. DEWALL A - PLAN 2 PDE ATAIL P 2 AN DE A TYP. WALL - PLAN YP DETAIL WA P 1 AN DE A 3 TYP. WALL - PLAN YP DETAIL WA P 3P YP AN DE AA 1 P4 AN TYP. WALL - PLAN YP DETAIL WAYP2WA P 4 AN DE A WA TYP. - PLAN YP DETAIL WA 1P P 5YP AN DEA A 2 5 LIGHTWEIGHT WALL AS PER A51.03 WALL TYPES SCHEDULE

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

INSULATION AS PER ESD REPORT

INSULATION AS PER LIGHTWEIGHT WALL AS PER ESD REPORT WALL TYPES SCHEDULE

SARKING AS PER WALL TYPES SCHEDULE

SARKING AS PER WALL TYPES SCHEDULE INSULATION AS PER ESD REPORT

INSULATION AS PER INTERNAL LIGHTWEIGHT WALL AS PER ESD REPORT WALL TYPES SCHEDULE SARKING AS PER WALL TYPESINSULATION SCHEDULE AS PER ESD REPORT

SARKING AS PER WALL AS CEMENT SHEET CLADDING TYPES SCHEDULE PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, LIGHTWEIGHT WALL AS PER DAMP PROOF MEMBRANE AS WALL TYPES SCHEDULE PER MANUF'S INSTALLATION GUIDE AS PER INSULATION ESD REPORT CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF COLORBOND 'T' FLASHING FINISH MEMBRANE AS PER MANUF'S TO MATCH WEATHERTEX SARKING AS PER WALL RETURN INSTALLATION GUIDE, CLADDING MATERIAL COLOR, TYPES SCHEDULE CEMENT SHEET TO CREATE CAULK AND SEAL ACCORDINGLY SEPARATION FROM ADJACENT CEMENT SHEET CLADDING WEATHERTEX CEMENT SHEET CLADDING ASWITH DIFFERENT FINISH COLOR OVER BATTEN AS AS PER WALLCAVITY TYPES SCHEDULE, PER WALL MEMBRANE TYPES SCHEDULE DAMP PROOF AS PER MANUF'S INSTALLATION GUIDE

COLORBOND 'T' FLASHING FINISH TO MATCH WEATHERTEX CLADDING MATERIAL COLOR, CAULK AND SEAL ACCORDINGLY

16

INTERNAL

INTERNAL EXTERNAL

WEATHERTEX CLADDING OVER CAVITY BATTEN AS AS PER WALL TYPES SCHEDULE

EXTERNAL

INTERNAL

INTERNAL EXTERNAL

16

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

INTERNAL

16

INTERNAL

EXTERNAL

INSULATION AS PER ESD REPORT

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

INSULATION AS PER ESD REPORT SARKING AS PER WALL TYPES SCHEDULE

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

CEMENT SHEETAS CLADDING AS SARKING PER WALL PER WALL TYPES SCHEDULE, TYPES SCHEDULE DAMP PROOF MEMBRANE AS COLORBOND 'T' FLASHING FINISH PER MANUF'S INSTALLATION GUIDECEMENT SHEET CLADDING AS TO MATCH WEATHERTEX CLADDING MATERIAL COLOR, EXTERNAL PER WALL TYPES SCHEDULE, CAULK AND SEAL ACCORDINGLY LIGHTWEIGHT WALL AS DAMP PROOF MEMBRANE ASPER WALL TYPES SCHEDULE PER MANUF'S INSTALLATION WEATHERTEX CLADDING WEATHERTEX GUIDE CLADDING OVER CAVITY BATTEN AS AS INSULATION ASAS PER OVER CAVITY BATTEN AS PER WALL TYPES SCHEDULE REPORT PER WALLESD TYPES SCHEDULE COLORBOND 'T' FLASHING FINISH TO MATCH WEATHERTEX SARKING AS PER WALL CLADDING MATERIAL COLOR, TYPESSHEET SCHEDULE CLADDING AS PER CAULKCEMENT AND SEAL ACCORDINGLY WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S CEMENT SHEET CLADDING AS PER WALL CEMENT SHEET CLADDING AS GUIDE, RETURN TYPESINSTALLATION SCHEDULE, DAMP PROOF PER WALL TYPES SCHEDULE, CEMENT TOMEMBRANE CREATE MEMBRANE ASSHEET PER MANUF'S INSTALLATION DAMP PROOF AS FROMINSTALLATION ADJACENT GUIDE,SEPARATION RETURN CEMENT SHEET PER MANUF'S CEMENT SHEET CLADDING WITH GUIDE DIFFERENT FINISH COLOR CEMENT SHEET TO STOP 10mm BEFORE BLOCKWORK WALL, CAULK AND SEAL A51.03 1 : 10 ACCORDINGLY

CEMENT SHEET CLADDING AS AS PER WALL SARKING PER WALL TYPES SCHEDULE, TYPES SCHEDULE DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, EXTERNAL SARKING AS PER WALL DAMP PROOF MEMBRANE AS COLORBOND 'T' FLASHING FINISH TYPES SCHEDULE PER MANUF'S INSTALLATION TO MATCH WEATHERTEX GUIDE CLADDING MATERIALINSULATION COLOR, AS PER CAULK AND SEAL ACCORDINGLY ESD REPORT

INTERNAL

EXTERNAL

INTERNAL

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE, RETURN EXTERNAL CEMENT SHEET TO CREATE SEPARATION FROM ADJACENT CEMENT SHEET CLADDING WITH DIFFERENT FINISH COLOR INTERNAL

WEATHERTEX CLADDING CLADDING OVER CAVITY BATTENWEATHERTEX AS AS OVER CAVITY BATTEN AS AS EXTERNAL PER WALL TYPES SCHEDULE PER WALL TYPES SCHEDULE COLORBOND 'T' FLASHING FINISH TO MATCH WEATHERTEX CLADDING MATERIAL COLOR, BLOCKVENEER WALL AS PER CAULK AND SEAL ACCORDINGLY WALL TYPES SCHEDULE

EXTERNAL

W100

WINDOW TYPE

TL#

FINISH TYPE

J0#

LIGHTWEIGHT WALL AS PER WALLJOINERY TYPES SCHEDULE TYPE

WX #

INSULATION AS PER WALL TYPE ESD REPORT

FT #

SARKING AS PER WALL FENCE TYPE TYPES SCHEDULE

SARKING AS PER WALL TYPES SCHEDULE

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

SARKING AS PER WALL INSULATION AS PER TYPES SCHEDULE ESD REPORT

INTERNAL

D102

1 : 10

INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT INTERNAL

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

A51.03

1 : 10

TYPE WA5A TYP. P ANWALL DE YP A- PLAN P YP AN DE WADOORDETAIL P AN5YP DE WA A

LIGHTWEIGHT WALL AS PER A51.03 WALL TYPES SCHEDULE

LIGHTWEIGHT WALL AS PER WALL TYPES SCHEDULE

SARKING AS PER WALL TYPES SCHEDULE

INSULATION AS PER LIGHTWEIGHT WALL AS PER INTERNAL ESD REPORT WALL TYPES SCHEDULE SARKING AS PER WALL TYPES SCHEDULE INSULATION AS PER ESD REPORT

INTERNAL

A51.03

A51.03 LIGHTWEIGHT WALL AS PER1 : 10 WALL TYPES SCHEDULE

1 : 10

SARKING CEMENT SHEET CLADDING AS AS PER WALL TYPES SCHEDULE PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE LIGHTWEIGHT CLADDING OVER CAVITY BATTEN AS EXTERNAL PER WALL TYPES SCHEDULE

INTERNAL

WEATHERTEX CLADDING OVER CAVITY BATTEN AS AS PER WALL TYPES SCHEDULE COLORBOND 'T' FLASHING FINISH TO MATCH WEATHERTEX VAPOUR BARRIER AS PER CLADDING MATERIAL COLOR, EXTERNAL CEMENT SHEET CLADDING AS INSTALLATION PER MANUF'S GUIDE CAULK AND SEAL ACCORDINGLY WALL TYPES SCHEDULE, DAMP PROOF COLORBOND 'T' FLASHING MEMBRANE AS PER MANUF'S CEMENT SHEET CLADDING AS PER WALL TO MATCH CLADDING INSTALLATION GUIDE,FINISH RETURN TYPES SCHEDULE, DAMP PROOF MATERIAL COLOR, CAULK AND MEMBRANE AS PER MANUF'S INSTALLATION INTERNAL CEMENT SHEET TO CREATE EXTERNAL SEAL ACCCORDINGLGY SEPARATION FROM ADJACENT GUIDE, RETURN CEMENT SHEET CEMENT SHEET CLADDING WITH DIFFERENT FINISH COLOR

1 : 10

WA A P YP AN DE

P A

INSULATION AS PER ESD REPORT

CHANGE IN LEVEL

CEMENT SHEET CLADDING AS SARKING AS PER WALL PER WALL TYPES SCHEDULE, TYPES SCHEDULE DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION LIGHTWEIGHT CLADDING SPOT LEVEL GUIDE OVER CAVITY BATTEN AS PER WALL TYPES SCHEDULE

16

1 : 10

1 : 10 WA P AN DE P YP AN TYP. A WALL YP - PLAN WAA DETAIL P AN4YP DE WA A 4 DE

16

A51.03

1 : 10

A51.03 1 : 10 A51.03

WA A PYP AN DE A P3 YP ANTYP. DE WALL - PLAN WA DETAIL P AN3YP DE WA A

16

A51.03

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

A51.03 1 : 10 A51.03 1 : 10

A51.03

1 : 10 WA P ANWALL DE YP A- PLAN P YP AN DE WA DETAIL P AN1YP DE WA A 2 A TYP.

1 : 10 TYP. WALL YP - PLAN WA DETAIL P AN2YP DE WA A

16

A51.03

1

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

NOM. SETDOWN

16

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

VAPOUR BARRIER AS PER WEATHERTEX CLADDING OVER CAVITY BATTEN AS AS MANUF'S INSTALLATION GUIDE PER WALL TYPES SCHEDULE COLORBOND 'T' FLASHING COLORBOND 'T' FLASHING FINISH

FINISH TO MATCH CLADDING TO MATCHNOTES WEATHERTEX GENERAL CLADDING MATERIAL COLOR, MATERIAL COLOR, CAULK AND ACCCORDINGLGY CAULK ANDEXTERNAL SEALNOTES ACCORDINGLY REFER TO GENERAL ONSEAL SHEET A01.00

CEMENT SHEET CLADDING AS PER WALLBLOCKWORK WALL AS PER DOUBLE TYPES SCHEDULE, DAMP PROOF WALL TYPES SCHEDULE MEMBRANE AS PER MANUF'S INSTALLATION GUIDE, RETURN CEMENT SHEET

TYP. WALL - PLAN YP WA DETAIL P 6AN DE A TYP. WALL - PLAN YP WA DETAIL P 7AN DE A 8 TYP. WALL - PLAN YP WA DETAIL P 8AN DE A 6 7 A51.03 10 1 : 10 1 : 10 FINISHES L8EGEND YP WAYP WA P AN DE P AN A DE A YP WAYP WA P AN DE P AN A DE 1A:YP YP WA WAYP WA P TYP. ANDE DE P AAN A DE A A51.03 WA AN DE WALL - PLAN DETAIL YP6WA P YP AN WA DE A 7 P AN TYP. DEWALL A - PLAN YPDETAIL WA 7P YP AN WA DE A 8 P AN TYP. DEWALL A - PLAN DETAIL ATAIL P 6 AN DE A TYP. WALL - PLAN YP DETAIL WA P 7 AN DE A 8 TYP. WALL - PLAN YP DETAIL WA P 8P YP AN DE AA 6 P AN 7 A51.03 A51.03 1 : 10 1 : 10 2PAC1 TWOPAC - DIESKAU YP WA P AN DE A A51.03 A51.03 1 : 10 1 : 10 CB1 CONCRETE BLOCK WA P ANWALL DE YP A- PLAN WA A PYP AN DE A WA A P AN DE A TYP. WALL YP - PLAN WA DETAIL P AN6YP DE WA A P YP AN DE WA DETAIL P AN7YP DE WA A P8 YP ANTYP. DE WALL - PLAN WA DETAIL P AN8YP DE WA A P YP AN DE 6 7 A TYP. CB1a CONCRETE BLOCK

INSULATION AS PER ESD REPORT

INTERNAL

YP WA

INTERNAL

P AN DE A

MIN. 20 GAP

YP WA MIN. 20

MIN. 20

GAP

GAP

CP1

EXTERNAL

FC1 EXTERNAL

FC2 GL1 GL2 LM1 LM2 ML1 MT1 MT3 PB1 PC1 PT1 PT2 PT3 PT4 PT5

RETURN LIGHTWEIGHT CLADDING CEMENT SHEET TO STOP 10mm BEFORE FLASHING, CAULK AND SEAL RETURN LIGHTWEIGHT ACCORDINGLY CLADDING CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING CUSTOM FOLD COLORBOND CUSTOM FOLD COLORBOND LAP OVER FLASHING TO LINE CLADDING, TO STOP CLADDINGTO STOP CLADDING CLADDING, OVER GAP BETWEEN THE LAP OVER FLASHING TOOVER LINE FLASHING TO LINE LAP PARTIWALL, FINISH IN MT3 OVER GAP BETWEEN THEGAP BETWEEN THE OVER CEMENT SHEET TO STOP PARTIWALL, FINISHPARTIWALL, IN MT3 FINISH IN MT3 10mm BEFORE FLASHING, CAULK AND SEAL ACCORDINGLY CEMENT SHEET TO CONTINUE PASS AND BUT AGAINST CEMENT CLADDING SHEET CUSTOM FOLD COLORBOND

10

10

P AN DE A

LOT BOUNDARY

EXTERNAL

CONCRETE - EXPOSED AGGREGATE CONCRETE PAVERS - ANSTON MIMOSA

CLADDING, TO STOP CLADDING INTERNAL INTERNAL LAP OVER FLASHING TO LINE CEMENT SHEET TO CONTINUE OVER GAP BETWEEN THE SARKING AS PER WALL TYPES PASS AND BUT AGAINST PARTIWALL, FINISH IN MT3 CLADDINGSCHEDULE CEMENT SHEET INTERNAL INSULATION AS PER ESD INTERNAL INTERNAL REPORT CEMENT SHEET TO CONTINUE SARKING AS PERPASS WALLAND TYPES BUT AGAINST SARKING AS PER WALL TYPES SCHEDULE CEMENT MIN. 20 CLADDING SHEET SCHEDULE INSULATION AS PER ESD GAP INTERNAL INSULATION AS PER ESD REPORT INTERNAL REPORT PARTIWALL SARKING AS PER WALL TYPES MIN. 20 MIN. 20 AS PER WALLSCHEDULE TYPES SCHEDULE MIN. 20 GAP GAP INSULATION AS PER ESD GAP REPORT PARTIWALL PARTIWALL PARTIWALL AS PER WALL TYPES SCHEDULE AS PER WALL TYPES SCHEDULE MIN. 20 AS PER WALL TYPES SCHEDULE GAP

10

INTERNAL

RM1

INTERNAL

EXTERNAL

LIGHTWEIGHT CLADDING AS SUPERTUFT ESCAPE TWIST, PURE NEWPER WALL TYPES SCHEDULE, WOOL, TUFTED, ON AIRSTEP SUPA BLUE VAPOUR BARRIER AS PER EXTERNAL MANUF'S INSTALLATION GUIDE UNDERLAY (9.5MM RUBBER) LIGHTWEIGHT CLADDING AS FIBRE SHEET, RENDERED WITH PER WALL CEMENT TYPES SCHEDULE, VAPOUR BARRIER AS PER IN PT1 RN1 AND PAINTED MANUF'S INSTALLATION EXTERNAL GUIDE

LOT BOUNDARY

1 : 10

EXTERNAL LIGHTWEIGHT CLADDING AS LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, PER WALL TYPES SCHEDULE, VAPOUR BARRIER AS PER VAPOUR BARRIER AS PER EXTERNAL MANUF'S INSTALLATION GUIDE MANUF'S INSTALLATION GUIDE LIGHTWEIGHT CLADDING AS RETURN LIGHTWEIGHT PER WALL TYPES SCHEDULE, CLADDING RETURN LIGHTWEIGHT VAPOUR BARRIER AS PER CLADDING MANUF'S INSTALLATION GUIDE

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING LAP OVER FLASHING TO LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

CEMENT SHEET TO STOP CEMENT SHEET CLADDING AS 10mmPER BEFORE WALL FLASHING, TYPES SCHEDULE, CUSTOM FOLDCAULK COLORBOND ANDPROOF SEAL MEMBRANE AS DAMP CLADDING, TOACCORDINGLY STOP CLADDING PER MANUF'S INSTALLATION AND LINE OVER GAP BETWEEN CEMENT SHEET TO STOP GUIDE MT3 THE PARTIWALL, FINISH IN BEFORE 10mm FLASHING, FOLD COLORBOND CAULK SEAL LIGHTWEIGHTCUSTOM CLADDING ASAND CLADDING, TO STOP CLADDING ACCORDINGLY PER WALL TYPES SCHEDULE, LAP OVER FLASHING TO LINE VAPOUR BARRIER AS PER CLADDING WEATHERTEX OVER GAP GUIDE BETWEEN THE MANUF'S INSTALLATION OVER CAVITY BATTEN CUSTOM FOLD PARTIWALL, FINISH IN COLORBOND MT3 AS AS PER WALL TYPES SCHEDULE CLADDING, TO STOP CLADDING INTERNAL COLORBOND 'T' FLASHING LAP OVER FLASHING TO FINISH LINE SARKING AS PER WALLSHEET TYPESTO CONTINUE CEMENT MATCH WEATHERTEX OVER GAP BETWEEN THE SCHEDULE PASSTO SARKING AS PER WALL TYPES AND BUT AGAINST CLADDING MATERIAL COLOR, PARTIWALL, SCHEDULE CEMENT CLADDING FINISH SHEET IN MT3 CAULK AND SEAL ACCORDINGLY INSULATION AS PER ESD INTERNAL INTERNAL CEMENT INTERNAL REPORT SHEET TO CONTINUE CEMENT SHEET CLADDING AS PER WALL PASSSCHEDULE, AND BUT AGAINST TYPES DAMP PROOF SARKING AS PER WALL TYPES INSULATION AS PER CEMENT ESD SHEET INSTALLATION MIN. 20 CLADDING MEMBRANE AS PER MANUF'S SCHEDULE REPORT GUIDE, CEMENT SHEET GAP RETURN INTERNAL INSULATION ASINTERNAL PER ESD REPORT PARTIWALL SARKING AS PER WALL TYPES AS PER WALL SCHEDULE TYPES SCHEDULE INSULATION AS PER ESD REPORT

LIGHTWEIGHT CLADDING AS A51.03 PER WALL TYPES SCHEDULE, EXTERNAL VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

LOT BOUNDARY

EXTERNAL

CN1 CN2 CN3

OVER PEDESTAL PAVING TYP. WALL - PLAN DETAIL 5 SYSTEM

5

EXTERNAL

LOT BOUNDARY

LOT BOUNDARY

LOT BOUNDARY

LOT BOUNDARY

LOT BOUNDARY

LOT BOUNDARY

EXTERNAL EXTERNAL

GAP

EXTERNAL INTERNAL

EXTERNAL

GAP

10

YP WA

INSULATION AS PER ESD REPORT

GAP

SCHEDULE MIN. 20 INSULATION AS PER ESD INTERNAL GAP REPORT SARKING AS PER WALL TYPES PARTIWALL SCHEDULE AS PER WALL TYPES SCHEDULE INSULATION AS PER ESD REPORT

INTERNAL

P AN DE A

MIN. 20

16

10

EXTERNAL

INTERNAL

INTERNAL

INTERNAL SARKING AS PER WALL TYPES SARKING AS PER WALL TYPES SCHEDULE SCHEDULE INSULATION AS PER ESD REPORT INTERNAL

RETURN LIGHTWEIGHT CLADDING

SARKING AS PER WALL TYPES SCHEDULE RETURN LIGHTWEIGHT CLADDING

INTERNAL

TYP. WALL - PLAN DETAIL 4

LIGHTWEIGHT CLADDING AS A51.03 PER WALL TYPES SCHEDULE, 1 : 10 EXTERNAL VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

10

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN CEMENT SHEET TO STOP CEMENT SHEET CLADDING AS THE PARTIWALL, FINISH IN MT3 10mm BEFORE FLASHING, PERAND WALL TYPES SCHEDULE, CAULK SEAL LIGHTWEIGHT CLADDING AS DAMP PROOF MEMBRANE AS ACCORDINGLY PER WALL TYPES SCHEDULE, PER MANUF'S INSTALLATION VAPOUR BARRIER AS PER CUSTOM FOLD COLORBOND GUIDE CLADDING, TO STOP CLADDING MANUF'S INSTALLATION GUIDE CUSTOM FOLD COLORBOND LAP OVER FLASHING TO LINE CLADDING, TO STOP CLADDING OVER GAP BETWEEN THE LAP OVER FLASHING TO LINE SARKING AS PER WALL TYPES FINISH OVER PARTIWALL, GAP BETWEEN THE IN MT3 SCHEDULE PARTIWALL, FINISH IN MT3 CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF INTERNAL CEMENT SHEETAS TOPER CONTINUE MEMBRANE MANUF'S PASS AND BUT AGAINST INSTALLATION GUIDE, RETURN INSULATION AS PER ESD CEMENT CLADDING SHEET CEMENT SHEET TO CREATE REPORT SEPARATION FROM ADJACENT INTERNAL INTERNAL INTERNAL CEMENT SHEET CLADDING WITH DIFFERENT FINISH SARKING AS PER WALLCOLOR TYPES

GAP

10

GAP

INTERNAL

INTERNAL

EXTERNAL

RETURN LIGHTWEIGHT CLADDING SARKING AS PER WALL TYPES SCHEDULE

INTERNAL

CUSTOM FOLD COLORBOND CLADDING,'T'TO STOP CLADDING COLORBOND FLASHING FINISH AND LINE OVER GAP BETWEEN TO MATCH WEATHERTEX THE PARTIWALL, IN MT3 CLADDING MATERIALFINISH COLOR, CAULK AND SEAL ACCORDINGLY LIGHTWEIGHT CLADDING AS PER WALL CLADDING TYPES SCHEDULE, WEATHERTEX VAPOUR OVER CAVITYBARRIER BATTEN AS AS PER AS INSTALLATION PERMANUF'S WALL TYPES SCHEDULEGUIDE

EXTERNAL

SARKING AS PER WALL TYPES SCHEDULE

EXTERNAL

4

EXTERNAL

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN EXTERNAL THE PARTIWALL, FINISH IN MT3 LIGHTWEIGHT CLADDING AS PER TYPES SCHEDULE, CEMENT SHEET TOWALL CONTINUE BARRIER AS PER PASS AND BUTVAPOUR AGAINST EXTERNAL MANUF'S INSTALLATION GUIDE CEMENT CLADDING SHEET LIGHTWEIGHT CLADDING AS LIGHTWEIGHT WALL SCHEDULE, AS PER PER WALL TYPES WALL TYPES SCHEDULE VAPOUR BARRIER AS PER MANUF'S SARKING AS PER WALL TYPESINSTALLATION GUIDE INSULATION AS PER SCHEDULE RETURN LIGHTWEIGHT ESD REPORT CLADDING

10

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, EXTERNAL VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE SARKING AS PER WALL TYPES LIGHTWEIGHT CLADDING AS SCHEDULE LIGHTWEIGHT WALL SCHEDULE, AS PER PER WALL TYPES WALL TYPES SCHEDULE VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

CUSTOM FOLD COLORBOND CEMENT SHEET CLADDING AS CLADDING, TO STOP CLADDING PER WALL TYPES SCHEDULE, LAP OVER FLASHING TO LINE DAMP PROOF MEMBRANE AS OVER GAP BETWEEN THE PER MANUF'S INSTALLATION PARTIWALL, FINISH IN MT3 GUIDE

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

EXTERNAL

EXTERNAL

INSULATION AS PER RETURN LIGHTWEIGHT ESD REPORT CLADDING

SARKING AS PER WALL TYPES SCHEDULE SARKING AS PER WALL TYPES SCHEDULE

INTERNAL

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

1 : 10

GAP

EXTERNAL

CEMENT SHEET TO CONTINUE PASS AND BUT AGAINST EXTERNAL CEMENT CLADDING SHEET

EXTERNAL

LIGHTWEIGHT WALL AS PER CEMENT SHEET TO CONTINUE WALL TYPES SCHEDULE RETURN LIGHTWEIGHT PASS AND BUT AGAINST CLADDING CEMENT CLADDING SHEET INSULATION AS PER ESD REPORT

SARKING AS PER WALL TYPES SCHEDULE

TYP. WALL - PLAN DETAIL 3

3

A51.03

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

GAP

EXTERNAL

LIGHTWEIGHT CLADDING AS CUSTOM FOLD COLORBOND PER WALL TYPES SCHEDULE, CLADDING, TO STOP CLADDING VAPOUR BARRIER PER AND LINE OVER AS GAP BETWEEN MANUF'S INSTALLATION GUIDE THE PARTIWALL, FINISH IN MT3

1 : 10

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

EXTERNAL

LOT BOUNDARY

EXTERNAL

EXTERNAL

EXTERNAL

EXTERNAL

10

CEMENT SHEET TO CONTINUE PASS AND BUT AGAINST CEMENT CLADDING SHEET

1 : 10

CEMENT SHEET TO STOP 10mm BEFORE BLOCKWORK WALL, CAULK AND SEAL ACCORDINGLY CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS MANUF'S INSTALLATION CONCRETE - SMOOTH PER GUIDE

DOUBLE BLOCKWORK WALL AS PER WALL TYPES SCHEDULE

16

EXTERNAL

1 : 10

TYP. WALL - PLAN DETAIL 1

2

A51.03

A51.03

10

LOT BOUNDARY LOT BOUNDARY

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

1 : 10

LOT BOUNDARY

1 : 10

TYP. WALL - PLAN DETAIL 2

1

A51.03

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

A51.03

LOT BOUNDARY

EXTERNAL

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE

A51.03

LOT BOUNDARY

EXTERNAL

Typ. Wall - Plan Details

CEMENT SHEET CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE, RETURN CEMENT SHEET

LOT BOUNDARY

A51.03

COLORBOND 'T' FLASHING FINISH TO MATCH CLADDING MATERIAL COLOR, CAULK AND SEAL ACCORDINGLY

MIN. 40 GAP

INTERNAL

LOT BOUNDARY

INTERNAL

FIBRE CEMENT SHEET, RENDERED WITH

LIGHTWEIGHT CLADDING AS RETURN LIGHTWEIGHT RN1 AND PAINTED IN PT2 PER WALL TYPES SCHEDULE, CLADDING VAPOUR BARRIER AS PER GLASS - CLEAR MANUF'S INSTALLATION GUIDE GLASS - FROSTED RETURN LIGHTWEIGHT CLADDING LAMINEX OYSTER GREY NATURAL

