939 Sanchez | Permit Set

Page 1

PROJECT LOCATION

ARCHITECTURAL

N

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

5.

COMMENT RESPONSE

06/10/2017

6.

COMMENT RESPONSE

10/18/2017

7. COMMENT RESPONSE 9. PRICING SET

STRUCTURAL

LIGHTING AND POWER

10/20/2016

05/30/2018 07/11/2018


C.H. EL +9'-10"

C.H. EL +9'-10"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-10"

9. PRICING SET

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-10"

C.H. EL +9'-10"

C.H. EL +9'-10"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

07/11/2018


N

UP

UP

PARAPET +293.5'

RIDGE +290.8'

RIDGE +292.0'

2ND FLOOR DECK DECK +274.5'

DRIVEWAY RAMP SLOPE UP

ADJACENT BUILDING (935 SANCHEZ) DN

1 HR DECK FROM GRADE TO 30" ABOVE FINISH OF DECK

UP

ROOF BELOW +32'-714"

TERRACE BELOW +32'-714"

ROOF +44'-112"

EXTERIOR ROOF MTD. HEAT PUMP SUPPLEMENTAL SINGLE ZONE GARAGE LEVEL MECHANICAL SYSTEM TRANE MODEL 4TXK38

DECK BELOW

REDUCED SETBACK PER SECTION 134.c

FRONT SETBACK

NEW CURB CUT

45% SETBACK

SANCHEZ STREET

CONCRETE SIDEWALK

EXTERIOR ROOF MTD. HEAT PUMP FOR MAIN MULTI-ZONE DUCTLESS MECHANICAL SYSTEM TRANE MODEL 4TXM22

DECK +10'-0"

GARDEN

UP

+8'-112"

DN

1 HR DECK FROM GRADE TO 30" ABOVE FINISH OF DECK

LIGHTWELL

NOTE: DUCTLESS MULTI-ZONE HEATING + COOLING SYSTEM TO BE PROVIDED BY BRADY AIR CONDITIONING INC. 338N CANAL ST. #5 SOOTH SAN-FRANCISCO, CA 94080 (650) 742 9640 CONTACT JEROME GALLEGUS FOR PRICING

WOOD DECK

ADJACENT BUILDING (943 SANCHEZ)

1.

PROJECT REVIEW MEETING

10/20/2016

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

5.

COMMENT RESPONSE

06/10/2017

6.

COMMENT RESPONSE

10/18/2017

9. PRICING SET

N UP

UP

PARAPET +293.5'

RIDGE +290.8'

RIDGE +292.0'

2ND FLOOR DECK DECK +274.5'

DRIVEWAY RAMP SLOPE UP

ADJACENT BUILDING (935 SANCHEZ) DN

UP

FRONT SETBACK

RIDGE +277.9'

EXIST. DRIVEWAY TO BE REPLACED

UP

45% SETBACK

RIDGE +277.9'

REDUCED SETBACK PER SECTION 134.c

UP

SANCHEZ STREET

CONCRETE SIDEWALK

RIDGE +276.5'

DN

LIGHTWELL

ADJACENT BUILDING (943 SANCHEZ)

WOOD DECK

07/11/2018


UP

W12x35

UP

SIDEWALK +1'-0" UP

ELEV. EQUP. SAND TRAP W/ METAL COVER

SIDEWALK +4'-3/4" 1ST FLOOR -0'-15"

1ST FLOOR -0'-15"

1ST FLOOR -0'-15" DN SIDEWALK +0'-0"

SIDEWALK -0'-7-3/4"

1ST FLOOR -0'-15"

1ST FLOOR -0'-15"

OPERABLE RESCUE OPENING AREA 5'-0" X 4'-3"

SIDEWALK -0'-9-1/4" UP

UP

1

1

2

2

3

3

4 5

4 6

7 56

SIDEWALK -2'-6-1/4"

F. FLOOR -0'-30"

TRASH ENCL.

7

8

9

10

11

W12x35

SANCHEZ STREET

UP

LOWER DECK

LANDING +0'-22"

N

BUILDING ENTRY

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

5.

COMMENT RESPONSE

06/10/2017

6.

