PROJECT LOCATION
ARCHITECTURAL
N
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
5.
COMMENT RESPONSE
06/10/2017
6.
COMMENT RESPONSE
10/18/2017
7. COMMENT RESPONSE 9. PRICING SET
STRUCTURAL
LIGHTING AND POWER
10/20/2016
05/30/2018 07/11/2018
C.H. EL +9'-10"
C.H. EL +9'-10"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-10"
9. PRICING SET
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-10"
C.H. EL +9'-10"
C.H. EL +9'-10"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
07/11/2018
N
UP
UP
PARAPET +293.5'
RIDGE +290.8'
RIDGE +292.0'
2ND FLOOR DECK DECK +274.5'
DRIVEWAY RAMP SLOPE UP
ADJACENT BUILDING (935 SANCHEZ) DN
1 HR DECK FROM GRADE TO 30" ABOVE FINISH OF DECK
UP
ROOF BELOW +32'-714"
TERRACE BELOW +32'-714"
ROOF +44'-112"
EXTERIOR ROOF MTD. HEAT PUMP SUPPLEMENTAL SINGLE ZONE GARAGE LEVEL MECHANICAL SYSTEM TRANE MODEL 4TXK38
DECK BELOW
REDUCED SETBACK PER SECTION 134.c
FRONT SETBACK
NEW CURB CUT
45% SETBACK
SANCHEZ STREET
CONCRETE SIDEWALK
EXTERIOR ROOF MTD. HEAT PUMP FOR MAIN MULTI-ZONE DUCTLESS MECHANICAL SYSTEM TRANE MODEL 4TXM22
DECK +10'-0"
GARDEN
UP
+8'-112"
DN
1 HR DECK FROM GRADE TO 30" ABOVE FINISH OF DECK
LIGHTWELL
NOTE: DUCTLESS MULTI-ZONE HEATING + COOLING SYSTEM TO BE PROVIDED BY BRADY AIR CONDITIONING INC. 338N CANAL ST. #5 SOOTH SAN-FRANCISCO, CA 94080 (650) 742 9640 CONTACT JEROME GALLEGUS FOR PRICING
WOOD DECK
ADJACENT BUILDING (943 SANCHEZ)
1.
PROJECT REVIEW MEETING
10/20/2016
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
5.
COMMENT RESPONSE
06/10/2017
6.
COMMENT RESPONSE
10/18/2017
9. PRICING SET
N UP
UP
PARAPET +293.5'
RIDGE +290.8'
RIDGE +292.0'
2ND FLOOR DECK DECK +274.5'
DRIVEWAY RAMP SLOPE UP
ADJACENT BUILDING (935 SANCHEZ) DN
UP
FRONT SETBACK
RIDGE +277.9'
EXIST. DRIVEWAY TO BE REPLACED
UP
45% SETBACK
RIDGE +277.9'
REDUCED SETBACK PER SECTION 134.c
UP
SANCHEZ STREET
CONCRETE SIDEWALK
RIDGE +276.5'
DN
LIGHTWELL
ADJACENT BUILDING (943 SANCHEZ)
WOOD DECK
07/11/2018
UP
W12x35
UP
SIDEWALK +1'-0" UP
ELEV. EQUP. SAND TRAP W/ METAL COVER
SIDEWALK +4'-3/4" 1ST FLOOR -0'-15"
1ST FLOOR -0'-15"
1ST FLOOR -0'-15" DN SIDEWALK +0'-0"
SIDEWALK -0'-7-3/4"
1ST FLOOR -0'-15"
1ST FLOOR -0'-15"
OPERABLE RESCUE OPENING AREA 5'-0" X 4'-3"
SIDEWALK -0'-9-1/4" UP
UP
1
1
2
2
3
3
4 5
4 6
7 56
SIDEWALK -2'-6-1/4"
F. FLOOR -0'-30"
TRASH ENCL.
7
8
9
10
11
W12x35
SANCHEZ STREET
UP
LOWER DECK
LANDING +0'-22"
N
BUILDING ENTRY
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
5.
COMMENT RESPONSE
06/10/2017
6.