CEMENT SHEET TO STOP LAMINEX SEASONED OAK 10mm BEFORE FLASHING, CAULK AND SEAL MELAMINE - WHITE RETURN LIGHTWEIGHT CLADDING ACCORDINGLY ALUMINIUM INSTOP PC1 CEMENT SHEET TO 10mm BEFORE FLASHING, STEEL COLORBOND MONUMENT (MATT) CUSTOM FOLD COLORBOND CAULK ANDIN SEAL CLADDING, TO STOP CLADDING ACCORDINGLY PLASTERBOARD LAP OVER FLASHING TO LINE COLORBOND MONUMENT MATT OVER GAP BETWEEN THE CUSTOM FOLD COLORBOND CUSTOM FOLD COLORBOND PARTIWALL, FINISH IN MT3 COLORBOND (MATT) CLADDING, TO STOP CLADDING CLADDING, TO STOPMONUMENT CLADDING LAP OVER FLASHING TO LINE LAP OVER PEBBLE FLASHING (MATT) TO LINE GREY CEMENT SHEET OVER GAP BETWEEN THE TO CONTINUE OVER GAP BETWEEN THE AND BUT AGAINST PARTIWALL,PASS FINISH IN MT3 PARTIWALL, FINISH IN(MATT) MT3 RATTLESNAKE CEMENT CLADDING SHEET CALF SKIN (MATT) CEMENT SHEET TO CONTINUE INTERNAL NATURAL PASS AND BUT WHITE AGAINST (WALLS - LOW SHEEN; AS PER WALL TYPES CEMENT CLADDING SHEET DOORS - SEMI-GLOSS, CEILINGS - FLAT)SARKING SCHEDULE INTERNAL INTERNAL KLIPLOK 700 HI STRENGTH IN COLORBOND INSULATION AS PER ESD CEMENT SHEET TO CONTINUE REPORT MONUMENT SARKING AS PER WALL TYPES PASS AND BUT AGAINST SCHEDULE CEMENT CLADDING SHEET RENDER OVER MIN. 20FC INSULATION AS PER ESD CAESARSTONE EMPIRA WHITE GAP REPORT INTERNAL PARTIWALL CAESARSTONE STATUARIO MAXIMUS SARKING AS PER WALL TYPES MIN. 20 AS PER WALL TYPES SCHEDULE SCHEDULE PALING FENCE GAP INSULATION AS PER ESD STOCKHOLM EUROPEAN OAKREPORT PLANK (P3) PARTIWALL SPOTTED GUM TIMBER DECKING AS PER WALL TYPES SCHEDU MIN. 20 TILE - WHITE MATT (VERTICAL) GAP A5 TILE - WHITE MATT (HORIZONTAL)

RN1 ST1 ST2 TB1 TB2 TB3 TL3 A51.03 1 : 10 TL3a PARTIWALL TILE - PITCH SIGN MATT (R10) ASTL4 PER WALL TYPES SCHEDULE TL5 TILE - MOON GREY MATT (R11) A51.03 1 : 10 TL6 TILE - MOSAIC BUILT DAM MATT VP1 VGROOVE PANEL - EASYVJ100, IN 2PAC1 FINISH 1 : 10 EXTERNAL EXTERNAL ECOGROOVE IN WB1 WEATHERTEX SELFLOK PT1 LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, WB2 WEATHERTEX SELFLOK ECOGROOVE IN VAPOUR BARRIER AS PER PT2 MANUF'S INSTALLATION GUIDE WB3 WEATHERTEX SELFLOK ECOGROOVE IN PT3 WB4 WEATHERTEX SELFLOK ECOGROOVE IN PT4 RETURN LIGHTWEIGHT

EXTERNAL

EXTERNAL

MIN. 40

YP PAR WA

10

MIN. 20

GAP

INTERNAL

INTERNAL

LOT BOUNDARY

LOT BOUNDARY

A51.03

EXTERNAL LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

90

EXTERNAL

RETURN LIGHTWEIGHT CLADDING

EXTERNAL

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

MIN. 20

GAP

GAP

DAMP PROOF MEMBRANE AS CEMENT SHEET TO CONTINUE PER MANUF'S INSTALLATION PASS AND BUT AGAINST GUIDE CEMENT CLADDING SHEET

INTERNAL

CEMENT SHEET TO CONTINUE PASS AND BUT AGAINST CEMENT CLADDING SHEET

INTERNAL

INTERNAL SARKING AS PER WALL TYPES SCHEDULE

INTERNAL

SARKING AS PER WALL TYPES SCHEDULE INSULATION AS PER ESD REPORT

SARKING AS PER WALL TYPES SCHEDULE

MIN. 20

MIN. 20

GAP

GAP

PARTIWALL MIN. 20 AS PER WALL TYPES SCHEDULE GAP PARTIWALL

PARTIWALL AS PER WALL TYPES SCHEDULE

INSULATION AS PER ESD REPORT

YP PAR WA P AN DE A YP PYP ANPAR AWA YP APAR WA P AN DE A YP PAR YP P AN DE A TYP.WA PARTIWALL -DE PLAN DETAIL P 6AN DE PARTIWALL - PLANWA DETAIL P 7PAR AN DEWA A 14 PAR 15 TYP. A51.03 A51.03 10 1 : 10 YP PAR YP WA PAR WA P AN DE P AN A DE A YP PAR YP WA PAR WA P AN DE P1 :YP AN A DE PARA WAYP PAR P AN14 WA DE TYP. A P PARTIWALL AN DE A - PLAN DETAIL YP PAR 6 WAYP PAR P AN15 WA DE TYP. A P PARTIWALL AN DE A - PLAN DETAIL 7 DETAIL WA P 6 AN DE A YP- PLAN PAR DETAIL WA P 7 AN DE A 15 TYP. PARTIWALL

WA LL WA1

INSULATION AS PER ESD REPORT

A51.03 WALL,1 REFER LIGHTWEIGHT : 10 TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

C

ARCHITECTSCH EAT C

CH

C

CH

03 9412 5100

its commissioned purpose. No part of this document may be reproduced, or transmitted in any FOLDEDmodified COLORBOND FLASHING ADDITIONAL SARKING OVER form or by any without the explicit written TO means MATCH WINDOW FRAME FLASHING, EXTENDEDuse 200mm authority of FINISH Architects EAT. Unauthorized of this document in any MIN. form what ever isOF prohibited. PASTsoSIDES WINDOW

FRAME ANDTYPE UNDER SARKING ASAND PER UP WALL NEAREST LAP ABOVE OR TO

Level 2, 118SCHEDULE Langridge SOFFIT Street, Collingwood 3066 VIC Australia P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

P50 SHADOW GAP

MIN. 10

FOLDED COLORBOND FLASHING LIGHTWEIGHT TO TO MATCHCLADDING WINDOW FRAME STOPFINISH FLUSH WITH THE TOP OF WINDOW SILL SARKING AS PER WALL TYPE PRIME ALL EDGES OF EXPOSED SCHEDULECLADDING LIGHTWEIGHT

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

CAULK AND SEAL ACCORDINGLY LIGHTWEIGHT CLADDING TO INTERNAL STOP FLUSH WITH THE TOP OF WINDOW SILL

MIN. 10

P AN DE A

WSP AUSTRALIA W PTYULTD ARCHITECTS EATCH C W UW U U ARCHITECTS EAT CON U CON NG U NG O W NCOGU MNCHGW M HU CADPW CHUWC WSP AUSTRALIAWPTY CH LTD U CONSULTING PTY CON LTDU FLOREANCIG NG SMITH O NC G M H

WSP AUSTRALIAWPTY LTD U

®

AN YP DE PAR A - PLAN PAR WA A P AN15DE TYP. A PPARTIWALL WA DETAIL YP P AN PAR 7DE WA A YP P AN DE

A51.03

INTERNAL

PRIME ALL EDGES OF EXPOSED LIGHTWEIGHT CLADDING EXTERNAL

C

WSP AUSTRALIA W UPTY LTD

W U WSP W AUSTRALIA U W UPTY LTD

WSP AUSTRALIA W PTYULTD

W

ADP CONSULTING CON PTY LTD U NG FLOREANCIG SMITH O NC G M H

WSP U AUSTRALIA W PTY U LTD

W PTY ADP W CONSULTING U CON U U LTD NG FLOREANCIG CON UOSMITH NGNC CON G M UH NG O

SARKING AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT CLADDING

CAULK AND SEAL ACCORDINGLY

CAULK AND SEAL ACCORDINGLY EXTERNAL

AS PER WALL TYPES SCHEDULE

P AN DE A

30

CAULK AND SEAL ACCORDINGLY P50 SHADOW GAP

FOLDED COLORBOND FLASHING TO MATCH WINDOW FRAME

CAULK AND SEAL ACCORDINGLY ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE FOLDED COLORBOND FLASHING AS PER ESD REPORT TO MATCH WINDOW FRAME FINISH

P AN DE A

CAULK AND SEAL ACCORDINGLY

WSP AUSTRALIA PTY LTD

FOLDED COLORBOND FLASHING TO MATCH WINDOW FRAME CEMINTEL TEXTURE BASE, FINISH REFER TO WALL TYPE Structural and Civil Engineer ENSURE WINDOW SCHEDULE Level 15, 28 Freshwater Place FRAME SITS FLUSH WITH PLASTERBOARD Southbank, VIC 3006 All rights reserved. This document remains the CAVITY BATTEN INTERNALLY property of Architects EAT and is only to be used for

FINISH CEMINTEL TEXTURE BASE SHEET, ARCHITECTS EAT REFER TO WALL TYPE SCHEDULE

03 9412 5100

SARKING AS PER WALL TYPE CEMINTEL TEXTURE BASE, SCHEDULE

REFER TO WALL TYPE Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia SCHEDULE P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au

®

its commissioned purpose. No part of this document SARKING AS PER WALL TYPE may be reproduced, modified or transmitted in any form or by any means without the explicit writtenSCHEDULE authority of Architects EAT. Unauthorized use of this CEMINTEL TEXTURE BASE SHEET, document in any form what so ever is prohibited. REFER TO WALL TYPE SCHEDULE

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY P50 SHADOW GAP

INTERNAL

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT CAULK AND SEAL ACCORDINGLY

P50 SHADOW GAP

A51 03

ENSURE WINDOW FRAME SITS FLUSH SHADOW GAP WITHP50 PLASTERBOARD INTERNALLY

30

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

YP PAR WA P50 SHADOW GAP

FOLDED COLORBOND FLASHING TO MATCH WINDOW FRAME FINISH

A51 03

INTERNAL

ALL WINDOWS SUITE AND EXTERNAL GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

INTERNAL

30

YP PAR WA

ALL WINDOWS SUITE AND CAULK AND SEAL ACCORDINGLY GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

INSULATION AS PER ESD REPORT

P50 SHADOW GAP

FOLDED COLORBOND FLASHING TO MATCH WINDOW FRAME FINISH CAULK AND SEAL ACCORDINGLY FOLDED COLORBOND FLASHING TO MATCH WINDOW FRAME

WSP AUSTRALIA PTY LTD

FINISH ADP CONSULTING PTY LTD FLOREANCIG SMITH

Building Services Engineer

ESD Consultant

Level 15, 28 Freshwater Place ENSURE WINDOW Southbank, VIC 3006 FRAME SITS FLUSH WITH PLASTERBOARD 03 9412 5100 INTERNALLY

Building Surveyor

CEMINTEL TEXTURE BASE SHEET, TORd WALL TYPE SCHEDULE Level 1, 60 REFER Albert

South Melbourne, VIC 3205 03 9636 0280 BLOCK VENEER WALL, REFER TO info@arkresources.com.au SARKING AS PER WALL TYPE SCHEDULE

WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

31 Dover St Cremorne VIC 3121 03 9429 7798 info@floreancigsmith.com.au

ENSURE WINDOW P50 SHADOW GAP FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

D102

DOOR TYPE

W100

WINDOW TYPE

TL#

FINISH TYPE

J0#

JOINERY TYPE

CAULK AND SEAL ACCORDINGLY

WX #

WALL TYPE

FOLDED COLORBOND FLASHING TO MATCH WINDOW FRAME FINISH

FT #

FENCE TYPE

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

P50 SHADOW GAP

CHANGE IN LEVEL 30

INTERNAL

30

GAP PARTIWALL

MIN. 20 ALL WINDOWS SUITE AND GAP GLAZINGS ESD PERFORMANCE PARTIWALL AS PER ESD REPORT AS PER WALL TYPES SCHEDULE EXTERNAL

30

INSULATION AS PER ESD REPORT

30

INTERNAL

MIN. 20

A51.03

NC G M H

CAULK AND SEAL ACCORDINGLY

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT EXTERNAL

SPOT LEVEL

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

DETAIL - TYPICAL CONSTRUCTION DETAILS 3

BLOCK VENEER WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

Drawing Name NOM. SETDOWN

10 ALVINA ST, OAKLEIGH SOUTH

Project Name

Client GENERAL NOTES

SARKING AS PER WALL TYPE SCHEDULE

SOUTHLINK PROJECTS PTY LTD

REFER TO GENERALAddress NOTES ON SHEET A01.00 10 ALVINA ST, OAKLEIGH SOUTH

CAVITY BATTEN SARKING AS PER WALL TYPE SCHEDULE

SARKING AS PER WALL TYPE SCHEDULE

SARKING AS PER WALL TYPE SCHEDULE

FOLDED COLORBOND FLASHING WITH SQUASHBACK FOLD TO STOP END OF CLADDING AND RETURN TO THE SIDES OF WINDOW FRAMES, CAULK AND SEAL ACCORDINGLY

EXTERNAL

CEMINTEL TEXTURE BASE SHEET, DIRECT FIXED AND FINISHED TO MANUF'S INSTALLATION GUIDE OVER LIGHTWEIGHT WALL

EXTERNAL

SARKING AS PER WALL TYPE SCHEDULE AND AS PER MANUF. REQUIREMENTS

FOLDED COLORBOND FLASHING BEYOND

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

FOLDED COLORBOND FOLDED COLORBOND FLASHING WITHBEYOND FLASHING SQUASHBACK FOLDSUITE TO STOP ALL WINDOWS AND END GLAZINGS OF CLADDING ESDAND RETURN TO THE SIDES PERFORMANCE ASOF PER ESD WINDOW FRAMES, CAULK REPORT AND SEAL ACCORDINGLY

FOLDED COLORBOND FLASHING WITH FOLDED COLORBOND SQUASHBACK FOLD TO STOP FLASHING BEYOND END OF CLADDING AND ALL WINDOWS SUITE RETURN TO THE SIDES OFAND GLAZINGS ESDCAULK WINDOW FRAMES, AS PER ESD AND PERFORMANCE SEAL ACCORDINGLY REPORT CEMINTEL TEXTURE BASE SHEET OVER COLORBOND CAVITY BATTEN FOLDED FIXED AND FINISHED FLASHING WITH TO MANUF'S INSTALLATION SQUASHBACK FOLD TO STOP GUIDE OVER LIGHTWEIGHT END OF CLADDING AND WALLRETURN TO THE SIDES OF

FOLDED COLORBOND CEMINTEL TEXTURE BASE FLASHING SHEET, DIRECT WITH FIXED AND SQUASHBACK FOLD TO STOP FINISHED TO MANUF'S END OF CLADDING AND INSTALLATION GUIDE OVER RETURN TO THE SIDES OF LIGHTWEIGHT WALL WINDOW FRAMES, CAULK AND SEAL ACCORDINGLY SARKING AS PER WALL TYPE SCHEDULE ANDTEXTURE AS PER BASE CEMINTEL MANUF. REQUIREMENTS SHEET OVER CAVITY BATTEN

EXTERNAL

FIXED ANDWALL, FINISHED TO LIGHTWEIGHT REFER MANUF'S TO WALL TYPEINSTALLATION SCHEDULE OVER LIGHTWEIGHT AND GUIDE TYP. TOWNHOUSE TYPE WALL DRAWINGS

EXTERNAL

SARKING AS PER WALL TYPE SCHEDULE AND AS PER MANUF. REQUIREMENTS

INTERNAL

P50 SHADOW GAP

INTERNAL

INTERNAL

TYP. YP WINDOW W NDOW DETAIL DE -ALW WALL W WA1

2

A56.01

1:5

TYP. YPYP WINDOW WW NDOW NDOW DETAIL DE DEA A - LWW WALL W WA WA2 1:5

P50 SHADOW GAP

INTERNAL

INTERNAL

CAULK AND SEAL ACCORDINGLY FOLDED ALUMINIUM COVER PLATE TO SIT FLUSH WITH ADJACENT WINDOW FRAMES IN MATCHING FINISH TO WINDOW FRAMES FINISH SARKING AS PER WALL TYPE SCHEDULE AND AS PER MANUF. REQUIREMENTS PACK OUT TO SUIT LIGHTWEIGHT WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

EXTERNAL

CAULK AND SEAL ACCORDINGLY

EXTERNAL

ALL DOOR SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

EXTERNAL INTERNAL

INTERNAL ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

TYP. YP WINDOW YP W NDOW W NDOW DETAIL DEDE -ALW A WALL W WA W 2WA

2

A56.01

3

A56.01

1:5

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY P50 SHADOW GAP

TYP. YPYP WINDOW WW NDOW NDOW DETAIL DE DEA A - LWW WALL W WA WA- BVBV WALL BV WA WA 1:5

3

A56.01

TYP. YP WINDOW YP W NDOW W NDOW DETAIL DE DE -ALWA WALL W WA W- WA BV WALL BV WA 5

A56.01

WB2

5

A56.01

1:5

ALUM. A AUM UM SLIDING S SD D NG NG DOOR DOOR DOOR CORNER CORNER CORNER JUNCTION UNC UNCON ON DETAIL DE DEA A 1:5

RN1 ST1 ST2 TB1 TB2 TB3 TL3 TL3a TL4 TL5 TL6 VP1 WB1

P50 SHADOW GAP

INTERNAL

GL1 GL2 LM1 LM2 ML1 MT1 MT3 PB1 PC1 PT1 PT2 PT3 PT4 PT5 RM1

P50 SHADOW GAP

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

1 Typ W ndows - P an Deta s

A56.01

FOLDED COLORBOND FLASHING WITH SQUASHBACK FOLD TO STOP END OF CLADDING AND RETURN TO THE SIDES OF WINDOW FRAMES, CAULK AND SEAL ACCORDINGLY

LIGHTWEIGHT WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

FC2

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

SARKING AS PER WALL TYPE SCHEDULE AND AS PER MANUF. REQUIREMENTS

P50 SHADOW GAP ENSURE WINDOW FRAME SITS FLUSH WITH PLASTERBOARD INTERNALLY

FC1

1:5

LIGHTWEIGHT WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

LIGHTWEIGHT WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

CP1

1:5

FOLDED COLORBOND FLASHING BEYOND

WINDOW FRAMES, CAULK SARKING AS PER WALL TYPE AND SEAL SCHEDULE ANDACCORDINGLY AS PER MANUF. REQUIREMENTS

TWOPAC - DIESKAU CONCRETE BLOCK CONCRETE BLOCK CONCRETE - SMOOTH CONCRETE - EXPOSED AGGREGATE CONCRETE PAVERS - ANSTON MIMOSA OVER PEDESTAL PAVING SYSTEM SUPERTUFT ESCAPE TWIST, PURE NEW WOOL, TUFTED, ON AIRSTEP SUPA BLUE UNDERLAY (9.5MM RUBBER) FIBRE CEMENT SHEET, RENDERED WITH RN1 AND PAINTED IN PT1 FIBRE CEMENT SHEET, RENDERED WITH RN1 AND PAINTED IN PT2 GLASS - CLEAR GLASS - FROSTED LAMINEX OYSTER GREY NATURAL LAMINEX SEASONED OAK MELAMINE - WHITE ALUMINIUM IN PC1 STEEL IN COLORBOND MONUMENT (MATT) CAULK AND SEAL ACCORDINGLY PLASTERBOARD COLORBOND MONUMENT FOLDED MATT ALUMINIUM COVER PLATE TO SIT FLUSH WITH ADJACENT COLORBOND MONUMENT WINDOW (MATT) FRAMES IN MATCHING FINISH TO WINDOW FRAMES FINISH GREY PEBBLE (MATT) RATTLESNAKE (MATT) PACK OUT TO SUIT CALF SKIN (MATT) NATURAL WHITE (WALLS - LOW SHEEN; DOORS - SEMI-GLOSS, CEILINGS - FLAT) KLIPLOK 700 HI STRENGTH IN COLORBOND MONUMENT RENDER OVER FC CAULK AND SEAL ACCORDINGLY CAESARSTONE EMPIRA WHITE CAESARSTONE STATUARIO MAXIMUS ALL DOOR SUITE AND GLAZINGS ESD PALING FENCE PERFORMANCE AS PER ESD REPORT STOCKHOLM EUROPEAN OAK PLANK (P3) SPOTTED GUM TIMBER DECKING INTERNAL TILE - WHITE MATT (VERTICAL) TILE - WHITE MATT (HORIZONTAL) TILE - PITCH SIGN MATT (R10) TILE - MOON GREY MATT (R11) TILE - MOSAIC BUILT DAM MATT VGROOVE PANEL - EASYVJ100, IN 2PAC1 FINISH WEATHERTEX SELFLOK ECOGROOVE IN PT1 WEATHERTEX SELFLOK ECOGROOVE IN PT2 WEATHERTEX SELFLOK ECOGROOVE IN PT3 WEATHERTEX SELFLOK ECOGROOVE IN PT4

TYP. YP WINDOW W NDOW DETAIL DE -ABV WALL BV WA

TYP. YPYP WINDOW WW NDOW NDOW DETAIL DE DEA A - BVBV WALL BV WA WA

4

FOLDED COLORBOND FLASHING BEYOND

LIGHTWEIGHT WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

2PAC1 CB1 CB1a CN1 CN2 CN3

A56.01

A56.01

ALL WINDOWS SUITE AND GLAZINGS ESD PERFORMANCE AS PER ESD REPORT

FINISHES LEGEND

4

Typ W ndows - Sect on Deta s

FOLDED COLORBOND FLASHING BEYOND

A51 03 A51

WSP CON AUSTRALIA U NG CON PTY LTD U NG O ADPNC CONSULTING G M OH PTY NC GLTDM FLOREANCIG H SMITH

NC G M O H

MIN. 10

1 : 10

EXTERNAL EXTERNAL LIGHTWEIGHT WALL, REFER LIGHTWEIGHT CLADDING AS PER TO SCHEDULE WALLWALL TYPETYPE SCHEDULE AND AND TYP. TYP. TOWNHOUSE TYPE DRAWINGS BLOCKVENEER WALL AS PER TOWNHOUSE DRAWINGS, WALL TYPES SCHEDULE, INSTALLED AS PER MANUF'S BLOCKWORK TO RETURN INSTALLATION GUIDE LIGHTWEIGHT CLADDING OVER AND WRAP AROUND CAVITY BATTEN AS PER WALL TYPE ADDITIONAL SARKING OVER SCHEDULE AND TYP. TOWNHOUSE Structural and Civil Engineer FLASHING, EXTENDED 200mmAS PER SARKING AS PER WALL DRAWINGS, INSTALLED MIN. MANUF'S PAST SIDES OF WINDOWGUIDE Level 15, 28 Freshwater TYPES PlaceSCHEDULE INSTALLATION FRAME AND UP AND UNDER Southbank, VIC 3006 NEAREST ABOVE OR TOthe All rights reserved. ThisLAP document remains CAVITY property of SOFFIT Architects EATBATTEN and is only to be used for

A51.03

MIN. 10

C CH

AC A/C CONDENSER AHD AUSTRALIAN HEIGHT DATUM 1 : 10 1 : 10 CH CEILING HEIGHT LIGHTWEIGHT WALL, REFER TO CL CLOTHESLINE WALL TYPE SCHEDULE AND TYP. LIGHTWEIGHT WALL, REFER TO TOWNHOUSE TYPE DRAWINGS LIGHTWEIGHT CLADDING OVER COS CONFIRM ON SITE WALL TYPE SCHEDULE AND TYP. CAVITY BATTEN AS PER WALL TYPE TOWNHOUSE TYPE DRAWINGS DP DOWNPIPE A51.03 CEMINTEL TEXTURE BASE SHEET / 1 : 10 SCHEDULE AND TYP. TOWNHOUSE WEATHERTEX CLADDING, OVER EJ EXPANSION JOINT DRAWINGS, Rev. Description Date 90 INSTALLED 90 AS PER CAVITY BATTEN FIXED AND FINISHED MANUF'S INSTALLATION GUIDE EQ EQUAL TO MANUF'S INSTALLATION GUIDE LIGHTWEIGHTStructural CLADDING and AS CivilPER Engineer Building Services Engineer ESD Consultant Building Surveyor CB1 BLOCKWORK CAPPING LIGHTWEIGHT EX. EXISTING OVER LIGHTWEIGHT WALL WALL TYPE SCHEDULE AND TYP.WALL, REFER TO OVER PARTIWALL WALL15, TYPE28 SCHEDULE AND TYP.Place CAVITY BATTEN Freshwater Level 15, 28 Freshwater Place Level 1, 60 Albert Rd 31 Dover StEXT TOWNHOUSELevel DRAWINGS, EXTERIOR LIGHTWEIGHT WALL, REFER TO TOWNHOUSE DRAWINGS CAVITY BATTEN INSTALLED ASSouthbank, PER MANUF'S TYPE WALL TYPE SCHEDULE AND TYP. Rev. Description Date VIC 3006 Southbank, VIC 3006 South Melbourne, VIC 3205 Cremorne VIC 3121 FCL FINISHED CEILING LEVEL DETAIL TYPICAL CONSTRUCTION DETAILS 3 All rights reserved. This document remains the Structural and Civil Engineer Building Services Engineer ESD Consultant Building Surveyor INSTALLATION GUIDE TOWNHOUSE TYPE DRAWINGS ADDITIONAL SARKING OVER ADDITIONAL SARKING OVER CEMINTEL TEXTURE BASE SHEET / property of Architects EAT and is only to be used for FFL FINISHED FLOOR LEVEL Building Services Engineer ESD Consultant Building Surveyor Drawing Name 03 WEATHERTEX 9412 5100 03 9412 510015, 28 Freshwater Place 03 9636Level 028015, FLASHING, 03 9429Level 7798 FLASHING, EXTENDED 200mm EXTENDEDPlace 200mm its commissioned purpose. No part of this document CLADDING OVER , Level 28 Freshwater 1, 60 Albert Rd 31 Dover St EXTERNAL EXTERNAL ADDITIONAL SARKING OVER FD FLOOR DRAIN may be reproduced, modified or transmitted in any MIN. PAST SIDES OF WINDOW MIN. PAST SIDES OF WINDOW CAVITY BATTEN FIXED AND FINISHED Level 15, 28 Freshwater Place Level 1, 60 Albert Rd 31 Dover St Scale AsCremorne indicated VIC @ A1 FLASHING, EXTENDED 200mm info@arkresources.com.au info@floreancigsmith.com.au 10 ALVINA ST, OAKLEIGH SOUTH Description Date form or by any means without the explicit written Southbank, VIC 3006 Rev. Southbank, VIC 3006 South Melbourne, 3205 3121 All rights reserved. This document remains the FRAME AND UP ANDCLADDING UNDER AS PER FRAME AND UP AND UNDER DETAIL - TYPICAL CONSTRUCTION DETAILS 3 TO MANUF'S GM GASVIC METER LIGHTWEIGHT Level 2, 118 Langridge Street, Collingwood 3066VIC VIC Australia MIN. PAST SIDES OF WINDOW INSTALLATION GUIDE authority of Architects EAT. Unauthorized use of this EAT and is only to be used for Southbank, VIC 3006 South 3205 Cremorne VIC 3121 by LINE VO03 9429 7798 NEAREST LAP ABOVE ORMelbourne, TO NEAREST LAP ABOVE OR TO Project Name OVER LIGHTWEIGHT WALL property of Architects WALL SCHEDULE TYP. W: eatas.com.au ® document in any form whatESD FRAME AND UP AND UNDER 03 9412 5100 03 9412 5100 03 9636 Structural and Civil AND Engineer Building Services Engineer Consultant Building Surveyor Drawing Name GRV0280 10MMDrawn GROOVE so ever is prohibited. P: +61 3 8413 5300 TYPE E: office@eatas.com.au its commissioned purpose. No part of this document SOFFIT SOFFIT TOWNHOUSE DRAWINGS, NEAREST LAP ABOVE OR BATTEN TO may be reproduced, modified or transmitted in any 03 9412 5100 03 9636 0280 03 9429 7798 Client SOUTHLINK PROJECTS PTY LTD - info@floreancigsmith.com.au by HWS HOT Checked WATER Level 15,MANUF'S 28 Freshwater Place Level 15, 28 Freshwater Place Level 1, 60 Albert RdCAVITY 31 Dover St INSTALLED AS PER info@arkresources.com.au 10SERVICE ALVINA ST, OAKLEIGH SOUTH SOFFIT form or by any means without the explicit written FOLDED COLORBOND FLASHING FOLDED COLORBOND FLASHING INSTALLATION GUIDE Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia LB1 LETTER BOX TYPE 1 10 ALVINA ST, OAKLEIGH SOUTH info@arkresources.com.au info@floreancigsmith.com.au Address Issued Date 16/10/2020 EAT. Unauthorized use of this ADDITIONAL SARKING OVER authority of Architects Southbank, Southbank, VIC 3006 South Melbourne, VIC 3205 Cremorne VIC 3121 Project Name TO MATCH WINDOW FRAME VIC 3006 TO MATCH WINDOW FRAME All rights reserved. This document remains the ® FOLDED COLORBOND FLASHING P: +61 3 8413 5300 E: office@eatas.com.au W: eatas.com.au FLASHING, EXTENDED 200mmdocument in any form what so ever is prohibited. LB2 LETTER BOX TYPE 2 property of Architects EAT and is only to be used for FINISH FINISH ADDITIONAL SARKING OVER Status TENDER TO MATCH WINDOW 03 9412 5100 03 9412 5100 03 9636 0280 03 9429 7798 SOUTHLINK PROJECTS PTY LTD MIN.FRAME PAST SIDES OF WINDOW its commissioned purpose. No part of this document NGL NATURAL Client GROUND LEVEL FLASHING, EXTENDED 200mm FINISH FRAME AND UP AND UNDER any ENSURE WINDOWmay be reproduced, modified or transmitted in SARKING AS PER WALL ENSURE WINDOW SARKING AS PER WALL TYPE ENSURE WINDOW MIN. PAST SIDES OFTYPE WINDOW 10 ALVINA ST, OAKLEIGH SOUTH info@arkresources.com.au info@floreancigsmith.com.au O/A OVERALL Address form or by any means without the explicit written NEAREST LAP ABOVE OR TO FRAME SITS FLUSH FRAME SITS FLUSH FRAME SITS FLUSH SCHEDULE SCHEDULE FRAME AND UP AND UNDER SARKING AS PER SOFFIT WALL TYPE ENSURE WINDOW authority of Architects EAT. Unauthorized use of this O/F OVERFLOW WITH PLASTERBOARD WITH PLASTERBOARD WITH PLASTERBOARD ® document in any form what so ever is prohibited. NEAREST LAP ABOVE OR TO FRAME SITS FLUSH SCHEDULE INTERNALLY INTERNALLY INTERNALLY SOFFIT PV PHOTO VOLTAIC (SOLAR) PANEL WITH PLASTERBOARD FOLDED COLORBOND FLASHING LIGHTWEIGHT CLADDING TO INTERNALLY LIGHTWEIGHT CLADDING AS TO MATCH WINDOW FRAME (PC) PRIME COST CEMINTEL TEXTURE BASE SHEET / COLORBOND STOPFOLDED FLUSH WITH THE TOPFLASHING OF PER WALL TYPES SCHEDULE, FINISH TO MIN. 10 P50 SHADOW GAP P50 SHADOW GAP P50 SHADOW GAP LIGHTWEIGHT CLADDING WEATHERTEX CLADDING TO STOP PGL PROPOSED GROUND LEVEL TO MATCH WINDOW SILL WINDOW FRAME MIN. 10 DAMP PROOF MEMBRANE AS STOP FLUSH WITH THE TOP OF FLUSH WITH THE TOP OF WINDOW FINISH P50 SHADOW GAPENSURE WINDOW (PS) PROVISIONAL SUM ENSURE WINDOW SARKING AS PER WALL TYPE PER MANUF'S INSTALLATION WINDOW SILL SILL; PRIME ALL EDGES OF EXPOSED PRIME ALL EDGES OF EXPOSED FRAME SITS FLUSH FRAME SITS FLUSH SCHEDULE GUIDE RWH RAINWATER HEAD CLADDING MATERIAL LIGHTWEIGHT CLADDING SARKING AS PER WALL TYPE ENSURE WINDOW PRIME ALL EDGES OF EXPOSED WITH PLASTERBOARD WITH PLASTERBOARD FRAME SITS FLUSH SCHEDULE SHW SOLAR BOOSTED HOT WATER LIGHTWEIGHT CLADDING INTERNALLY INTERNALLY WITH PLASTERBOARD CAULK AND SEAL ACCORDINGLY CAULK AND SEAL ACCORDINGLY SPRD'R SPREADER INTERNALLY TEXTURE BASE SHEET / CAULK AND SEALCEMINTEL ACCORDINGLY INTERNAL SSL STRUCTURAL SURFACE LEVEL P50 SHADOWINTERNAL GAP P50 SHADOW GAP LIGHTWEIGHT CLADDING TO WEATHERTEX CLADDING TO STOP MIN. 10 TEJ TILE EXPANSION JOINT STOP FLUSH WITH THE TOP OF FLUSH WITH THE TOP OF WINDOW P50 SHADOW GAP WINDOW SILL SILL; PRIME ALL EDGES OF EXPOSED TOW TOP OF WALL CLADDING MATERIAL WM WATER METER PRIME ALL EDGES OF EXPOSED EXTERNAL INTERNAL INTERNAL INTERNAL EXTERNAL

