PROFESSIONAL WORKS | 2016 - 2021 BOWEN VICTOR ZHANG, AIA
VICTOR ZHANG, AIA REGISTERED ARCHITECT/PROJECT DESIGNER AT HLW
PROFILE
WORK EXPERIENCE
My primary experience has been working on commercial and creative office type projects in the Los Angeles area. My projects range from new construction to adaptive reuse projects of various sizes. Having worked though all phases of design and construction, I have a well rounded understanding of the industry and what I can offer and contribute to the project at hand. Coming from a design background, I care deeply about creating the best design solutions while staying grounded to the constraints of the real world. Problem will always surface in life and I pride myself in my problem-solving abilities.
HLW International
In my free time, I love playing tennis, cooking, and finding a cafe to spend the day reading in. I also enjoy digging deeper into current events and perspectives that diversify the way I think.
Project Architect / Project Designer
774-275-4335 bowenvzhang@gmail.com Los Angeles, CA
Santa Monica, CA May 2016 - Present
Project Experience: Schematic Design/Design Development: • Research market comps during design phases to deliver unique solutions/products. • Produce design presentations for review by client and other stakeholders. • Utilize 3D softwares such as Sketchup and Revit to create 3D models and visuals. • Present conceptual and schematic design decks to clients and other stakeholders. • Coordinate with consultants to determine preliminary systems for pricing and construction feasibility.
Construction Documentation and Administration: • Attain approvals and permits from governing city and state agencies. • Coordinate consultants to produce CDs for bidding and construction. • On-site inspection of construction progress and communication with G.C and trades. • Review construction RFIs, submittals, and change orders during construction phase.
Professional Works: 180 E Ocean Blvd - repositioning of commercial office building
SD-CA
2901 Wilshire Blvd - facade renovation of medical office building
SD-CA
Union Bank Plaza - revitalization of prominent retail plaza in DTLA
SD-CD
Google Building E - repositioning of office building for tech client
SD-CD
N. Vine Campus - adaptive re-use and ground up creative office campus
SD-DD
USC East Library - study for ground up office tower for education client
SD
Zhujiang Beer HQ - international competition for mixed-use project.
SD
Gensler Internship Pembrooke and Ives Internship
Boston, MA May 2015 - Aug 2015 New York, NY Jun 2014 - Nov 2014
CERTIFICATIONS AND ORGANIZATIONS SOFTWARES
Registered Architect in California
Nov 2019 - Present
Revit SketchUp Rhino Adobe Illustrator Adobe Photoshop Adobe InDesign Microsoft Suite Enscape V-Ray Auto CAD Grasshopper
Urban Land Institute YLG
Jun 2019 - Present
ACE Mentor Program Team Leader
May 2016 - Present
LANGUAGES
A.C.E. Mentor of the Year Mango Vinyl Hub Design Competition - Honorable Mention Thesis Exhibition Prize Ralph T. Walker Travel Grant King and King Design Competition
English (Fluent) Mandarin Chinese (Fluent) Spanish (Proficient)
EDUCATION Syracuse University, Bach. Architecture Magna Cum Laude Total GPA: 3.56/ Design GPA: 3.82
Syracuse, NY Sep 2011 - May 2016
AWARDS Feb 2018 Jun 2017 May 2016 Nov 2015 May 2015
CONTENTS HIGHLIGHT PROJECTS: ZHUJIANG BEER HQ
pg 4-15
International competition of 2 million SF mixed-use campus for ZhuJiang Beer Co. including office, luxury hotel, apartments and five story commercial podium.
CBS West Coast HQ
Competition for 275, 000 sf HQ building for CBS in the Los Angeles. Building program includes office space, cafeteria, executive suites, and 90 seat screening room.
180 E. OCEAN BLVD. Building repositioning of existing Class-A office building including expansion of
pg 16-23
pg 24-31
main lobby, addition of eyebrow canopy, and typical corridor upgrades.
2901 WILSHIRE BLVD. Facade recladding, ground level exterior improvements and interior lobby and
pg 32-39
UNION BANK PLAZA Revitalization of existing food and retail plaza at high profile location in DTLA.
pg 40-45
corridor upgrades of existing four story medical office building.
Scope of work includes new landscape, canopy and facade cladding.
N. VINE CAMPUS 95,000 sf campus comprised of existing two-story historic building and three story
pg 46-55
ground-up creative office building with central amenity courtyard.
MISC PROJECTS: MANGO VINYL HUB
pg 56-57
UBP CORAL TREE PLAZA
pg 58-59
VIBE ARTS DISTRICT
pg 60
WAREHOUSE ON GRAND
pg 61
USC EAST LIBRARY BUILDING
pg 62
GOOGLE BUILDING E
pg 63
ZhuJiang Beer HQ Owner: ZhuJiang Beer Co. Location: GuangZhou, China HLW Project Team: David Swartz (P.I.C.), Bicen Ye (P.M.), Victor Zhang (Project Designer), Jianxin Li (Job Captain), Weina Li (Interior Designer), Keith Tu (Arch. Designer) Collaboration Partner in China: CNS
The ZhuJiang Beer HQ competition is an international competition for a 2 million SF mixed-use, waterfront development including office HQ for ZhuJiang Beer Co, for lease office space, luxury hotel and apartment tower, and 5 story commercial podium. In addition to the new construction, a variety of industrial buildings scattered accross the site were available for adaptive re-use instead of razing all existing site conditions. At the center of our design philosophy was the idea of preserving the existing to compliment the new. When approaching a site with a variety of disparate elements, it was essentail to interlace the old with the new, the river and the city, the industrail and the luxury, traditional and modern lifestyles etc. The vision for the project is to create a continuous 24-hr circadian cycle of activity that will bring in life through all hours of the day and maximize the usage of development by the public in addition to the everyday workers.Through the use of design and attantion to the various calm and energetic experiences that one could experience, Pearl River Beer HQ should be a one of a kind experience for all ages and types of people.
4
5
Natural Interlace is the core and foundation of our concept: Natural Interlace in the beer loop.The loop is a natural interlace bringing the different components of the project together - the existing structures, rivers and neighboring communities are the natural components that inspired us to creat the beer loop. Natural Interlace in the key architectural design elements.The horizontal bars interlace the buildings in and out of the campus together cohesively.The detail in the opening of the exteriror walls on the hotel level intercacing indoor and outdoor, nature and manmade elements, to create a harmoniouse environment.Using of the solar panels on the roof is a form of interlacing with nature to optimize the building.
Axonometric
Unique to the Zhujiang Beer HQ site is not only the proximity to the river, what is also unique is the abundance of programs and activities for various user groups around the entire CBD zone. Thus a symbiotic relationship can be established where the CBD zone provides people of all backgrounds to potentially visit our site while our site can provide relief from the monotony of office towers and apartment buildings with fun and dynamic experiences throughout a 24 hour cycle. When viewed seperately, the main programs of the development and the associated user groups underutilized the site. The office program is only active dring working hours, residential program is only utilized in after-work hours and hospitality program does not provide for other incentive to stay on the site other than resting at night. How can design be used to connect these programs to not only create more foot traffic onto the site throughout all hours of the day and also enrichthe time already spent on the site?
Formal Strategy
Existing Condition: Party Pier has no connection to site
Modify Party Pier: Massing of Party Pier is pulled back and pushed to create spatial hierarchy and larger public spaces.
Maximum Building Massing: Explore the new building massing per zoning code and floor area requirements.
Connecting Urban Axis: Modify maximum building massing to connect central building axis to Party Pier axis.
Setback Podium Massing: Set back podium levels around central plaza for a more human-scale public space and to allow for terracing green spaces at various levels.
Smoothen Massing: Podium and tower massings are smoothened to create organic form that emphasizes central plaza and provides various sweeping views.
Horizontal Connection Bars: Horizontal connection bars bridge buildings throughout the site and help unify identity of the site.
Proposed condition: Urban Loop connecting site to larger urban context is placed on site with areas of overlap with site loop.
Program Diagram
建筑设计
|
新建筑设计
功能剖面
酒店裙楼
ARCHITECTURAL DESIGN
BUILDING SECTION Department Legend
Sections
Level 24
104500 100000
Level 23 Level 22 Level 21 Level 20 Level 19 Level 18 Level 17 Level 16 Mezzanine Level 15 Level 14 Level 13 Level 12 Level 11
|
新建筑设计
Level 10 Level 9 Level 8 Level 7
办公楼
95500 91700 87200 82700 78200 73700 69400 65100 60800 56800 52800 49000 45000 41000 37000 33000 29000 25000
Level 6 BUILDING SECTION 20000 Level 5 Level 4
Department Legend
Level 3 Level 2
AMENITY
Level 1
15000 10000 5000 0
OFFICE PARKING REFUGE RESTAURANT RETAIL
69400
BOH
HOTEL
1
19
18
17
ne
78200
2000
8600
82700
5000 3400 3400 3400 3400 3400 3400 3400 3400 3400 5200
87200
42000 38600 35200 31800 28400 25000 20000 15000 10000 5000 0 -4500 -7500 -10500
Level 14 Level 13 Level 12 Level 11 Level 10 Level 9 Level 8 Level 7 Level 6 Level 5 Level 4 Level 3 Level 2 Level 1 B1 B2 B3
15000 10000 5000 0 -4500
52200 48800 45400 42000 38600 35200 31800 28400 25000 20000
-7500 -10500
Level 17
Level 16 Level 15 Level 14 Level 13 Level 12 Level 11 Level 10 Level 9 Level 8 Level 7 Level 6 Level 5 Level 4 Level 3 Level 2 Level 1 B1 B2 B3
LEGEND
Department Legend Amenity AMENITY Apartment APARTMENT BOH B.O.H.
Circulation CIRCULATION HOTEL Hotel OFFICE Office
Parking PARKING Refuge REFUGE Restaurant RESTAURANT Retail RETAIL
PODIUM & HOTEL SECTION1
1 73700 8 1 : 500 69400 65100 60800
69400
228 600
20
91700
5000
21
95500
55600
5000
22
100000
60800
5000
23
69400
5000
24
104500
45400
Level 15
226
3000 3000 4500
25
109000
48800
ARCHITECTURAL
RETAIL
0 4300 4300 4500 4500 4500 4500 3800 4500 4500 4500 4500 4500
26
52200
Level 16
1 : 650
酒店裙楼RESTAURANTBUILDING SECTION
113500
55600
Level 17
SECTION @ PODIUM & HOTEL
PARKING
120000 118000
60800
ARCHITECTURAL DESIGN
APARTMENT
CIRCULATION 新建筑设计
8600
Level 25
109000
HOTEL
300030004500 5000 5000 5000 5000 5000 340034003400340034003400340034003400 5200
Level 26
113500
2000
Level 27
120000 118000
5000 5000 5000 5000 5000 4000 4000 4000 4000 4000 400038004000 4000 4300 4300 4300 4500 4500 4500 4500 3800 4500 4500 4500 4500 4500
CIRCULATION Parapet Level 28
能剖面
27
APARTMENT BOH
筑设计
et 28
AMENITY
184
60800
Level 1
9
Ground Level Site
Ground Level Site Plan
Thrid Level Site Plan
Level Three Site Plan
10
View From Urban Park
View From Campus Track
11
BEER GARDEN CONCEPT: Resting at the top of the hotel/residential tower and connecting to the office tower, the Sky Beer Garden provides a space of leasure and exploration for both the daily office workers and visiting guests. Maant to showcase the history, innovation, and creativity of the Zhujiang Beer company. Designed as an open 建筑设计 新建筑设计 ARCHITECTURAL DESIGN plan, the the|in only interupted by the playful geometries of various exhibits and meeting programs to provide a meandering experience for those visiting. The ceiling of the exhibition space is composed of circular geometries that feel up to provide natural lighting into the space while also implying the texture of beer 啤酒文化中心设计概念 SPATIAL VISION bubbles floating the the surface.
216
Sky Beer Garden Concept Axon
12
吧台 BAR
企业展厅 CORPORATE SHOWROOM
吧台 BAR
展厅 SHOWROOM
餐厅/食堂 RESTAURANT
吧台 BAR
接待 RECEPTION
餐厅/食堂 RESTAURANT
多功能厅 CONFERENCE
建筑设计
会议 新建筑设计 CONFERENCE
|
建筑平面图
展厅 SHOWROOM
17层 啤酒文化中心屋顶平面
商务中心 BUSINESS CENTER
会议 CONFERENCE
会议 CONFERENCE
ARCHITECTURAL DESIGN
展厅 SHOWROOM
FLOOR PLANS
Department Legend BOH CIRCULATION
Sky Beer Garden Plan
OFFICE
213 G H J 10000
K
OFFICE
L
M
SHAFT L1, L3, L6-L11, L13-L21
L1, L2, L4, L5, L15-L17, L23-L27
JAN'S
MECH. ELEC.
ELEVATOR ACCESS WOMEN'S
N
8400
VESTIBULE
MEN'S L1, L2, L4, L5, L15-L17, L23-L27
L1, L3, L6-L11, L13-L21
B3-L27
VESTIBULE
STAIR
O 10000
STAIR
P
Q R
9900
1
9900
2
9900
3
9900
4
9900
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Sky Beer Garden Roof Plan
1
LEVEL 17 & ROOF 1 : 500
215
13
14
15
CBS West Coast HQ Owner: CBS Location: Los Angeles, California HLW Project Team: Mark Zwagerman (P.I.C.), Sejal Sonani (P.M.), Marcelo Franganillo, Pablo Maida, Victor Zhang (Project Designers) CBS West Coast HQ is a competition for a ground up 375k SF, six-level office building consisting of offices, production rooms, executive suites, and a 90 seat auditorium. Included in the comprehensive design package were site analysis, office benchmarking, building systems life cycle and code analysis. The ultimate proposal seeks to create an iconic building that captures the essence of the CBS brand to attract and attain the best industry talent and to provide a holistic campus plan complimenting the existing studio buildings and infrastructure.
16
17
BUILDING CONCEPT: As CBS's first large scale project since the 1950's and HQ in the West coast, providing an identity to the west coast culture and CBS company culture became a prominent question at the center of the building concept. Ultimately, a connection between the various levels of the building was made to the various iconic natural elements to the state of California. The entrenched podium levels of the building is comparable to the flat-topped mesa of the california desserts, the open plan of the ice levels are enveloped by a light, ephemeral skin, and the executive level soars above the treetops to provide sweeping 360 degree views..
CBS / EAST COAST HQ
+
CBS / EAST WESTCOAST COASTHQ HQ
=
+
?
=
MASSING DIAGRAM
GARDEN TERRACE PROVIDES A PUBLIC SPACE FOR BUILDING USERS TO RELAX AND INTERACT WITH ONE ANOTHER
ALL EY
WHAT IS THE ESSENCE OF CALIFORNIA? RADFORD AV
NATURE AS A SOURCE OF OCEAN INSPIRATION 90-SEAT SCREENING ROOM, TWO-STORY LOBBY AND PRE-FUNCTION SPACE DOUBLE UP AS A STUDIO AMENITY
MASSING DIAGRAM
LANDSCAPING WRAPS AROUND BUILDING TO CREATE BUFFER ZONES AND SECLUDED OUTDOOR SPACES
RADFORD AV
ENUE
Mesa: Building base becomes part of the landscape
CBS STUDIO CENTER WEST COAST HQ
ALL EY
SEQUOIA
N
ENUE
RADFORD AV
N
ENUE
MASSING DIAGRAM
Ocean: RADskin FORD AVENUE Flexible, open floor plans enveloped by an ephemeral
MESA CBS STUDIO CENTER WEST COAST HQ
EAST TERRACES (PRIVATE)
NATURE AS A SOURCE OF INSPIRATION
ALL
EY
WEST TERRACE
RADFORD AV
N
ENUE Sequoia: RADFORviews Executive floor with exterior terrraces and stunning "treetop" D AVENUE
18 CBS STUDIO CENTER
SitePLAN Plan POSED PLAN SITE
EXIT
GAT E
GILLIGAN’S ISLAND ROAD
ADMIN
E
LAN
ANE UT L RY P ENT OR VISIT TRY E EN LOY EMP O ULL
Y URIT SEC TH BOO
STAGE 9
STAGE 10
P DRO OFF
CE FEN DINING TERRACE
E ZON
ZEN GARDEN
REPUBLIC AVENUE
TERRACE
NUE AVE
Y URIT SEC TE GA
D FOR
SIX STORY 275,000 SF BUILDING
EXECUTIVE ENTRY
RAD EXECUTIVE ROOF DECK
STAGE 14
N
GATE
ALLEY
Sectional Perspective
CBS STUDIO CENTER WEST COAST HQ
SCALE: 1/40” = 1’-0”
19
FACADE CONCEPT:
The facade of the tower levels derives its inspiration from the movement of the southern california coast. The single, asymmetrical module is repeated
FACADE onDESIGN a module rotated at 90 degree increments to create a rippling effect across the building. The outer modular skin also provides shading for the clear glass skin
behind and frames the surrounding views. Throughout the day, with the movement of the sun, the shadows cast by the outer facade also changes to create a building that is perceived differently at different times of the day.
ROTATE MODULES IN 90-DEGREE INCREMENTS TO FORM WAVE-LIKE RIPPLES ACROSS THE FACADE
APPLY ORGANIC CONTOUR LINES TO GENERATE THE PATTERN OF MODULE ROTATION
CBS STUDIO CENTER WEST COAST HQ
20
Elevations:
GROUND LEVEL PLAN
Plans:
90-SEAT SCREENING ROOM
GARDEN
LOBBY/ PREFUNCTION PROJ.
16' - 0"
TERRACE
VESTIBULE
32' - 0"
BUILDING SERVICE
MAIN ELECTRICAL
EMPLOYEE ELEV
32' - 0"
128' - 0"
ELEC.
W
OFFICE
J.C.
OFFICE M
M
ELEC. EXECUTIVE ELEV
SERVICE CORRIDOR
32' - 0"
FIRE FREIGHT CTRL. ELEV
IDF
W
IDF
TERRACE
EXECUTIVE LEVEL PLAN (SIXTH FLOOR)
16' - 0"
THIRD - FIFTH FLOORS)
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
12' - 0"
30' - 0"
342' - 0"
N Room Legend
Roo
FIRST FLOOR GROSS AREA: 49,990 SF
OFFICE Terrace
01 / LEVEL 1
HLW International LLP
1556 20th Street, Suite B Santa Monica, CA 90404 Tel 310 453 2800
Scale: 1/32" = 1'-0"
CONF.
CONF. LOUNGE
ENTRY
BOARD ROOM
OFFICE
A/V
OFFICE
TERR.
RECEPTION
CBS STUDIO CENTER WEST COAST HQ
PH ELEC.
RECEPTION
COPY PRINT
PH W CTD#1
EDIT BAY
IDF
IDF
J.C. STUDIO M
COPY PRINT
EDIT BAY
M
STO.
ELEV. PANTRY
TELE PRESENCE
FILES
ELEC.
OFFICE
STO.
SERVICE CORRIDOR/STO.
PH
JC IDF
KITCHEN
ELEV.
RACK ROOM
OFFICE
W
ELEC.
TERRACE
ELEC.
M PH
COPY
STO. IDF
W
EDIT BAY
STO.
COPY
FILES
PH
HD HD
OFFICE
EXECUTIVE DINING
CAFE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TERR.
OFFICE
PH
21
N
TYPICAL FLOOR GROSS AREA: 45,410 SF
SIXTH FLOOR GROSS AREA: 45,410 SF (INCLUDES COVERED TERRACES)
22
23
180 E. Ocean Blvd Owner: Thrifty Oil Co. Location: Long Beach, CA HLW Project Team: Mark Zwagerman (P.I.C.), Joacha Sullivan (P.M./ P.A.), Victor Zhang (Project Designer/ P.A.), Tracey Franklyn (Interior Designer) Consultants: Urban Arena (Landscape), Holmes (Structural), ESI (M.E.P.), Kimley-Horn (Civil), Spark Studio (Lighting)
180 E Ocean Blvd is an existing Class A building built in the 1980's prominently located off the Convention Center Promenade with views of the Ocean to the South . As part of an effort to modernize and reposition the property, the existing lobby glazing was pulled forward to create a larger, double height entry experience and a new eyebrow canopy was anchored to the existing pre-cast concrete wall panels and columns. Through the use of a darker, contrasting material palette in the new intervention, the design intent of separating old and new was achieved. The dark ACM clad canopy, wood underside and column cladding, new glazing, and a unique flooring pattern that connect the interior lobby with exterior plaza create an experience that is completely different of that of the existing building. The location of the project near the coastline triggered a standard review by the CA Coastal Commission and was successfully approved for its consideration of the surrounding environment and local bird migration patterns.
24
25
Axonometric
New canopy structure divides existing tower above and building repositioning scope at plaza level.
E
F A
B
F
C
18' - 0"
D C1
E
45' - 0"
D 17' - 6"
28' - 6"
C E
D
E1
F
6' - 0"
15' - 0"
TOWER ABOVE
B
G
C
21' - 0"
CO LO NV NG EN BE TIO AC N CE
G1
H
19' - 0"
9' - 6"
B
17' - 6"
J
K 9' - 1"
F2 A510_2
1
2
2A
3
4
19' - 6"
5
16' - 6"
6
18' - 0"
7
18' - 0"
8
18' - 0"
9
18' - 0"
10
18' - 0"
10A
16' - 6"
SIM F2 A500_2
11
19' - 6"
9' - 1"
12
1
17' - 11"
12' - 6"
9' - 0"
14
New glazing and accent fin wall at restaurant tenant corner.
14
44 12
14' - 6"
14
7 BUILDING BEYOND
MEZZANIN
E-PT-2
Expanded Lobby enclosure creates more functional space and contemporary look to existing building.
14 E-GL-1 E-PT-2
E-AL-1
E-PT-2
E-PT-2
13
14
15' - 0"
New built-in planters define edge of private plaza from public promenade.
E-PT-2
13
PLA 1
F4 Elevations SCALE: 1/8"16= 1'-0"
11
10A
16
B3 A552_2
10 19' - 6"
8
16' - 6"
7
F5 A510_2
18' - 0"
16
6
18' - 0"
5
18' - 0"
4
18' - 0"
3
B4 A510_2
18' - 0"
2A
16' - 6"
19' - 6"
17.24'
2
13.07'
9' - 0"
9.42'
8.96'
LEVEL 3 42' - 0" SCALE: 1/8" = 1'-0"
2
2A 9' - 0"
17
B4 A510_2
3 19' -16"
E-MT-1
4
5
16' - 17 6"
1
6
18' - 0"
1
E-MT-1
F5 A510_2
7
18' - 0" 7
18' - 0"
8
9
18' - 0"
10
18' - 0"
10A
16' - 6"
19' - 6"
11
9' - 1"
LEVEL 2 29' - 6"
E-MT-1
OPEN TO BEYOND
E-AL-1
E-PT-2
D3 A550_2
14' - 6"
1
12' - 6"
EXTERIOR ELEVATION - EAST - STREET LEVEL
17
E-WD-1 E-PT-2
E-PT-2
E-GL-1
E-AL-3
E-AL-3
E-AL-4
E-AL-4
MEZZANINE LEVEL 15' - 0"
E-AL-2 14 E-WD-1
E-GL-1
E-WD-1
E-WD-1
E-WD-1
E-AL-1 14
4
2
4
2
4
EXTERIOR BUILDING ELEVATION - WEST - PLAZA LEVEL
1
SCALE: 1/8" = 1'-0"
E-GL-1
E-AL-1 2
E-AL-1 37
15
18' - 0"
1
37
15
18' - 0"
E-PT-1
E-AL-1
E-GL-1
3
49
E-GL-1
E-AL-1
E-PT-2
3
E-PT-1
E-GL-1
1
18' - 0"
14
E-GL-1
PLAZA LEVEL 0"
E-PT-1
15' - 0"
E-WD-1
MEZ
15' - 0"
E-TL-1
4
E-MT-1
14' - 6"
E-GL-1
F3 West Elevation F3
E-PT-1
1
18' - 0"
122' - 9"
EXTERIOR ELEVATION - EAST - PLAZA LEVEL
PARKING STRUCTURE BELOW
SCALE: 1/8" = 1'-0"
K
J
H
9' - 1"
17' - 6"
F3 A550_2 9' - 6"
17
G1
G
F
19' - 0"
21' - 0"
1
1
C3 A551_2 15' - 0"
E1
E
D
F2 A510_2
6' - 0"
28' - 6"
1
17' - 6"
1
F2 A554_2
C1
C 18' - 0"
7
17
LEVEL 2 29' - 6"
E-MT-1
E-MT-1
14' - 6"
E-MT-1
E-GL-1 E-MT-1
E-WD-1
E-GL-1
E-AL-3
E-AL-1
MEZZANINE LEVEL 15' - 0"
E-WD-1
E-GL-1
E-GL-1 E-AL-2
E-AL-2
E-AL-1
E-AL-2
15' - 0"
14 E-GL-1
E-WD-1
E-WD-1
E-WD-1
E-GL-1
E-GL-2
E-WD-1
E-WD-2
E-AL-1
LL DIMENSIONS AREEXTERIOR MEASURED FROM FINISH TO-FINISH UNLESS NOTEDLEVEL OTHERWISE. ELEVATION NORTH - PLAZA LL DIMENSIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE SCALE: 1/8" = 1'-0" CHITECT'S ATTENTION PRIOR TO CONSTRUCTION. ROVIDE & ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT BINET OCCURS. ROVIDE PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITH 75' VEL DISTANCE TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING ONSTRUCTION. EE SHEET A040_2B FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A013 FOR GRAPHIC IMAGE SIONS AREREQUIRE MEASURED FROM FINISH TO FINISH NOTED OTHERWISE. REA MAY FLOOR FILL SO THAT FLOORUNLESS FINISHES CAN ALIGN. SEE FLOOR TRANSITION SIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE AILS AND DOOR TRANSITION DETAILS. ATTENTION PRIOR TO RACE / REINFORCE ALLCONSTRUCTION. NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED. ATTACH SHEETFLOOR METALFINISH BACKING WALL STUDS WHERE WALL MOUNT LIP RESISTANT ON PLATES ALL NEWTO FINISH. URS. TO SHEETS A011-A013 FOR TITLE 24 NOTES AND A031_2B FOR DISABLED PATH OF TRAVEL. EFER ORTABLE EXTINGUISHER WITH AFOR RATING OF NOT LESS&THAN OR 2-A10BC WITH AT 75' DRYWALL REFER TOFIRE PARTITION DETAIL SHEET TYPICAL CORNER JOINT2-A CONDITION DETAIL ANCE TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING ONSTRUCTION. RTITIONS. A040_2B FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A013 GRAPHIC IMAGE LOCATIONS WITH NEW "F.E.C." DESIGNATION ARE TO RECEIVE SEMI FOR RECESSED FIRE
CONSTRUCTION KEYNOTES
North Elevation
ERAL CONSTRUCTION NOTES 26
2
1
NEW E-AL-1 AND E-GL-1 GLAZING.
2
NEW BI-FOLD DOORS. SEE DOOR SCHEDULE FOR DETAILS.
4
NEW STUD WALL WITH SCHEDULED FINISH.
1
4 NEW E-WD-1 NEW E-AL-1 AND E-GL-1CLADDING. GLAZING.
15
2
5 PROVIDE OPAQUE FILM ON GLASS. NEW BI-FOLD DOORS. SEE DOOR SCHEDULE FOR DETAILS.
16
3
6 CONC. DECK STRENGTHENING THIS AREA. SEE STRUCTURAL DRAWINGS. NEW STUD WALL WITH SCHEDULED FINISH. 7
NEW ALUMINUM SLAT TRELLIS.
E-AL-1
E-AL-1
CONSTRUCTION KEYNOTES 3
E-GL-1
8' - 0"
E-PT-1
ENERAL CONSTRUCTION NOTES
F2
9
8.80'
8.57'
23' - 6"
F4
PARKING STRUCTURE BELOW
EXTERIOR ELEVATION - SOUTH - PLAZA LEVEL
17
15
15
2 4 2 4 NEW ROLL-UP GARAGE DOOR: RAYNOR DOOR ALUMAVIEW AV200 WITH RAYNOR POWERHOIST OPTIMA MODEL SERIES RG OPERATOR. SEE DETAILS.
16
POWERWASH CONCRETE PANELS.
17
NEW METAL CLAD EYEBROW.
NEWGARAGE FENCE FOR TENANT SECURITY. NEW 18 ROLL-UP DOOR: RAYNOR DOOR ALUMAVIEW AV200 WITH RAYNOR POWERHOIST OPTIMA MODEL SERIES RG OPERATOR. SEE DETAILS. 19 FURTHER EXPLORATION REQUIRED FOR NEW ELEVATOR STOP AT MEZZANINE. POWERWASH CONCRETE PANELS.
30 31
32 20 DATUM REVEAL LINES CONTINUE ON THIS ADJACENT ELEVATION. NEW METAL CLAD EYEBROW. 33 21 (GLW-1) FOCAL GLASS WALL WITH MILLWORK BASE. REFERENCE A780_2 / D3 FOR DETAIL.
PLAZA LEVEL 0"
30
38 NEW MILLWORK COLUMNS.
31 32 33
4
37
1
44
SIGNAGE BY OTHERS. SEE SIGNAGE PACKAGE.
NEW OVERFLOW DRAIN.
45
NEW PAINT PER SCHEDULE. SEE BUILDING ELEVATIONS.
NOT USED
46
SOLID CORE WOOD DOOR
NOT USED
47
SEE LANDSCAPE DRAWINGS.
PATCHCOLUMNS. OPENINGS IN METAL DECK AND CONC. SLAB AS REQ. REFERENCE STRUCTURAL 44 NEW 34 MILLWORK DRAWINGS. NEW OVERFLOW DRAIN. 35 NEW RAILING ATTACHED TO EXISTING PRECAST CONC. WALL. REFERENCE STRUCTURAL 45 NOT USEDDRAWINGS. 46 36 FUTURE TENANT UNDER SEPARATE PERMIT. NOT USED 47 37 NEW STOREFRONT DOOR GLAZING SYSTEM.
