V A N E S Holden SA INTERIOR DESIGN PORTFOLIO
linie
linie
18 X 30 18 X 72
3' - 3 13/32"
R R
18 X 36
15'-0"
COOKING PICK-UP
3' - 6 23/32"
25' - 2 1/16"
4' - 10 1/8"
24 X 72
24 X 72
E
18 X 30 1'-0"
18 X 60
18 X 72
-
3' - 3 7/8"
18 X 48
18 X 72
3' - 2 13/32"
9' - 6 1/32"
48' - 0"
18 X 42
18 X 60 WAREWASHING
OFFICE
18 X 60
3' - 3 13/32"
5' - 1 7/32" 16' - 1 7/8"
24 X 48
3' - 11 5/8"
3' - 6 23/32"
4' - 8 27/32"
3' - 7 1/8"
24 X 60
-
25' - 2 1/16"
4' - 8 9/16"
30' - 6"
5' - 0 7/8" 2' - 11 1/8" 10' - 6" 4' - 0 5/32"
COOLER
UP
10' - 0 7/8"
4' - 10 1/8"
4' - 6"
6' - 6 5/32" 6' - 3 23/32"
6' - 3 1/16" 70' - 5 13/32"
18 X 36
2' - 9 23/32"
14' - 7 3/4"
18' - 4 11/16" 7' - 11 15/16" 17' - 0 1/16"
34' - 3 1/16" 4' - 0" 5' - 6 11/16"
3' - 10 5/8" 4' - 10 7/16" 6' - 6 1/32" 5' - 8 23/32"
G
RID E
G
RID E
MAFES SALES STORE Mississippi State University
MAFES SALES STORE Mississippi State University
Muschio Medical Spa and Dermatology Clinic
Muschio Medical Spa and Dermatology Clinic
Muschio Medical Spa and Dermatology Clinic
Muschio Medical Spa and Dermatology Clinic
NEXT
BETTER TOGETHER
NEXT
BETTER TOGETHER
104
FORUM SPACE
S1
S1
NEXT
BETTER TOGETHER
UP
UP
OPEN TO ABOVE
3
2
3
2
3
2
4 1
1
1
1
1
1
4 3
2
3
2
4 1
1 4
3
2
3
2
3
2
-
-
CENTER RIDGE 8 FT CEDAR TIMBERS KING POST
DECORATIVE BEAM
DECORATIVE BEAM PAINTED CORRUGATED TIN
FINISHED FLOOROF LEVEL 2 KING POST
CENTER RIDGE KING POST
CORRUGATED TIN
PINE LOGS CENTER RIDGE KING POST
LAYERED WOOD
CORRUGATED TIN
2
2 1
1 2
2
2
2 1
1
1 2
2
1
1
2
2
1 2
2
2
2 1
1 2
2 3 4
6 5
6
6 6
5 6
6
6
5
5
6
6
6
1
6
7 11
7 11
8 8
10 7 9
11 9
DISPLAY
6
6
2
10
6
6
7
10
9
11
9
DISPLAY
Site Utilization Plan Brewing Facility
12 FL OZ
Brewing Facility Storage/Packaging Room
This site is a small scale project, but the plan must be very precise. Chain fence and silt fence will be placed around the site. Also the lone pecan tree that is on site will be protected by a fence. After the first demolition is done on the site, an access road will be built up with grey stone. Deliveries for this site will be prior to 7:00 A.M. Also, since it is a small project, the project superintendent will not need an office trailer. Instead, he will just work out of his truck and walk around the site. Material laydown at the beginning of the project will be inbetween the access road and the building. Once the floor in the building is demoed and refilled with concrete, most material will be placed inside the building. Dumpsters are placed near the access road, so pick up is easy and quick.
DEVIL’S CROSSROADS BLACK LAGER
Cost Analysis
IT’S WORTH SELLING
YOUR SOUL. Total Building Cost Breakdown:
Proposed Beer Label
General Conditions: Sitework: Exterior: Interior: MEP:
Viewing Area Tasting Area
Total Construction Cost:
$88.64 sq.ft.
West Elevation (NTS)
$108,000 $56,500 $151,500 $66,300 $113,000 $495,300
Schedule Men’s Restroom
12 FL OZ
Central Office
Brasfield & Gorrie Student Design Competition, Fall 2015 Vanessa Holden, Ben Marshall, Edward Holmes V, Brent Gaude’, Casey Jennings, Michael Carraway, Jared Robinson
Women’s Restroom
Mechanical Room
Office Storage
Break Room
MISSISSIPPI MUD STOUT
Mechanical /FMR
Floor Plan N Rendered Scale: 1/8” = 1’ - 0”
FOR THOSE WHO LIKE TO GET DOWN & DIRTY.