TYP. PARTIWALL YP PAR- PLAN WA DETAIL YP P AN PAR 6DE WA A LOT BOUNDARY

14

A51.03

P AN DE A

GENERAL LEGEND

INSULATION AS PER ESD REPORT

GAP PARTIWALL

AS PER WALL TYPES SCHEDULE LIGHTWEIGHT WALL, REFER TO WALL TYPE SCHEDULE AND TYP. TOWNHOUSE TYPE DRAWINGS

LOT BOUNDARY

GAP PARTIWALL

AS PER WALL TYPES SCHEDULE

MIN. 40

CH

AS PER WALL TYPES SCHEDULE MIN. 20

Typ. Partiwall - Plan DetailsYP PAR WA

YP PAR WA

AS PER WALL TYPES SCHEDULE

AS PER WALL TYPES SCHEDULE

MIN. 20

INTERNAL

INTERNAL SARKING AS PER WALL TYPES SCHEDULE INSULATION AS PER ESD REPORT

INSULATION AS PER ESD REPORT

PARTIWALL PARTIWALL AS PER WALL TYPES SCHEDULE AS20PER WALL TYPES SCHEDULE MIN. INSULATION AS PER ESD REPORT GAP PARTIWALL

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING LAP OVER FLASHING TO LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING LAP OVER FLASHING TO LINE OVERCLADDING GAP BETWEEN LIGHTWEIGHT AS THE FINISH IN MT3 PER WALLPARTIWALL, TYPES SCHEDULE,

INTERNAL

INTERNAL INTERNALSARKING AS PER WALL TYPES SCHEDULE INSULATION AS PER ESD REPORT MIN. 20

CLADDING

CEMENT SHEET TO STOP 10mm BEFORE FLASHING, CAULK AND SEAL ACCORDINGLY

DAMP PROOF MEMBRANE AS CEMENT SHEET TO CONTINUE PER MANUF'S INSTALLATION PASS AND BUT AGAINST GUIDE CEMENT CLADDING SHEET

INTERNAL

INSULATION AS PER ESD REPORT

GAP PARTIWALL SARKING AS PER WALL AS PER WALL TYPES SCHEDULE TYPES SCHEDULE

90

CB1 BLOCKWORK CAPPING OVER PARTIWALL

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING LAP OVER FLASHING TO LINE OVER GAP LIGHTWEIGHT CLADDING ASBETWEEN THE PER WALL TYPESPARTIWALL, SCHEDULE, FINISH IN MT3

INTERNAL

MIN. 20 PARTIWALL AS PER WALL TYPES SCHEDULE

INSULATION AS PER ESD REPORT

LOT BOUNDARY

LOT BOUNDARY

LOT BOUNDARY

LOT BOUNDARY

GAP

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, INTERNAL DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION SARKING AS PER WALL TYPES INTERNAL GUIDE SCHEDULE

INTERNAL

INTERNAL SARKING AS PER WALL TYPES SCHEDULE

GAP

1 : 10 EXTERNAL

CB1 BLOCKWORK CAPPING OVER PARTIWALL

CEMENT SHEET TO STOP 10mm BEFORE FLASHING, CAULK AND SEAL ACCORDINGLY

INSULATION AS PER ESD REPORT

P AN DE A

MIN. 20 PARTIWALL MIN. 20 AS PER WALL TYPES SCHEDULE GAP PARTIWALL

INSULATION AS PER ESD REPORT

INTERNAL INTERNAL

A51.03

90 90 LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE, EXTERNAL EXTERNAL BLOCKWORK TO RETURN AND WRAP AROUND RETURN LIGHTWEIGHT SARKING AS PER CLADDING WALL TYPES SCHEDULE

SARKING AS PER WALL TYPES SCHEDULE

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING LAP OVER FLASHING TO LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

EXTERNAL

EXTERNAL

AND WRAP AROUND

CB1 BLOCKWORK CAPPING OVER PARTIWALL

EXTERNAL

1 :EXTERNAL 10

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE, BLOCKWORK TO RETURN EXTERNAL

RETURN LIGHTWEIGHT CLADDING

90

EXTERNAL

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, VAPOUR BARRIER AS PER LIGHTWEIGHT CLADDING AS MANUF'S INSTALLATION GUIDE PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS SARKING AS PER WALL TYPES PER MANUF'S INSTALLATION SCHEDULE LIGHTWEIGHT CLADDING AS GUIDE PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS INTERNAL PER MANUF'S INSTALLATION GUIDE INTERNAL INSULATION AS PER ESD REPORT

INTERNAL

INTERNAL

90

A51.03

EXTERNAL

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, VAPOUR BARRIER AS PER MANUF'S INSTALLATION GUIDE

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

INTERNAL

A

CB1 BLOCKWORK CAPPING OVER PARTIWALL

SARKING AS PER WALL TYPES SCHEDULE BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE, BLOCKWORK TO RETURN AND WRAP AROUND

SARKING AS PER WALL TYPES SCHEDULE

LIGHTWEIGHT CLADDING AS PER WALL TYPES SCHEDULE, DAMP PROOF MEMBRANE AS PER MANUF'S INSTALLATION GUIDE

INTERNAL

EXTERNAL EXTERNAL

C:\Users\VALONIA.o\Documents\201007_RVT19_ALVINA_CD_MASTERPLAN_valonia.o.rvt

EXTERNAL

1 : 10

EXTERNAL

10

EXTERNAL

SARKING AS PER WALL TYPES SCHEDULE

A51.03

CEMENT SHEET TO CONTINUE PASS AND BUT AGAINST CEMENT CLADDING SHEET

90

GAP

BLOCKVENEER WALL AS PER WALL TYPES SCHEDULE, BLOCKWORK TO RETURN AND WRAP AROUND

EXTERNAL

PARTIWALL

AS PER WALL TYPES SCHEDULE

MIN. 40

90

PARTIWALL

AS PER WALL TYPES SCHEDULE

LOT BOUNDARY

EXTERNAL

CUSTOM FOLD COLORBOND CLADDING, TO STOP CLADDING AND LINE OVER GAP BETWEEN THE PARTIWALL, FINISH IN MT3

MIN. 20 AS PER WALL TYPES SCHEDULE AS PER WALL TYPES SCHEDULE GAP

PARTIWALL

AS PER WALL TYPES SCHEDULE

MIN. 40

LOT BOUNDARY

1 : 10

LOT BOUNDARY LOT BOUNDARY

A51.03

PARTIWALL PARTIWALL

PARTIWALL MIN. 20 AS PER WALL TYPES SCHEDULE GAP

GAP

PARTIWALL

AS PER WALL TYPES SCHEDULE

10

PARTIWALL

AS PER WALL TYPES SCHEDULE MIN. 20

LOT BOUNDARY

1 : 10

LOT BOUNDARY

TYP. PARTIWALL YP PAR - PLANWA DETAIL P 1AN DE A YP PAR - PLANWA DETAIL P 2AN DE11A TYP. PARTIWALL YP PAR - PLANWA DETAIL P 3AN DE 12 A TYP. PARTIWALL YP PAR - PLANWA DETAIL P 4AN DE A 9 10 TYP. PARTIWALL 1 A51.03 10 10 10 YP PAR YP WA PAR WA P AN DE P AN A DE A YP PAR YP WA PAR WA P ANA51.03 DE P AN A1 :YP DEPAR A YP PAR PAR YP9 WA PAR PPARTIWALL ANDE DE P AAN A A51.03 DE A 1 :YP PAR YPPAR PAR WA P TYP. PANAN ADE DEA 1A:YP PAR YP WA PAR WA P AN P AN A-YP DEPAR ADETAIL WAYP AN WA DE TYP. A PWA AN - PLAN DETAIL PAR YP 1WA PWA AN WA DE AANTYP. PDE PARTIWALL -YP PLAN PAR WA YP YP 2PAR PP WA DE A A P PARTIWALL AN DE DE A PLAN WAYP 3 PAR P AN12 WA DE TYP. A P PARTIWALL AN DE A 11 AN R DETAIL WA P 1 AN DE A 10 TYP. PARTIWALL YP- PLAN PAR DETAIL WA P 2 AN DE YP- PLAN PAR DETAIL WA P 3P AN DE YP - PLAN PAR DETAIL WA P 4 YP AN DE A 10 PARTIWALL - PLAN PARDETAIL DETAIL WA 5AN AN DETYP. 11 ATYP. PARTIWALL 12A1 : 10TYP. PARTIWALL A51.03 A51.0313 1 : 10 A51.03 1 : 10 A51.03 A51.03 A51.03 A51.03 1 : 10 1 : 10 1 : 10 1 : 10 PAR WA P AN A- PLAN YP TYP. PAR WAYP P AN DE A YP P PAR WA AYP PPAR AN- PLAN DE PAR WA P AN A- PLAN PAR WA A TYP. PARTIWALL YP PAR- PLAN WA DETAIL YP P AN PAR 1DE WA A YP P AN DE TYP. A PARTIWALL YP DE PAR WA DETAIL YP P AN PAR 2DE WA A11 P AN PARTIWALL DE A PAR - PLAN WA DETAIL YP P AN PAR 3DE WA A 12 TYP. AN DE PARTIWALL WAA DETAIL YP P AN PAR 4DE WA A YP P AN DE TYP. A PARTIWALL YPDE PAR WA DETAIL YP P AN PAR 5DE WA A YP P AN DE 9 10 13

WB3 ALUM. A YPUM SLIDING W NDOW S D DOOR NG DE DOOR ACORNER CORNER W WA JUNCTION UNC BV WA DETAIL ON DE A

1:5

WB4


17 NEVILLE ST, ALBERT PARK Project: 2-Storey Private Residential Type: Alteration to Existing Dwelling with Heritage Overlay Status: Construction Completed Cost: $1million Area: 238m2

This is a restoration and alteration to existing double-storey brick warehouse, originally a sausage factory, then converted to a residence in 1989 by George Hatzisavas Architect with living, dining, kitchen, a garage on the ground floor, 2 bedrooms and study on the first floor, plus a roof deck. The project started out as mainly remedial work to leaking roof and gutters, to interior alteration and a new entry door. The new alteration sits in contrast from the mainly white and grey existing interior, we explored the revealation of original material of the existing brick walls, adding warmer materiality into the house, examined issue of leaking roof and worked on details to prevent future leakage with the new glazed roof. We also took this opportunity to improve the thermal performace fo the dwellign envelope.


A41.01

EX. METAL ROOF BELOW COLORBOND CUSTOM FORMED VALLEY GUTTER TO FALL TO EXISTING DOWNPIPE, BUILDER TO INSPECT ON SITE. FINISH TO MATCH RM1

CO L

FALL

3

EX. METAL ROOF BELOW

A13.01

®

Efficient Energy Choices

Structural & Civil Engineer

ESD Consultant

Cremorne 3121 03 9427 9333 office@krneta.com.au

FALL MIN. 1:100

FALL MIN. 1:100

Roo P an(Upper) - Demo Ex st ng BOUNDARY

2

2

1

A13.01

EQ

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EQ

EQ

EQ

A41.01

+11.100 PROP. ROOF LEVEL - UPPER 513RIDGE513 REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH146 EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

XRM 3079 COS

146

6115 COS

GLAZED ROOF

ROOF DECK

EX.

XDW1

XRM

XRN

XGL

EX. GLAZED ROOF WITH RAFTERS BELOW, TO BE REPLACED WITH NEW

XRM

XGL

EX. DECK FFL

2

A11.02

PLAN - EXISTING & DEMOLITION - ROOF (UPPER) 1 : 50

XRN

+8.030

EX. DECK FFL

+7.740

EX. FIRST FLOOR FCL

R O A D

XRN EX.

EX. ENTRY DOOR, AND CANOPY TO BE REMOVED

EX.

XFW1

XFW2

EX. FIRST FLOOR FFL

ALL TREES TO BE RETAINED UNLESS OTHERWISE NOTED

EX.

XWG1

EX.

XWG2

XWG3

EX.

ESD Consultant

KRNETA Building Suveyors Building Surveyor

P.O. Box 576 Essendon North VIC 3041 03 9331 3695 info@efficientenergychoices.com.au

Level 2, 13 Cremorne Street Cremorne 3121 03 9427 9333 office@krneta.com.au

LEVATION - EXISTING & DEMOLITION - SOUTHWEST

Rev.

Description

Date

+5.340

EX. FIRST FLOOR FFL

+5.090

EX. GROUND FLOOR FCL

2PAC1 CN1 GL1 GL3 GL4 513 513 GR1 GR2 GR3 MR1 3079 COS MT1 GLAZED ROOF PB1 PL1 PT1 PT2 PT3 RM1 TL1 TL2 TL3 TL4 TV1 XBR XCN XLB XMF XPB XRD XRM XRN XST XTD XTF XTL

XBR

XBR

XRN

PLAN - EXISTING & DEMOLITION 17 NEVILLE ST Project Name

Client Address

XBR

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

Zinta Vilde GROUND FLOOR FFL 17 Neville St,+2.690 Albert EX. Park

A11.02

Scale Drawn by Checked by Issued Date Status

1

A31.01

300

NEW EAVES GUTTER DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. MOTORISED SHADE,TO BE REINSTATE OVER RM1, BUILDER TO ENSURE WATERPROOFING TO METAL ROOFING AND GLAZED ROOF

282 Canterbury Road Surrey Hills 3127

GL1

XRN

MT1 SHROUD OVER ENTRY DOOR AND DOOR DETAIL TO REFER TO A53.01, STRUCTURE SUPPORT REFER TO STRUCTURE ENG'S DRAWINGS

D102

DOOR TYPE

XD102

EX. DOOR TYPE

W100

WINDOW TYPE

XW100

EX. WINDOW TYPE

EQ#

EQUIPMENT TYPE

TL#

FINISH TYPE

XTL#

EX. FINISH TYPE

TB#

FURNITURE TYPE

J0#

JOINERY TYPE

RWH

Efficient Energy Choices

KRNETA Building Suveyors Building Surveyor

A11.02

1 : 50 @ A1 VO EE 04/10/2021 FOR CONSTRUCTION

1 : 50

Rev.

FOR CONSTRUCTION

3

4

6407

3079

300

NEW EAVES GUTTER DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

RM1

EX.

EX. MOTORISED SHADE,TO BE REINSTATE OVER RM1, BUILDER TO ENSURE WATERPROOFING TO METAL ROOFING AND GLAZED ROOF

RM1

XDW1

GL1

R O A D

XFW2

NOM. UPSTAND/ PLINTH

ARLO ESSENTIAL WIRED VIDEO DOOR BELL FINAL POSITION TO BE CONFIRMED WITH ARCHITECT ON SITE

DG1

184 RICHARDSON ST EX.

XWG2

EX.

XWG3

XRN

DEMOLITION LEGEND XBR

XWG4

XRN

XBR

XRN

XBR

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE DEMOLISHED AND MAKE GOOD FOR NEW WORKS

E evat on South - Proposed

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

XBR

RED DASHED LINE DENOTES VEGETATION TO BE REMOVED

A

B

C

D

DEMOLITION NOTES

NEW EAVES GUTTER DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

1.

3657MATERIALS, REMOVE ALL HAZARDOUS WHICH ARE RECORDED IN ANY HAZARDOUS MATERIALS RISK ASSESSMENT REPORTS BEFORE PROCEEDING WITH COMPLETE DEMOLITION OF BUILDINGS.

2.

MAINTAIN AND PROTECT ALL EXISTING BUILDINGS ADJACENT AND/OR ASSOCIATED WITH THE NEW WORKS, INCLUDING DEMOLITION

3.

ALL TOP SOIL TO REMAIN ON SITE FOR FUTURE LANDSCAPING - GROUND WORKS

4.

ALL LOOSE EQUIPMENT & FURNITURE TO

L

L CO

PLAN - ROOF UPPER

NOM. SETDOWN

EX.

EX. XDF2

L EX. L CO EX.

2

A22.02

REFER TO GENERAL NOTES ON SHEET A01.00

SINGLE STOREY WEATHERBOARD HOUSE

SINGLE STOREY BRICK HOUSE

E

F

10693 COS 913

4272

RM1

EX.

2 A41.01

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

ESD Consultant

XRN

XRN

287

PARAPET 4 A41.01

A

BOX GUTTER AND RHW BELOW COLOUR TO MATCH EXISTING

CHANGE IN LEVEL

EX. XWG1 NOTES GENERAL

DP

3657

B

4 A41.01

717

PARAPET

RAFTER

RAFTER

RAFTER

RAFTER

STRUCTURE ENG'S DRAWINGS

SPOT LEVEL

15 NEVILLE ST

DP

913

COLORBOND EAVES GUTTER TO MATCH EXISTING

STRUCTURAL TYPE

EX.

FLASHING FALL MIN

EAVES GUTTER

Ø100mm DP, COLOUR TO MATCH EXISTING ALLOW FOR SPREADER

RAFTER, HYNE BEAM

ALL TREES TO BE RETAINED UNLESS OTHERWISE NOTED

Status

EX.

FALL

METAL ROOF BELOW

1 : 50 @ A1 EX. MOTORISED SHADE VO EE GLAZED ROOF BELOW 04/10/2021 FOR CONSTRUCTION

12565 COS

XFW1

BOX GUTTER

RWH

4272 10693 COS

3

RAFTERS, CONCELAED

ALL TOP SOIL TO REMAIN ON SITE FORFIXED TO RAFTERS FUTURE LANDSCAPING - GROUND WORKS EXPOSED TIMBER ALL LOOSE EQUIPMENT & FURNITURE 17 TO, APPEARANCE GRADE A IN BE STORED ON SITE IN EXISTING BUILDING, PLANTATION PINE CONFIRM LOCATION WITH CLIENT BENEATH TO

XRN

EX.

FALL MIN FLASHING

A41.01

Scale 1 : 50 @ A1 Level 2, 13 Cremorne Street P.O. Box 576 Essendon Cremorne 3121 Drawn by North VIC 3041 VO 03 9331 3695 03 9427 9333 EE Checked by info@efficientenergychoices.com.au Issued Date 04/10/2021 office@krneta.com.au

0400 588 948 Zinta Vilde info@structuraledge.com.au 17 Neville St, Albert Park

AUSTRALIAN HEIGHT DATUM CEILING HEIGHT CONFIRM ON SITE DOWNPIPE EXPANSION JOINT EQUAL EXISTING 2 EXTERIOR FINISHED CEILING LEVEL FINISHED FLOOR LEVEL FLOOR DRAIN INTERIOR NATURAL GROUND LEVEL OPEN FIRE PLACE OVERALL OVERFLOW PARAPET LINE PHOTO VOLTAIC (SOLAR) PANEL PRIME COST PROPOSED GROUND LEVEL PROVISIONAL SUM RAINWATER HEAD RIDGE LINE SPREADER STRUCTURAL SURFACE LEVEL PANEL JOINT EX. WALL TOP OF BRICKWORK TOP OF BLOCKWORK WALL TOP OF CONCRETE WALL

RM1

300

CO EX.

146

10693 COS 913

913 COS

STAIRCASE

146 3365 340 146

3657

717

377

CO L

C:\Users\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt

RWH

CO L

1134

C:\Users\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt

L CO EX. L CO EX. 284 300

DP

FALL

CO L

DP

XWF6

CO L EX.

RAFTER

RAFTER

DP

CO

4272

3980 COS

BEDROOM 2 / MASTER BEDROOM

181

26 4910 377

L

CO

EX.

L CO EX. EX.

PARAPET

All rights reserved. This document remains the Project Name property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Client Address

L

. GARAGE DOOR L

120

EX.

EXTEND OF PAINT LINE OF FLOOR OVERAND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS EX. ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING CO L L

CO

EX.

DP

L

CO

EX.

L CO EX.

XDF2 212° 00' 54" 10.67 m

FALL

CO L EX.

146

Roo P an(Upper) - Proposed FLASHING TO MATCH RM1, RM1 TO BE COORDINATED AND INSTALLED AS PER MANUF'S INSTALLATIOIN GUIDE

CO

XFW4

L CO EX.

CO

EX.

3750 COS

GARAGE DOOR OPENING

ROLLER DOOR MECHANISM OVER

L CO

EX. EX. RWH + DP

FW1

EX. DP XWF6

CO L

RAFTER

RAFTER

RAFTER

RAFTER

RAFTER

EX.

6115 COS

IPSUM Structures PLAN - EXISTING & DEMOLITION Structural & Civil Engineer

AHD CH COS DP EJ EQ EX. EXT FCL FFL FD 3079 INT NGL OFP O/A O/F PL PV (PC) PGL (PS) RWH RL SP SSL PJ TBRW TBWW TCW

BOX GUTTER

230

L

L EX. END OF BULKHEAD

L

CO

EX.

L CO L CO EX. XDF2

L CO EX.

380

1134

CO L

L CO EX.

L

EX. L CO

L

EX.

CO EX.

L CO

L

EX.

CO EX. LINE OF FLOOR OVER

L

EX.

CO EX. 300

BOX GUTTER

L CO EX. L CO 287

BOX GUTTER

DP

FALL

FALL FALL

913

D

A22.01

Scale Drawn by Checked by C Issued Date Status

SOLID BLOCKING BUILDINGS ADJACENT AND/OR ASSOCIATED WITH THE NEW WORKS, INCLUDING CENTRE TO EXPOSED RAFTERS, MATCH FINISH DEMOLITION AND DEPTH TO EXPOSED

EAVES GUTTER

100mm THK METECNOSPAN PIR INSULATED ROOF PANEL

513

ROOF DECK

®

BOUNDARY

BOUNDARY

TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE

Ø100mm DP, COLOUR TO MATCH EXISTING ALLOW FOR SREADER

2PAC1 CN1 GL1 GLASS TYPE 1 (CLEAR) GL3 GLASS TYPE 3 - (CLEAR) GL4 GLASS TYPE 4 (NARROW REEDED) GR1 513 GROUT TYPE 513 1 513 TIMBER RAFTERS GR2 GROUT TYPE 2 GR3 GROUT TYPE 3 1026 1026 GLAZING MR1 MIRROR TYPE 1 3079 COS METAL FINISH - TYPE 1 MT1 OVERALL PB1ROOFPLASTERBOARD GLAZED PL1 PLYWOOD TYPE 1 PT1 PAINT TYPE 1 PT2 PAINT TYPE 2 PT3 PAINT TYPE 3 RM1 METAL ROOF FINISH - TO MATCH EXISTING TL1 TILE TYPE 1 TL2 TILE TYPE 2 TL3 TILE TYPE 3 TL4 TILE TYPE 4 TV1 TIMBER VENEER - TYPE 1 XBR BRICKWORK - EXISTING XCN CONCRETE - EXISTING XLB LINING BOARD - EXISTING XMF STEEL FRAME - EXISTING XPB PLASTERBAORD - EXISTING XRD RENDER - EXISTING XRM METAL ROOF - EXISTING XRN RENDER FINISH - EXISTING XST CAESARSTONE - EXISTING XTD TIMBER DECK - EXISTING XTF TIMBRE FRAME - EXISTING XTL TILE - EXISTING

513 1026

Date

EX. METAL R

PV

3

4.

Ø100mm DP, COLOUR TO MATCH EXISTING TWOPAC FINISH - TYPE 1 ALLOW FOR CONCRETE - OFF FORM SPREADER

1 : 50

EXTEND WALL TO RM1, ENSURE WEATHERPROOF AND FLASHING WHERE WALL MEETS EDGE OF RM1

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF,

METAL ROOF BELOW

E

FINISHES LEGEND

513

146

2

3079

TIMBER RAFTERS MAINTAIN AND PROTECT ALL EXISTINGBELOW

FALL MIN. 1:100

BOX GUTTER TO MATCH EXISTING, BUILDER TO ENSURE WATERPROOF TO CHIMNEY / FLUE JUNCTION

EQ

3079 COS

1 : 50

GUTTER, RAIN WATER +11.100 PROP. ROOF LEVEL - UPPER RIDGE HEADS, DOWNPIPE, FINISH

1

300

2

PARAPET

EQ

GLAZED ROOF

717

BOUNDARY

CO

EX. EX STEEL BEAM CO L

L CO EX.

