E D U C AT I O N S
Victoria Moulin architect
Be an architect, a desire which came to me at the age of 14 and never left me. I have always liked imagine, creating, drawing, matching, doing odd jobs, ... I’m a perfectionist and rigorous, i do not stop as long as I am not satisfied by the accomplished work. I know how to work in a group, I rather have the temperament of a leader, I like making the decisions and to organize the work. I like working the smallest dimension of the architecture, the
scale of live, needs for humans within architecture. Heigne street n°4 Viesville 6230, Belgique Saint Bernardus Street n°73, Saint Gilles 1060, Belgique
2016 - 2018
Master’s degree in architecture with a specialization materiality and ecodesign with distinction at the Faculty of Architecture, Architectural Engineering, Urban Planning (LOCI) of Brussels, Catholic University of Louvain-La-Neuve.
2013 - 2016
Bachelor’s degree in architecture at the Faculty of Architecture, Architectural Engineering, Urban Planning (LOCI) of Brussels, Catholic University of Louvain-La-Neuve.
2012 - 2013
Graduate Certificate of High Education at Saint-Michel du Chapois in Gosselies Math-Language Option.
2007 - 2013
Secondary school at Saint - Michel du Chapois in Gosselies. Belgique.
A R C H IT E CT U R E E X P E R I E N C E S July 2016
Augustus 2017 4 weeks summer intership at ASSAR architects under the direction of Guy Standaert on the theme of the urban fracture with 6 others Belgian and foreign students. Septembre 2018 1 year internship at Quatorze IG, general study office construction in Paris (France). Learning Revit (technical part), feasibility studies, projet site supervision, contest.
9 februari 1995
PROFESSIONAL EXPERIENCES
I have my driver’s license +32495493180 victoria.moulin@gmail.com
3 weeks Internship on construction site in the GIP construct compagny in Chaumont Gistoux, Belgium. (Observation and participation : heating, electricity, investment frame, ...)
Summer 2015
Seasonal saleswoman for a comic strip distribution compagny.
2016 et 2017
Student responsible for summer events for a Belgian publishing house.
SKILLS Autocad Sketch up Photoshop Indesign Revit 3ds Max Velux Daylight Microsoft word LANGUES French
Native language
English
Familiar
Dutch
Poor knowledge
3 weeks internship with EF in Santa Barbara (USA)
I NT E R E ST S A N D P A S S I O N S Dance (since 8), theatre and dicton (3 years), water sport, fitness. Travel (Paris, Cologne, Berlin, Lisbon, Venice, Naples, Athens, Croatia) Realization of a tower of light for the conception of forms (BAC2) The tower consists of triangles assembled by notch and fitting without glue
A R C H IT E CT U R A L E X P E R I E N C E S
INTERSHIP AT QUATORZE IG Intership take place from september 2018 to september 2019 in Paris (13th district).
Quatorze IG is a middle size general study office in construction organize in 5 department: Fluid and energy department, electrical engineering department, economy of construction, BIM and synthesis, execution project management. The choice i made to complete an internship in a general study office allow me to meet and work with various profiles working in construction environment. The internship taking place in Paris, I have the opportunity to work for big and renowned names like Galeries Lafayette or city of Paris’s contest for J.O 2024. Following a description of the various tasks performed at Quatorze IG : - Remodeling 5th floor Galeries Lafayette Haussmann : Monitoring the project from studies to implementation. Realise work phasing plans, work location plans, security plans, accessibility plans and more. Construction supervision, site visits, reserves and reception. - Melt hotel Bordeaux : Realization of the 3d model Revit building techniques: Ventilation, heating, air conditioning and plumbing. Learn about Revit software and basics of air conditioning, plumbing, ... - Science Po 13 U : conducting a feasibility study to bring a building receiving students up to fire standards. - Competition tour Eiffel Olympic Games 2024 : Competition carried out in collaboration with a London architecture office. Realization of a phasing book of the works on the entire site. A
Extrait de plan climatisation, ventilation, chauffage Melt Bordeaux
C
I
0.91
2
1
1.09
B
3
5
4
6
IV
7
0.92 II
0.84
II
D1
D2
Dortoir 8 p.
Dortoir 4 p.
PVC Placo / Faïence Béton lasuré / Placo
PVC Placo / Faïence Béton lasuré / Placo
32.8 m²
Capsule 1
Capsule 2
Capsule 3
Capsule 4
Capsule 5
Capsule 6
D4
D5
Dortoir 4 p.