COMMENT RESPONSE
10/18/2017
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
UP
UP
UP
SLOPE UP
DRIVEWAY RAMP SLOPE UP
GARAGE UP
SANCHEZ STREET
UP
UP ALLEE
UP
N
BUILDING ENTRY
UP
10/20/2016
07/11/2018
UP
DN
DN
W12x35
DN
SIDEWALK +1'-0"
DW
FRZ
DN
CL
GRILLE
CL
DECK BELOW -0'-15"
FRIDGE
119
104
89
74
59
44
29
21.5
14
2ND FLOOR +10'-0"
2ND FLOOR +10'-0" OVEN
OVEN
GARDEN +8'-1-1/2"
ISLAND UP
DECK
DN
UP
18
1 7
6 2
3
4
5
8
9
10
11
12
13
14
15
16
17 3 4
5
6
7
8
9
10
11
12
13
14
15
6
DN
W12x35
FIREPLACE
LIGHTWELL
N
LANDING BELOW +0'-22"
LIGHTWELL
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
5.
COMMENT RESPONSE
06/10/2017
6.
COMMENT RESPONSE
10/18/2017
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
UP
DN
DN
DN
OFFICE KITCHEN
DINING
WOOD DECK DN
LIVING YARD
DN BEDROOM BATH
LAUNDRY
LIGHTWELL
N LIGHTWELL
10/20/2016
07/11/2018
DN
NOTE: (E) 3RD FLOOR PLAN IS ATTIC SPACE
OPERABLE RESCUE OPENING AREA 6'-8" X 4'-11"
(N) SKYLIGHT
OPERABLE RESCUE OPENING AREA 6'-1" X 2'-1"
OPERABLE RESCUE OPENING AREA 6'-8" X 2'-1"
3RD FLOOR +21'-712"
OPERABLE RESCUE OPENING AREA 6'-1" X 2'-1"
UP
OPERABLE RESCUE OPENING AREA 6'-8" X 2'-1"
7
6
5
4
3 13
2 14
1 15
18 16
17
DN (N) SKYLIGHT 8
N
9
10
11
LIGHTWELL 1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
5.
COMMENT RESPONSE
06/10/2017
6.
COMMENT RESPONSE
10/18/2017
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
DN
N
LIGHTWELL
10/20/2016
07/11/2018
AREA OF ROOF BELOW
SLOPE TO ROOF DRAIN SLOPE TO ROOF DRAIN
SLOPE TO ROOF DRAIN
SLOPE TO ROOF DRAIN
ROOF BELOW
SLOPE TO ROOF DRAIN
AREA OF DECK BELOW
SLOPE TO ROOF DRAIN
N
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
5.
COMMENT RESPONSE
06/10/2017
6.
COMMENT RESPONSE
10/18/2017
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
DN
OPERABLE RESCUE OPENING AREA 8'-1" X 12'-0"
TERRACE
4TH FLOOR +32'-714"
DN TRENCH DRAIN 17
LIGHTWELL 8
9
10
11
12
13
(N) SKYLIGHT
N
14
15
16
FIRE FEATURE
10/20/2016
07/11/2018
UP
DN
DN
W12x35
DN
SIDEWALK +1'-0"
DN
CL
DW
FRZ
GRILLE
CL
DECK BELOW -0'-15"
FRIDGE
119
104
89
74
59
44
21.5
29
14
2ND FLOOR +10'-0"
2ND FLOOR +10'-0" OVEN
OVEN
GARDEN +8'-1-1/2"
ISLAND UP
DECK
DN
UP
18
1 6 2
3
4
7 5
8
9
10
11
12
13
14
15
16
17
3 4
5
6
7
8
9
10
11
12
13
14
15
6
DN
W12x35
FIREPLACE
LIGHTWELL
LANDING BELOW +0'-22"
LIGHTWELL
9. PRICING SET
N
UP
W12x35
UP
SIDEWALK +1'-0" UP
ELEV. EQUP. SAND TRAP W/ METAL COVER
SIDEWALK +4'-3/4" 1ST FLOOR -0'-15"
1ST FLOOR -0'-15"
1ST FLOOR -0'-15" DN SIDEWALK +0'-0"
SIDEWALK -0'-7-3/4"
1ST FLOOR -0'-15"
1ST FLOOR -0'-15"
SIDEWALK -0'-9-1/4" UP
UP
UP
1
1
2
2
3
3
4 5
4 6
7 56
F. FLOOR -0'-30"
TRASH ENCL.