L CO EX. DP XFW4

L CO L CO EX. RWH PARAPET

RAFTER

EQ

50

BUILDER TO INSPECT CONDITION OF SIDE PANELS, AND CONFIRM

CO

L CO L CO

3657

L CO EX. 340 717

377 3980 COS 146

10693 COS

913

913 COS

STAIRCASE

146 3365

3657

340 146 717

377

231 1134 5100 4272 10693 COS

76

EQ

A

3.

5.

Description

A41.01

FACADE MOULDING BELOW

1

EQ

Rev.

GROUT TYPE 3 MIRROR TYPE 1 METAL FINISH - TYPE 1 PLASTERBOARD PLYWOOD TYPE 1 PAINT TYPE 1 PAINT TYPE 2 PAINT TYPE 3 METAL ROOF FINISH - TO MATCH EXISTING TILE TYPE 1 TILE TYPE 2 TILE TYPE 3 TILE TYPE 4 TIMBER VENEER - TYPE 1 BRICKWORK - EXISTING CONCRETE - EXISTING LINING BOARD - EXISTING STEEL FRAME - EXISTING PLASTERBAORD - EXISTING RENDER - EXISTING METAL ROOF - EXISTING RENDER FINISH - EXISTING CAESARSTONE - EXISTING TIMBER DECK - EXISTING TIMBRE FRAME - EXISTING TILE - EXISTING

GENERAL LEGEND

BOX GUTTER AND RHW BELOW

ELEVATION - PROPOSED - SOUTHWEST

TWOPAC FINISH - TYPE 1 CONCRETE - OFF FORM GLASS TYPE 1 (CLEAR) GLASS TYPE 3 - (CLEAR) GLASS TYPE 4 (NARROW REEDED) GROUT TYPE 1

F

END FACE OF RM1

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE RECONSTRUCTED TO RECEIVE NEW WORKS

E evat on South - Demo Ex st ng

EX. ROOF LEVEL - UPPER RIDGE

2.

A41.01

EQ

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au

TWOPAC FINISH - TYPE 1 COLOUR TO MATCH EXISTING CONCRETE - OFF FORM GLASS TYPE 1 (CLEAR) GLASS TYPE 3 - (CLEAR) GLASS TYPE 4 (NARROW REEDED) 513 513 GROUT TYPE 1 GROUT TYPE 2 GROUT TYPE 3 MIRROR TYPE 1 METAL FINISH - TYPE 1 PLASTERBOARD PLYWOOD TYPE 1 PAINT TYPE 1 PAINT TYPE 2 PAINT TYPE 3 METAL ROOF FINISH - TO MATCH EXISTING TILE TYPE 1 TILE TYPE 2 TILE TYPE 3 TILE TYPE 4 TIMBER VENEER - TYPE 1 BRICKWORK - EXISTING CONCRETE - EXISTING LINING BOARD - EXISTING STEEL FRAME - EXISTING PLASTERBAORD - EXISTING RENDER - EXISTING METAL ROOF - EXISTING RENDER FINISH - EXISTING CAESARSTONE - EXISTING TIMBER DECK - EXISTING TIMBRE FRAME - EXISTING TILE - EXISTING

XWG4

Drawing Name

XBR

EQ

1

2650

Efficient Energy Choices

vil Engineer

XRN

2

A41.01

EQ

4

2400

2650

SINGLE STOREY WEATHERBOARD HOUSE

M Structures

XRN

1

A13.01

A41.01

15 NEVILLE ST XRN

BEDROOM 2 / MASTER BEDROOM

4272

ALL LOOSE EQUIPMENT & FURNITURE TO BE STORED ON SITE IN EXISTING BUILDING, CONFIRM LOCATION WITH CLIENT

5.

184 RICHARDSON ST EX.

FALL MIN. 1:100

Ø100mm DP, COLOUR TO MATCH EXISTING ALLOW FOR SPREADER

FINISHES LEGEND

EQ

EX.

EX. CHIMNEY

FALL MIN. 1:100 PARAPET

PARAPET

1

A41.01

A13.01

EQ

EX. GLAZED ROOF WITH RAFTERS BELOW, TO BE REPLACED WITH NEW

GARAGE DOOR OPENING

4.

FALL MIN. 1:100

302° 00' 54" 13.11 m

BOX GUTTER AND RHW BELOW, COLOUR TO MATCH EXIST

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

8280

ALL TOP SOIL TO REMAIN ON SITE FOR FUTURE LANDSCAPING - GROUND WORKS

2PAC1 CN1 GL1 GL3 GL4 GR1

REMOVE ALL HAZARDOUS MATERIALS, 12.76mm THK WHICH ARE RECORDED IN ANY HAZARDOUS VIRIDIAN EnviroShield MATERIALS RISK ASSESSMENT REPORTS Peformance™ ITO CLEAR. BEFORE PROCEEDING WITH COMPLETE ENSURE PANEL JOINT DEMOLITION OF BUILDINGS. TO SIT CENTRE TO

GL1

Drawing Name

MAINTAIN AND PROTECT ALL EXISTING BUILDINGS ADJACENT AND/OR ASSOCIATED WITH THE NEW WORKS, INCLUDING DEMOLITION

REFER TO GENERAL NOTES ON SHEET A01.00

FINISHES LEGEND

BUILDER TO REINSTALL EX. MOTORISED SHADE OVER NEW ROOFING AND REINSTATE POWER

Zinta Vilde GLAZED ROOF 17 Neville St, Albert Park DEMOLITION NOTES

385

17 NEVILLE ST

3.

PARAPET

EX. ROOF LEVEL - UPPER RIDGE

terbury Road Hills 3127 8 948 EX. GROUND FLOOR FFL ucturaledge.com.au

PARAPET

PARAPET

32° 00' 54" 10.67 m

EX. CHIMNEY

FALL MIN. 1:100

XTD

FALL MIN. 1:100

Rev. Description ARCHITECTS EAT

2. GL1

4 A41.01

302° 00' 54" 13.11 m EX. GUTTER TO BE REPLACED

XTD

BOUNDARY

PARAPET

PARAPET

EX. RAFTERS

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. RWH + DP

EX. RAFTERS

EX. RAFTERS

PARAPET

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

L CO EX.

EX. BOX GUTTER BELOW

ROOF DECK

EX ROOF DECK BELOWGL1

NOM. UPSTAND/ PLINTH

EX. MOTORISED SHADE

Project Name

Client Address

385

2

REMOVE ALL HAZARDOUS MATERIALS, WHICH ARE RECORDED IN ANY HAZARDOUS MATERIALS RISK ASSESSMENT REPORTS BEFORE PROCEEDING WITH COMPLETE DEMOLITION OF BUILDINGS.

1 : 50 NOM. SETDOWN

Ø100mm DP, COLOUR TO MATCH EXISTING

A41.01 RED DASHED LINE DENOTES VEGETATION TO BE REMOVED

1.

PLAN - LEVEL 1

SPOT LEVEL

GENERAL NOTES

RED DASHED LINE DENOTES A41.01 VEGETATION TO BE REMOVED

17 NEVILLE ST

ROOF DECK

GL1

Level 2, 13 Cremorne Street DEMOLITION NOTES

XGL

EX. GLAZED ROOF AND RAFTERS BELOW TO BE REPLACED WITH NEW

EX ROOF DECK BELOW

SOLID BLOCKING CENTRE TO EXPOSED RAFTERS, MATCH FINISH AND DEPTH TO EXPOSED RAFTERS, CONCELAED FIXED TO RAFTERS

Building Surveyor

P.O. Box 576 Essendon North VIC 3041 03 9331 3695 info@efficientenergychoices.com.au

CHANGE IN LEVEL

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE RECONSTRUCTED TO RECEIVE NEW WORKS

1.

Roo P an(Lower) - Proposed

KRNETA Building Suveyors GLAZED ROOF

EX. GLAZED ROOF BELOW

282 Canterbury Road Surrey Hills 3127 0400 588 948 info@structuraledge.com.au

Drawing Name

PL1

9mm THK PL1 PLYWOOD WALL LINING

BOX GUTTER AND RHW BELOW, COLOUR TO MATCH EXISTING

3070

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

IPSUM Structures

STRUCTURAL TYPE

A22.01

SOLAR PANELS AS PER NOMINATED SUBCONTRACTOR'S

3

RM1

JOINERY TYPE

2

AC CONDENSORS AS PER NOMINATED SUBCONTRACTOR'S SPECIFICATIONS, ALLOW POWER TO AC, INSTALL AS PER MANUF'S INSTALLATION GUIDE

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE RECONSTRUCTED TO RECEIVE NEW WORKS

RM1

FURNITURE TYPE

INTERNAL FACE OF BOX GUTTER

PLAN - GENERAL ARRANGEMENT RM1

A13.01

EX. MOTORISED SHADE EX. STAIRCASE TO ROOF DECK

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE DEMOLISHED AND MAKE GOOD FOR NEW WORKS FALL

FALL

FALL

VOID TO FIRST FLOOR

UP

GLAZED ROOF

UP

XDW1 EX. GLAZED ROOF BELOW

290

EX.GLAZED TIMBER BALUSTRADE TO BE RETAINED AND MADE GOOD. BUILDER TO INSPECT ON SITE.

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. MOTORISED SHADE BUILDER TO REINSTALL EX. METAL ROOF EX. MOTORISED SHADE OVER NEW ROOFING AND REINSTATE POWER

C EX. GLAZED ROOF BELOW

PL1

DEMOLITION LEGEND

EX. MOTORISED SHADE

ARCHITECTS EAT

3

Date EX. METAL ROOF BELOW

Description

AC CONDENSORS AS PER NOMINATED SUBCONTRACTOR'S SPECIFICATIONS, ALLOW POWER TO AC, INSTALL AS PER MANUF'S INSTALLATION GUIDE

250

EX. MOTORISED SHADE TO BE RETAINED AND MADE GOOD, BUILDER TOENSURE FLASHING AND WATERPROOF TO NEW METAL AND GLAZED ROOF

EX. GLAZED ROOF

XRM RM1

Rev.

RM1

EAVES OVER

12.76mm THK VIRIDIAN EnviroShield Peformance™ ITO CLEAR. ENSURE PANEL JOINT TO SIT CENTRE TO TIMBER RAFTERS BELOW

A22.02

EX. FINISH TYPE

J0#

TO MATCH RM1

302° 00' 54" 13.11 m

1 : 50 REFER TO GENERAL NOTES ON SHEET A01.00

FINISH TYPE

TB#

ALLOW FOR HATCH DENOTES ALL EXISTING SPREADER STRUCTURES AND SURFACES TO BE DEMOLISHED AND MAKE GOOD FOR NEW WORKS ROOF RIDGE, FLASHED

PLAN - EXISTING & DEMOLITION PLAN- -ROOF ROOF(UPPER) DECK 1

2

XRM RM1

3 A41.01

XRM

GLAZED ROOF

EXPOSED TIMBER RAFTER, HYNE BEAM 17 , APPEARANCE

PARAPET

TL#

XTL#

JOINERY TYPE

DEMOLITION LEGEND

STRUCTURAL TYPE

NOM. UPSTAND/ PLINTH

FALL

L CO EX.

EX. MOTORISED SHADE

A13.01

EX. METAL ROOF BELOW

FALL

EX. BOX GUTTER

EX. DP

A13.01

360

JOINERY TYPE

NOM. SETDOWN

FALL

UP

1134 913

FURNITURE TYPE

J0#

EX. DOOR TYPE

STRUCTURAL TYPE

RM1

VOID GROUND

X

REFER TO GENERAL NOTES ON SHEET A01.00SPECIFICATIONS,

VOID TO FIRST FLOOR

RM1

EX. MOTORISED SHADE

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

GENERAL NOTES A11.02

EX. METAL ROOF

3

3 A41.01

GRADE A IN PLANTATION PINE BENEATH TO STRUCTURE ENG'S DRAWINGS

D102 XD102

COLORBOND BOX GUTTER TO FALL TO EXISTING WALL PENETRATION, COLOUR TO MATCH RM1

NOM. UPSTAND/ PLINTH

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX BALUSTRADE

2

RWH TO MATCH EXISTING

RWH

SPOT LEVEL

CHANGE IN LEVEL

FALL

EX. ROOF RL +10.970

3

XRM

FALL MIN. 1:100

W100 WINDOW TYPE EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, XW100 EX. WINDOW TYPE BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW EQ# EQUIPMENT TYPE SCHEDULE

INSTALL AS PER MANUF'S INSTALLATION GUIDE. ALLOW SPACE IN SWITCHBOARD FOR SOLAR PANEL SYSTEM

EQ

SPOT LEVEL

FALL

EX. METAL ROOF

181

EX. FINISH TYPE

TB#

FALL

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. DP

EX. D INING

1 : 50

. GARAGE DOOR L

XTL#

RM1

SOLAR PANELS AS PER NOMINATED SUBCONTRACTOR'S SPECIFICATIONS, INSTALL AS PER MANUF'S INSTALLATION GUIDE. ALLOW SPACE IN SWITCHBOARD FOR SOLAR PANEL SYSTEM

PLAN - EXISTING & DEMOLITION - ROOF DECK

1

CO

FINISH TYPE

AC

212° 00' 54" 10.67 m

212° 00' 54" 10.67 m

FLASHING

A11.02

L CO EX.

122° 00' 54" 13.11 m

TL#

PARAPETTYPE FURNITURE

CHANGE IN LEVEL

9mm THK PL1 PLYWOOD WALL LINING

XFW5

A41.01

DOOR TYPE

C:\Users\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt

A41.01

EX. FINISH TYPE

TB#

NOM. SETDOWN

XDW3

END FACE OF RM1

A

XTL#

AC

VOID TO GROUND FLOOR

200

GENERAL NOTES

ROOF RIDGE, FLASHED TO MATCH RM1 EX. METAL ROOF BUILDER TO REINSTALL EX. MOTORISED SHADE OVER NEW ROOFING AND REINSTATE POWER

4

WINDOW TYPE

FALL MIN. 1:100 J0#

FALL

BUILDER TO ASSESS ON

A41.01

EX. DOOR TYPE

W100

PV

EAVES OVER

IF EX. CONDITION EX. METALSITE, ROOF ALLOW FOR 100mm THK METECNOSPAN PIR INSULATED ROOF PANEL TO CLEAR EX WINDOW. OTHERWISE REPLACE WITH 80mm THK METECNOSPAN EX. ROOF +10.970 INSULATED ROOF PIR RL PANEL WITH R VALUE AS PER ESD REPORT

B

XD102

RM1

SOLAR PANELS AS PER NOMINATED SUBCONTRACTOR'S SPECIFICATIONS, INSTALL AS PER MANUF'S INSTALLATION GUIDE. ALLOW SPACE IN SWITCHBOARD FOR SOLAR PANEL SYSTEM

XWF6

NEW TIMBER BEAM TO STRUCT. ENG. DWGS. ENSURE FACE OF TIMBER BEAM IS ALIGNED TO FACE OF EX. BALUSTRADE

BOUNDARY

A13.01

EF1 NEW EXHAUST FANS TO REPLACE EXISTING. REFER FF&E SCHEDULE, ALLOW POWER TO EXHAUST FANS

DOOR TYPE

1134

BOUNDARY

A13.01

122° 00' 54" 13.11 m

PV

D102

BUILDER TO ASSESS ON SITE, IF EX. CONDITIONXW100 ALLOW FOR EX. WINDOW TYPE 100mm THK METECNOSPAN PIR INSULATED ROOF PANEL TO EQ# OTHERWISE CLEAR EX WINDOW. EQUIPMENT TYPE REPLACE WITH 80mm THK METECNOSPAN PIR INSULATED TL# R VALUEFINISH TYPE ROOF PANEL WITH AS PER ESD REPORT

FLASHING

A13.01

EQUIPMENT TYPE

A41.01

Ø100mm DP, COLOUR TO MATCH EXISTING, ALLOW FOR SPREADER

D

A

4 TWOPAC FINISH - TYPE 1 CONCRETE - OFF FORM GLASS TYPE 1 (CLEAR) GLASS TYPE 3 - (CLEAR) GLASS TYPE 4 (NARROW REEDED) 300 GROUT TYPE 1 GROUT TYPE 2 GROUT TYPE 3 MIRROR TYPE 1 METAL FINISH - TYPE 1 PLASTERBOARD PLYWOOD TYPE 1 PAINT TYPE 1 RWH TO MATCH PAINT TYPE 2 EXISTING PAINT TYPE 3 COLORBOND BOX METAL ROOF FINISH - TO MATCH EXISTING GUTTER TO FALL TO EXISTING WALL TILE TYPE 1 RWH PENETRATION, COLOUR TO MATCH TILE TYPE 2 RM1 TILE TYPE 3 TILE TYPE 4 TIMBER VENEER - TYPE 1 BRICKWORK - EXISTING CONCRETE - EXISTING LINING BOARD - EXISTING STEEL FRAME - EXISTING PLASTERBAORD - EXISTING RENDER - EXISTING METAL ROOF - EXISTING RENDER FINISH - EXISTING CAESARSTONE - EXISTING TIMBER DECK - EXISTING TIMBRE FRAME - EXISTING TILE - EXISTING

A11.01

3915

FALL MIN. 1:100

COLORBOND CUSTOM FORMED VALLEY GUTTER TO FALL TO EXISTING DOWNPIPE, BUILDER TO INSPECT ON SITE. 1 : 50 FINISH TO MATCH RM1

A22.01

WINDOW TYPE

EX. WINDOW TYPE

A41.01

RWH

PLAN - LEVEL 1

2

EX. WINDOWS NOTE DOOR TYPE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE EX. DOOR TYPEAND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

EQ#

1

INTERNAL FACE OF BOX GUTTER EX. METAL ROOF BELOW

E

Building Surveyor

XW100

3

4875

A41.01

2

CO L

1

COLORBOND BOX GUTTER TO FALL TO EXISTING WALL PENETRATION, COLOUR TO MATCH RM1

1620 COS

2

EX. METAL ROOF BELOW

BUILDER TO INSPECT CONDITION OF EXTERNAL CLADDINGS AND ADVISE REMEDIAL ACTION REQUIRED WITH ARCHITECT. PROVIDE COST ALLOWANCE FOR REPLACEMENT IF NECCESSARY

EX.

4910

DP

377

W100

1

EX. A/C CONDENSORS UNITS TO BE REMOVED

F

1 A13.01

PARAPET

EX. RWH + DP

PARAPET

D102 XD102

1

A13.01

2

XFW2

B

GR3 XFW8 Scale 1 : 50 @ A1 Level 2,313 Cremorne Street MR1 A41.01 3121 MT1 P.O. Box 576Drawn Essendon Cremorne by North VIC 3041 VO PB1 03 9331 3695Checked by 03 9427 9333 EE PL1 info@efficientenergychoices.com.au Issued Date 04/10/2021 office@krneta.com.au PT1 Status FOR CONSTRUCTION PT2 PT3 RM1 GENERAL LEGEND LINE OF TL1 PLYWOOD AHD AUSTRALIAN HEIGHT DATUM LINING OVER TL2 CH CEILING HEIGHT TL3 COS CONFIRM ON SITE TL4 DP DOWNPIPE EJ EXPANSION JOINT TV1 EQ EQUAL XBR VOID TO EX. GROUND FLOOR EXISTING XCN NEW EXT EXTERIOR XLB COLORBOND FCL FINISHED CEILING LEVEL BOX GUTTER, XMF FFL FINISHED FLOOR LEVEL FALL TOWARDS NEW TO EX. WALL XPB FDTIMBER BEAMFLOOR DRAIN STRUCT. ENG. DWGS. PENETRATION, INT FACE OFINTERIOR XRD ENSURE FINISH TO MATCH TIMBER NGL BEAM IS NATURAL GROUND LEVEL RM1 XRM ALIGNED OF OFP TO FACEOPEN FIRE PLACE EX. BALUSTRADE XRN O/A OVERALL NEW RWH TO XST O/F OVERFLOW MATCH EXISTING XTD PL PARAPET LINE PV PHOTO VOLTAIC (SOLAR) PANEL XTF 4 (PC) PRIME COST XTL FALL MIN. 1:100 A41.01 PGL PROPOSED GROUND LEVEL (PS) PROVISIONAL SUM RWH RAINWATER HEAD RL RIDGE LINE FACADE MOULDING BELOW 4 SP SPREADER SSL STRUCTURAL SURFACE LEVEL PJ PANEL JOINT TBRW TOP OF BRICKWORK WALL TBWW TOP OF BLOCKWORK WALL TCW TOP OF CONCRETE WALL 3079 300

TIMBER BEAM TO WRAP TIMBER BEAM TO WRAP AROUND AND CAP OVER AROUND AND CAP OVER BOX GUTTER. BOX GUTTER. FIXED GLAZING TO SIT ON 13165 COS FIXED GLAZING TO SIT ON TOP, GLAZING SPEC TOP, GLAZING SPEC REFER TO WINDOW REFER TO WINDOW 6407 SCHEDULE SCHEDULE 1

3079 2

BOUNDARY

2

VOID TO GROUND FLOOR

XFW1

2

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT RWH TO MATCH REPLACE GLAZINGS ARE PER WINDOW EXISTING SCHEDULE

32° 00' 54" 10.67 m

EX. GUTTER TO BE REPLACED

A13.01

VOID TO GROUND FLOOR

F rst F oor P an - Proposed 2

4 A41.01

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

AUSTRALIAN HEIGHT DATUM CEILING HEIGHT CONFIRM ON SITE DOWNPIPE EXPANSION JOINT NEW EQUAL COLORBOND BOX GUTTER, EXISTING FALL TOWARDS EXTERIOR EX. WALL FINISHED CEILING LEVEL PENETRATION, FINISH TO MATCHLEVEL FINISHED FLOOR RM1 FLOOR DRAIN INTERIOR NATURAL GROUND LEVEL NEW RWH TO OPEN FIREEXISTING PLACE MATCH OVERALL OVERFLOW PARAPET 4 LINE PHOTO VOLTAIC (SOLAR) PANEL A41.01 PRIME COST PROPOSED GROUND LEVEL PROVISIONAL SUM RAINWATER HEAD RIDGE LINE SPREADER STRUCTURAL SURFACE LEVEL PANEL CANOPY JOINT OVER ENTRY DOOR TOP OF BRICKWORK WALL TOP OF BLOCKWORK WALL TOP OF CONCRETE WALL

Building Surveyor

XWF5

EX BALUSTRADE

AHD CH COS DP EJ EQ EX. EXT FCL FFL FD INT NGL OFP O/A O/F PL PV (PC) PGL (PS) RWH RL SP SSL PJ TBRW TBWW TCW

GROUT TYPE 2 KRNETA Building GR2 Suveyors

EX. CHIMNEY

FALL MIN. 1:100

XFW7

UP

Efficient Energy Choices

XCN

334 COS

PARAPET

STUDY

XFW5

3 A41.01

ESD Consultant

FFL +5.340

RAFTER

EX. RAFTERS

L CO EX.

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE 3 POSSIBLE.

EX. RWH + DP

EX. RAFTERS

EX. RAFTERS

PARAPET

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

L CO EX.

EX. BOX GUTTER BELOW

Client Address

®

A41.013775

PARAPET

FALL

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

EX. RAFTERS

32° 00' 54" 10.67 m

EX. RAFTERS

EX. RAFTERS

PARAPET

EX. RWH + DP

2

282 Canterbury Road Surrey Hills 3127 Zinta 0400 Vilde 588 948 XFW6 17 Neville info@structuraledge.com.au St, Albert Park

Project Name All rights reserved. This document remains the property of ArchitectsUP EAT and is only to be used for its commissioned purpose. No part of this document EX. STAIRCASE TO may be reproduced, modified or transmitted in any ROOF DECK written form or by any means without the explicit authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

XWF6

XCN

FFL +5.340

FALL

EX. BOX GUTTER

VOID TO GROUND FLOOR

1

A13.01

ALL TREES TO BE RETAINED UNLESS OTHERWISE NOTED

FALL

EX. CHIMNEY

17 NEVILLE ST

FALL

EX. GLAZED ROOF AND RAFTERS BELOW TO BE REPLACED WITH NEW

EX. BOX GUTTER

4

5.

XCN

Structural & Civil Engineer

NEW TIMBER BEAM TO STRUCT. ENG. DWGS. ENSURE FACE OF TIMBER BEAM IS ALIGNED TO FACE OF EX. BALUSTRADE

300

3

Roo P an(Lower) - Demo Ex st ng EX. BOX GUTTER BELOW

CONCRETE - OFF FORM GLASS TYPE 1 (CLEAR) GLASS TYPE 3 - (CLEAR) GLASS TYPE 4 (NARROW REEDED) GROUT TYPE 1 GROUT TYPE 2 GROUT TYPE 3 MIRROR TYPE 1 METAL FINISH - TYPE 1 PLASTERBOARD PLYWOOD TYPE 1 PAINT TYPE 1 PAINT TYPE 2 PAINT TYPE 3 METAL ROOF FINISH - TO MATCH EXISTING TILE TYPE 1 EX. METAL ROOF BELOW TILE TYPE 2 TILE TYPE 3 TILE TYPE 4 TIMBER VENEER - TYPE 1 BRICKWORK - EXISTING CONCRETE - EXISTING LINING BOARD - EXISTING STEEL FRAME - EXISTING PLASTERBAORD - EXISTING RENDER - EXISTING METAL ROOF - EXISTING RENDER FINISH - EXISTING CAESARSTONE - EXISTING TIMBER DECK - EXISTING TIMBRE FRAME - EXISTING TILE - EXISTING

A11.01

FALL

XTD

XCN

XFW7

A41.01

ALL LOOSE EQUIPMENT & FURNITURE TO BE STORED ON SITE IN EXISTING BUILDING, CONFIRM LOCATION WITH CLIENT

FFL +5.340

CORRIDOR

CANOPY OVER ENTRY DOOR

CH Issued Date CEILING HEIGHT 04/10/2021 COS CONFIRM ON SITE Status DOWNPIPE FOR CONSTRUCTION DP EJ EXPANSION JOINT EQ EQUAL EX. EXISTING EXT EXTERIOR FCL FINISHED CEILING LEVEL FFL FINISHED FLOOR LEVEL FD FLOOR DRAIN INT INTERIOR NGL NATURAL GROUND LEVEL OFP OPEN FIRE PLACE O/A OVERALL O/F OVERFLOW PL PARAPET LINE PV PHOTO VOLTAIC (SOLAR) PANEL (PC) PRIME COST PGL PROPOSED GROUND LEVEL (PS) PROVISIONAL SUM RWH RAINWATER HEAD RL RIDGE LINE SP SPREADER SSL STRUCTURAL SURFACE LEVEL PJ PANEL JOINT TBRW TOP OF BRICKWORK WALL TBWW TOP OF BLOCKWORK WALL TCW TOP OF CONCRETE WALL

17 Neville St, Albert Park

EX. GUTTER TO BE REPLACED

122° 00' 54" 13.11 m

A

4.

BEDROOM

XFD1

FFL +5.340 PLAN - EXISTING & DEMOLITION IPSUM Structures

UP

NEW RWH TO MATCH EXISTING

B

4 A41.01

Level 2, 13 Cremorne Street EX. MOTORISED SHADE P.O. Box 576 Essendon 3121 Scale North VIC 3041 1 : 50 @Cremorne A1 03 9331 3695GENERAL 03 9427 9333 C Drawn by LEGEND VO info@efficientenergychoices.com.au office@krneta.com.au AHDChecked AUSTRALIAN HEIGHT DATUM EX. ROOF BELOW EEGLAZED by

EX.GLAZED TIMBER BALUSTRADE TO BE RETAINED AND MADE GOOD. BUILDER TO INSPECT ON SITE.