Dortoir 6 p.
PVC Placo / Faïence Béton lasuré / Placo
PVC Placo / Faïence Béton lasuré / Placo
12.0 m²
12.1 m²
25.3 m²
R
90*120cm
Q
hsd = hsp = 2,73 m hsfp = 2,3 m
TR01
TR01
R1 38
53.9 m²
P
P.In
R1 10
33
P.In
32
Circulation
7
17.37 NGF
ir 2 p.
stockage ?
22
P.In
assise
R1 27
L
2,3 m hsfp = 2,73 m hsp =
hsd =
R1 23
SPUN ROCAT
8 p.
es ho.
² 32.6 m
III 0cm 90*12
es PVC / Faïence éniqu Placo / Dalles hygi Placo
² 19.8 m
0.93
P.In
2,3 m hsfp = 2,73 m hsp =
hsd =
R1 26
² 20.2 m
16 15 14
hsd 2,74 m
13
J
6 0.8
12 11 10
0.92 I
9 8
mpier Voie po
B'
K
PVC / Faïence o Placo lasuré / Plac Béton
0cm 90*12
R1 30
I
ouch WC+d
TR02
PVC / Faïence Placo Placo
ir Dorto
R1 25
P.In R1 29
TR02
. comm Cuis.
P.In R1 24
P.In R1 28
lave linge bouilloire x2 frigo+bac congélateur machine à café x2 lave vaisselle lavabo micro-onde x2 rangements
H
0cm 90*12
P.In
31
hsfp = 2,3 m
D6
P.In
R1
G
hsd = hsp = 2,73 m
M
R1 20
TR01
P.In
R1 19
21
. 12
c e co ïen Pla Fa ré / PV co / lasu ² Pla ton 7m Bé
hsd 2.73 m hsfp 2.40 m
PVC Peinture
P.In
TR02
D rto Do C
F
R1 18
N
0.9
R1
CFA ETAGE
n P.I R1
R1 17 P.In
90*120cm
02
34
CUISINES
20.9 m²
Gaines 1.9843m²
0 14 PP
hsd = hsp = 2,73 m hsfp = 2,3 m
uches fe.
PVC Placo / Faï ence Placo
R1 CFO ETAGE
400 kg Gaine 1,5x1,45m Porte 0,7m
630 kg Gaine 1,8x1,6m Porte 0,9m
R1 16
WC+do
P.In
630 kg Gaine 1,8x1,6m Porte 0,9m
R1 15
m
PRT 140
R1 12
6.9 m²
19
18
17
16
15
14
13
12
9
11
8
10
7
6
5
4
3
1
2
0 14
6.1 m²
PVC Béton lasuré Béton lasuré
R1 13
1.4
Escalier B
PVC Béton lasuré Béton lasuré
T PR n P.I
01
P.In
35
p.
E
R1 14
P.In
R1
36
ir 2
. 12
c e co ïen Pla Fa ré / PV co / lasu ² Pla ton 3m Bé
R1
8
D rto Do C
TR
O P.In
Escalier A
hsd = hsp = 2,73 m hsfp = 2,3 m
11
hsfp = 2,3 m hsd = hsp = 2,73
1
2
3
4
5
7
8
6
9
10
11
12
13
14
15
16
19
1.4
P.In
2UP L = 1.40m H = 3.04m 19 marches
90*120cm
17
Stock 1.9653m²
90*120cm
TR
2UP G = 0,28 m H = 0,16 m 19 marches
n P.I
n P.I
C
18
TR02
Stock 2.4 m²
TR02
7 1.5
TR02
n P.I
D
hsfp = 2,3 m hsd = hsp = 2,73 m
R1 08
40
R1 09
R1 37
PVC Placo / Faïence Béton lasuré / Placo
R1 07
P.In
Dortoir 12 p.
P.In
B
TR01
P.In
D3
4 0.9
hsd = hsp = 2,73 m hsfp = 2,3 m
P.In
1.4
R1 41
P.In
P.In
P.In
A
IV
A'
Local Clim MC
MC
MC
MC
Local Clim
MC
P68
P164
P163
P162
P70
P69
P165
P71
technique
RIA
W.C.
Asc.
Circulation
Cloison grillage
Issues de secours
RDC > R+5
Bureau
Local inacc.
I.S
2 UP
Esc 6
RDC > R+7
Sanit.personnel hommes
Réserve
Esc 6B 2 UP P74
Dégagement
I.S
W.C.W.C.W.C.W.C.
