Architecture Portfolio 2012 - 2019

Page 1





Basement Floor Plan

CLEAN CLEAN TECH TECH PARK PARK ONE-TWO ONE-TWO DROP OFF POINT

Terrace covered with PV

MAIN ROAD ARRIVAL AREA

SYSTEM THINKING THINKING VIEW 1 SYSTEM

Board walks

FRESH WATER SWAMP

VIEW 3

BIODIVERSITY BIODIVERSITY HOTSPOT HOTSPOT

EXPLODED EXPLODED AXONOMETRIC AXONOMETRIC

SWAMP NaturalCONNECTOR Features around the site

EXISTING OASIS Connectivity to site

Terrace floor plan Commercial Farm / Services

URA map

FORM DEVELOPMENT STAGE 2

Solar Canopy maximisation

STAGE 3

Fourth Floor Plan Bare Labs/Fitted Labs, Office

Terrace covered Terrace covered with PV with PV

SITE SECTION

Connectivity Connectivity to site to site

AFTER

BEFORE

FORMFORM DEVELOPMENT DEVELOPMENT EXISTING TYPOL-

EXISTING BRIEF

STAGE 2STAGE Land use :2B1 Industry

STAGE 1STAGE 1

PROPOSED TYPOLOGY

Solar Canopy Solar Canopy

STAGE 3STAGE 3

CONNECTING ROAD BOARD WALKS ALONG GARDEN E-DECK CONNECTION

Office Seminar Halls Cafetaria Bare Laboratory Fitted Laboratory Multipurpose room

4

1

BIODIVERSITY BIODIVERSITY HOTSPOT HOTSPOT

MAIN ROAD MAIN ROAD

BIORETENTION BIORETENTION SWAMPSWAMP VIEW 2CONNECTING CONNECTING

ROAD ROAD

EXISTING 1. Building Footprint 2. Asphalt 3. Energy 4. Green TOTAL

54% 2 6 20% 14% 46% 134%

PROPOSED 1. Building Footprint 2. Asphalt 3. Green 4. Public 6. Energy 7. Water 8. Food

46% 7.5% 90% 45.6% 98% 290% 33%

TOTAL

610%

4

3

1 6

MAIN ROAD MAIN ROAD

Office Seminar Halls N Cafetaria Bare Laboratory Fitted Laboratory Multipurpose room

ARRIVALARRIVAL AREA AREA GREEN SYSTEM

SWAMPSWAMP CONNECTOR CONNECTOR

Type 2 Forest area

EXISTING DNA 2

4

DROP OFF DROP POINT OFF POINT

1

EXISTING 1. Building Footprint

N

EXISTINGEXISTING OASIS OASIS PROPOSED DNA

54% 2 6

4

3

1 6

7

GroundRainwater Floor Plan Treatment Office, Seminar plant Halls, cafe

Ground water recharge

Basement Floor Plan

PV PANEL ROOF Municipal Water supply

Oasis conncetion

General Visitors

First FloorFirst PlanFloor Plan Bare Labs/Fitted Bare Labs/Fitted SYSTEMS PLOT RATIO Labs, Office Labs, Office

OF INFLUENCE 2.75 ZONE Zone of influence

Site area: 31,559 sqm

Green Systems Intergation Swamp Gardens

NTU Students Terraced Gardens

45%

Clean Tech Park Visitors

E-deck Link to Clean

Residential/Commercial

SYSTEM ANALYSIS

ZONE OF INFLUENCE PLAN

Ground Floor Ground PlanFloor Plan

Land use : B1 Industry Office, Seminar Office, Seminar Site area : 24000 m2 Halls, cafe Halls, cafe SWAMP GFA : 60,160 m2 The 4,772sqm swamp is extended into site creating gardens around the site. It is located in the first CFA : 72,190 m2 man made fresh water swamp forest of Singapore. Plot Ratio : 2.51 Population : 900 BasementBasement Floor PlanFloor Plan No. of storeys: 6 + Basement Program:

SYSTEMS INTEGRATION VENN DIAGRAM Arrival Plaza Green connector

LANDSCAPE

OASIS SWAMP

• Increase in Biodiversity area. • Increase in fresh water swamps. • Connectivity to the E-Deck. • Connectivity to surrounding residential blocks.

