Victoria Moulin's portfolio

Page 1


E D U C AT I O N S

Victoria Moulin architect

Be an architect, a desire which came to me at the age of 14 and never left me. I have always liked imagine, creating, drawing, matching, doing odd jobs, ... I’m a perfectionist and rigorous, i do not stop as long as I am not satisfied by the accomplished work. I know how to work in a group, I rather have the temperament of a leader, I like making the decisions and to organize the work. I like working the smallest dimension of the architecture, the

scale of live, needs for humans within architecture. Heigne street n°4 Viesville 6230, Belgique Saint Bernardus Street n°73, Saint Gilles 1060, Belgique

2016 - 2018

Master’s degree in architecture with a specialization materiality and ecodesign with distinction at the Faculty of Architecture, Architectural Engineering, Urban Planning (LOCI) of Brussels, Catholic University of Louvain-La-Neuve.

2013 - 2016

Bachelor’s degree in architecture at the Faculty of Architecture, Architectural Engineering, Urban Planning (LOCI) of Brussels, Catholic University of Louvain-La-Neuve.

2012 - 2013

Graduate Certificate of High Education at Saint-Michel du Chapois in Gosselies Math-Language Option.

2007 - 2013

Secondary school at Saint - Michel du Chapois in Gosselies. Belgique.

A R C H IT E CT U R E E X P E R I E N C E S July 2016

Augustus 2017 4 weeks summer intership at ASSAR architects under the direction of Guy Standaert on the theme of the urban fracture with 6 others Belgian and foreign students. Septembre 2018 1 year internship at Quatorze IG, general study office construction in Paris (France). Learning Revit (technical part), feasibility studies, projet site supervision, contest.

9 februari 1995

PROFESSIONAL EXPERIENCES

I have my driver’s license +32495493180 victoria.moulin@gmail.com

3 weeks Internship on construction site in the GIP construct compagny in Chaumont Gistoux, Belgium. (Observation and participation : heating, electricity, investment frame, ...)

Summer 2015

Seasonal saleswoman for a comic strip distribution compagny.

2016 et 2017

Student responsible for summer events for a Belgian publishing house.


SKILLS Autocad Sketch up Photoshop Indesign Revit 3ds Max Velux Daylight Microsoft word LANGUES French

Native language

English

Familiar

Dutch

Poor knowledge

3 weeks internship with EF in Santa Barbara (USA)

I NT E R E ST S A N D P A S S I O N S Dance (since 8), theatre and dicton (3 years), water sport, fitness. Travel (Paris, Cologne, Berlin, Lisbon, Venice, Naples, Athens, Croatia) Realization of a tower of light for the conception of forms (BAC2) The tower consists of triangles assembled by notch and fitting without glue



A R C H IT E CT U R A L E X P E R I E N C E S


INTERSHIP AT QUATORZE IG Intership take place from september 2018 to september 2019 in Paris (13th district).

Quatorze IG is a middle size general study office in construction organize in 5 department: Fluid and energy department, electrical engineering department, economy of construction, BIM and synthesis, execution project management. The choice i made to complete an internship in a general study office allow me to meet and work with various profiles working in construction environment. The internship taking place in Paris, I have the opportunity to work for big and renowned names like Galeries Lafayette or city of Paris’s contest for J.O 2024. Following a description of the various tasks performed at Quatorze IG : - Remodeling 5th floor Galeries Lafayette Haussmann : Monitoring the project from studies to implementation. Realise work phasing plans, work location plans, security plans, accessibility plans and more. Construction supervision, site visits, reserves and reception. - Melt hotel Bordeaux : Realization of the 3d model Revit building techniques: Ventilation, heating, air conditioning and plumbing. Learn about Revit software and basics of air conditioning, plumbing, ... - Science Po 13 U : conducting a feasibility study to bring a building receiving students up to fire standards. - Competition tour Eiffel Olympic Games 2024 : Competition carried out in collaboration with a London architecture office. Realization of a phasing book of the works on the entire site. A

Extrait de plan climatisation, ventilation, chauffage Melt Bordeaux


C

I

0.91

2

1

1.09

B

3

5

4

6

IV

7

0.92 II

0.84

II

D1

D2

Dortoir 8 p.

Dortoir 4 p.

PVC Placo / Faïence Béton lasuré / Placo

PVC Placo / Faïence Béton lasuré / Placo

32.8 m²

Capsule 1

Capsule 2

Capsule 3

Capsule 4

Capsule 5

Capsule 6

D4

D5

Dortoir 4 p.