E.A.S
A3 LOT
Bureau
P73
P72
Dégt. technique
NIVEAU
EAS 5A1 3 PMR
Asc.
Asc.
NIVEAU R+5
P60
Gaine
Dégt.
Depuis ET04
Escaliers condamnés
R-3 > R+9
L.T
Réserve
Vers ET06
Réserve
Vers ET06
Vide sur ET04
Réserve
ECHELLE
Réserve
P58
P57
P54
Zone de réception P151
Depuis ET04
P150
1/400
P56
2 UP
Réserve
RDC > R+7
QIG
P55 P155
Esc 7 Bureau
EMETTEUR
Zone en travaux du 04/03/2019 au 03/04/2019
Réserve
PLAN
Zone de projet phase 1 -LAYETTE
Cheminement vers issues de secours
RIA
Réserve
P53
A5-3
TYPE DE DOC.
OP
18159
P38
Dégagement
DATE
RIA
Bureau
P52
P51
Local Sécurité Incendie
RIA
ACCES DEPUIS LA BASE VIE AU R+6 P50
P37
Local Electrique
Local Technique
Zone de réception
RIA
Zone vacante
14/01/2019
Circulation
Bureau Bureau
Esc 9 1 UP
P36
P35 Réserve
AFFAIRE N°
LEGENDE
P34
Bureau
LOT-SPEC.
Réserve
Local Technique
P33
P31
P30
Bureau
P24
Vide
Bureau
P40
MC
P32
Réserve P29
P23
I.S
Vestiaires
Bureau Bureau P28
P.22
Depuis ET04
P09
P.8
(Grille) P.21
P20
P11
DATE
PHASE DCE Local Technique
P12
Bureau RIA
P10
P.7
LT
Zone Inaccessible Bureau
0
Salle de réunion
Réserve
14/01/2019
P.15 Local inaccess.
Vide
P.14
P13
FORMAT
P16
Dégagement
INDICE
I.S
Vestiaires
PLAN N°
PHASE 1: LAYETTE du 04/03/2019 au 12/05/2019
P19 P18
P17 Vers ET06
Salle de réunion
NIVEAU R+5
00
RDC > R+9
INDICE
2 UP
Esc a
Depuis ET04
Vers ET06
Depuis ET04
P176 P 81
P175
P101
P173 Cabine
Depuis ET04
RIA
P 84
P 83
P 82
Depuis ET04
Asc.
I.S
I.S Cabine
Cabine
RIA
P86
P85
I.S
Bureau
Zone Inaccessible Asc.
Asc.
Cabine
Sanitaires
Salle de détente
P335
Bureau
Vers ET06
P336
Bureau
Bureau
Trappe
Vers ET06
P184
Cabine P183 Cabine
P182
W.C
Asc.
Réserve
OPM5-1
Cheminement des ouvriers depuis la base vie du R+6
OP
Cuisine
Asc.
Accès Hélice
P180b
A5-2
Bureau
Bureau
Asc.
P94
P400
P334
P95
P344
R-1 > R+5
Local inacc.
P405
P404 Bureau
P406
Depuis ET04 Vide sur Escalier
I.S
Bureau
Bureau
P180
Asc.
Esc 3 P107
Local Climatisation
3 UP
Esc 4
R-1 > R+7
3 UP
Esc 5 Bureau
L.T
P403
P402
P337
P98
P97
RIA
Circulation P401
Circulation
Asc.
3 UP
R-2 > R+7
P410
P409
P411
P412 P415
Cab P190
P192
P194
P193
P202
P408
P108 P204
P414
P413
RiA
h<1.80m
P203 P343
P338
RIA
Local technique
P416
Clim.
(Grille)
P417
1.7
P418
OPM5-2 P205
P425
P424
P423
P426
P207 P208
EAS
RIA
Rés. d'appro
P206
P210 Cab.
P209
h<1.80m
P419
P420
P421
P422
P339
P211
P437
Réserve
P427
P212
P216
P215
P430
P429
P428
P433
P435
P434
P438
P441
P440
P439
P436
P442
P340
P341
P214 Cab.
P213
Réserve
P605
Vitrine
LT.
LT.
RIA
OPM5-3
P345
P219
P501
Cab.
P500
P346
P503
P502
RIA
P504 P505
P604
P601
OPA5-1
P614
Cab.
Cabine
P506
Cab.
P600
EAS 5H1 3 PMR
P603
P602
P605 Cab.
