E
D
C
B
A
(206)778 6878
OWNER: Kevin Thatcher, Eric Swenson, and Fausto Vitello.
0
0
0
DESIGNER: Thanh Vu 14418 42nd Ave S Tukwila WA, 98168 (206) 778 6878
1
Reference Grid
0
Wall centered on the Grid Line
0
CONTRACTOR SUB-CONSULTANT DESCRIPTION: Existing place is SKB architect's building to be converted to a Thrasher's skateboard shop.
DRAWING REFERENCE SYMBOLS
VICINITY MAP
Ref View Name 1 1
A101
1
DESCRIPTION
2
ISSUE DATE
NOTE: Center line of studs shall be located on Reference Grid Lines or centered between the Grid Lines unless otherwise indicated.
DRAWN BY: THANH VU
BUILDING REFERENCE GRID 1/4" = 1'-0"
THRASHER SKATEBOARD STORE
0
DRAWING INFORMATION
Interior elevation
1 Ref View Name
Room name
Room name
Room number
101 101 1t
North Arrow DRAWING REFERENCE SYMBOL 1/4" = 1'-0"
MATERIAL SYMBOLS
3
CLIENT: THRASHER'S OWNER
Sheet number
A101
001
Section number
SIM
PROJ. NO.:
1
PROJECT SITE: 2333 3RD AVE SEATTLE
DRAWING INDEX 4
Hard Wood Floor
2X2" Ceramic Tile
1
Cover Sheet A0.0 Title Page A1.0 First Floor Plan A1.1 Second Floor Plan A2.0 First Floor Reflected Ceiling Plan A2.1 Second Floor Reflected Ceiling Plan A3.0 First Floor Finish Plan A3.1 Second Floor Finish Plan A4.0 Building Sections A4.1 Building Sections (if needed) A5.0 Door and Window Schedules A5.1 Partition Types A6.0 Interior Elevations A7.0 Vertical Circulation A8.1 Details A8.2 Details E1.0 First Floor Electrical, Data and Communication Plan E1.1 Second Floor Electrical, Data and Communication Plan
3/23/2014 11:34:47 AM
1. All work shall conform to the requirements of the City and State of Rumford, Rhode Island and the International Building Code, 2003 Edition and with the requirements of other agencies having jurisdiction. 2. One copy of all building permits shall be submitted to the Architect. 3. Contractor shall verify all conditions and measurements at the project site. Any discrepancies with project drawings or documents shall be reported to the Architect. 4. All existing construction to remain shall be repaired to be in working condition, unless otherwise noted. 5. All dimensions are to finish face of masonry, face of concrete, centerline of steel, face of mill work, or fixtures unless otherwise noted. Dimensions are not adjustable without architect's approval unless noted as "+/-". Verify dimensions marked "V.I.F." prior to commencement of construction and notify architect in writing of any inconsistencies. 6. All dimensions, notes and details shown on one portion of a drawing shall apply typically to all opposite hand and/or conditions unless otherwise noted. 7. Contractor shall not scale drawings. Dimensions shall govern. Drawings at a large scale shall take precedence over drawings of a small scale. Details shall govern over plans, sections and elevations. 8. Contractor shall verify rough opening requirements with manufacturer's unit dimensions and requirements. Provide blocking or shims as required for installation. Where conditions prevent provision of required rough opening, specifics of the situation shall be reported in writing to the Architect. 9. All mounting of equipment, fixtures or accessories - including wall, floor and ceiling installation- shall be as required to meet provisions of the International Building Code and Rhode Island Building Code, 2003 Editions and manufacturer's instructions. In cases of differences contractor shall notify architect in writing. All casework shall be secured to support blocking at walls. 10. Contractor shall notify architect immediately of all utilities determined in the course of construction as being necessary to be removed which have not otherwise been noted for removal. Contractor shall remove such utilities only after consultation with the architect and owner. All utilities removed shall be disconnected, cut back to source and capped. All penetrations created by the removal of utilities shall be sealed to match adjacent construction and finishes. 11. Delays resulting from failure to supply submittals and information shall be the responsibility of the General Contractor. Appropriate stepsshall be taken to make up lost time. 12. Contractor shall maintain project identification sign as per Architect's direction. 13. Contractor shall protect area and new or existing materials and finishes from damage which may occur from construction, demolition, dust, water, etc. and shall provide and maintain temporary barricades, closure walls, etc., as required to protect the public during the period of construction. Damage to new and existing materials, finishes, structures, and equipment shall be repaired or replaced to the satisfaction of the Owner at the expense of the General Contractor. 14. Work areas are to remain secure and lockable during construction. Contractor shall remove all rubbish and waste materials of allsub contractors and trades on a daily basis and shall exercise strict control over job cleaning to prevent any dirt, debris or dust from affecting any finished areas in or outside the job site. Burning of debris on the site shall not be permitted. 15. Upon completion, the Contractor shall leave the premises and all affected areas clean and in an orderly manner ready for move-in. This is to include cleaning of all glass (including inside of exterior glass) and frames, both new and existing. 16. Contractor shall not proceed with any work requiring additional compensation beyond the contract amount without written authorization from the architect or owner's representative. Failure to obtain written authorization shall invalidate any claim for additional compensation.
PROJECT INFORMATION
Manufacturer Manhole Minimum Mirror Miscellaneous Movement Joint Module Line Masonry Opening Machine Screw Mounted Mullion North Not In Contract Number Nominal Not To Scale Overall On Center Outside Diameter (dim.) Office Opposite Hand Opening Opposite Overflow Scupper Piece Portland Cement Plaster Plate, Plastic Phase Plastic Laminate Plaster Plywood Pair Point Partition Pressure Treated Quarry Tile Riser, Radius Roof Drain Roof Vent Reference Refrigerator Reinforced Required Resilient Room Rough Opening Redwood Rain Water Leader South See Architectural Drawings Solid Core Seat Cover Dispenser Schedule Soap Dispenser Section Shelf Shower Sheet Similar Score Joint Specification Square See Structural Drawings Service Sink Stainless Steel Station Standard Steel Storage Structural Self Tapping Screw Suspended Symmetrical Tread, Telephone Towel Bar Top of Curb Telephone Terrazzo Tongue and Groove Thick Top of Parapet Top of Pavement Top of Steel Television Top of Wall Typical Unfinished Unless Otherwise Noted Uninterrupted Power Source Vertical Vestibule West With Water Closet Window Dimension Wood Without Where Occurs Waterproof Water Resistant Wood Screw Wainscot Weight
PROJECT INFORMATION
SHEET INFORMATION
Mfr. M.H. Min. Mir. Misc. M.J. M.L. M.O. M.S. Mtd. Mul. N. N.I.C. No. # Nom. N.T.S. O.A. O.C. O.D. Off. O.H. Opg. Opp. O.S. Pc. P.C.P. Pl. Ph. P. Lam. Plas. Plywd. Pr. Pt. Ptn. P.T. Q.T. R. R.D. R.V. Ref. Refr. Reinf. Reqd. Resil. Rm. R.O. Rwd. R.W.L. S. S.A.D. S.C. S.C. D. Sched. S.D. Sect. Sh. Shr. Sht. Sim. S.J. Spec. Sq. S.S.D. S.Sk. SSt. Sta. Std. Stl. Stor. Str. S.T.S. Susp. Sym. T. T.B. T.C. Tel. Ter. T.&G. Thk. T.O.P. T.P. T.O.S. T.V. T.W. Typ. Unf. U. O. N. U. P. S. Vert. Vest. W. W/ W.C. W.D. Wd. W/O W.O. W.P. W.R. W.S. Wsct. Wt.