CO
CONST
SIGNAGE BY OTHERS. SEE SIGNAGE PACKAGE. 48 WALL TO RECEIVE NEW E-ST-2 STUCCO FINISH. SEE ELEVATIONS AND FINISH PLANS FOR EXTENT. NEW PAINT PER SCHEDULE. SEE BUILDING ELEVATIONS. 49 ARCHITECTURAL LOUVERS W/ 50% FREE AREA FOR OSA INTAKE. SEE MECH. DRAWINGS. SOLID CORE WOOD DOOR 50 PROVIDE ACCESSIBLE SIGNAGE. SEE SHEET A791_2 - PARKING DETAILS FOR MORE SEE LANDSCAPE DRAWINGS. INFORMATION
B10
Site Plan
E. SEASIDE WAY
CONVENTION CENTER WALKWAY
E. OCEAN BLVD.
AREA N.I.C.
AREA N.I.C.
AREA N.I.C.
S. LOCUST AVE.
F
E
F F
F
E E1 E1
Typical Facade Drawings 15' - 0"
D
15' - 0"
6' - 0"
E
6' - 0"
D
C
C
10A 10A
E
B 11
N.
B
11
C3 C3 A551_2 A551_2
5
5
7
18
18
14' - 6"
SIM SIM F2 F2 A780_2 A780_2 4
1
1
E-GL-1
E-GL-1
E-AL-1
E-AL-1
4
2
2
17
17
MEZZANINE MEZZANINE LEVEL LEVEL 15' - 0" 15' - 0"
MEZZANINE MEZZANINE LEVEL LEVEL 15' - 0" 15' - 0"
2 E-WD-1
2 E-WD-1 17
17
E-AL-2
E-AL-2
2
19
5
5
17
17
F1 F1 A702_2 A702_2
E-WD-1
1' - 2"
2 E-WD-1
19
1' - 2"
19 19
14' - 6"
E-MT-1
2' - 5 5/8"
E-MT-1
7
2' - 5 5/8"
18
6
1' - 0 3/8"
18
6
F4 F4 A702_2 A702_2
1' - 0 3/8"
3
3' - 2 3/4"
3
LEVEL 2 LEVEL 2 29' - 6" 29' - 6"
SIM SIM B2 B2 A703_2 A703_2
3' - 2 3/4"
LEVEL 2 LEVEL 2 29' - 6" 29' - 6"
F3F3
MIN 2% SLOPE MIN 2% SLOPE FROM BUILDING FROM BUILDING
PLAZA LEVEL PLAZA LEVEL 0" 0"
EXTERIOR EXTERIOR ELEVATION ELEVATION - NORTH - NORTH SCALE: 1/2" SCALE: = 1'-0"1/2" = 1'-0"
C3 C3 A551_2 A551_2
13
TYP.
E-AL-1
TYP.
E-AL-1
13
10' - 6"
13 E-GL-1
10' - 6"
13 E-GL-1
15' - 0"
15' - 0"
WALL MOUNTED WALL MOUNTED LIGHT LIGHT FIXTURE FIXTURE FE-2, TYP.FE-2, TYP.
C3 C3 A701_2 A701_2 SIM. SIM.
C3 C3
LOBBY LOBBY INTERIOR INTERIOR AND EXTERIOR AND EXTERIOR - SECTION - SECTION DETAILDETAIL SCALE: 1/2" SCALE: = 1'-0"1/2" = 1'-0"
PLAZA LEVEL PLAZA LEVEL 0" 0"
27
Existing Building
28
Proposed Renderings
29
Typical Details D
C
B
A
3" DIAMETER DOWNSPOUT. SEE PLUMBING DRAWINGS. 1/2" BATTEN
(N) 6" X 6" HSS STEEL TUBE. SEE STRUCTURAL DRAWINGS.
BENT METAL FORM
ALUMINUM "WOOD" CLADDING.
THRIFTY OIL CO.
AIR AND WATER BARRIER
BACKER ROD AND SEALANT
180 E OCEAN BLVD, LONG BEACH, CA 90802
5/8" EXTERIOR SHEATHING
BI-FOLD DOOR 8000 SERIES BY ARCADIA OR EQUAL
PHASE 12 - RENOVATION
3 5/8" STUD FRAMING.
1437 4th Street, 4th Floor Santa Monica, California 90401 t +1 310 453 2800 | www.hlw.com
1 3/4"
4 1/2"
TO F.O. GLASS
(E) CONCRETE COLUMN
THRIFTY OIL CO. CARRNOW OWNER 13116 Imperial Hwy PROJ. MGT. Santa Fe Springs, CA 90670 t +1 562.921.3581 x 374
HOLMES INT. 4' - 2"
STRUCTURAL ENGINEER 523 w. 6th Street Suite 1122 Los Angeles, CA 90014 t +1 213-481-5630
LIGHTING DESIGN 881 Broadway, Floor 5 New York, NY 10003 t +1 212-353-4959
5/8" THICK GYPSUM WALLBOARD
ENGINEERED SPACES, INC. M.E.P. ENGINEER 1250 Gene Autry Way Anaheim CA. 92805 t +1 714-999-1646
SPARK STUDIO
1/2"
PROJECT MANAGMENT 15333 Culver Drive. #340 Irvine, CA 92604 t +1 (424) 529-6980
SEAN NASS
SIGNAGE 447 S. Robertson Blvd., Suite 101 Beverly Hills, CA 90211 t +1 310 . 288 . 0088
KIMLEY-HORN 1 5/8" STUD FRAMING
CIVIL ENGINEER 660 S. Figueroa Street, Suite 2050 Los Angeles, CA 90017 t +1 213-261-4040
NO.
4 1/8"
1/2"
BENT FLASHING CONNECTION
4 5 6 8 11 13 14 15
TO F.O. GLASS
3' - 8"
F
ISSUE OR REVISION
PHASE 2 - 70% CONSTRUCTION DOCUMENTS PHASE 2 - ISSUE FOR BID ADDENDUM 1 PHASE 2 - ISSUE FOR BID ADDENDUM 2 PHASE 2 - ISSUE FOR PLAN CHECK PHASE 2- PLAN CK CORRECTIONS PHASE 2 - ISSUE FOR BID ISSUE FOR BID ISSUE FOR CONSTRUCTION
CURTAIN WALL T-500 SERIES BY ARCADIA. VERTICAL STRUCTURAL GLAZING.
4 1/2"
C3
DATE
31 OCT. 2019 15 NOV. 2019 03 DEC. 2019 03 DEC. 2019 05 MAR. 2020 12 MAR. 2020 11 MAY. 2020 17 JUL, 2020
TYPICAL COLUMN DETAIL SCALE: 3" = 1'-0"
Column Cladding Detail (Plan)D
E
C
B
NEW STUCCO TO MATCH EXISTING
(N) METAL STUD TO MATCH EXISTING
5/8" TILE AS SCHEDULED
CURTAIN WALL T-500 SSG SERIES BY ARCADIA OR EQUAL. VERTICAL STRUCTURAL GLAZING. NEW STL. BEAM
ALUM. FIN
4"
ALUMINNUM PANEL AS SCHEDULED
3/8"
SHEET METAL BACKING
10"
2"
1' - 4" TYP.
5/8" EXTERIOR SHEATHING
2"
FLUID APPLIED MEMBRANE AIR AND WATER BARRIER SHEET TITLE:
D4
LOUVER WALL PLAN DETAIL @ CORNER
BUILDING EXTERIOR DETAILS
LOUVER WALL PLAN DETAIL
ACM and Louver Wall (Plan) 1/2" MIN.
SCALE: 3" = 1'-0"
4
2"
EXTERIOR
REVEAL
F4
SEAL/ SIGNATURE
8" STUD FRAMING
INTERIOR
2"
S. LOCUST AVE.
1/2" CEMENT BOARD
R-13 INSULATION
3/8"
1"
AIR AND WATERPROOFING MEMBRANE
SEALANT WITH BACKER ROD
5"
SHEET METAL BACKING
NEW FIN
(E) METAL STUD V.I.F.
TILE SETTING BED
NORTH
(E) STUCCO
EXISTING V.I.F
5
E. SEASIDE WAY
HSS COLUMN
C1 A704_2
E. OCEAN BLVD.
KEY PLAN
SEPARATE SHEET FOR ISOLATING DISSIMILAR METALS
SCALE: 3" = 1'-0"
1/2" MIN. 5/8" THICK GYPSUM WALLBOARD
PROJECT NO. 18291
(E) CONCRETE COLUMN
DATE: 07/17/20
SCALE: As indicated
DRAWN BY: Author
CHECKED BY: Checker
C1
PHASE:
2
MAIN ENTRY LOBBY JAMB DETAIL SCALE: 3" = 1'-0"
D
C
B
A
SHEET NO.
(E) PRECAST CON
A701_2 © 2019 HLW International LLP
ROLLING DOOR A
3
TYPICAL OUTSIDE CORNER
MANUFACTURER'S END CAP @ TOP & BOTTOM
1/2" INSULATED G
1" THICK INSULATED GLASS UNITS
SECTIONAL GLAS GARAGE DOOR A
ALUMINUM GLAZING SYSTEM (ARCADIA T500 SSG CLADDING OR EQUAL)
GARAGE DOOR T
HSS BEAM SEE STRUCTURAL
2 1/2"
2 EXISTING STRUCTURAL COLUMN
FORTINA THS 50125 ALUM. SLAT WITH THEM -50 BACK RAIL
DOOR TRACK MECHANISM
VERTICAL LIFT TRACK DOOR AS SCHEDULED
30 V.I.F.
7 1/4" INSULATED GLASS JAMB SEAL
"
EXTRUDED ALUMINUM ANGLE
5/8" SHEATHING EXTERIOR
Anaheim CA. 92805 t +1 714-999-1646
6" METAL SOFFIT FRAMING, ATTACHED TO CANOPY STRUCTURES
THRIFTY OIL CO. SEAN CARRNOW SPARK STUDIO NASS OWNER DESIGN LIGHTING SIGNAGE 13116 ImperialFloor Hwy5 PROJ. MGT. 881 Broadway, 447 S. Robertson Blvd., Suit
T-500 CURTAIN WALL BY ARCADIA OR EQUAL
Santa Fe NY Springs, New York, 10003CA 90670 t +1212-353-4959 562.921.3581 x 374 t +1
KIMLEY-HORN CIVIL ENGINEER HOLMES INT. 660 S. Figueroa Street, Suite 2050
3 5/8" SHEATHING EXTERIOR
8" METAL STUD TRACK
NO.
6" METAL SOFFIT FRAMING, ATTACHED TO CANOPY STRUCTURES
5/8" GYPSUM BOARD
4
31 OCT. 2019
PHASE 2 - 70% CONSTRUCTION DOCU
LIGHTING 6 03DESIGN DEC. 2019 881 Broadway, Floor 5 8 03 DEC. 2019 New York, NY 10003 05 MAR. 2020 t +111212-353-4959 13 12 MAR. 2020 14 11 MAY. 2020 15 17 JUL, 2020
SIGNAGE PHASE 2 - ISSUE FOR BID ADDENDUM 447 S. Robertson Blvd., Sui PHASE 2 - ISSUE FOR PLAN CHECK Beverly Hills, CA 90211 PHASE 2- PLAN t +1CK 310CORRECTIONS . 288 . 0088 PHASE 2 - ISSUE FOR BID ISSUE FOR BID ISSUE FOR CONSTRUCTION
KIMLEY-HORN
11 A
CIVIL ENGINEER 660 S. Figueroa Street, Suite 2050 Los Angeles, CA 90017 t +1 213-261-4040
PRESSURE TREATED BLOCKING
(E) CONCRETE SLAB
COMPOSITE ALUM. PANEL
H
8" METAL STUD TRACK
NO.
AIR AND WATER BARRIER
5/8" SHEATHING
THRIFTY OIL CO.
8" STUD FRAMING HSS STRUCTURAL FRAMING
R-13 THERMAC INSULATION
180 E OCEAN BLVD, LONG BEACH, CA 90802
1/2"
PHASE 12 - RENOVATION INTERIOR
COMPOSITE ALUM. PANEL WD-01 CLADDING BEYOND HSS BEAM. SEE STRUCT. AIR AND WATER BARRIER
HOLMES INT.
METAL DECKING 1/2" BATTEN
5/8" EXTERIOR SHEATHING
1
PATCH SLAB TO EXTERIOR AIR AND WATER BARRIER WALL
ALUMINUM "WOOD" CLADDING. BENT STAINLESS STEEL BACKER ROD SEALANTBED FLASHING SETAND IN SEALANT 3/8" TILE FINISH AS SCHEDULED WATERPROOFING
TILE AS SCHEDULED PATCH SLAB TO EXTERIOR WALL 2% SLOPE MIN. HSS STAINLESS STRUCTURAL FRAMING BENT STEEL PER STRUCTURAL DRAWINGS FLASHING SET IN SEALANT BED
PLAZA LEVEL 0"
NO.
4 5 6 8 11 13 14 15
(N) TILE KEMPER PUR LIQUID APPLIED POLYURETHANE MEMBRANE
1' - 6"
D1
(E) STRUCTURAL SLAB
SCALE: 3" = 1'-0" BENT METAL FORM
D
C
1' - 2"
15
MORTAR 2% SLOPEBED
F
PHASE 2 - 70% CONSTRUCTION DOCUMENTS PHASE 2 - ISSUE FOR BID ADDENDUM 1 PHASE 2 - ISSUE FOR BID ADDENDUM 2 PHASE 2 - ISSUE FOR PLAN CHECK PHASE 2- PLAN CK CORRECTIONS PHASE 2 - ISSUE FOR BID ISSUE FOR BID ISSUE FOR CONSTRUCTION
THRESHOLD AS SCHEDULED
1' - 6"
PROTECTION BOARD
SHEET TITLE: PROJECT NO. 18291
KEMPER PUR LIQUID APPLIED POLYURETHANE MEMBRANE
SCALE: 3" = 1'-0"
TILE AS SCHEDULED
CHECKED BY: Checker
(E) WATERPROOFING
(E) 2%TOPPING SLOPE SLAB (E) WATERPROOFING (E) STRUCTURAL SLAB
LOBBY STOREFONT WALL DETAILS
PLAZA LEVEL 0"
SCALE: 3" = 1'-0"
B
BUILDING EXTERIOR DETAILS PHASE:
A
2
DATE: 07/17/20
DRAWN BY: Author
SHEET NO.
A702_
PROJECT NO. 18291
© 2019 HLW Inte
DATE: 07/17/20
1"
SCALE: 3" = 1'-0"
1' - 6"
PHASE:
(E) TOPPING SLAB (E) WATERPROOFING
LOBBY ENTRY WALL DETAILS
(E) STRUCTURAL SLAB
SCALE: 3" = 1'-0"
C
B1
LOBBY STOREFONT WALL DETAILS
FRAMED CANOPY TYPICAL WALL SECTION DETAIL SCALE: 3" = 1'-0"
(E) TOPPING SLAB (E) WATERPROOFING (E) STRUCTURAL SLAB
SCALE: 3" = 1'-0"
B
E. SEASIDE WAY
D
KEY PLAN
E. OCEAN BLVD.
FAUX WOOD ALUMINUM BY KNOTWOOD OR EQ.
NORTH
Eyebrow Canopy Detail (Section) S. LOCUST AVE.
DRAWN BY: Author
CHECKED BY: Checker
1' - 6"
ALUMINUM FLASHING
D1 B2
D1
E
PLAZA LEVEL 7" TALL CONC CURB W. 1 #4 AND 0" #4 DOWELS @ 24" O.C.
TOPPING SLAB AND MORTAR BED
B1
BUILDING EXTERIOR DETAILS
(E) TOPPING SLAB TOPPING SLAB AND MORTAR BED
SCALE: 3" = 1'-0"
EPOXY EMBEDDED J HOOK DOWEL
PLAZA LEVEL 0"
S. LOCUST AVE.
SEAL/ SIGNATURE
(E) WATERPROOFING
DEMO PORTION OF (E) TOPPING SLAB TO ALLOW FOR (N) MORTAR BED
TILE AS SCHEDULED (E) TOPPING SLAB 2% SLOPE MIN. (E) WATERPROOFING
1"
LOBBY ENTRY WALL DETAILS
TOPPING SLAB AND MORTAR BED
SHEET TITLE:
KEMPER PUR LIQUID APPLIED POLYURETHANE MEMBRANE
RETAIL CANOPY DETAIL
ISSUE OR REVISION
31 OCT. 2019 15 NOV. 2019 03 DEC. 2019 03 DEC. 2019 05 MAR. 2020 12 MAR. 2020 11 MAY. 2020 17 JUL, 2020
THRESHOLD AS SCHEDULED PROTECTION BOARD
TILE AS SCHEDULED
F1
DATE
7/17/2020 4:33:25 PM
WATERPROOFING
5/8" EXTERIOR SHEATHING
EXTERIOR
SIGNAGE 447 S. Robertson Blvd., Suite 101 Beverly Hills, CA 90211 t +1 310 . 288 . 0088
CIVIL ENGINEER 660 S. Figueroa Street, Suite 2050 Los Angeles, CA 90017 t +1 213-261-4040
DEMO PORTION OF (E) TOPPING SLAB TO ALLOW FOR (N) MORTAR BED
ALUMINUM SYSTEM (E) TOPPINGFRAMING SLAB
MORTAR BED BI-FOLDING DOOR ASSEMBLY AS SCHEDULED 7"BI-FOLDING TALL CONCDOOR CURBASSEMBLY W. 1 #4 AND ASDOWELS SCHEDULED #4 @ 24" O.C.
KIMLEY-HORN EPOXY EMBEDDED J HOOK DOWEL
TOPPING SLAB AND MORTAR BED
BEAM. SEE STRUCT.
METAL FLASHING
M.E.P. ENGINEER 1250 Gene Autry Way Anaheim CA. 92805 t +1 714-999-1646
LIGHTING DESIGN 881 Broadway, Floor 5 New York, NY 10003 t +1 212-353-4959
KEMPER PUR LIQUID APPLIED POLYURETHANE MEMBRANE
AND WATER BARRIER
15 METAL FLASHING
INTERIOR SPARK STUDIO SEAN NASS
(N) TILE
S. LOCUST AVE.
SEAL/ SIGNATURE
HSS BEAM. SEE STRUCT.
ENGINEERED SPACES, INC.
STRUCTURAL ENGINEER 523 w. 6th Street Suite 1122 Los Angeles, CA 90014 t +1 213-481-5630
KEY PLAN
HSS BEAM. SEE STRUCT.
3 1/2" METAL STUDS
PROJECT MANAGMENT 15333 Culver Drive. #340 Irvine, CA 92604 t +1 (424) 529-6980
POSITE ALUM. PANEL
6" METAL STUDS @ 16" O.C. BETWEEN STRUCTURAL STEEL TUBE
1' - 2"
THRIFTY OIL CO. CARRNOW OWNER 13116 Imperial Hwy PROJ. MGT. Santa Fe Springs, CA 90670 t +1 562.921.3581 x 374
POSITE ALUM. PANEL
BI-FOLDING DOOR ASSEMBLY AS SCHEDULED R-13 THERMAC INSULATION 3 1/2" METAL STUDS
1/2"
3/8" TILE FINISH AS SCHEDULED
TUBE STEEL FRAMING SEE STRUCTURAL DRAWINGS.
ALUMINUM FRAMING SYSTEM AIR AND WATER BARRIER
5/8" SHEATHING EXTERIOR
BACKER ROD AND SEALANT
ND WATER BARRIER
HSS BEAM. SEE STRUCT. E. SEASIDE WAY
1/2" 1437 4th Street, 4th Floor Santa Monica, California INTERIOR 90401 t +1 310 453 2800 | www.hlw.com
AIR AND WATER BARRIER
9"
THERMAC INSULATION COMPOSITE ALUM. R-13 PANEL METAL FLASHING
HSS STRUCTURAL FRAMING
BEAM. SEE STRUCT.
KEY PLAN COMPOSITE ALUM. PANEL
SEALANT & BACKER ROD 5/8" SHEATHING
8" STUD FRAMING
ALUMINUM "WOOD" CLADDING.
PHASE 2 - 70% CONSTRUCTION DOCU PHASE 2 - ISSUE FOR BID ADDENDUM PHASE 2 - ISSUE FOR BID ADDENDUM PHASE 2 - ISSUE FOR PLAN CHECK PHASE 2- PLAN CK CORRECTIONS PHASE 2 - ISSUE FOR BID ISSUE FOR BID ISSUE FOR CONSTRUCTION
EXTERIOR PRESSURE TREATED BLOCKING PRESSURE TREATED BLOCKING 3 1/2" METAL STUDS
ALUMINUM COMPOSITE PANEL
TPO SINGLE PLY ROOFING 1/2" BATTEN 1/2" PROTECTION BOARD 5/8" EXTERIOR SHEATHING 2% SLOPE MIN. AIR AND WATER BARRIER
ISSUE OR REVISION
31 OCT. 2019 15 NOV. 2019 03 DEC. 2019 03 DEC. 2019 05 MAR. 2020 12 MAR. 2020 11 MAY. 2020 17 JUL, 2020
E. SEASIDE WAY
2
AIR AND WATER BARRIER
DATE
4 5 6 8 11 13 14 15
5/8" GYPSUM BOARD
ALUMINUM COPING
M.E.P. ENGINEER 1250 Gene Autry Way Anaheim CA. 92805 ISSUE OR REVISION t +1 714-999-1646
DATE
5 15 NOV. 2019 PHASE 2 - ISSUE FOR BIDNASS ADDENDUM SPARK STUDIO SEAN
T-500 CURTAIN WALL BY ARCADIA OR EQUAL
TAPERED WOOD BLOCKING
ENGINEERED SPACES, INC
STRUCTURAL ENGINEER Los Angeles, CA 90017 523 w. 6th Street Suite 1122 t +1 213-261-4040 Los Angeles, CA 90014 t +1 213-481-5630
WOOD FINISH ALUMINUM SLAT SOFFIT
(E) CONCRETE SLAB
B
Beverly Hills, CA 90211 PROJECT MANAGMENT t +1 310 . 288 . 0088 15333 Culver Drive. #340 Irvine, CA 92604 t +1 (424) 529-6980
2
SHEET NO.
A702_
A
© 2019 HLW Int
Eyebrow Canopy Detail (Section)
SEAL/ SIGNATURE
ALUMINUM COMPOSITE PANEL WATER & AIR BARRIER
TUBE STEEL FRAMING SEE STRUCTURAL DRAWINGS.
1"
SHEET TITLE:
BUILDING EXTERIOR DETAILS
5/8" EXTERIOR SHEATHING
1"
BENT METAL FORM
ALUMINUM ANGLE
ALUMINUM FLASHING FAUX WOOD ALUMINUM BY KNOTWOOD OR EQ.
B1
PROJECT NO. 18291 DATE: 07/17/20
CHECKED BY: Checker
DRAWN BY: Author
PHASE:
FRAMED CANOPY SOFFIT DETAIL 2
2
SCALE: 3" = 1'-0"
B
SCALE: 3" = 1'-0"
A
SHEET NO.
A703_2 © 2019 HLW International LLP
31
2901 Wilshire Blvd. Owner: GWP Real Estate Location: Santa Monica, CA HLW Project Team: David Swartz (P.I.C.), Erica Steenstra (P.M.), Victor Zhang (P.A./ Project Designer), Nicole Dehlin-Grant (Interior Designer), Yuri Bernabe (Job Captain) Consultants: HLW (Landscape), Englekirk (Structural), LA Consulting Engineers (Mech,Plumb.), REX (Elec.), Gsell Engineering (Civil), Spark (Lighting) General Contractor: V10 Construction The Yale-Wilshire medical office building located at 2901 Wilshire Blvd in Santa Monica was originally built in the 1960's without major exterior improvements since it was built. Under new ownership's vision to bring new life and higher quality tenants to the property, a major effort was put into the re-design of the existing stucco facade and inaccessible ground level retail area. In addition to the many difficulties of re-cladding an existing building was the additional difficulty of minimizing disturbances to existing tenants while creating a comprehensive exterior facade design. In order to create hierarchy on the facade, two architectural frames were strategically placed at the street intersection and recessed building entry and a new site stair and eyebrow canopy highlight the improvements at the pedestrian street level. As part of Santa Monica Ordinance, this project was subject to local Architectural Board Review and was successfully approved for its good design and contribution to a more pedestrian friendly experience.
32
33
FACADE STRATEGY: A majority of the existing tenants were located on the second level, constraining the amount of work that could be done to increase the existing narrow window openings. The vacancies at levels three and four however, allowed for the strategic expansion of the existing glazing locations to create an increasingly transparent facade with better views and privacy. Complementing the modular window units is an elegant weaving pattern of Alucobond ACM panels that accentuate the composition of the new facade. At the intersection of Yale and Wilshire and the recessed building entry, two architectural feature frames bring hierarchy to the facade and some visual relief from the weaving pattern of ACM panels and window units.
Existing Glazing
existing facade:
Existing Facade
34
Expanded Glazing
8' - 6 11' - 6" 11' - 6" 11' - 6" 11' - 6"
1 E-ST-255' - 4" PENTHOUSE ROOF
9' - 10"
29
9' - 9"
-9' - 9" MID LEVEL PARKING -18' - 11" LOWER LEVEL PARKING
F
TYP.
8' - 6"
1
46' - 10" ROOF
1
16' - 0"
6' - 2"
TYP.
23
5
TYP.
11' - 6"
E-TL-1 E-MT-235' - 4" 4TH FLOOR E-TL-1
E-TL-1
OPEN TO PARKING BEYOND E-ST-1
E-MT-2
E-AL-2
E-ST-1 E-TL-1
OPEN TO PARKING BEYOND 1
E-MT-2
TYP.
E-ST-1 E-AL-3 OPEN TO PARKING BEYOND
E-TL-1
OPEN TO PARKING BEYOND
E-ST-1 E-AL-1
E-MT-2 E-AL-2
E-TL-1
OPEN TO PARKING BEYOND
E-MT-2
E-AL-2
E-MT-2
15
E-AL-2 E-TL-1
E-PT-1
E-TL-1
E-PT-1
E-PT-1
E-TL-1
E-MT-2
TYP. 29
E-AL-4 1
TYP.
12' - 4"
E-AL-3 1
E-TL-1
OPEN TO PARKING RAMP BEYOND
0" GROUND FLOOR
2
2.1
3.1
E-TL-1
E-TL-1
5
4.1
F3 A6.3
F2 A6.1
F3 A6.3
E-AL-5
OPEN TO BEYOND
E-TL-1
7 E-TL-1
E-AL-5
2
4.1
CONSTRUCTION ELEVATION - WEST
5
E-PT-1
E-PT-1
5.1
5.2
6.1
7.1
8.1
9
10
5.1
5.2
6.1
7.1
8.1
9
10
F2 A6.2
F2 A6.1
F2 A6.2 E-MT-1
46' - 10" ROOF 11' - 6"
15
11' - 6"
15
11' - 6"
15
15
11' - 6" 12' - 4"
E-GL-1 E-AL-2
E-AL-7 E-GL-1
7
TYP.
TYP.
E-AL-2
E-AL-7
E
E-AL-2
E-AL-5
E-AL-2
E-GL-1 E-AL-2 E-AL-7
E-AL-1
E-GL-1
D
E-AL-1
E-AL-6 E-GL-1
E-AL-6
E-GL-1
E-GL-1 E-AL-3 E-AL-6
E-GL-1
E-AL-6
E-GL-1 E-AL-2 E-AL-7
E-AL-4
1
7 E-AL-3
1
E-AL-3 E-AL-6
E-TL-1 E-GL-2 7 E-TL-1
E-PT-1
E-PT-1
E-GL-1 E-AL-7 E-GL-1 E-AL-7
7
7
3
E-TL-1 2 3
7 E-TL-1 E-PT-1
E-PT-1 E-GL-2
E-PT-1
E-PT-1
2
TYP.
E-AL-7
7
E-GL-1
E-TL-1
E-AL-7
E-AL-4
3
E-GL-1
E-TL-1
E-GL-1 E-AL-7
7
7
1
E-TL-1
E-AL-3 3
E-TL-1
7
E-GL-2 7
1 C3 A7.1
E-TL-1
TYP. 13
13
13
13
23
E-AL-3
23
E-GL-2
TYP.
1 E-AL-6 E-GL-1
E-GL-1
15
2
TYP.
1
E-GL-1 E-AL-4 E-AL-3 E-AL-6 4 E-TL-1
28
1
E-AL-3 I-TW-3
E-AL-2
TYP.
E-AL-2
TYP.
E-TL-1
28
TYP.
E-GL-1 E-AL-7
4
TYP. 10
2
1
E-GL-1 E-AL-4
E-AL-2
10
E-AL-7
E-AL-1
E-AL-6
E-AL-2
E-AL-7
E-AL-2
E-AL-6 TYP.
C
TYP.
E-AL-1
E-GL-1
27 E-GL-1
E-AL-2 1
TYP.
TYP.
E-AL-1 1
TYP.
TYP.
E-AL-1
1
I-TW-3
E-GL-1 E-AL-7
E-TL-1
E-TL-1
OPEN TO BEYOND
OPEN TO BEYOND
TYP.
E-AL-5
9' - 2"
9' - 9"
Wilshire Blvd Elevation (East)
C3 A7.1
E-TL-1
E-AL-6
E-AL-6
15
E-GL-1 E-AL-3 E-AL-6
27
TYP.
15
E-GL-1 E-AL-2 E-AL-7
E-AL-2
E-AL-5 TYP.
E-AL-3
1
E-GL-1
15 E-GL-1
E-AL-7 E-AL-3
16 TYP. E-GL-1
15
E-GL-1 E-AL-2 E-AL-7
E-AL-2
E-AL-6
E-GL-1 E-AL-2 E-AL-7
E-AL-5
E-GL-1
TYP.
9' - 9"
E-AL-5
E-GL-1
E-GL-1
E-TL-1 E-AL-5
E-AL-3
16
15
E-AL-6
E-GL-1
E-TL-1 7
16
E-AL-2
E-AL-7
1
E-AL-5
E-GL-1
TYP.