COMMENT RESPONSE

10/18/2017

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

UP

UP

UP

SLOPE UP

DRIVEWAY RAMP SLOPE UP

GARAGE UP

SANCHEZ STREET

UP

UP ALLEE

UP

N

BUILDING ENTRY

UP

10/20/2016

07/11/2018


UP

DN

DN

W12x35

DN

SIDEWALK +1'-0"

DW

FRZ

DN

CL

GRILLE

CL

DECK BELOW -0'-15"

FRIDGE

119

104

89

74

59

44

29

21.5

14

2ND FLOOR +10'-0"

2ND FLOOR +10'-0" OVEN

OVEN

GARDEN +8'-1-1/2"

ISLAND UP

DECK

DN

UP

18

1 7

6 2

3

4

5

8

9

10

11

12

13

14

15

16

17 3 4

5

6

7

8

9

10

11

12

13

14

15

6

DN

W12x35

FIREPLACE

LIGHTWELL

N

LANDING BELOW +0'-22"

LIGHTWELL

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

5.

COMMENT RESPONSE

06/10/2017

6.

COMMENT RESPONSE

10/18/2017

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

UP

DN

DN

DN

OFFICE KITCHEN

DINING

WOOD DECK DN

LIVING YARD

DN BEDROOM BATH

LAUNDRY

LIGHTWELL

N LIGHTWELL

10/20/2016

07/11/2018


DN

NOTE: (E) 3RD FLOOR PLAN IS ATTIC SPACE

OPERABLE RESCUE OPENING AREA 6'-8" X 4'-11"

(N) SKYLIGHT

OPERABLE RESCUE OPENING AREA 6'-1" X 2'-1"

OPERABLE RESCUE OPENING AREA 6'-8" X 2'-1"

3RD FLOOR +21'-712"

OPERABLE RESCUE OPENING AREA 6'-1" X 2'-1"

UP

OPERABLE RESCUE OPENING AREA 6'-8" X 2'-1"

7

6

5

4

3 13

2 14

1 15

18 16

17

DN (N) SKYLIGHT 8

N

9

10

11

LIGHTWELL 1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

5.

COMMENT RESPONSE

06/10/2017

6.

COMMENT RESPONSE

10/18/2017

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

DN

N

LIGHTWELL

10/20/2016

07/11/2018


AREA OF ROOF BELOW

SLOPE TO ROOF DRAIN SLOPE TO ROOF DRAIN

SLOPE TO ROOF DRAIN

SLOPE TO ROOF DRAIN

ROOF BELOW

SLOPE TO ROOF DRAIN

AREA OF DECK BELOW

SLOPE TO ROOF DRAIN

N

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

5.

COMMENT RESPONSE

06/10/2017

6.

COMMENT RESPONSE

10/18/2017

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

DN

OPERABLE RESCUE OPENING AREA 8'-1" X 12'-0"

TERRACE

4TH FLOOR +32'-714"

DN TRENCH DRAIN 17

LIGHTWELL 8

9

10

11

12

13

(N) SKYLIGHT

N

14

15

16

FIRE FEATURE

10/20/2016

07/11/2018


UP

DN

DN

W12x35

DN

SIDEWALK +1'-0"

DN

CL

DW

FRZ

GRILLE

CL

DECK BELOW -0'-15"

FRIDGE

119

104

89

74

59

44

21.5

29

14

2ND FLOOR +10'-0"

2ND FLOOR +10'-0" OVEN

OVEN

GARDEN +8'-1-1/2"

ISLAND UP

DECK

DN

UP

18

1 6 2

3

4

7 5

8

9

10

11

12

13

14

15

16

17

3 4

5

6

7

8

9

10

11

12

13

14

15

6

DN

W12x35

FIREPLACE

LIGHTWELL

LANDING BELOW +0'-22"

LIGHTWELL

9. PRICING SET

N

UP

W12x35

UP

SIDEWALK +1'-0" UP

ELEV. EQUP. SAND TRAP W/ METAL COVER

SIDEWALK +4'-3/4" 1ST FLOOR -0'-15"

1ST FLOOR -0'-15"

1ST FLOOR -0'-15" DN SIDEWALK +0'-0"

SIDEWALK -0'-7-3/4"

1ST FLOOR -0'-15"

1ST FLOOR -0'-15"

SIDEWALK -0'-9-1/4" UP

UP

UP

1

1

2

2

3

3

4 5

4 6

7 56

F. FLOOR -0'-30"

TRASH ENCL.