Ref View Name
Acoustical Above Finish Floor Aggregate Aluminum Approximate Architectural Area Drain Americans with Disabilities Act Board, Bead Bituminous Backing Plate Building Block Blocking Beam Bottom Built-Up Cabinet Catch Basin Control Joint Ceiling Cement Ceramic Cast Iron Ceiling Clear Column Concrete Connection Construction Continuous Corridor Countersunk Double Department Detail Diameter Dimension Dispenser Down Door Opening Door Drawer Downspout Dry Standpipe Drawing Existing East, Electrical Each Expansion Joint Elevation Electrical Elevator Emergency Enclosure Electrical Panelboard Equal Equipment Electric Water Cooler Existing Exposed Expansion Exterior Fire Alarm Flat Bar Floor Drain Foundation Flat Head Finish Floor Fluorescent Face of Concrete Face of Finish Face of Studs Fireproof Frame Fiberglass-Reinforced Plaster Foot or Feet Footing Furring Gauge Galvanized Glass Grid Line Gypsum Wall Board Hose Bibb Hollow Core Hardwood Hardware Hollow Metal Horizontal High Point Height Inside Diameter (dim.) Insulation Janitor Joint Kitchen Laboratory Laminate Lavatory Laminated Plastic Ligh Maximum Metal Bolt Mechanical Membrane Metal
BUILDING REFERENCE GRID
Ref View Name
Acous. A.F.F. Aggr. Al. Approx. Arch. A.D. A.D.A. Bd. Bitum. Bkp. Bldg. Blk. Blkg. Bm. Bot. B.U. Cab. C.B. C.J. Ceil. Cem. Cer. C.I. Clg. Clr. Col. Conc. Conn. Constr. Cont. Corr. Ctsk. Dbl. Dept. Det. D Dim. Disp. Dn. D.O. Dr. Dwr. D.S. D.S.P. Dwg. (E) E. Ea. E.J. El. Elec. Elev. Emer. Encl. E.P.B. Eq. Equip. E.W.C. Exst. Expo. Exp. Ext. F.A. F.B. F.D. Fdn. F.H. Fin. Fl. Fluor. F.C. F.F. F.S. Fprf. Fr. F.R.P. Ft. Ftg. Furr. Ga. Galv. Gl. G.L. gwb. H.B. H.C. Hdwd. Hdwe. H.M. Horiz. H.P. Ht. I.D. Ins. Jan. Jt. Kit. Lab. Lam. Lav. L.P. Lt. Max. M.B. Mech. Memb. Met.
GENERAL NOTES
NOTES:
3/23/2014 11:34:47 AM E:\Studio 3\practice studio 3 FINAL.rvt
ABBREVIATIONS
THANH.VU@BELLEVUECOLLEGE.EDU
5
TITLE PAGE
3D SECTION
A0.0
E
D
C
B
A
(206)778 6878
OWNER: Kevin Thatcher, Eric Swenson, and Fausto Vitello.
0
0
0
DESIGNER: Thanh Vu 14418 42nd Ave S Tukwila WA, 98168 (206) 778 6878
1
Reference Grid
0
Wall centered on the Grid Line
0
CONTRACTOR SUB-CONSULTANT DESCRIPTION: Existing place is SKB architect's building to be converted to a Thrasher's skateboard shop.
DRAWING REFERENCE SYMBOLS
VICINITY MAP
Ref View Name 1 1
A101
1
DESCRIPTION
2
ISSUE DATE
NOTE: Center line of studs shall be located on Reference Grid Lines or centered between the Grid Lines unless otherwise indicated.
DRAWN BY: THANH VU
BUILDING REFERENCE GRID 1/4" = 1'-0"
THRASHER SKATEBOARD STORE
0
DRAWING INFORMATION
Interior elevation
1 Ref View Name
Room name
Room name
Room number
101 101 1t
North Arrow DRAWING REFERENCE SYMBOL 1/4" = 1'-0"
MATERIAL SYMBOLS
3
CLIENT: THRASHER'S OWNER
Sheet number
A101
001
Section number
SIM
PROJ. NO.:
1
PROJECT SITE: 2333 3RD AVE SEATTLE
DRAWING INDEX 4
Hard Wood Floor
2X2" Ceramic Tile
1
Cover Sheet A0.0 Title Page A1.0 First Floor Plan A1.1 Second Floor Plan A2.0 First Floor Reflected Ceiling Plan A2.1 Second Floor Reflected Ceiling Plan A3.0 First Floor Finish Plan A3.1 Second Floor Finish Plan A4.0 Building Sections A4.1 Building Sections (if needed) A5.0 Door and Window Schedules A5.1 Partition Types A6.0 Interior Elevations A7.0 Vertical Circulation A8.1 Details A8.2 Details E1.0 First Floor Electrical, Data and Communication Plan E1.1 Second Floor Electrical, Data and Communication Plan
3/23/2014 11:34:47 AM
1. All work shall conform to the requirements of the City and State of Rumford, Rhode Island and the International Building Code, 2003 Edition and with the requirements of other agencies having jurisdiction. 2. One copy of all building permits shall be submitted to the Architect. 3. Contractor shall verify all conditions and measurements at the project site. Any discrepancies with project drawings or documents shall be reported to the Architect. 4. All existing construction to remain shall be repaired to be in working condition, unless otherwise noted. 5. All dimensions are to finish face of masonry, face of concrete, centerline of steel, face of mill work, or fixtures unless otherwise noted. Dimensions are not adjustable without architect's approval unless noted as "+/-". Verify dimensions marked "V.I.F." prior to commencement of construction and notify architect in writing of any inconsistencies. 6. All dimensions, notes and details shown on one portion of a drawing shall apply typically to all opposite hand and/or conditions unless otherwise noted. 7. Contractor shall not scale drawings. Dimensions shall govern. Drawings at a large scale shall take precedence over drawings of a small scale. Details shall govern over plans, sections and elevations. 8. Contractor shall verify rough opening requirements with manufacturer's unit dimensions and requirements. Provide blocking or shims as required for installation. Where conditions prevent provision of required rough opening, specifics of the situation shall be reported in writing to the Architect. 9. All mounting of equipment, fixtures or accessories - including wall, floor and ceiling installation- shall be as required to meet provisions of the International Building Code and Rhode Island Building Code, 2003 Editions and manufacturer's instructions. In cases of differences contractor shall notify architect in writing. All casework shall be secured to support blocking at walls. 10. Contractor shall notify architect immediately of all utilities determined in the course of construction as being necessary to be removed which have not otherwise been noted for removal. Contractor shall remove such utilities only after consultation with the architect and owner. All utilities removed shall be disconnected, cut back to source and capped. All penetrations created by the removal of utilities shall be sealed to match adjacent construction and finishes. 11. Delays resulting from failure to supply submittals and information shall be the responsibility of the General Contractor. Appropriate stepsshall be taken to make up lost time. 12. Contractor shall maintain project identification sign as per Architect's direction. 13. Contractor shall protect area and new or existing materials and finishes from damage which may occur from construction, demolition, dust, water, etc. and shall provide and maintain temporary barricades, closure walls, etc., as required to protect the public during the period of construction. Damage to new and existing materials, finishes, structures, and equipment shall be repaired or replaced to the satisfaction of the Owner at the expense of the General Contractor. 14. Work areas are to remain secure and lockable during construction. Contractor shall remove all rubbish and waste materials of allsub contractors and trades on a daily basis and shall exercise strict control over job cleaning to prevent any dirt, debris or dust from affecting any finished areas in or outside the job site. Burning of debris on the site shall not be permitted. 15. Upon completion, the Contractor shall leave the premises and all affected areas clean and in an orderly manner ready for move-in. This is to include cleaning of all glass (including inside of exterior glass) and frames, both new and existing. 16. Contractor shall not proceed with any work requiring additional compensation beyond the contract amount without written authorization from the architect or owner's representative. Failure to obtain written authorization shall invalidate any claim for additional compensation.