1
E-AL-3 E-MT-1
E-AL-7
E-AL-7
11' - 6" 11' - 6"
12' - 4" 2ND FLOOR
TYP.
F
12' - 4"
12' - 4" 2ND FLOOR
E-AL-5
ALIGN
15
16
ALIGN
16
-9' - 9" MID LEVEL PARKING -18' - 11" LOWER LEVEL PARKING
E-AL-5
TYP.
E-PT-1
E-ST-2
E-TL-1
OPEN TO PARKING BEYOND
E-AL-4
1
-9' - 9" MID LEVEL PARKING
E-AL-2
E-TL-1 C3 A6.3
E-MT-2
E-ST-1 E-AL-2
E-TL-1
TYP.
E-ST-2
5
15 E-TL-1
OPEN TO PARKING BEYOND
E-MT-2
OPEN TO PARKING BEYOND
E-MT-2
E-AL-3
12' - 4" 2ND FLOOR
E-TL-1
E-ST-1
E-TL-1
OPEN TO PARKING BEYOND
E-MT-2
E-AL-2
Yale St Elevation (South)
0" GROUND FLOOR
E-AL-2
1
E-ST-1
OPEN TO PARKING BEYOND
E-MT-2
E-ST-1
E-TL-1
1
23' - 10" 3RD FLOOR
E-ST-1
TYP.
E-ST-2
E-AL-2
5
0" GROUND FLOOR
E-AL-2
1
E-AL-3
3.1
23' - 10" 3RD FLOOR
E-AL-5 5
15
TYP.
E-ST-2
E-AL-3
2.1
23' - 10" 3RD FLOOR
1
TYP.
TYP. E-AL-2
4' - 0"
E-MT-1
2
35' - 4" 4TH FLOOR
19' - 0"
1
1
35' - 4" 4TH FLOOR
9' - 10"
E-ST-2 E-ST-2
E-ST-2
SCALE: 1/8" = 1'-0" 16
TYP.
E-ST-2
TYP.
E-ST-1
SCALE: 1/8" = 1'-0"
9/24/2020 6:10:09 PM
1
K
E-ST-2 E-ST-2
CONSTRUCTION ELEVATION - NORTH
46' - 10" ROOF
J
5
SCALE: 1/8" = 1'-0"
F1
H
16
E-ST-2
-18' - 11" LOWER CONSTRUCTION LEVEL PARKING ELEVATION - NORTH
1
G
5
6' - 2"
5
9' - 2"
-9' - 9" MID LEVEL PARKING
F4 F4
E
5
9' - 2"
2
0" GROUND FLOOR
18' - 6"
D
29
11' - 6"
0" GROUND FLOOR
C
TYP.
11' - 6"
12' - 4" 2ND FLOOR
1
3' - 6"
12' - 4" 2ND FLOOR
B
E-ST-2
3' - 6"
23' - 10" 3RD FLOOR
TYP.
E-AL-3
E-AL-2
5
5
5
11' - 6"
23' - 10" 3RD FLOOR
1 E-ST-2
1
11' - 6"
35' - 4" 4TH FLOOR
5
5
TYP.
E-ST-2
12' - 4"
35' - 4" 4TH FLOOR
1 E-ST-2
12' - 4"
3
46' - 10" ROOF
23
E-ST-2
9' - 9"
ROOF
E-AL-5
F1 F1
9' - 2"
Proposed Facade
-18' - 11" LOWER LEVEL PARKING ELEVATION - SOUTH CONSTRUCTION SCALE: 1/8" = 1'-0"
CONSTRUCTION ELEVATION - SOUTH SCALE: 1/8" = 1'-0"
0 6:09:58 PM
F
E
D
C
0 6:09:58 PM
F
E
D
C
35
Axonometric
New roof top terrace provides amenity space for building tenants.
Weaving ACM pattern integrates existing and new facade openings and creates refreshed design.
Architectural frames at corner and building entry create hierarchy and impact moments on facade.
New canopy unifies building entry with parking exit.
New site stair promotes pedestrian access to ground level retail.
Facade Studies Accent Color Frame Studies
Corrugated Metal Texture Studies
36
Enlarged Elevation F
E
D
C
B
A
ENLARGED WALL SE
C2 A6.2
4.1
12' - 4"
4.1
1' - 0" 10"
5
E
5.1
5
D2 A6.1
D
J
4' - 0"
5.1
K
E-AL-3
46' T.O. SLAB
- 10" ROOF
E-AL-3
T.O. MULLION
46' -46' 10"- 10" ROOF ROOF
46' - 10" ROOF
T.O. MULLION
T.O. MULLION
T.O. MULLION
E-AL-1 I-GL-1
T.O. SLAB T.O. SLAB35'
- 4" 4TH FLOOR 2' - 0"
E-AL-3
T.O. MULLION
I-GL-1
J (N) STRUCTURAL FRAMING. SEE STRUCTURAL
6
(N) ROOFING MEMBRANE SLOPED MIN 2% TO (
7
(N) PARAPET FLASHING.
9' - 6"
(N) POURED IN PLACE CONCRETE TOPPING SL
9
E-AL-5 (N) E-AL-4 ALUMINUM SLAT TRELLIS.
10
(N) E-AL-3 COMPOSITE ALUMINUM CLADDING.
11
(N) E-AL-3 COMPOSITE ALUMINUM RAINSCREEN
12
(N) E-GL-4 GLASS RAILING W/ STAINLESS STEE
13
(N) E-AL-1 AND E-GL-1 BI-FOLD DOORS.
14
(E) CONC. CURB.
15
(N) EGGRESS RAILING PAINTED E-PT-2.
16
(N) E-AL-4 CLAD RAILING
17
(N) E-AL-4 CLAD SIGNAGE CANOPY.
18
(N) E-MT-1 EYEBROW CANOPY
19
SIGNAGE BY OTHERS THIS AREA. REFERENCE
20
(E) WALL TO RECEIVE NEW PAINT AS SCHEDUL
21
METAL STUD WALL.
E-AL-1
23' - 10" 3RD FLOOR
23' - 10" 3RD FLOOR
I-GL-1
9' - 6"
9' - 6"
T.O. SLAB 23' T.O. SLAB
- 10" 3RD FLOOR 2' - 0"
T.O. SLAB E-AL-3
E-AL-5
E-AL-5
E-AL-2
T.O. SLAB 23' -23' 10"- 10" 3RD3RD FLOOR FLOOR
23' - 10" 3RD FLOOR
T.O. SLAB
2' - 0"
E-AL-2
T.O. MULLION
T.O. MULLION
T.O. MULLION
T.O. MULLION
9' - 6"
9' - 6"
9' - 6"
11' - 6"
11' - 6"
I-GL-1
3 E-AL-4
E-AL-3
E-AL-2
E-AL-4
E-AL-2
12' - 4" 2ND FLOOR
T.O. SLAB E-AL-3
T.O. SLAB T.O. SLAB12'
- 4" 2ND FLOOR
3' - 4" E-AL-5
E-AL-1
T.O. MULLION
E-TL-1
E-TL-1
I-GL-1
E-TL-1
T.O. MULLION
T.O. SLAB
2
12' - 4" INSIDE 0"
0" GROUND FLOOR
OUTSIDE
T.O. SLAB
GROUND FLOOR
C2
F2
OPEN TO BEYOND
OPEN TO BEYOND
I-GL-1
0" GROUND FLOOR
SCALE: 3/8" = 1'-0"
0" 0" GROUND FLOOR GROUND FLOOR
I-GL-1
0" GROUND FLOOR
OUTSIDE
INSIDE
OUT
ENTRY ELEVATION ENLARGED SCALE: 3/8" = 1'-0"
D2
ENLARGED TYP. GLASS OPENINGS @ SOUTH ELEVATION ENLARGED TYP. GLASS OPENINGS @ SOUTH ELEVATION 7.1 SCALE: 3/8" = 1'-0"
B.O. CEILING
I-GL-1
CONSTRUCTION - SOUTH ELEVATION - Callout 1
F2
T.O. SLAB
B.O. CEILING
9' - 0"
9' - 0" I-GL-1
E-AL-5
2
12' - 4" 2ND FLOOR
E-AL-5
E-TL-1
12' - 4"
I-GL-1
12' -12' 4" - 4"T.O. SLAB 2ND2ND FLOOR FLOOR
9' - 0"
E-AL-2
E-AL-2 E-AL-4
12' - 4" 2ND FLOOR
3' - 4"
E-AL-2 T.O. SLAB
3' - 4"
E-AL-4
E-AL-3
9' - 0"
E-AL-4
3' - 4"
E-AL-4
6.1
5
C
T.O. MULLION
2' - 0"
E-AL-2 E-AL-1
E-AL-3
Enlarged Elevations
(N) E-WD-1 SOFFIT W STUD BACKING.
11' - 6" E-AL-1
T.O. SLAB
E-AL-1
(E) PRE-CAST CONCRETE PANEL
4
T.O. SLAB
T.O. MULLION
9' - 6"
9' - 6" E-AL-2
E-AL-2
3
(N) E-WD-1 WALL CLADDING.
3
I-GL-1
2' - 0"
E-AL-1
35' - 4" 4TH FLOOR
9' - 6"
4
T.O. MULLION
11' - 6"
4
35' -35' 4" - 4"T.O. SLAB 4TH4TH FLOOR FLOOR 2' - 0"
35' - 4" 4TH FLOOR
T.O. SLAB
E-AL-3
(N) E-AL-1 AND E-GL-1 GLAZING.
2
2' - 0"
9' - 6"
9' - 6"
35' - 4" 4TH FLOOR
2' - 0"
T.O. SLAB
9' - 6"
11' - 6"
I-GL-1
E-AL-5
E-AL-2
F2
E-AL-5T.O. PARAPET
11' - 6"
E-AL-1
46' - 10" ROOF
8"
46' - 10" ROOF
5
K
T.O. PARAPET
T.O. PARAPET
2' - 0"
5
J
1
8 T.O. PARAPET
T.O. SLAB
C
D2 A6.1
E-AL-5
E-AL-2
D
K
8"
10" 1' - 0"
E
8"
10' - 0"
F
2' - 0"
6' - 0"
F
8"
7.1
2' - 0"
7
2' - 0"
6.1
SCALE: 3/8" = 1'-0"
Wall Section
D2
ENLARGED SECTION @ TYP GLASS OPENINGS.
ENLARGED SECTION @ TYP GLASS OPENINGS.
SCALE: 3/8" = 1'-0"
SCALE: 3/8" = 1'-0"
INSIDE 4.1
4.1 5.1
J
5.1
OUTSIDE
EQ
EQ
EQ D1 A7.8 TYP.
1
INSIDE J
1
OUTSIDE
F1 GFRC Modular Panel Studies
020 6:10:35 PM
D1 A7.8 TYP.
INSIDE
J
B2
OUTSIDE
ENLARGED SECOND FLOOR PLAN @ ENTRY SCALE: 3/8" = 1'-0"
F
2' - 6"
F1 9/24/2020 6:10:31 PM
3' - 0"
E.Q.
E TYP. GLASS OPENING - LEVEL 2 SCALE: 3/8" = 1'-0"
F
F1
9/24/2020 6:10:31 PM
2' -3'6"- 0"
3' - 0"
E.Q.
E.Q.
3' - 0"
3' - 0"
K
E.Q.
3' - 0"
D
ISOMETRIC @ ENTRY POPOUT SCALE:
K
C
B
A
B1
TYP. GLASS OPENING - LEVEL 2 SCALE: 3/8" = 1'-0"
F
E
E
D
D
C
C
37 2901 WILSHIRE BLVD DESIGN PRESENtAtIoN
octoBER 4, 2018
F
E
D
C
B
F
Ground Level Plan
A
E
D
GENE
1. ALL DIMENSIO
Level 2-4 Plan
3. PROVIDE & ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT CABINET OCCURS.
2. ALL DIMENSIO TO CONSTRU
2901 WILSHIRE - PHASE 2
3. PROVIDE & A
2901 WILSHIRE BLVD. SANTA MONICA, CA
4. PROVIDE PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITH 75' TRAVEL DISTANCE TO ALL ORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING CONSTRUCTION.
5
B
1. ALL DIMENSIONS ARE MEASURED FROM FINISH TO FINISH UNLESS NOTED OTHERWISE. 2. ALL DIMENSIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR TO CONSTRUCTION.
5
C
GENERAL CONSTRUCTION NOTES
4. PROVIDE POR ALL ORTIONS OF
5. SEE SHEETS A0.22 THRU A0.24 FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A0.24 FOR GRAPHIC IMAGE.
5. SEE SHEETS
6. AREA MAY REQUIRE FLOOR FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DETAILS AND DOOR TRANSITION ETAILS.
6. AREA MAY RE TRANSITION ETA
7. BRACE / REINFORCE ALL NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED.
7. BRACE / REIN
8. REFER TO SHEET A0.41 SERIES SHEETS FOR PARTITION TYPES & DETAILS. 10
11
8. REFER TO SH
9. REFER TO SH
10. REFER TO PARTITION DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT DRYWALL PARTITIONS.
166' - 6" 3' - 0"
18' - 0"
20' - 0"
24' - 0"
20' - 0"
20' - 0"
24' - 0"
18' - 0"
3' - 0"
11. LOCATIONS WITH NEW "F.E.C." DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER CABINETS MOUNTED AT 3'-4" F.F. TO THE CENTERLINE OF HANDLE.
16' - 6"
12. IF OUTLETS ARE INSTALLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE TO MAINTAIN INTEGRITY OF WALL RATING. 13. VERIFY ALIGNMENTS SHOWN IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, FURR COLUMN OR WALL TO PROVIDE ALIGNMENT. 14. REFER TO SHEET A0.42 FOR DOOR SCHEDULE,DOOR 1 2 TYPES, AND HARDWARE.
12
3
18' - 0"
20' - 0"
24' - 0"
10
5
28 B 102B
N.I.C
N.I.C
5
COVERED PARKING
18' - 6"
5
5
COVERED PARKING
5
1
NEW STOREFRONT GLASS WINDOW SYSTEM.
2
NEW GLASS GUARDRAIL WITH STAINLESS STEEL HAND RAIL.
3
NEW STOREFRONT GLASS DOOR SYSTEM.
4
NEW STUD WALL WITH SCHEDULED FINISH. SEE ELEVATIONS.
5
NEW WALL FINISH PER SCHEDULE.
6
W345D NEW DOOR, SEE DOOR SCHEDULE. 5 TYP. NEW ACM CLADDING OVER EXISTING COLUMN.
7
5
EF5
5
9' - 10"
RAMP TO SUBTERRANEAN PARKING
5
3
D
6
6' - 2"
21
C
5
5
ST-01B
E
N.I.C
6' - 2"
105
5
5
6 4
9' - 10"
5 1
G
N.I.C
H
101 28
ALIGN
W103
1
102A
10
7
27
2
EF1
1
7
27 2
21
2
13
C1 A7.1
7
14
24
4
D5 A8.0
W100
TYP.
7
EF1
27
F5 A8.0
144' - 0"
2
7 J
F1 A8.0
14
W105A
4' - 0"
7
3
1
7
UP 1 R.
7
3
1
14
5
UP 5 R.
2
100
3' - 11 1/2"
103
19' - 0"
W105B
12
1
8
8
K
LINE OF CANOPY ABOVE
13
NOT IN USE.
NEW BOX PLANTER AND PLANTING.
16' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
1
F138
LEVEL 1 CONSTRUCTION PLAN SCALE: 1/8" = 1'-0"
2.1
3.1
4.1
5.1
5.2
6.1
7.1
19
SIGN CENTRIX
W350G
W301A 1
SIGNAGE CONSULTANT 446 Robertsob Blvd., Suite 101 Beverly Hills, CA 90211 t +1 310 288 0088
W301B
W301C 5
TYP.
W301D
W301E
W301F 1
TYP.
W301G 5
TYP.
W301H
W301I
17
TYP.
B
W301J
W301K 5
TYP.
C
TYP.
NO.
13
STAINLESS STEEL HANDRAIL WITH INTEGRATED LIGHTING.
14
NEW FLOOR W345A FINISH. SLOPED TO DRAIN AS REQUIRED.
15
17 NEW GLASS CURTAIN WALL SYSTEM. SEE WALL SECTIONS AND DETAILS.
16
NEW FACADE PROJECTIONS WITH ACM CLADDING.
17
19REMAIN. W335N AT THIS LOCATION TO EXISTING COLUMN
1 2 3 5
DATE
ISSUE OR REVISION
12/23/19 05/19/20 08/05/20 09/24/20
D
ISSUE FOR PLAN CHECK ISSUE FOR PLAN CHECK CORRECTIONS ISSUE FOR PLAN CHECK CORRECTIONS #2 ISSUE FOR CONSTRUCTION
W301M
E W311A
N.I.C.
NEW STOREFRONT WINDOW SYSTEM.
F3 A4.2
29
9
19
PATCH INTERIOR TENANT CEILING TO MATCH EXISTING AS REQUIRED..
22
W335MSCREEN ON EXISTING STRUCTURAL FRAMING. NEW MECHANICAL 5 TYP. NEW STRUCTURAL MEMBERS TO HOLD NEW MECHANICAL UNITS. SEE STRUCTURAL AND 4.2 MECHNICAL DRAWINGS. 1 TYP. PATCH AND WATERPROOF ROOFING MEMBRANE AS REQUIRED.
23
W335L NEW PARAPET WALL AT THIS LOCATION.
24
NEW CAST IN PLACE CONCRETE STAIRS ON GRADE. FINISH PER SCHEDULE.
25
EXISTING ROOF DRAIN TO REMAIN.
26
EXISTING WATER LINE TO17REMAIN.
27
NEW CAST IN PLACE CONCRETE DECK INFILL.
28
NEW FRAMELESS GLASS15 WINDOW SYSTEM.
29
NEW PLASTER METAL REGLETS PER ELEVATION.
W311B 17
TYP.
W319A
F
G KEY PLAN
W319B
H
N.I.C.
30
NEW MECHANICAL EQUIPMENT MOUNTED TO EXISTING SCREEN. SEE MECHANICAL DRAWINGS. W335K
31
NEW ROOFING MEMBRANE OVER SUBSTRATE OVER TAPERED RIGID INSULATION SLOPED TO DRAIN.
32
NEW EXTERIOR WALL FINISH AT EXISTING STAIR ENCLOSURE.
33
NEW GUTTER AND DOWNSPOUTS.
34
NEW MECHANICAL UNITS ON (E) RAISED CONC SLAB.
35
NEW BRACE FRAME. SEE STRUCTURAL DRAWINGS.
36
NEW 4" X4" HSS KICKERS. SEE STRUCTURAL DRAWINGS. 17
W319C
N.I.C.
5 1
NORTH TRUE NORTH
WILSHIRE BLVD.
19
SEAL/ SIGNATURE
TYP. TYP.
19
19 J
1 15
TYP.
W335J
W335I
16
5
TYP. W335H
W335G
17
TYP. W335F
5
17
W335E
W335D
16
W335C
15
W335B
1
TYP. W335A
W319F
TYP. W319E
NEW STO
2
NEW GLAS
3
NEW STO
4
NEW STUD
5
NEW WAL
6
NEW DOO
7
NEW ACM
8
NEW STRU
9
EXISTING
10
NEW FRAM
11
NOT IN US
12
NEW BOX
13
STAINLES
14
NEW FLOO
15
NEW GLAS
16
NEW FACA
17
EXISTING
18
NEW STO
19
PATCH IN
20
NEW MEC
21
NEW STRU MECHNIC
22
PATCH AN
23
NEW PAR
24
NEW CAS
25
EXISTING
26
EXISTING
27
NEW CAS
28
NEW FRAM
29
NEW PLAS
30
W319D
19
CONS 1
K
NEW MEC DRAWING
31
NEW ROO TO DRAIN
32
NEW EXTE
33
NEW GUT
34
NEW MEC
35
NEW BRA
36
NEW 4" X4
F1 A4.1
F1 A6.3
F1 A6.2
SHEET TITLE: 16' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
16' - 0"
134' - 6"
16' - 0"
8.1
29
W350F
1
F3 A6.4 1.1
2
A F4 A4.1
N.I.C.
38' - 6" 16' - 0"
16' - 6"
W301L
21
16' - 0"
3' - 0"
W345B
6
F1 A4.1
18' - 0"
LIGHTING DESIGNER 115 5th Avenue, 5th Floor New York, New York 10003 t +1 212 353 4600
12
21
F
4.2
24' - 0"
SPARK
11
14. REFER TO S
11
LANDSCAPE ARCHITECT 1437 4th Street, 4th Floor Santa Monica, CA 90401 t +1 310 452 2800
W350E
ELECTRICAL ENGINEER 2501 Davidson Drive., 2nd Floor Monterey Park, CA 91754 t +1 323 262 9199
NEW FRAMELESS GLASS DOOR SYSTEM.
20
W350B
10
15. INSTALL FIR CBC. SEE CBC 7
20' - 0"
CIVIL ENGINEER 11416 Victoria Avenue Los Angeles, CA 90066 310-892-7293
REX
10
19
6
W350A
9
F118 A4.2
N.I.C
110 5
16' - 0"
UP
F3 A4.2
9
N.I.C
F1 A4.2
3
103' - 8"
UP
W345F
1 N.I.C. TYP. NEW STRUCTURAL COLUMN. SEE STRUCTURAL DRAWINGS. W345C EXISTING ELEVATOR WITH NEW FINISHES AS SCHEDULED. SEE ELEVATOR SHEETS.
8 5
W345E
9
YALE ST.
14' - 2"
F2 A6.7
MECHANICAL/PLUMBING ENGINEER 3211 Dora Verdugo Dr. Glendale, CA 91208 t +1 818 244 9090 W350C W350D
D4 A7.6
8
166' - 6"
LA CONSULTING GSELL ENGINEERS ENGINEERING
CONSTRUCTION KEYNOTES
4
RAISED SLAB
7
18' - 6"
A F4 A4.1
RAMP FROM SUBTERRANEAN PARKING
13. VERIFY ALIG COLUMN OR 6
20' - 0"
HLW
STRUCTURAL ENGINEER 888 South Figueroa St., 18th Fl. Los Angeles, CA 90017 t +1 323 733 6673 x352
4
12. IF OUTLETS WALL RATIN
ACOUSTICAL ENGINEER 3617 Hayden Avenue, Suite 100 Culver City, CA 90232 t +1 310 829 6343
OWNER 9320 Wilshire Blvd # 306 Beverly Hills, CA 90212 t +1 310 858 6797
ENGLEKIRK
21
11. LOCATIONS 3'-4" F.F. TO THE
NEWSON BROWN ACOUSTICS, LLC 5
GWP REAL ESTATE 4
15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR CEILING. DAMPERS TO COMPLY WITH CBC. SEE CBC 716.2.
3' - 0"
10. REFER TO P
ARCHITECT 1437 4th Street, 4th Floor Santa Monica, CA 90401 t +1 310 453 2800 | www.hlw.com
14' - 2"
9
9' - 10"
8
6' - 2"
7
103' - 8"
6
16' - 0"
5
6' - 2"
4
9' - 10"
3
19' - 0"
2
4' - 0"
1
9. REFER TO SHEETS A0.22-A0.24 AND A0.32 FOR TITLE 24 NOTES AND ACCESSIBLE PATH OF TRAVEL.
SYMBOLS LEGEND
9
1
F1
B10
2.1
3.1
LEVEL 1 CONSTRUCTION PLAN 4.1
5.1
INDICATES PARTITION TYPE. SEE A0.41 FOR PARTITION TYPES.
LEVEL 3 CONSTRUCTION PLAN
1i INDICATES WINDOW TYPE. SEE A0.43 FOR WINDOW TYPES. SCALE: 1/8" = 1'-0" 1i
INDICATES DOOR SYMBOL. SEE SHEET A0.42 FOR DOOR SCHEDULE , TYPES, AND HARDWARE.
EXISTING WALL TO REMAIN, PROTECT IN PLACE. NEW WALL PARTITIONS, SEE SHEET A0.41 FOR VARIOUS TYPES AND SIZES. NOT IN SCOPE
PROJECT NO. 18261 SCALE: 1/8" = 1'-0"
DATE: 09/24/20
CHECKED BY: Checker
DRAWN BY: Author
PHASE:
2
SHEET NO.
5.2
6.1
7.1
8.1
SYMB B10
I
1i
I
1i
I
E
N
A3.1
N
ON THRU STOREFRONT @ UPPER FLOORS AND SITE STAIR - Callout 3
1 1/2" = 1'-0"
C3 C
B
SECTION THRU STOREFRONT @ UPPER FLOORS AND SITE STAIR - Callout 1 SCALE: 1 1/2" = 1'-0"
A
EXTERIOR
SEALANT JOINT
7/8" EXTERIOR SMOOTH STUCCO FINISH 5/8" EXTERIOR SHEATHING AIR AND WATER BARRIER
METAL PANEL VERTICAL JOINT WITH SEALANT
2901 WILSHIRE - PHASE 2
EXISTING 3 1/4" STUDS
2901 WILSHIRE BLVD. SANTA MONICA, CA
D
C
2 1/4"
E
1" 5/8" 1"
EXISTING EDGE OF SLAB
B
A
ARCHITECT 1437 4th Street, 4th Floor Santa Monica, CA 90401 t +1 310 453 2800 | www.hlw.com
GWP REAL ESTATE
NEWSON BROWN ACOUSTICS, LLC
ENGLEKIRK
HLW
ACOUSTICAL ENGINEER 3617 Hayden Avenue, Suite 100 Culver City, CA 90232 t +1 310 829 6343
OWNER 9320 Wilshire Blvd # 306 Beverly Hills, CA 90212 t +1 310 858 6797
INTERIOR
Typical Details
STRUCTURAL ENGINEER 888 South Figueroa St., 18th Fl. Los Angeles, CA 90017 t +1 323 733 6673 x352
LANDSCAPE ARCHITECT 1437 4th Street, 4th Floor Santa Monica, CA 90401 t +1 310 452 2800
LA CONSULTING GSELL ENGINEERS ENGINEERING MECHANICAL/PLUMBING ENGINEER 3211 Dora Verdugo Dr. Glendale, CA 91208 t +1 818 244 9090
CIVIL ENGINEER 11416 Victoria Avenue Los Angeles, CA 90066 310-892-7293
REX
SIGN CENTRIX
ELECTRICAL ENGINEER 2501 Davidson Drive., 2nd Floor Monterey Park, CA 91754 t +1 323 262 9199
6"
PEEL AND STICK MEMBRANE TO OVER LAP ROOING MEMBRANE
SIGNAGE CONSULTANT 446 Robertsob Blvd., Suite 101 Beverly Hills, CA 90211 t +1 310 288 0088
SPARK
NEW ROOF MEMBRANE TO MATCH AND OVERLAP EXISTING ROOFING PER MANUFACTURERS SPECIFICATIONS.
ALUMINUM FLASHING
LIGHTING DESIGNER 115 5th Avenue, 5th Floor New York, New York 10003 t +1 212 353 4600
ALUMINUM COMPOSITE METAL PANEL WALL SYSTEM ON ALUMINUM SUBGIRT FRAMING BEYOND
2"
EXISTING ROOF MEMBRANE TO REMAIN
1" INSULATED GLASS ALIGN OUTSIDE FACE OF GLASS WITH EXTERIOR SHEATHING AND EXTERIOR SHEATHING AND EXISTING EDGE OF SLAB
EXISTING ROOF SLAB
EXISTING FLOOR SLAB
TOP OF EXISTING FLOOR SLAB
1 2 3 5
DATE
12/23/19 05/19/20 08/05/20 09/24/20
ISSUE OR REVISION
8"
NO.
1" INSULATED GLASSGLAZED ALUMINUM CURTAIN WALL
ISSUE FOR PLAN CHECK ISSUE FOR PLAN CHECK CORRECTIONS ISSUE FOR PLAN CHECK CORRECTIONS #2 ISSUE FOR CONSTRUCTION
ROOF LEVEL 46'-10"
ALUMINUM COMPOSITE METAL PANEL WALL SYSTEM ON ALUMINUM SUBGIRT FRAMING
EXISTING ROOF SLAB
6" METAL STUDS AT 16" O.C.
ALUMINUM COMPOSITE METAL PANEL WALL SYSTEM ON ALUMINUM SUBGIRT FRAMING AIR AND WATER BARRIER
AIR AND WATER BARRIER
EXISTING BEAM
BATT INSULATION. 2-1/2" THICK R8
2' - 0"
KEY PLAN EXISTING BEAM
SIMPSON FCB BYPASS FIXED-CLIP FRAMING CONNECTOR
SIMPSON FCB BYPASS FIXED-CLIP FRAMING CONNECTOR
EXISTING BEAM BEYOND
2-1/2" METAL STUDS AT 16" O.C. 3-5/8" METAL STUDS AT 16" O.C. SOFFIT FRAMING
6" METAL STUDS AT 16" O.C. BATT INSULATION. R-21 5-1/2" THICK
6" METAL STUDS AT 16" O.C.
YALE ST.
2-1/2" METAL STUDS AT 16" O.C.
EXISTING BEAM BEYOND
3-5/8" METAL STUDS AT 16" O.C. SOFFIT FRAMING
BATT INSULATION. R-21 5-1/2" THICK NORTH TRUE NORTH
WILSHIRE BLVD.
5/8" MOVEMENT JOINT SEAL/ SIGNATURE
5/8"
2' - 0"
EXISTING BEAM
5/8" EXTERIOR SHEATHING
5/8" EXTERIOR SHEATHING
R-15 3-1/2" THICK BATT INSULATION
R-15 3-1/2" THICK BATT INSULATION
4" 6" SHEET TITLE:
BATT INSULATION. R-21 5-1/2" THICK
EXTERIOR WALL DETAILS
ALUMINUM COMPOSITE METAL PANEL WALL SYSTEM ON ALUMINUM SUBGIRT FRAMING BEYOND
EXISTING CEILING
1" INSULATED GLASS ALIGN OUTSIDE FACE OF GLASS WITH EXTERIOR SHEATHING AND EXTERIOR SHEATHING AND EXISTING EDGE OF SLAB
CEILING PROJECT NO. 18261
ALIGN ACM SOFFIT TO COLUMN COVER
SCALE: 3" = 1'-0"
DATE: 09/24/20
CHECKED BY: Checker
DRAWN BY: Author
PHASE:
C1 C
2
EXTERIOR WALL METAL PANEL AND GLAZED ALUMINUM STOREFRONT SECTION DETAIL TYPICAL SCALE: 3" = 1'-0"
B
A
SHEET NO.