7

8

9

10

11

W12x35

SANCHEZ STREET SIDEWALK -2'-6-1/4"

LOWER DECK

LANDING +0'-22"

BUILDING ENTRY

N

07/11/2018


TERRACE

FIRE FEATURE

4TH FLOOR +32'-714"

DN TRENCH DRAIN 17

LIGHTWELL 8

9

10

11

12

13

14

15

16

(N) SKYLIGHT

N 9. PRICING SET

DN

NOTE: (E) 3RD FLOOR PLAN IS ATTIC SPACE

(N) SKYLIGHT

3RD FLOOR +21'-712"

UP 7

5

6

4

3 13

2 14

1 15

18 16

17

DN (N) SKYLIGHT 8

LIGHTWELL

9

10

11

07/11/2018


1

4

D5 D4

D4 5

D5

4 D6 D3

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

6

D1

5

(E) SECOND FLOOR +259.00' = +10'-0"

D7

2 3

D1 D8

1

D1

2

D2

3

D3

4

D4

5

D5

6

D6 D7 D8

10/18/2017

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

D2

10/20/2016

07/11/2018


1

4

9 T. O. CURB

27

19

+294.73'=+44'-912"

19 ROOF DECK

37

25

25

FRONT YARD SETBACK LINE

+294.06'=+44'-112"

26

12 9 26 FOURTH FLOOR

14

10 19

19

+282.54'=+32'-714"

16

16 7 7 11

5

23

26

26

THIRD FLOOR

19

+271.56'=+21'-712"

33 23

4

1.

PROJECT REVIEW MEETING

10/20/2016

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

10/18/2017

16

14

16 9. PRICING SET

7

13 30

22

31 11

6

5

19

23 (E) SECOND FLOOR +259.00' = +10'-0"

GARDEN LEVEL +258.06' =

32

(E) FIN

+8'-112"

+259.0'

2

(E) GRADE AT NORTH

15

3

+257.1' (E) GRADE AT NORTH

8

29

+255.3'

8

36

TOP OF (E) CURB AT â„„ +248.99'=-0'-11 1/4"

28 (N) FIRST FLOOR +248.69'=-0'-15"

24

24

8

24

24

24

1

7

15

23

2

8

16

24

3

9

17

25

4

10

18

26

19

27

20

28

5

11

32

33

34 35

6

12

36 21 13 22 14

29 30 31

37

35

07/11/2018


22

1 9 T. O. CURB +294.73'=+44'-912" ROOF DECK

19

+294.06'=+44'-112"

17

10 FOURTH FLOOR +282.54'=+32'-714"

19

20

17

11 THIRD FLOOR +271.56'=+21'-712"

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

9. PRICING SET

5 (E) SECOND FLOOR +259.94' = +10'-0"

GARDEN LEVEL +258.06' = +8'-112"

2

(N) FIRST FLOOR +248.69'=-0'-15"

1

7

15

23

2

8

16

24

3

9

17

25

4

10

18

26

19

27

20

28

5

11

32

33

34 35

6

12

36 21 13 22 14

29 30 31

37

10/20/2016

10/18/2017

07/11/2018


21

21

3

T. O. CURB +294.73'=+44'-912" ROOF DECK +294.06'=+44'-112"

4 5 6

3 FOURTH FLOOR 1 +282.81'=+32'-74"

6 11

5

21

21

7

(E) ROOF RIDGE +277.90'=+27'-1112"

12

(E) ATTIC

THIRD FLOOR

+271.44'=+21'-6"

+271.56'=+21'-712"

6 1

13

5 14

4

17

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

7. COMMENT RESPONSE 9. PRICING SET

18

15 (E) SECOND FLOOR

24

19

16

20

17

(E) SECOND FLOOR +259.00' = +10'-0"

+259.00' = +10'-0"

8 9 10

21

(E) FIRST FLOOR +250.23'=+0'-312" PROJECT 0'-0" +249.94'=+0'-0" (N) FIRST FLOOR +248.69'=-0'-15"