Dortoir 6 p.

PVC Placo / Faïence Béton lasuré / Placo

PVC Placo / Faïence Béton lasuré / Placo

12.0 m²

12.1 m²

25.3 m²

R

90*120cm

Q

hsd = hsp = 2,73 m hsfp = 2,3 m

TR01

TR01

R1 38

53.9 m²

P

P.In

R1 10

33

P.In

32

Circulation

7

17.37 NGF

ir 2 p.

stockage ?

22

P.In

assise

R1 27

L

2,3 m hsfp = 2,73 m hsp =

hsd =

R1 23

SPUN ROCAT

8 p.

es ho.

² 32.6 m

III 0cm 90*12

es PVC / Faïence éniqu Placo / Dalles hygi Placo

² 19.8 m

0.93

P.In

2,3 m hsfp = 2,73 m hsp =

hsd =

R1 26

² 20.2 m

16 15 14

hsd 2,74 m

13

J

6 0.8

12 11 10

0.92 I

9 8

mpier Voie po

B'

K

PVC / Faïence o Placo lasuré / Plac Béton

0cm 90*12

R1 30

I

ouch WC+d

TR02

PVC / Faïence Placo Placo

ir Dorto

R1 25

P.In R1 29

TR02

. comm Cuis.

P.In R1 24

P.In R1 28

lave linge bouilloire x2 frigo+bac congélateur machine à café x2 lave vaisselle lavabo micro-onde x2 rangements

H

0cm 90*12

P.In

31

hsfp = 2,3 m

D6

P.In

R1

G

hsd = hsp = 2,73 m

M

R1 20

TR01

P.In

R1 19

21

. 12

c e co ïen Pla Fa ré / PV co / lasu ² Pla ton 7m Bé

hsd 2.73 m hsfp 2.40 m

PVC Peinture

P.In

TR02

D rto Do C

F

R1 18

N

0.9

R1

CFA ETAGE

n P.I R1

R1 17 P.In

90*120cm

02

34

CUISINES

20.9 m²

Gaines 1.9843m²

0 14 PP

hsd = hsp = 2,73 m hsfp = 2,3 m

uches fe.

PVC Placo / Faï ence Placo

R1 CFO ETAGE

400 kg Gaine 1,5x1,45m Porte 0,7m

630 kg Gaine 1,8x1,6m Porte 0,9m

R1 16

WC+do

P.In

630 kg Gaine 1,8x1,6m Porte 0,9m

R1 15

m

PRT 140

R1 12

6.9 m²

19

18

17

16

15

14

13

12

9

11

8

10

7

6

5

4

3

1

2

0 14

6.1 m²

PVC Béton lasuré Béton lasuré

R1 13

1.4

Escalier B

PVC Béton lasuré Béton lasuré

T PR n P.I

01

P.In

35

p.

E

R1 14

P.In

R1

36

ir 2

. 12

c e co ïen Pla Fa ré / PV co / lasu ² Pla ton 3m Bé

R1

8

D rto Do C

TR

O P.In

Escalier A

hsd = hsp = 2,73 m hsfp = 2,3 m

11

hsfp = 2,3 m hsd = hsp = 2,73

1

2

3

4

5

7

8

6

9

10

11

12

13

14

15

16

19

1.4

P.In

2UP L = 1.40m H = 3.04m 19 marches

90*120cm

17

Stock 1.9653m²

90*120cm

TR

2UP G = 0,28 m H = 0,16 m 19 marches

n P.I

n P.I

C

18

TR02

Stock 2.4 m²

TR02

7 1.5

TR02

n P.I

D

hsfp = 2,3 m hsd = hsp = 2,73 m

R1 08

40

R1 09

R1 37

PVC Placo / Faïence Béton lasuré / Placo

R1 07

P.In

Dortoir 12 p.

P.In

B

TR01

P.In

D3

4 0.9

hsd = hsp = 2,73 m hsfp = 2,3 m

P.In

1.4

R1 41

P.In

P.In

P.In

A

IV

A'


Local Clim MC

MC

MC

MC

Local Clim

MC

P68

P164

P163

P162

P70

P69

P165

P71

technique

RIA

W.C.

Asc.

Circulation

Cloison grillage

Issues de secours

RDC > R+5

Bureau

Local inacc.

I.S

2 UP

Esc 6

RDC > R+7

Sanit.personnel hommes

Réserve

Esc 6B 2 UP P74

Dégagement

I.S

W.C.W.C.W.C.W.C.

