![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/8067344b844c2639c7af1af0ebbe6329.jpeg?width=720&quality=85%2C50)
1 minute read
Urban development Lomas Verdes
Estado de México, Mexico
2022
Advertisement
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/36c97c36a16528ff5cc60e99be0d13f2.jpeg?width=720&quality=85%2C50)
Collaboration with:
The Topography of the site has a big amount of slopes that are bigger than 25%, wich represent a challenge for in matters of construction. Also there are Natural Restrictions that affect the land becouse of the pass of the rain water and the conection with the natural reserve, this natural conditions guide the design of the new inside roads and the distribution of the properties.
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/7177db3b3b6c8a72ee1bc22c2a46bcd3.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/2dedbb0ff4e89b43d3fe38f60b7ae730.jpeg?width=720&quality=85%2C50)
GLA: 25 -30%
Max Levels: 10
+ 70% of Permeable open space
The project it´s located on Estado de México, in a land where there is a lot of slopes that marks the guide of how to organize the position of the buildings, keeping the relationship with the desire high that can allow them to have an open clear view. Secondly, the project kept an important portion of Open spaces that the people can use for practice open air activities and sports, this can be possible by optimizing the land space available, this base it´s use after for the propose of new design guidelines that are thinking to be use for the future owners in order to keep the urban image of the natural reserve.
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/2bf97882ceaf575c2a371810368b22b7.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/2c38fb0681e52d9f9ad4535ec5c4ab88.jpeg?width=720&quality=85%2C50)
Finally, the project considers a Commercial Area that complete the master plan, so the design aims the development of the zone by keeping save the natural conditions of the zone
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/df1c23d643768cdb7124b213fcf90098.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/65f6c96724e44937c1dae6823a4f4355.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/5e0fff2f2c4e6851255e2ac6b7b4a110.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230313225352-2a284a41ef3b289bbf27352dfb746511/v1/26506c2585653766621328693689a222.jpeg?width=720&quality=85%2C50)