P615 Caisses
P220
RIA
Local ménage
P221
WC WC WC P617WC
P222 P507
P515
P606
P613
WC WC WC WC
P348
P347
P223
I.S
P616
MAITRE D'OEUVRE
RDC > R+6
Vers ET06
Depuis ET04
Esc 10 2 UP
Vers ET06
P342
P225
Zone Inacc.
Réserve
Ventilation
Vers ET06
P227 L.T Inaccessible
RIA
Inaccessible
AE Depuis ET04
P230
Local Technique
P228
Réserve
P350
RIA
P514
Réserve
P349
P513
P511
P512
P612
P509
Réserve P607
P618
P608
P609
P610
P611
RIA
WC
Cab. h<1.80m
Réserve
Réserve
Réserve
h<1.80m
P351
Esc 11 2 UP
Sanitaires publics femmes
WC WC WC WC P508
P510
Réserve
Soubassement
P352
OPH5-1
h<1.80m
P519
OPH5-2
WC
P622
Accès pompier
P518
WC
Sanitaires publics hommes
P623
WC
P624
Cab
Depuis ET04
h<1.80m
P620
P625 Réserve
Réserve
h<1.80m
P517
WC
WC PMR
I.S Vers ET06
P621
Réserve
h<1.80m
P516
RDC > R+6
Tel. 01.81.69.54.80 contact@quatorze-ig.com
P200
64, rue du Dessous des Berges 75013 Paris
EAS 5M1 3 PMR
PARIS
Cabine
PLAN DE CHEMINEMENT D'ISSUES DE SECOURS DE LA PHASE 1 : LAYETTE
P172
Depuis ET04
RDC > R+5
GL Remodeling R+5
P171
Depuis ET04
Vers ET06
Réserve P170
Esc 15 2 UP
40, Boulevard Haussmann
Robinet d'incendie armé
WC WC
Change bébé
h<1.80m
P627
h<1.80m
RDC > R+6
P.60
Soubassement P628
Esc 12 3 UP
Cab
Cab
h<1.80m
P626
P629
WC
Cab
Rés
WC
WC PMR
Pl.
P633 Réserve P630 P632
OPH5-3
Exemple of security plan, phasing work plan, evacuation plan.
Elevation of a arrangement : realisation of execution plans for the construction compagny.
Pictures site supervision : weekly visits, controls of work done.
Excerpt from the phasing book for the Eiffel Tower contest. Macro phasing of the site.
P R O J E CT S R E A L I Z E D D U R I N G U N IV E R S ITY C O U R S E Projects realized during university course of 5 years at LOCI BRUXELLES.
C O L L E CT IV E H O U S I N G individual project third year bachelier 2015 - 2016, semester 1
The project consists on the realization of an apartment building in a fictional context which was imposed on us. The project has a north-west facade with street and a south-east facade in contact with the garden. The last two facades are against adjoining 14 meters high. The program consists on 12 apartments frome 0 to 4 bedrooms. The first desire was to open the building towards the back to take advantage of the south east orientation. The challenge was to allow every apartment to benefit from the best orientation. The apartments overlap along the adjoining, from the largest four bedrooms apartment to the small studio, giving place to an inner courtyard. The entrane to the building is made by a void at all levels on the side of the facade. The inhabitants can take one of the 2 circulations or enjoy the courtyard. Servants spaces are settled along the adjoining. Adjoinings become inhabited walls where bathroom, small office space, storage, laundry follow on after the other. Living rooms and bedrooms enjoy large corner openings and balconies overlooking the courtyard.
Coupe AA’
Coupe BB’
Plan rez de chaussée
Plan rez + 1
Elevation nord ouest
Plan rez + 4
Plan rez + 2
Plan rez + 3
F R I E N D L I N E S S A N D S P O RT Pairs project first year of Master 2016 - 2017 , semester 2
The project consist on the realization of a fitness gym and a community center in the North of the city center of Charleroi. The plot is at the end of an avenue. A park, which covers the ring of Charleroi, borders the rear of the plot. The program requires working with small and large ranges at the structural level. We chose to work with a wood structure. The project settles down a few meters back from the street to create a smal place that allows users to settle. A contrast is created between the horizontality of the gym, which is part of the slope, and the verticality of the neighborhood house, which aligns with the templates of other buidings in the street. Pedestrian and bike access to the park is created along the gym. The ascent is slow and allows to observe the athletes in full exercise. The ground floor welcome a ÂŤ game coffee ÂŤ where young and old can come to play a board game or a eletronic game. Locker rooms is located in the back side of the park. They allow the players to reach directly the fitness gym. The cafetaria settle down on the first floor, with a wide view on the gym, an access to the terraces but also a terrace that leads to the park. The following floors welcome the functions of the community center : a library, creative studios, an computer room and a multipurpose room on the top floor to enjoy the view of the city. We chose to work with completely glazed facades in front of which a wooden cladding sieve the light.