E.A.S

A3 LOT

Bureau

P73

P72

Dégt. technique

NIVEAU

EAS 5A1 3 PMR

Asc.

Asc.

NIVEAU R+5

P60

Gaine

Dégt.

Depuis ET04

Escaliers condamnés

R-3 > R+9

L.T

Réserve

Vers ET06

Réserve

Vers ET06

Vide sur ET04

Réserve

ECHELLE

Réserve

P58

P57

P54

Zone de réception P151

Depuis ET04

P150

1/400

P56

2 UP

Réserve

RDC > R+7

QIG

P55 P155

Esc 7 Bureau

EMETTEUR

Zone en travaux du 04/03/2019 au 03/04/2019

Réserve

PLAN

Zone de projet phase 1 -LAYETTE

Cheminement vers issues de secours

RIA

Réserve

P53

A5-3

TYPE DE DOC.

OP

18159

P38

Dégagement

DATE

RIA

Bureau

P52

P51

Local Sécurité Incendie

RIA

ACCES DEPUIS LA BASE VIE AU R+6 P50

P37

Local Electrique

Local Technique

Zone de réception

RIA

Zone vacante

14/01/2019

Circulation

Bureau Bureau

Esc 9 1 UP

P36

P35 Réserve

AFFAIRE N°

LEGENDE

P34

Bureau

LOT-SPEC.

Réserve

Local Technique

P33

P31

P30

Bureau

P24

Vide

Bureau

P40

MC

P32

Réserve P29

P23

I.S

Vestiaires

Bureau Bureau P28

P.22

Depuis ET04

P09

P.8

(Grille) P.21

P20

P11

DATE

PHASE DCE Local Technique

P12

Bureau RIA

P10

P.7

LT

Zone Inaccessible Bureau

0

Salle de réunion

Réserve

14/01/2019

P.15 Local inaccess.

Vide

P.14

P13

FORMAT

P16

Dégagement

INDICE

I.S

Vestiaires

PLAN N°

PHASE 1: LAYETTE du 04/03/2019 au 12/05/2019

P19 P18

P17 Vers ET06

Salle de réunion

NIVEAU R+5

00

RDC > R+9

INDICE

2 UP

Esc a

Depuis ET04

Vers ET06

Depuis ET04

P176 P 81

P175

P101

P173 Cabine

Depuis ET04

RIA

P 84

P 83

P 82

Depuis ET04

Asc.

I.S

I.S Cabine

Cabine

RIA

P86

P85

I.S

Bureau

Zone Inaccessible Asc.

Asc.

Cabine

Sanitaires

Salle de détente

P335

Bureau

Vers ET06

P336

Bureau

Bureau

Trappe

Vers ET06

P184

Cabine P183 Cabine

P182

W.C

Asc.

Réserve

OPM5-1

Cheminement des ouvriers depuis la base vie du R+6

OP

Cuisine

Asc.

Accès Hélice

P180b

A5-2

Bureau

Bureau

Asc.

P94

P400

P334

P95

P344

R-1 > R+5

Local inacc.

P405

P404 Bureau

P406

Depuis ET04 Vide sur Escalier

I.S

Bureau

Bureau

P180

Asc.

Esc 3 P107

Local Climatisation

3 UP

Esc 4

R-1 > R+7

3 UP

Esc 5 Bureau

L.T

P403

P402

P337

P98

P97

RIA

Circulation P401

Circulation

Asc.

3 UP

R-2 > R+7

P410

P409

P411

P412 P415

Cab P190

P192

P194

P193

P202

P408

P108 P204

P414

P413

RiA

h<1.80m

P203 P343

P338

RIA

Local technique

P416

Clim.

(Grille)

P417

1.7

P418

OPM5-2 P205

P425

P424

P423

P426

P207 P208

EAS

RIA

Rés. d'appro

P206

P210 Cab.

P209

h<1.80m

P419

P420

P421

P422

P339

P211

P437

Réserve

P427

P212

P216

P215

P430

P429

P428

P433

P435

P434

P438

P441

P440

P439

P436

P442

P340

P341

P214 Cab.

P213

Réserve

P605

Vitrine

LT.

LT.

RIA

OPM5-3

P345

P219

P501

Cab.

P500

P346

P503

P502

RIA

P504 P505

P604

P601

OPA5-1

P614

Cab.

Cabine

P506

Cab.

