Victoria Su Architecture Portfolio Undergraduate

Page 1

VICTORIA SU

2017 ARCHITECTURE PORFOLIO | Undergraduate


VICTORIA SU vsu2@illinois.edu

224-808-0703

EDUCATION University of Illinois Urbana-Champaign B.A. in Architectural Studies | 2014-2018

SKILLS Design Software Rhino AutoCad Revit

WORK EXPERIENCE University of Illinois Foundation Student Development Representative | Summer 2016 Communicated with University of Illinois alumni and built rapport to facilitate a personal connection with patrons of the University Giving Foundation. Worked alongside the University of Illinois to raise funds to support all three University of Illinois campuses (Urbana-Champaign, Chicago, and Springfield) Raised funding for other University associated programs such as the I4, Illinois Public Media NPR, and Allerton Park

Caffe Bene Barista | June 2016 - December 2016 Maintained cleanliness within the café, including sweeping tables and floors, maintaining kitchen and prep area, and removing trash. Prepared and served beverages and food in accordance with health codes and café standards. Worked on registers to authorize returns and exchanges, and audit receipts. Worked alongside members of upper management to guarantee top customer service. Completed tasks in a timely manner to meet time sensitive deadlines

Vini’s Pizza Cashier/Food Maintenance | June 2014 - August 2015 Sliced and boxed pizzas for carry out and delivery. Authorized phone and online transactions. Maintained cleanliness within the restaurant, including sweeping tables and floors, maintaining kitchen and prep area, and removing trash. Worked on registers to authorize returns and exchanges, and audit receipts. Completed tasks in a timely manner to meet time sensitive deadlines

ORGANIZATIONS

3DS Max

NOMAS (National Organization of Minority Architecture Students) Secretary | 2015-Present

Photoshop Illustrator

Promote social and professional events within the school of architecture. Work with professional firms and organizations to give students professional networking opportunities. Provide computer programming and resume building workshops to students.

Indesign

Honduras Water Project Team Member | 2016 - 2017

Premiere Pro

Used 3D modeling software to design a sustainable gravity flow water system. Partnered with a Non-Governmental Organization in Honduras to implement our design.

Languages English Taiwanese Spanish Mandarin

AWARDS + CERTIFICATES Louise Woodroofe Prize Winner | Spring 2017 Awarded to student based on juried competition of freehand drawings IDEA Regional AutoCad Competition Third Place | Spring 2014 Students must replicate a 2D AutoCad drawing under time allotted (one hour).


CONTENTS LIVE/WORK COMPLEX Champaign, IL | Spring 2017 CABINS + COMMUNITY HOUSE Kickapoo State Park, IL | Fall 2016 CAFFE VERDE SOLARIUM Urbana, IL | Fall 2016 SEASONS MARKET Champaign, IL | Spring 2016 APARTMENT 308 Champaign, IL | Spring 2016


LIVE/WORK COMPLEX Champaign, IL | Spring 2017



Floor Plans 1-6

Street Elevation


Section A-A

CIRCULATION PUBLIC PRIVATE

Section B-B

Spatial + Circulation Diagram


CABINS + COMMUNITY HOUSE Kickapoo State Park, IL | Fall 2016


“Two roads diverged in a wood, and I took the one less traveled by and that has made all the difference.” -Robert Frost

N

FLOOR PLAN 1/8” = 1’-0”

20’

40’

80’

Site Plan


EXISTING PATH CANOE/WATER PATH LODGING PATH

Cabin Section

Path Diagram

Cabin Floor Plan


Community House Deck

Cabin Interior


Handcut Cabin Section Model | Basswood + Corkboard


Site Model | Basswood + MDF + Foam


CAFFE VERDE SOLARIUM Urbana, IL | Fall 2016


B

A

A

B

Floor Plan + Surrounding Context

Form Diagram


Section A-A

Section B-B


Solarium Hallway

Northern Exterior


SEASONS MARKET Champaign, IL | Spring 2016


Closed Stall Winter

Open Stall Summer

3D Site Axon

Stall Diagram

Interior Closed


Elevation

Section Perspective


Building Model | Mat Board + MDF + Corrugated Cardboard


APARTMENT 308 Champaign, IL | REVIT Spring 2016

Southeast Perspective

South Elevation


$

. .

&

.

$ $

+

$

)

+

%

$

)

$

%

%

&

$

$

$ $ ) $

$

%

&

+

$ &

&

*

$

&

(

&

&

) )

'1

1

%

%

$

%

$

&

&

$

)

&

83

$

$

+

)

)

$

$

+

%

$

$

$

)

&

&

&

)

$

&

)

83

$ +

$

$

$

83 83

$

$

%

$

$ %

&

$

%

$

$

$

%

$

$

&

&

$

$

$

)

$ $

$

$

$

$ %

$

)

$

%

$

&

&

% %

+ $

)

$

.