EXISTING CEILING
A7.6
39
© 2019 HLW International LLP
B4
PARAPET AND STOREFRONT HEAD SECTION DETAIL SCALE: 1 1/2" = 1'-0"
40
Union Bank Plaza Owner: KBS Location: Downtown Los Angeles, CA HLW Project Team: Mark Zwagerman (P.I.C.), Kurt Fisher (P.M.), Bicen Ye (P.A.), Marcelo Franganillo & Victor Zhang (Project Designers), Jianxin Li & Ina Lee (Job Captains) Consultants: HLW (Landscape), NYASE (Structural), AMA Consulting Engineers (M.E.P.) Spark (Lighting) Contractor: Swinerton Prominently located at the intersection of Figueroa St. and W 5th St. the Union Bank Plaza (UBP) provides a pedestrian connection to the larger Union Bank tower setback from the street front. As a result of multiple fragmented changes throughout the decades, the existing plaza was composed of eclectic and outdated elements. The new proposal for UBP took into consideration the existing structure and geometries of the past while incorporating new materials and detailing to visually connect the plaza to the tower beyond. To increase the usability and improve the environment of the space, contemporary planting in new concrete planters and a new canopy structure were introduced to provide shade and serve as a buffer from vehicular traffic. The significant upgrades to the facade and addition of planting and canopy structure have transformed a once outdated food plaza covered with sun umbrellas into a contemporary urban space that could serve the daily public beyond the work day and contributes to the revitalization and livable nature of future DTLA.
41
Building History
F
E
D
TO HARBOR FREEWAY/INTERSTATE 110
PL
HAA 1960's Original Design: Tower featured a contrasting palette of light colored verticals and dark colored infill panels and glazing. The street-plevel plaza was an orthogonal, open space matching the geometry of the tower.
RSA 1989 Repositioning: RSA's modifications to the original design included major changes to the geometries of the plaza and the addition of a continuous colonnade reinforcing the curved nature of the plaza.
AV
PL
Site Plan
EXISTING OFFICE BUILDING
AVTV
V
V
V
PEDESTRIAN BRIDGE
CR
V
WEST 5TH STREET
BUILDING ENTRANCE
EXISTING 2-STORY BUILDING TYPE IB M OCCUPANCY
EXISTING 2STORY BUILDING TYPE IB M OCCUPANCY V
CR
CANOPY ABOVE
DN
(N)PLANTER PL
EXISTING MECHANICAL PENTHOUSE
EXISTING CONFERENCE CENTER
DN
PEDESTRIAN BRIDGE
(N)PLANTER
PARKING STRUCTURE EXIT
SOUTH FIGUEROA STREET
42
retail plaza: proposed design
??? JFA 1994 Repositioning: JFA's intervention included the removal of all but one of the RSA column bays and the addition of planting along the ground level fascia and water feature and tenant patio walls for privacy and noise mitigation.
DESIGN PRESENTATION 445 S FIGUEROA ST, LOS ANGELES 90071
HLW 2021 Rebranding: More than two decades after the last major intervention, HLW's design for the UBP must incorporate the need to create a coprehensive design that will connect to the tower beyond and speak to the revitalization of DTLA.
SEPTEMBER 25, 2018
Facade Inspiration
LOBBY: BUIILDING FACADE
Facade Shadow Patterns
Tower Facade
Existing Tower Facade
SCHEMATIC DESIGN 445 S FIGUEROA ST, LOS ANGELES 90071
JULY 13, 2018
retail plaza: street edge & rAmp condition
New Materials and Detailing Techniques
New UBP Facade
Figueroa Street Elevation
43
STREET LEVEL 306' - 9"
HARDSCAPE ELEMENTS REFER TO L220_2B
3
10
8
25
8
1
5
25
3
C5
RIOR SECTION - WEST
Elevations and Sections 102
103
30' - 0"
TYP. 1
104
30' - 0"
25
25
23
5
28
FC-01
PT-01
13' - 11"
GL-01
36' - 5"
24
26
PT-02
PT-02
GL-01
FC-01
FC-01
GL-01
AL-01
PT-01
AL-03
GL-01
FC-01
FC-01
GL-01
AL-01
C1 A570_2B
GL-01
AL-05
FC-01
FC-01
AL-03 GL-02
F1 A323_2B
GL-02
FC-01
14' - 11"
5
AL-04
7' - 7"
PT-01
10' - 0"
9
15
F4 A323_2B
1
107
20' - 0"
10
15
14
106
30' - 0"
1
10
105
30' - 0"
AL-04
5
EXTERIOR SECTION - EAST
1/8" = 1'-0"
101
1
AL-03
AL-03
AL-05
GL-02
FC-01
AL-05
FC-01
AL-01 FC-01
15 TL-01
3
GL-02
AL-05
GL-01
AL-03
AL-03
FC-01
AL-01 FC-01
GL-01
GL-01
15
FC-01
AL-05
GL-01
GL-01
FC-01
TL-01
3
25
5
8
28
1
22 TYP.
8
22 TYP.
1
5
3
15
14
3
10
8
5
28
5
1
3
15
3
RIOR ELEVATION - SOUTH HH
KK-1
Wall Sections
JJ
FOR TYPICAL CORNER & JOINT CONDITION COLUMN DETAIL AT DRYWALL PARTITIONS. EXISTING
306' - 9"
EXISTING COLUMN CENTER LINE
CENTER LINE
EXISTING COLUMN CENTER LINE
GNATION ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER CABINETS MOUNTED AT 3'-4" DLE.
F2
RETAIL EXTERIOR NORTH 1
E2
RETAIL EXTERIOR NORTH 1
1/2" = 1'-0" 1/2" = 1'-0" 2 2 LY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE TO MAINTAIN INTEGRITY OF
1/2" = 1'-0"
2
F
F2EXTERIOR RETAIL RETAIL NORTHEXTERIOR 3 NORTH 1
306' - 9"
306' - 9"
EXISTING COLUMN CENTER LINE
1/2" = 1'-0"
1/2" = 1'-0"
(E) COLUMN TO REMAIN
14 LINE
(E) ESCALATOR TO REMAIN
EXISTING COLUMN CENTER LINE
C2NORTH 3 RETAIL EXTERIOR SOUTH 1 RETAIL EXTERIOR
C2
1/2" = 1'-0" 1/2" = 1'-0" 151/2" = 1'-0" NEW CONCRETE/PAVED STEPS AND RAILINGS,SEE SITE DETAIL SHEETS
CANOPY BEAM. SEE STRUCTURAL DRAWINGS
24
NEW STUD WALL BACKING FOR SCHEDULED FINISH,SEE WALL SECTION AND DETAIL
25
NEW BI-FOLD DOORS. SEE DOOR SCHEDULE FOR DETAILS.
26
PAINT EXISTING METAL 9 TRELLIS STRUCTURE AS SCHEDULED
28
TBD COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
KEY PLAN
KEY PLAN
13
13
10
10
18
18
306' - 9"
EXISTING ROOF DRAIN TO REMAIN, SEE PLUMBING DRAWINGS EXISTING COLUMN CENTER LINE
10
9
C2
1/2" = 1'-0"
18
STREET LEVEL 306' - 9"
SOUTH FIGUROA STREET
NEW METAL PAINTED LOUVER, SEE DETAILS.
RETAIL EXTERIOR SOUTH 1
SEAL/ SIGNATURE
TRUE EXISTING PLAN COLUMN CENTER LINE
C
SHEET TITLE:
WALL SECTIONS
METAL PANEL PAINTED CLADDING LOUVER BEYOND 24 COLOMN
24
PAINTED LOUVER
14
CURVED ALUMINUM MECHANICAL PLATE SOFFIT DUCTS, SEE MECHANICAL DRAWINGS 25
25
MECHANICAL DUCTS, SEE MECHANICAL DRAWINGS
15
NOT IN USE
5
STEEL ANDPLATE ALUMINUM CANOPY 16 CURVED ALUMINUM FAÇADE CAP
16
STEEL AND ALUMINUM CANOPY
6
STRUCTURAL STEEL BEAM/POST. REFER TO STRUCTURAL DRAWINGS (E)17STRUCTURAL ROOF ASSEMBLY TO REMAIN
17
STRUCTURAL STEEL BEAM/POST. REFER TO STRUCTURAL DRAWINGS
7
DECORATIVE PAVING.REFER REFERTO TOSTRUCTURAL HARDSCAPE DRAWINGS. PLANS (E)18STRUCTURAL STEELCONCRETE BEAM TO REMAIN.
18
DECORATIVE CONCRETE PAVING. REFER TO HARDSCAPE PLANS
8
STEEL COLUMN. REFER TO STRUCTURAL DRAWINGS (E)19STEEL STRUCTURAL CHANNEL TO REMAIN
19
STRUCTURAL STEEL COLUMN. REFER TO STRUCTURAL DRAWINGS
7. BRACE / REINFORCE ALL NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED. 7. BRACE / REINFORCE ALL NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS 7. REQUIRED. BRACE / REINFORCE ALL NEW OR EXISTING PARTITIONS TO NEW CHANNEL MILLWORKTO ASREMAIN REQUIRED. (E) STEEL 8 RECEIVE
8
STRUCTURAL COLUMN. REFER TO STRUCTURAL DRAWINGS 19 (E) STEEL CHANNELSTEEL TO REMAIN
8. REFER TO SHEET A060 SERIES SHEETS FOR PARTITION TYPES & DETAILS.
9
(E) STRUCTURAL COLUMN (OR SHOWN AS DASHED LINE BEYOND CLADDING) TO (E) STRUCTURAL COLUMN TO (ORREMAIN SHOWN AS DASHED LINE BEYOND CLADDING) TO REMAIN (E) STRUCTURAL COLUMN (OR SHOWN AS DASHED LINE BEYOND CLADDING) TO REMAIN 20 (E) STRUCTURAL 20 9 REMAIN FLOOR ASSEMBLY TO REMAIN (E)20STRUCTURAL FLOOR ASSEMBLY
10
METAL PANEL RAINSCREEN SYSTEM 21 GLAZED ALUMINUM STOREFRONT
21
METAL PANEL RAINSCREEN SYSTEM
11
STRUCTURAL METAL FLOOR STUDASSEMBLY. SOFFIT REFER TO STRUCTURAL DRAWINGS 22
22
METAL STUD SOFFIT
44
F
4/11/2019 4:54:14 PM
F
E
4/11/2019 4:54:14 PM
F
E
D
E
D
C
D
C
B
C
PROJECT NO. 18109
A
WALL SE
PROJECT NO. 18109
PROJECT NO. 18109
DATE: 02/01/19
SCALE: As indicated
DATE: 02/01/19
SCALE: As indicated
CHECKED BY: Checker
DRAWN BY: Author
CHECKED BY: Checker
DRAWN BY: Author
CHECKED BY: Checker
SHEET NO.
2B A575_2B
B
SHEET TITLE:
SCALE: As indicated
PROJECT PHASE
12. IF OUTLETS ARE INSTALLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE 12. IF TOOUTLETS MAINTAIN ARE INTEGRITY INSTALLED OF DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER 12. CODE IF OUTLETS TO MAINTAIN ARE INSTALLED INTEGRITY DIRECTLY OF INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE TO MAINTAIN INTEGRITY OF WALL RATING. WALL RATING. WALL RATING. 4/11/2019 4:54:14 PM
B
SHEET TITLE:
13
METAL STUD FLOOR SOFFIT ASSEMBLY. REFER TO STRUCTURAL DRAWINGS 11 22 STRUCTURAL
SEAL/ SIGNATURE
WALL SECTIONS
NOT IN USE FIN 15 ALUMINUM VERTICAL
METAL PANEL RAINSCREEN ALUMINUM STOREFRONTSYSTEM 10 21 GLAZED
TRUE PLAN
SEAL/ SIGNATURE
CURVED MECHANICAL SOFFITSEE MECHANICAL DRAWINGS 14 25 ALUMINUM SIGNAGE BY OTHERS. SHOWNPLATE FOR DUCTS, REFERENCE ONLY
10. REFER TO PARTITION DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT DRYWALL 10. REFERPARTITIONS. TO PARTITION DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL 10.ATREFER DRYWALL TO PARTITION PARTITIONS. DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT DRYWALL PARTITIONS. STRUCTURAL FLOOR ASSEMBLY. REFER TO STRUCTURAL DRAWINGS 11 11. LOCATIONS WITH NEW "F.E.C." DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER 11. LOCATIONS CABINETS WITHMOUNTED NEW "F.E.C." AT 3'-4" DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER 11. LOCATIONSCABINETS WITH NEWMOUNTED "F.E.C." DESIGNATION AT 3'-4" ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER CABINETS MOUNTED AT 3'-4" A.F.F. TO THE CENTERLINE OF HANDLE. A.F.F. TO THE CENTERLINE OF HANDLE. A.F.F. TO THE CENTERLINE OF HANDLE.
306' - 9"
RETAIL EXTERIOR SOUTH 1
METAL PANEL PAINTED COLOMN LOUVER CLADDING 13 CEMENT 24PANEL FIBER RAINSCREEN SYSTEMBEYOND
9. REFER TO SHEETS A005-A009 AND A040 FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL. 9. REFER TO SHEETS A005-A009 AND A040 FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL. 9. REFER TO SHEETS A005-A009 AND A040 FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL. GLAZED ALUMINUM STOREFRONT 10
STREET LEVEL SOUTH FIGUROA STREET
4
8. REFER TO SHEET A060 SERIES SHEETS FOR PARTITION TYPES & DETAILS. 9 (E) STRUCTURAL FLOOR ASSEMBLY TO REMAIN
KEY PLAN
13
3
8. REFER TO SHEET A060 SERIES SHEETS FOR PARTITION TYPES & DETAILS.
2' - 0"
14' - 11"
23
TBD
STREET LEVEL
4' - 11"
1' - 7"
NEW SITE LIGHTING, SEE L223 SITE LIGHTING PLAN COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
14' - 11"
1' - 7"
NEW OPEN TRELLIS CANOPY ABOVE, SEE ROOF PLAN FOR DETAIL
22
27
(E) CEILING HEIGHT
20
2
1
DATE
04/05/2019
14
20 (E) TENANT
NEW FLOOR FINISH TO MATCH EXISTING TENANT SPACE
GENERAL CONSTRUCTION NOTES GENERAL CONSTRUCTION WALLNOTES SECTION CONSTRUCTION KEY WALL NOTESSECTION CONSTRUCTION KEY WALL NOTES SECTION CONSTRUCTION KEY NOTES
1
5
10' - 0"
20
4
(E) CEILING HEIGHT
2.
6.
32' - 5"
32' - 5" 4' - 11"
24
METAL CURVED NEW STRUCTURAL DECORATIVE COLUMNS RAILING. DEFERRED TO HOLD NEW APPROVAL CANOPY ABOVE, REFER TO CURVEDDRAWINGS GLAZED NEW DECORATIVE STRUCTURAL RAILING. COLUMNS DEFERRED TO HOLD APPROVAL NEW CANOPY ABOVE, REFER TO STRUCTURAL NEW STRUCTURAL COLUMNS TO HOLD NEW CANOPY ABOVE, REFER TO STRUCTURAL DRAWINGS 12 STUDS 23 GLAZED 12STRUCTURAL 23 23 DRAWINGS
5.
NO.
SECOND LEVEL RETAIL
22
1
4.
2' - 7"
4' - 11"
4' - 11"
14' - 11"
10' - 0"
10' - 0"
1' - 0" 14' - 11"
EXISTING COLUMN CENTER LINE
24 (E) CEILING HEIGHT
NEW CURVED ALUMINUM SOFFIT PLATE (E) TENANT
D
1. ALL DIMENSIONS ARE MEASURED FROM 13. FINISH VERIFY TO FINISH ALIGNMENTS UNLESSSHOWN NOTED IN OTHERWISE. DRAWINGS1.INALL FIELD. DIMENSIONS IF ALIGNMENT ARE MEASURED IS NOT ACHIEVABLE, FROM FINISH 13.TOVERIFY FINISH1ALIGNMENTS UNLESS METAL NOTED SHOWN STUDS OTHERWISE. IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, 13. VERIFY ALIGNMENTS SHOWN CURVED STUDS IN DRAWINGS GLAZED DECORATIVE IN FIELD. IF RAILING. ALIGNMENT DEFERRED IS NOT ACHIEVABLE, APPROVAL 1 12 METAL FURR COLUMN OR WALL TO PROVIDE ALIGNMENT. FURR COLUMN OR WALL TO PROVIDE ALIGNMENT. FURR COLUMN OR WALL TO PROVIDE ALIGNMENT. ALL DIMENSIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE 2. ARCHITECT'S ALL DIMENSIONS ATTENTION TO BE VERIFIED PRIOR IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO 2. THE ALL DIMENSIONS ARCHITECT'STO ATTENTION BE VERIFIED PRIOR IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT THE ARCHITECT'S METAL PANEL COLOMN CLADDING BEYOND FIBER CEMENT PANEL TO RAINSCREEN SYSTEMATTENTION PRIOR CEMENT PANEL RAINSCREEN SYSTEM 2 2 13 FIBER 14. REFER TO SHEET A070 FOR DOOR SCHEDULE.TO SEE SHEET A071 FOR DOOR TYPES AND 14. REFER TO SHEET A070 FOR DOOR SCHEDULE. SEE SHEET A071 FOR DOOR TYPES AND14. REFER TO SHEET A070 FOR DOOR SCHEDULE. SEE SHEET A071 FOR DOOR TYPES AND TO CONSTRUCTION. TO CONSTRUCTION. CONSTRUCTION. HARDWARE. HARDWARE.3 HARDWARE. CURVED ALUMINUM PLATEFOR SOFFIT 3 14 SIGNAGE SIGNAGE BY OTHERS. SHOWN FOR REFERENCE ONLY BY OTHERS. SHOWN REFERENCE ONLY PROVIDE & ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT CABINET 3. PROVIDE OCCURS. & ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT 3. PROVIDE CABINET&OCCURS. ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT CABINET OCCURS. 15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR 15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR 15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR NOT INVERTICAL USE 4 4 15 ALUMINUM ALUMINUM VERTICAL FIN FIN PROVIDE PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC4.WITH PROVIDE 75' TRAVEL PORTABLE DISTANCE FIRE EXTINGUISHER TO ALL CEILING. WITH A RATING DAMPERS OF TO NOTCOMPLY LESS THAN WITH2-A CBC. ORSEE 2-A10BC 4.CBC PROVIDE WITH 716.2. 75' PORTABLE TRAVEL DISTANCE FIRE EXTINGUISHER TO ALL WITH CEILING. A RATING DAMPERS OF NOT LESS TO COMPLY THAN 2-A WITH ORCBC. 2-A10BC SEEWITH CBC 716.2. 75' TRAVEL DISTANCE TO ALL CEILING. DAMPERS TO COMPLY WITH CBC. SEE CBC 716.2. PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING CONSTRUCTION. PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING CONSTRUCTION. PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING CONSTRUCTION. STEEL AND ALUMINUM CANOPYCAP CURVED ALUMINUM PLATE FAÇADE CAP ALUMINUM PLATE FAÇADE 5 5 16 CURVED SEE SHEETS A051 THRU A055 FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A010 FOR 5. GRAPHIC SEE SHEETS IMAGE.A051 THRU A055 FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A0105.FOR SEE GRAPHIC SHEETSIMAGE. A051 THRU A055 FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A010 FOR GRAPHIC IMAGE. STRUCTURALROOF STEEL BEAM/POST. REFER TO STRUCTURAL DRAWINGS 6 6 17 (E) STRUCTURAL (E) STRUCTURAL ROOF ASSEMBLY TO REMAIN ASSEMBLY TO REMAIN AREA MAY REQUIRE FLOOR FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION 6. AREA DETAILS MAY AND REQUIRE DOORFLOOR TRANSITION FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION 6. AREA MAY DETAILS REQUIRE AND FLOOR DOOR TRANSITION FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DETAILS AND DOOR TRANSITION DECORATIVESTEEL CONCRETE REFER TO HARDSCAPE PLANS DETAILS. DETAILS. DETAILS. (E) STRUCTURAL STEEL BEAM TO REMAIN. REFER TO STRUCTURAL DRAWINGS. BEAM PAVING. TO REMAIN. REFER TO STRUCTURAL DRAWINGS. 7 7 18 (E) STRUCTURAL
2' - 7"
2' - 7" 3' - 6" 4' - 11"
3' - 6"
36' - 5"
36' - 5"
9' - 0"10' - 0"
1' - 0"
1' - 0" 14' - 11" 9' - 0"
306' - 9"
2
22 ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
1. ALL DIMENSIONS ARE MEASURED FROM FINISH TO FINISH UNLESS NOTED OTHERWISE.
3.
1
STREET LEVEL
13 EXISTING
E GENERAL CONSTRUCTION NOTES
9' - 0"
NEW ALUMINUM TRELLIS AT STEEL CANOPY, SEE DETAIL DRAWINGS STREET LEVEL 306' - 9" EXISTING BASEMENT TRANSFORMER ACCESS HATCH, SEE MEP DRAWINGS.
E2
RETAIL EXTERIOR NORTH 3
9
12 COLUMN CENTER
E2
18
9 NEW CLADDING ON (E) WALL
22
7
21
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
10
NEW SIGNAGE (FOR REFERENCE ONLY) 18
SECTION THROUG
1/8" = 1'-0"
STREET
9 10
STREET LEVELSTREET 11 LEVEL
STREET LEVEL
306' - 9"
14' - 11"
13 13 NEW FIBER CEMENT AND METAL PANEL CLADDING AROUND EXISTING COLUMN
9' - 0"
NEW COLUMN TO20 SUPPORT THE PLAZA CANOPY ABOVE (SEE STRUCTURE DRAWINGS) 20
9
STREET LEVEL
TBD
8
9
B1
ISSUE OR REVISION
ISSUE FOR PLAN321' CHECK - 8" / 2B
WEST 5TH STREET
9
1' - 7"
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
7
18
18
DATE
04/05/2019
1 4
NEW PARAPET WALL WITH CLADDING
19
SITE PAVING AND DRAINS REFERENCE L220 AND L221 HARDSCAPE PLAN 15
2 7
17 18
10
5
5
1 4
17 DETAILS NEW14 EXTERIOR STUD 17WALL WITH CLADDING,SEE WALL14 SECTIONS AND
(E) CEILING HEIGHT
13
9
40 FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL.
F2
C1 TYP A675_2B
18
24
TBD (E) TENANT SUITE 205 NEW FIBER CEMENT & ALUMINUM SPANDREL RAINSCREEN JIMMY JOHN'S
NO.
1' - 4"
SECOND LEVEL RETAIL
WEST 4TH
C1 TYP A675_2B
TBD
ISSUE OR REVISION
ISSUE FOR PLAN CHECK 321' /- 2B 8"
16
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
20
10
TYP
2
INFILL NEW ROOF DECK WITH NEW ROOFING1' AND INSULATION TO MATCH EXISTING 1' - 7" - 7" COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
DATE
WEST 5TH STREET
6
12
18
04/05/2019
1
17
(E) TENANT
24
5
321' - 8"
4
14
(E) CEILING HEIGHT
NO.
1' - 4"
SECOND LEVEL RETAIL
7 ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
5
STREET
5
1' - 0"
1' - 0"
14' - 11"
14' - 11"
9' - 0"
10
1' - 4"
17
9' - 0"
1' - 0" 9' - 0"
10
10' - 0"
14' - 11"
9' - 0"
9' - 0"
9' - 0"10' - 0" 9' - 0"
14' - 11"
10' - 0"
9' - 0"
9' - 0"
10
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
22
14 NEW STOREFRONT SYSTEM, SEE WALL SECTION AND DETAIL
4
9
SECOND LEVEL RETAIL
1
24
HAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DETAILS AND DOOR TRANSITION
C1 STING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED. 18 A675_2B
2
7
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
1
24 24 15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR CEILING. 1' - 7" DAMPERS TO COMPLY WITH CBC. (E) TENANT SUITE 105 (E) TENANT SUITE 105 (E) TENANT SUITE 105 TBD HER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BCEXTERIOR WITH 75' TRAVEL DISTANCE TO ALL SEE CBC 716.2. JIMMY JOHN'S JIMMY JOHN'S JIMMY JOHN'S (E) TENANT SUITE 205 (E) TENANT SUITE 205 EXTERIOR EXTERIOR JIMMY JOHN'S JIMMY JOHN'S H FLOOR; ALSO DURING CONSTRUCTION. 20 20 20 3 3 3 15 15 CTILE EXIT SIGNAGE LOCATIONS AND SHEET A010 FOR GRAPHIC IMAGE.
TS FOR PARTITION TYPES & DETAILS. 9
14' - 11"
1
ALTER EXISTING DUCTWORK AS NEEDED, SEE
12
18
5
321' - 8"
4
22
2 NOT IN USE CEILING HEIGHT (E) CEILING HEIGHT (E) CEILING HEIGHT (E) CEILING HEIGHT 14.(E)REFER TO SHEET A070 FOR DOOR SCHEDULE. SEE SHEET A071 FOR DOOR TYPES AND HARDWARE. 3 NEW RAILING. SEE DETAIL SHEETS
24
14' - 11"
4' - 0" 36' - 5"
2
7
14MECHANICAL DRAWINGS
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
A671_2B
321' - 8"
CONSTRUCTION KEY NOTES
4
22
1/8" = 1'-0"
SECOND LEVEL RETAIL
321' - 8"
9
MEP ENGINEER 2101 El Segundo Blvd., S Los Angeles, CA 90071 t +1 310 846 4666 | www
CIVIL ENGINEER 700 South Flower Street, Los Angeles, CA 90017 t +1 213 481 0201 | www
t +1 213 481 0201 | www.kpff.com
WEST 4TH
1
321' - 8"
12
18
306' - 9"
TYP CIVIL F1 ENGINEER 700 South Flower Street, Suite 2100 A671_2B Los Angeles, CA 90017
5
EXTERIOR STAIR SECTION B1 TYP
STRUCTURAL ENGINE 550 South Hope Street, S Los Angeles, CA 90071 t +1 213 362 0707 | www
(E) CEILING HEIGHT
23
14' - 11"
4
SECOND LEVEL SECOND RETAILLEVEL RETAIL
1' - 4"
1437 4th Street, 4th F Santa Monica, Califo t +1 310 453 2800 |
MEP ENGINEER 2101 El Segundo Blvd., Suite 303 Los Angeles, CA 90071 t +1 310 846 4666 | www.amapc.com
CIVIL ENGINEER F1 TYP 700 South Flower Street, Suite 2100 Los A671_2B Angeles, CA 90017 t +1 213 481 0201 | www.kpff.com
3
10
C1
TYP9
23
10' - 0"
2
13
3
335' - 1 7/8"
STREET LEVEL
MEP ENGINEER 2101 El Segundo Blvd., Suite 303 Los Angeles, CA 90071 t +1 310 846 4666 | www.amapc.com 10
20
F1 TYP A671_2B
STRUCTURAL ENGINEER 550 South Hope Street, Suite 1700 Los Angeles, CA 90071 t +1 213 362 0707 | www.nyase.com
(E) CEILING HEIGHT
WEST 5TH STREET
2 2' - 0"
B1 A671_2B
1' - 4"
20
306' - 9"
1437 4th Street, 4th Floor Santa Monica, California 90401 t +1 310 453 2800 | www.hlw.com
14
(E) TENANT SUITE 201C
10
20
ROOF LEVEL
335' - 1 7/8"
27' - 11"
321' - 8"
TYP
10
STREET LEVEL
5
23
445 S. FIGUEROA STRE LOS ANGELES, CALIFO 90071
ROOF LEVEL
th 1437 4th Street, 2 4 4 Floor Santa Monica, California 90401 t +1 310 453 2800 | www.hlw.com 22
STRUCTURAL ENGINEER 550 South Hope Street, Suite 1700 Los Angeles, CA 90071 t +1 213 362 0707 | www.nyase.com
GL-02
(E) CEILING HEIGHT
24
GL-02
4' - 11"
B1 A671_2B
SECOND LEVEL RETAIL
10
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
TL-01
(E) TENANT SUITE 201C
TBD COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
TL-01
17
24
1' - 7"
1
7
14
(E) CEILING HEIGHT
1' - 0"
1' - 4" 5
13
15
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
14
UNION BAN
445 S. FIGUEROA STREET LOS ANGELES, CALIFORNIA
5
335' - 1 7/8"
4
22
9' - 0"
1' - 8"
3
334' - 7 7/8"
7
27' - 11"
3
13. VERIFY ALIGNMENTS SHOWN IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, FURR 14 14 17 COLUMN OR WALL TO PROVIDE ALIGNMENT.17 1' - 0"
1' - 0"
1' - 0"
24
9' - 0" 10
2
17
20
5
7
1
13
14
22
(E) CEILING HEIGHT
4' - 11"
10 TYP.
321' - 8"
(E) TENANT 20 SUITE 205 STARBUCKS
20
6
1
1
MECHANICAL DRAWINGS
F4 A706_2B ROOF LEVEL
5
UNION BANK 90071 B1 A677_2B
A677_2B
11
6
4
445 S. FIGUEROA STREET LOS ANGELES, 16 CALIFORNIA 90071 B1 19
19
MECHANICAL PENTHOUSE LEVEL
SECOND LEVEL RETAIL
ALTER EXISTING DUCTWORK AS
(E) TENANT SUITE 201C
TBD
(E) TENANT SUITE 205 STARBUCKS
36' - 5"
6' - 0"
(E) TENANT SUITE 205 STARBUCKS
B3 TYP A672_2B
3' - 6"
TL-01
2
4
22
7NEEDED, SEE
14
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
27' - 11"
3
334' - 7 7/8"
17 24
4' - 11"
4
1' - 0"
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
CKING PLATES TO WALL STUDS WHERE WALL MOUNT CABINET OCCURS.