PROJECT INFORMATION
Manufacturer Manhole Minimum Mirror Miscellaneous Movement Joint Module Line Masonry Opening Machine Screw Mounted Mullion North Not In Contract Number Nominal Not To Scale Overall On Center Outside Diameter (dim.) Office Opposite Hand Opening Opposite Overflow Scupper Piece Portland Cement Plaster Plate, Plastic Phase Plastic Laminate Plaster Plywood Pair Point Partition Pressure Treated Quarry Tile Riser, Radius Roof Drain Roof Vent Reference Refrigerator Reinforced Required Resilient Room Rough Opening Redwood Rain Water Leader South See Architectural Drawings Solid Core Seat Cover Dispenser Schedule Soap Dispenser Section Shelf Shower Sheet Similar Score Joint Specification Square See Structural Drawings Service Sink Stainless Steel Station Standard Steel Storage Structural Self Tapping Screw Suspended Symmetrical Tread, Telephone Towel Bar Top of Curb Telephone Terrazzo Tongue and Groove Thick Top of Parapet Top of Pavement Top of Steel Television Top of Wall Typical Unfinished Unless Otherwise Noted Uninterrupted Power Source Vertical Vestibule West With Water Closet Window Dimension Wood Without Where Occurs Waterproof Water Resistant Wood Screw Wainscot Weight
PROJECT INFORMATION
SHEET INFORMATION
Mfr. M.H. Min. Mir. Misc. M.J. M.L. M.O. M.S. Mtd. Mul. N. N.I.C. No. # Nom. N.T.S. O.A. O.C. O.D. Off. O.H. Opg. Opp. O.S. Pc. P.C.P. Pl. Ph. P. Lam. Plas. Plywd. Pr. Pt. Ptn. P.T. Q.T. R. R.D. R.V. Ref. Refr. Reinf. Reqd. Resil. Rm. R.O. Rwd. R.W.L. S. S.A.D. S.C. S.C. D. Sched. S.D. Sect. Sh. Shr. Sht. Sim. S.J. Spec. Sq. S.S.D. S.Sk. SSt. Sta. Std. Stl. Stor. Str. S.T.S. Susp. Sym. T. T.B. T.C. Tel. Ter. T.&G. Thk. T.O.P. T.P. T.O.S. T.V. T.W. Typ. Unf. U. O. N. U. P. S. Vert. Vest. W. W/ W.C. W.D. Wd. W/O W.O. W.P. W.R. W.S. Wsct. Wt.
Ref View Name
Acoustical Above Finish Floor Aggregate Aluminum Approximate Architectural Area Drain Americans with Disabilities Act Board, Bead Bituminous Backing Plate Building Block Blocking Beam Bottom Built-Up Cabinet Catch Basin Control Joint Ceiling Cement Ceramic Cast Iron Ceiling Clear Column Concrete Connection Construction Continuous Corridor Countersunk Double Department Detail Diameter Dimension Dispenser Down Door Opening Door Drawer Downspout Dry Standpipe Drawing Existing East, Electrical Each Expansion Joint Elevation Electrical Elevator Emergency Enclosure Electrical Panelboard Equal Equipment Electric Water Cooler Existing Exposed Expansion Exterior Fire Alarm Flat Bar Floor Drain Foundation Flat Head Finish Floor Fluorescent Face of Concrete Face of Finish Face of Studs Fireproof Frame Fiberglass-Reinforced Plaster Foot or Feet Footing Furring Gauge Galvanized Glass Grid Line Gypsum Wall Board Hose Bibb Hollow Core Hardwood Hardware Hollow Metal Horizontal High Point Height Inside Diameter (dim.) Insulation Janitor Joint Kitchen Laboratory Laminate Lavatory Laminated Plastic Ligh Maximum Metal Bolt Mechanical Membrane Metal
BUILDING REFERENCE GRID
Ref View Name
Acous. A.F.F. Aggr. Al. Approx. Arch. A.D. A.D.A. Bd. Bitum. Bkp. Bldg. Blk. Blkg. Bm. Bot. B.U. Cab. C.B. C.J. Ceil. Cem. Cer. C.I. Clg. Clr. Col. Conc. Conn. Constr. Cont. Corr. Ctsk. Dbl. Dept. Det. D Dim. Disp. Dn. D.O. Dr. Dwr. D.S. D.S.P. Dwg. (E) E. Ea. E.J. El. Elec. Elev. Emer. Encl. E.P.B. Eq. Equip. E.W.C. Exst. Expo. Exp. Ext. F.A. F.B. F.D. Fdn. F.H. Fin. Fl. Fluor. F.C. F.F. F.S. Fprf. Fr. F.R.P. Ft. Ftg. Furr. Ga. Galv. Gl. G.L. gwb. H.B. H.C. Hdwd. Hdwe. H.M. Horiz. H.P. Ht. I.D. Ins. Jan. Jt. Kit. Lab. Lam. Lav. L.P. Lt. Max. M.B. Mech. Memb. Met.
GENERAL NOTES
NOTES:
3/23/2014 11:34:47 AM E:\Studio 3\practice studio 3 FINAL.rvt
ABBREVIATIONS
THANH.VU@BELLEVUECOLLEGE.EDU
5
TITLE PAGE
3D SECTION
A0.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
1
2
2
A4.0
3
4
A
5
A
B
0' - 6"
A 32' - 9 7/32"
11' - 1 5/32"
REPAIR CUSTOM ELEVATOR
106 103
12' - 0 1/32"
15' - 2 5/16"
6' - 7 29/32"
2' - 10 19/32"
5' - 1 29/32"
EMPLOYEE RESTROOM 107
2
11' - 8 7/16"
2' - 7 7/16"
11' - 1 5/32" 104
15' - 0"
6' - 11 1/4"
T.Y.P
2 A8.1
BUILT IN SHELVES 7' - 2 7/8"
0' - 6"
B
DESCRIPTION
BUILT IN SHELVES
6' - 2 11/16"
15' - 2 7/8"
105
ISSUE DATE
104
D
DRAWN BY: THANH VU
103
WAITTING AREA
BUILT IN SHELVES
THRASHER SKATEBOARD STORE
A8.1 MERCHANDISE
DRAWING INFORMATION
HVAC
BUILT IN SHELVES
12' - 9 1/8"
15' - 0"
1
PROJECT INFORMATION
8' - 1 19/32"
102
DISPLAY TABLE
8' - 4"
ENTRANCE 109
105
ELEVATOR
2' - 11 1/4"
5' - 9 15/16"
2' - 7 7/16"
10' - 8 15/16"
2' - 7 7/16"
7' - 3 9/16"
6' - 6 11/32"
6' - 9 1/2"
12' - 6 1/2" 25' - 11 3/8"
15' - 0"
1 A4.0
DISPLAY TABLE
0' - 6"
106
0' - 6"
D
STORE EXIT
CLIENT: THRASHER'S OWNER
102 BUILT IN SHELVES
33' - 5 5/8"
C
001
MERCHANDISE
3
PROJ. NO.:
108
PROJECT SITE: 2333 3RD AVE SEATTLE
SALE DESK
UP
110 4
4
A8.1
8' - 6 19/32"
RESTROOM
FITTING ROOM
FTTING ROOM
113
112
111
3/23/2014 11:15:45 AM E:\Studio 3\practice studio 3 FINAL.rvt
E
7' - 11 3/4"
15' - 0"
15' - 0"
15' - 0"