P600

EAS 5H1 3 PMR

P603

P602

P605 Cab.

P615 Caisses

P220

RIA

Local ménage

P221

WC WC WC P617WC

P222 P507

P515

P606

P613

WC WC WC WC

P348

P347

P223

I.S

P616

MAITRE D'OEUVRE

RDC > R+6

Vers ET06

Depuis ET04

Esc 10 2 UP

Vers ET06

P342

P225

Zone Inacc.

Réserve

Ventilation

Vers ET06

P227 L.T Inaccessible

RIA

Inaccessible

AE Depuis ET04

P230

Local Technique

P228

Réserve

P350

RIA

P514

Réserve

P349

P513

P511

P512

P612

P509

Réserve P607

P618

P608

P609

P610

P611

RIA

WC

Cab. h<1.80m

Réserve

Réserve

Réserve

h<1.80m

P351

Esc 11 2 UP

Sanitaires publics femmes

WC WC WC WC P508

P510

Réserve

Soubassement

P352

OPH5-1

h<1.80m

P519

OPH5-2

WC

P622

Accès pompier

P518

WC

Sanitaires publics hommes

P623

WC

P624

Cab

Depuis ET04

h<1.80m

P620

P625 Réserve

Réserve

h<1.80m

P517

WC

WC PMR

I.S Vers ET06

P621

Réserve

h<1.80m

P516

RDC > R+6

Tel. 01.81.69.54.80 contact@quatorze-ig.com

P200

64, rue du Dessous des Berges 75013 Paris

EAS 5M1 3 PMR

PARIS

Cabine

PLAN DE CHEMINEMENT D'ISSUES DE SECOURS DE LA PHASE 1 : LAYETTE

P172

Depuis ET04

RDC > R+5

GL Remodeling R+5

P171

Depuis ET04

Vers ET06

Réserve P170

Esc 15 2 UP

40, Boulevard Haussmann

Robinet d'incendie armé

WC WC

Change bébé

h<1.80m

P627

h<1.80m

RDC > R+6

P.60

Soubassement P628

Esc 12 3 UP

Cab

Cab

h<1.80m

P626

P629

WC

Cab

Rés

WC

WC PMR

Pl.

P633 Réserve P630 P632

OPH5-3

Exemple of security plan, phasing work plan, evacuation plan.

Elevation of a arrangement : realisation of execution plans for the construction compagny.

Pictures site supervision : weekly visits, controls of work done.


Excerpt from the phasing book for the Eiffel Tower contest. Macro phasing of the site.



P R O J E CT S R E A L I Z E D D U R I N G U N IV E R S ITY C O U R S E Projects realized during university course of 5 years at LOCI BRUXELLES.


C O L L E CT IV E H O U S I N G individual project third year bachelier 2015 - 2016, semester 1

The project consists on the realization of an apartment building in a fictional context which was imposed on us. The project has a north-west facade with street and a south-east facade in contact with the garden. The last two facades are against adjoining 14 meters high. The program consists on 12 apartments frome 0 to 4 bedrooms. The first desire was to open the building towards the back to take advantage of the south east orientation. The challenge was to allow every apartment to benefit from the best orientation. The apartments overlap along the adjoining, from the largest four bedrooms apartment to the small studio, giving place to an inner courtyard. The entrane to the building is made by a void at all levels on the side of the facade. The inhabitants can take one of the 2 circulations or enjoy the courtyard. Servants spaces are settled along the adjoining. Adjoinings become inhabited walls where bathroom, small office space, storage, laundry follow on after the other. Living rooms and bedrooms enjoy large corner openings and balconies overlooking the courtyard.



Coupe AA’

Coupe BB’

Plan rez de chaussée

Plan rez + 1


Elevation nord ouest

Plan rez + 4

Plan rez + 2

Plan rez + 3


F R I E N D L I N E S S A N D S P O RT Pairs project first year of Master 2016 - 2017 , semester 2

The project consist on the realization of a fitness gym and a community center in the North of the city center of Charleroi. The plot is at the end of an avenue. A park, which covers the ring of Charleroi, borders the rear of the plot. The program requires working with small and large ranges at the structural level. We chose to work with a wood structure. The project settles down a few meters back from the street to create a smal place that allows users to settle. A contrast is created between the horizontality of the gym, which is part of the slope, and the verticality of the neighborhood house, which aligns with the templates of other buidings in the street. Pedestrian and bike access to the park is created along the gym. The ascent is slow and allows to observe the athletes in full exercise. The ground floor welcome a ÂŤ game coffee ÂŤ where young and old can come to play a board game or a eletronic game. Locker rooms is located in the back side of the park. They allow the players to reach directly the fitness gym. The cafetaria settle down on the first floor, with a wide view on the gym, an access to the terraces but also a terrace that leads to the park. The following floors welcome the functions of the community center : a library, creative studios, an computer room and a multipurpose room on the top floor to enjoy the view of the city. We chose to work with completely glazed facades in front of which a wooden cladding sieve the light.