EX. ROOF DECK

TL4

BEDROOM 2

GRIND AND CLEAN SCUFF MARKS ON EX, CONCRETE FLOOR, LEVEL AND RESEAL

GENERAL LEGEND

XDF1

3

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING TWOPAC FINISH - TYPE 1

2690

®

ENSUITE FFL +5.340

Drawing Name

A41.01

BELOW Efficient Energy Choices EX. METAL ROOF KRNETA Building Suveyors A13.01

ESD Consultant

EX. MOTORISED SHADE TO BE RETAINED AND MADE Surrey Hills 3127 GOOD, BUILDER TOENSURE 0400 588 948 FLASHING AND WATERPROOF TO NEW info@structuraledge.com.au EX. GLAZED ROOF METAL AND GLAZED ROOF Zinta Vilde

XGL

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

ALL TREES TO BE RETAINED UNLESS OTHERWISE NOTED

BATH FFL +5.340 TL2

Date

RWH

Client Address

302° 00' 54" 13.11 m

EX. EXHAUST TO BE REPLACED WITH NEW

ALL LOOSE EQUIPMENT & FURNITURE TO BE STORED ON SITE IN EXISTING BUILDING, CONFIRM LOCATION WITH CLIENT

5.

XCN

FFL +5.340

RAFTER

ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING

3

IPSUM Structures A13.01

EX. MOTORISED SHADE

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document Project Name may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

XGL

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

4.

CREST OF BULKHEAD

BEDROOM 2

NEW COLORBOND BOX GUTTER, FALL TOWARDS EX. WALL PENETRATION, FINISH TO MATCH RM1

DEMOLITION

2PAC1 CN1 GL1 GL3 GL4 GR1 GR2 GR3 MR1 MT1 PB1 PL1 PT1 PT2 PT3 RM1 TL1 TL2 TL3 TL4 TV1 XBR XCN XLB XMF XPB XRD XRM XRN XST XTD XTF XTL

282 Canterbury Road

EX. DP Drawing Name

17 NEVILLE ST

EX. BOX GUTTER BELOW

ALL TOP SOIL TO REMAIN ON SITE FOR FUTURE LANDSCAPING - GROUND WORKS

XWG4

Structural & Civil Engineer PLAN - EXISTING & DEMOLITION

UP

EX.GLAZED TIMBER BALUSTRADE TO BE RETAINED AND MADE GOOD. BUILDER TO INSPECT ON SITE.

REPAIR AND / OR REPLACE ALL EXISTING RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

3.

2400

Date

XDW1

1

LINE OF PLYWOOD LINING OVER

4986

L CO

Description UP

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au

EX. GLAZED ROOF AND RAFTERS BELOW TO BE REPLACED WITH NEW

REMOVE ALL HAZARDOUS MATERIALS,

C:\Users\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt

Rev.

EX. DP

EX. GLAZED ROOF

VOID TO GROUND FLOOR

A55.01

FINISHES LEGEND

EX. METAL ROOF

ARCHITECTS EAT

EX. MOTORISED SHADE

EX. MOTORISED SHADE TO

1.

8410 COS

Building Surveyor

BE RETAINED AND MADE Level 2, 13 Cremorne Street GOOD, BUILDER TOENSURE FLASHING AND Cremorne 3121 WATERPROOF TO NEW METAL AND GLAZED ROOF 03 9427 9333 office@krneta.com.au

120

EX.

LINE OF FLOOR OVER EX. EX. CO CO L L EXTEND OF PAINT AND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS

DEMOLITION NOTES

EX.

EX.

KRNETA Building Suveyors

EX. WINDOW @1850 AFFL

1

GRIND AND CLEAN SCUFF MARKS ON EX, CONCRETE FLOOR, LEVEL AND RESEAL

ALL TOP SOIL TO REMAIN ON SITE FOR FUTURE LANDSCAPING - GROUND WORKS

FALL

P.O. Box 576 Essendon North VIC 3041 03 9331 3695 info@efficientenergychoices.com.au

EX. STEEL BEAM

A54.01

FALL

ESD Consultant

EX. METAL ROOF

A13.01

Efficient Energy Choices

Civil Engineer

nterbury Road Hills 3127 88 948 tructuraledge.com.au

150

ENSUITE

XFW3

3.

2PAC1 CN1 GL1 GL3 GL4 3079 GR1 3775 COS GR2 MASTER BEDROOM GR3 MR1 MT1 PB1 PL1 PT1 PT2 PT3 RM1 TL1 TL2 TL3 FALL MIN. 1:100 TL4 TV1 PL1 XBR XFW10 XCN XLB XMF XPB XRD XRM XRN XST XTD XTF XTL MASTER

BOX GUTTER

1 : 50

XFW9

LINE OF PLYWOOD LINING OVER

BRICKS, ALLOW FOR

1

VOID TO GROUND FLOOR

C

GROUTMAINTAIN TOUCH UP AND PROTECT ALL EXISTING 2. AND SEALING, BUILDINGS ADJACENT AND/OR ASSOCIATED CONFIRM WTIH ARCHITECT ONTHE SITE NEW WORKS, INCLUDING WITH ONCE RENDER IS DEMOLITION REMOVED

3

2430 COS

D

A41.01

REMOVE ALL HAZARDOUS MATERIALS, WHICH ARE RECORDED IN ANY HAZARDOUS MATERIALS RISK ASSESSMENT REPORTS BUILDER TO ALLOWPROCEEDING WITH COMPLETE BEFORE FOR REPAIR AND OF BUILDINGS. CLEAN DEMOLITION EXPOSED

A41.01

XFW9

VOID TO GROUND FLOOR

FALL

3

UM Structures

PLYWOOD LINING, REFER A42.01 FOR DETAIL

PL1

FOR DETAILS

XWG4

EX. STEEL BEAM

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au

C

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. DP

REMOVE EX. WALL AND CEILING LINING

VOID TO FIRST FLOOR

D

3

A41.01

RED DASHED LINE DENOTES VEGETATION TO BE REMOVED

3657

FALL

REMOVE EX. WALL AND CEILING LINING

130

BATH

PL1

Rev. Description ARCHITECTS EAT

WHICH ARE RECORDED IN ANY HAZARDOUS BUILDER TO ALLOW FOR REPAIR AND MATERIALS RISK ASSESSMENT REPORTS CLEAN EXPOSED BEFORE PROCEEDING WITH COMPLETE BRICKS, ALLOW FOR OF BUILDINGS. GROUT TOUCHDEMOLITION UP AND SEALING, CONFIRM WTIH 2. MAINTAIN AND PROTECT ALL EXISTING ARCHITECT ON SITE ADJACENT AND/OR ASSOCIATED ONCE RENDERBUILDINGS IS REMOVED WITH THE NEW WORKS, INCLUDING

BUILDER TO INSPECT CONDITION OF EXTERNAL CLADDINGS AND ADVISE REMEDIAL ACTION REQUIRED WITH ARCHITECT. PROVIDE COST ALLOWANCE FOR REPLACEMENT IF NECCESSARY

CO

L

EX. DP

1.

FALL

EX. EXHAUST

XRM

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

6407

1972 COS

A41.01

FALL MIN. 1:100

REPAIR AND REPLACE BROKENTIMBER FRAMED WINDOWS TO MATCH EXISTING

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE RECONSTRUCTED TO RECEIVE NEW WORKS

FOOTINGS TO REMAIN, REFER STRUCTURE ENGINEER'S DWGS FOR DETAILS

EX. A/C CONDENSORS UNITS TO BE REMOVED

FALL

EX. EXHAUST

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE DEMOLISHED AND MAKE GOOD FOR NEW WORKS

Level 2, 13 Cremorne Street 3 Cremorne 3121 03 9427 9333 NEW PAD FOOTINGS office@krneta.com.au TO EX. FOOTINGS. EX

212° 00' 54" 10.67 m

XRM

PLAN - GROUND FLOOR 1 A22.01 PLAN - EXISTING & DEMOLITION FIRST FLOOR 1 -: 50

3750 COS

DG2

3757 COS

EX. RWH + DP

EX. BOX GUTTER BELOW

1 : 50

1 A41.01

3

RED DASHED LINE DENOTES VEGETATION TO BE REMOVED

FINISHES LEGEND

BUILDER TO INSPECT AND ALLOW FOR WOODPECKER WOOD HEATER TO REPLACE EXISTING FINAL SPEC FOR FIREPLACE TO BE CONFIRMED WITH ARCHITECT BEFORE PURCHASING

13165 COS

2 A41.01 3079

RWH

A22.01

REFER TO GENERAL NOTES ON SHEET A01.00

EX. METAL ROOF

2

E

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE RECONSTRUCTED TO RECEIVE NEW WORKS

NEW PAD FOOTINGS TO EX. FOOTINGS. EX FOOTINGS TO REMAIN, REFER STRUCTURE

XWG3 EX. MOULDING BELOW

2

COLORBOND BOX GUTTER TO FALL TO EXISTING WALL PENETRATION, COLOUR TO MATCH RM1

1 : 50

GENERAL NOTES

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

PARAPET EX. BOX GUTTER BELOW

A11.01

REPAIR AND / OR REPLACE ALL EXISTING GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO LINE OF FLOOR OVER INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. CHIMNEY EX. FIREPLACE

333

PLYWOOD LINING, REFER A42.01 FOR DETAIL

REPAIR AND REPLACE BROKENTIMBER FRAMED WINDOWS TO MATCH EXISTING

DEMOLITION NOTES ENGINEER'S DWGS

Ground F oor P an - Demo Ex st ng

GLAZED ROOF

122° 00' 54" 13.11 m

EX. RWH + DP

BUILDER TO INSPECT CONDITION OF EXTERNAL CLADDINGS AND ADVISE REMEDIAL ACTION REQUIRED WITH ARCHITECT. PROVIDE COST ALLOWANCE FOR REPLACEMENT IF NECCESSARY

1

A53.01

E

HATCH DENOTES ALL EXISTING STRUCTURES AND SURFACES TO BE DEMOLISHED AND MAKE GOOD FOR NEW WORKS

NEW BULKHEAD TO CEILING

EX. GLAZED PARTITION TO BE REPLACED

2

1 A13.01 300

100

EX. EXHAUST TO BE REPLACED WITH NEW

EX. METAL ROOF

LIVING

VOID TO GROUND FLOOR TL1

XWG2

DG1

EX. STEEL BE

FALL MIN. 1:100

1

DEMOLITION LEGEND

ALLOW POWER TO NEW GARAGE DOOR, REFER TO DOOR SCHEDULE FOR SPECIFICATIONS

REMOVE PAINT AND RENDER FROM EX. LINE OF FLOOR OVER BRICK WALLS, TBC WITH ARCHITECT ON SITE

VOID TO GROUND FLOOR

1

A41.01

RWH

A54.01

3

XFW2

2

717

A41.01

1 A13.01

EX. RWH + DP

EX.

EX. EX. RWH + DP

1

A41.01

A13.01

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE

AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW A13.01 SCHEDULE

CO L

L CO

L L

CO

EX.

EX. L CO

2

A53.01

BOX GUTTER OVER

A13.01

F

C:\Users\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt

A13.01

2

END OF BULKHEAD

L

EX. EX. CO CL O

CO

L

CO

L

XWG3

F rst F oor P an - Demo Ex st ng 1

1

A56.01 EX CONCRETE FLOOR TO BE CLEANED, REGROUND AND RESEALED. BUILDER TO CHECK CONDITION ON SITE AND GARAGE MAKE GOOD. XCN

FFL +2.690

PLAN -FLOOR GROUND FLOOR PLAN - EXISTING & DEMOLITION 1 - FIRST

DEMOLITION LEGEND

BUILDER TO INSPECT EX. MOULDING BELOWAND ALLOW FOR WOODPECKER WOOD HEATER TO REPLACE EXISTING FINAL SPEC FOR FIREPLACE TO BE CONFIRMED WITH ARCHITECT BEFORE PURCHASING

EX. CHIMNEY DG1

2

XFR

XWF5

XFW1

ENTRY DOOR WITH CANOPY OVER , REFER DETAIL DRAWINGS

NOM. UPSTAND/ PLINTH

A13.01

REPAIR AND / OR REPLACE ALL EXISTING GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH LINE OF FLOOR OVER EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX. CHIMNEY EX. FIREPLACE

XWG2

XFW2

JOINERY TYPE STORE STRUCTURAL TYPE

NEW BULKHEAD TO CEILING

EX. GLAZED PARTITION TO BE REPLACED

LINE OF FLOOR OVER

DP

XWG1

XFW1

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

TL1 VOID TO GROUND FFLFLOOR +2.690

VOID TO GROUND FLOOR

ENTRY DOOR WITH CANOPY OVER , REFER DETAIL DRAWINGS

J0#

DP

ALLOW POWER TO NEW GARAGE DOOR, REFER TO DOOR SCHEDULE FOR SPECIFICATIONS

LINE OF FLOOR PAINT OVER AND REMOVE RENDER FROM EX. BRICK WALLS, TBC WITH ARCHITECT ON SITE

L CO EX.

L

VOID TO GROUND FLOOR

FURNITURE TYPE

Building Surveyor

P.O. Box 576 Essendon North VIC 3041 03 9331 3695 info@efficientenergychoices.com.au

XWF5

BOX GUTTER OVER

EX4 TIMBER BALUSTRADE

A41.01

EX. FINISH TYPE

KRNETA Building Suveyors

XFW8

XCN

CO 717

A

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

FINISH TYPE

FFL +2.540

REINSTATE POWER TO ALL KITCHEN APPLIANCES

XFR

Efficient Energy Choices

LIVING

EX.

B

EQUIPMENT TYPE

TL#

TB#

A11.01

EX CONCRETE FLOOR TO BE CLEANED, REGROUND AND RESEALED. GARAGE BUILDER TO CHECK CONDITION ON SITEXCN AND MAKE GOOD.

ESD Consultant

FFL +5.340

REPAIR AND / OR REPLACE ALL EXISTING GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

1

Structural & Civil Engineer

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

EQ#

CT1

FFL +2.540

BEDROOM 2

XTL#

XCN

XCN

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGSRWH ARE PER WINDOW TO MATCH SCHEDULE EXISTING

2 SPOT LEVEL

REPLACE EX. VANITY UNIT, REFER TO POWDER ROOM DETAIL DRAWINGS, ENSURE WATERPROOFING TO WALL AND FLOOR

A56.01

IPSUM Structures

STUDY

EX. WINDOW TYPE

LAUNDRY

XDG3

ALLOW POWER TO NEW COOKTOP

CT1

XCN

REMOVE AND REPLACE EX. FLOOR AND WALL FINISHES, GLAZING TO SHOWER, SHOWER DOOR AND EX. CEILING LINING

EX.

EX. GLAZED PARTITION TO BE REPLACED

MASTER BEDROOM

TL1

XFW6

WINDOW TYPE

CHANGE IN LEVEL

PWDR

XFW6

2

COLORBOND BOX GUTTER TO FALL TO EXISTING WALL PENETRATION, COLOUR TO MATCH RM1

F

NOM. SETDOWN

REPLACE EX. VANITY UNIT, REFER TO POWDER ROOM REFER TO GENERAL NOTES ON SHEET A01.00 DETAIL DRAWINGS, ENSURE WATERPROOFING TO WALL AND FLOOR DG2

NOM. SETDOWN

FFL +2.690

282 Canterbury Road Surrey Hills 3127 0400 588 948 info@structuraledge.com.au

EX. DOOR TYPE

XDG3

TL1

KITCHEN

XFD1

EX.

L EX.

NEW FLOOR FINISH TO MATCH EX. FFL, ENSURE EX. CONCRETE SLAB IS REGROUND AND LEVELLED TO RECEIVE NEW FINISHES.

XFW5

CO

EX.

CO

L CO EX. L

CO

VOID TO GROUND FLOOR

OV1

REMOVE AND REPLACE EX. ROBE WITH NEW

All rights reserved. This document remains the property of Architects EAT andUP is only to be used for UP purpose. No part of this document its commissioned EX. STAIRCASE may be reproduced, modified or transmitted in any EX. STAIRCASE TOTO FIRST FLOOR form or by any means without the explicit written ROOF DECK authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

®

EX. 3657

EX CONCRETE FLOOR TO BE CLEANED, REGROUND AND RESEALED. BUILDER TO HECK CONDITION ON SITE AND MAKE GOOD.

EX.

L CO

L

EX. EX STEEL BEAM EX. CO CL O L

360 10693 COS

L CO EX.

913

A41.01

REMOVE PAINT AND RENDER FROM EX. BRICK WALLS, TBC WITH ARCHITECT ON SITE

XDG2

XFW10

XDF2 LINE OF FLOOR OVER

NEW PAD FOOTINGS TO EX. FOOTINGS. EX FOOTINGSXWF6 TO REMAIN, REFER STRUCTURE ENGINEER'S DWGS FOR DETAILS

C

EX. RWH + DP

ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING

Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au

340

EXTEND OF PAINT AND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS

ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING

XTL

3

XFW7

A13.01 EXTEND OF PAINT AND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS

EX. RWH + DP XWG4

REPAIR AND / OR REPLACE ALL RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

ENSUITE

XTL

XDF2

9616 COS

EX. GARAGE DOOR

L CO EX.

L CO EX.

XWG3

D

3

L CO EX. CO

EX.

LINE OF FLOOR OVER

L

LINE OF FLOOR OVER

LINE OF FLOOR OVER

BATH

XDF1

EX. BIFOLD TIMBER FRAMED WINDOWS TO BE REPLACED LIKE TO LIKE

ARCHITECTS EAT 3

EX. WINDOW@1850 AFFL

FFL +2.690

REMOVE AND REPLACE EX. VANITY, PLUMBING FIXTURES, RETAIN EX. WC

4272

XCN

A13.01

VOID TO GROUND FLOOR

DOOR TYPE

W100

CHANGE IN LEVEL

LAUNDRY

1

ALLOW POWER TO NEW COOKTOP

XFW8

STUDY

VOID TO GROUND FLOOR

4

STRUCTURAL STORE TYPE

XDG3

XDG3

REINSTATE POWER TO ALL KITCHEN APPLIANCES

3775 COS

D102 XD102

XW100

XGW5

BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. TL1

EX. GUTTER OVER

RETAIN CARCASSES TO EX. MIRROR CABINET AND MAKE GOOD, NEW DOORS TO EX. MIRROR CABINET

RETAIN CARCASSES TO EX. MIRROR CABINET AND MAKE GOOD, NEW DOORS TO EX. MIRROR CABINET BUILDER TO ALLOW FOR REPAIR AND CLEAN EXPOSED REMOVE AND REPLACE BRICKS, ALLOW FOR EX. VANITY, PLUMBING GROUT FIXTURES, RETAIN EX. TOUCH UP AND SEALING, WC CONFIRM WTIH ARCHITECT ON SITE ONCETO RENDER IS RETAIN CARCASSES REMOVED EX. JOINERY AND MAKE GOOD, NEW DOORS TO EX. MIRROR CABINET

BEDROOM 2

REMOVE PAINT AND RENDER FROM EX. BRICK WALLS, TBC WITH ARCHITECT ON SITE

XWG5 EX. RWH + DP

REINSTATE POWER TO ALL KITCHEN APPLIANCES

LINE OF FLOOR OVER

EX.

1 : 50

EX CONCRETE FLOOR TO BE CLEANED, REGROUND AND RESEALED. BUILDER TO CHECK CONDITION ON SITE AND MAKE GOOD.

XCN

CO

1134

L CO

EX.

A11.01

GARAGE

XGW5

BOX GUTTER OVER

REFER TO KITCHEN DETAIL DRAWINGS FOR DETAIL REMOVE AND REPLACE EX. FLOOR AND WALL FINISHES, GLAZING TO SHOWER AND EX. CEILING LINING

REMOVE AND REPLACE EX. GARAGE DOOR WITH NEW

X. KITCHEN NEW, RETAIN EX. D ALL APPLIANCES. REPLACE EX. W, REFER FF&E R APPLIANCES. TCHEN EXHAUST EHOOD

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, BULKHEAD OVER, DOWNPIPE, FINISH TO ALIGN TO EX WALL MATCH EXISTING.

1

A57.01

XGW5

PLAN - EXISTING & DEMOLITION - GROUND FLOOR

1

LAUNDRY

PWDR

EXFW9

EX.

CO EX.

L

L

XDG3

CO

STORE

XDG3

REMOVE AND REPLACE EX. VANITY, PLUMBING FIXTURES, RETAIN EX. WC

XFW4

XFB

XDG2

1 A13.01

DP

F

L

2 A13.01

EX. RWH + DP

EX STEEL BEAM

EX. RWH + DP

XGW5

377

XWG5

5865

TL1

FFL +2.690

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

DP

JOINERY TYPE

GENERAL NOTES

FFL +5.340

EX.

120

1 A41.01

ALLOW FOR PENETRATION FOR NEW RANGEHOOD MOTOR, ALLOW POWER TO RANGEHOOD

EX. STAIRCASE TO FIRST FLOOR

230

6580

2

A41.01

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

FURNITURE TYPE

NOM. UPSTAND/ PLINTH

TL1 REMOVE AND REPLACE EX. FLOOR AND WALL FINISHES, FFL +2.690 GLAZING TO SHOWER, SHOWER DOOR AND EX. CEILING LINING

XFD1

UP

380

Ground F oor P an - Demo Ex st ng

EX. FINISH TYPE

RWH TO MATCH EXISTING

SPOT LEVEL

MASTER BEDROOM

XWG1 EX. CHIMNEY

1134

6407

EX. STAIRCASE TO ROOF DECK

A41.01

904

3079

FINISH TYPE

TL1

KITCHEN

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

524

13165 COS

A13.01 300

TL#

A13.01

NEW PAD FOOTINGS XWF6 TO EX. FOOTINGS. EX FOOTINGS TO REMAIN, REFER STRUCTURE ENGINEER'S DWGS FOR DETAILS

146

1

A13.01

CO

2

3

A

EQUIPMENT TYPE

XTL#

PWDR

XDF2

UP

EX TIMBER BALUSTRADE

B

EX. WINDOW TYPE

XGW5 TB#

XDG2

OV1

REMOVE AND REPLACE EX. ROBE WITH NEW

EX.

EX.

2

ROLLER DOOR MECHANISM OVER

1

EQ EQUAL EX. EXISTING EXT EXTERIOR FCL FINISHED CEILING LEVEL REPAIR FFL AND / ORFINISHED FLOOR LEVEL REPLACE ALL FD FLOOR DRAIN EXISTING GUTTER, INT WATER INTERIOR RAIN HEADS, NGL DOWNPIPE, NATURAL GROUND LEVEL FINISH TO MATCH OFP OPEN FIRE PLACE EXISTING. BUILDER O/A TO OVERALL INSPECT O/F OVERFLOW CONDITION ON PL EX. DP TO PARAPET LINE SITE, BE REPAIRED AND PHOTO VOLTAIC (SOLAR) PANEL PV MAINTAINED (PC) PRIME COST WHERE POSSIBLE. PGL PROPOSED GROUND LEVEL (PS) PROVISIONAL SUM RWH RAINWATER HEAD 4 EX. WINDOWS NOTE RL RIDGE LINE RETAIN EX. FRAMES, RESEAL AND CAULK, SP SPREADER BUILDER TO ASSESS CONDITION ON SITE DISCUSS WITH ARCHITECT SSL STRUCTURALAND SURFACE LEVEL REPLACE GLAZINGS ARE PER WINDOW PJ PANEL JOINT SCHEDULE TBRW TOP OF BRICKWORK WALL TOP OF BLOCKWORK WALL 3079 TBWW 300 TCW TOP OF CONCRETE WALL

360

EX. CHIMNEY

XTL

NEW FLOOR FINISH TO MATCH EX. FFL, ENSURE EX. CONCRETE SLAB IS REGROUND AND LEVELLED TO RECEIVE NEW FINISHES.

XFW5

VOID TO GROUND FLOOR

CONFIRM ON SITE

DPGLAZED DOWNPIPE EX. PARTITION TO BE EJ EXPANSION JOINT REPLACED

774

REPAIR AND / OR REPLACE ALL RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

BUILDER AHD TO HECK AUSTRALIAN HEIGHT DATUM CONDITION ON SITE AND CH GOOD. CEILING HEIGHT MAKE

L

XWG4

ENSUITE

XTL

LINE OF FLOOR OVER

EX CONCRETE FLOOR TO

WINDOW TYPE

EQ#

J0#

333

BEDROOM 2

W100

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

3

BE CLEANED, REGROUND GENERAL LEGEND AND RESEALED.

COS

BATH

A41.01

C

REMOVE PAINT AND RENDER FROM EX. BRICK WALLS, TBC WITH ARCHITECT ON SITE

CO

XWG3

D

35 160

EX. RWH + DP

LINE OF FLOOR OVER

XWG2

L

LINE OF FLOOR OVER

EX.

EX. FIREPLACE

XWG1

CO

LINE OF FLOOR OVER

EX.

EX. RWH + DP

CO

L

EX. DOOR PANEL AND CANOPY OVER TO BE REMOVED

ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING

XFB

ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING

LIVING FFL +2.690

EXTEND OF PAINT AND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS

CO

REMOVE EX. FLOORBOARDS, EX. CONCRETE SLAB TO BE RETAINED

REMOVE PAINT AND RENDER FROM EX. BRICK WALLS, TBC WITH ARCHITECT ON SITE

EX.

LINE OF FLOOR OVER

EXTEND OF PAINT AND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS

3 A13.01

L

L CO EX.

EX. STAIRCASE TO FIRST FLOOR

XFW7

3 A13.01

XFW10

RETAIN CARCASSES TO EX. MIRROR CABINET AND MAKE GOOD, NEW DOORS TO EX. MIRROR CABINET

XDF2

10693 COS

L CO

L EX.

EX.

EX.

CO

CO

L

L CO

L CO EX.

UP

9616 COS

EX. GARAGE DOOR

ARCHITECT TO CONFIRM ON SITE BEFORE PROCEEDING

LINE OF FLOOR OVER

XWG5

EX. GUTTER OVER

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BULKHEAD OVER, BUILDER TO INSPECT ALIGN TO EX WALL CONDITION ON SITE,

REMOVE AND REPLACE EX. VANITY, PLUMBING FIXTURES, RETAIN EX. WC

XDF1

EX. BIFOLD TIMBER FRAMED WINDOWS TO BE REPLACED LIKE TO LIKE

3

LINE OF FLOOR OVER

4272

EX CONCRETE FLOOR TO BE CLEANED, REGROUND AND RESEALED. BUILDER TO CHECK CONDITION ON SITE AND MAKE GOOD.

GARAGE XCN

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

EX.

XCN

EX. RWH + DP

XGW5

REINSTATE POWER TO ALL KITCHEN EX. WINDOW@1850 AFFL APPLIANCES

VOID TO BOX GUTTER OVER FLOOR GROUND

BUILDER TO ALLOW REMOVE AND REPLACE EX. VANITY, PLUMBINGFOR REPAIR AND FIXTURES, RETAIN EX.CLEAN EXPOSED BRICKS, ALLOW FOR WC GROUT TOUCH UP AND SEALING, CONFIRM WTIH RETAIN CARCASSES TO ARCHITECT ON SITE EX. JOINERY AND MAKE ONCE RENDER IS GOOD, NEW DOORS TO EX. MIRROR CABINET REMOVED

BEDROOM 2

1

A57.01

XGW5

RETAIN CARCASSES TO EX. MIRROR CABINET AND MAKE GOOD, NEW DOORS TO EX. MIRROR CABINET

26

XFB

A13.01

REFER TO KITCHEN REMOVE AND REPLACE DETAIL DRAWINGS EX. FLOOR AND WALL FOR DETAIL FINISHES, GLAZING TO SHOWER AND EX. CEILING LINING

240

REPLACE ALL EX. KITCHEN JOINERY WITH NEW, RETAIN EX. BENCHTOP AND ALL APPLIANCES. EXCEPT OVEN0 REPLACE EX. OVEN WITH NEW, REFER FF&E SCHEDULE FOR APPLIANCES. REMOVE EX. KITCHEN EXHAUST AND EX. RANGEHOOD

KITCHEN

EX STEEL BEAM

L CO EX.