7
8
9
10
11
W12x35
SANCHEZ STREET SIDEWALK -2'-6-1/4"
LOWER DECK
LANDING +0'-22"
BUILDING ENTRY
N
07/11/2018
TERRACE
FIRE FEATURE
4TH FLOOR +32'-714"
DN TRENCH DRAIN 17
LIGHTWELL 8
9
10
11
12
13
14
15
16
(N) SKYLIGHT
N 9. PRICING SET
DN
NOTE: (E) 3RD FLOOR PLAN IS ATTIC SPACE
(N) SKYLIGHT
3RD FLOOR +21'-712"
UP 7
5
6
4
3 13
2 14
1 15
18 16
17
DN (N) SKYLIGHT 8
LIGHTWELL
9
10
11
07/11/2018
1
4
D5 D4
D4 5
D5
4 D6 D3
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
6
D1
5
(E) SECOND FLOOR +259.00' = +10'-0"
D7
2 3
D1 D8
1
D1
2
D2
3
D3
4
D4
5
D5
6
D6 D7 D8
10/18/2017
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
D2
10/20/2016
07/11/2018
1
4
9 T. O. CURB
27
19
+294.73'=+44'-912"
19 ROOF DECK
37
25
25
FRONT YARD SETBACK LINE
+294.06'=+44'-112"
26
12 9 26 FOURTH FLOOR
14
10 19
19
+282.54'=+32'-714"
16
16 7 7 11
5
23
26
26
THIRD FLOOR
19
+271.56'=+21'-712"
33 23
4
1.
PROJECT REVIEW MEETING
10/20/2016
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
10/18/2017
16
14
16 9. PRICING SET
7
13 30
22
31 11
6
5
19
23 (E) SECOND FLOOR +259.00' = +10'-0"
GARDEN LEVEL +258.06' =
32
(E) FIN
+8'-112"
+259.0'
2
(E) GRADE AT NORTH
15
3
+257.1' (E) GRADE AT NORTH
8
29
+255.3'
8
36
TOP OF (E) CURB AT â„„ +248.99'=-0'-11 1/4"
28 (N) FIRST FLOOR +248.69'=-0'-15"
24
24
8
24
24
24
1
7
15
23
2
8
16
24
3
9
17
25
4
10
18
26
19
27
20
28
5
11
32
33
34 35
6
12
36 21 13 22 14
29 30 31
37
35
07/11/2018
22
1 9 T. O. CURB +294.73'=+44'-912" ROOF DECK
19
+294.06'=+44'-112"
17
10 FOURTH FLOOR +282.54'=+32'-714"
19
20
17
11 THIRD FLOOR +271.56'=+21'-712"
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
9. PRICING SET
5 (E) SECOND FLOOR +259.94' = +10'-0"
GARDEN LEVEL +258.06' = +8'-112"
2
(N) FIRST FLOOR +248.69'=-0'-15"
1
7
15
23
2
8
16
24
3
9
17
25
4
10
18
26
19
27
20
28
5
11
32
33
34 35
6
12
36 21 13 22 14
29 30 31
37
10/20/2016
10/18/2017
07/11/2018
21
21
3
T. O. CURB +294.73'=+44'-912" ROOF DECK +294.06'=+44'-112"
4 5 6
3 FOURTH FLOOR 1 +282.81'=+32'-74"
6 11
5
21
21
7
(E) ROOF RIDGE +277.90'=+27'-1112"
12
(E) ATTIC
THIRD FLOOR
+271.44'=+21'-6"
+271.56'=+21'-712"
6 1
13
5 14
4
17
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
7. COMMENT RESPONSE 9. PRICING SET
18
15 (E) SECOND FLOOR
24
19
16
20
17
(E) SECOND FLOOR +259.00' = +10'-0"
+259.00' = +10'-0"
8 9 10
21
(E) FIRST FLOOR +250.23'=+0'-312" PROJECT 0'-0" +249.94'=+0'-0" (N) FIRST FLOOR +248.69'=-0'-15"
1
11
21
2
12
22
3
13
23
4
14
5
15
6
16
7
17
8
18
9
19
10
20
24
25
10/20/2016
10/18/2017 05/30/2018 07/11/2018
3
T. O. CURB +294.73'=+44'-912"
6
ROOF DECK +294.06'=+44'-112"
4
5
6 3
1
FOURTH FLOOR +282.81'=+32'-714"
4 5 (E) ROOF RIDGE +277.90'=+27'-1112" (E) ROOF RIDGE +276.5'=+26'-634"
1 6 3 (E) ATTIC
THIRD FLOOR
+271.44'=+21'-6"
+271.56'=+21'-712"
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
6
4.