5
7
1' - 7"
14' - 11"
GL-01
GL-02
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
1
36' - 5"
17
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
14
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
6
ALTER EXISTING DUCTWORK17 AS NEEDED, SEE MECHANICAL DRAWINGS
(E) CEILING HEIGHT (E) CEILING HEIGHT
FIGUEROA STREET SIDE
21' - 7"4
FIGUEROA STREET SIDE
9' - 0"10' - 0"
9' - 0"
9' - 0"
6' - 0" 2
IELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR 1' - 0"
1' - 8"
2' - 0"
1
1
7
14
7
B3 TYP A672_2B
4' -- 11" 11" 4' 4' - 11"
4
9
22
2' - 4"
1
9
4
321' - 8"
1' - 0"
2
4' - 11"
2' - 0"
4
16
B1 A677_2B
5 11
MECHANICAL PENTHOUSE LEVEL 2
334' - 7 7/8"
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
17
7
4' - 11"
7
SECOND LEVEL RETAIL
4' - 11"
5
13' - 0"
13' - 0" 10' - 0"
6' - 0"
9' - 0"
36' - 5"
FIGUEROA STREET SIDE
5
9
4
4' - 11"
1' - 8"
4' - 0"
7
(E) TENANT SUITE 205 STARBUCKS
(E) TENANT SUITE 205 STARBUCKS
1' - 8"
5
4
OM FINISH TO FINISH UNLESS NOTED OTHERWISE.
19
F4 A671_2B
NEW COLUMN CENTER LINE
TYP
UNION BANK
1
22
(E) CEILING HEIGHT
1
334' - 7 7/8"
1
ALTER EXISTING DUCTWORK AS NEEDED, SEE MECHANICAL DRAWINGS
3
1' - 8"
2
13' - 0"
4
4
10' - 0"
2
3 (E) TENANT SUITE 205 STARBUCKS
9 22 TYP.
4
9' - 0"
5
1
2
D1 TYP A672_2B 7
TBD
1
16 1' - 4"
11
5
F4 A671_2B
B4 TYP A671_2B
1
MECHANICAL PENTHOUSE MECHANICAL LEVELPENTHOUSE LEVEL
1' - 8"
(E) CEILING HEIGHT
1
2
5
334' - 7 7/8"
4' - 11" 4' - 0"
4' - 0" 4
4
5
2' - 4"
2
2
4' - 0"
334' - 7 7/8"
5
1
B3 TYP A672_2B
1' - 4"
F4 A671_2B
21
B4 TYP A671_2B
14' - 11"
9
D1 TYP A672_2B 7
5
STRUCTION NOTES
(E) ROOF MECHANICAL PENTHOUSE
1
11
5
MECHANICAL PENTHOUSE LEVEL
2' - 4"
4
4' - 11"
2
9
1
NEW COLUMN CENTER LINE
TYP
32' - 5"
1' - 4"
7"
21
B4 TYP A671_2B
9
MECHANICAL PENTHOUSE LEVEL
D1 TYP A672_2B 7 4' - 0"
1
11 2' - 0"
5 9
EXTERIOR ELEVATION - WEST
(E) ROOF MECHANICAL PENTHOUSE
NEW COLUMN CENTER LINE
TYP
4' - 11"
(E) ROOF MECHANICAL PENTHOUSE
7"
5
14' - 11"
21 1
A
30' - 0"
1' - 0"
PT-01 1
A
343' - 1 7/8"
7 6' - 7"
(E) ROOF MECHANICAL PENTHOUSE
B JJ
TOP OF ROOF (PENTHOUSE)
11
9
5
TOP OF ROOF (PENTHOUSE) 343' - 1 7/8"
7
A
14' - 11"
10
6
B
9' - 0"10' - 0"
2' - 0"
8
343' - 1 7/8"
8
1' - 0" 7 21
21
C KK
7
1
(E) ROOF MECHANICAL PENTHOUSE
343' - 1 7/8"
8' - 6"
AL-03
FC-01
B
6' - 7"
6
C
8' - 6"
D4 TYP A672_2B
6
D BUILDING PROFILE BEYOND 6
8' - 6"
8' - 6"
1
1 A677_2B
4' - 11"
7"
8 1' - 0"
C
TOP OF ROOF (PENTHOUSE) TOP OF ROOF (PENTHOUSE)
343' - 1 7/8"
PT-01
D
8
TOP OF ROOF (PENTHOUSE)
7
4' - 11"
13' - 11"
2' - 0"
AL-01
E 6
1' - 0"
(E) ROOF MECHANICAL PENTHOUSE
TYP. 22
7
21
D
6' - 7"
6
1
343' - 1 7/8"
D4 TYP A672_2B
6
E
1' - 6" 6 8
TOP OF ROOF (PENTHOUSE)
8' - 6"
1' - 0"
7
8' - 6"
18
8
D4 TYP A672_2B
6
5
8' - 6"
7' - 7"
23
F KK-1
1' - 6"
8' - 6"
KK-1
1' - 6"
E
8' - 6"
KK-1
F
8' - 6" 8' - 6"
F
B
A
© 2018 HLW International LLP
PROJECT PHASE
SHEET NO.
2B A575_2B A
© 2018 HLW International LLP
PROJECT PHASE
2B
F
E
E
D
D
C
C
B
B
JJ
(E) CENTER OF COLUMN 5/8" EXTERIOR SHEATHING
AL-05
D1
GL-01
GL-02
FC-01
FC-01
AL-03
FC-01
FC-01
E
AL-05
FC-01
GL-01
AL-01 FC-01
AL-01GL-01 FC-01
GL-01
GL-02
(E) STEEL COLUMN
GL-02
SECOND LEVEL RETAIL
GL-01
AL-01 FC-01
FC-01
FC-01
AL-05
FC-01 FC-01
1437 4th Street, 4th Floor Santa Monica, California 90401 t +1 310 453 2800 | www.hlw.com
TL-01
GL-01
GL-03 AL-01 FC-01
18 FC-01
AL-05
FC-01
AL-03 GL-03
GL-01 AL-01 AL-01 FC-01 FC-01
GL-01
3"
ALUMINUM FLOATING BRACKET AND HANGER RAIL SYSTEM
A676_2B
GL-01
5/8" EXTERIOR SHEATHING
HARDSCAPE ELEMENTS REFER TO8 L220_2B
10
25
8
1
3 5
10
25
8
25
8
1
5
XTERIOR SECTION - WEST
25
ELECTRICAL CONDUIT TO LIGHT FIXTURE
MN BEYOND ALUMINUM ANGLE FACADE SOFFIT CAP BRACKET AT 16” O.C. REFER TO B1 AND D1 A676_2B
3
1
3
6"
14
ALUMINUM FLOATING BRACKET AND HANGER SYSTEM
103
STAINLESS STEEL FLASHING
30' - 0"
NO.
30' - 0"
5
102
DATE
104
ISSUE OR REVISION
30' - 0"
04/05/2019
103
105
30' - 0"
ISSUE FOR PLAN CHECK / 2B
30' - 0"
104 20' - 0"
30' - 0"
106
107
105
F1 AL-05 A323_2B
(E) INSULATION
AL-03
3/8" THICK X 3-1/2”W X 12”L X 4”D ALUMINUM BENT PLATECAP AT BRACKET 16” O.C. AT 16" O.C. ALUMINUM ANGLE FACADE REFER TO B1 AND D1 A676_2B ALUMINUM Z-GIRT AT 16" O.C. . 156" THICK. 3" DEEP WITH 2" RETURNS ALUMINUM Z-GIRT AT 16" O.C. .156" THICK. REFER TO B1 AND D1 A676_2B FIBER CEMENT WALL PANELS
FLUID APPLIED MEMBRANE METAL CLIP AIR AND WATER BARRIER
AL-01 FC-01
15
(E) INSULATION
B1
3/4" 1/2"
AL-05
GL-01
GL-01
(E) STEEL COLUMN
FC-01
FC-01
5/8" THICK TYPE 'X' GYPSUM BOARD 3 5/8" METAL STUDS @ 16" O.C.
445 S. FIGUEROA STREET LOS ANGELES, CALIFORNIA 90071
3
ALUMINUM Z-GIRT AT 16" O.C. REFER TO B1 AND D1 A676_2D
GL-02
METAL L-TRIM
METAL STUD CLIP
AL-03
AL-05
AL-05
FC-01
FC-01
AL-03
FC-01 AL-03
AL-05
ALUMINUM FLOATING BRACKET AND HANGER RAIL SYSTEM
FC-01
FC-01
SHIM
AL-05
SEALANT & BACKER ROD
1437 4th Street, 4th Floor Santa Monica, California 90401 t +1 310 453 2800 | www.hlw.com
A676_2B
AL-01 GL-01 FC-01
GL-01
GL-01
GL-01
FC-01
GL-01
GL-01
ALUMINUM HAT CHANNEL. .156" THICK
5/8" EXTERIOR SHEATHING
TL-01
FC-01
2"
2"
1/2"
TL-01
STRUCTURAL ENGINEER 550 South Hope Street, Suite 1700 Los Angeles, CA 90071 t +1 213 362 0707 | www.nyase.com
MINERAL FIBER INSULATION
HSS KICKER.
GL-01
1/2"
GLAZED ALUMINUM ENTRANCE DOOR
4" 16 GA. METAL STUDS AT 16" O.C.
8" X 8" X 12" X 1/2" STEEL ANGLE ATTACH TO BEAM.
GLAZED ALUMINUM STOREFRONT
FIBER CEMENT WALL PANELS
HSS AT 4' - 0" O.C.
SHEET TITLE:
4" METAL STUD SOFFIT FRAMING
4"7"
1 3/4"
7" 5/16" (8MM)
KK-1
JJ
SCALE: 1 1/2" = 1'-0"
Checker
1 A677_2B
DECORATIVE CONCRETE PAVING
TBD
1' - 4"
PT-01
1 1/2" = 1'-0"
DATE: 02/07/19
KK
DRAWN BY: Author
HOT FLUID APPLIED WATER PROOFING
D1
RUN WATERROOFING INTO DRAIN
3 3/4"
4" 16 GA. METAL STUDS AT 16" O.C.
JJ
5/8" EXTERIOR SHEATHING
306' - 9"
14' - 11"
EXTERIOR ELEVATION - WEST
(E) STEEL BEAM WITH SPRAY-ON FIREPROOFING
B1
4' - 11"
15
FIBER CEMENT WALL PANELS
SIM
3
10 TYP.
ALUMINUM FLOATING BRACKET AND HANGER RAIL SYSTEM
4" METAL STUD SOFFIT FRAMING
GL-02
TL-01
1/4" THICK X 3-1/2”W X 12”L X 4”D ALUMINUM BENT PLATE AT 16” O.C.
TUBE STEEL BEAM, SEE STRUCTURAL DRAWINGS
3"X3"X6" ALUMINUM ANGLE ATTACHED TO BACK SIDE OF ALUMINUM PLATE SOFFIT
TUBE STEEL AT 4’-0” O.C.
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
3
GL-02
3
HSS AT 4’-0” O.C.
3
A676_2B
3
15
C1
EXTERIOR STAIR SECTION
306' - 9"
9 3/4"
3
ALUMINUM ANGLE FACADE SOFFIT CAP BRACKET AT 16" O.C. REFER TO B1 AND D1 A676_2B CONTINUOUS CURVED LIGHT FIXTURE
MECH. SHEETMETAL PLENUM WHERE OCCURS. CONNECT TO LOUVER AND EXISTING DUCT. SEE MEP DWG.
1 3/4"
7"
1
16 STOREFRONT NEW SYSTEM, WALLWITH SECTION AND DETAIL NEW EXTERIOR STUD WALL CLADDING,SEE WALL SECTIONS AND DETAILS 4"SEE
2
17 IN USE NEW PARAPET WALL WITH CLADDING NOT
3
18 RAILING. NEW DETAIL SHEETS SOFFIT PLATE NEWSEE CURVED ALUMINUM
5/16" (8MM)
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS MECHANICAL LOUVER
9
NEW SIGNAGE (FOR REFERENCE ONLY) 25 NEW BI-FOLD DOORS. SEE DOOR SCHEDULE FOR DETAILS.
10
NEW CLADDING ON (E) WALL
10
11
NEW ALUMINUM TRELLIS AT STEEL CANOPY, SEE DETAIL DRAWINGS
11
12
EXISTING BASEMENT TRANSFORMER ACCESS HATCH, SEE MEP DRAWINGS.
12
13
(E) COLUMN TO REMAIN
13
NEW CLADDING ON (E) WALL 26 PAINT EXISTING METAL TRELLIS STRUCTURE AS SCHEDULED NEW ALUMINUM TRELLIS AT STEEL CANOPY, SEE DETAIL DRAWINGS 27 EXISTING ROOF DRAIN TO REMAIN, SEE PLUMBING DRAWINGS EXISTING BASEMENT TRANSFORMER ACCESS HATCH, SEE MEP DRAWINGS. 28 NEW METAL PAINTED LOUVER, SEE DETAILS. (E) COLUMN TO REMAIN
14
(E) ESCALATOR TO REMAIN
14
(E) ESCALATOR TO REMAIN
15
NEW CONCRETE/PAVED STEPS AND RAILINGS,SEE SITE DETAIL SHEETS
15
NEW CONCRETE/PAVED STEPS AND RAILINGS,SEE SITE DETAIL SHEETS
D
C
B1
SECTION THROUGH RAMP
1/8" = 1'-0"
SHEET TITLE:
SECTION THRO
1/8" = 1'-0"
EXTERIOR DETAILS
SYMBOLS LEGEND
1/2" THICK CURVED ALUMINUM PLATE SOFFIT
1/2"
NEW SIGNAGE (FOR REFERENCE ONLY)
D
B1
EXTERIOR STAIR SECTION
9
E
24' - 0"
CONSTRUCTION KEY NOTES
HSS BEAM
1"
ECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE TO MAINTAIN INTEGRITY OF
306' - 9"
SEAL/ SIGNATURE
ELECTRICAL CONDUIT TO LIGHT
FIXTURE 1/8" = 1'-0"
4" 16 GA. METAL STUD SOFFIT FRAMING
6"
DESIGNATION T 3'-4" ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER CABINETS MOUNTED AT 3'-4" HANDLE.
STREET LEVEL
1:12 MAX.
STREET LEVEL
B1
INSULATION TO MATCH EXISTING
1/2"
HEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT DRYWALL PARTITIONS.
306' - 9"
TRUE PLAN
MINERAL FIBER INSULATION
6"
D A040 FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL.
GL-02 STREET LEVEL
TL-01
SOUTH FIGUROA STREET
SEE MEP DWG. L 15. BACKING INSTALL PLATES FIRE DAMPERS TOBI-FOLDING WALL STUDS IN ALL DUCTS WHEREPENETRATING WALL MOUNT CABINET EXISTING OCCURS. CORRIDOR WALLS4" &1 3/4" OR CEILING. 15. INSTALL FIRE DAMPERS IN ALL NEW DUCTS PENETRATING CORRIDOR WALLS & ORTO CEILING. GLAZED ALUMINUM DOORS 1/2" TYP 4 19 NEWNEW INFILL ROOF DECK WITHEXISTING NEW ROOFING AND INSULATION MATCH EXISTING 4 INFILL ROOF DECKFINISH WITH NEW ROOFING AND INSULATION TO MATCH EXISTING 7" FLOOR TO MATCH EXISTING TENANT SPACE TO DOOR SCHEDULE /DETAILS DAMPERS, REFER TO COMPLY WITH CBC. TO COMPLY WITH CBC. (E) INTERIOR CEILING COLUMN ENCLOSURE BEYOND 5/16"DAMPERS (8MM) GUISHER ALL SEEWITH CBC A716.2. RATING OF NOT LESS THAN 2-A OR 2-A10BC WITH 75' TRAVEL DISTANCE TO ALL SEE CBC 716.2. 5 5 NEW FIBER CEMENT & ALUMINUM SPANDREL RAINSCREEN NEW CEMENT ALUMINUM SPANDREL RAINSCREEN 21 FIBERNEW OPEN&TRELLIS CANOPY ABOVE, SEE GLAZED ROOF PLANSTOREFRONT FOR DETAIL ALUMINUM EACH FLOOR; ALSO DURING CONSTRUCTION. COLUMN ENCLOSURE BEYOND 6 6 SITE PAVING AND DRAINS REFERENCE L220 AND L221 HARDSCAPE PLAN SITE AND DRAINS REFERENCE L221 HARDSCAPE PLAN 22 PAVING NEW SITE LIGHTING, SEE L223L220 SITEAND LIGHTING PLAN TBD R TACTILE EXIT SIGNAGE LOCATIONS AND SHEET A010 FOR GRAPHIC IMAGE. 2' - 10" COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION B1 (SEE STRUCTURE EL RETAIL SECTION DETAILDRAWINGS) - STREET LEVEL 7 7 RETAILNEW NEW COLUMN TO SUPPORT THE PLAZA CANOPY ABOVE TO SUPPORT THE PLAZA CANOPY ABOVE (SEE STRUCTURE DRAWINGS) 23 COLUMN CANOPY BEAM. SEE STRUCTURAL DRAWINGS 1 1/2" = 1'-0" TION SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DETAILS AND DOOR TRANSITION 8 NEW FIBER CEMENT AND METAL PANEL CLADDING AROUND EXISTING COLUMN 8 NEW FIBER CEMENT AND METAL PANEL CLADDING AROUND EXISTING COLUMN 24 NEW STUD WALL BACKING FOR SCHEDULED FINISH,SEE E D C B A WALL SECTION AND DETAIL
HEETS FOR PARTITION TYPES & DETAILS.
F1 A708_2B TL-01
4" 16 GA. METAL STUDS AT 16" O.C.
1 CURVED NEW STOREFRONT WALL SECTION AND DETAIL D FROM 13. VERIFY FINISHALIGNMENTS TO FINISH UNLESS SHOWNNOTED IN DRAWINGS OTHERWISE. IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE,13. FURR VERIFY ALIGNMENTS SHOWN IN DRAWINGS SYSTEM, IN FIELD. SEE IF ALIGNMENT IS NOT ACHIEVABLE, FURR CONTINUOUS LIGHT FIXTURE COLUMN OR WALL TO PROVIDE ALIGNMENT. COLUMN OR1/2"WALL TO PROVIDE ALIGNMENT. THICK CURVED ALUMINUM PLATE SOFFIT 2 1/2" 2 NOT IN USE DRIN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR 14. REFER TO SHEET A070 FOR DOOR SCHEDULE. SEE SHEET A071 FOR DOOR TYPES AND HARDWARE. 14. REFER TO SHEET A070 FOR DOOR SCHEDULE. SEE SHEET A071 FOR DOOR TYPES AND HARDWARE. 3 NEW RAILING. SEE DETAIL SHEETS
D
KEY PLAN
5/8" EXTERIOR SHEATHING
(E) STEEL BEAM WITH SPRAY-ON FIREPROOFING
CONSTRUCTION KEY NOTES
R EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED.
E
F4 A706_2B
ALUMINUM Z-GIRT AT 16" O.C. .156" THICK. REFER TO B1 AND D1 A676_2B FLUID APPLIED MEMBRANE AIR AND WATER BARRIER
(E) STRUCTURAL COLUMN
(E)STRUCTURAL COLUMN BEYOND
ONSTRUCTION NOTES
C1
1/8" = 1'-0"
A676_2B
ELECTRICAL CONDUIT TO LIGHT FIXTURE
F
4/11/2019 4:54:26 PM
321' - 8"
14' - 11"
STREET LEVEL
FIBER CEMENT WALL PANEL RAINSCREEN SYSTEM
PLAN DETAIL @ COLUMN ENCLOSURE @ RETAIL
1/2" THICK CURVED ALUMINUM PLATE FACADE CAP
F4 A706_2B 7"
GL-02
MINERAL FIBER INSULATION
ALUMINUM FLOATING BRACKET AND HANGER RAIL SYSTEM
3"
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
(E) INSULATION
TL-01
5/8" EXTERIOR SHEATHING
FORMED METAL PLATE RAIN SCREEN SYSTEM
3"
TL-01 FLOATING BRACKET AND SECOND LEVELALUMINUM RETAIL HANGER RAIL YSTEM
GL-01
GL-02
4" 16 GA. METAL STUDS AT 16" O.C.
ISSUE OR REVISION
ALUMINUM ANGLE FACADE CAP BRACKET AT 16" O.C. REFER TO B1 AND D1 A676_2B
ALUMINUM Z-GIRT AT 16" O.C. .156" THICK. REFER TO B1 AND D1 A676_2B
3
3/8"
JJ
3" = 1'-0"
D1
22 TYP.
FLUID APPLIED MEMBRANE AIR AND WATER BARRIER
3
1"
1' - 4"
4" METAL STUD BRACE AT 16" O.C.
10 TYP.
3
ISSUE FOR PLAN CHECK / 2B
30' - 0"
F1
T.F.O. FC PANEL
(E) FLOOR ASSEMBLY
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
(E) INSULATION
15
1 5/8" METAL STUD
COLUMN ENCLOSURE BEYOND
ALUMINUM ANGLE FACADE CAP BRACKET AT 16" O.C. REFER TO B1 AND D1 A676_2B
INSULATION TO MATCH EXISTING
3
CUT EXISTING SLAB
321' - 8"
(E) FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM/BEYOND OUTSIDE AND INSIDE CORNERS
5
1
2' - 0"
SECOND LEVEL RETAIL
TL-01
28
1"
KK
FIBER CEMENT WALL PANELS
GL-02
DATE
04/05/2019
1
SEALANT & BACKER ROD
GL-01
3/8"
GLAZED ALUMINUM STOREFRONT
1' - 11"
1/2" THICK CURVED ALUMINUM PLATE FACADE CAP
V.I.F
5
MECHANICAL LOUVER. REFER TO MEP DWGS.
A676_2B
22 TYP.
A676_2B
NO.
1' - 7"
GLAZED DECORATIVE RAILING
3 7/8"
5
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
GLAZED ALUMINUM STOREFRONT
10
3
CIVIL ENGINEER 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 t +1 213 481 0201 | www.kpff.com
STAINLESS STEEL FLASHING
BUILDING PROFILE BEYOND 30' - 0"
ALUMINUM BRACKET WITH S.S. FASTENERS. ALUMINUM FACADE CAP TO METAL STUD FRAMING
PT-01
(E) CONCRETE SLAB ON METAL DECKING GLAZED ALUMINUM BI-FOLD DOOR SYSTEM
15 8
5/8" EXTERIOR SHEATING
TBD
SECTION DETAIL - SECOND LEVEL RETAIL
© 2018 HLW International LLP
AL-03
FC-01
AL-01
3 5/8" METAL STUD
10 3
FURRED COLUMN BEYOND
A
7"
5
CONTINUOUS CURVED LIGHT FIXTURE
2B A671_2B
1 A677_2B B4
PT-01
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
B
3
WEST 5TH STREET
PT-01
KK-1
(E) INTERIOR SHEET NO. CEILING
PROJECT PHASE
7
1 142
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
1/2"
BUILDINGCHECKED PROFILE BEYOND BY:
GLAZED ALUMINUM STOREFRONT
TYP. 22
2815
5
7"
PROJECT NO. 18109
COLUMN ENCLOSURE BEYOND
18
ELECTRICAL CONDUIT TO LIGHT FIXTURE
(E) MECH, DUCT. CONNECT TO PLENUM.
MECHANICAL LOUVER SEE MEP DWG.
5
3
ALUMINUM ANGLE FACADE SOFFIT CAP BRACKET AT 16” O.C. REFER TO B1 AND D1 A676_2B
MECH. SHEETMETAL PLENUM WHERE OCCURS. CONNECT TO LOUVER. REFER TO MEP DWGS.
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
23
1
HSS BEAM.
1/2" THICK ALUMINUM PLATE SOFFIT
2' - 5"
5 8
2' - 0"
1 3/4"2"
10
6"
1"
1/2"
38
2214 TYP.
1/2" THICK CURVED ALUMINUM PLATE SOFFIT
1/2"
5/16" (8MM)
SECTION DETAIL - STREET LEVEL RETAIL
22 TYP.15
EXTERIOR DETAILS
ALUMINUM ANGLE FACADE SOFFIT CAP ON AWB TO EXTEND 4” FLUID APPLIED FLASHING BRACKET AT 16" FROM/BEYOND O.C. OUTSIDE AND INSIDE CORNERS REFER TO B1 AND D1 A676_2B CONTINUOUS CURVED LIGHT FIXTURE CONTINUOUS CURVED LIGHT FIXTURE
1/2"
HH
(E) HSS COLUMN BEYOND
13
2' - 0"
9 3/4"
28 1
3 5/8"
FIXTURE
58
1 3/4" 5/8"
5
FLUID APPLIED MEP ENGINEER MEMBRANE AIR303 AND 2101 El Segundo Blvd., Suite BARRIER Los Angeles, WATER CA 90071 t +1 310 846 4666 | www.amapc.com
1/2"
3/8" THICK X 3-1/2”W X 12”L X 4”D 8O.C. 3 22 TYP. 22TO LIGHT TYP.PLATE AT 16”25 ELECTRICAL CONDUIT ALUMINUM BENT
1
(E) INTERIOR CEILING
7' - 7"
PT-02
STREET
28 15
JJ
13' - 11"
FC-01
FC-01
WEST 4TH
8
4"
E
2' - 7"
UNIONAL-03 BANK
(E) HSS BEAM TO REMAIN. REFER TO STRUCTURAL DRAWINGS
1' - 10"
3
2 1/2"
MECH. SHEETMETAL PLENUM WHERE OCCURS. CONNECT TO LOUVER AND EXISTING DUCT. SEE MEP DWG.
PROTECTION BOARD
AL-03
FC-01
4' - 11"
5
ELECTRICAL CONDUIT TO LIGHT FIXTURE HSS BEAM
DRAINAGE BOARD
26
PT-02
AL-01
AT 16” O.C. REFER TO B1 AND D1 A676_2B
(E) BEAM BEYOND
MINERAL WOOL INSULATION
XTERIOR ELEVATION - SOUTH
7
FC-01 ALUMINUM ANGLE FACADE CAP BRACKET AL-01
GL-02
TRUE PLAN
(E) STEEL BEAM WITH SPRAY-ON FIREPROOFING
24
4" METAL STUD BRACE AT 16" O.C.
STEEL BEAM WITH 4" 16 GA. METAL STUD SOFFIT SPRAY-ON FIREROOFING, SEE FRAMING STRUCTURAL DRAWINGS (E) STRUCTURAL COLUMN
TYP. 22
GL-01
B1
SEAL/ SIGNATURE
5
5/8" EXTERIOR SHEATING
FLUID APPLIED MEMBRANE AIR AND WATER BARRIER
AL-03
(E)SOUTH INSULATION FIGUROA STREET
9
FORMED METAL PLATE PANEL RAIN SCREEN SYSTEM
PT-02
14' - 11"
25
FC-01
4" METAL STUDS AT 16" O.C.
INSULATION TO MATCH EXISTING STEEL BEAM WITH SPRAY ON FIREPROOFING
GLAZED ALUMINUM STOREFRONT
PLAN DETAIL @ COLUMN ENCLOSURE
3" = 1'-0"
AL-05
5/8" EXTERIOR SHEATHING
A676_2B
(E) CONCRETE SLAB ON METAL DECKING HSS AT 4’-0” O.C.
FC-01
METAL STUD CLIP
GL-02
(E) ROOF STRUCTURE ASSEMBLY
AL-01 FC-01
GL-01
ALUMINUM HAT CHANNEL. .156" THICK 5/8" EXTERIOR SHEATHING ALUMINUM EXTRUSION WALL PANEL BRACKET SYSTEM 4" 16 GA. METAL STUDS AT 16" O.C.
A676_2BMINERAL FIBER INSULATION FLUID APPLIED MEMBRANE AIR AND WATER BARRIER
B1
INSULATION TO MATCH EXISTING
10' - 0"
MINERAL FIBER INSULATION
7"
GL-01
F4
1/2" THICK CURVED ALUMINUM PLATE FACADE CAP
AL-03
AL-05 AL-05
GL-01
TL-01
(E) STEEL BEAM WITH SPRAY-ON FIREPROOFING
3
AL-03 FC-01
AL-03
AL-05
PT-01
FC-01
GL-01
AL-01
GL-02
26
15
FASTEN AS REQUIRED
A676_2B
EXISTING COLUMN CENTER LINE
14' - 11"
FC-01
FC-01
AL-01 FC-01
36' - 5"
1
107
20' - 0"
PT-02
AL-01
STREET
(E) BARE METAL DECK WITH ROOFING ASSEMBLY
24
(E) CENTER OF COLUMN 5/8" EXTERIOR SHEATHING
D1
(E) ROOF ASSEMBLY
GL-02
4
5
10
1' - 4" T.F.O.FC PANEL
FC-01AL-03
KEY PLAN
ALUMINUM FLOATING BRACKET AND HANGER RAIL YSTEM
7" GL-02
2"
GL-02
ROOFING ASSEMBLY TO MATCH EXISTING
WEST 5TH STREET
36' - 5"
ROOFING ASSEMBLY TO MATCH EXISTING
GL-01
1/2" THICK CURVED ALUMINUM PLATE FACADE CAP FIBER CEMENT WALL PANELS
A676_2B
FC-01 PT-01
5/8" EXTERIOR SHEATHING
GL-01
GL-01
3/4" 1/2"
C1 A570_2B
COUNTER FLASHING
4"
SHAPED GALVANIZED METAL COPING
15
4" METAL STUDS AT 16" O.C.