ZONE OF INFLUENCE`

Office Seminar Halls Cafetaria Bare Laboratory Fitted Laboratory N Multipurpose room Commercial Farm Community Park

CLEAN TECK 1&2 /Bioretention ponds Greywater Treatment Swamp plant

E-DECK PLAZA

Site Boundary

PROPOSED BRIEF

PV Panel

Board walks

N

3.66

35

Water Storage Tank

EXISTING OASIS

SITE SECTION

Land use : B1 Industry Site area : 24500 m2 GFA : 60,000 m2 : 72,000 m2 CFA : 2.5 Plot Ratio Population : 900 No. of storeys: 7 + Basement Program:

Swamp water

BIPV Wall panels

Third Floor Third PlanFloor Plan Bare Labs/Fitted Bare Labs/Fitted Labs, Office Labs, Office

(Without Overlaps)

PROPOSED TYPOLOGY

Retention Tank

Systems Integration

DROP OFF POINT

SYSTEMS PLOT RATIO

290% Non portable self-sufficiency

Energy self-sufficiency

Bare Labs/Fitted Bare Labs/Fitted Labs, Office Labs, Office

(With Overlaps)

EXISTING BRIEF Dense Biodiversity

Rainwater

Second Floor Second PlanFloor Plan Biodiversity Bare Labs/Fitted Bare Labs/Fitted connection to Labs, Office Labs, E-DeckOffice type 2 forest

AFTER

Type 2 EXISTING TYPOLForest area

Water Self-sufficiency

Conncetion

GREEN BOARD WALKS BOARD WALKS BEFORE ALONG GARDEN ALONG GARDEN E-DECK E-DECK CONNECTION CONNECTION

SYSTEMS INTEGRATION VENN DIAGRAM

7

30m heiight

2

ZONE OF INFLUENCE PLAN

: B1 Industry Fifth floorFifth Land use planfloor plan : 24000 m2 Site area Fitted labs Fitted labs GFA : 60,160 m2 CFA : 72,190 m2 Plot Ratio : 2.51 Population : 900 No. of storeys: 6 + Basement Program: Fourth Floor Fourth PlanFloor Plan

CONNECTOR

VIEW 3 PROPOSED DNA

First Floor Plan Bare Labs/Fitted Labs, Office

SYSTEM ANALYSIS

ZONE OF INFLUENCE`

PROPOSED BRIEF maximisation maximisation

Office Seminar Halls Cafetaria MAIN ROAD Bare Laboratory Fitted Laboratory AREA Multipurpose Solar Panel Solar size Panel increased sizeARRIVAL increased to maximum to maximum to improve toroom improve Commercial Farm energy efficiency energy efficiency SWAMP Community Park

PROPOSED PROPOSED GROUND GROUND FLOOR FLOOR PLANPLAN EXISTING DNA

BIORETENTION SWAMP

Second Floor Plan Bare Labs/Fitted Labs, Office

Terrace floor Terrace planfloor plan Commercial Commercial Farm / Farm / Services Services

MAIN ROAD

Site area : 24500 m2 GFA : 60,000 m2 : 72,000 m2 CFA : 2.5 Plot Ratio Population : 900 No. of storeys: 7 + Basement Program:

VIEW 1

BIODIVERSITY HOTSPOT

URA map URA map

Public Systems Integration

VIEW 2 Natural Natural Features Features aroundaround the sitethe site

Third Floor Plan Bare Labs/Fitted Labs, Office

Solar Panel size increased to maximum to improve energy efficiency

PROPOSED GROUND FLOOR PLAN

FRESH WATER FRESH WATER SWAMP SWAMP

Swamp /Bioretention ponds

Fifth floor plan Fitted labs

30m heiight

STAGE 1

N

Water Self-sufficiency Rainwater

290% Non portable self-sufficiency Retention Tank

Energy self-sufficiency Swamp water

Systems Integration

BIRDS 140 species of birds are found around the swamp area which can be brought into site through biodiversity

Ground water recharge

Board walks Board walks

BIPV Wall panels

Swamp /Bioretention Swamp /Bioretention ponds ponds BUTTERFLY 26 different species of butterflies can be found in this 1,066 sqm of space around the site.

Municipal Water supply Greywater Treatment plant

CLEAN TECK 1&2

E-DECK PLAZA

Biodiversity connection to

PV Panel

Water Storage Tank

PV PANEL ROOF

N

35

Rainwater Treatment plant

BUILDING INTEGRATION WITH BIODIVERSITY

GR


GREEN SYSTEM

TOTA

4,32

N

Type 2 BIPVarea Panels Forest

BUTTERFLY 26 different species of butterflies can be found in this 1,066 sqm of space around the site.