1

11

21

2

12

22

3

13

23

4

14

5

15

6

16

7

17

8

18

9

19

10

20

24

25

10/20/2016

10/18/2017 05/30/2018 07/11/2018


3

T. O. CURB +294.73'=+44'-912"

6

ROOF DECK +294.06'=+44'-112"

4

5

6 3

1

FOURTH FLOOR +282.81'=+32'-714"

4 5 (E) ROOF RIDGE +277.90'=+27'-1112" (E) ROOF RIDGE +276.5'=+26'-634"

1 6 3 (E) ATTIC

THIRD FLOOR

+271.44'=+21'-6"

+271.56'=+21'-712"

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

6

4.

PRELIMINARY BID

01/26/2017

5

6.

COMMENT RESPONSE

25 4

7. COMMENT RESPONSE

7

9. PRICING SET

22

(E) SECOND FLOOR

(E) SECOND FLOOR

+259.00' = +10'-0"

+259.00' = +10'-0" (E) DECK

GARDEN LEVEL

+259.0' = +9'-918"

+258.06' = +8'-112"

MIDPOINT OF GRADE +256.41' = +6'-558"

(E) FIRST FLOOR +252.6' = +2'-8"

TOP OF (E) CURB AT â„„ +248.99'=-0'-11 1/4" (N) FIRST FLOOR +248.69' = -0'-15"

1

11

21

2

12

22

3

13

23

4

14

5

15

6

16

7

17

8

18

9

19

10

20

24

25

10/20/2016

10/18/2017 05/30/2018 07/11/2018


9

12

9 9

(E) ROOF RIDGE +277.90'=+27'-1112"

1 1

2 (E) ATTIC +271.44'=+21'-6"

4 13

14

5 4

10 11 4

(E) SECOND FLOOR +259.00' = +10'-0"

3 (E) GRADE AT NORTH PL +258.10' = +9'-1" (E) GRADE AT SOUTH PL +257.35' = +7'-1"

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

7. COMMENT RESPONSE

6

9. PRICING SET

(E) FIRST FLOOR +250.23'=+0'-312" PROJECT 0'-0" +249.94'=+0'-0"

1

6

11

2

7

12

3

8

13

4

9

14

5

10

10/20/2016

10/18/2017 05/30/2018 07/11/2018


21

18

18

T. O. CURB +294.73'=+44'-912" ROOF DECK +294.06'=+44'-112"

16

2

10

18 19 3

20

20

20 3

FOURTH FLOOR +282.81'=+32'-714"

16 11 4

21 9

4

15

20

THIRD FLOOR

3

+271.56'=+21'-712"

1 6

14

1 10

1.

PROJECT REVIEW MEETING

10/20/2016

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

10/18/2017

12 7

10 8

9 (E) SECOND FLOOR +259.00' = +10'-0"

14 3

GARDEN LEVEL +258.06' = +8'-112"

17 17

(N) FIRST FLOOR +248.69'=+0'-15"

1

9

2

10

17 18

3

11

19

4

12

20

5

13

21

6

14

7

15

8

16

13

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

07/11/2018


11

11

2

9

1

9 (E) ROOF RIDGE +277.90'=+27'-1112"

13 (E) ATTIC +271.44'=+21'-6"

4

5

10

1.

PROJECT REVIEW MEETING

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

7. COMMENT RESPONSE

4

9. PRICING SET

(E) SECOND FLOOR +259.00' = +10'-0"

7

8

(E) FIRST FLOOR +250.23'=+0'-312" PROJECT 0'-0" +249.94'=+0'-0"

12

1

6

11

2

7

12

3

8 13

4

9

5

10

10/20/2016

10/18/2017 05/30/2018 07/11/2018


12

3

16 6

T. O. CURB +294.73'=+44'-912" ROOF DECK

12

+294.06'=+44'-112"

6 1

2

16

4

3

14

14 3

FOURTH FLOOR +282.81'=+32'-714"

14 9

17 16

4 16

10

3 14

14

THIRD FLOOR

1.

PROJECT REVIEW MEETING

+271.56'=+21'-712"

2.

PRE-APPLICATION MEETING

12/07/2016

3.

ISSUED FOR PERMIT

12/09/2016

4.