A MUSICAL HIDING Individual Project second year of Bachelor 2014 - 2015, semester 2
The project is set up in Saint-Gilles, a municipality in the Brussels metropolitan. The plot was chosen during a preliminary group work. The program consists on housing and a commercial function to choose according to the needs of the neighborhood. The chosen plot is located on one of the main street of the town, ChaussĂŠe de Waterloo. It is lined with small shops and housing in floors. The plots of the street are, on the whole, very narrow in front and long towards the interior. The worked plot of land measures 4 meter of wide and 28 meter of length. The town hosts several music school but no concert place to allow young artists to occur. The creation of a musical hiding offers to all a meeting place, learning and the opportunity to occur in front of a small public. The project is divided into 3 parts separated by patios. The first part consist on a ground floor for the musical hiding and a triplex 3 bedrooms. The second part is a small concert hall. The third place is a duplex intended to welcome a student. 3 parts are connected between them by corridors opened on patios. The triplex works in half-levels to win a maximun of place by avoiding big flights of staircase. A central core stiffens the structure of the complex and houses the water features. The inhabitants of the triplex share their life with the musical hiding. Indeed, during concert evenings, a gallery is accessible trough the residentâ&#x20AC;&#x2122;s stay to admire the artists. This concert space changes function as the day progresses. In the morning and afternoon, it is a place of learning. At the end of the afternoon, it is a place of meetings and sharing for adults and children. In the evening, the room livens up and becomes a place of scenic performance.
Les différentes ambiances au fur et à mesure de la journée. la matinée l’après midi et le soir.
Coupe 1/200
Plan d'implantation 1/1000
Elevation 1/1000
Elevation 1/200
Plan rez de chaussĂŠee 1/200
Plan rez + 1
Plan rez + 2
Plan rez + 3
A N I N H A B I T E D D I KE
Individual project first year of bachelor 2013 - 2014, semester 2
the project is located in Tubize, in Brabant Wallon, Belgium. The town has been hit several times by major floods further to the overflowing of the Seine. A meadow, situated in the middle of the city and crossed by the Sein, serves as storm basin. Itâ&#x20AC;&#x2122;s on this meadow that we were suggested us to set up a dike accompanied by a lake and a restaurant area. The dike established discreetly in the landscape. it is composed of triangular panels covered with grass of different sizes and different slopes. The dike winds, dilates and retracts. Cones of 3 triangular pieces stand on the dike to protect and guide the users along the sinuous course. The restaurant area is hidden in the dike. It can be reached by being on the dike by a staircase along a cone or by a ramp which comes down directly along the water point. Cabins for the bathing and the restauration area are enlightened by 2 light shaft. These are created by the absence of a piece of cones installed on the dike. The shape of cones is visible from the inside. The terrace allows to settle down at the waterâ&#x20AC;&#x2122;s edge.