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM/BEYOND OUTSIDE AND INSIDE CORNERS
GL-01
D1 7"
4" 1 1/8"
13' - 11"
GL-01
GL-01
CANOPY STEEL COLUMN
GL-01
PT-01
5/8" EXTERIOR SHEATHING 1/2" THICK CURVED ALUMINUM PLATE FACADE CAP
18 GA. GALVANIZED AND PAINTED COPING
AL-04
6 1/2"
4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS FC-01 FC-01
A676_2B
106
10' 30'--0"0"
A
2 1/2"
FLUID APPLIED FLASHING ON AWB TO EXTEND
PT-01
1' - 0 5/8"
D1
9
15
B
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM/BEYOND OUTSIDE AND INSIDE CORNERS
1' - 4" T.F.O. FC PANEL
FC-01
10
151
SHAPED ALUMINUM COPING. AL-03
COLUMN ENCLOSURE BEYOND
(E) FLOOR ASSEMBLY
AL-03
AL-04
AL-04
5
28
C
CUT EXISTING SLAB
1' - 11"
PT-01
F4 A323_2B
23
8 3/8"
AL-04
GLAZED ALUMINUM STOREFRONT
25
D
EXISTING COLUMN CENTER LINE
125
COLUMN CLADDING DEPTH TO BE DETERMINED BY STOREFRONT LOCATION
4" 16 GA. METAL STUDS AT 16" O.C.
FC-01
5
1' - 7"
TBD
EXISTING COLUMN CENTER LINE
7' - 7"
23TYP. 1 28
E
ALUMINUM BRACKET WITH S.S. FASTENERS. ALUMINUM FACADE CAP TO METAL STUD FRAMING
F
14
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS MIN.
WEST 4TH
25
TION DETAIL - SECOND LEVEL RETAIL
-0"
15 10
FLUID APPLIED MEMBRANE AIR AND WATER BARRIER
4' - 11"
CEILING
AL-03
5
2' - 7 1/8"
101
1/2"
25
C-01
28
FIBER CEMENT WALL PANEL RAINSCREEN SYSTEM
FLUID APPLIED FLASHING ON AWB TO EXTEND 4” FROM / BEYOND OUTSIDE AND INSIDE CORNERS
GLAZED ALUMINUM STOREFRONT
1 1/2" = 1'-0"
5
5 EXTERIOR SECTION - EAST
1/8" = 1'-0"
MECHANICAL LOUVER. REFER TO MEP DWGS.
B1
5/8"
1 1
FURRED COLUMN BEYOND
1
1 3/4"
3"
102 30' - 0"
GL-02
5/16"
CONTINUOUS CURVED LIGHT FIXTURE
T. CONNECT TO PLENUM.
01
3 5/8" METAL STUDS @ 16" O.C.
3/8"
10
C5
EXTERIOR SECTION - EAST
1/8" = 1'-0"
5
CIVIL ENGINEER 700 South Flower Street, Suite 2100 Los Angeles, CA 90017 t +1 213 481 0201 | www.kpff.com
7"
Typical Details
C5
MEP ENGINEER 2101 El Segundo Blvd., Suite 303 Los Angeles, CA 90071 t +1 310 846 4666 | www.amapc.com
LIGHT FIXTURE IN CONCRETE FLOOR SLAB
306' - 9"
FIBER CEMENT WALL PANELS
O.C.
METAL PLENUM WHERE OCCURS. LOUVER. REFER TO MEP DWGS.
STREET LEVEL
306' - 9"
2"
3
STREET LEVEL
STRUCTURAL ENGINEER 550 South Hope Street, Suite 1700 Los Angeles, CA 90071 t +1 213 362 0707 | www.nyase.com
MINERAL FIBER INSULATION
3/8"
"
AL-01 FC-01
METAL L-TRIM
2' - 0"
4" 16 GA. METAL STUDS AT 16" O.C.
OND
AL-01 FC-01
321' - 8" 6
GL-01
EAM.
D
9
13' - 11"
6 1/2"
AL-05
F
AL-01
18
ALUMINUM HAT CHANNEL. .156" THICK
L1/2" STEEL ANGLE
5
GL-02
METAL STUD CLIP
14' - 11"
GL-02
321' - 8"
FC-01
FLUID APPLIED MEMBRANE AIR AND WATER BARRIER
B1
GL-01
SECOND LEVEL RETAIL
445 S. FIGUEROA STREET LOS ANGELES, CALIFORNIA 90071
AL-03
ALUMINUM Z-GIRT AT 16" O.C. REFER TO B1 AND D1 A676_2D
GL-01
FC-01
36' - 5"
GL-02
UNION BANK
(E) HSS BEAM TO REMAIN. REFER TO STRUCTURAL DRAWINGS
TL-01
M WITH EPROOFING
GL-01
METAL STUD CLIP
AL-03 FC-01
N
335' - 6 7/8"
FC-01
3
ALUMINUM ANGLE FACADE CAP BRACKET AT 16” O.C. REFER TO B1 AND D1 A676_2B
GL-02
UCTURE
AL-01
TOP OF PARAPET (RETAIL)
335' - 6 7/8" AL-05
PT-01
18
7"
22 GL-02
28' - 10"
"
EMBLY
FC-01 TOP OF PARAPET (RETAIL)
1/2" THICK CURVED ALUMINUM PLATE FACADE CAP
GL-01
L
PT-01
FASTEN AS REQUIRED
A676_2B
1
343' - 1 7/8"
2"
T.F.O.FC PANEL
3
8 3/8"
SHEATHING
EMBLY TO NG
AL-03
FC-01
1' - 4"
2 1/2"
13' - 11"
18
DS AT 16" O.C.
AL-04
24
TOP OF PENTHOUSE
5
343' - 1 7/8"
55 PT-02
14' - 11"
PT-01
TOP OF 23 PENTHOUSE 1
7
PT-01
3/4" 1/2"
"
D FLASHING ON AWB TO EXTEND 4” D OUTSIDE AND INSIDE CORNERS
11
A
AL-03
EXISTING COLUMN CENTER LINE
)INUM COPING.
5
1 1
7' - 7"
PT-01
AL-04
PT-01
B
11 A677_2B
23
24
7' - 7"
7
KK-1 JJ
5
13' - 11"
11
36' - 5"
1 A677_2B
1
JJ
14' - 11"
JJ KK-1
A
16
NEW EXTERIOR STUD WALL WITH CLADDING,SEE WALL SECTIONS AND DETAILS
17
NEW PARAPET WALL WITH CLADDING
B10
INDICATES PARTITION TYPE. SEE A030 FOR PART
1i
DATE: 02/07/19
DOOR SYMBOL SEE SHEET A070 FOR DOOR SCHEDULE , TYPES,
DRAWN BY: Author
EXISTING WALL TO REMAIN, PROTECT IN PLACE.
PROJECT NO. 18109
18
NEW CURVED ALUMINUM SOFFIT PLATE
19
NEW FLOOR FINISH TO MATCH EXISTING TENANT SPACE
SCALE: 1 1/2" = 1'-0"
CHECKED BY: Checker
21 NEW OPEN TRELLIS CANOPY ABOVE, SEE ROOF PLAN FOR DETAIL PROJECT PHASE SHEET NO. 22 23
2B A671_2B
NEW SITE LIGHTING, SEE L223 SITE LIGHTING PLAN CANOPY BEAM. SEE STRUCTURAL DRAWINGS
24
NEW STUD WALL BACKING FOR SCHEDULED FINISH,SEE WALL SECTION AND DETAIL
25
NEW BI-FOLD DOORS. SEE DOOR SCHEDULE FOR DETAILS.
26
PAINT EXISTING METAL TRELLIS STRUCTURE AS SCHEDULED
27
EXISTING ROOF DRAIN TO REMAIN, SEE PLUMBING DRAWINGS
28
NEW METAL PAINTED LOUVER, SEE DETAILS.
NEW WALL PARTITIONS, SEE SHEET A030 FOR VA SCOPE LINE
© 2018 HLW International LLP
C
B
B
45
A
817 / 827 N. Vine Campus Owner: Lincoln Propery Co. West HLW Project Team: Mark Zwagerman (P.I.C.), Sejal Sonani (P.M.), Josh Kenin (P.A.), Victor Zhang (Project Designer), Designer) Kirstin Nguyen (Job Captain) Consultants: HLW (Landscape), Structural Focus (Structural), ARC Engineering (M.E.P.), KPFF (Civil), KGM (Lighting)| General Contractor: KPRS
Centrally located in West Hollywood’s entertainment district, the 817/827 N. Vine Street Campus is a creative office space which is due to be leased by Netflix. Three structures compose the campus; 817 N. Vine is an existing building and the former home to The Musician’s Union, 827 N. Vine is a four story ground up construction, and a new 280 stall parking structure occupies the north of the site. Tying the two commercial buildings is a vibrant central courtyard capable of hosting private events along with day to day tenant use.
46
47
Formal Diagrams
Existing
Demolition
Proposed
Existing condition with minimal courtyard due to additions to original historic building. Single structure occupying site of future construction.
Demolish add-on structured to original building and single structure to maximize site and create larger central open courtyard.
New building is set back at courytard facing facade to maximize couryard area. Upper level views at north facade afford views to Hollywood sign.
Site Plan
LILLIAN WAY
WARING AVE.
NEW PARKING STRUCTURE FOR 827 VINE ST. WITH OFFSITE PARKING FOR 817 VINE ST.
817 VINE ST. CONVERSION OF EXISTING AUDITORIUM TO CREATIVE OFFICE.
827 VINE NEW 3-STORY 45’-0” HIGH CREATIVE OFFICE BUILDING
817 VINE ST. CONVERSION OF EXISTING 2 STORY OFFICE BUILDING TO CREATIVE OFFICE.
N. VINE STREET 48
As an existing building with historic landmark status, 817 N. Vine St was not only unique due to its adaptive re-use strategy, but also because of the city and local stakeholder’s design input on the project. Integral to the design of the building was the balance between maximizing the usability of the building while maintaining the historical qualities such as the openness of the drive aisle, the visual transparency of the central courtyard from the street and the central covered walkway. To create a large interior open plan, the cores of the building are located on the outside on the perimeter of the building, with one exit stair being an exterior stair. Similarly, shear walls commonly placed centrally in a typical floro alan are placed outbound on the perimeter and seen from the exterior of the building. Along with the concrete shear walls, the facade of 827 N. Vine consists of an irregular pattern of fiber cement panels and glazing units. 49
Typical Floor Plan F
E
D
M
N
N.5
C
P
Q
B
R
A
S
T
U
197' - 6 1/2" 13' - 6"
12' - 2"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
PL
19' - 10 1/2"
29' - 10"
1' - 1"
1' - 1"
13
13 PL
827 LOS AN
F5 A603B NOTE: THIS GRIDLINE NOT PARALLEL TO GRIDLINE 5-B
1' - 0"
7
4"
B104.2
7
7
1 2 3 6
ELECTRICAL B104
B102
9
7
7
5-B OFFICE TENANT 4 B105
2 1/2"
11
F1 A655B
11' - 3 3/8"
UP
9' - 4 3/4"
3 ACCESIBLE MEANS OF EGRESS (SECTION 1009.3)
1
22' - 6"
B3 A604B
G6 MPOE B107
BS6
STAIR 6 S6
BS101
B106
8
D3 A603B
RAMP DOWN AT 8.33%
G6 G6
E1 A784B
F1 A785B
B105
B107
34' - 11 3/4"
S2.1
F3 A604B
TYP
288.31
2' - 3"
10' - 11 3/4"
TYP
27' - 6"
10' - 0"
20' - 3"
10' - 2"
WARING AVE.
G6
105' - 6 5/8"
S2.1
F5 A612B
7
G6.1 2' - 6"
11 3
LIGHTING CONSU
3-B
KAPLAN GEHRIN LIGHTING 270 CORAL CIRCL O 310.552.2191 EX WWW.KGMLIGHT
TYP
27' - 6"
S2.1
B101.2
9' - 9" E1 A654B
12/12/2017
TYP
KEY PLAN
G6
5' - 9"
1' - 1"
4' - 1"
S 1 P IS G IS
2"
F4
1' - 2 1/2"
F4
B101.1
1' - 1"
107' - 6 3/4"
TYP
DATE 01/13/2017 04/14/2017 06/05/2017 09/01/2017
B2 A786B
LOBBY B101 6' - 10"
3
3' - 4"
G6
7' - 6 3/8"
11
NO.
24' - 5 5/8"
WOMEN WC B103
B1 A811B
F1 A653B
26' - 10 1/2"
S2.1
11
6-B
B103
34' - 4 3/4"
B104.1
3
TYP
13' - 8 1/2"
S2.1
MEN WC B102
23
13' - 7 1/2"
G6.1
TYP
1' - 1"
6-B
TYP
MEP CONSULTAN
12' - 1"
C6 A911B
BREEZEWAY B108
277 SOUTH LAKE BURBANK, CA 91 TEL: (818) 508-63 FAX: (818) 508- 70
F3
2-B
STRUCTURAL CO
2.1%
23' - 11"
C1 A913B
F1 F2 A652B
F1 A651B BE3
11
TYP
8
TYP
3
8
3' - 0" 4' - 1 7/8"
8
7 24
7
24
30' - 0"
VINE STREET
Architecture
C
B
KEYNOTES 1
STOREFRONT
21
HOSE BIBB. SEE PLUMBING DRAWINGS
2
BREEZEWAY ENTRANCE WITH STEEL ANGLE FRAMING MEMBERS AND DECORATIVE PERFORATED METAL INFILL.
22
VENT THROUGH ROOF. SEE PLUMBING DRAWINGS
E EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC E TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING
3
WINDOW WALL
23
FUTURE LOCATION FOR FUTURESOLAR PANELS INVERTERS AND METERING EQUIPMENT
4
ELEVATOR PENTHOUSE
24
EXTERIOR LIGHTING FIXTURE. SEE LIGHTING DWGS.
5
ROOF HATCH AND GUARDRAIL / GATE
6
PLANTER
7
SHEAR WALL (TYP.)
8
CONCRETE COLUMN
9
ROOF DRAIN & OVERFLOW DRAIN
7
11
E
11
FIBER CEMENT PANEL 19 10RAINSCREEN 3 14
12
1-HR RATED EXTERIOR WALL
13
UTILITY POLE
14
PREFINISHED PARAPET COPING
15
CLASS B COATED FOAM ROOFING
16
MECHANICAL ROOF MOUNTED UNIT AND PLATFORM
17
MECHANICAL SUPPLY
18
MECHANICAL EXHAUST
19
PRO-BEL HORIZONTAL CABLE LIFELINE SYSTEM
20
SMALL CONDENSER UNITS WITH STEEL SUPPORTS
16
11
7
U
10
T.O. PARAPET B (332.33) (E)PYLON SIGN 10
(E)PYLON SIGN 11
3
TYP. 19
10
D
14
42' - 6"
3
STEEL GATE WITH PANIC HARDWARE 16' - 0"
F2 A990B
11
29' - 4"
B LEVEL 2 (B) (304.31) 16' - 0"
STEEL GATE WITH PANIC HARDWARE
F2 A990B
2' - 6"
16' - 0"
GRADE PLANE (B) (288.81)
1' - 0"
LEVEL 1(B) (288.31)
F3
0' - 0"
LOWEST ADJ. GRADE (B) (287.33)
LOWEST ADJ. GRADEGRADE (B) (287.33) PLANE (B) (288.81) -1' - 0"
2' - 6"
0' - 6"
LEVEL 1(B) (288.31) 0' - 0"
LOWEST ADJ. GRADE (B) (287.33)
10
1
ROOF B (330.81) 24
14
10
42' - 6"
19
44' - 0"
ROOF B (330.81) 42' - 6"
14
3
T.O. PARAPET B (332.33)
1' - 6"
SOUTH ELEVATION
ALIGN ALIGN
13' - 2"
LOWEST ADJ. GRADE (B) (287.33) C1
16' - 0"
LEVEL 2 (B) (304.31) 16' - 0"
0' - 6"
A913B
C4 A784B
LEVEL 3 (B) (317.64) 29' - 4"
LEVEL 2 (B) (304.31) 16' - 0"
0' - 6"
LEVEL 1(B) (288.31)
LEVEL 1(B) (288.31) 0' - 0"
LOWEST ADJ. GRADE (B) (287.33) -1' - 0"
0' - 6"
LEVEL 1(B) (288.31) 0' - 0" B3SIDE) EAST ELEVATION BUILDING (COURTYARD LOWEST ADJ. GRADE (B) 1/8"(287.33) = 1'-0"
T.O. PARA 277 SOUTH LAKE STRE 44' - 0" BURBANK, CA 91502-21 TEL: (818) 508-6300 EXT ROOF B (3 C3 OH FAX: (818) 5087050 42' - 6" A655B
* FROM LAMC SECTION 12.21.1.B.3(a): EAST ELEVATION BUILDING (COURTYARD SIDE)
-1' - 0"
B3
WHERE HEIGHT IS LIMITED TO THIRTY (30) FEET OR FORTY-FIVE (45) FEET, ROOF STRUCTURES FOR THE HOUSING OF ELEVATORS AND STAIRWAYS MAY EXCEED THE BUILDING HEIGHT LIMIT BY UP TO TEN (10) FEET IN HEIGHT.
EAST ELEVATION BUILDING (COURTYARD SIDE)
STRUCTURAL CONSUL
LEVEL 3 (B 29' - 4"
CIVIL CONSULTANT
LEVEL 2 (B 16' - 0"
700 SOUTH FLOWER ST LOS ANGELES, CA 9001 O 213.418.0201 F 213.266.5294 ARCHITECT
GRADE PLANE (B) (288.81)
GRADE PLANE (B) (288.81) LOWEST ADJ. GRADE (B) (287.33) -1' - 0" GRADE PLANE (B) (288.81)
1/8" = 1'-0"
22
LEVEL 2 (B) (304.31)
0' - 0"
B3
SOUTH ELEVATION
29' - 4"
1' - 0"
0' - 0"
-1' - 0"
22
13' - 4"
13' - 2"
0' - 6"
LEVEL 1(B) (288.31)
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
C1 A913B 1' - 0"
50
TEMPERED GLASS
TEMPERED GLASS
13' - 4"
ADJACENT BUILDING GRADE PLANE (B) (288.81)
C1 A913B
LEVEL 3 (B) (317.64)
LEVEL 3 (B) (317.64)
19
C4 A784B
42' - 6"
29' - 4"
ROOF B (330.81) E2 24 42' - 6" A654B
14
C4 A784B
ROOF B (330.81)
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
TEMPERED GLASS
TEMPERED GLASS
C2 A913B
16' - 0"
TEMPERED GLASS
16' - 0"
ADJACENT BUILDING 16' - 0"
ADJACENT BUILDING
LEVEL 2 (B) (304.31)
1' - 0"
TEMPERED GLASS
C4 A913B
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
F2 A654B
C2 A913B
29' - 4"
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
C2 A913B
LEVEL 3 (B) (317.64)
16' - 0"
TEMPERED GLASS
C4 A913B
1' - 0"
F2 A654B TEMPERED GLASS
13' - 4"
F3 A913B
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
13' - 2"
C4 A913B TEMPERED GLASS
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
TEMPERED GLASS
T.O. PARAPET B (332.33)
44' - 0"
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
20
MEP CONSULTANT
N.5
1' - 6"
T.O. PARAPET B (332.33)
44' - 0"
1' - 6"
16
T.O. PARAPET B (332.33)
C3 OH A655B
19
10' - 0" *
14
N
24
GRADE PL 0' - 6"
LEVEL 1(B 0' - 0"
LOWEST A -1' - 0" 1' - 0"
4
19
E2 A654B
1' - 6"
10
M C3 OH A655B
13' - 2"
14
14
13' - 4"
24
3
43' - 6 1/4" FROM GRADE PLANE TO TOPALIGN OF PARAPET (3 STORIES)
1
19
16' - 0"
F510 14 A612B
24
1' - 0"
20 19
E2 A654B
ALIGN
10
14
ALIGN
14
3
10' - 0" *
24
1' - 0 3/4"
TEMPERED GLASS
KAPLAN GEHRING MCC LIGHTING 270 CORAL CIRCLE, EL O 310.552.2191 EXT. 166 WWW.KGMLIGHTING.CO
N.5
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
1
1-B
1' - 6"
16
TEMPERED GLASS
F2 A654B
N
13' - 4" 13' - 2" ALIGN 43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
10
2-B
44' - 0"
24
N.5
16' - 0"
20
F3 A913B
M
13' - 2"
N
10' - 0" *
16
19
M
1-B
3-B
1' - 0 3/4"
F3
LEVEL 2 (B) (304.31)
13' - 4"
2-B
10' - 0" *
4
1' - 0 3/4"
1/8" = 1'-0"
16' - 0"
F5 A612B 5-B E4 A784B
17
F3
KEY PLAN
LEVEL 2 (B) (304.31)
16' - 0"
1-B
E4 A784B
22
29' - 4"
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
2-B 3-B F5 A612B
24
BUILDING:
LEVEL A 3 (B) (317.64)
1' - 0"
3-B 5-B
E4 A784B
F3 A913B
DATE 04/14/2017 100% DES SCALE: 06/05/2017 PERMIT S 1/8" = 1'-0" 09/01/2017 ISSUE FO CHECKED BY: GMP (AD 12/12/2017 ISSUE FO
LIGHTING CONSULTAN
1' - 6"
5-B
19
9
EAST ELEVATION
1/8" = 1'-0"
17
42' - 6"
NO.
-1' - 0"
F5
4
44' - 0"
29' - 4"
EAST ELEVATION
10' - 0" *
2
T.O. PARAPET B (332.33) ROOF B (330.81)
0' - 6"
0' - 0"
2 3 6
LEVEL 3 (B) (317.64)
0' - 6"
-1' - 0"
1/8" = 1'-0"
42' - 6"
STEEL GATE WITH PANIC HARDWARE
LEVEL 1(B) (288.31)
1' - 0"
2' - 6"
GRADE PLANE (B) (288.81)
2
F5
44' - 0"
(E)PYLON SIGN
LEVEL 3 (B) (317.64)
LOS ANGE
INDICATES ANGLED GRIDLINE
T.O. PARAPET B (332.33) ROOF B (330.81)
10
F2 A990B
AST ELEVATION
LEVEL 1 PLAN 827 VIN
TYPICAL GRIDLINE
A
44' - 0"
ROOF B (330.81)
7
C
A
10' - 0" *
14
TO BE SOLARBAN 70XL PENINGS IN FIELD.
F
T
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
15
MPLY WITH CBC. SEE CBC 716.2. SURED FROM WALL TO THE HINGED SIDE OF DOOR UNLESS NOTED
10
F3 A651B
Drawing Title
1' - 6"
19 F3 A612B
Fax 310 453 7020
NEW WALL PARTITIONS, SEE SHEET A030B FOR VARIOUS TYPES AND SIZES.
1' - 6"
11
F3 S IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR A656B
S
EXTERIOR LIGHT COLORED CEMENT PLASTER (TYP.) 10 TYP.
13' - 2"
TYP.
Santa Monica, CA 904
DOOR SYMBOL SEE SHEET A081B FOR DOOR SCHEDULE , TYPES, AND HARDWARE.
NEW CMU WALLS
13' - 4"
16
INDICATES PARTITION TYPE. SEE A030B FOR PARTITION TYPES.
NEW CONCRETE FLOOR/SLAB ON GRADE
10' - 0" *
R
B10 B100
Consulting
Tel 310 453 2800
16' - 0"
15
16
F3 A651B
1556 20th Street Suite
U
1' - 6"
Q F3 A612B
F3 A651B
Planning
NEW SHEAR WALLS
TU
13' - 2"
P
"F.E.C." DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE F3 F3 MOUNTED AT 3'-4" A.F.F. TO THE CENTERLINE OF HANDLE.A612B A656B LLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER RITY OF15 WALL RATING. 11 HOWN IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, O PROVIDE ALIGNMENT. B FOR DOOR SCHEDULE, DOOR TYPES AND HARDWARE. SEE SHEET
ST
13' - 4"
B FOR PARTITION TYPES & DETAILS. B-A008B FOR TITLE 24 NOTES DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION N.5 DETAIL AT
RS
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
QR
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
U A043B FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET G008B
OOR FILL SO THAT FLOOR N.5 FINISHES CAN ALIGN. SEE FLOOR PQ DOOR TRANSITION DETAILS. L NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS
AEngineering Interiors
SYMBOL B LEGEND
C
EASURED FROM FINISH TO FINISH UNLESS NOTED OTHERWISE. VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE PRIOR TO CONSTRUCTION. EET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT
Elevations
A
13' - 2"
D
B
13' - 4"
E
C
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
D
HLW Internation
16' - 0"
L CONSTRUCTION FNOTES
ARCHITECT
1' - 1"
29' - 10"
10' - 0" *
D
30' - 0"
43' - 6 1/4" FROM GRADE PLANE TO TOP OF PARAPET (3 STORIES)
CONSTRUCTION PLAN - BUILDING B
E
30' - 0"
F5 A604B
F3 A612B
E
700 SOUTH FLOW LOS ANGELES, C O 213.418.0201 F 213.266.5294 PL
30' - 0"
45' - 0" FROM LOWEST ADJACENT GRADE TO TOP OF PARAPET
12' - 2"
GRADE PLANE: 288.81 SEE G002B FOR CALCULATIONS
F
1-B
1' - 10"
EXTERIOR ENCLOSURE NOTE: SEE A660B AND A661 B FOR ENLARGED PLANS OF EXTERIOR WALL, EXTERIOR WALL DIMENSIONS AND RULES FOR MODULE DEFINITIONS
CIVIL CONSULTA
2' - 11"
7
PL
4.8%
24 PL
TYP
11
WARING AVE.