3/23/2014 11:15:45 AM
101
6' - 0 11/16"
NOTES:
RESTROOM
8' - 0 9/16"
8' - 5 1/2"
8' - 5 1/2"
12' - 2 1/4"
8' - 0 1/4"
0' - 6" 107
108
1/4" = 1' 0"
109
SHEET INFORMATION
101
C
5
FIRST FLOOR PLAN
1
FIRST FLOOR PLAN 1/4" = 1'-0"
A1.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
2
A4.0
1
3
4
5
A
B
A 12' - 0"
6' - 1"
4' - 7 5/16"
DISPLAY TABLE GLASS WALL
1 BUILT IN SHELVES A8.1
4' -9
WAITING BENCH
4" 1/
° .00 135
BUILT IN SHELVES
DISPLAY TABLE
MERCHANDISE
12' - 5 1/4"
15' - 0"
9' - 10 1/2"
205 ° .00 135
RECEPTION DESK 203
DESCRIPTION
B
2
ISSUE DATE
DISPLAY TABLE
DRAWN BY: THANH VU
201
THRASHER SKATEBOARD STORE
9' - 0"
CUSTOM ELEVATOR
DRAWING INFORMATION
BUILT IN SHELVES
204
OPEN TO BELOW
PROJECT INFORMATION
14' - 4 1/4"
GLASS SLIDING DOOR WITHOUT FRAME
MERCHANDISE 21' - 10 25/32"
6' - 8 3/16"
BUILT IN SHELVES
OPEN TO BELOW 12' - 9 1/8"
15' - 0"
7' - 2 7/8"
15' - 10 7/32"
HALLWAY 206
7' - 3"
12' - 6 1/2"
OPEN TO BELOW
201
C BAR CHAIRS
METAL GRATE WALL
BUILT IN BAR SHELVES
E
3/23/2014 11:15:50 AM E:\Studio 3\practice studio 3 FINAL.rvt
7' - 11 9/16"
1
SECOND FLOOR PLAN 1/4" = 1'-0"
15' - 0"
15' - 0"
15' - 0"
3/23/2014 11:15:50 AM
STAIR
DN
4' - 8 23/32"
4
NOTES:
ADA BAR COUNTER
1/4" = 1' 0"
15' - 7 19/32" 25' - 0 7/8"
BUILT IN BAR SHELVES
6' - 4 15/32"
SOCIAL AREA
BAR COUNTER
5' - 3 3/4"
4' - 10 29/32"
CLIENT: THRASHER'S OWNER
11' - 9"
SHEET INFORMATION
12' - 2 1/4"
D
8' - 3 3/16"
6' - 5"
12' - 0 7/16"
WALL ATTACHED MAGAZINE SHELVES
OPEN TO BELOW
001
202
15' - 0"
A4.0
PROJ. NO.:
1
13' - 10 15/16"
ELEVATOR
HALLWAY
8' - 4"
SCULPTURE RAIL
3
PROJECT SITE: 2333 3RD AVE SEATTLE
C
5
SECOND FLOOR PLAN
A1.1
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
A
1 4' - 0"
EQ
EQ
EQ
EQ
4' - 0" PENDANT LIGHT LEVEL 2
DROP CEILING 8' 0" . AFF
15' - 0"
EQ
CUSTOM ELEVATOR
EMPLOYEE RESTROOM 15' - 0"
CONC. 10'-0" AFF
102 EQ
13' - 9 3/32"
4' - 0"
15' - 0"
109
EQ
4' - 0"
4' - 11"
15' - 0"
4' - 5"
ENTRANCE
ELEVATOR
FRONT DOOR
LED GROUND BURIED LIGHT 0' 0" AFF
UNDER CABINET LIGHT WD. 8'-0" AFF
2' - 0"
EQ
4' - 0"
4' - 11"
C
EQ
CONC. 20' 0" AFF
FULL HEIGHT WINDOW
RESTROOM
RESTROOM
FITTING ROOM
FTTING ROOM
101
113
112
111
CONC. 10'-0" AFF 1' - 11 1/4" 2' - 0"
2' - 0"
CONC. 10'-0" AFF 2' - 0"
CONC. 10'-0" AFF EQ EQ
12' - 2 1/4"
2' - 0"
3' - 0" 2' - 0"
2' - 0"
3' - 0"
2' - 0"
12' - 2 1/4"
110
OPEN TO LEVEL 2
2' - 4"
D
STORE EXIT
6' - 4 5/16"
4' - 0"
EQ
CONC. 20' 0" AFF
STAIR
CONC. 10'-0" AFF 2' - 0"
2' - 0"
3
CLIENT: THRASHER'S OWNER
2' - 0"
CONC. 10'-0" AFF
001
MERCHANDISE
EQ
108
EQ
DISPLAY CABINET
SALE DESK
19' - 1 5/16"
4' - 11"
15' - 0"
107
2
PROJ. NO.:
EQ
4' - 11"
104
ISSUE DATE
MET. DROP CEIL 10'-0" AFF
EQ
MERCHANDISE
PROJECT SITE: 2333 3RD AVE SEATTLE
LED LIGHT UNDER EACH SHELF
DESCRIPTION
OPEN TO LEVEL 2
DRAWN BY: THANH VU
TYP
CONC. 20' 0" AFF
THRASHER SKATEBOARD STORE
LED BURIED LIGHT
CONC. 20' 0" AFF
DRAWING INFORMATION
25' - 11 1/8"
3' - 0 5/8"
B
CONC. 10'-0" AFF
PROJECT INFORMATION
CONC. 20' 0" AFF
106
2' - 0"
103
105
REPAIR
LED LIGHT UNDER EACH SHELF
HVAC
WAITTING AREA
EQ
15' - 0"
LED LIGHT UNDER EACH SHELF
15' - 0"
7' - 11 9/16"
15' - 0"
15' - 0"
15' - 0"
2
3
4
5
FIRST FLOOR REFLECTED CEILING PLAN 1/4" = 1'-0"
3/23/2014 11:15:54 AM E:\Studio 3\practice studio 3 FINAL.rvt
REFLECTED CEILING SYMBOLS
LED BURIED GROUND LIGHT
UNDER CABINET LIGHT
ADJUSTABLE ANGLE RECESSED LIGHT
LED NEON BAR LIGHT
PENDANT LIGHT
EMEREGENCY EXIST LIGHT
3/23/2014 11:15:54 AM
15' - 0"
NOTES:
1
15' - 0"
1/4" = 1' 0"
1
4
7' - 11 9/16"
SHEET INFORMATION
E
TYP
TYP
TYP
5
FIRST FLOOR REFLECTED CEILING PLAN
WALL MOUNTED FIXTURE
A2.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
EQ
EQ
3' - 7 1/4"
2' - 7"
EQ
OPEN TO BELOW
204
EQ
EQ
RECEPTION DESK
ALIGNED
6' - 10 11/32"
° .00 135
EQ 2' - 0"
EQ
EQ
EQ
RECESSED LED. BLUE
ELEVATOR
CONC. 10'-0" AFF
OPEN TO BELOW
HALLWAY OPEN TO BELOW
202
EQ
EQ
15' - 0"
CONC. 20'-0" AFF LEVEL 1
EQ
CONC. 10'-0" AFF
DROP CEILING 8' 0" . AFF
EQ
EQ
D
EQ
SOCIAL AREA
FULL HEIGHT WINDOW
CONC. 20'-0" AFF LEVEL 1
EQ
METAL SCULPTURE
EQ
12' - 2 1/4"
201
EQ
MET. DROP CEIL 10'-0" AFF
8' - 5 13/16"
EQ
EQ
EQ
EQ
12' - 2 3/32"
EQ
EQ
EQ
3
CLIENT: THRASHER'S OWNER
CONC. 10'-0" AFF
001
C
2' - 0"
4' - 10"
206
FRONT DOOR
HALLWAY
1' - 5"
EQ
EQ
MET. DROP CEIL 10'-0" AFF
PROJ. NO.:
2' - 7 3/32"
203 ° .00 135
DESCRIPTION
EQ
5' - 1 5/32"
ISSUE DATE
EQ 1' - 1 1/2" EQ DROP CEILING 8' 0" . AFF
2
PROJECT SITE: 2333 3RD AVE SEATTLE
EQ
EQ
EQ
5' - 0 15/16"
EQ
EQ 1' - 0"
3' - 5"
205
10' - 11 13/32"
CONC. 20'-0" AFF LEVEL 1
6' - 8 1/2"
CONC. 10'-0" AFF
DRAWN BY: THANH VU
CUSTOM ELEVATOR CONC. 20'-0" AFF LEVEL 1
MERCHANDISE EQ
1' - 0"
LED LIGHT UNDER EACH SHELF
MERCHANDISE
EQ
1' - 8"
THRASHER SKATEBOARD STORE
EQ
LED LIGHT UNDER EACH SHELF
15' - 0"
3' - 0"
DRAWING INFORMATION
EQ
LED LIGHT UNDER EACH SHELF
3' - 5"
EQ
PROJECT INFORMATION
EQ
2' - 7"
EQ
B
EQ
EQ
EQ
1' - 5"
EQ
15' - 0"
EQ
LED LIGHT UNDER EACH SHELF
4' - 3"
EQ
EQ 1' - 0"
1' - 5"
0' - 11 1/4" EQ
2' - 1 9/32"
A
4' - 3" 4
2
3
15' - 0"