PRELIMINARY BID
01/26/2017
5
6.
COMMENT RESPONSE
25 4
7. COMMENT RESPONSE
7
9. PRICING SET
22
(E) SECOND FLOOR
(E) SECOND FLOOR
+259.00' = +10'-0"
+259.00' = +10'-0" (E) DECK
GARDEN LEVEL
+259.0' = +9'-918"
+258.06' = +8'-112"
MIDPOINT OF GRADE +256.41' = +6'-558"
(E) FIRST FLOOR +252.6' = +2'-8"
TOP OF (E) CURB AT â„„ +248.99'=-0'-11 1/4" (N) FIRST FLOOR +248.69' = -0'-15"
1
11
21
2
12
22
3
13
23
4
14
5
15
6
16
7
17
8
18
9
19
10
20
24
25
10/20/2016
10/18/2017 05/30/2018 07/11/2018
9
12
9 9
(E) ROOF RIDGE +277.90'=+27'-1112"
1 1
2 (E) ATTIC +271.44'=+21'-6"
4 13
14
5 4
10 11 4
(E) SECOND FLOOR +259.00' = +10'-0"
3 (E) GRADE AT NORTH PL +258.10' = +9'-1" (E) GRADE AT SOUTH PL +257.35' = +7'-1"
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
7. COMMENT RESPONSE
6
9. PRICING SET
(E) FIRST FLOOR +250.23'=+0'-312" PROJECT 0'-0" +249.94'=+0'-0"
1
6
11
2
7
12
3
8
13
4
9
14
5
10
10/20/2016
10/18/2017 05/30/2018 07/11/2018
21
18
18
T. O. CURB +294.73'=+44'-912" ROOF DECK +294.06'=+44'-112"
16
2
10
18 19 3
20
20
20 3
FOURTH FLOOR +282.81'=+32'-714"
16 11 4
21 9
4
15
20
THIRD FLOOR
3
+271.56'=+21'-712"
1 6
14
1 10
1.
PROJECT REVIEW MEETING
10/20/2016
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
10/18/2017
12 7
10 8
9 (E) SECOND FLOOR +259.00' = +10'-0"
14 3
GARDEN LEVEL +258.06' = +8'-112"
17 17
(N) FIRST FLOOR +248.69'=+0'-15"
1
9
2
10
17 18
3
11
19
4
12
20
5
13
21
6
14
7
15
8
16
13
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
07/11/2018
11
11
2
9
1
9 (E) ROOF RIDGE +277.90'=+27'-1112"
13 (E) ATTIC +271.44'=+21'-6"
4
5
10
1.
PROJECT REVIEW MEETING
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
7. COMMENT RESPONSE
4
9. PRICING SET
(E) SECOND FLOOR +259.00' = +10'-0"
7
8
(E) FIRST FLOOR +250.23'=+0'-312" PROJECT 0'-0" +249.94'=+0'-0"
12
1
6
11
2
7
12
3
8 13
4
9
5
10
10/20/2016
10/18/2017 05/30/2018 07/11/2018
12
3
16 6
T. O. CURB +294.73'=+44'-912" ROOF DECK
12
+294.06'=+44'-112"
6 1
2
16
4
3
14
14 3
FOURTH FLOOR +282.81'=+32'-714"
14 9
17 16
4 16
10
3 14
14
THIRD FLOOR
1.
PROJECT REVIEW MEETING
+271.56'=+21'-712"
2.
PRE-APPLICATION MEETING
12/07/2016
3.
ISSUED FOR PERMIT
12/09/2016
4.