2
TYP
2' - 1 1/2"
3
3.9%
F1 A656B
23' - 11"
F3
1' - 1"
38' - 2 1/4"
7 12
* FROM LAMC 12.21.1.B.3(a): HLWSECTION International LLP
WHERE HEIGHT IS LIMITED TO THIRTY Architecture FORTY-FIVE (45) FEET, ROOF STRUCT Engineering ELEVATORS AND STAIRWAYS MAY EXC BUILDING HEIGHT LIMIT BY UP TO TEN * FROM LAM Interiors
DD
D3 D3 A656B A656B
P
1
2
1
CC 1-B 1-B
P
2
BB
2
E-PT-01 E-PT-01
2
1
T.O.T.O. PARAPET B (332.33) PARAPET B (332.33)
T.O.T.O. PARAPET B (332.33) PARAPET B (332.33) 44' - 0" 44' - 0"
1' - 6"
1' - 6"
42' - 6" 42' - 6"
10"
1' - 6" 10"
ROOF B (330.81) ROOF B (330.81)
10"
E-CP-01 E-CP-01
1
E-CP-01 E-CP-01
44' - 0" 44' - 0"
E-GL-01 E-GL-01
1' - 6"
N.5 N.5
EE
ROOF B (330.81) ROOF B (330.81) 42' - 6" 42' - 6"
10"
Enlarged Elevations FF
B4 B4 A912B A912B
13' - 2"
10' - 0"
10' - 0" 13' - 2"
12' - 4"
12' - 4"
13' - 2"
10' - 0"
10' - 0" 13' - 2"
E-GL-01 E-GL-01 E-FC-01 E-FC-01
E1 E1 A912B A912B
F1 F1 A912B A912B E-CP-01 E-CP-01 2' - 4"
2' - 4"
E-CP-01 E-CP-01 I-CN-02 I-CN-02
10 10
LEVEL 3 (B)3 (317.64) LEVEL (B) (317.64)
29' - 4" 29' - 4"
1' - 0"
1' - 0"
LEVEL 3 (B)3 (317.64) LEVEL (B) (317.64)
29' - 4" 29' - 4"
E-FC-01 E-FC-01 E-FC-01 E-FC-01
LEVEL 2 (B)2 (304.31) LEVEL (B) (304.31)
16' - 0" 16' - 0"
16' - 0" 16' - 0"
F1 F1 A656A656
16' - 0"
5' - 9"
5' - 9" 16' - 0"
9' - 3"
9' - 6"
15' - 0"
9' - 6"
5
Sim Sim C4 C4 A082B A082B
15' - 0"
16' - 0"
5' - 9"
5' - 9" 16' - 0"
5
5
9' - 3"
13 13
13 13
5
8
LEVEL 2 (B)2 (304.31) LEVEL (B) (304.31)
10 10
45' - 0"
45' - 0"
8
I-CN-02 I-CN-02
Sim Sim F4 F4 A082B A082B
13' - 4"
16' - 8"
E-CP-01 E-CP-01
D3 D3 A913B A913B
E-CP-01 E-CP-01
E-FC-01 E-FC-01
16' - 8" 13' - 4"
12' - 4"
12' - 4"
44' - 0"
13' - 4" 44' - 0"
13' - 4"
13' - 4"
13' - 4"
E-GL-01 E-GL-01
E-CP-01 E-CP-01
LOWEST ADJ.ADJ. GRADE (B) (287.33) LOWEST GRADE (B) (287.33)
3/8" =3/8" 1'-0" = 1'-0"
D3 D3 A656B A656B
P
B3B3
SECTION DETAIL SECTION DETAIL
2' - 3"2' - 3"
E3 E3 A911B A911B
1-B 1-B
1' - 1"1' - 1' 1"- 0"1' - 0" 1' - 11" 1' - 11"
3' - 0"3' - 0"
2' - 0"2' - 0"
AXONOMETRIC VIE AXONOMETRIC
KEYNOTES KEYNOTES
P
12' - 2" 12' - 2" 9' - 1"9' - 1"
0' - 0"0' - 0"
-1' - 0" -1' - 0"
D3D3 N.5 N.5
LEVEL 1(B)1(B) (288.31) LEVEL (288.31) LOWEST ADJ.ADJ. GRADE (B) (287.33) LOWEST GRADE (B) (287.33)
-1' - 0" -1' - 0"
ECTION DETAIL SECTION DETAIL
1' - 0"
6 1/2"
6 1/2"
0' - 0"0' - 0"
1' - 0"
1' - 0"
1' - 0"
I-CN-02 I-CN-02
LEVEL 1(B)1(B) (288.31) LEVEL (288.31)
2' - 0"2' - 0"
1
COPING PARAPET COPING 1 PARAPET
2
ARREST CLIPCLIP LINELINE SYSTEM 2 FALLFALL ARREST SYSTEM
3
SEE SEE A202B FOR FOR PLANPLAN DIMENSIO LIGHT A202B DIME 3 LIGHT
4
GATEGATE WITHWITH PANIC HARDWARE STEEL PANIC HARDWA 4 STEEL
5
ENTRANCE WITHWITH ALUMIN BREEZEWAY ENTRANCE ALU 5 BREEZEWAY
6
FOAM ROOFING (ICC (ICC ESR ESR 253 COATED FOAM ROOFING 6 COATED
7
PERFORATED METAL PA DECORATIVE PERFORATED META 7 DECORATIVE
8
SIGNAGE 8 SIGNAGE
9
SHOWN DASHED - FOR- FO CL GUARDRAIL SHOWN DASHED 9 GUARDRAIL
IN SHEAR WALLWALL 10 10REVEAL REVEAL IN SHEAR
NLARGED PLAN AT LEVEL 3 3 ENLARGED PLAN AT LEVEL
11 11EXTERIOR CEMENT STUCCO CONTRO EXTERIOR CEMENT STUCCO CON D3 D3 A656B A656B
5
P
13 131/2" ALUMINUM PLATE PAINTED TO MA 1/2" ALUMINUM PLATE PAINTED TO FASTENERS FASTENERS
5
MATERIAL MATERIALLEGEN LEGE
BE3 BE3
- 0" MIN4'CLEAR
MIN CLEAR
5' - 0"
5' - 0" 4' - 0"
EDGE OF SLAB EDGE OF SLAB ABOVE ABOVE
E-CN-13 CONCRETE SHEAR WAL E-CN-13 CONCRETE SHEAR
1' - 1"
AT PLASTER AT PLASTER
1' - 71'1/2" - 7 1/2"
E-FC-01 FIBER CEMENT PANEL R E-FC-01 FIBER CEMENT PAN
B3 B3 A911B A911B
13 13
C1 C1 A911B A911B
12 12EXTERIOR CEMENT STUCCO EXPANSI EXTERIOR CEMENT STUCCO EXPA
Sim Sim F3 F3 A082B A082B 13 13
C3 C3 A911B A911B AT FIBER AT FIBER CEMENT CEMENT PANEL PANEL
P
10' - 7" 10' - 7"
1' - 1"
N.5 N.5
1-B 1-B
E-CP-01 EXTERIOR CEMENT STU E-CP-01 EXTERIOR CEMENT
E-GL-01/02 INSULATED GLASS WI E-GL-01/02 INSULATED GLAS
1' - 7"1' - 7"
12' - 2" 12' - 2"
NLARGED PLAN AT LEVEL 1 1 ENLARGED PLAN AT LEVEL
FF
N
N
REFERENCE SHEET A095B FOR FOR MATERIALS REFERENCE SHEET A095B MATERIALS
F3 F3 A656B A656B
EE
DD
CC
BB
51
Ground Level Plan F
E
A
C.1
C.2
20' - 9"
D.1
13' - 5"
7
BUILDING LINE ABOVE
C
B
A
D2 A611A
EXISTING NON-COMPLIANT STAIR: 10" TREADS, 7.65" RISERS NON-COMPLIANT HANDRAILS SEE A781A AND ORIGINAL AS BUILDS SHEET # 14 FOR MORE INFORMATION
B
20' - 9"
7
D
E.1
13' - 2"
E.6
13' - 2"
F.1
13' - 2"
H.1
G.1
13' - 2"
13' - 2"
EXISTING NON-COMPLIANT STAIR: 10" TREADS, 7.65" RISERS NON-COMPLIANT HANDRAILS. SEE ORIGINAL AS BUILDS SHEET # 14 FOR MORE INFORMATION
28' - 9"
7
8 STAIR 4 S4
AG1
G4.1 F2 A781A
A108
G4.1 OFFICE TENANT 1 A109
43
S2.1
RATED SHAFT ENCLOSURE
16' - 0"
24
A107.5 S2.1
S2.1
ELEV
S2.1
A106
16' - 0"
G6.1
RECESS SHEAR WALL 1" FROM FACE OF EXISTING WALL
23
1"
G4.1
A109.6
A107.2
A107.1
5
6
6
6
6
A109.1
A109.2
A109.3
A109.4
41
G6
F3
BUILDING LINE ABOVE
16' - 0"
827 VINE
A109.7
1
ADA WC A105
ADA WC A106
20
125' - 3"
WARING AVE
5
22 4 B1 A802A
ALIGN
LOBBY A107
A107.3
BUILDING LINE ABOVE
F4 A611A
S2.1
6
A105
20
B6 A041A A602A
24
288.31
B4 A783A F4 A611A
12
A110
G6.1
MPOE A108
7
6
STAIR 2 S2
7
5' - 1 1/2"
8 22
20
AS2.2
ELECTRICAL A110
G4.1
F6 A602A
9 2 A614A
20
20 4
PL
1 A092A
STORAGE A111
AS4.3
31
A111
16' - 6"
AE2
4
EXISTING NON-COMPLIANT STAIR: 7.2" RISERS. NON-COMPLIANT HANDRAILS SEE SHEET #15 OF ORIGINAL DRAWINGS FOR MORE INFORMATION
COURTYARD: SEE LANDSCAPE
B3 A602A
2 1/2" FROM PL TO FACE OF GRADE BEAM
20' - 0"
11 22
F1 A634A
A104.2
BUILDING LINE ABOVE
20 G6 3
F2
F3 A602A
1 A614A 1' - 0 1/2"
6' - 0"
F2
23
41
A103.3
10
F4 A926A
23 1
2
A103.4
1
5
17
F6 A611A
288.31 RATED SHAFT ENCLOSURE ABOVE
4
24
A101.1
F1 A640A
4' - 6 5/8"
4
20 1 2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
20
3' - 0"
17' - 3"
17 RATED SHAFT ENCLOSURE ABOVE
18
B2 A602A
AE1 12
3
288.31
G4
OFFICE TENANT 2 A104
A112
TENANT 4 A101
A101.2
5
18' - 3 7/16"
17
UP
8' - 7 1/8"
2
4
1
29
4' - 5 7/8"
A113
G6 F6 A611A
UP
11
G6
24
LOBBY A103
F3
F3
9
288.31
A103.2
24' - 3"
WOMEN WC A112
MEN WC A113
23' - 6"
4
28
4
44
G6
G6
B1 A801A
F1 A642A
18 BUILDING LINE ABOVE
20' - 9"
20' - 0"
20' - 0"
20' - 0"
20' - 0"
20' - 0"
16' - 0"
20' - 0"
20' - 0"
20' - 6"
197' - 3" A
C
B
D
E
F
D2 A611A
F3
1/8" = 1'-0"
F
52
J
K
L
KEYNOTES
Ground level plan showcasing the new interventions to the existing ground level plan. The existing drive-aisle has been captured to create an event space while keeping the original visual transparency. The existing covered walk-way (plan left) has been infilled and captured as office space while also keeping the visual transparancy with a butt-joint glazing system.
1. ALL DIMENSIONS ARE MEASURED FROM FINISH TO FINISH UNLESS NOTED OTHERWISE. 2. ALL DIMENSIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR TO CONSTRUCTION. 3. PROVIDE & ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT CABINET OCCURS. 4. PROVIDE PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITH 75' TRAVEL DISTANCE TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING CONSTRUCTION. 5. SEE SHEETS A040A THRU A042A FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET G008A FOR GRAPHIC IMAGE. 6. AREA MAY REQUIRE FLOOR FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DETAILS AND DOOR TRANSITION DETAILS. 7. BRACE / REINFORCE ALL NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED. 8. REFER TO SHEET G030A FOR PARTITION TYPES & DETAILS. 9. REFER TO SHEETS G006A-G008A FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL. 10. REFER TO PARTITION DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT DRYWALL PARTITIONS. 11. LOCATIONS WITH NEW "F.E.C." DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER CABINETS MOUNTED AT 3'-4" A.F.F. TO THE CENTERLINE OF HANDLE. 12. IF OUTLETS ARE INSTALLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE TO MAINTAIN INTEGRITY OF WALL RATING. 13. VERIFY ALIGNMENTS SHOWN IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, FURR COLUMN OR WALL TO PROVIDE ALIGNMENT. 14. REFER TO SHEET A081A FOR DOOR SCHEDULE, DOOR TYPES AND HARDWARE. SEE SHEET A083A AND A084A FOR DOOR DETAILS. 15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR CEILING. DAMPERS TO COMPLY WITH CBC. SEE CBC 716.2. 16. ALL DOORS ARE 4" MEASURED FROM WALL TO THE HINGED SIDE OF DOOR UNLESS NOTED OTHERWISE. 17. VERIFY RATING OF ALL EXISTING WALLS. SEE A040A-A042A FOR LOACATIONS 18. SEE STAIR AND ELEVATOR DETAILS FOR LANDING HEIGHTS AT LEVEL 2 AND LOFT.
4/4/2018 9:59:03 AM
1
H
LEVEL 1 CONSTRUCTION PLAN - BUILDING A
GENERAL CONSTRUCTION NOTES 2
G
VINE STREET
E
1
(N) STOREFRONT. SIMILAR TO ORIGINAL WHERE OCCURS
22
(N) CAST-IN-PLACE CONCRETE; SEE STRUCTURAL DWGS.
43
(N) LIP OF STAGE MATCH (E) PROFILE OF ORIGINAL
2
(E) PUNCHED OPENINGS: RESTORE WINDOWS, DOORS WHERE OCCURS
23
(N) SHEAR WALL (TYP.); SEE STRUCTURAL DWGS.
44
STOREFRONT MULLIONS TO HAVE "E-PT-09" FINISH
3
(E) WINDOWS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS
24
(E) WINDOWS AT PUNCHED OPENINGS: RETAIN EXISTING FRAMES, REGLAZE WITH NEW GLASS
4
(N) BUTT JOINT GLAZED WINDOWS FROM (E) FLOOR TO UNDERSIDE OF LEVEL 2 STRUCTURE
25
(N) STEEL CANOPY
5
(N) TERRAZZO FLOOR
26
(N) EXTERIOR LIGHT COLORED CEMENT PLASTER (TYP.)
6
(N) BIFOLD DOOR IN (E) OPENING
27
(N) EXTERIOR DARK COLORED CEMENT PLASTER (TYP.)
7
(E) STAIR
28
(N) BRACED FRAME; SEE STRUCTURAL DWGS.
8
INFILL (E) DOOR / WINDOW OPENING
29
NEW FOLDING DOORS: 4 PANELS, 7'-0" TALL BY 3'-0" WIDE
9
(N) CONCRETE FLOOR; EXTENT OF FLOORING TO BE REVIEWED UPON DEMOLITION
30
(N) STRUCTURAL SHEATHING; SEE STRUCTURAL DRAWINGS
10
(N) 1-HR RATED TGP GLASS WALL WITH BACK-SET MULLIONS AND TRIPLE GLAZING
31
(N) GUARDRAIL AND SELF CLOSING GATE
11
(E) TERRAZZO TO REMAIN
32
(N) MECHANICAL ROOF MOUNTED UNIT AND PLATFORM
12
(N) SHIPS LADDER AND (N) RAILING PER CAL OSHA
33
(N) 6" CONCRETE ALL AROUND (E) COLUMN; SEE STRUCTURAL DWGS.
13
(E) CHILLER
34
(E) SHIPS LADDER
14
(N) ELEVATOR PENTHOUSE
35
(E) EXISTING FOUNDATION; SEE STRUCTURAL DWGS
15
(N) ROOF HATCH
36
(N) CLASS B COATED FOAM ROOFING
16
(N) STEEL CANOPY
37
(N) MECHANICAL SUPPLY
17
(N) CONCRETE FLATWORK
38
(N) MECHANICAL EXHAUST
18
(E) PLANTER, SEE LANDSCAPE AND IRRIGATION DRAWINGS FOR PLANT TYPES
39
(N) ROOF DRAIN AND OVERFLOW
19
(N) PLANTER, SEE LANDSCAPE AND IRRIGATION DRAWINGS FOR PLANT TYPES
40
(N) GUTTER AND DOWNSPOUT TO DRAIN TO EPIC GREEN SYSTEM PLANTER
20
PAINTED (E) CONCRETE COLUMN
41
INFILL (E) OPENING WITH (N) STOREFRONT
21
(N) SIGNAGE
42
(E) FLAGPOLE AND (N) RAILING PER CAL OSHA
D
C
SYMBOL LEGEND B10
INDICATES PARTITION TYPE. SEE G030 FOR PARTITION TYPES.
B100
DOOR SYMBOL SEE SHEET A081 FOR DOOR SCHEDULE , TYPES, AND HARDWARE EXISTING WALLS TO REMAIN, PROTECT IN PLACE.
NEW WALL PARTITIONS, SEE SHEET A030 FOR VARIOUS TYPES AN NEW SHEAR WALLS NEW BUILDING FINISH EXISTING BUILDING FINISH
B
A
Elevations F
E A
D F
B
C
EE
D 31
36
F3 A632A
C.1 5
C.2
3
D.1 13' - 2"
F3 A631A 13' - 2"
E.1
3
13' - 2"
E.6
F
D
G
H
F.1
13' - 2"
13' - 2"
G
3
G.1
30
H.1
3 28' - 9"
A C
J
31
D2 A611A
3
B
F5 A640A
8
3
K
B
L F4 A642A
3
3
HIGH PT (A) (318.32) 30' - 0"
8"
13' - 5"
C
30' - 0"
W5
W5
W5
W5
W4 38
F3 A638A
3' - 8 1/2" 3' - 9" 3' - 8 1/2" 3' - 10"
W5
13
W6
W5
12' - 0"
W2
7
W5
5
12' - 0"
3' - 7" 4' - 1 1/2"
ROOF (A) (315.31) 27' - 0"
7
34
16
LEVEL 2 (A) (303.31) 2
2
2
2
2
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
TEMPERED GLASS
TEMPERED GLASS
TEMPERED GLASS 9 18
1' - 6"
TEMPERED GLASS TEMPERED GLASS
18
9
18
6
6
6
TEMPERED GLASS
TEMPERED GLASS
0' - 0"
1
9
GRADE PLANE (A) (286.90) -1' - 5" 20
1
6
1/8" = 1'-0"
4
20
6
A611A
3
8
30
1 2 3 W1 5
LEVEL 1(A) (288.31) 0' - 0"
W1
26
26
B6
4
15' - 0" 16
-3' - 7 1/2"
-3' - 7 1/2"
5
817 VINE S LOS ANGELES
7
LEVEL 2 (A)F4(303.31)
LOWEST ADJ. GRADE (A) (284.70)
2
35
9
35
NO.
DATE 01/13/2017 04/14/2017 06/05/2017 09/01/2017
7 8 11 12
09/25/2017 11/17/2017 02/20/2018 04/04/20018 10
ISSU SCHEMATIC DESIG 100% DESIGN DEV PERMIT SET ISSUE FOR PLAN C PRICING ISSUE FOR GMP ISSUE FOR PLAN C ISSUE FOR OHR A BULLETIN 02/IFC
NORTH ELEVATION 2 BUILDING A
1/8" = 1'-0"
7
6
38
F3 A639A
4
1/8" = 1'-0"
8
13
TEMPERED GLASS GRADE PLANE (A) (286.90) -1' - 5" 2
LOWEST ADJ. GRADE (A) (284.70)
26
F6 BUILDING WEST EAST ELEVATION A ELEVATION @ COURTYARD
E6
TEMPERED GLASS
19 LEVEL 1(A) (288.31)
12 6
15' - 0"
15' - 0"
2
12' - 4" VIF
2
3' - 7 1/2"
2
24' - 6 1/2"
2
15' - 0"
2
15' - 5 1/2"
2
3' - 7 1/2"
2
10' - 0"
2
8' - 6"
2
2' - 3"
2
27' - 0"
29' - 3" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
4' - 1"
ROOF (A) (315.31)
HIGH PT (A) (318.32)
31' - 5 1/2" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
D2 A611A
F3 A637A
KEY PLAN
1
13
2
2
2
2
2
W1
W1
W1
W1
W1
W1
W1
W1
W1
F3
1/8" = 1'-0"
9
8"
W5
W5
W1
W1
TEMPERED GLASS 9
2 F4 A601A
2
D4
W1
W1
10
11
10
9
1
12
H.1
W1
SOUTH ELEVATION BUILDING A 7
9
18
EAST ELEVATION @ COURTYARD
W1
2 12
TEMPERED GLASS
7
27
12
G.1 G
39
F3 A636A
18
H
TEMPERED GLASS 1
TEMPERED GLASS
40
20
19
9 F.1
1
E.6
20
E.1 4
20
1
F3 A635A
40
4
D.1
39
20
C.1
LEVEL 2 (A) (303.31) 18 15' - 0"
40
39
C
7
38
6
5
4
29
3
29
2
15' - 0"
23
3 29
F3 A633A
3
3
30
F6 A611A
3
8
3
36
29
KEY PLAN
30' - 0"
ONT GLAZING TO BE SOLARBAN 70XL L EXISTING OPENINGS IN FIELD.
1/8" = 1'-0"
F4 A601A
9
W1
18
GENERAL CONSTRUCTION NOTES D4 SOUTH ELEVATION BUILDING A
E.6
E.1
D.1
(N) STOREFRONT. SIMILAR TO ORIGINAL WHERE OCCURS
21
2
(E) PUNCHED OPENINGS: INSTALL (N) WINDOW TO MATCH (E).
22
3
(E) WINDOWS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS
4
(N) BUTT-JOINT GLAZED WINDOWS FROM (E) FLOOR TO UNDERSIDE OF LEVEL 2 STRUCTURE
5
(E) ALUMINUM WINDOW FRAME WITH (N) GLAZING. (E) FRAME TO BE EVALUATED BY RESTORATION CONTRACTOR TO DETERMINE IF ITCAN BE RETAINED.
6
(N) BIFOLD DOOR IN (E) OPENING
7
C.1FRAMING C (N) PLASTERC.2 FINISH ON COLD FORMED METAL
29
9 29 10 11
E
24 25 26
B
27 13 (N) PAINTED SHEAR WALL BEHIND EXISTING WINDOWS: RETAIN (E) WINDOW FRAMES, REGLAZE WITH (N) 28 31 LAMINATED GLASS 14 15 29 38 OVERFLOW DRAIN; SEE PLUMBING DRAWINGS 30 DOWNSPOUT FROM ROOF DISCHARGE TO EPIC GREEN SYSTEM; SEE PLUMBING AND CIVIL DRAWINGS. 31 PLANTING DEPTH FOR EPIC GREEN SYSTEM, NOT INCLUDING STORAGE LAYER; SEE CIVIL DRAWINGS FOR LOCATION, SIZE AND DIMENSION OF EPIC GREEN SYSTEM PLANTERS. 32
WARING AVE.
GRADE PLANE (A) (286.90) -1' - 5"
23
26 27
COLUMN REINFORCEMENT, SEE STRUCTURAL DRAWINGS 27' - SEE 0" PLUMBING AND CIVIL DRAWINGS. 10 DOWNSPOUT FROM ROOF DISCHARGE TO EPIC GREEN SYSTEM;
ROOF (A) (315.31)
0' - 0"
GRADE PLANE (A) (286.90) -1' - 5"
EXISTING CONSTRUCTION PATCH (E) OPENINGS. MAINTAIN RATING AS REQUIRED
(E) CONCRETE WALL AT (E) STAIR
29
(N) PARAPET WALL EXTENSION ON EXISTING PARAPET, PAINT TO MATCH BELOW
30
(N) ROOF COPING
(N) CONSULTANT MECHANICAL EQUIPMENT, SEE MECH. DRAWINGS 31CIVIL 32
COLUMN REINFORCEMENT, SEE STRUCTURAL DRAWINGS
14
(N) ELEVATOR PENTHOUSE
35
STAIR / RAMPOPENINGS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS 12 (N)AT (E) WINDOWS PUNCHED
33
OUTLINE OF EXISTING BUILDING AREA REMOVED
15
(N) ROOF HATCH
36
13 EXISTING (E) FLAGPOLE AND (N)CHILLER RAILING PER CAL OSHA
34
(E) CONCRETE CANOPY WITH NEW PREFINISHED METAL DRIP CAP
16
(N) STEEL CANOPY SIMILAR TO ORIGINAL, EXTEND EXISTING WING WALLS UP ONE BLOCK MODULE
37
17
(E) DRAINS
38
(N) ROOF HATCH 15 LADDER (N) SHIPS AND (N) RAILING PER CAL OSHA
18
(E) PLANTER
39
19
(N) CONCRETE LOW WALL
40
DRAINS TO HAVE "E-PT-09" FINISH 17 (E) MULLIONS STOREFRONT
20
(N) PAINT ON (E) CONCRETE COLUMN
E
(N) CONCRETE LOW WALL
(N) PAINT ON (E) CONCRETE COLUMN
B
D
C
Drawing Title
W[XXX]
1/8" = 1'-0"
(E) WINDOWS AT PUNCHED OPENINGS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS 35 BUILDING: 700 SOUTH FLOWER STREET, SUITE 2100 LOS(E)ANGELES, CA 90017 FLAGPOLE AND (N) RAILING PER CAL OSHA 36 O 213.418.0201 37F 213.266.5294
13
39
FLUTED GLASS (TEMPERED)
40
STOREFRONT MULLIONS TO HAVE "E-PT-09" FINISH
A
0' - 0"
GRADE PLANE (A) (286.90)
B
-1' - 5"
HLW International LLP Architecture Engineering Interiors
ELEVATION LEGEND
1
(N) STOREFRONT. SIMILAR TO ORIGINAL WHERE OCCURS
2
(E) PUNCHED OPENINGS: INSTALL (N) WINDOW TO MATCH (E).
3
(E) WINDOWS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS
4
(N) BUTT-JOINT GLAZED WINDOWS FROM (E) FLOOR TO UNDERSIDE OF LEVEL 2 STRUCTURE
5
(E) ALUMINUM WINDOW FRAME WITH (N) GLAZING. (E) FRAME TO BE EVALUATED BY RESTORATION CONTRACTOR TO DETERMINE IF ITCAN BE RETAINED.
6 7 8
21
(N) 1-HR RATED TGP GLASS WALL WITH BACK-SET MULLIONS AND TRIPLE GLAZING
22 23
PATCH (E) OPENINGS. MAINTAIN RATING AS REQUIRED
24
(N) HEADER IN (E) OPENING
25
(N) ROOF HATCH
(N) BIFOLD DOOR IN (E) OPENING
26
(E) WING WALL; ADD ADDITIONAL CAST-IN-PLACE MODULE; SEE STRUCTURAL DRAWINGS
(N) PLASTER FINISH ON COLD FORMED METAL FRAMING
27
(N) CONCRETE / SHOTCRETE WALL WITH PLASTER FINISH
(N) PAINTED SHEAR WALL BEHIND EXISTING WINDOWS: RETAIN (E) WINDOW FRAMES, REGLAZE WITH (N) LAMINATED GLASS
28
(E) CONCRETE WALL AT (E) STAIR
29
(N) PARAPET WALL EXTENSION ON EXISTING PARAPET, PAINT TO MATCH BELOW
30
(N) ROOF COPING
31
(N) MECHANICAL EQUIPMENT, SEE MECH. DRAWINGS
Consulting 1556 20th Street Suite B Santa Monica, CA 90404
NEW CONSTRUCTION
Fax 310 453 7020
Tel 310 453 2800
Signature EXISTING CONSTRUCTION
9
OVERFLOW DRAIN; SEE PLUMBING DRAWINGS
10
DOWNSPOUT FROM ROOF DISCHARGE TO EPIC GREEN SYSTEM; SEE PLUMBING AND CIVIL DRAWINGS.
11
PLANTING DEPTH FOR EPIC GREEN SYSTEM, NOT INCLUDING STORAGE LAYER; SEE CIVIL DRAWINGS FOR LOCATION, SIZE AND DIMENSION OF EPIC GREEN SYSTEM PLANTERS.
32
COLUMN REINFORCEMENT, SEE STRUCTURAL DRAWINGS
12
(N) STAIR / RAMP
33
OUTLINE OF EXISTING BUILDING AREA REMOVED
13
EXISTING CHILLER
34
(E) CONCRETE CANOPY WITH NEW PREFINISHED METAL DRIP CAP
14
(N) ELEVATOR PENTHOUSE
35
(E) WINDOWS AT PUNCHED OPENINGS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS
15
(N) ROOF HATCH
36
(E) FLAGPOLE AND (N) RAILING PER CAL OSHA
16
(N) STEEL CANOPY SIMILAR TO ORIGINAL, EXTEND EXISTING WING WALLS UP ONE BLOCK MODULE
37
17
(E) DRAINS
38
(N) SHIPS LADDER AND (N) RAILING PER CAL OSHA
18
(E) PLANTER
39
FLUTED GLASS (TEMPERED)
19
(N) CONCRETE LOW WALL
40
STOREFRONT MULLIONS TO HAVE "E-PT-09" FINISH
20
(N) PAINT ON (E) CONCRETE COLUMN
C
Planning
AREAS OF UNKNOWN CONDITIONS TO BE VERIFIED AFTER DEMO PHASE
EXISTING CONSTRUCTION (CUT)
W[XXX]
Drawing Title
BUILDING A ELEVATIONS
WINDOW TYPE SEE WINDOW SCHEDULE SHEET A090A
1/8" = 1'-0"
BUILDING:
B
DATE:
SCALE:
CHECKED BY:
DLS
08/28/17
PROJECT NO.
16001
DRAWING NO.
A601A
12
A
c
D
SCALE:
CHECKED BY:
38ARCHITECT (N) SHIPS LADDER AND (N) RAILING PER CAL OSHA
LEVEL 1(A) (288.31)
Tel 310 453 2800
Fax 310 453 7020
(E) WING WALL; ADD ADDITIONAL CAST-IN-PLACE MODULE; SEE STRUCTURAL DRAWINGS WINDOW TYPE SEE WINDOW SCHEDULE SHEET A090A (N) CONCRETE / SHOTCRETE WALL WITH PLASTER FINISH
OUTLINE OF EXISTING BUILDING AREA REMOVED 11 PLANTING DEPTH FOR EPIC GREEN SYSTEM, NOT INCLUDING STORAGE LAYER; SEE CIVIL DRAWINGS FORCANOPY LOCATION, SIZE AND DIMENSION OF EPICDRIP GREEN (E) CONCRETE WITH NEW PREFINISHED METAL CAPSYSTEM PLANTERS.
15' - 0"
Consulting
W[XXX]
28
34
12
Planning
1556 20th Street Suite B
BUILDING A EL
(N) HEADER IN (E) OPENING EXISTING CONSTRUCTION (CUT) CONSULTANT (N) ROOF HATCH 25STRUCTURAL
33
(N) STEEL CANOPY SIMILAR TO ORIGINAL, EXTEND EXISTING WING WALLS UP ONE BLOCK MODULE 16 GLASS FLUTED (TEMPERED)
Architecture Engineering Interiors
ELEVATION
EXISTING CHILLER
LEVEL 2 (A) (303.31)
HLW International LLP
Santa Monica, CA 90404
(N) STAIR / RAMP
20
WARING AVE.
LEVEL 1(A) (288.31)
13
WEST ELEVATION BUILDING A
D
N
277 SOUTH LAKE STREET (N) 1-HR RATEDNEW TGP CONSTRUCTION GLASS WALL WITH BACK-SET MULLIONS AND TRIPLE GLAZING 21 BURBANK, CA 91502-2111 TEL: (818) 508-6300 EXT. 202 22 FAX: (818) 508- 7050
PLASTER FINISH ON FORMED METAL FRAMING 7 (N)WALL (N) PARAPET EXTENSION ON COLD EXISTING PARAPET, PAINT TO MATCH BELOW 29 B1 (N) PAINTED SHEAR WALL BEHIND EXISTING WINDOWS: RETAIN (E) WINDOW FRAMES, REGLAZE WITH (N) 8 COPING (N) A910A ROOF LAMINATED GLASS HIGH PT (A) (318.32) 30' - 0" (N) MECHANICAL EQUIPMENT, SEE MECH. DRAWINGS 9 OVERFLOW DRAIN; SEE PLUMBING DRAWINGS
KEYNOTES
E
ARCHITECT
VINE ST.