1/500
I N D U ST R I A L L A N D S C A P E T O U P G R A D E D Pairs project second year of Master , 2017 - 2018, semester 1
The project of the year in master's degree invites the students to wonder about a territory and to develop a vision thoughout a project . The chosen site is located west of Charleroi city center, the old mining town in southern Belgium. A wide zone abandoned by the man where falls in ruins what remains coal mines and steel industry. For the first part of the analysis, we were interested in the nature of the soil and the plants that invaded the old industrial facilities. It is an extremely polluted site. it is morever for that reason that this territory stays without new function In the second part of the project, we suggest cleaning up the site by the phytoremediation. this technique involves planting plant species that can accumulate heavy metals in their sheets. The site being vast we suggest proceeding in 3 times on 3 different pieces of the territory. Each of these zones, once cleared , could be reused. One of the areas was particulary developed, the one that we were most impressed due to the scale of the vestiges of the industry, the one that we shall consider as symbolic. We suggest to cleaning up the zone in several phasesand by installing, as one goes along, the necessary equipments. A training place, offices, cafetaria take place in an already present industrial building on the site. Secondly, a storage place as well as a greenhouse settle down in two others small buildings on the site. The last stage of the project proposes to create a square along the road of Mons with a building of exhibition and concert on the high part of the site. A new public place which emphasizes the industrial heritage of the ÂŤblack CountryÂť
S P E C I A L I Z AT I O N : M AT E R I A L ITY ET Ă&#x2030; C O - D E S I G N This option aims to confront student with the interaction between constructs ans structural aspects of the envelopes and their details with the formal intentions of the architect
P R OT E CT OV E R T I M E Materiality and eco design option, three students work 2016 - 2017, semester 1
The materiality and eco-design module A option is developed over a semester and aims particularly at the constructive design and at the perfomances. The project consists in designing a new envelope for a building (Ucl Agro Faculty located at Croix du Sud 1-4) In Louvain-La-Neuve. This building is mainly built of concrete. Circular columns ending in capitals support large concrete slabs. These slabs extend in front to create a corridor serving as evacuation path. The railings create lonh horizontal bands. The entire facade is glazed between columns. The thermal losses of these buildings are catastrophic. The simple glazing hangs on the column by a simple joint. The slab that extends outside represents a significant thermal weakness. The first part of the work will try to solve the problems of energy perfomance and physical environments (light, acoustic, hydrothermal). The second part will consist in putting in place the devices chosen in the first part by reaching a good technical (watertighnesses, thermal and acoustic resistances, ...) We chose to work on a facade exposed south. The challenge was to protect from glare throughout the day but also to enjoy the sun to warm up the classes in winter. We chose horiontal sunshades. We determined their nombers and their orientations by a series of iterations tested on Velux Daylight Vizualizer as well as on Ecotect. The different situations have been tested in order to avoid a maximum dazzling of the users. Technically, we chose to work with a curtain wall. On each floor, we placed a lenght of 1 meter 20 to reduce thermal losses that would have generated a completely glazed facade. This one consists on a sandwich panel. The curtain walls create facades punctuated by the amounts and the through which are the only elements in relief. We wanted to avoid the visual impact of this structure of curtain wall by choosing profiles with a cap to create vacuum joints between components. The attachment of the sunshade system has also been studied in detail.
Raccord au ciel
Raccord au plancher
Raccord au sol
A CARDBOARD FACADE Materiality and eco design option, three student work 2017 - 2018, semester 1
Module B of the materiality and eco-design options aims to experiment with the different aspects and requirements related to the materiality of an envelope built by the realization of a prototype. The exercise involves designing and creating a life-size facade wall. The design is based on several theoretical supports concerning envrionmental impacts of building materials, the analysis of life cycles, the adaptability, the flexibility and the reversibility of construction systems. twelve students work on the same wall with a primary structure common. The wall is then divided into 4 strips of 1m wide by 3m high. Groups of three students are formed to work on the facing of the facade : thermal insulation, air and watertightness, interior finish, ... Our group of twelve chose to work with recycled or re-used materials. During the discussions two materials drew our attention : the tire, using in the constructions ÂŤEarthshipÂť and the cardboard, in particular the cardboard tubes used by the Japanese architecte Shigeru Ban. After several weeks of discussions, drawings and harvest of materials we were able to realize a sample to test the constructive system which we had just invented. This experience allowed us to understand that it was not easy to operate certain details as we had drawn. The structure is finally composed of 18cm diameter cardboard mandrels anchored in three tires. Then, we create a coffering OSB and DWD filled with cellulose. We also wanted to use cardboard for the floor. The latter is composed of mandrels, small cardboard tubes of 5cm diameter and honeycombed cardboard of 6cm thick. Finally, it was necessary to attack the construction of the entire wall. A big challenge for a part of the groupe which had never had the opportunity to make such a structure. It was neccessary to us one week to build the total of our prototype. For the facade material, our groupe of three chose plastic. We discovered Govaplasr, which makes panel from recycled plastic chips. The panels produced by the compagny are used to make terraces and fences. We met the challenge to adapt their system to be able to apply it in facade. The firm supplied us the small pastic plays which allows to fix panels. We completed the fixing system with small steel angles. The plastic panels are fixed to the structure by means of a wooden battens. I personally chose to take care of the organization of the group (realieation planning, distribution of the tasks, ...) but also the drawing of the technical detail.
Structure réalisée par le groupe de 12
A R C H IT E CT U R A L D R AW I N G S Freedhand drawings realized during the 3rd year of bachelor
Victoria Moulin Heigne street n°4 6230 Viesville Belgium Phone : +32495493180 victoria.moulin@gmail.com