A MUSICAL HIDING Individual Project second year of Bachelor 2014 - 2015, semester 2

The project is set up in Saint-Gilles, a municipality in the Brussels metropolitan. The plot was chosen during a preliminary group work. The program consists on housing and a commercial function to choose according to the needs of the neighborhood. The chosen plot is located on one of the main street of the town, ChaussÊe de Waterloo. It is lined with small shops and housing in floors. The plots of the street are, on the whole, very narrow in front and long towards the interior. The worked plot of land measures 4 meter of wide and 28 meter of length. The town hosts several music school but no concert place to allow young artists to occur. The creation of a musical hiding offers to all a meeting place, learning and the opportunity to occur in front of a small public. The project is divided into 3 parts separated by patios. The first part consist on a ground floor for the musical hiding and a triplex 3 bedrooms. The second part is a small concert hall. The third place is a duplex intended to welcome a student. 3 parts are connected between them by corridors opened on patios. The triplex works in half-levels to win a maximun of place by avoiding big flights of staircase. A central core stiffens the structure of the complex and houses the water features. The inhabitants of the triplex share their life with the musical hiding. Indeed, during concert evenings, a gallery is accessible trough the resident’s stay to admire the artists. This concert space changes function as the day progresses. In the morning and afternoon, it is a place of learning. At the end of the afternoon, it is a place of meetings and sharing for adults and children. In the evening, the room livens up and becomes a place of scenic performance.


Les différentes ambiances au fur et à mesure de la journée. la matinée l’après midi et le soir.


Coupe 1/200

Plan d'implantation 1/1000

Elevation 1/1000

Elevation 1/200


Plan rez de chaussĂŠee 1/200

Plan rez + 1

Plan rez + 2

Plan rez + 3


A N I N H A B I T E D D I KE

Individual project first year of bachelor 2013 - 2014, semester 2

the project is located in Tubize, in Brabant Wallon, Belgium. The town has been hit several times by major floods further to the overflowing of the Seine. A meadow, situated in the middle of the city and crossed by the Sein, serves as storm basin. It’s on this meadow that we were suggested us to set up a dike accompanied by a lake and a restaurant area. The dike established discreetly in the landscape. it is composed of triangular panels covered with grass of different sizes and different slopes. The dike winds, dilates and retracts. Cones of 3 triangular pieces stand on the dike to protect and guide the users along the sinuous course. The restaurant area is hidden in the dike. It can be reached by being on the dike by a staircase along a cone or by a ramp which comes down directly along the water point. Cabins for the bathing and the restauration area are enlightened by 2 light shaft. These are created by the absence of a piece of cones installed on the dike. The shape of cones is visible from the inside. The terrace allows to settle down at the water’s edge.


1/500


I N D U ST R I A L L A N D S C A P E T O U P G R A D E D Pairs project second year of Master , 2017 - 2018, semester 1

The project of the year in master's degree invites the students to wonder about a territory and to develop a vision thoughout a project . The chosen site is located west of Charleroi city center, the old mining town in southern Belgium. A wide zone abandoned by the man where falls in ruins what remains coal mines and steel industry. For the first part of the analysis, we were interested in the nature of the soil and the plants that invaded the old industrial facilities. It is an extremely polluted site. it is morever for that reason that this territory stays without new function In the second part of the project, we suggest cleaning up the site by the phytoremediation. this technique involves planting plant species that can accumulate heavy metals in their sheets. The site being vast we suggest proceeding in 3 times on 3 different pieces of the territory. Each of these zones, once cleared , could be reused. One of the areas was particulary developed, the one that we were most impressed due to the scale of the vestiges of the industry, the one that we shall consider as symbolic. We suggest to cleaning up the zone in several phasesand by installing, as one goes along, the necessary equipments. A training place, offices, cafetaria take place in an already present industrial building on the site. Secondly, a storage place as well as a greenhouse settle down in two others small buildings on the site. The last stage of the project proposes to create a square along the road of Mons with a building of exhibition and concert on the high part of the site. A new public place which emphasizes the industrial heritage of the ÂŤblack CountryÂť