4
5
3/23/2014 11:15:58 AM E:\Studio 3\practice studio 3 FINAL.rvt
SECOND FLOOR REFLECTIVE CEILING PLAN 1 1/4" = 1'-0" REFLECTIVE CEILING SYMBOL
3/23/2014 11:15:58 AM
15' - 0"
NOTES:
1
15' - 0"
1/4" = 1' 0"
7' - 11 9/16"
SHEET INFORMATION
LED LIGHT UNDER EACH SHELF
LED LIGHT UNDER EACH SHELF
E
5 LED BURIED GROUND LIGHT
UNDER CABINET LIGHT
ADJUSTABLE ANGEL RECESSED LIGHT
LED NEON LIGHT
PENDANT FIXTUER
EMERGENCY LIGHT
WALL MOUNTED FIXTURE
SECOND FLOOR REFLECTIVE CEILING PLAN
A2.1
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
3
4
5 1
A
WAITTING AREA
REPAIR
105
106
CUSTOM ELEVATOR
B MERCHANDISE BUILT IN SHELVES
104
SHOWER
15' - 0"
A6.0
EMPLOYEE RESTROOM
9
107
SALE DESK 108
DISPLAY TABLE
BUILT IN SHELVES
MERCHANDISE 102 THRESHOLD
ENTRANCE
12
-
110
-
UP
A6.0 A6.0 11
113
FITTING ROOM
FTTING ROOM
112
111
4
E
7' - 11 3/4"
15' - 0"
15' - 0"
15' - 0"
FINISH LEGEND
HARDWOOD FLOOR
2X2 CERAMIC TILE
3/23/2014 1:36:19 PM
101
RESTROOM
NOTES:
RESTROOM
SHEET INFORMATION
12' - 2 1/4"
D
STORE EXIT
CLIENT: THRASHER'S OWNER
DISPLAY TABLE
3
001
ELEVATOR
PROJ. NO.:
10
15' - 0"
A6.0
PROJECT SITE: 2333 3RD AVE SEATTLE
109 8
3/23/2014 1:36:19 PM E:\Studio 3\practice studio 3 FINAL.rvt
2
1/4" = 1' 0"
C
DESCRIPTION
1
ISSUE DATE
A6.0
DRAWN BY: THANH VU
2
THRASHER SKATEBOARD STORE
A6.0
DRAWING INFORMATION
103
6
3
PROJECT INFORMATION
HVAC
A6.0 BUILT IN SHELVES
BUILT IN SHELVES
15' - 0"
BUILT IN SHELVES
5
1
FINISH PLAN_ FIRST FLOOR 1/4" = 1'-0"
FIRST FLOOR FINISH PLAN
A3.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
3
4
5 1
A
BUILT IN SHELVES
MERCHANDISE BUILT IN SHELVES
A6.0
3OPEN
TO BELOW
204
B WAITING BENCH
DISPLAY TABLE
15' - 0"
BUILT IN SHELVES
MERCHANDISE
RECEPTION DESK
205
203
A6.0
HALLWAY
DESCRIPTION
DISPLAY TABLE
2
ISSUE DATE
CUSTOM ELEVATOR
DRAWN BY: THANH VU
1
THRASHER SKATEBOARD STORE
A6.0
DRAWING INFORMATION
2
PROJECT INFORMATION
OPEN TO BELOW
BUILT IN SHELVES
15' - 0"
DISPLAY TABLE
5
206
-
OPEN TO BELOW
201
BAR COUNTER
ADA BAR COUNTER
STAIR
DN
4
METAL GRATE WALL
BUILT IN BAR SHELVES
BUILT IN BAR SHELVES
E
7' - 11 9/16"
15' - 0"
15' - 0"
15' - 0"
FINISH LEGEND
3/23/2014 1:36:23 PM E:\Studio 3\practice studio 3 FINAL.rvt
HARDWOOD FLOOR
3/23/2014 1:36:23 PM
SOCIAL AREA
CLIENT: THRASHER'S OWNER
A6.0
12' - 2 1/4"
D
7
1/4" = 1' 0"
WALL ATTACHED MAGAZINE SHELVES
OPEN TO BELOW
SHEET INFORMATION
15' - 0"
202
NOTES:
HALLWAY
3
001
ELEVATOR
PROJ. NO.:
SCULPTURE RAIL
PROJECT SITE: 2333 3RD AVE SEATTLE
FRONT DOOR
C
2X2 CERAMIC TILE 5
1
FINISH PLAN_SECOND FLOOR 1/4" = 1'-0"
SECOND FLOOR FINISH PLAN
A3.1
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
2
3
A4.0
4
5 1 ELEVATOR
T.O PARAPET 24' - 0" Roof 22' - 0"
201
202 SECOND FLOOR FF 11' - 6" FIRST FLOOR_CEILING 10' - 0"
STORE ENTRY DOOR
MERCHANDISE
MERCHANDISE
102
102
ENTRANCE 109
EXTERIOR FIX WINDOW
FIRST FLOOR FF 0' - 0"
DESCRIPTION
201
2
ISSUE DATE
HALLWAY
DRAWN BY: THANH VU
SOCIAL AREA
THRASHER SKATEBOARD STORE
SOCIAL AREA
DRAWING INFORMATION
METAL SCULPTURE RAIL
PROJECT INFORMATION
SECOND FLOOR_CEILING 21' - 7"
GRATED METAL WALL
GROUND FF -4' - 0"
C
D
E
T.O PARAPET 24' - 0"
BAR BUILT IN SHELVES GLASS SLIDING DOOR FRAMELESS
GRATED METAL WALL
CUSTOM BOOK SHELVE
BAR COUNTER
Roof 22' - 0" SECOND FLOOR_CEILING 21' - 7"
CLIENT: THRASHER'S OWNER
B
001
A
3
PROJ. NO.:
CROSS SECTION 1/4" = 1'-0"
PROJECT SITE: 2333 3RD AVE SEATTLE
1
GLASS WALL
204
205
206
SOCIAL AREA 201
GLASS RAILING
SECOND FLOOR FF 11' - 6"
METAL_DROP CEILING
ELEVATOR
FIRST FLOOR_CEILING 10' - 0"
STORE EXIT
MERCHANDISE 104
3/23/2014 10:26:25 AM E:\Studio 3\practice studio 3 FINAL.rvt
CUSTOM ELEVATOR FLOOR
MERCHANDISE
FITTING ROOM
102
112
SALE DESK CUSTOM FIX WINDOW
NOTES:
HALLWAY
1/4" = 1' 0"
MERCHANDISE
SHEET INFORMATION
MERCHANDISE
3/23/2014 10:26:25 AM
4
5
BUILDING SECTIONS GROUND FF -4' - 0"
2
LONGITUDINAL SECTION 1/4" = 1'-0"
A4.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
Window Schedule Type Mark A
Family and Type
Height
Awning-Triple w Trim: 3 panels Awning-Triple w Trim: 3 panels_custom size Casement-Quad w Trim: 4 panels Fixed: custom size Awning-Triple w Trim: 3 panels
B C D A
Door Schedule
Type
Width
Sill Height
18' - 0"
3 panels
12' - 8 19/32"
3' - 0"
18' - 0"
11' - 6 13/16"
3' - 0"
18' - 0"
3 panels_custom size 4 panels
17' - 5 23/32"
3' - 0"
6' - 3" 18' - 0"
custom size 3 panels
7' - 0" 12' - 8 19/32"
1' - 0" 3' - 0"
3' - 5 9/32"
Number 101 102 103 104 105 106 107 108 109 201
Type Mark A A A A B B A A A C
Width 3' - 0" 3' - 0" 3' - 0" 3' - 0" 6' - 0" 6' - 0" 3' - 0" 3' - 0" 3' - 0" 6' - 0"
Height 6' - 8" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0"
Thickness 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2"
Type 36" x 80" 36" x 84" 36" x 84" 36" x 84" 72" x 84" 72" x 84" 36" x 84" 36" x 84" 36" x 84" AAâ„¢3900 Thermal Sliding Door
Finish
Note
Steel Steel Steel Steel Glass Glass Steel Steel Steel
1
A monumental, high performance, sliding door for use in low, medium and high rise applications.