$

+

$

) $

$

)

$

&

$

$

$

$ D

&

+

'

$

&KHFNHU

)

%

)

$

$ %

& $

%

& $

$

Fifth Floor Plan

Building Section

&KHFNHG

$

+

$

)LQDO

$

+

%

) $

+

&

+

$

$XWKRU

$

'1

% +

&

%

3URMHFW

& $

&

'UDZQ

&

)

'DWH

)

)

$

$

$

$

$

$0

$

$ $

)LIWK )ORRU 3ODQ

(

)

6FDOH

$ &

$UFK 3URI 5DQGDOO 'HXWVFK

)

&

&

( *5((1

& $


WALL TYPE N1 & N2 REFER TO PLAN FOR LOCATIONS. SEE WALL SCHED. FOR ASSEMBLY.

GLASS GUARDRAIL 6 A5.4

ELASTOMERIC COATING ON ALL EXPOSED CONCRETE - COLOR SELECTED BY ARCHITECT

1"-0 TYP

CONC. UPTURNED BEAM (TYP) SEE STRUCT.

CONTINUOUS SEALANT B/T FLASHING & CONC. ELASTOMERIC COATING, COLOR TO BE SELECTED BY ARCHITECT.

BLACK ROD & SEALANT

2" RIGID INSULATION PLAZAMATE (R-10)

CONT. FLASHING, SEALANT BETWEEN FLASHING & CONCRETE

HYDROTECH ROOF MEMBRANE

CONCRETE SLAB. SLOPE TO DRAIN - REFER TO A1.04 FSP

2

CONTINUOUS DRIP EDGE

COMPRESSIBLE GASKET

PARKING 3" MINERAL WOOL INSULATION AT HEAD OF WALL IN STUD CAVITY

CMU STABILIZER CLIP, SEE STRUCT.

3" SPRAY FOAM W/GYP, SEE WALL SCHEDULE

T/SECOND FLOOR SLAB EL +14-8 RENFORCE AND GROUT SOLID WALL PER STRUCTURAL DRAWINGS

PROPERTY LINE

A4.2 1/2" = 1'-0"

E2 WALL TO STOP AT TOP OF CURB

REINFORCED CONCRETE SLAB ON GRADE W/ FROST WALL REFER TO STRUCTURAL DRAWINGS FOR DETAILS

A500

7 3/8"-0

NON-STRUCTURAL CONCRETE SLAB SLOPE MIN 2% AWAY FROM BUILDING EDGE, SEE CIVIL DRAWINGS

1

12 A5.1

8" CURB SEE S2.16

12 A5.1

Kristen R.

METAL PAN FLASHING WITH INTEGRAL WEEP

Checked:

TYPICAL EXTERIOR CMU WALL CONSTRUCTION WALL TYPE E2 8" CMU SPLIT FACE BLOCK 2"X2" STUDS ON INTERIOR SIDE 2" SPRAY FOAM (R-14) LAYER 5/8" DENSGLASS

CMU CLIP, SEE 1/52.16

Victoria Su

METAL DRIP EDGE, EMBED IN CMU HEAD JOINT.

Wall Details

3/10/2016 2:02:52 AM

A5.1 #12 1" = 1'-0"

Drawn:

3

2

CONC. UPTURNED BEAM (TYP) SEE STRUCT.

3/10/15

NOTE: ALL RIGID INSULATION TO MEET THE REQUIREMENTS OF 1040 TEST OR SIMILAR AND THE CHARACTERISTICS OF FOAM PLASTIC BOARD INSULATION AS DEFIED IN THE SPECIFICATION UNDER ASTM C 578 AND ASTM 3 84 (REFER TO SPEC)

PARKING

Date:

TPO ROOF MEMBRANE OVER MIN 2" RIGID INSULATION SLOPED TO DRAIN, 2" MIN, (R-10 AVERAGE)

3' - 2"

TYP. TERM BAR/COUNTER FLASHING - REFER TO ROOF DETAIL SHEET A53

6"-0

3" SEMI-RIGID MINERAL WOOL BOARD INSULATION WITH INTEGRAL FACING, R13

ELASTOMERIC COATING ON ALL EXPOSED CONCRETE - COLOR SELECTED BY ARCHITECT

A4.2 Construction Details

8 A5.1

FILL BOTTOM 6" OF STUD CAVITY WITH MINERAL WOOL INSULATION

Project:

2" KINGSPAN INSULATED METAL PANEL SYSTEM (R-14)

308 E. GREEN

STOP INSULATION AND GYP. AT TOP OF CURB

Arch 233 Prof. Randall Deutsch

METAL FLASHIGN WITH INTEGRAL WEEP

As indicated

TYPICAL EXTERIOR METAL WALL CONSTRUCTION WALL TYPE N • 2' INSULATED METAL PANEL (R-14) KINGSPAN SYSTEM W/ SEALED JOINTS • 1/2" AIR SPACE • FLUID APPLIED AIR BARRIER • 5/8" DENSGLASS SHEATHING • 6" METAL STUD