E

REMOVE AND REPLACE EX. GARAGE DOOR WITH NEW

REMOVE KITCHEN ISLAND AND REPLACED WITH NEW

REPAIR AND / OR REPLACE ALL EXISTING , RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

XFW9

LAUNDRY

PWDR

XWC1

ALLOW FOR PENETRATION FOR NEW RANGEHOOD MOTOR, ALLOW POWER TO RANGEHOOD

DP

REMOVE AND REPLACE EX. VANITY, PLUMBING FIXTURES, RETAIN EX. WC

XFW4

L EX.

XDG3

REMOVE EX. VANITY

EX. WINDOWS NOTE RETAIN EX. FRAMES, RESEAL AND CAULK, BUILDER TO ASSESS CONDITION ON SITE AND DISCUSS WITH ARCHITECT REPLACE GLAZINGS ARE PER WINDOW SCHEDULE

A13.01

F

CO

L CO

L CO EX.

L CO

XDG2

XKM1 XSN1

A13.01

XD102

A41.01

1

EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE. WHERE NEW DP IS REQUIRED, MATCH EXISTING

EX. RWH + DP

STORE

XDG3

REMOVE PAINT AND RENDER FROM EX. BRICK WALLS, REVIEW AND DISCUSS WITH ARCHITECT ON SITE

EXTEND OF PAINT AND RENDER REMOVAL TO EXPOSED EX. BRICK WALLS

EX. RWH + DP

XGW5

XFB

REPLACE EX. KITCHEN JOINERY WITH NEW, RETAIN EX. BENCHTOP, SINK AND KITCHEN MIXER. REFER TO FF&E SCHEDULE FOR FIXTURES

EX.

XWG5

2

2

3079 3775 COS

XW100

1

A41.01

REPAIR AND / OR REPLACE ALL EXISTING METAL ROOF, GUTTER, RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

617

XGW5

REPAIR AND / OR REPLACE ALL EXISTING , RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

377

XGW5

LINE OF FLOOR OVER

REMOVE EX. FLOORBOARDS, EX. CONCRETE SLAB TO BE RETAINED

2

EX.

EX. RWH + DP

DOOR TYPE EX. DOOR TYPE

5865

1 A13.01

REMOVE EX. DOOR AND GLAZING ABOVE

DP

2 A13.01

REPAIR AND / OR REPLACE ALL EXISTING RAIN WATER HEADS, DOWNPIPE, FINISH TO MATCH EXISTING. BUILDER TO INSPECT CONDITION ON SITE, EX. DP TO BE REPAIRED AND MAINTAINED WHERE POSSIBLE.

120

1

300

300

146

6580

3079 D102

904

6407

35 160

3079

PHOTO VOLTAIC (SOLAR) PANEL PRIME COST PROPOSED GROUND LEVEL PROVISIONAL SUM RAINWATER HEAD RIDGE LINE SPREADER 4 STRUCTURAL SURFACE LEVEL PANEL JOINT TOP OF BRICKWORK WALL TOP OF BLOCKWORK WALL TOP OF CONCRETE WALL

524

13165 COS 300

PV (PC) PGL (PS) RWH RL SP SSL PJ TBRW TBWW TCW

360

3

774

2

CO

1

EXHAUST FANS TO REFER TO NOMINATED SUBCONTRACTOR SPECS AND INSTALL AS PER MANUF'S INSTALLATION GUIDE.

EXTEND WALL TO RM1,

A

SINGLE STOREY BRICK HOUSE

Description


D

FINI

C

2PA C G G G G G G M M P P P P P RM T T T T T XB XC X XM X XR XR XR X XT X X

+11.100 PROP. ROOF LEVEL - UPPER RIDGE LL FA

FA LL

100mm THK METECNOSPAN PIR INSULATED ROOF PANEL

RM1

D

D

+11.100 PROP. +11.100 ROOF PROP. LEVEL ROOF -FLASHING UPPER LEVEL RIDGE - UPPER RIDGE TO CAP OVER EDGE FO

FA LL EX. TIMBER RAFTERS AND ROOF FRAMING

ROOF PANEL, FLASHING AS PER ROPFING MANUF'S F LL LL INSTALLATION GUIDE FA FA TURN DOWN ALL OVER EAVES GUTTER, COLOUR TO MATCH RM1

PL1

FA LL

NEW EAVES GUTTER TO REPLACE EXISTING, COLOUR TO MATCH RM1

100mm THK 100mm THK METECNOSPANMETECNOSPAN PIR INSULATEDPIR INSULATED ROOF PANEL ROOF PANEL

9mm THK PLYWOOD LINING TO REPLACE EX. CEILING LINING EX. STEEL ROD, TO BE PAINTED IN PT2

PL1

CENTRE PANEL JOINT

EX. CLADDING EX. TIMBER EX. TIMBER RAFTERS AND RAFTERS AND ROOF FRAMINGROOF FRAMING

E

PL1

PJ

+9.350

PL1

9mm THK PLYWOOD LINING TO REPLACE EX. WALL LINING ON ALL SIDES

9mm THK PLYWOOD 9mm THK PLYWOOD LINING TO REPLACE LINING TO REPLACE EX. CEILING LINING EX. CEILING LINING

ROOF LEVEL - LOWER RIDGE

EX. STEEL EX. STEEL ROD, TO BE ROD, TO BE PAINTED IN PT2PAINTED IN PT2

PL1

CENTRE PANELCENTRE PANEL JOINT JOINT

PL1

FA LL

F

RM1

F

E

E

EX. STAIRCASE RAILING PJ

+9.350

9mm THK PLYWOOD LINING TO REPLACE EX. WALL LINING, TO BE MITRED AS IT MEETS PLYWOOD CEILING LINING BEYOND

EX. COLUMN PL1

600

MIN. 150 OVERHANG OVER VALLEY GUTTER

VALLEY GUTTER

FA LL

FA LL

MIN 215 TO CAP FLASHING TO CAP FLASHING EDGE OF ROOFEDGE OF ROOF PANEL. TOEFFECTIVE MATCH PANEL. WIDTH TO MATCH RM1, RM1, CUT TO ROOF PANEL CUT TO ROOF PANEL TO BE DONE INTO BE DONE IN ACCORDANCE ACCORDANCE TO TO MANUF'S MANUF'S 15 0 INSTALLATION INSTALLATION GUIDE GUIDE 0 15

RM1

RM1

LL FA

FA LL METECNOSPAN PIR 100mm THK INSULATED ROOF PANEL RM1

RM1

3

OVERFLASHING TO VALLEY GUTTER BY MIN. 50mm

A42.01

SECTION DETAIL 3

C

1 : 10

.50 MIN

MIN .50

PB1

EX. COLUMN EX. COLUMN

HIG

T HP OIN OIN HP T HIG 100mm THK METECNOSPAN 100mm THK METECNOSPAN PIR INSULATEDPIR ROOF PANEL ROOF PANEL INSULATED

BACKING

600

+8.030

MIN 215

FA RM1LL

RM1

RM1

EX. STEEL PURLIN

15 0

MIN .50

0 15

PB1

HIG

HP OIN

HIG T H IN POPO IN

H T HIG

H T HIG

A42.01

3

A42.01

EX. STEEL BEAM, ALLOW FOR REPAINTING WHERE NECCESSARY

FALL MIN. 1:1

SECTION SECTION DETAIL DETAIL 3 3 3

A42.01 1 : 10

1 : 10

PACKING TO SUIT

INT PO

NEW STEEL BEAMS FRAMING, BOTTOM OF BACKING BACKING BEAMS TO ALIGN, REFER STRUCTURE ENG'S DRAWINGS FOR DETAIL. FORMED FORMED GUTTER COLORBOND TO GUTTER TO PAINTCOLORBOND TO MATCH EXISTING +8.030 MATCH RM1. MATCH RM1. VALLEY VALLEY TO FALL GUTTER INTO EX. TO FALL INTO EX. FACEGUTTER OF EX. TIMBER DOWNPIPE. DOWNPIPE. TO INSPECT BUILDER TO INSPECT MULLIONBUILDER CONDITION ONCONDITION SITE. ON SITE. NEW OFF-FORM EX. CONCRETE TIMBER RAFTERS AND RAFTERS ROOF EX. TIMBER AND ROOF SLAB TO FRAMING FRAMING STRUCTURE ENG'S

SECTION DETAIL 2

2

FALL MIN 1:100

70

WALL LINE BEYOND WALL LINE BEYOND

EX. WINDOW, BUILDER TO ENSURE WATERPROOFING AND FLASHING TO EXISTING WINDOW

EX. TIMBER RAFTERS AND ROOF FRAMING

0 15

EX. FIRST FLOOR FCL

FLASHING OVER SCREED 100mm THK METECNOSPAN 100mm THK METECNOSPAN PIR PIR INSULATED ROOF INSULATED PANEL ROOF PANEL SCREED TO FALL AND WATERPROOFED, LL REFER ARDEX FA OVERFLASHING OVERFLASHING TO VALLEY GUTTER TO VALLEY GUTTER SPECIFICATIONS AND BYDETAIL MIN. 50mm BY MIN. 50mm

.50 MIN

MIN .50

15 0

+7.740

EX. WINDOW EX. WINDOW

L LRM1 FA

.50 MIN

13mm THK PLASTERBOARD 13mm THK PLASTERBOARD TO TO REPLACE EXISTING REPLACE EXISTING

MIN 215

EFFECTIVE WIDTH EFFECTIVE WIDTH

FA LL

A42.01

BUILDER TO ENSURE FLASHING AND MIN. 150 OVERHANG MIN.WATERPROOFING 150 OVERHANG OVER VALLEY OVER VALLEY TO GUTTER GUTTER EX. WINDOW

600

VALLEY GUTTER VALLEY GUTTER

EX. DECK FFL

EX. TIMBER RAFTERS AND ROOF PB1 PB1 FRAMING

100mm THK METECNOSPAN PIR INSULATED ROOF PANEL

5

EX. WINDOW SILL

FORMED COLORBOND GUTTER TO MATCH RM1. VALLEY GUTTER TO FALL INTO EX. DOWNPIPE. BUILDER TO INSPECT CONDITION ON SITE.

PB1

PJ

ROOF +9.350 LEVEL ROOF - LOWER LEVELRIDGE - LOWER RIDGE

1 : 10

EX.+8.030 DECK FFL EX. DECK FFL

DRAWINGS

EX. EX. STEEL PURLIN EX. STEEL PURLIN COLUMN

+7.740

9mm PLYWOOD LINING EX.+7.740 FIRST FLOOR FCL EX. THK FIRST FLOOR FCL

PL1 TO REPLACE EX. CEILING LINING.

BUILDER TO ASSESS BUILDER ONTO ASSESS ON SITE, IF EX. CONDITION SITE, IF EX. CONDITION ALLOW FOR 100mm ALLOW THK FOR 100mm THK METECNOSPANMETECNOSPAN PIR PIR INSULATED ROOF INSULATED ROOF PANEL TO CLEAR PANEL EX TO CLEAR EX WINDOW. OTHERWISE WINDOW. OTHERWISE REPLACE WITHREPLACE 80mm WITH 80mm THK METECNOSPAN THK METECNOSPAN PIR PIR INSULATED ROOF INSULATED ROOF PANEL WITH RPANEL VALUE WITH R VALUE AS PER ESD REPORT AS PER ESD REPORT

PARAPET FLASHING PARAPET FLASHING TO MATCH RM1TO MATCH RM1

FALL MIN 3

FALL MIN 3

o

50

50

o

PB1

100mm THK METECNOSPAN 100mm THK METECNOSPAN PIR INSULATEDPIR ROOF INSULATED PANEL ROOF PANEL

2

RM1

A42.01 EX. TIMBER RAFTERS EX. TIMBER AND RAFTERS AND ROOF FRAMINGROOF FRAMING LL FA

Structural &LINING Civil PLYWOOD LINING PLYWOOD TO TURN UP Engineer TO TURN UP TO CLAD OVERTO TIMBER CLADCanterbury BEAM, OVER TIMBER BEAM, 282 Road MITRE AT CORNER MITRE JOINT. AT CORNER JOINT.

1

Surrey Hills 3127 0400 588 EX. 948 +5.090 GROUND EX. GROUND FLOOR FCLFLOOR FCL info@structuraledge.com.au

EX.+7.740 FIRST FLOOR EX. FIRST FCLFLOOR FCL

1 : 10

TOPPING - ARDEX K900BF TO BE INSTALLED TO ACHIEVE 1:100 FALLS. 5mm WIDE CONTROL JOINTS TO BE INSTALLED TO THE TOPPING AT THE JUNCTION OF THE METAL / CONCRETE. CONTROL JOINTS TO BE INSTALLED AT THE TILE OF INSTALLATION AND NOT CUT IN TO THE TOPPING AFTER INSTALLATION. THE TOPPING ON EITHER SIDE OF CONTROL JOINTS IN TO BE 100% INDEPENDENT FROM THE OTHER SIDE OF THE JOINT. AS PER ARDEX RECOMMENDATION

PL1

BACKING ROD AND SEALANT

PL1

HIGH POINT

PL1

PL1

250 COS

250 COS

524 COS

138 COS

PL1

524 COS

FALL MIN 1:100

PRIMING - 2 x ARDEX WPM 300 TO BE INSTALLED TO ALL SURFACES, 2nd COAT TO HAVE ARDEX PRIMER SAND BROADCAST IN TO THE WET COATING STEEL BEAMS TO BE TREATED WITH PRIMER INTERNATIONAL INTEGARD 269 BEFORE INSTALLING ARDEX PRODUCT, AS PER ARDEX RECOMMENDATION

1280 COS

PL1

138 COS

HIGH POINT

5

A42.01

EX.+5.340 FIRST FLOOR EX. FIRST FFLFLOOR FFL

IPSUM 9mm THK PLYWOOD 9mm THK LINING. PLYWOODStructures LINING.

+7.740

SECTION DETAIL 4

WATERPROOFING - ARDEX BUTYNOL - 1.5mm BLACK

1 : 10

LL FA

1280 COS

INDICATIVE EX.INDICATIVE FRAMING EX. FRAMING INTERNALLY, WHERE INTERNALLY, WHERE ALTERATION TO ALTERATION EX. TO EX. RAFTERS ARE REQUIRED. RAFTERS ARE REQUIRED. TBC WITH STRUCTURE TBC WITH STRUCTURE ENG AND ARCHITECT ENG AND ARCHITECT

4

A42.01

BOND BREAKER TAPE

MIN. 100

MIN 10050 MIN.

OVERFLASHING

OVERFLASHING

MIN 50

FOLDED BOXEDFOLDED BOXED GUTTER TO REPLACE GUTTER TO REPLACE EXISITNG, TO MATCH EXISITNG, TO MATCH RM1, TO FALL TO RM1, EX.TO FALL TO EX. WALL PENETRATION WALL PENETRATION

A42.01

SECTION SECTION DETAIL DETAIL 2 2 2

A42.01 1 : 10

75

FORMED COLORBOND FORMED COLORBOND FLASHING TO FLASH FLASHING OVER TO FLASH OVER BOX GUTTER, FLASHING BOX GUTTER, TO FLASHING TO MATCH RM1 MATCH RM1

d. This document remains the itects EAT and is only to be used for +5.090 d purpose. No part of this document ced, modified or transmitted in any means without the explicit written itects EAT. Unauthorized use of this form what so ever is prohibited.

PB1

9mm THK PLYWOOD 9mm THK LINING PLYWOOD LINING PL1 TO REPLACE PL1EX. TOCEILING REPLACE EX. CEILING LINING. LINING. 75

+5.340

PB1

EX. WINDOW, BUILDER EX. WINDOW, TO BUILDER TO ENSURE WATERPROOFING ENSURE WATERPROOFING AND FLASHINGAND TO EXISTING FLASHING TO EXISTING WINDOW WINDOW

RM1

MIN. 75mm ENDLAP MIN. 75mm CUTBACK. ENDLAP CUTBACK. ROOFING TO BE ROOFING INSTALLED TO BE INSTALLED OVER EXISTINGOVER ROOFING EXISTING ROOFING FRAME AS PERFRAME MANUF.AS PER MANUF. INSTALLATION INSTALLATION GUIDE GUIDE

PB1

SECTION DETAIL 5 1:5

Efficient Energy Choices EX. EXPOSED STEEL EX. EXPOSED STEEL

KRNETA Building Suveyors Building Surveyor

Drawing Name

RECEIVE GLAZING, RECEIVE GLAZING, ALLOW FOR REALLOW FOR REWHERE PAINTINGNorth WHEREVIC 3041 P.O. BoxPAINTING 576 Essendon NECCESSARY NECCESSARY

Level 2, 13 Cremorne Street Cremorne 3121 03 9427 9333 office@krneta.com.au

17 NEVILLE ST

ESD ConsultantBEAM, PACK OUT BEAM, TO PACK OUT TO

03 9331 3695 info@efficientenergychoices.com.au

Rev.

Description

Date

SECTION - DETAILS Project Name

Client Address

Zinta Vilde 17 Neville St, A

SECTION SECTION DETAIL DETAIL 1 1 Roof Section Details 1

A42.01 1 : 10

1 : 10

ARCHITECTS ARCHITECTS EAT EAT

IPSUMIPSUM Structures Structures

Efficient Efficient EnergyEnergy Choices Choices KRNETA KRNETA Building Building Suveyors Suveyors

Structural & Civil Structural Engineer & Civil Engineer

ESD Consultant ESD Consultant

282 Canterbury 282 Canterbury Road Road Hills Surrey 3127Hills 3127 All rights reserved. AllThis rights document reserved.remains This document the remainsSurrey the property of Architects property EATofand Architects is only toEAT be and usedisfor only to be used for 588 948 0400 588 948 its commissionedits purpose. commissioned No part purpose. of this document No part of this0400 document

Building SurveyorBuilding Surveyor

Level 2, 13Level Cremorne 2, 13 Cremorne Street Street P.O. Box 576 P.O.Essendon Box 576 Essendon North VICNorth 3041 VIC 3041CremorneCremorne 3121 3121 03 9331 3695 03 9331 3695 03 9427 9333 03 9427 9333

Rev.

Rev. Description


SILICONE SEALANT RECONNECT. BUILDER TO REINSTALL OVER NEW ROOFING AND MIN. 75mm ENDLAP CUTBACK. RECONNECT. ROOFING BE INSTALLEDREFER OVER TO GLAZINGTO SPECIFICATION EXISTING FRAME AS PER FINISHES SCHEDULE MIN. 75mmROOFING ENDLAP CUTBACK. MANUF. INSTALLATION GUIDE ROOFING TO BE INSTALLED OVER GLAZINGROOFING TAPE BEYOND EXISTING FRAME AS PER FORMED COLORBOND FLASHING TO MANUF.OVER INSTALLATION GUIDE AND FLASH GLAZING CHANNEL

FA LL

75

PL1

GLAZING TAPE, FLASHING TO MATCH RM1 FORMED GL1 COLORBOND FLASHING TO FLASH OVER GLAZING CHANNEL AND GLAZING CHANNEL, FILLED WITH GLAZING TAPE, FLASHING TO MATCH RM1 SILICONE SEALANT

DOWNPIPE BEYOND

A

B

CONDENSATION DRIP CHANNEL WITH WEEPBEYOND HOLE TO DRAIN DOWNPIPE TOWARDS BOX GUTTER.

DOWNPIPEOVER BEYOND FLASHING BOX GUTTER

FA LL

PLYWOOD LINING BEYOND SECURE FLASHING INTO EX. BRICK WALL AND SEAL

HIGH POINT

70

PB1

DRAWINGS FRAMING, BOTTOM FRAMING, OFBOTTOM OF BEAMS TO ALIGN, BEAMS TO ALIGN, EX. COLUMN REFER STRUCTURE REFER STRUCTURE ENG'S ENG'S DRAWINGSDRAWINGS FOR DETAIL. FOR DETAIL. PAINT TO MATCH PAINT EXISTING TO Level MATCH2,EXISTING 118 Langridge Street, Collingwood 3066 VIC Australia

SECTION DETAIL 4

®

P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au FACE OF EX. FACE TIMBER OF EX. TIMBER MULLION MULLION Level 2, 118 Langridge Street, Collingwood 3066 VIC Australia

®

A42.01 P: +61 3 8592 1999 E: office@eatas.com.au W: eatas.com.au

NEW OFF-FORM NEW OFF-FORM1 : 10 CONCRETECONCRETE SLAB TO SLAB TO STRUCTURE STRUCTURE ENG'S ENG'S DRAWINGSDRAWINGS

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document All rights reserved. This document remains the may be reproduced, modified or transmitted in any property Architects andthe is only to be used for form or byofany means EAT without explicit written its commissioned purpose. part of this use document authority of Architects EAT.No Unauthorized of this may be reproduced, transmitted in any document in any formmodified what soor ever is prohibited. form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

Structural & Civil Engineer

Structural & Civil Engineer NEW STEEL BEAMS

Surrey Hills 3127

WINDOW FRAME WINDOW FRAME

1447 COS 250 COS 250 COS

322

132 MIN 100 UPTURN

MIN 50 132100 MIN OVERFLASHING

1447 COS

1125

MIN 100 UPTURN

132

Building Surveyor

ESD Consultant

Cremorne 3121 Level 2, 13 Cremorne Street 03 9427 9333 Cremorne 3121 office@krneta.com.au 03 9427 9333 office@krneta.com.au

P.O. Box 576 Essendon North VIC 3041

Building Surveyor

Re

Re

FABRICATED STEEL BEAM, ALLOW FOR REPAINTING WHERE NECCESSARY NEW STEELNEW BEAMS STEEL BEAMS EX.COLUMN FRAMING, BOTTOM FRAMING, OFBOTTOM OF BEAMS TO ALIGN, BEAMS TO ALIGN, REFER STRUCTURE REFER STRUCTURE ENG'S ENG'S DRAWINGSDRAWINGS FOR DETAIL. FOR DETAIL. PAINT TO MATCH PAINT EXISTING TO MATCH EXISTING

C:\Users\VALONIA.o\Documents\210927_17 rs\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt NEVILLE ST_CD_valonia.o.rvt

EX.COLUMNEX.COLUMN

IPSUM StructuresIPSUM Structures Efficient Energy Choices KRNETA Building KRNETA SuveyorsBuilding Suveyors Efficient Energy Choices IPSUM Structures Efficient Energy Choices KRNETA Building Suveyors Structural & Civil Engineer

®

Structural & Civil Engineer

ESD Consultant

ESD Consultant

Building Surveyor

Building Surveyor

Structural & Civil Engineer ESD Consultant Building Street Surveyor 282 Canterbury Road Level 2, 13 Cremorne 282 Canterbury Road Level 2, 13 Cremorne Street Road Level 2, 13 Cremorne P.O. Box 576 Essendon North VICBox 3041 Surrey Hills 3127282 Canterbury Cremorne All rights reserved. This document remains the P.O. 576 Essendon North 3121 VIC 3041 Surrey Hills 3127 Cremorne Street 3121 All rights reserved. This document remains the property of Architects EAT and is only to be used for property of Architects EAT and is only Surrey to be used for P.O. Box 576 Essendon North VIC 3041 9333 Hills 0400 3127 588 948 Cremorne 3121 0400 588 03 9331 3695 03 9427 rights reserved. This document remains the948 its commissioned purpose. NoAll part of this document 03 9331 3695 03 9427 9333 its commissioned purpose. No part of this document of Architects may be reproduced, modified property or transmitted in any EAT and is only to be used for may beNo reproduced, modified or transmitted in any 0400 588 948 03 9331 3695 03 9427 9333 info@structuraledge.com.au info@efficientenergychoices.com.au office@krneta.com.au its commissioned purpose. part of this document form or by any means without the explicit written info@structuraledge.com.au info@efficientenergychoices.com.au office@krneta.com.au form or byorany means without may be reproduced, modified transmitted in anythe explicit written authority of Architects EAT. Unauthorized use of this info@structuraledge.com.au info@efficientenergychoices.com.au office@krneta.com.au authority Architects EAT. Unauthorized use of this any means withoutofthe explicit written document in any form what soform everorisby prohibited.

®

®

document in any form use what authority of Architects EAT. Unauthorized of so thisever is prohibited. document in any form what so ever is prohibited.

SECTION - DETAILS Drawing Name

SECTION DETAIL DETAIL 5 5 5SECTION

EDGE OF EX. EXPOSED

EX. CHIMNEY/FLUE info@efficientenergychoices.com.au DRAWINGS FOR DETAIL. EX. CHIMNEY/FLUE info@structuraledge.com.au 0400 588 948 03 9331 3695 PAINT TO MATCH EXISTING info@structuraledge.com.au info@efficientenergychoices.com.au EX. CUSTOM

SECTION DETAIL 5 5 Roof Deck Details

5

EDGE OF EX. EXPOSED STEEL BEAM

ESD Consultant

BOTTOM OF BEYOND BEYOND 282 Canterbury Road +5.090 EX.FRAMING, GROUND FLOOR FCL +5.090 EX. GROUND FLOOR FCL3695 BEAMS TO ALIGN, 0400 588 948 03 9331 STRUCTURE +5.090 ENG'S EX. GROUND FLOOR FCL P.O. Box 576 Essendon North VIC 3041 Surrey HillsREFER 3127

RECOMMENDATION PRIMING - 2PRIMING x ARDEX- WPM 2 x ARDEX 300 WPM 300 TO BE INSTALLED TO BE INSTALLED TO ALL TO ALL SURFACES,SURFACES, 2nd COAT TO2ndHAVE COAT TO HAVE ARDEX ARDEX PRIMER SAND PRIMER BROADCAST SAND BROADCAST IN IN TO THE WET TOCOATING THE WET COATING

Date

1125

105

MIN 100

COLORBOND TO SIT COLORBOND GUTTER TOGUTTER SIT TOP OFFRAME WINDOW FRAME ON TOP OFON WINDOW

Re

EX. CUSTOM EX. CUSTOM FABRICATED FABRICATED STEEL STEEL BEAM, ALLOW BEAM, FORALLOW RE- FOR REPAINTING WHERE PAINTING WHERE NECCESSARY NECCESSARY

ECTS EATARCHITECTS EAT ARCHITECTS EAT

Description

Building Surveyor

STEEL BEAM EDGE OF EX. EXPOSED TOBUILDER ENSURETO ENSURE IPSUM StructuresBUILDER Efficient Energy Choices KRNETA Building Suveyors STEEL BEAM WATERPROOFING WATERPROOFING TO TO PENETRATION PENETRATION EX. EXPOSED STEEL BEAM PB1 EX. EXPOSED STEEL BEAM IPSUM Structures Efficient Energy Choices KRNETA Building 282 Canterbury RoadSTEEL BEAM Level 2, 13 Cremorne Street Suveyors EX. EXPOSED

SECTION DETAIL DETAIL 4 4 4SECTION

STEEL BEAMS STEEL TO BE BEAMS TREATED TO BE TREATED WITH PRIMER WITH PRIMER INTERNATIONAL INTERNATIONAL A42.01 1:5 BEFORE INTEGARD 269 INTEGARD 269 BEFORE INSTALLINGINSTALLING ARDEX PRODUCT, ARDEX PRODUCT, AS PER ARDEX AS PER ARDEX RECOMMENDATION RECOMMENDATION

346 COS

346 COS

Level 2, 13 Cremorne Street Cremorne 3121 03 9427 9333 office@krneta.com.au

WATERPROOFING - ARDEX A42.01 A42.01 1 : 10- 1.5mm 1 :BLACK 10 BUTYNOL

TOPPING - ARDEX K900BF TO BE INSTALLED TO ACHIEVE 1:100 FALLS. 5mm WIDE CONTROL JOINTS TO BE INSTALLED TO THE TOPPING AT THE JUNCTION OF THE METAL / CONCRETE. CONTROL JOINTS TO BE INSTALLED AT THE TILE OF INSTALLATION AND NOT CUT WATERPROOFING WATERPROOFING - ARDEX IN TO THE TOPPING- ARDEX AFTER 1.5mm BLACK - 1.5mm BLACK BUTYNOL -INSTALLATION. BUTYNOL THE TOPPING ON TOPPING - ARDEX TOPPING - ARDEX TOEITHER TO K900BF K900BFSIDE OF CONTROL JOINTS IN TO BE BE INSTALLED BE INSTALLED TO ACHIEVE TO ACHIEVE 100% INDEPENDENT FROM 1:100 FALLS. 1:100 FALLS. SIDE OF THE 5mm WIDE THE CONTROL 5mmOTHER WIDEJOINTS CONTROL JOINTS JOINT. TO BE INSTALLED TO BE INSTALLED TO THE TO THE AS PERJUNCTION ARDEX TOPPING AT TOPPING THE AT THE OF JUNCTION OF THE METALRECOMMENDATION THE / CONCRETE. METAL / CONCRETE. CONTROL JOINTS CONTROL TO JOINTS BE TAPE TO BE BOND BREAKER INSTALLED INSTALLED AT THE TILEAT OFTHE TILE OF BACKING RODCUT AND INSTALLATION INSTALLATION AND NOT AND SEALANT NOT CUT FALL MIN 1:100 IN TO THE TOPPING IN TO THEAFTER TOPPING AFTER INSTALLATION. INSTALLATION. PRIMING - 2 x ARDEX WPM 300 THE TOPPING THEON TOPPING EITHER ON SIDE EITHER TO BE INSTALLED TO ALL SIDE OF CONTROL OFJOINTS CONTROL IN TO JOINTS BE IN TO BE SURFACES, 100% INDEPENDENT 100% INDEPENDENT FROM FROM 2nd COAT TO HAVE ARDEX THE OTHER THE SIDE OTHER OF THE SIDE OF THE IN SAND BROADCAST dge Street, Collingwood VIC Australia Level3066 2, PRIMER 118 Langridge Street, Collingwood 3066 VIC Australia JOINT. JOINT. TO THE WET COATING 9 E: Level office@eatas.com.au W: eatas.com.au 2, 118 Langridge 3066 VIC Australia +61 3Street, 1999 W: eatas.com.au ASP: PER AS8592 PER Collingwood ARDEX ARDEXE: office@eatas.com.au STEEL BEAMS TO BE TREATED RECOMMENDATION P: +61 3 8592RECOMMENDATION 1999 E: office@eatas.com.au W: eatas.com.au WITH PRIMER INTERNATIONAL BOND BREAKER BONDTAPE BREAKER TAPE INTEGARD 269 BEFORE INSTALLING ARDEX PRODUCT, BACKING ROD BACKING AND SEALANT ROD AND SEALANT FALL MIN 1:100 FALL MIN 1:100 AS PER ARDEX

265 COS

KRNETA Building Suveyors

EX. COLUMN EX. COLUMN

4

PL1

PL1 265 COS

ESD Consultant PENETRATION REPLACED REPLACED EXISTING, EXISTING,

Structural & Civil Engineer

17 NEVILLE ST Project Name

Client

Zinta Vilde

A42.01

Scale Drawn by Checked by

rs\VALONIA.o\Documents\210927_17 NEVILLE ST_CD_valonia.o.rvt

70

ARCHITECTS EAT NEW OFF-FORM PACKING TO PACKING SUIT TOSLAB SUITTO CONCRETE ARCHITECTS EAT ENG'S NEW STEELSTRUCTURE NEW BEAMS STEEL BEAMS

FOLDED BOXED GUTTER, TO FOLDED BOXED GUTTER, TO MATCH RM1, TO FALL TO EX. MATCH RM1, FOLDED BOXED GUTTER, TO TO FALL TO EX. WALL PENETRATION WALLTO PENETRATION MATCH RM1, TO FALL EX. WALL PENETRATION

BUILDER TO ENSURE COLORBOND FORMED COLORBOND IPSUM StructuresFORMED WATERPROOFING TOEfficient Energy Choices BOX GUTTER BOX TOGUTTER TO UPSTAND

10

MIN 100

®

All rights reserved. This document remains the property of Architects EAT and is only to be used for its commissioned purpose. No part of this document may be reproduced, modified or transmitted in any form or by any means without the explicit written authority of Architects EAT. Unauthorized use of this document in any form what so ever is prohibited.