3' - 9 17/32"
3' - 4 15/32" 2' - 4"
3' - 6"
6' - 0"
1
DOOR TYPE A 1/4" = 1'-0"
2
DOOR TYPE B 1/4" = 1'-0"
3
DOOR TYPE C 1/4" = 1'-0"
DESCRIPTION
2
ISSUE DATE
EQ
DRAWN BY: THANH VU
EQ
0' - 5 5/8"
7' - 0"
6' - 1 7/32"
EQ
6' - 4"
7' - 0"
7' - 3"
7' - 0"
17' - 7"
18' - 0"
17' - 7"
18' - 0"
EQ
THRASHER SKATEBOARD STORE
6' - 0" 3' - 0"
DRAWING INFORMATION
1' - 3 25/32"
PROJECT INFORMATION
0' - 1 13/16"
3' - 8 25/32"
0' - 1 1/2" 0' - 1 1/2" 11' - 6 13/16" 11' - 7 1/2"
WINDOW TYPE B 1/4" = 1'-0"
3' - 11 7/16"
0' - 5"
3/23/2014 10:26:28 AM E:\Studio 3\practice studio 3 FINAL.rvt
6
0' - 1 1/2"
WINDOW TYPE C 1/4" = 1'-0"
WINDOW TYPE D 1/4" = 1'-0"
4
3/23/2014 10:26:28 AM
7
0' - 2 1/2"
6' - 3"
18' - 4 1/2"
17' - 10 1/2"
0' - 1 1/4"
7' - 0"
CLIENT: THRASHER'S OWNER
3' - 11 7/16"
001
3' - 11 7/16"
PROJ. NO.:
3' - 11 7/16"
PROJECT SITE: 2333 3RD AVE SEATTLE
17' - 10 5/32"
3
NOTES:
5
1/4" = 1' 0"
WINDOW TYPE A 1/4" = 1'-0"
SHEET INFORMATION
4
5
DOOR AND WINDOW SCHEDULES
A5.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
3 5/8" 20 GAUGE METAL RUNNER 5/8" TPD.GYP.BD
LINES OF ABOVE STRUCTURE
METAL BRACKET
3 5/8" GAUGE METAL CHANEL
LINE OF STRUCTURE ABOVE
STRUCTURE ABOVE
1
5/8" TPD.GYP.BD U SHAPE METAL BRACKET_CEILING ATTACHED
3/8" ANCHOR BOLT
GYPSUM BOARD CEILING
3" AIR (THERMAL)
5 5/8" CONCRETE MANSONARY UNIT
LIGHT GAUGE
0' - 4"
3/4" PLYWOOD
2 1/2" THICK GLASS PANEL
1/2" GYPSUM BOARD 1 1/2" METAL SQUARE COLUMN
FRAMELESS GLASS WALL_TOP 3" = 1'-0"
10
5/8" TPD.GYP.BD
EXTERIOR WALL_TOP 3" = 1'-0"
3" AIR (THERMAL)
2
5 5/8" CONCRETE MANSONARY UNIT
2 1/2" THICK GLASS PANEL
1 1/2" METAL SQUARE COLUMN
3/4" PLYWOOD
0' - 6"
3 5/8" 20 GAUGE METAL STUD
DESCRIPTION
7
ISSUE DATE
CUSTOM SLAT METAL PARTITION_TOP 3" = 1'-0"
DRAWN BY: THANH VU
5/8" TPD.GYP.BD
4
THRASHER SKATEBOARD STORE
INTERIOR 1 HOUR RATE PARTITION_TOP 3" = 1'-0"
DRAWING INFORMATION
3
PROJECT INFORMATION
0' - 4"
LIGHT GAUGE_SLAT
3 5/8" GAUGE METAL STUD
1/2" GYPSUM BOARD
5/8" TPD.GYP.BD
FRAMELESS GLASS WALL_PLAN 3" = 1'-0"
5/8" TPD.GYP.BD
11
EXTERIOR WALL_PLAN 3" = 1'-0"
3" AIR (THERMAL)
GLASS PANEL
CLIENT: THRASHER'S OWNER
8
001
CUSTOM SLAT METAL PARTITION_PLAN 3" = 1'-0"
PROJ. NO.:
5
PROJECT SITE: 2333 3RD AVE SEATTLE
INTERIOR 1 HOUR RATE PARTITION_PLAN 2 3" = 1'-0"
3
5 5/8" CONCRETE MANSONARY UNIT
4
3/8" BOLT
3/23/2014 10:54:48 AM
LIGHT GAUGE
1/2" GYPSUM BOARD
0' - 4" 3 5/8" 20 GAUGE METAL RUNNER
1 1/2" METAL SQUARE COLUMN
U SHAPE METAL BRACKET_FLOOR ATTACHED
WALL BASE FLOOR
3 5/8" GAUGE METAL CHANEL
SCHEDULED BASE FINISH FLOOR 5/8" BOLT
3/23/2014 10:54:48 AM E:\Studio 3\practice studio 3 FINAL.rvt
INTERIOR 1 HOUR RATE PARTITION_BASE 1 3" = 1'-0"
6
CUSTOM SLAT METAL PARTITION_BASE 3" = 1'-0"
9
FRAMELESS GLASS WALL_BASE 3" = 1'-0"
12
EXTERIOR WALL_BASE 3" = 1'-0"
FLOOR
NOTES:
SCHEDULED BASE
SHEET INFORMATION
0' - 4"
3/4" PLYWOOD
5
PARTITION TYPE
A5.1
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
B
SECOND FLOOR_CEILING 21' - 7"
2' - 7 27/32"
6' - 8 1/4"
4' - 2 1/2"
4' - 2 21/32"
1' - 5 1/8"
4' - 5 1/16" 0' - 2 1/16"
WEST ELEVATION_CUSTOM ELEVATOR 1/4" = 1'-0"
3
EAST ELEVATION_REPAIR 1/4" = 1'-0"
D
0' - 6 1/4" 19' - 10 31/32"
EQ
EQ
EQ
EQ 2' - 10 25/32"
SPACE BETWEEN SHELVES REMAINS THE SAME
WEST ELEVATION_MERCHANDISE 104_ WALL SHELVES 6 1/4" = 1'-0"
C
C
D
1' - 10 1/4" 0' - 10 3/4"
7' - 0" 9' - 1"
EAST ELEVATION_MECHANDISE 102 SALE DESK 9 1/4" = 1'-0"
2' - 4 7/8"
3' - 6" 0' - 8 7/8" 3' - 6"
4' - 2 1/16"
10' - 1 13/16"
7' - 7"
4' - 11 13/32"
15' - 0"
5' - 0 19/32"
7' - 0"
3' - 8" 0' - 11 3/4"
GRAB BAR
MIRROR
PAPER TOWER AND DISPOSER
DISPOSER BOX_WALL ATTACHED