S P E C I A L I Z AT I O N : M AT E R I A L ITY ET É C O - D E S I G N This option aims to confront student with the interaction between constructs ans structural aspects of the envelopes and their details with the formal intentions of the architect


P R OT E CT OV E R T I M E Materiality and eco design option, three students work 2016 - 2017, semester 1

The materiality and eco-design module A option is developed over a semester and aims particularly at the constructive design and at the perfomances. The project consists in designing a new envelope for a building (Ucl Agro Faculty located at Croix du Sud 1-4) In Louvain-La-Neuve. This building is mainly built of concrete. Circular columns ending in capitals support large concrete slabs. These slabs extend in front to create a corridor serving as evacuation path. The railings create lonh horizontal bands. The entire facade is glazed between columns. The thermal losses of these buildings are catastrophic. The simple glazing hangs on the column by a simple joint. The slab that extends outside represents a significant thermal weakness. The first part of the work will try to solve the problems of energy perfomance and physical environments (light, acoustic, hydrothermal). The second part will consist in putting in place the devices chosen in the first part by reaching a good technical (watertighnesses, thermal and acoustic resistances, ...) We chose to work on a facade exposed south. The challenge was to protect from glare throughout the day but also to enjoy the sun to warm up the classes in winter. We chose horiontal sunshades. We determined their nombers and their orientations by a series of iterations tested on Velux Daylight Vizualizer as well as on Ecotect. The different situations have been tested in order to avoid a maximum dazzling of the users. Technically, we chose to work with a curtain wall. On each floor, we placed a lenght of 1 meter 20 to reduce thermal losses that would have generated a completely glazed facade. This one consists on a sandwich panel. The curtain walls create facades punctuated by the amounts and the through which are the only elements in relief. We wanted to avoid the visual impact of this structure of curtain wall by choosing profiles with a cap to create vacuum joints between components. The attachment of the sunshade system has also been studied in detail.


Raccord au ciel

Raccord au plancher

Raccord au sol


A CARDBOARD FACADE Materiality and eco design option, three student work 2017 - 2018, semester 1

Module B of the materiality and eco-design options aims to experiment with the different aspects and requirements related to the materiality of an envelope built by the realization of a prototype. The exercise involves designing and creating a life-size facade wall. The design is based on several theoretical supports concerning envrionmental impacts of building materials, the analysis of life cycles, the adaptability, the flexibility and the reversibility of construction systems. twelve students work on the same wall with a primary structure common. The wall is then divided into 4 strips of 1m wide by 3m high. Groups of three students are formed to work on the facing of the facade : thermal insulation, air and watertightness, interior finish, ... Our group of twelve chose to work with recycled or re-used materials. During the discussions two materials drew our attention : the tire, using in the constructions ÂŤEarthshipÂť and the cardboard, in particular the cardboard tubes used by the Japanese architecte Shigeru Ban. After several weeks of discussions, drawings and harvest of materials we were able to realize a sample to test the constructive system which we had just invented. This experience allowed us to understand that it was not easy to operate certain details as we had drawn. The structure is finally composed of 18cm diameter cardboard mandrels anchored in three tires. Then, we create a coffering OSB and DWD filled with cellulose. We also wanted to use cardboard for the floor. The latter is composed of mandrels, small cardboard tubes of 5cm diameter and honeycombed cardboard of 6cm thick. Finally, it was necessary to attack the construction of the entire wall. A big challenge for a part of the groupe which had never had the opportunity to make such a structure. It was neccessary to us one week to build the total of our prototype. For the facade material, our groupe of three chose plastic. We discovered Govaplasr, which makes panel from recycled plastic chips. The panels produced by the compagny are used to make terraces and fences. We met the challenge to adapt their system to be able to apply it in facade. The firm supplied us the small pastic plays which allows to fix panels. We completed the fixing system with small steel angles. The plastic panels are fixed to the structure by means of a wooden battens. I personally chose to take care of the organization of the group (realieation planning, distribution of the tasks, ...) but also the drawing of the technical detail.


Structure réalisée par le groupe de 12





A R C H IT E CT U R A L D R AW I N G S Freedhand drawings realized during the 3rd year of bachelor






Victoria Moulin Heigne street n°4 6230 Viesville Belgium Phone : +32495493180 victoria.moulin@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.