GUTTER AT HIGHEST 20mm FULLBOX 20mm SILICON FULL SILICON SANDWICHPOINT, SANDWICH BEAD ENSURE BEADBOTTOM OF COLORBOND TO SIT COLORBOND FLASHING COLORBOND FLASHING GUTTER TOP OFRM1 WINDOW FRAME RM1 TO MATCH TO MATCH ON

HIGH POINT

282 Canterbury Road COLOUR TO COLOUR MATCH TO MATCH RM1 RM1 WINDOW FRAME EX. COLUMN P.O. Box 576 Essendon North VIC 3041 Surrey Hills 3127 BEYOND EX. COLUMN 100mmOF UPSTAND OF9331 3695 MIN. 100mmMIN. UPSTAND 0400 588 948 03 BOX AT HIGHESTFFL GUTTER ATGUTTER HIGHEST +5.340 EX. FIRST FLOOR FFL BOX +5.340 EX. FIRST FLOOR EX. CHIMNEY/FLUE POINT, ENSURE OF BOTTOM info@structuraledge.com.au info@efficientenergychoices.com.au +5.340 EX. POINT, FIRSTENSURE FLOOR FFL OFBOTTOM

EX. COLUMN

FOR DETAIL. EX. STEEL DRAWINGS EX. BEAM, STEEL BEAM, MATCH ALLOW FORPAINT ALLOW RE- TO FOR RE- 2,EXISTING Level 118 Langridge Street, Collingwood 3066 VIC Australia PAINTING WHERE PAINTING P: WHERE3 8592 1999 E: office@eatas.com.au W: eatas.com.au FACE OF EX. +61 TIMBER NECCESSARY NECCESSARY MULLION

4

PB1

10 105

FALL MIN. 1:100 FALL MIN. 1:100

20

ARCHITECTS EAT FALL MIN 1:100 FALL MIN 1:100

TOFALL SUIT AND SCREED TOPACKING SCREED FALL AND TO WATERPROOFED, WATERPROOFED, NEW STEEL BEAMS REFER ARDEX REFER ARDEX FRAMING, BOTTOM OF SPECIFICATIONS SPECIFICATIONS AND BEAMS TO ALIGN, AND DETAIL DETAIL STRUCTURE ENG'S REFER

MIN 100

A42.01

20

SCREED

A42.01

FALL MIN. 1:100

5

70

SCREED

5

105

FALL MIN 1:100

SCREED TO FALL AND WATERPROOFED, REFER ARDEX EX. WINDOW EX.SILL WINDOW SILL SPECIFICATIONS AND DETAIL BUILDER TOBUILDER ENSURETO ENSURE FLASHING AND FLASHING EX. STEELAND BEAM, WATERPROOFING WATERPROOFING TO ALLOW FOR RE- TO EX. WINDOW EX. WINDOW PAINTING WHERE NECCESSARY FLASHING OVER FLASHING OVER

B

UPSTAND

B

20

C

FLASHING OVER SCREED

HIGH POINT

UPSTAND

A42.01

BUILDER TO ENSURE FLASHING AND C WATERPROOFING TO EX. WINDOW

10

5

EX. WINDOW SILL

MIN 100

B

MIN 50

CONDENSATION DRIP CHANNEL CONDENSATION DRIP CHANNEL WITH WEEP HOLE TO DRAIN WITHCHANNEL WEEP HOLE TO DRAIN TOWARDS BOX GUTTER. CONDENSATION DRIP WITH WEEP HOLETOWARDS TO DRAIN BOX GUTTER. TOWARDS BOX GUTTER. FLASHING OVER BOX GUTTER FLASHING OVER BOX GUTTER FLASHING OVER BOX GUTTER PLYWOOD LINING BEYOND PLYWOOD LINING BEYOND PLYWOOD LINING BEYOND EDGE OF EX. EXPOSED SECURE FLASHING INTO EX. STEEL BEAM SECURE FLASHING INTO EX. BRICK WALL AND SEAL BRICK EDGE OF EX. EXPOSED SECURE FLASHING INTOWALL EX. AND SEAL STEEL BEAM BRICK WALL AND SEAL

MIN 50

+5.090 EX. GROUND FLOOR FCL NEOPRENE SPACER EX. COLUMN NEOPRENE SPACER +5.340 EX. FIRST FLOOR FFL FA FA LL LL HYNE BEAM 17 , APPEARANCE HYNE BEAM 17 , APPEARANCE AL GRADE A IN PLANTATION PINE +5.340 EX. FFIRST FLOOR FFL L GRADE A IN PLANTATION PINE HYNE BEAM 17 , APPEARANCE EXPOSED TIMBER RAFTER, TO EXPOSED TIMBER RAFTER, TO PINE REPLACE EX. RAFTERS,. GRADE A IN PLANTATION REPLACE EXPOSED RAFTER, EX. TO RAFTERS,. RAFTERS TO BE CONCEALED FIXED TIMBERRAFTERS TO BE CONCEALED FIXED TO TIMBER BEAM, REFER REPLACE EX. RAFTERS,. TO TIMBER BEAM, REFER RAFTERS TO BE CONCEALED FIXEDEX. EXPOSED STEEL BEAM STRUCTURE ENG'S DRAWINGS EX. BUILDER TO ENG'S DRAWINGS TODECK, TIMBER BEAM,STRUCTURE REFER INSPECT CONDITION STRUCTURE ENG'S DRAWINGS EX. EXPOSED STEEL BEAM NEW TIMBER BEAM TO ON SITE AND REVIEW NEW TIMBER BEAM A TO REPLACE EXISTING, REFER ANDTO DISCUSS WITH +5.090 EX. GROUND FLOOR FCL REPLACE EXISTING, REFER TO NEW TIMBER TO STRUCTURAL ENG'S ARCHITECT ONBEAM SITER STRUCTURAL REPLACE EXISTING, REFER TO ENG'S DRAWINGS DRAWINGS +5.090 EX. GROUND FLOOR FCL STRUCTURAL ENG'S ADJUSTABLE DRAWINGS HIGH POINT PODS AND PAVER TOP OF TIMBER BEAM TO BE TOP OF TIMBER BEAM TO BE BY MITRED TO FLUSH WITH SYSTEM TOP MITRED TOP OF TIMBER BEAM TO TO BE FLUSH WITH TOP FO TIMBER RAFTERS, TOBUILDER TIMBER MITRED TO FLUSHFO WITH TOPRAFTERS, TO STRUCTURE ENG'S APPROVAL STRUCTURE ENG'SEX. APPROVAL FO TIMBER RAFTERS, TO RENDERED PL1 PL1 EX. DECK, BUILDER TOBUILDER EX. DECK, STRUCTURE ENG'STO APPROVAL WALL INSPECT CONDITION INSPECT ENSURE PLYWOOD LINING FACE CONDITION PL1 ENSURE PLYWOOD20mm LINING FACE FULL SILICON ON SITE ONREVIEW SITE AND REVIEW A ALIGNED TO EDGE OFAND EX. A OF EX. ALIGNED TO EDGE ENSURE PLYWOOD ANDBEAM DISCUSS WITH AND DISCUSS WITH LINING FACE SANDWICH BEAD EXPOSED STEEL EXPOSED ALIGNED EDGE OF EX. STEEL BEAM ARCHITECTARCHITECT ON SITER TO ON SITER COLORBOND FLASHING EXPOSED STEEL BEAM TO MATCH RM1 9mm THK PLYWOOD LINING. ADJUSTABLE ADJUSTABLE PL1 9mm THK PLYWOOD LINING. COLORBOND FORMED PLYWOOD LINING TURN UPAND PAVER PLYWOOD LINING TO PODSTO AND PAVER PODS TURN UP TO 9mm THK PLYWOOD LINING. BOX GUTTER TO CLAD OVER TIMBER SYSTEM BYBEAM, SYSTEM BY LININGTO BEAM, EXISTING, PLYWOOD TOCLAD TURNOVER UP TIMBER REPLACED 265 COS MITRE AT CORNER JOINT. BUILDER BUILDER MITRE BEAM, AT CORNERCOLOUR JOINT. TO MATCH TO CLAD OVER TIMBER MITRE AT CORNER JOINT. RM1 346 COS EX. RENDERED EX. RENDERED WALL100mm UPSTAND OF WALL MIN. MIN 100

C

1125

EDGE OF EX. EXPOSED STEEL BEAM

GENERAL GENERAL NOTES NOTES

Roof Glazing Section Details

DOWNPIPE BEYOND DOWNPIPE BEYOND

346 COS

GLAZING TAPE BEYOND GLAZING SPECIFICATION GLAZING SPECIFICATION REFER TO FINISHES REFER TO FINISHES GLAZING SPECIFICATION SCHEDULE SCHEDULE REFER TO FINISHES EX. EXPOSED STEEL BEAM REFER TO REFER GENERAL TO GENERAL NOTES ON NOTES SHEET ONA01.00 SHEET A01.00 SCHEDULE EX. COLUMN

9mm THK PLYWOOD 9mm THK LINING PLYWOOD TO REPLACE LINING TOEX. REPLACE EX. WALL LINING, WALL TO LINING, BE MITRED TO BE AS MITRED IT MEETS AS IT MEETS PLYWOOD CEILING PLYWOOD LINING CEILING BEYOND LINING BEYOND

PL1

250 COS 1447 COS COS 1447

NOM. SETDOWN NOM. SETDOWN +5.340 EX. FIRST FLOOR FFL NOM. UPSTAND/ NOM. UPSTAND/ PLINTH PLINTH GLAZING TAPE BEYOND

NEOPRENE SPACER

PL1

1125 1125

265 PL1COS DOWNPIPE BEYOND COS 346265 COS

OVERFLASHING

9mm THK PLYWOOD LINING TO REPLACE EX. WALL LINING, TO BE MITRED AS IT MEETS PLYWOOD CEILING LINING BEYOND

132

PL1

TO CLAD OVER TIMBER BEAM,

EX. STAIRCASE EX. STAIRCASE RAILING RAILING

322

132

MIN 100 MIN 100

GENERAL NOTES PLYWOOD LINING TO TURN UP TO CLAD OVER TIMBER BEAM, EX. COLUMN MITRE AT CORNER JOINT.

PL1

MATCH RM1, TO FALL TO EX. WALL PENETRATION

PL1

9mm THK PLYWOOD LINING. SPOT SPOT LEVEL REFER TOLEVEL GENERAL NOTES ON SHEET A01.00 MITRE AT CORNER JOINT. PLYWOOD LINING TO TURN UP

GLAZING TAPE BEYOND

FOLDED BOXED GUTTER, TO MATCH RM1, TO FALL TO EX. WALL PENETRATION FOLDED BOXED GUTTER, TO

ALIGNED TO EDGE OF EX.

EXPOSED STEEL BEAM EX. WINDOW BEYOND CHANGE CHANGE INFRAME LEVEL LEVEL 9mmIN THK PLYWOOD LINING.

EX. WINDOW FRAME BEYOND

EX. STAIRCASE RAILING

SECURE FLASHING INTO EX. BRICK WALL AND SEAL

OVERFLASHING

CO L EX. WINDOW FRAME BEYOND

265 COS HIGH POINT 346 COS

PL1

FO TIMBER RAFTERS, TO J0# JOINERYNOM. JOINERY TYPESETDOWN TYPE STRUCTURE ENG'S APPROVAL ENSURE PLYWOOD LINING FACE ALIGNED TO EDGE OF EX. EXPOSED STEEL BEAM STRUCTURAL STRUCTURAL TYPE TYPE NOM. UPSTAND/ PLINTH ENSURE PLYWOOD LINING FACE

HIGH POINT

MIN 100 UPTURN

J0#

9mm THK PLYWOOD 9mm THK LINING PLYWOOD TO REPLACE LINING TO REPLACE EX. WALL LINING EX. WALL ON ALL LINING SIDES ON ALL SIDES

PLYWOOD LINING BEYOND SECURE FLASHING INTO EX. BRICK WALL AND SEAL

PL1

PL1

WITH WEEP HOLEBOX TO GUTTER DRAIN FLASHING OVER FOLDED BOXED GUTTER, TO TOWARDS BOX GUTTER. MATCH RM1, TO FALL TO EX. PLYWOOD LININGBOX BEYOND FLASHING OVER GUTTER WALL PENETRATION

322

FA LL

CONDENSATION DRIP CHANNEL WITH WEEP HOLE TO DRAIN TOWARDS BOX GUTTER. CONDENSATION DRIP CHANNEL

322

FA LL

CO L

X. FIRST FLOOR FCL +7.740 EX. FIRST FLOOR FCL +7.740 EX. FIRST FLOOR FCL

A

A

250 COS

+8.030 EX. DECK FFL EX. DECK FFL

GENERAL GENERAL LEGEND LEGEND

CO L

X. DECK FFL +8.030

FA LL

FINISHES FINISHES LEGEND LEGEND

322

FA LL

GENERAL LEGEND

1447 COS

FA LL

RM1

FINISHES LEGEND

1125

EX. FIRST FLOOR FCL

A

250 COS

EX. FIRST FLOOR FCL

+7.740

A

B

MIN 50

+7.740

B

OVERFLASHING

EX. DECK FFL

A

1447 COS

EX. DECK FFL FIRST FLOOR FCL C

+8.030

B

NEOPRENE SPACER GLAZING SPECIFICATION REFER TO GLAZING TAPE BEYOND FINISHES SCHEDULE

250 COS

+8.030 +7.740 C

FA LL

MIN 100 UPTURN

EX. DECK FFL C

PL1

MIN 50MIN 50

+8.030

GLAZING CHANNEL, FILLED WITH SILICONE SEALANT GLAZING SPECIFICATION REFER TO FINISHES SCHEDULE

FA LL

OVERFLASHING OVERFLASHING

FA LL

LL FA

NEW TIMBER RAFTER ADDED C TO EX. ROOF FRAMING, C REFER TO STRUCTURE ENG'S DRAWINGS

9mm THK PLYWOOD LINING TO PL1 REPLACE EX. CEILING LINING. GLAZING TAPE BEYOND PLYWOOD LINING TO TURN UP TO GL1 FORM A FASCIA AND STOP BELOW PL1 EX. ROOFROOF, FRAMING GLAZED MITRED PLYWOOD GL1 CORNER JOINT ENSURE PLYWOOD LINING TO FINISH NEW TIMBER RAFTER ADDED EX. ROOF FRAMING INLINE WINDOW FRAME TO EX. WITH ROOFEX. FRAMING, PL1 HYNE BEAM 17 , APPEARANCE BEYOND REFER TO STRUCTURE ENG'S NEW TIMBER RAFTER ADDED GRADE A IN PLANTATION PINE DRAWINGS TO EX. ROOF FRAMING, EXPOSED TIMBER RAFTER TO PLYWOOD LINING BOARD BEYOND PL1 NEOPRENE SPACER REFER TO STRUCTURE ENG'S STRUCTURE ENG'S DRAWINGS FA LL LL DRAWINGS FA 9mm THK TO PLYWOOD 100mm THK METECNOSPAN PIR BUILDER ENSURELINING TO 100mm THK METECNOSPAN PIR SPACER NEOPRENE REPLACE EX. CEILING LINING. INSULATED ROOF PANEL WATERPROOFING AROUND EX. INSULATED PIR ROOF PANEL 100mm THK METECNOSPAN PLYWOOD LINING TOLINING TURN COLUMN ANDUP EX.TO 9mm THK PENETRATION PLYWOOD TO INSULATED ROOF PANEL FORM A FASCIA AND STOP BELOW WINDOW REPLACE FRAMES EX. CEILING LINING. GLAZED ROOF, MITRED PLYWOOD PLYWOOD LINING TO TURN UP TO +8.030 EX. DECK FFL CORNER JOINT AND STOP BELOW FORM A FASCIA AHD AUSTRALIAN HEIGHT DATUM ENSURE PLYWOOD LINING TO FINISH GLAZED ROOF, MITRED PLYWOOD EX. WINDOW FRAME BEYOND INLINE WITH EX. WINDOW FRAME CH CEILING HEIGHT CORNER JOINT HYNE BEAM 17 , APPEARANCE BEYOND 2PAC1 FINISH - TYPE 1 ENSURE PLYWOODTWOPAC LINING TO FINISH PLANTATION GRADE A INON COS CONFIRM SITE PINE EX. COLUMN INLINE WITH EX. WINDOW FRAME EXPOSED TIMBER RAFTER TO PLYWOOD LINING BOARD BEYOND CN1 CONCRETE - OFF FORM HYNE BEAM 17 , APPEARANCE DP DOWNPIPE BEYOND STRUCTURE ENG'S DRAWINGS EX. MOTORISED ROOF SHADE. GRADE A IN PLANTATION EX. EJ MOTORISED ROOF SHADE. EXPANSION JOINT PINE GL1 STEEL GLASS TYPE 1 (CLEAR) BUILDER TO REINSTALL OVER EX. EXPOSED BEAMBEYOND EXPOSED BUILDER TO REINSTALL OVER TIMBER RAFTER TO PLYWOOD BOARD EX. MOTORISED ROOF SHADE. BUILDER TOLINING ENSURE NEW ROOFING AND EQ EQUAL NEW ROOFING GL3 GLASS TYPE 3 - (CLEAR) BUILDER TO REINSTALL OVER AND STRUCTURE ENG'S DRAWINGS WATERPROOFING AROUND EX. RECONNECT. EX. EXISTING RECONNECT. ROOFING AND COLUMN PENETRATION ANDTYPE EX. GL4 GLASS 4 (NARROW REEDED) NEW BUILDER TO ENSURE RECONNECT. EXT EXTERIOR WINDOW FRAMES AROUND EX. MIN. 75mm ENDLAP CUTBACK. WATERPROOFING MIN. 75mm ENDLAP CUTBACK. GR1 GROUT TYPE 1 ROOFING TO BE INSTALLED OVER FCL TO BE INSTALLED FINISHED CEILING +8.030 LEVEL +7.740 EX. DECK FIRST FFL FLOOR FCL COLUMN PENETRATION AND EX. ROOFING OVER MIN. CUTBACK. AS75mm PER ENDLAP WINDOW FRAMES GROUT TYPE 2 EXISTING ROOFING FRAME GR2 AHD AUSTRALIAN AUSTRALIAN HEIGHT DATUM HEIGHT DATUM EXISTING ROOFING FRAME AS PER FFL FLOOR LEVEL ROOFING AHD TO BE INSTALLED OVER FINISHED MIN EX. WINDOW FRAME BEYOND MANUF. INSTALLATION GUIDE M MANUF. INSTALLATION GUIDEDRAIN .7 EXISTING CH ROOFING FRAME AS PER FLOOR +8.030 EX. DECK FFL CH CEILING CEILING HEIGHT HEIGHT FD GR3 GROUTINTYPE 3 .7 5 M 5 MANUF. INSTALLATION GUIDE IN 2PAC1 2PAC1 TWOPAC TWOPAC FINISH - TYPE FINISH1FORMED - TYPE COLORBOND 1 FLASHING TO COS FORMED COS CONFIRM CONFIRM ON SITE ON INT INTERIOR COLORBOND FLASHING TO SITE WINDOW BEYOND TYPE 1 EX. COLUMN MR1. 7FRAME 5 MIRROR FLASH OVER GLAZING CHANNEL AND OVER GLAZING CHANNELGROUND AND CN1 CN1 CONCRETE CONCRETE - OFF FORM - OFFGLAZING FORMTAPE, FLASHINGFORMED COLORBOND TONATURAL DPRM1 FLASH DPFLASHING DOWNPIPE DOWNPIPE NGL LEVEL TO MATCH MT1 METAL FINISH - TYPE 1 GLAZING TAPE, AND FLASHING TO MATCH RM1 FLASH OVER EX. COLUMN EJ GLAZING EJCHANNEL EXPANSION EXPANSION JOINT JOINT OFP OPEN FIRE PLACE GL1EX. GL1 GLASS TYPE GLASS 1 (CLEAR) TYPE 1 (CLEAR) EXPOSED BEAM GLAZING FLASHING TO MATCH RM1 PB1 STEEL PLASTERBOARD GLAZING CHANNEL, FILLED WITH TAPE, EQ GLAZING EQ EQUAL EQUAL CHANNEL,OVERALL FILLED WITH O/A GL3 GL3 GLASS TYPE GLASS 3 - TYPE (CLEAR) 3 - (CLEAR)SEALANT SEALANT PL1 STEEL PLYWOOD TYPESILICONE 1 GLAZING CHANNEL, FILLED WITH OVERFLOW EX. SILICONE EX.EXISTING EXISTING O/F EX. EXPOSED BEAM GL4 GL4 GLASS TYPE GLASS 4 (NARROW TYPE 4 (NARROW REEDED) REEDED) SILICONE SEALANT EX. WINDOW FRAME BEYOND FA EXT EXTEXTERIOR EXTERIOR PT1 PAINT TYPE 1 FA PL PARAPET LINE L LL GR1 L GR1 GROUT TYPE GROUT TYPE 1 GLAZING F1 FCL FCLFINISHED FINISHED CEILING CEILING LEVEL LEVEL +7.740 EX. FIRST FLOOR FCL PV PHOTO VOLTAIC (SOLAR) PANEL SPECIFICATION REFER TO ALTYPE 2 PT2 PAINT GLAZING SPECIFICATION REFER TO GR2 GR2 GROUT TYPE GROUT 2 LTYPE 2 FINISHES SCHEDULE FFL FFLFINISHED FINISHED FLOOR LEVEL FLOOR LEVEL (PC) PRIME COST FINISHES SCHEDULE GLAZING SPECIFICATION REFER TO PT3 PAINT TYPE 3 +7.740 EX. FIRST FLOOR FCL FDSCHEDULE FD FLOOR DRAIN FLOOR DRAIN GR3 GR3 GROUT TYPE GROUT 3 TYPE 3 GLAZING TAPE BEYOND FINISHES PGL PROPOSED GROUND LEVEL RM1 METAL ROOF FINISH - TO MATCH EXISTING INT GLAZING TAPE BEYOND INTINTERIOR INTERIOR (PS) PROVISIONAL SUM MR1 MR1 MIRROR MIRROR TYPE 1 TYPE 1 GLAZING TAPE BEYOND TL1 TILE TYPE 1 PL1 NGL NGLNATURAL NATURAL GROUNDGROUND LEVEL RWH RAINWATER HEAD LEVEL MT1 MT1 METAL FINISH METAL- TYPE FINISH1 PL1 - TYPE 1 GL1 TL2 TILE OFP OFPOPEN FIRE OPEN PLACE FIRE GL1 RL RIDGE LINEPLACE PL1 TYPE 2 FLASHING TO CAP OVER EDGE FO PB1 PB1 PLASTERBOARD PLASTERBOARD GL1 O/A EX. ROOF FRAMING O/AOVERALL OVERALL SP SPREADER GLAZING TAPE BEYOND TL3 TILE TYPE 3 ROOF PANEL, EX. ROOF FRAMING PL1 PLYWOOD PL1 PLYWOOD TYPE 1 TYPE 1 FLASHING AS PER ROPFING MANUF'S O/F O/F OVERFLOW OVERFLOW SSL STRUCTURAL SURFACE LEVEL EX. ROOF FRAMING TL4 TILE TYPE 4 EX. WINDOW FRAME BEYOND INSTALLATION GUIDE TURN DOWN NEW TIMBER RAFTER ADDED PT1 ADDED PAINT PT1 TYPE PAINT 1 TYPE 1 PL PL PARAPET PARAPET LINEGLAZING LINE SPECIFICATIONB NEW TIMBER RAFTER PJ PANEL JOINT OVER EAVES COLOUR TO TO EX. GUTTER, ROOF FRAMING, TIMBER VENEER - TYPE 1 PL1 REFER TO FINISHES TO EX. ROOF FRAMING, TV1 NEW TIMBER RAFTER ADDED PV PV PHOTO VOLTAIC PHOTO VOLTAIC (SOLAR) (SOLAR) PANEL PANEL B PL1 TBRW TOP OF PT2 PAINT PT2 TYPE PAINT 2 TYPE 2 RM1 TO STRUCTURE ENG'S MATCHREFER EX.BRICKWORK WINDOW FRAMEWALL BEYOND SCHEDULE REFER TO STRUCTURE ENG'S TO EX. ROOF FRAMING, XBR BRICKWORK - EXISTING PL1 DRAWINGS (PC) (PC) PRIME COST PRIME COST TBWW TOP OF BLOCKWORK WALL NEW EAVES GUTTER TO REPLACE EXISTING, DRAWINGS PAINT PT3 TYPE PAINT 3 TYPE 3 REFER TO STRUCTURE ENG'S PT3 NEOPRENE SPACER XCN CONCRETE - EXISTING COLOUR TO MATCH RM1 PGL NEOPRENE PGLPROPOSED PROPOSED GROUND GROUND LEVEL WALL LEVEL TCW TOP OF CONCRETE SPACER DRAWINGS RM1 RM1 METAL ROOF METAL FINISH ROOF- TO FINISH MATCH - TOEXISTING MATCH EXISTING NEOPRENE SPACER (PS) (PS) PROVISIONAL PROVISIONAL SUM SUM XLB LINING BOARD EXISTING 9mm THK PLYWOOD LINING TO 9mm THK PLYWOOD TO TYPE NEOPRENE SPACER TL1 LINING TILE TL1 TILE 1 TYPE 1 DOOR TYPE HEAD D102 REPLACE EX. CEILING LINING. RWH RWH RAINWATER RAINWATER HEAD REPLACE XMF STEEL FRAME - EXISTING 9mm LININGEX. TO CEILING LINING. PLYWOOD LINING TO TURN UPTHK TO PLYWOOD TL2TO TURN TILE TL2 TYPE TILE 2 TYPE 2 PLYWOOD LINING UP TO RL RL RIDGE LINE RIDGE LINE REPLACE EX. CEILING LINING. FASCIA STOP FLASHING TO FLASHING CAPFORM OVER TOAEDGE CAP OVER FOAND EDGE FOBELOW A FASCIA AND STOPXPB BELOW PLASTERBAORD - EXISTING EX. DOOR TYPE PLYWOOD LININGFORM TO TURN UP TO HYNE BEAM 17 BEYOND , APPEARANCE XD102 GLAZING TAPE SP SP SPREADER SPREADER TL3 TILE TL3 TYPE TILE 3 TYPE 3 GLAZED ROOF, MITRED PLYWOOD ROOF PANEL, ROOF PANEL, GLAZED MITRED PLYWOOD FORM A FASCIA AND STOPROOF, BELOW XRD RENDER - EXISTING GRADE A IN PLANTATION PINE JOINT FLASHING AS FLASHING PERCORNER ROPFING AS PER MANUF'S ROPFING MANUF'S SSL SSLSTRUCTURAL STRUCTURAL SURFACE SURFACE LEVEL LEVEL CORNER JOINTTL4 TILE TL4 TYPE TILE 4 TYPE 4 GLAZED ROOF, MITRED PLYWOOD EXPOSED TIMBER RAFTER, TO ENSURE PLYWOOD INSTALLATION INSTALLATION GUIDE TURN GUIDE DOWN TURNLINING DOWNTO FINISH W100 XRM WINDOW TYPE GLAZING TAPE BEYOND ENSURE PLYWOOD LINING TO FINISHMETAL ROOF - EXISTING GLAZING SPECIFICATION PJ PANEL JOINT PANELREPLACE JOINT EX. RAFTERS,. INLINE WITH EX. WINDOWCORNER FRAME JOINT INLINE WITH EX. OVER EAVES OVER GUTTER, EAVES COLOUR GUTTER, TOCOLOUR TO TV1 TV1 TIMBER VENEER - TYPE 1 -HYNE TYPEBEAM 1 17 , APPEARANCE PJ WINDOWTIMBER FRAME VENEER REFER TO FINISHES ENSURE PLYWOOD LINING TO FINISH RAFTERS TO BE XRN RENDER FINISH - EXISTING TBRW HYNE TBRW TOP TOP OF BRICKWORK WALLCONCEALED WALL FIXED BEAMOF 17 , BRICKWORK APPEARANCE RM1 MATCH RM1MATCHBEYOND BEYOND FRAME SCHEDULE INLINE WITH EX. WINDOW GRADE A IN PLANTATION PINE TO TIMBER BEAM, REFER XBR XBR BRICKWORK BRICKWORK - EXISTING - EXISTING XW100A IN PLANTATION GLAZING SPECIFICATION PINE EX. TYPE GRADE 17 , APPEARANCE TBWW TBWW TOP OF BLOCKWORK TOPWINDOW OF BLOCKWORK WALL WALL XST CAESARSTONE - EXISTING NEW EAVESNEW GUTTER EAVES TOGUTTER REPLACE TOEXISTING, REPLACE EXISTING, EXPOSED TIMBER RAFTERHYNE TO BEAM STRUCTURE ENG'S DRAWINGS PLYWOOD LINING BOARDBEYOND BEYOND REFER EXPOSED TIMBER RAFTER TO TO FINISHES IN PLANTATION PINE GRADE A PLYWOOD LINING BOARD BEYOND XCN XCN CONCRETE CONCRETE EXISTING EXISTING COLOUR TOCOLOUR MATCH RM1 TO MATCH RM1 STRUCTURE ENG'S DRAWINGS TCW TCW TOP OF CONCRETE TOP OF CONCRETE WALL WALL SCHEDULE ENG'S DRAWINGS XTD TIMBER DECK - EXISTING EXPOSED TIMBERSTRUCTURE RAFTER PLYWOOD LINING BOARD BEYOND EQ# TO TYPE NEW TIMBER BEAM TO XLB XLB LINING BOARD LINING- BOARD EXISTING - EXISTING STRUCTURE ENG'S DRAWINGS EQUIPMENT BUILDER TO ENSURE XTF TIMBRE FRAME - EXISTING NEOPRENE SPACER REFER TO BUILDER TO ENSURE DOOR TYPE DOORREPLACE TYPE EXISTING, D102 D102 WATERPROOFING AROUND EX. XMFAROUND XMF STEEL FRAME STEEL- FRAME EXISTING - EXISTING ENG'S WATERPROOFING EX. BUILDER TL# XTL TILE - EXISTING FINISHSTRUCTURAL TYPE COLUMN PENETRATION AND EX. TO ENSURE EX. CLADDING DRAWINGS AND EX. WATERPROOFINGCOLUMN AROUNDPENETRATION EX. XPB NEOPRENE SPACER XPB PLASTERBAORD PLASTERBAORD - EXISTING - EXISTING WINDOW FRAMES EX. DOOR EX. TYPE DOOR TYPE HYNE BEAM 17 , APPEARANCE XD102 XD102 WINDOW FRAMES COLUMN PENETRATION AND EX. IN PLANTATION PINE GRADE A XRD XRD RENDER RENDER EXISTING EXISTING +8.030 EX. DECK FFL XTL# WINDOW FRAMES EX. FINISH +8.030 EX.OFTYPE DECK FFL TOP TIMBER BEAM TO BETO EXPOSED TIMBER RAFTER, HYNE BEAM 17 , APPEARANCE W100 W100 XRM XRM METAL ROOF METAL - EXISTING ROOF - EXISTING WINDOW TYPE TYPE +8.030WINDOW EX. DECK FFL MITRED TOEX. FLUSH WITH TOP EX. WINDOW FRAME BEYOND REPLACE RAFTERS,. EX. WINDOW FRAME BEYOND PLANTATION GRADE A INRAFTERS, FO TIMBER TO PINEFIXED RAFTERS TO BE CONCEALED FURNITURE TYPE TB# XRN RENDERRENDER FINISH - EXISTING FINISH - EXISTING EX. WINDOW FRAME BEYOND XRN EXPOSED TIMBER RAFTER, TO STRUCTURE ENG'S APPROVAL TO TIMBER BEAM, REFER XW100 XW100 EX. COLUMN EX. WINDOW EX. WINDOW TYPE REPLACE TYPE EX. RAFTERS,. EX. COLUMN XST XST CAESARSTONE CAESARSTONE - EXISTING - EXISTING STRUCTURE DRAWINGSFIXED RAFTERS TO ENG'S BE CONCEALED J0# 9mm THK PLYWOOD LINING TO REPLACE JOINERY TYPE EX. COLUMN ENSURE PLYWOOD LINING FACE TO TIMBER BEAM, REFER XTD XTD TIMBER DECK TIMBER - EXISTING DECK - EXISTING EX. WALL ON STEEL ALL SIDES EQ# EQ# EQUIPMENT EQUIPMENT TYPE TYPE EX. LINING EXPOSED BEAM NEW TIMBER BEAMOF TOEX. ALIGNED TO EDGE STRUCTURE ENG'S DRAWINGS EX. EXPOSED STEEL BEAM XTF XTF TIMBRE FRAME TIMBRE- FRAME EXISTING - EXISTING REPLACE EXISTING, REFER TO EXPOSED STEEL STRUCTURAL TYPEBEAM EX. EXPOSED STEEL BEAM ENG'STO TL# TL# XTL TILE XTL - EXISTING TILE - EXISTING NEW TIMBER BEAM FINISH TYPE FINISHSTRUCTURAL TYPE EX. CLADDING EX. CLADDING DRAWINGS REPLACE EXISTING, REFER TO CHANGE IN LEVEL 9mm THK PLYWOOD STRUCTURAL ENG'S LINING. +7.740 EX. FIRST FCL PLYWOOD LINING TO TURN UP XTL# FLOOR XTL# EX. FINISH EX.TYPE FINISH +7.740 EX.OFTYPE FIRST FLOOR FCL DRAWINGS TOP BEAM TO BE TO CLADTIMBER OVER TIMBER BEAM, +7.740 EX. FIRST FCL MITREDAT TO FLUSH WITH SPOTFLOOR LEVEL MITRE CORNER JOINT.TOP FO RAFTERS, FURNITURE FURNITURE TYPE TYPE TB# TB# TOPTIMBER OF TIMBER BEAMTO TO BE STRUCTURE ENG'SWITH APPROVAL MITRED TO FLUSH TOP