2" WALL BASE
2" WALL BASE
TOILET
3' - 6"
SINK
2' - 7"
VANITY
3' - 0"
3' - 0"
TOILET
1' - 11"
EAST ELEVATION_MERCHANDISE 102 1/4" = 1'-0"
5
INTERIOR ELEVATIONS
2' - 7 7/16"
10
6' - 1"
2' - 8"
MIRROR
2' - 3 1/8"
ELECTRICAL OUTLET
0' - 6"
BRAB BAR
3' - 5 9/32"
SALE DESK
2' - 1 13/32" 2' - 6 19/32"
7' - 2"
DISPLAY TABLE
0' - 4"
1' - 0"
3/23/2014 10:26:41 AM E:\Studio 3\practice studio 3 FINAL.rvt
METAL BENCH
DISPLAY TABLE SWITCH
2' - 10"
1' - 2" 1' - 8"
6' - 3"
0' - 8 13/32"
CUSTOM FIX WINDOW
3' - 10 23/32"
2' - 0" 0' - 9"
SLAT METAL DROP CEILING
3/23/2014 10:26:41 AM
B
4
1/4" = 1' 0"
SOUTH ELEVATION_SOCIAL 201 7 1/4" = 1'-0"
SHEET INFORMATION
WEST ELEVATION_MERCHANDISE 102_BUIT IN RETAIL SYS 8 1/4" = 1'-0"
3
CLIENT: THRASHER'S OWNER
1' - 5 7/8"
EQ
EQ
1' - 4 21/32" 1' - 5 5/32"
1' - 0"
CUSTOM MAGAZINE RACK_WALL ATTACHED
1' - 0"
3' - 11 29/32"
0' - 7 5/8"
1' - 6 29/32"
5' - 0"
0' - 11 9/32"
4' - 11 31/32"
1' - 0 23/32"
5' - 0"
EQ
2' - 11 3/32" 1' - 7"
5' - 0"
2' - 7 5/8" 0' - 5 1/8"
5' - 0"
0' - 3"
1' - 8 15/32" 2' - 11 11/32" 1' - 8 15/32" 3' - 7 23/32"
4' - 0 1/16"
2' - 11 11/32"
DROP CEILING
4' - 2 7/32"
001
B
3' - 0"
4' - 0"
DESCRIPTION
EAST ELEVATION_RECEIPTION 203 1/4" = 1'-0"
5
PROJ. NO.:
C
6' - 5"
PROJECT SITE: 2333 3RD AVE SEATTLE
D
RECEIPTION TABLE
NOTES:
2
1' - 4"
1' - 3" BENCH
2
ISSUE DATE
3' - 10 3/4"
0' - 2 3/16"
FIRST FLOOR FF 0' - 0"
CUSTOM ELEVATOR_HYDRAULIC
EAST ELEVATION_CUSTOM ELEVATOR 1/4" = 1'-0"
2' - 0" 1' - 8 3/4"
6' - 9"
2' - 2"
ELEVATOR HYDRAULIC
1
2' - 0"
DRAWN BY: THANH VU
1' - 7"
2' - 0"
0' - 9"
GROUND FF -4' - 0" 4' - 3 11/32"
2' - 0"
3' - 4"
5' - 0"
1' - 8"
1' - 5 9/32"
2' - 10 3/8"
5' - 0"
3' - 9 11/32"
9' - 1"
2' - 0"
THRASHER SKATEBOARD STORE
EAST ELEVATION_MERCHANDISE 204 1/4" = 1'-0"
DRAWING INFORMATION
1' - 7"
2' - 7 11/16"
PROJECT INFORMATION
3' - 8 21/32"
4
8' - 10 5/32"
4' - 5 13/16"
1' - 2 1/4"
ELEVATOR FLOOR
GROUND FF -4' - 0"
SECOND FLOOR FF FIRST 11' - 6" FLOOR_CEILING 10' - 0"
0' - 7 1/2"
FIRST FLOOR FF 0' - 0"
4' - 0"
FIRST FLOOR FF 0' - 0"
8' - 2 1/2"
1' - 3 1/4"
2' - 10"
EQ EQ
ELEVATOR FLOOR
CUSTOM ELEVATOR FLOOR
GLASS WALL
SECOND FLOOR_CEILING 21' - 7"
1' - 10 3/16"
6' - 0" 4' - 0"
CUSTOM ELEVATOR FLOOR
4' - 6 17/32"
14' - 5 1/2"
FIRST FLOOR_CEILING 10' - 0"
3' - 5 7/16"
DISPLAY TABLE
SECOND FLOOR FF FIRST 11' - 6" FLOOR_CEILING 10' - 0" CUSTOM SHELF_10' AFF
1' - 6"
SECOND FLOOR FF 11' - 6"
2' - 10 25/32"
GLASS WALL
10' - 0"
EQUAL DIMENSION FOR BOTH BOOKSHELVES
GLASS SLIDING ELEVATOR DOOR_FRAMELESS
10' - 0"
10' - 0"
EQ
12' - 2"
1 3' - 5 7/16"
CUSTOM SHELF_10' AFF
1' - 5 5/32"
SECOND FLOOR_CEILING 21' - 7"
CUSTOM SHELF_10' AFF
1' - 7"
CUSTOM SHELVES
B
CUSTOM SHELF_10' AFF
9' - 0"
EQ
1' - 7"
B 1' - 4 21/32"
B
11
SOUTH ELEVATION_RESTROOM 113 1/4" = 1'-0"
12
WEST ELEVATION_RESTROOM 101 1/4" = 1'-0"
A6.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
18' - 1"
4' - 0 1/4"
4' - 0"
4' - 0" 1
1" EXTENDED HANRAIL 2". Stl. Square GUARD RAIL 2" Stl.Sq 5 A7.0 C CHANEL St 0' - 11"
2" STEEL GUARD RAIL
ENLARGE STAIR PLAN FIST FLOOR 1/2" = 1'-0"
4
DESCRIPTION
2
ISSUE DATE
DRAWN BY: THANH VU
1
THRASHER SKATEBOARD STORE
BUILT IN SHELVES UNDER STAIR
DRAWING INFORMATION
11" TREAD
PROJECT INFORMATION
2" HAND RAIL
STAIR SECTION 1/2" = 1'-0"
5' - 8"
1' EXTEND HANDRAIL 3 A7.0
HAND RAIL 2" Stl. Sq
HAND RAIL 2" Stl. Sq
GUARD RAIL 2" Stl. Sq
11' TREAD 0' - 11"
BALLUSTER 1'' Stl. Sq
C CHANEL STRINGER STEEL
Non-Monolithic Landing
4 DN
ENLARGE STAIR PLAN SECOND FLOOR 1/2" = 1'-0"
GUARD RAIL 2" Stl. Sq HAND RAIL 2" Stl. Sq
2" . Stl
GRATED METAL TREAD NOSING Stl.