SOLAR PV PANEL 1. Roof 2. East and west Facade

BIPV PANELS FOR EAST - WEST

BUILDING INTEGRATION WITH BIODIVERSITY

Arrival Plaza Green connector Terraced Gardens

GREEN SYSTEM CONNECTING TO THE SURROUNDING BIO-

Existing waterbody

PUBLIC SPACE

Bioswale Green cover SITE SECTION Bioretention Pond

Rain water Collection Surface

Vegetated Swale

Wetland cleansing Biotope

Sedimentation Basin for removal of larger dirt

site waterbody

NATURAL SWAMP FILTRATION SYSTEM DETAIL

Bioretention pond

The swamp area improves the Biodiversity oof the site and its surrounding by attracting many species of animals, birds and butterflies

Excess Rainwater into the river

Detail section of swamp

Green System 1. Biodiversity extension from adjacent type 2 forest 2. Building green - Biophylic architecture.

site boundary

WATER

Board Walks Bioretention pond

N

SELF(N

RAINWATE

76,

RECYCL

63

BUIL

WATER SYSTEM

Arrival Plaza

N

N

PUBLIC SYSTEM N

1. PROPOSED E-DECK CONNECTION TO SITE

Swamp conncetion 2. CONNECTION TO MRT Proposed WATER SYSTEM CONNECTING TO THE OASIS SYSTEMS OF E-Deck connection 3. CONNECTION TO NTU

FOOD

1. Bioretention Pond 2. Wetland Cleansing Biotope 3. Vegetated Swamp 4. Sedimentation basin 5. Existing waterbody expansion

Sedimentation Pond

1

Board Walks

4 PUBLIC VIEW 1 - ENTRANCE PLAZA

AGRICULT

1

SEL 1

Board Walks

Non-porta

4. CONNECTION TO RESIDENTIAL UNITS 5. PUBLIC SPACES AROUND BIOSWALE, EXISTING AND PROPOSED.

Public access to Biodiversity through cafetaria, seminar halls and recreational spaces around waterbody

Rainwater collection from Solar Canopy

Green leafy Vegetables grown on the roof top VIEW 2 - GARDEN AND SWAMP AREA

ENERGY

Roof top Intense farming system

Kai Lan

Lettuce

Spinach

Bayam

Kang Kong

1. Overhangs shade facade 2. Natural ventilation reduces cooling load Roof of the Industrial building to become potential 3. Planting improves microclimate commercial farming 4. Plants acts as thermal insulation

Roof top Intense farming system

Solar Energy Generation PV Panels

N

5. Water regulates ambient air tempera-

FOOD

ture

SELF-

6. Tall narrow form shades public space FOOD SYSTEM Solar Energy Generation PV Panels 9M A Frame farm over Roof AHU Unit and Chiller Plants Area. As per the building Requirements

COM

Double skin system

INT N

Kinetic louvers

ROOF FUNCENERGY SYSTEM PV Panel Roof for Solar energy collection

Rainwater collection through solar panel roof top

in collaboration with

BIPV Panels

BIPV PANELS FOR EAST - WEST

ENERG

312 Roof top Intense farming system

BUIL

12,

Food collection point

AGRICULT

TOTA

VARSHA BHA 4,3

Master of Science, Integrated Sustainable Design SOLAR PV PANEL 1. Roof 2. East and west Facade

Existing waterbody

site boundary

WATER


Arrival Plaza Green connector Terraced Gardens Green System 1. Biodiversity extension from adjacent type 2 forest 2. Building green - Biophylic architecture.