RM1

RM1

D

D

NG, TO MATCH RM1

RIDGE CAPPING, TO MATCH RM1 RIDGE CAPPING, TO MATCH RM1 FA LL LL FA

C

100 UPTURN MIN UPTURN MIN 100

D

322

75

EX. ROOF FRAMING

132

MIN .

MIN 100

MIN .

As indicated @ A1 VO EE

Rev.

Description Rev.

Rev. Desc Description


1

5 A53.01

4

5

2

1

A53.01

A53.01

50 COS

2

A53.01

PACKING TO SUIT

MT1 60

MT1

MT1

50 COS

10mm SHADOW LINE

PACKING TO SUIT 10mm THK BRASS SHEET. 10mmOF SHADOW END BRASS LINE SHEET TO STOP FLUSH WITH THE FACE OF ADJACENT BRICK WALL 10mm THK BRASS SHEET. END OF BRASS SHEET TO STOP FLUSH WITH THE FACE OF ADJACENT BRICK WALL

EX. CONCRETE THRESHOLD

500 500

FROM THE FACE OFFROM EX. BRICK THE FACE WALLOF EX. BRICK WALL

MT1 60

MT1 DETAIL ENTRY DOOR ELEVATION

EX. CONCRETE THRESHOLD

3 A53.01 DETAIL ENTRY DOOR ELEVATION

3

BRASS SHEET ON TI TO FOLD AND WRAP

EX. DOOR JAMB, BUILDER TO INSPECT CONDITION ON SITE AND MAKE GOOD, PAINT EX. JAMB TO MATCH DOOR LOCK SYSTEM, EXISTING TURN SNIP AND ESCUTCHEON REFER TO ARCHITREND SPECIFICATIONS CUT OUT FOR LETTER FLAP

A DOOR LOCK SYSTEM, NEW TO REPLACE TURNDOOR SNIP AND EXISTING DOOR PANEL. ESCUTCHEON REFER TO METAL CLADDED SOLID ARCHITREND CORE TIMBER ENTRY SPECIFICATIONS DOOR . FACE OF DOOR TO FLUSH CUT OUT FOR LETTER FLAP WITH EXTERNAL FACE OF DOOR JAMB A NEW DOOR TO REPLACE EXISTING DOOR PANEL. EXTEND OF CANOPY OVER METAL CLADDED SOLID CORE TIMBER ENTRY DOOR . FACE OF DOOR TO FLUSH WITH EXTERNAL FACE OF DOOR JAMB

2

D

A53.01

EXTEND OF CANOPY OVER

2

A53.01 10

940 COS

1:

D

A53.01

BRASS PLATE CANOPY

1:

5

4

A53.01 940 COS

10

A53.01

BRASS PLATE CANOPY

DETAIL - ENTRY DOOR FLOOR PLAN

1

A53.01

1 : 10

5

4 10

940 A53.01 COS

A53.01

FROM THE FACE

BRASS PLATE CANOPY 850 COS

DETAIL - ENTRY DOOR FLOOR PLAN EQ

EQ

EQ

EQ EQ EQ

EQ

EQ

EQ

EQ

EQ

10mm THK BRASS PLATE V FOLDED AT FROM THE FACE CORNER

EQ

NEW SOLID CORE DOOR PANEL EQ EQ

EQ EQ

EQ EQ 940 COS BRASS PLATE CANOPY 850 COS

EX LINTEL

1

EQ

EQ

EQ

10mm THK BRASS PLATE V FOLDED AT CORNER

EQ 10

EX LINTEL

10mm SHADOW LINE

EQ EQ

925

715 COS

925

715 COS

10mm THK BRASS PLATE CANOPY, TO BE CONCEALED FIXED ON TO EX. WALL AND LINTEL. BUILDER TO INSPECT 10mm SHADOW LINE ON SITE AND CONFIRM WITH ARCHITECT AND STRUCTURE ENGINEER 10mm THK BRASS PLATE CANOPY, TO BE CONCEALED FIXED ON TO EX. WALL AND LINTEL. BUILDER TO INSPECT ON SITE AND CONFIRM WITH ARCHITECT AND STRUCTURE ENGINEER

EQ

925

10

10

EQ

1 : 10

10mm SHADOW LINE

10mm SHADOW LINE

EXISTING

A53.01

NEW SOLID CORE DOOR PANEL EQ EQ

925

11

10

EX. DOOR JAMB, BUILDER TO INSPECT CONDITION ON SITE AND MAKE GOOD, PAINT EX. DOOR JAMB TO MATCH EXISTING

A53.01

MT1

CONCEALED HINGES, REFER TO ARCHITREND SPECIFICATIONS

10

BRASS SHEET ON TI TO FOLD AND WRAP

EXISTING

CONCEALED HINGES, REFER TO ARCHITREND SPECIFICATIONS

4

A53.01

EX WINDOW

200 COS

EX. GROUND FLOOR FCL

200 COS

+5.090

BRASS SHEET TO END IN LNE WITH BOTTOM EX. DOOR JAMB (SHOWN IN GREY DASH) 200 COS

EX. GROUND FLOOR FCL

200 COS

+5.090

EX WINDOW

BRASS SHEET TO END IN LNE WITH BOTTOM EX. DOOR JAMB (SHOWN IN GREY DASH) BRASS SHEET TO END IN LNE WITH FACE OF BRICK WALL BEYOND

BRASS SHEET TO END IN LNE WITH FACE OF BRICK WALL BEYOND

1130 COS

XBR

1130 COS

2200

XRN

XBR MT1

DOOR LOCK SYSTEM, TURN SNIP AND ESCUTCHEON REFER TO ARCHITREND SPECIFICATIONS

1070 COS

EQ

1028

EQ

1028

DOOR LOCK SYSTEM, TURN SNIP AND ESCUTCHEON REFER TO ARCHITREND SPECIFICATIONS

1070 COS

XBR

60

+2.690

2200

MT1

TO CENTRE OF ESCUCTHEON TO CENTRE OF ESCUCTHEON

ENSURE ALIGN

2200 COS

60

2200 COS

MT1 NEW SOLID CORE DOOR PANELCORE DOOR PANEL NEW SOLID

XRN ENSURE ALIGN

SWING-IN LETTER FLAP SWING-IN LETTER FLAP DOOR HANDLE

EQ

DOOR HANDLE

XBR

EQ

NEW SOLID NEW SOLID CORE DOOR PANELCORE DOOR PANEL

FACE OF DOOR TO FLUSH TO EXTERNAL FACE OF EX. DOOR JAMB

MT1

EQ

3115 COS 3115 COS

FACE OF DOOR TO FLUSH TO EXTERNAL FACE OF EX. DOOR JAMB METAL CLADDED SOLID CORE TIMBER ENTRY DOOR .

CONCEALED SPRING LOADED DOOR SEAL EX. CONCRETE THRESHOLD

CONCEALED SPRING LOADED DOOR SEAL

EX. GROUND FLOOR FFL

EQ

2200 COS

2200 COS

BRASS PLATE CANOPY BRASS PLATE CANOPY

METAL CLADDED SOLID CORE TIMBER ENTRY DOOR .

EX. CONCRETE THRESHOLD

+2.690

EX. GROUND FLOOR FFL

3

A53.01

DETAIL - ENTRY DOOR ELEVATION 1 : 10

4

A53.01

DETAIL 1 : 10


EQ

BRASS SHEET ON TIMBER SUBSTRATE TO FOLD AND WRAP AROUND

25

5mm THK BRASS PLATE HANDLE

50 36

MT1 MT1

24 24

MT1

40

MT1

MT1

2

MT1

DETAIL - ENTRY DOOR PANEL AND HANDLE

A53.01

5mm THK BRASS BOTTOM PLATE, JOINT TO HANDLE TO BE GROUND SMOOTH

9

MT1

25

MT1 MT1

40

MT1

50

MT1

MT1

9

MT1

MT1

DOOR LOCK SYSTEM, A NEW DOOR TO REPLACE TURN SNIP AND EXISTING DOOR PANEL. ESCUTCHEON REFER TO ARCHITRENDMETAL CLADDED SOLID CORE TIMBER ENTRY SPECIFICATIONS DOOR . FACE OF DOOR CUT OUT FOR LETTER FLAPTO FLUSH WITH EXTERNAL FACE OF DOOR JAMB A NEW DOOR TO REPLACE EXISTING DOOR PANEL. METAL CLADDED SOLID EXTEND OF CANOPY OVER CORE TIMBER ENTRY DOOR . FACE OF DOOR TO FLUSH WITH EXTERNAL FACE OF DOOR JAMB

20

MT1 MT1 MT1

20

CUT OUT FOR LETTER FLAP

MT1

21

MT1

MT1 FALL

MT1

20

MT1

MT1

SWING-IN BRASS PLATE, REFER DETAIL 130

36 25

40 21

MT1

ESCUTCHEON REFER TO ARCHITREND SPECIFICATIONS

SWING-IN PLATE, SPOTTED GUM TIMBERBRASS INSERT, REFER DETAILMOCK TO BE GROUND SMOOTH, UP TO BE APPROVED BY ARCHITECT

40

MT1 MT1 MT1

25

THRESHOLD

MT1

10

MT1

MT1

EX. DOOR JAMB, BUILDER TO INSPECT CONDITION ON SITE AND MAKE GOOD, PAINT EX. DOOR JAMB DOOR TO MATCH LOCK SYSTEM, EXISTING TURN SNIP AND 60

EQ

20

BRASS SHEET ON TIMBER SUBSTRATE TO FOLD AND WRAP AROUND

FALL

1

5mm THK BRASS PLATE HANDLE

EQ

130

EX. DOOR JAMB, BUILDER TO INSPECT CONDITION ON SITE AND MAKE GOOD, PAINT EX. DOOR JAMB TO MATCH EXISTING

SPOTTED GUM TIMBER INSERT, TO BE GROUND SMOOTH, MOCK UP TO BE APPROVED BY ARCHITECT

EQ 10

1:2

SPOTTED GUM TIMBER INSERT, TO BE GROUND SMOOTH, MOCK UP TO BE APPROVED BY ARCHITECT 5mm THK BRASS BOTTOM THK BRASS PLATE, JOINT5mm TO HANDLE TO PLATE HANDLE BE GROUND SMOOTH SPOTTED GUM TIMBER INSERT, TO BE GROUND SMOOTH, MOCK UP TO BE APPROVED BY ARCHITECT

5mm THK BRASS PLATE HANDLE

EXTEND OF CANOPY OVER

DETAIL - ENTRY DOOR PANEL AND HANDLE

2

A53.01

1:2

A

A

726 COS 500 FROM THE FACE OF EX. BRICKAWALL

10mm SHADOW LINE

500 10mm THK BRASS PLATE V FOLDED AT FROMCORNER THE FACE OF EX. BRICK WALL

BUILDER TO ENSURE JOINT TO EXISITNG FLASHING AND EX. LINTEL, WATERPROOF BUILDER TO TO SUIT INSPECT STRUCTURAL INTEGRITY ON SITE

FALL

10

EQ

10mm SHADOW LINE

10

FALL

715 COS 925

EXISTING

MT1

BUILDER AND ENGINEER TO INSPECT CONDITION ON SITE, FINAL STRUCTURE STRATEGIES TO BE DISCUSSED WITH ARCHITECT

715 COS

200 COS

925

MT1

BUILDER AND ENGINEER INSPECT BUILDER TO TO ALLOW FOR CONDITION SITE, TO FINAL CONCEALEDON FIXING STRUCTURE EX. LINTEL AND EX. STRATEGIES TO BE OPENING., ENSURE DISCUSSED STRUCTURAL INTEGRITYWITH OF SHROUD ARCHITECT

MT1

BRASS SHEET TO END IN LNE WITH BOTTOM EX. DOOR JAMB (SHOWN IN GREY DASH)

MT1

BUILDER TO ENSURE JOINT TO EXISITNG BUILDER TO ALLOW FOR FLASHING AND CONCEALED WATERPROOF TO SUIT FIXING TO EX. LINTEL AND EX. OPENING., ENSURE STRUCTURAL INTEGRITY OF SHROUD

MT1

10mm THK BRASS PLATE V FOLDED AT CORNER

EXISTING

A

EX. LINTEL, BUILDER TO INSPECT STRUCTURAL INTEGRITY ON SITE

726 COS

MT1

BRASS SHEET TO END IN LNE WITH BOTTOM EX. DOOR JAMB (SHOWN IN GREY DASH)

200 COS

BRASS SHEET TO END IN LNE WITH FACE OF BRICK WALL BEYOND

BRASS SHEET TO END IN LNE WITH FACE OF BRICK WALL BEYOND

FACE OF DOOR TO FLUSH TO EXTERNAL FACE OF EX. DOOR JAMB METAL CLADDED SOLID CORE TIMBER ENTRY DOOR .

CUSTOM DOOR HANDLE

ø3mm BRASS ROD MT1

MT1 EQ

2200 COS

NEW SOLID CORE DOOR PANEL

2200 COS

MT1

MT1

EQ

BRASS SHEET TO WRAP AROUND AND INTO THE FLAP OPENING

MT1

MT1 MT1

FORMED BRASS PLATE AROUND BRASS ROD TO ALLOW SWING-IN OF BRASS PLATE, FOR MT1BRASSSAMPLE ø3mm ROD ARCHITECT'S

APPROVAL BEFORE FORMED BRASS MANUFACTURING. PLATE AROUND BRASS ROD TO ALLOW SWING-IN ROUND END OF OF BRASS PLATE, SAMPLE FORBRASSPLATE ARCHITECT'S APPROVAL BEFORE MANUFACTURING. ROUND END OF BRASSPLATE

5mm THK BRASS HANDLE

MT1

EQ

5mm THK BRASS BOTTOM PLATE, JOINT TO HANDLE TO BE GROUND SMOOTH (SAME TO BRASS TOP PLATE) 5mm THK BRASS HANDLE

EQ

CONCEALED SPRING LOADED DOOR SEAL EX. CONCRETE THRESHOLD

CONCEALED SPRING LOADED DOOR SEAL

5mm THK BRASS BOTTOM PLATE, JOINT TO HANDLE TO BE GROUND SMOOTH (SAME TO BRASS TOP PLATE) ALLOW FOR FALL BRASS SHEET ON TIMBER SUBSTRATE TO FOLD AND WRAP AROUND

TL1 FALL EQ

1028

BRASS SHEET TO MT1 WRAP AROUND AND INTO THE FLAP OPENING

MT1 MT1

EQ

MT1

CUSTOM DOOR HANDLE

2200 COS

NEW SOLID CORE DOOR PANEL

MT1

MT1

MT1

NEW SOLID CORE DOOR PANEL

2200

50 COS

TO CENTRE OF ESCUCTHEON

TO CENTRE OF ESCUCTHEON

1028

2200 COS

2200

DOOR LOCK SYSTEM, TURN SNIP AND ESCUTCHEON REFER TO ARCHITREND SPECIFICATIONS

NEW SOLID CORE DOOR PANEL

DOOR LOCK SYSTEM, TURN SNIP AND ESCUTCHEON REFER TO ARCHITREND SPECIFICATIONS

1130 COS

50 COS

FACE OF DOOR TO FLUSH TO EXTERNAL FACE OF EX. DOOR JAMB

60

1130 COS

METAL CLADDED SOLID CORE TIMBER ENTRY DOOR .

EX. CONCRETE THRESHOLD

TL1 FALL

ALLOW FOR FALL BRASS SHEET ON TIMBER SUBSTRATE TO FOLD AND WRAP AROUND


PROJECT TITLE 4 Bayview Rd Seddon

STAGE OF PROJECT Sketch Design

TITLE Render

DATE 11/03/2022

PROJECT TITLE 4 Bayview Rd Seddon

PROJECT TITLE 4 Bayview Rd Seddon

4 BAYVIEW RD, SEDDON Project: 2-Storey Private Residential Type: New Built PROJECT TITLE Status: Tender Render ign Cost: $1.5million Area: 220m2 PROJECT TITLE 4 Bayview Rd Seddon

STAGE OF PROJECT Sketch Design

TITLE Render

DATE 11/03/2022

DATE PROJECT TITLE 4 Bayview Rd 11/03/2022 Seddon

STAGE OF PROJECT Sketch Design

STAGE OF PROJECT Sketch Design

TITLE Render

TITLE Render

DATE 11/03/2022

DATE 11/03/2022

The brief was to create a family home for a working couple with twin boys. The is long and narrow with street frontage on the narrow end and 3 neighbouring lots STAGE OF PROJECT TITLE DATE within This provided challenges Sketchclose Design proximity.Render 11/03/2022 in locating opening opportunities for daylights while maintaining privacy to our subject site and neighbouring lots.. That aside, the design also has to be sensible to protect daylight onto neighbours solar panels. With those in mind, layout has been strategize to maximize daylight penetration with courtyard and landscaping opportunity to assist in providing indoor outdoor engagement and privacy. Central courtyard provides space for young kids to play with sufficient supervision from within the home.


Site Context PROJECT TITLE 4 Bayview Rd Seddon

STAGE OF PROJECT Sketch Design

STAGE OF PROJECT Sketch Design

Site Plan

TITLE Proposed Site Plan

DATE 11/03/2022

PROJECT TITLE 4 Bayview Rd Seddon

PROJECT TITLE 4 Bayview Rd Seddon

PROJECT TITLE 4 Bayview Rd Seddon

DATE 11/03/2022

PROJECT TITLE 4 Bayview Rd Seddon

Setbacks

TITLE Proposed Site Plan

STAGE OF PROJECT Sketch Design

STAGE OF PROJECT Sketch Design

TITLE Proposed Site Plan

DATE 11/03/2022

STAGE OF PROJECT Sketch Design

STAGE OF PROJECT Sketch Design

Orientation + Privacy PROJECT TITLE 4 Bayview Rd Seddon

TITLE Proposed Site Plan

DATE 11/03/2022

TITLE Proposed First Floor Plan

TITLE Proposed Ground Floor Plan

Daylight Penetration STAGE OF PROJECT Sketch Design

DATE 11/03/2022

DATE 11/03/2022

TITLE Proposed Site Plan

DATE 11/03/2022

PROJECT TITLE 4 Bayview Rd Seddon

Protecting Neighbour PV + POS PROJECT TITLE 4 Bayview Rd Seddon

STAGE OF PROJECT Sketch Design

TITLE Proposed Site Plan

DATE 11/03/2022

Approach + Access PROJECT TITLE 4 Bayview Rd Seddon

STAGE OF PROJECT Sketch Design

TITLE Proposed Site Plan

DATE 11/03/2022

Landscape Intervention PROJECT TITLE 4 Bayview Rd Seddon

STAGE OF PROJECT Sketch Design

TITLE Proposed Site Plan

Ground Floor Plan DATE 11/03/2022

First Floor Plan


THANK YOU! Valonia Octavia


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.