A5.1 #8 1" = 1'-0"

3" SEMI-RIGID MINERAL WOOL BOARD INSULATION W/ INTEGRAL FACING, R-13

Scale:

3' - 2"

GRAVEL T/FIFTH FLOOR SLAB EL +43'-10"

FLASHING, CONTINUATION OF WATERPROOFING FROM ABOVE


8" CMU SPLIT FACE BLOCK, 2 HR

3" BATT INSULATION IN WALLS ADJACENT TO BATHROOMS (A2) 1 LAYER 5/8" GYPSUM BOARD EACH SIDE

Wall Type A 1" = 1'-0"

Wall Type A4 1" = 1'-0"

3" SPRAY FOAM @ EXTERIOR WALLS AND BETWEEN TEMPERED AND UNTEMPERED SPACES ONLY

3/8" MORTAR JOINT

1 LAYER 5/8" GYPSUM BOARD ON EACH SIDE

0' - 7 1/4" TYPICAL U.N.O.

4

12" CONCRETE FOR PAINT - SEE STRUCT DWGS

1 LAYER OF 5/8" DENSGLASS ON INTERIOR SIDE & 2" SPRAY FOAM

0' - 5" TYPICAL U.N.O.

1

2" X 2" STUDS ON INTERIOR SIDE

6" METAL STUD @ 16" O.C. 1' - 4" O.C.

1' - 4" O.C.

3/8" METAL STUD @ 16" O.C.

1 LAYER OF 5/8" GYP BD

SEE STRUCT DWGS FOR VERTICAL & HORIZONTAL JOINT REINFORCEMENT SPEC.

2" X 3" METAL STUDS, 24" O.C. ELASTOMERIC COATING AT EXTERIOR LOCATIONS

0' - 10 1/4"

7

Wall Type E2 1" = 1'-0"

10

Wall Type K4 1" = 1'-0" 6" METAL STUD @24" O.C.

5/8" GYP. BD. 6" METAL STUD @24" O.C. W/4" MINERAL FIBER INSULATION (R-15 MAX)

8" CMU SPLIT FACE BLOCK, 2 HR

4" BATT INSULATION IN WALLS ADJACENT TO BATHROOMS (A2)

SEE STRUCT DWGS FOR VERTICAL &HORIZONTAL JOINT REINFORCEMENT SPEC.

1 LAYER 5/8" GYPSUM BOARD ON EACH SIDE

ELASTOMERIC COATING AT EXTERIOR LOCATIONS

5/8" DENSGLASS EXT. SHEATHING FLUID APPLIED AIR BARRIER 1/2" AIR SPACE

3" SEMI-RIGID MINERAL WOOL BOARD INSULATION 9"-0

0' - 5" TYPCIAL U.N.O.

3

Wall Type A2 1" = 1'-0"

6

Wall Type E 1" = 1'-0"

1' - 0"

9

Wall Type K 1" = 1'-0"

9 3/4" 0

12

Wall Type N2 1" = 1'-0"

A901

1' - 4" O.C.

3/8" MORTAR JOINT

24" O.C.

12" CONCRETE FOR PAINT - SEE STRUCT DWGS

3 5/8" METAL STUD @ 16" O.C.

2" INSULATED METAL PANEL (R-14)

3/10/2016 2:02:56 AM

Wall Type N 1" = 1'-0"

1" = 1'-0"

11

Kristen R.

Wall Type H 1" = 1'-0"

Checked:

8

Vicky Su

Wall Type A5 1" = 1'-0"

Drawn:

5

2

Wall Type A1 1" = 1'-0"

3/10/15

2

Scale:

9 1/4" 0

4" MINERAL FIBER INSULATION (R-15 MAX) TO EXTEND 6" ABOVE UPTURN BEAMS

Wall Section Details

2" INSULATED METAL PANEL (R-14)

1 LAYER 5/8" GYPSUM BOARD ON EACH SIDE

308 E. GREEN

1/2" AIR SPACE

Date:

1 LAYER 5/8" GYPSUM BOARD ON ONE SIDE ONLY

24" O.C.

4" MIN BATT INSULATION

FLUID APPLIED AIR BARRIER

Project:

1 LAYER 5/8" GYPSUM BOARD ON 1 SIDE ONLY

3 5/8" METAL STUD @ 16" O.C.

1' - 4"

3" BATT INSULATION IN WALLS ADJACENT TO BATHROOMS (A2)

6" METAL STUD @ 16" O.C. 1' - 4" O.C.

1' - 4" O.C.

3 5/8" METAL STUD @16" O.C.

Arch 233 Prof. Randall Deutsch

5/8" DENSGLASS EXT. SHEATHING

Wall Details


Thank you


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.