PRELIMINARY BID

01/26/2017

6.

COMMENT RESPONSE

11 14

15

10

3 (E) SECOND FLOOR +259.00' = +10'-0"

18

18 GARDEN LEVEL +258.06' = +8'-112"

9 10

(N) FIRST FLOOR +248.69'=+0'-15"

17 18

1

9

2

10

3

11

4

12

5

13

6

14

7

15

8

16

17 18

10/18/2017

7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

9

10/20/2016

07/11/2018


C.H. EL +9'-10"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-10"

C.H. EL +9'-10"

9. PRICING SET

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-10"

C.H. EL +9'-10"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

07/11/2018


C.H. EL +10'-3"

C.H. EL +10'-3"

C.H. EL +10'-3"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-3"

TOP OF F.F. EL +0'-0"

C.H. EL +10'-3"

9. PRICING SET

TOP OF F.F. EL +0'-0"

C.H. EL +10'-3"

C.H. EL +10'-3"

C.H. EL +10'-3"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

07/11/2018


C.H. EL +9'-7"

C.H. EL +9'-7"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-7"

C.H. EL +9'-7"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

9. PRICING SET

C.H. EL +9'-7"

C.H. EL +9'-7"

TOP OF F.F. EL +0'-0"

TOP OF F.F. EL +0'-0"

C.H. EL +9'-7"

TOP OF F.F. EL +0'-0"

07/11/2018


7. COMMENT RESPONSE

05/30/2018

8. COMMENT RESPONSE

06/18/2018

9. PRICING SET

07/11/2018


9. PRICING SET

07/11/2018


FINISHED FLOOR

FINISHED FLOOR

9. PRICING SET

WALL TYPE

A1

WALL TYPE

A2

WALL TYPE

A3

WALL TYPE

A4

WALL TYPE

B1

WALL TYPE

B2

WALL TYPE

B3

WALL TYPE

B4

WALL TYPE

A5

07/11/2018


9. PRICING SET

07/11/2018


(N) SECOND FLOOR

(N) SECOND FLOOR

+10'-0"

+10'-0"

UP

STREET LEVEL + 7 12 "

STREET LEVEL + 7 12 "

UP 1

7. COMMENT RESPONSE 9. PRICING SET

2

3

4

5 6

GARDEN LEVEL

GARDEN LEVEL

+8'-112"

+8'-112"

(N) FIRST FLOOR -1'-3"

(N) FIRST FLOOR -1'-3"

7

8

9

10

11

12

13

14

15

05/30/2018 07/11/2018


(N) SECOND FLOOR +10'-0"

FOURTH

STAIR #5

(N) FIRST FLOOR -1'-3"

THIRD

7. COMMENT RESPONSE 9. PRICING SET

STAIR #4

UP 1

2

3

4

SECOND

18

5 6

STAIR #3

FIRST

7

8

9

10

11

12

13

14

15

16

17

05/30/2018 07/11/2018


THIRD FLOOR +271.56'=+21'-712"

UP 1 18 2 3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

(E) SECOND FLOOR +259.00' = +10'-0"

7. COMMENT RESPONSE 9. PRICING SET

FOURTH FLOOR +32'-714"

7

6

5

4

3

2

1

UP 17 8

THIRD FLOOR +21'-712"

9

10

11

12

13

14

15

16

05/30/2018 07/11/2018


FINISHED FLOOR

9. PRICING SET

FINISHED FLOOR

FINISHED FLOOR

FINISHED FLOOR

FIN. F.

07/11/2018


POFD041.085 POFD045.166

C534 GV22/K

GV22/K

POFD045.166

C534

POFD053.085

C534

POFD041.085

C534

POFD053.085

C534

POFD041.085

C534

7. COMMENT RESPONSE 9. PRICING SET

POFD041.085

POFD053.085

C534

C534

POFD045.166

C534

GV22/K

05/30/2018 07/11/2018


9. PRICING SET

07/11/2018


LIVING

4TH FLOOR +32'-714"

9. PRICING SET

C.H. EL +10'-3"

C.H. EL +9'-3"

C.H. EL +10'-3"

C.H. EL +9'-3"

C.H. EL +10'-3"

C.H. EL +9'-3"

07/11/2018