SITE SECTION

SITE SECTION

PUBLIC SPACE BEFORE

AFTER

EXISTING TYPOL-

EXISTING BRIEF

PROPOSED BRIEF

Land use : B1 Industry Site area : 24500 m2 : 60,000 m2 GFA : 72,000 m2 CFA : 2.5 Plot Ratio Population : 900 No. of storeys: 7 + Basement Program:

Board Walks

Office Seminar Halls Cafetaria Bare Laboratory N Fitted Laboratory Multipurpose room

Arrival Plaza

Board Walks N

EXISTING DNA 2 Proposed 4 1 E-Deck connection

1. PROPOSED E-DECK CONNECTION TO SITE

PROPOSED DNA EXISTING CONNECTION TO MRT 1 6 1. Building 2. Footprint 54% 2 6 4 3 2. Asphalt 3. CONNECTION TO NTU 20% 3. Energy 14% 4. Green 4. CONNECTION TO 46% RESIDENTIAL UNITS TOTAL 134%

5. PUBLIC SPACES AROUND BIOSWALE, EXISTING AND PROPOSED PROPOSED.

ENERGY

1. Building Footprint 2. Asphalt 3. Green 4. Public 6. Energy 7. Water 8. Food

46% 7.5% 90% 45.6% 98% 290% 33%

TOTAL

610%

ZONE OF INFLUENCE PLAN

: B1 Industry Land use : 24000 m2 Site area GFA : 60,160 m2 CFA : 72,190 m2 Plot Ratio : 2.51 Population : 900 No. of storeys: 6 + Basement Program:

PUBLIC SYSTEM

SYSTEM ANALYSIS

ZONE OF INFLUENCE`

PROPOSED TYPOLOGY

Water Self-sufficiency

290% Non portable self-sufficiency

Rainwater

Retention Tank

Energy self-sufficiency Swamp water

Ground water recharge

BIPV Wall panels

VIEW 1 - ENTRANCE PLAZA

PUBLIC

PV PANEL ROOF Municipal Water supply

1

CLEAN TECK 1&2

Greywater Treatment plant

E-DECK PLAZA

E-Deck Conncetion

Biodiversity connection to type 2 forest

Oasis conncetion

Site Boundary

Public access to Biodiversity through cafetaria, seminar halls and recreational spaces around waterbody

PV Panel

Water Storage Tank

SYSTEMS INTEGRATION VENN DIAGRAM

7

35%

Rainwater Treatment plant

Systems Integration

Office Seminar Halls Board Walks Cafetaria Bare Laboratory Fitted Laboratory Multipurpose room Commercial Farm Community Park

SYSTEMS PLOT RATIO (With Overlaps)

SYSTEMS PLOT RATIO (Without Overlaps)

ZONE OF INFLUENCE 2.75 VIEWZone 2 - GARDEN of influenceAND SWAMP AREA Site area: 31,559 sqm

3.66

45%

• Increase in Biodiversity area. • Increase in fresh water swamps. 1. Overhangs shade facade • Connectivity to the E-Deck. 2. Natural ventilation reduces cooling load • Connectivity to surrounding residential blocks. 3. Planting improves microclimate

Green Systems Intergation90

LANDSCAPE

General Visitors

Public Systems Integration

GREEN SYSTEM CONNECTING TO THE SURROUNDING BIOVIEW 2

Bioswale Green cover

Swamp Gardens OASIS SWAMP NTU Students Terraced Gardens

Clean Tech Park Visitors

E-deck Link to Clean

Residential/Commercial

4. Plants acts as thermal insulation

GREEN

Solar Energy Generation PV Panels

5. Water regulates ambient air temperature

Type 2 Forest area

SELF-

6. Tall narrow form shades public space Dense Solar EnergyBiodiversity Generation PV Panels

SWAMP The 4,772sqm swamp is extended into site creating gardens around the site. It is located in the first man made fresh water swamp forest of Singapore.

Double skin system

ENERG

N

Kinetic louvers

ENERGY SYSTEM

2

BIRDS 140 species of birds are found around the swamp area which can be brought into site through biodiversity

N

BUIL

GREE 12,

AGRICULT

GREEN SYSTEM

WATER GREEN SYSTEM CONNECTING TO THE SURROUNDING BIO-

BUTTERFLY 26 different species of butterflies can be found in this 1,066 sqm of space around the site.

SOLAR PV PANEL 1. Roof 2. East and west Facade

4,3

BUILDING INTEGRATION WITH BIODIVERSITY

Arrival Plaza Green connector Terraced Gardens

Green System 1. Biodiversity extension from adjacent type 2 forest 2. Building green - Biophylic architecture.