Proposed Beer Label
Sweetgum Brewing Company is a microbrewery
Lighting Legend
Roofing Start: 10/28/15 Finish: 11/23/15 ID: 16 Duration: 21 days
Recessed Can Light Ceiling Mounted Exit Light Sprinkler
Interior Construction Start: 10/12/15 Finish: 12/24/15 ID: 20 Duration: 59 days
CMU STUCCO 3" RIDGED INSULATION 5/8" GYPSUM BOARD
Site Work Start: 11/24/15 Finish: 12/22/15 ID: 43 Duration: 21 days
3/8" REBAR 7/8" FURRING STRIP
Constructabilty Analysis For Roofing Materials
North Elevation (NTS)
Selective Demolition Start: 10/1/15 Finish: 10/27/15 ID: 7 Duration: 21 days
Professors Gines, Gregory, Herrmann, Miller and Powney
Concept Statement looking to open its doors in Starkville, MS. Tours of the facility and samples of the product will be available to the public, so Sweetgum needs an inviting and engaging space that will capture the public’s attention. During our research, we began to notice an interesting contrast of textures and materials between the initial phases of the brewing process and the final ones. We broke the process down into five phases to coordinate with our building’s structural grid. The phases we decided to include are raw ingredients, brewing process, fermentation, transportation, and storage. The process begins with the rustic textures and earthy tones of beer’s raw ingredients: hops, yeast, and barley. These textures and colors were translated in the tasting room and main office with the inclusion of a bar front made from pieces of wood salvaged from the existing building; a color palette of greens, white, and brown; and simple furniture pieces. The other phases involve the smoother textures of the brewing and fermentation equipment, metals and plastics of large trucks, and the glass and metal of the bottles and cans. The entire process is described through a ceiling cloud that marks the main circulation of the building. The cloud’s material changes from rough wood to shiny metal to smooth glass as it moves from the tasting room to the canning and kegging viewing area. Signage and walls work together to mark where these changes occur. The cloud draws the public through the space and helps create a memorable educational and social event.
Project Start Start: 8/31/15 Finish: 11/2/15 ID: 2 Duration: 50 days
STACKED STONE WINDOW SILL WINDOW MULLION Opion 1 – Wood Shingles
Opion 2 – Asphalt Shingles
Opion 3 – Curved Metal Roofing
Cost ($$$): Quanity: Total Cost: Schedule:
Cost ($$$): Quanity: Total Cost: Schedule:
Cost ($$$): Quanity: Total Cost: Schedule:
$5.56/SF 6300 SF $34,999 7 days
$5.58/SF 6300 SF $35,146 8 days
Ceiling Plan N Reflected Scale: 1/8” = 1’ - 0”
$7.67/SF 6300 SF $48,336 12 days
Column Detail (NTS)
Constructability Analysis For Outdoor Experience
Opion 1 – Demo Concrete Slab and re-Sod
Opion 2 – 12”x12” paver surface w/ 2” grass seams also with large Pergola
Punch Out Start: 1/8/16 Finish: 1/21/16 ID: 63 Duration: 10 days
Opion 3 – 16”x16” paver surface w/ 2” grass seams also with large Pergola
Cross Section Scale: 1/8” = 1’ - 0”
CROSS SECTION
Cost ($$$): Quanity: Total Cost: Schedule:
$8.82/SF Cost ($$$): 1836 SF Quanity: $16,194 Total Cost: 14 days Schedule:
$20.73/SF 1836 SF $38,060 17 days
Cost ($$$): Quanity: Total Cost: Schedule:
Interior Finishes Start: 12/24/15 Finish: 1/8/16 ID: 16 Duration: 21 days
$21.40/SF 1836 SF $39,290 16 days
Constructability Analysis
Existing wood to be reused Longitudnal Section 2"X6" 6" BATT INSULATION
Scale: 1/8” = 1’ - 0”
Clean Up Start: 1/8/16 Finish: 1/15/16 ID: 65 Duration: 5 days
Project Duration Start: 8/31/15 Finish: 1/21/16 ID: 1 Duration: 112 days
Tasting Room Rendering (NTS)
Materials Palette
Stained Concrete Flooring
Reclaimed Wood Barfront
Tasting Room Backsplash Fire Clay Tile
CEDER SHAKES 5/8" PLYWOOD
Final Check
Tasting Room Accent WallSherwin Williams Nankeen Touring Area Rendering (NTS)
CANNING METAL BRACKET 2"X4" TOP PLATE
Brewing Process/Wayfinding Signage
RAW INGREDIENTS
Board 1 of 1
Existing Site
2"X4" STUD
Roof Detail (NTS)
5/8" GYPSUM BOARD
Tasting Room Wall Color- Sherwin Williams, Indian White
REF.DW
kotte
the lofty lounge
TOP VIEW
3D VIEW
FRONT VIEW
SIDE VIEW
EATON CUSTOM SEATING COMPETITION DATE: DEC. 10, 2015 DIMS: 42” W X 30.42” X 65.60” H
APPROVED BY: WR
SCALE: 3/4” = 1’-0”
4