PRELIMINARY BID
01/26/2017
6.
COMMENT RESPONSE
11 14
15
10
3 (E) SECOND FLOOR +259.00' = +10'-0"
18
18 GARDEN LEVEL +258.06' = +8'-112"
9 10
(N) FIRST FLOOR +248.69'=+0'-15"
17 18
1
9
2
10
3
11
4
12
5
13
6
14
7
15
8
16
17 18
10/18/2017
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
9
10/20/2016
07/11/2018
C.H. EL +9'-10"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-10"
C.H. EL +9'-10"
9. PRICING SET
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-10"
C.H. EL +9'-10"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
07/11/2018
C.H. EL +10'-3"
C.H. EL +10'-3"
C.H. EL +10'-3"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-3"
TOP OF F.F. EL +0'-0"
C.H. EL +10'-3"
9. PRICING SET
TOP OF F.F. EL +0'-0"
C.H. EL +10'-3"
C.H. EL +10'-3"
C.H. EL +10'-3"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
07/11/2018
C.H. EL +9'-7"
C.H. EL +9'-7"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-7"
C.H. EL +9'-7"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
9. PRICING SET
C.H. EL +9'-7"
C.H. EL +9'-7"
TOP OF F.F. EL +0'-0"
TOP OF F.F. EL +0'-0"
C.H. EL +9'-7"
TOP OF F.F. EL +0'-0"
07/11/2018
7. COMMENT RESPONSE
05/30/2018
8. COMMENT RESPONSE
06/18/2018
9. PRICING SET
07/11/2018
9. PRICING SET
07/11/2018
FINISHED FLOOR
FINISHED FLOOR
9. PRICING SET
WALL TYPE
A1
WALL TYPE
A2
WALL TYPE
A3
WALL TYPE
A4
WALL TYPE
B1
WALL TYPE
B2
WALL TYPE
B3
WALL TYPE
B4
WALL TYPE
A5
07/11/2018
9. PRICING SET
07/11/2018
(N) SECOND FLOOR
(N) SECOND FLOOR
+10'-0"
+10'-0"
UP
STREET LEVEL + 7 12 "
STREET LEVEL + 7 12 "
UP 1
7. COMMENT RESPONSE 9. PRICING SET
2
3
4
5 6
GARDEN LEVEL
GARDEN LEVEL
+8'-112"
+8'-112"
(N) FIRST FLOOR -1'-3"
(N) FIRST FLOOR -1'-3"
7
8
9
10
11
12
13
14
15
05/30/2018 07/11/2018
(N) SECOND FLOOR +10'-0"
FOURTH
STAIR #5
(N) FIRST FLOOR -1'-3"
THIRD
7. COMMENT RESPONSE 9. PRICING SET
STAIR #4
UP 1
2
3
4
SECOND
18
5 6
STAIR #3
FIRST
7
8
9
10
11
12
13
14
15
16
17
05/30/2018 07/11/2018
THIRD FLOOR +271.56'=+21'-712"
UP 1 18 2 3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
(E) SECOND FLOOR +259.00' = +10'-0"
7. COMMENT RESPONSE 9. PRICING SET
FOURTH FLOOR +32'-714"
7
6
5
4
3
2
1
UP 17 8
THIRD FLOOR +21'-712"
9
10
11
12
13
14
15
16
05/30/2018 07/11/2018
FINISHED FLOOR
9. PRICING SET
FINISHED FLOOR
FINISHED FLOOR
FINISHED FLOOR
FIN. F.
07/11/2018
POFD041.085 POFD045.166
C534 GV22/K
GV22/K
POFD045.166
C534
POFD053.085
C534
POFD041.085
C534
POFD053.085
C534
POFD041.085
C534
7. COMMENT RESPONSE 9. PRICING SET
POFD041.085
POFD053.085
C534
C534
POFD045.166
C534
GV22/K
05/30/2018 07/11/2018
9. PRICING SET
07/11/2018
LIVING
4TH FLOOR +32'-714"
9. PRICING SET
C.H. EL +10'-3"
C.H. EL +9'-3"
C.H. EL +10'-3"
C.H. EL +9'-3"
C.H. EL +10'-3"
C.H. EL +9'-3"
07/11/2018