PUBLIC SPACE

Bioswale Green cover Existing waterbody

SITE SECTION

Bioretention Pond

Rain water Collection Surface Bioretention pond Excess Rainwater

Wetland cleansing Biotope

Vegetated Swale

Sedimentation Basin for removal of larger dirt

site waterbody

NATURAL SWAMP FILTRATION SYSTEM DETAIL The swamp area improves the Biodiversity oof the site and its surrounding by attracting many species of animals, birds and butterflies

wamp

BIPV PANELS FOR EAST - WEST

TOTA

N

site boundary

Type 2 Forest area BIPV Panels

SELF(N

RAINWATE








C'

D

Prédio Contíguo

orme

conf

édio

pr ite do

lim

claraboia

.55

CP= 0.51

3.00 E10 LJTF== 2.70

5.68

16

18

CP= 0.51 LJ = 3.00 TF= 2.50

CP= 0.51 LJ = 3.00 TF= 2.50

CP= 0.51 LJ = 3.00 TF= 2.50

21

20

CP= 0.51 LJ = 3.00 TF= 2.50

CP= 0.51 LJ = 3.00 TF= 2.50

.20

1.15

.38

.65

1.20

.15

1.50

.30

1.50

.15

1.20

.65

.30

.65

1.20

.15

1.50

15

E12

CP= 0.51 LJ = 3.00 TF= 2.70

17

CP= 0.51 LJ = 3.00 TF= 2.70

19

1.71

CP= 0.51 LJ = 3.00 TF= 2.70

E16 4.25

l loi

.30

06

CPP = 16.50

11

4.83

CP= 0.51 LJ = 3.00 TF= 2.70

.38

1.40

2.40

.38

2.71

.30

1.24

11.10

.45

4.05

.38

CP= 0.51

3.00 E09 LJTF== 2.70

2.50

CP= 0.51

var E09 LJTF== var

fg

1.36

de

frig

frig

fn

.65

.20

4.00 CP= 0.51 LJ = 3.00 TF= 2.50

.65

1.30

09

1.20

1.30

CP= 0.51 LJ = 3.00 TF= var

E15 04

2.95

10.00

lareira

2.00

1.30

1.12

.30

5.38

Espaço Verde

e le

nto

me

nta

va

CPP = 16.52

.70

co

ráfi

og

top

08

06 88°

5.29

.20

07

CP= 0.00 LJ = 3.51 TF= 3.21

08

4.84

.75

.45

1.20

1.20

.20

3.60 CPP = 16.50

68°

3.40

CP= 0.00 LJ = 3.51 TF= 3.21

1.10

.62

Prédio Contíguo PT Existente

.40 .45

.20

01

.45 .38

98°

E04

3.40 CP= -0.02 LJ = 3.53 TF= 3.23

3.40

CPP = 15.99

04

1.01

3.40

01

CPP = 13.82

5.92

82° 01

vazio

CPP = 16.37

levantamento

E06

entrada

1.00

E05

.70

io conforme

3.24 1.36

E07 E03

10

CPP = 15.32

CP= 0.21 LJ = 2.70 TF= ...

limite do préd

4.46

pré

10.00 1.50

CP= 0.00 LJ = 3.51 TF= 3.21

2.25 .38

do

con

01 CS= 16.01

A

ite

lim

4.00

dio

03

.70

E08

A'