0' - 4 3/16" 17 EQUAL UNITS
C CHANEL Stl. 0' - 11"
NOTES:
2
0' - 2"
STRUCTURAL COLUMN
3/23/2014 10:21:08 AM
4
SHEET INFORMATION
A7.0
TREAD 11' GRATED METAL 0' - 1 13/32"
3/23/2014 10:21:08 AM E:\Studio 3\practice studio 3 FINAL.rvt
MULTIPLE SCALES CLIENT: THRASHER'S OWNER
GUARD RAIL 2" Stl. Sq
3
PROJ. NO.:
1' - 0"
PROJECT SITE: 2333 3RD AVE SEATTLE
5' - 2"
3
STAIR TREAD PLAN 1 1/2" = 1'-0"
7" RISER
5
TOP STAIR TREAD SECTION 1 1/2" = 1'-0"
5
VERTICAL CIRCULATION
A7.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
OPEN BACK METAL GRATED SHELVES 0' - 4"
1
METAL BRAKET T SHAPE. Stl
0' - 6 23/32"
RECESSED POST 5'' B.F.F Stl. 0' - 5"
0' - 2 1/8"
0' - 3 7/8"
0' - 0 3/32" 11 UNITS EQUAL
0' - 0 3/16" 0' - 1 11/32"
CEILING GYP.10' AFF
DISPLAY SHELVES DETAIL
0' - 1"
1' - 2 21/32"
0' - 2"
SECOND FLOOR FF 11' - 6"
DESCRIPTION
2
ISSUE DATE
DRAWN BY: THANH VU
GREATED METAL SHELVES PLAN 3" = 1'-0"
THRASHER SKATEBOARD STORE
2
DRAWING INFORMATION
3 A8.1
PROJECT INFORMATION
METAL GRATED SLEVELS
T BRACKET 2"X6.5"
0' - 2" WELDED T SHAPED METAL BRACKET
0' - 2 1/8"
0' - 6"
0' - 3"
GRATED METAL SHELVES
1
3
RECESSED 6" UNDER FF
DISPLAY SHELVES SECTION 1" = 1'-0"
METAL SHELVES BRACKET DETAIL 3" = 1'-0"
NOTE: THE SHELVE WAS DESIGNED TO BE RECCESED TO THE METAL BRACKET, WHICH WAS WELDED TO THE MAIN STEEL POST
MULTIPLE SCALES CLIENT: THRASHER'S OWNER
3' - 10"
PROJ. NO.:
2" METAL POST Stl. Sq
3
PROJECT SITE: 2333 3RD AVE SEATTLE
2' - 6 25/32"
2" STEEL POST
0' - 4"
LINE OF FINISH FLOOR
NOTES:
VINYL BASE BOARD
WALL BASE DETAIL
3/23/2014 10:18:47 AM E:\Studio 3\practice studio 3 FINAL.rvt
INTERIOR PARTITION TBD. GYP.
SHEET INFORMATION
0' - 0 3/8"
3/23/2014 10:18:47 AM
4
CAULK 5
DETAIL
4
WALL BASE DETAIL 6" = 1'-0"
A8.1
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
3 EQ
EQ
4 EQ
5
EQ 1
15' - 0"
EQ
1' - 0"
A
REPAIR 106
WAITTING AREA
GFI
15' - 0"
SHOWER
SALE DESK
EMPLOYEE RESTROOM
108
107
GFI
C
TV TD
DESCRIPTION
EQ
2
ISSUE DATE
TV TD T
EQ
DRAWN BY: THANH VU
B
1' - 0"
R
105
THRASHER SKATEBOARD STORE
104
103
DRAWING INFORMATION
CUSTOM ELEVATOR
PROJECT INFORMATION
MERCHANDISE
EQ
HVAC
T
MERCHANDISE 102
ENTRANCE
110
D
12' - 2 1/4"
GFI
GFI
0' - 6"
UP
RESTROOM
RESTROOM
FITTING ROOM
FTTING ROOM
101
113
112
111
MULTIPLE SCALES CLIENT: THRASHER'S OWNER
STORE EXIT
3
PROJ. NO.:
15' - 0"
ELEVATOR
PROJECT SITE: 2333 3RD AVE SEATTLE
109
15' - 0"
15' - 0"
SYMBOL LEGEND SINGLE OUTLET
FLOOR SINGLE OUTLET
DUPLEX OUTLET
1
EDC FIRST FLOOR PLAN 1/4" = 1'-0"
DATA COMMUNICATION OUTLET
TV
TD
GFI
GFI DUPLEX OUTLET
TELEVISION OUTLET
T
3/23/2014 9:50:50 AM E:\Studio 3\practice studio 3 FINAL.rvt
TRIPLEX OUTLET
TELEPHONE OUTLET
FLOOR DUPLEX OUTLET
3/23/2014 9:50:50 AM
15' - 0"
NOTES:
7' - 11 9/16"
1/4" = 1' 0"
E
SHEET INFORMATION
4
5
FIRST FLOOR EDC
E1.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
3 EQ
EQ
4 EQ
5
EQ 1
15' - 0"
EQ
1' - 0"
A
REPAIR 106
WAITTING AREA
GFI
15' - 0"
SHOWER
SALE DESK
EMPLOYEE RESTROOM
108
107
GFI
C
TV TD
DESCRIPTION
EQ
2
ISSUE DATE
TV TD T
EQ
DRAWN BY: THANH VU
B
1' - 0"
R
105
THRASHER SKATEBOARD STORE
104
103
DRAWING INFORMATION
CUSTOM ELEVATOR
PROJECT INFORMATION
MERCHANDISE
EQ
HVAC
T
MERCHANDISE 102
ENTRANCE
D
12' - 2 1/4"
GFI
GFI
0' - 6"
UP
RESTROOM
RESTROOM
FITTING ROOM
FTTING ROOM
101
113
112
111
CLIENT: THRASHER'S OWNER
110
001
STORE EXIT
3
PROJ. NO.:
15' - 0"
ELEVATOR
PROJECT SITE: 2333 3RD AVE SEATTLE
109
15' - 0"
15' - 0"
SYMBOL LEGEND SINGLE OUTLET
FLOOR SINGLE OUTLET
DUPLEX OUTLET
1
EDC FIRST FLOOR PLAN 1/4" = 1'-0"
DATA COMMUNICATION OUTLET
TV
TD
GFI
GFI DUPLEX OUTLET
TELEVISION OUTLET
T
3/23/2014 1:38:54 PM E:\Studio 3\practice studio 3 FINAL.rvt
TRIPLEX OUTLET
TELEPHONE OUTLET
FLOOR DUPLEX OUTLET
3/23/2014 1:38:54 PM
15' - 0"
NOTES:
7' - 11 9/16"
1/4" = 1' 0"
E
SHEET INFORMATION
4
5
FIRST FLOOR EDC
E1.0
E
D
C
B
A
(206)778 6878 THANH.VU@BELLEVUECOLLEGE.EDU
1
2
3
4
5 1
15' - 0"
A
OPEN TO BELOW
MERCHANDISE
OPEN TO BELOW
RECEPTION DESK 203
205 -0
"
TD T
HALLWAY
DESCRIPTION
1' - 0"
7' -
2
1'
9/ 16 "
16' - 3"
15' - 0"
MERCHANDISE
2
ISSUE DATE
EQ
DRAWN BY: THANH VU
EQ
THRASHER SKATEBOARD STORE
B
DRAWING INFORMATION
CUSTOM ELEVATOR
PROJECT INFORMATION
204
TV
206 8' - 4 15/32"
OPEN TO BELOW
D
SOCIAL AREA OPEN TO BELOW
12' - 2 1/4"
201
CLIENT: THRASHER'S OWNER
15' - 0"
202
001
ELEVATOR
HALLWAY
3
PROJ. NO.:
SCULPTURE RAIL
PROJECT SITE: 2333 3RD AVE SEATTLE
C
4
7' - 11 9/16"
15' - 0"
15' - 0"
15' - 0"
SYMBOL LEGEND SINGLE OUTLET
FLOOR SINGLE OUTLET
TRIPLEX OUTLET
FLOOR DUPLEX OUTLET
1
3/23/2014 1:39:38 PM
5 DATA COMMUNICATION OUTLET
TV
TD
GFI DUPLEX OUTLET
TELEVISION OUTLET
T
3/23/2014 1:39:38 PM E:\Studio 3\practice studio 3 FINAL.rvt
DUPLEX OUTLET
NOTES:
E
1/4" = 1' 0"
METAL GRATE WALL
SHEET INFORMATION
STAIR
DN
TELEPHONE OUTLET
SECOND FLOOR EDC
EDC SECOND FLOOR PLAN 1/4" = 1'-0"
E1.1