90° CPP = 16.32

ALÇADO RUA JOÃO BONANÇA

Passeio Existente

RP IT

acesso pedonal limite do prédio conforme levanta mento topográfico 1.50

4.59

AT

CPP = 16.24

80°

.30

5.00

TMP = XX.XX

Topo do murete proposto

TME = XX.XX

Topo do murete existente

Fogão

fn

Forno Lava loiças

mll

Máquina de lavar loiça

mlr

Máquina de lavar roupa

msr

Máquina de secar roupa

mo

Micro-ondas

de

Despenseiro

ch

Chaminé

Legenda de Compartimentos: Espaços interiores: 01

Garagem

cave

02

Arrecadação / Área técnica

cave

03

Área técnica

cave

34.55m²

04

Área polivalente

cave

38.65m²

05

Lavandaria Hall de entrada / circulação

cave

11.00m²

06

piso 0

16.85m²

07

Arrumos

piso 0

08

Lavabo

piso 0

3.00m²

09

Sala de refeições e lounge

piso 0

58.50m²

10

Sala de estar

piso 0

38.45m²

piso 0

34.00m²

11

Cozinha e apoio

12

Escadas de acesso ao piso inferior/0

13

Circulação

piso 0

1.64

118.60m² 8.75m²

3.10m²

27.50m²

14

Circulação

piso 0

22.10m²

15

Quarto 01

piso 0

17.80m²

16

Instalação sanitária privativa 01

piso 0

3.80m²

17

Quarto 02

piso 0

17.80m²

18

Instalação sanitária privativa 02

piso 0

3.80m²

19

Quarto 03

piso 0

17.80m²

20

Instalação sanitária privativa 03

piso 0

3.80m²

21

Quarto 04

piso 0

26.90m²

22

Instalação sanitária privativa 04

piso 0

11.75m²

23

Lavabo

piso 0

3.20m²

E01 Acesso automóvel

Igreja de Nossa Senhora do Carmo

D'

C

Cota de Pavimento/ terreno existente

fg

lloi

Obra Localização

Espaços exteriores:

CPP = 16.42

acesso automóvel 1.50

CPE = XX.XX

Armário técnico para contadores Frigorífico

Limite do prédio conforme levantamento topográfico subscrito por topógrafo e fornecido pelos requerentes.

topográfico

lareira

Cota de Pavimento proposta

Intercomunicador

frig

B'

form

deck

CPP = XX.XX

01

.62

3.30

CS = 00.00

01 02

.30

CP= 0.51 LJ = 3.00 TF= 2.70

Cota de soleira - Corresponde à cota altimétrica de 16.01

Receptáculo postal

IT AT

2.00

92°

10

TF - Altura do tecto falso

RP

CP - Espaço para futura instalação de rolo de cobertura de segurança, a instalar pelo dono de obra. duche

5.79

CPP = 17.10

CPP = 15.80

E11

CP - rolo p/a fechamento da piscina

l loi

frig

LJ - Altura até à laje

TF= X.XX

.83

mll

topográfico limite do prédio conforme levantamento

B

CP - Cota de pavimento

LJ = X.XX

1.09

deck

l loi

1 - Compartimento / espaço CP= X.XX

E17

1.10

.83 .38

01

01

.38

1.10

Legenda de Desenho:

limite

106°

1.13

20

.60

1.28

.30

.80

5.04 3.94

.38

.45

.45 .20

vazio

Prédio Contíguo (Parcela destacada)

CPP = 16.50

3.50

4.85

3.60

12

2.52

ráfico

CP= 0.51 LJ = 3.00 TF= 2.50

topog

1.45

23

Antiga instalação da Escola Industria l de Lagos - Gil Eanes

duche exterior 3.05

CP= 0.51 LJ = 3.00 TF= 2.70

ento

.65

claraboia

rme lev

.38

E14

confo

1.20

claraboia

.15

3.28

édio

.20 1.20

CP= 0.51 LJ = 3.00 TF= 2.70

1.20

2.25 CP= 0.51 LJ = 3.00 TF= 2.50

.30

01 forno

.45

106°

1.20

4.47

antam

CP= 0.51 LJ = 3.00 TF= 2.70

CP= 0.51 LJ = 3.00 TF= 2.70

do pr

14 .45

.48

.38

22

.65

CP= 0.51 LJ = 3.00 TF= 2.70

13

4.63

.38

.65

97°

.38

2.45

.38

1.85

87° duche

.38

limite do prédio conforme levantamento topográfico .38

E13

áfico

pogr

to to

amen

levant

cave

Requerente :

E02 Acesso à garagem

cave

E03 Acesso pedonal à habitação

piso 0

E04 Entrada exterior coberta

piso 0

Contém:

piso 0

PLANTA

E05 Floreira E06 Floreira

piso 0

E07 Estacionamento exterior coberto

piso 0

Fase

:

Acesso pedonal à habitação

piso 0

Data: Abril 20

E09 Terraço semi-coberto / deck

piso 0

Obs.: - Toda

E10 Pátio semi-coberto / Barbecue

piso 0

E08

E11 Piscina (10.00m x 4.00m) E12

Arrumos exteriores

piso 0

E13 Pátio descoberto

piso 0

E14 Pátio semi-coberto

piso 0

E15 Lareira

piso 0

E16 Floreira

piso 0

E17 Escadas de acesso técnico à cobertura

piso 0

E18 Cobertura técnica de acesso condicionado

cob

E19 Cobertura ajardinada

cob

- Deve espe - Deve - Toda deve

Arquitectura: M

Colaboração: A

már

8600 Tel. 28 www.m

















Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.