AREAS OF UNKNOWN CONDITIONS TO BE VERIFIED AFTER DEMO PHASE
DOOR IN (E) OPENING 6 (N) BIFOLD (E) CONCRETE WALL AT (E) STAIR
19
700 SOUTH FLOWER STREET, LOS ANGELES, CA 90017 O 213.418.0201 F 213.266.5294
15' - 0"
B2
24
C
CIVIL CONSULTANT 30 23
LEVEL 2 (A) (303.31)
KAPLAN GEHRING MCCARROLL ARCHITECTURAL LIGHTING 270 CORAL CIRCLE, EL SEGUNDO, CALIFORNIA 90245 O 310.552.2191 EXT. 166 | D 310.606.8745 | WWW.KGMLIGHTING.COM NORTH ELEVATION 1/8" = 1'-0" MEP CONSULTANT
(E) WING WALL; ADD ADDITIONAL CAST-IN-PLACE MODULE; SEE STRUCTURAL DRAWINGS 5 (E) ALUMINUM WINDOW FRAME WITH (N) GLAZING. (E) FRAME TO BE EVALUATED BY RESTORATION A CONTRACTOR TO WALL DETERMINE IF ITCAN BE RETAINED. (N) CONCRETE / SHOTCRETE WITH PLASTER FINISH
(E) PLANTER
2
ELEVATION LEGEND
KEYNOTES
18
STRUCTURAL CONSULTANT
F6 A611A
-3' - 7 1/2"
0' - 0"
1 (N) STOREFRONT. SIMILAR TO ORIGINAL WHERE OCCURS PATCH (E) OPENINGS. MAINTAIN RATING AS REQUIRED 2 (E) PUNCHED OPENINGS: INSTALL (N) WINDOW TO MATCH (E). (N) HEADER IN (E) OPENING 3 (E) WINDOWS: RETAIN EXISTING WINDOW FRAMES, REGLAZE WITH NEW GLASS (N) ROOF HATCH 4 (N) BUTT-JOINT GLAZED WINDOWS FROM (E) FLOOR TO UNDERSIDE OF LEVEL 2 STRUCTURE
(N) ELEVATOR PENTHOUSE
277 SOUTH LAKE STREET BURBANK, CA 91502-2111 TEL: (818) 508-6300 EXT. 202 FAX: (818) 508- 7050
23
LEVEL 1(A) (288.31)
(N) 1-HR RATED TGP GLASS WALL WITH BACK-SET MULLIONS AND TRIPLE GLAZING
14
KAPLAN GEHRING MCCARROL LIGHTING 270 CORAL CIRCLE, EL SEGUN O 310.552.2191 EXT. 166 | D 310 WWW.KGMLIGHTING.COM 4 TEMPERED GLASS MEP CONSULTANT
LOWEST ADJ. GRADE (A) (284.70)
-3' - 7 1/2"
1/8" = 1'-0"
27' - 0"
LIGHTING CONSULTANT
LOWEST ADJ. GRADE (A) (284.70)
D2
30' - 0"
ROOF (A) (315.31)
12
D F
23
34
15' - 0"
-3' - 7 1/2"
1
8 D2 A611A
LEVEL 2 (A) (303.31)
LOWEST ADJ. GRADE (A) (284.70)
KEYNOTES
1/8" = 1'-0" 1. ALL DIMENSIONS ARE MEASURED FROM FINISH TO FINISH UNLESS NOTED OTHERWISE. 2. ALL DIMENSIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR TO CONSTRUCTION. 3. PROVIDE & ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT CABINET OCCURS. 4. PROVIDE PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC WITH 75' TRAVEL DISTANCE TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING CONSTRUCTION. H FOR TACTILE EXIT SIGNAGE LOCATIONS G.1 G AND SHEET G008B F.1 5.H.1 SEE SHEETS A041B THRU A043B FOR GRAPHIC IMAGE. 6. AREA MAY REQUIRE FLOOR FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DETAILS AND DOOR TRANSITION DETAILS. 7. BRACE / REINFORCE ALL NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS REQUIRED. 8. REFER TO SHEET G030B FOR PARTITION TYPES & DETAILS. 38 PATH OF TRAVEL. 9. REFER TO SHEETS A006B-A008B FOR TITLE 24 NOTES AND DISABLED 10. REFER TO PARTITION DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT DRYWALL PARTITIONS. 11. LOCATIONS WITH NEW "F.E.C." DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE EXTINGUISHER CABINETS MOUNTED AT 3'-4" A.F.F. TO THE CENTERLINE OF HANDLE. 12 ARE INSTALLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE 12. IF OUTLETS TO MAINTAIN INTEGRITY OF WALL RATING. 13. VERIFY ALIGNMENTS SHOWN IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, FURR COLUMN OR WALL TO PROVIDE ALIGNMENT. 38 TO SHEET A081B 23FOR DOOR SCHEDULE, 29 23 TYPES AND HARDWARE. SEE SHEET 14. REFER DOOR A081B FOR DOOR DETAILS. 15. INSTALL FIRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR CEILING. DAMPERS TO COMPLY WITH CBC. SEE CBC 716.2. 16. ALL DOORS ARE 4" MEASURED FROM WALL TO THE HINGED SIDE OF DOOR UNLESS NOTED OTHERWISE. 17. STOREFRONT GLAZING TO BE SOLARBAN 70XL 18. VERIFY ALL EXISTING OPENINGS IN FIELD.
15' - 0"
12' - 0"
W1
WEST ELEVATION BUILDING A
12
TEMPERED GLASS
HIGH PT (A) (318.32)
1
3' - 7 1/2"
W1
3' - 7 1/2"
D2
-3' - 7 1/2"
26
4
31' - 3 1/2" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
4
35 15' - 0"
4
35
9
-1' - 5"
2
29' - 3" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
4
18' - 0"
4/4/2018 10:00:24 AM
4
LOWEST ADJ. GRADE (A) (284.70)
1
F
2
33' - 7 1/2" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
SHEET G030B FOR PARTITION TYPES & DETAILS. SHEETS A006B-A008B FOR TITLE 24 NOTES AND DISABLED PATH OF TRAVEL. PARTITION DETAIL SHEET FOR TYPICAL CORNER & JOINT CONDITION DETAIL AT RTITIONS. S WITH NEW "F.E.C." DESIGNATION ARE TO RECEIVE SEMI RECESSED FIRE R CABINETS MOUNTED AT 3'-4" A.F.F. TO THE CENTERLINE OF HANDLE. S ARE INSTALLED DIRECTLY INTO CORE WALLS, SEAL/INSULATE AS REQ'D PER CODE NTEGRITY OF WALL RATING. IGNMENTS SHOWN IN DRAWINGS IN FIELD. IF ALIGNMENT IS NOT ACHIEVABLE, FURR WALL TO PROVIDE ALIGNMENT. SHEET A081B FOR DOOR SCHEDULE, DOOR TYPES AND HARDWARE. SEE SHEET OOR DETAILS. IRE DAMPERS IN ALL DUCTS PENETRATING EXISTING CORRIDOR WALLS & OR PERS TO COMPLY WITH CBC. SEE CBC 716.2. S ARE 4" MEASURED FROM WALL TO THE HINGED SIDE OF DOOR UNLESS NOTED
7
2' - 0"
SIONS ARE MEASURED FROM FINISH TO FINISH UNLESS NOTED OTHERWISE. SIONS TO BE VERIFIED IN FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION PRIOR TO CONSTRUCTION. ATTACH SHEET METAL BACKING PLATES TO WALL STUDS WHERE WALL MOUNT URS. ORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN 2-A OR 2-A10BC EL DISTANCE TO ALL PORTIONS OF THE BUILDING ON EACH FLOOR; ALSO DURING ON. S A041B THRU A043B FOR TACTILE EXIT SIGNAGE LOCATIONS AND SHEET G008B IMAGE. REQUIRE FLOOR FILL SO THAT FLOOR FINISHES CAN ALIGN. SEE FLOOR TRANSITION DOOR TRANSITION DETAILS. INFORCE ALL NEW OR EXISTING PARTITIONS TO RECEIVE NEW MILLWORK AS
GRADE PLANE (A) (286.90)
W3
12' - 0"
27
0' - 0"
W5
15' - 0"
ERAL CONSTRUCTION NOTES
LEVEL 1(A) (288.31)
W5
31' - 5" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
2' - 11"
18
W4
3' - 7 1/2"
S
W4
27' - 0"
1' - 0"
11' - 2 1/2"
4
14' - 9 1/2"
4
W4
-1' - 5"
-3' - 7 1/2"
HIGH PT (A) (318.32)
18' - 0"
3
W4
30' - 7 1/2"
4
0' - 0"
LILLIAN WAY
23
W3
LIGHTING CONSULTANT
13
ROOF (A) (315.31)
11' - 1 1/2" VIF
33' - 7 1/2" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
5
W4
0' - 0"
B1 A910A
2' - 0"
38
VINE ST
15' - 0"
LEVEL 1(A)NO. (288.31)DATE
12' - 0"
F4 A611A
3 26
30
LEVEL 2 (A) (303.31)
LOWEST ADJ. GRADE (A)4(284.70)
15
1
8"
3
3
LEVEL 1(A) (288.31) 817 VINE STREET GRADE PLANE (A) (286.90) LOS ANGELES, CA 90038
13 12
3
ISSUE OR12REVISION 1 01/13/2017 SCHEMATIC DESIGN PROGRESS GRADE PLANE (A) (286.90) 100% DESIGN DEVELOPMENT 2 04/14/2017 -1' - 5" 9 3 06/05/2017 PERMIT SET LEVEL 1(A) (288.31) 09/01/2017 ISSUE FOR PLAN CHECK VERIFICATION / ISSUE FOR 0' - 0" LOWEST 5ADJ. GRADE (A) (284.70) -3' - 7 1/2" PRICING GRADE PLANE (A) (286.90) -1' - 5" 7 09/25/2017 ISSUE FOR GMP B3 NORTH ELEVATION BUILDING A 1/8" =CHECK 1'-0" VERIFICATION 8 11/17/2017 ISSUE FOR PLAN LOWEST ADJ. GRADE (A) (284.70) -3' - 7 1/2" 11 02/20/2018 ISSUE FOR OHR APPROVAL B A 12 04/04/20018 BULLETIN 02/IFC
14
38
D2 A611A
W1 LEVEL 2 (A) (303.31)
2' - 0"
8
9
35 15' - 0"
W1
31
T ELEVATION BUILDING A
12' - 0"
8"
27' - 0"
W1
1
C.2
ROOF (A) (315.31) 35
2
F3 A634A
31' - 3 1/2" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
W5
4
27' - 0"
29' - 3" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
W4
W5
4
12' - 0"
30' - 0"
W5
4
HIGH PT (A) (318.32) 27' - 0"
HIGH PT (A) (318.32)
15' - 0"
4
4
30' - 0"
3' - 7 1/2"
3
W5
4
GRADE (A) (284.70)
1/8" = 1'-0"
4
W4
HIGH PT (A) (318.32)
ROOF (A) (315.31)
F4 A642A
3
W3
30' - 0"
34
F4 A644A
21
3
W5 L
31 W5
8"
W3
2
36
33' - 7 1/2" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
2
8
-1' - 5"
TEMPERED GLASSLOWEST ADJ. -3' - 7 1/2" 2 2
3
1' - 0"
2
F5 A640A
W4 K
3
29' - 3" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
2
31
J
3
31' - 5 5/16" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
27
2
H
3 W4
3' - 7 1/2"
TEMPERED GLASS
8 W4
2' - 1"
GRADE PLANE (A) (286.90)
2' - 11" 12' - 4"
2' - 0"
0' - 0"
W4
G
3
W5
LEVEL 1(A) (288.31)
31
12' - 4"
W5
3
7' - 8 3/4"
18
8
ROOF (A) (315.31)
2' - 6 1/4"
W5
7
30
31' - 5 1/2" FROM LOWEST ADJ. GRADE TO TOP OF PARAPET
TEMPERED GLASS W5
W3 11' - 2 1/2"
W44
W6
SOUTH ELEVATION BUILDING A BEHIND COLUMNS
30
F6 A611A
3
A
20' - 0"
12' - 0"
3
4
3
D
20' - 0"
15' - 0"
3
4
5 W2
D2 A611A
30
29' - 3" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
F3 A631A
3 4
F
10
E
B
20' - 0"
12' - 4" VIF
3 4
28
3
3' - 7 1/2"
5 4
5
E
31 F3 A632A
16
LILLIAN WAY
F3 A633A
3
F
16' - 0"
2' - 3"
4
D
3
G.1 G
C
1' - 6"
8
H
12' - 9"
30' - 7 1/2"
5
C
H.1 7' - 3"
3
D2 A611A
11' - 1 1/2" VIF
6
J 20' - 0"
14' - 9 1/2"
7 B
K
D
20' - 6"
33' - 7 1/2" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
L
E
F4 A611A
3
31' - 5" FROM GRADE PLANE TO TOP OF PARAPET (2 STORIES)
3
2017 HLW International LLP
53
DLS
P
D
A
DASHED LINE DASHED LINE DASHED DASHED LINELINE REPRESENTS EXTENT REPRESENTS REPRESENTS REPRESENTS EXTENT EXTENT EXTENT AND LOCATION OF AND LOCATION ANDAND LOCATION OF LOCATION OF OF STRUCTRAL PORTION STRUCTRAL OF STRUCTRAL PORTION STRUCTRAL OF PORTION PORTION OF OF UPTURNED BEAM UPTURNEDUPTURNED BEAM UPTURNED BEAM BEAM
F4 A912B
CONCRETE SLAB - CONCRETE SEE CONCRETE SLAB CONCRETE - SEESLAB SLAB - SEE - SEE STRUCTURAL DRAWINGS STRUCTURAL STRUCTURAL STRUCTURAL DRAWINGSDRAWINGS DRAWINGS
F4 A912B
1/2" 1/2" 1" 1/2"1/2"1/2" 1" 1"
F4 F4 A912B A912B
2"
CONCRETE SLAB - CONCRETE SEE CONCRETE SLAB CONCRETE - SEESLAB SLAB - SEE - SEE STRUCTURAL DRAWINGS STRUCTURAL STRUCTURAL STRUCTURAL DRAWINGSDRAWINGS DRAWINGS
2" 2"
Z METAL
Z METAL Z METAL Z METAL
PERFORATED J MOLDING
PERFORATED PERFORATED PERFORATED J J J MOLDING MOLDING MOLDING
FLASHING
FLASHING FLASHING FLASHING
10" 10"
1/2"
2"
10"
10" 10"
1/2" 1"
KEY PLAN
K
SEALANT & BACKER SEALANT ROD &SEALANT BACKER SEALANT &ROD BACKER & BACKER RODROD
SHADING DEVICE BY SHADING DEVICE SHADING SHADING BYDEVICE DEVICE BY BY OTHERS SHOWN DASHED OTHERS SHOWN OTHERS OTHERS DASHED SHOWN SHOWN DASHED DASHED
7/16"
1"
WARING AVE.
Project Details
10"
10"
10" 10"
1/2"
10"
2" 2" 10"
2"
10"
0"
2 1/4" X 4 1/2" EXTRUDED 2 1/4" XALUMINUM 4 1/2" 2 1/4" EXTRUDED 2 1/4" X 4 X1/2" 4 1/2" EXTRUDED ALUMINUM EXTRUDED ALUMINUM ALUMINUM STOREFRONT SYSTEM STOREFRONT AS SCHEDULED STOREFRONT STOREFRONT SYSTEM ASSYSTEM SCHEDULED SYSTEM AS SCHEDULED AS SCHEDULED 1"7/16" 7/16" 1" 1"
7/16"
1" INSULATED GLASS 1" INSULATED UNITS 1" INSULATED 1" GLASS INSULATED UNITS GLASS GLASS UNITS UNITS LINE OF COLUMN BEYOND LINE OF COLUMN LINELINE OFBEYOND OF COLUMN COLUMN BEYOND BEYOND
LIGHTING CONS L SHEAR WALL
E5
SEE STRUCTURAL SEE DRAWINGS STRUCTURAL SEESEE STRUCTURAL STRUCTURAL DRAWINGSDRAWINGS DRAWINGS
E5 E5DETAIL E5SECTIONSECTION SECTION DETAIL SECTION DETAIL DETAIL
3" = 1'-0"
TURAL NGS AL DRAWINGS DRAWINGS
SHEAR WALL SHEAR SHEAR WALL WALL
B4
3" = 1'-0" 3" =3"1'-0" = 1'-0"
B4 B4DETAIL B4SECTIONSECTION SECTION DETAIL SECTION DETAIL DETAIL
3" = 1'-0"
1-B
1-B
1-B 1-B
1' - 8"
1' - 8"
1' - 8" 1' - 8"
KAPLAN GEHRIN K LIGHTING L 270 CORAL CIRC 2 O 310.552.2191 E O WWW.KGMLIGHW
3" = 1'-0" 3" =3"1'-0" = 1'-0"
RSIDE DE B OF OF SLAB SLAB 5/16" 1"
4 1/2"
1/2" 1"
3/4" 5/8"
3 5/8"
5/8"3/4" 1315/16" 3/4"
MEP CONSULTA M
5/16" 5/16"
5/16"
1" 1/2"
1/2" 3/4"
2" 2"
2"
1" 1/2"1/2"
1" 1"
1 15/16" 35/8" 5/8" 3 5/8" 5/8"5/8"1 15/16" 1 15/16"
277 SOUTH LAK2 BURBANK, CA 9B TEL: (818) 508-6T FAX: (818) 508- F 7
4 1/2" 4 1/2"
1/2" 1"
FIBER CEMENT PANEL FIBER FIBER CEMENT CEMENT PANEL PANEL FIBER CEMENT PANEL ICC ESR 3910 ICCICC ESRESR 39103910 ICC ESR 3910
FIBER CEMENT FIBER FIBER PANEL CEMENT CEMENT PANEL PANEL FIBER CEMENT PANEL ICC ESR 3910 ICCICC ESRESR 39103910 ICC ESR 3910
1/2"1/2" 1" 1"
PAINTED METAL PAINTED PAINTED FLASHING METAL METAL FLASHING FLASHING PAINTED METAL FLASHING
SHIM
3/4" MIN
3/4" MIN
CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS PLASTER J-MOLD PLASTER J-MOLD PLASTER PLASTER J-MOLD J-MOLD
7/8" FURRING 7/8"CHANNEL 7/8" FURRING FURRING CHANNEL CHANNEL 7/8" FURRING CHANNEL
FLASHING PAINTEDFLASHING FLASHING PAINTED FLASHING PAINTED PAINTED SHIM
MIN? MIN?
MIN?
MIN?
CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS PLASTER PLASTER J-MOLD J-MOLD PLASTER J-MOLD PLASTER J-MOLD
CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS PLASTER J-MOLD PLASTER J-MOLD PLASTER J-MOLD PLASTER J-MOLD
STRUCTURAL CS
PAINTED METAL FLASHING PAINTED PAINTED METAL METAL FLASHING FLASHING PAINTED METAL FLASHING
" THICK GYPSUM5/8" THICK 5/8" GYPSUM THICK GYPSUM 5/8" THICK GYPSUM ALLBOARD WALLBOARD WALLBOARD WALLBOARD
3/4" MIN 3/4" MIN
4 1/2"
1" 1"
1"
2"
SHIM SHIM
CIVIL CONSULTC
1-1/2" Z FURRING 1-1/2" Z FURRING 1-1/2" 1-1/2" Z FURRING Z FURRING
Architecture A
SEE WALL SECTION PER LEVEL
FIRE SAFING
3/8"
1"
5/16"
6" METAL STUDS BEYOND 6" METAL 6" METAL STUDS STUDS BEYOND BEYOND 6" METAL STUDS BEYOND FIREFIRE SAFING SAFING FIRE SAFING 4"
1" 1/2"1/2" 1" 1"
1' - 1"
10"
3 1/2"
B1
5/16" 5/16"
B1
3" = 1'-0"
CC
B
B1B1
SECTION DETAIL SECTIONSECTION DETAIL SECTION DETAIL DETAIL 1/2" 3" = 1'-0" 3" =3"1'-0" = 1'-0"
B
5/8"5/8"
5/16" 1/2"
BB 2' - 2"
1 15/16" 1 15/16"
A 10" 2"
C5
3" = 1'-0"
PLAN DETAIL
B5
3" = 1'-0"
3" = 1'-0"
U
BATT INSULATION
7 1/2"
1 3/16"
KAPLAN GEHRING MCCARROLL ARCHITECT LIGHTING KAPLAN GEHRING MC 270 CORAL CIRCLE, ELLIGHTING SEGUNDO, CALIFORN O 310.552.2191 EXT. 166 | DCORAL 310.606.8745 | E 270 CIRCLE, WWW.KGMLIGHTING.COM O 310.552.2191 EXT. 16 WWW.KGMLIGHTING.C MEP CONSULTANT MEP CONSULTANT 4"
4" 10"
FIXED BRACKET
1-B
5/16" FIBER CEMENT PANEL "TERGO+" FASTENER
1-B
SHIM 1/4" MIN. REQUIRED FOR AIRFLOW AIR AND VAPOR BARRIER 5/16" FIBER CEMENT PANEL FORMED METAL CLOSURE, PTD AIR AND VAPOR BARRIER TO MATCH MULLIONS FORMED METAL CLOSURE, PTD AIR AND VAPOR BARRIER TO MATCH MULLIONS 3/8" SEALANT TYP
STRUCTURAL CONSULTANT STRUCTURAL CONSU
2" 2"
10"
10"
10"
3/8" SEALANT TYP
1/4"
4"
3/16"
3/16"
3/16"
3" = 1'-0"
PLAN DETAIL
D3
3" = 1'-0"
4"
4"
EDGE OF 3/8" SEALANT TYP SEALANT, TYP 2' - 0"
MODULE
SHARP CORNERS ON SHEAR WALLS, TYP LINE OF PLASTER BELOW
PLAN DETAIL
3/8"
4" 3/8"
SHIM AS REQUIRED 6' -3/8" 0" SEALANT TYP
4" 1' - 11 13/16" FIBER CEMENT PANEL 1' - 11 13/16" FIBER CEMENT PANEL 2' - 0" MODULE
6' - 0"
B3
SHARP CORNERS ON SHEAR WALLS, TYP
PLAN DETAIL
B3
3" = 1'-0"
LINE OF PLASTER BELOW
3" = 1'-0"
700 SOUTH FLOWER STREET, SUITE 2100 LOS ANGELES, CA 90017 700 SOUTH FLOWER S O 213.418.0201 LOS ANGELES, CA 900 F 213.266.5294 O 213.418.0201 F 213.266.5294 ARCHITECT ARCHITECT
5/16"
3"
CONC. SHEARWALL
1/2"
3" 1"
1"
1/2"
2' - 0"
2' - 0" 3/16"
SHIM AS REQUIRED
3/8"
3/8"
MODULE
4" 3/16"
CONC. SHEARWALL
EDGE OF SEALANT, TYP ALIGN
1/2"
2 1/4"
1' - 11 5/8"
2' - 0"
3/16"
D3
1' - 11 5/8"
ALIGN
4"
5/16"
3/16"
4"
4"
1/2"
4"
1"
1"
3"
3"
2 1/4"
4 1/2"
4 1/2"
1/2"
7"
5/8"
1/2"
CIVIL CONSULTANT
7"
5/8"
CIVIL CONSULTANT
9/16"
3/16"
1"
277 SOUTH LAKE STREET BURBANK, CA 91502-2111 277 SOUTH LAKE STR TEL: (818) 508-6300 EXT. 202 BURBANK, CA 91502-2 FAX: (818) 508- 7050 TEL: (818) 508-6300 EX FAX: (818) 508- 7050
CONTINUOUS HANGER RAIL
"TERGO+" FASTENER
1' - 8"
7 1/2" 10"
1 3/8"
2"
10"
SHARP CORNERS ON SHEAR WALLS, TYP
AIR AND VAPOR BARRIER BATT INSULATION 2"
MODULE
MODULE
END MODULE
MODULE
LIGHTING CONSULTANT LIGHTING CONSULTAN
3"
1"
10"
CONTINUOUS HANGER RAILGWB FINISH N.I.C
GALV STL ANGLE FOR JAMB ATTACHMENTFIXED BRACKET
6" COLD -FORMED 5/8" SHEATHING 1/2" CONTINUOUS INSULATION METAL FRAMING BELOW 1/2"AIRFLOW CONTINUOUS INSULATION SHIM 1/4" MIN. REQUIRED FOR
SEE STRUCTURAL DRAWINGS
MODULE
5/8" SHEATHING
2"
1' - 11 1/8"
1-B
GWB FINISH N.I.C
5/8" COLD FORMED METAL FRAMING GALV STL ANGLE FOR JAMB3ATTACHMENT
MODULE
1' - 8"
6" COLD -FORMED METAL FRAMING BELOW
EDGE OF FRAMING BELOW
END MODULE
SHARP CORNERS ON SHEAR WALLS, TYP
GLAZED ALUMINUM SYSTEM GWB 3 5/8" COLD FORMED METAL1/2" FRAMING
EDGE OF FRAMING BELOW
1-B
MODULE
MODULE
MODULE
SEE STRUCTURAL DRAWINGS
10"
1' - 8" COLUMN
SEE STRUCTURAL DRAWINGS
10"
1' - 8" COLUMN
MODULE
MODULE
R
3"
1' 10" - 8" COLUMN
SEE STRUCTURAL DRAWINGS 10"
1/2" GWB
1' - 0" 1' - 0"
U
1 3/16"
10"
GLAZED ALUMINUM SYSTEM
1' - 0"
PLAN DETAIL 1' - 8" COLUMN
R
1"
VINE ST.
B5
PLAN DETAIL
2"
3/8"
3" = 1'-0"
PLAN DETAIL
3" = 1'-0"
AA
3/8"
C5
PLAN DETAIL
A
1"
3' - 0" COLUMN
E5
BU
LILLIAN WAY
5/16" 5/16"
1 15/16"
10"
CHECKED BY: CH
1" 1"
1"
1/2"5/16" 1/2"
1 15/16"
SC
As indicate
WARING AVE.
C
1" 5/8"
5/8"
2' - 2"
PLAN DETAIL
2' - 0"
2' - 0"
4"
C
5/16"
5/16"
1" 1"
3' - 0" COLUMN
"
1" 1" MIN MIN
1"
MIN
4"
DD
1" 1 11/16" 1 11/16"
2' - 0"
D
3" = 1'-0" 3" =3"1'-0" = 1'-0"
1 11/16"
SCALE:
KEY BUILDING: PLAN
2'-11" TO NEXT MODULE
D
C1 C1 C1SECTION SECTION DETAIL AT COLUMN SECTION DETAIL SECTION AT DETAIL DETAIL COLUMN ATAT COLUMN COLUMN
1"
1 11/16"
WARING AVE.
3" = 1'-0"
EE
KEY PLAN
1' - 11 1/8"
C1
3" = 1'-0" 3" =3"1'-0" = 1'-0"
E
MIN
1"
1"
3/16"
E1 E1DETAIL E1SECTIONSECTION SECTION DETAIL SECTION DETAIL DETAIL
3" = 1'-0"
1" 1"
06/05/2017 09/01/2017
METAL AT METAL METAL FLASHING AT AT METAL FLASHING AT FLASHING MIN FLASHING MINMIN JAMB BEYOND JAMB JAMB BEYOND BEYOND JAMB BEYOND 3 1" 1/2" 3 1/2" 1" 1" 3 1/2" DISCONTINUOUS DISCONTINUOUS DISCONTINUOUS DISCONTINUOUS SHIM; MAINTAIN SHIM; MAINTAIN SHIM; SHIM; MAINTAIN MAINTAIN MINIMUM 1/4" AIR MINIMUM 1/4" MINIMUM MINIMUM 1/4"1/4" AIRAIR AIR GAP GAPGAP GAP
WITH EXTERIOR FACE OF SHEAR WALL SCHEDULED PARTITION
E1
1"
3 6
MODULE
SCHEDULED PARTITION
1' - 11 1/8" FIBER CEMENT PANEL
1' - 8" COLUMN 1" 1"SEE STRUCTURAL DRAWINGS
1"
1"
1" MIN
Dr
NO. PERMIT SET DATE 3 FOR PLAN 06/05/2017 PERMIT ISSUE CHECK VERIFICAT GMP6 (ADDENDUM NO.1) ISSUE F 09/01/2017 6-B METAL FLASHING METAL FLASHING METAL METAL FLASHING FLASHING GMP (A 9 12/12/2017 6-B ISSUE FOR CONSTRUCTION PERFORATED J MOLDING PERFORATED PERFORATED J MOLDING PERFORATED J MOLDINGJ MOLDING 9 12/12/2017 ISSUE F
1' - 0"
COLUMNS AT GRIDLINES N AND M ALIGNED WITH EXTERIOR FACE OF SHEAR WALLAT GRIDLINES N AND M ALIGNED COLUMNS
OP
1' - 11 1/8" FIBER CEMENT PANEL 1' - 0"
1' - 1"
1' - 8" COLUMN
SEE STRUCTURAL DRAWINGS
10"
10"
1" 1"
Fax 310 453 7020 Fa
Z FURRING CHANNEL FURRING Z FURRING CHANNEL CHANNEL Z FURRINGZCHANNEL
2' - 0"
1/2"
1"
827 VINE STREET 827 VIN LOS ANGELES, CA 90 LOS ANGE SECTION S NO. DATE ISSUE OR REVISI
Tel 310 453 2800 Te
1" 1"
1"
2'-11" TO NEXT MODULE
1"
METAL FLASHING AT METAL FLASHING METAL METAL FLASHING AT FLASHING AT AT JAMB BEYOND JAMB JAMB BEYOND BEYOND JAMB BEYOND
C
1556 20th Street Suit 15
4"
1/2"
6-BTRIM J METAL JWITH METAL TRIM WITH WITH J METAL TRIM WITHJ METAL TRIM WEEP HOLES WEEP WEEP HOLES HOLES WEEP HOLES
2' - 4"
P
Consulting
Drawing Title
1"
1' - 0"
Planning
Santa Monica, CA Sa 90
3" 3"
3"
3/16"
KACK
2' - 4"
AIR AND VAPOR AIRAIR ANDAND VAPOR VAPOR BARRIER BARRIER BARRIER
MINMIN MIN DISCONTINUOUS DISCONTINUOUS DISCONTINUOUS DISCONTINUOUS SHIM; SHIM; MAINTAIN MAINTAIN SHIM; MAINTAIN SHIM; MAINTAIN MINIMUM AIR MINIMUM 1/4"1/4" AIRAIR MINIMUM 1/4" AIR MINIMUM 1/4" GAP GAPGAP GAP
MIN
10" 10"
10"
10"
1' - 8" COLUMN
1"
GLAZED ALUMINUMGLAZED ALUMINUM GLAZED ALUMINUM GLAZED ALUMINUM STOREFRONT SYSTEM STOREFRONT STOREFRONT SYSTEM SYSTEM STOREFRONT SYSTEM
1" 1' - 8" COLUMN 1" MINSEE STRUCTURAL DRAWINGS MIN 1' - 0"
T
FLASHING FLASHING FLASHING
AIR AND VAPOR BARRIER 6-B
1"
FLASHING
8
6-B
6-B
1"
6-B
6-B
SEALANT AND BACKER SEALANT AND SEALANT BACKER ANDAND BACKER SEALANT BACKER ROD ROD RODROD
END MODULE
Z CLIP Z CLIP
° 12 9.
END MODULE
Z CLIP
179.12°
CORNER BEAD AND J MOLDING Z FURRINGZCHANNEL FURRING Z FURRING CHANNEL CHANNEL Z FURRING CHANNEL
MIN
179.12° 2° .1 89
SEE STRUCTURAL DRAWINGS
6' - 0"
0° .0 90
Z CLIP
CORNER BEAD AND J MOLDING
6' - 0" 1' - 0" 1' - 0"
1' - 0" 1' - 8" COLUMN
1" 1" 1/2"1/2" 1" 1" 1" Z FURRING CHANNEL Z FURRINGZCHANNEL FURRING CHANNEL Z FURRING CHANNEL
EDGE OF SLAB BELOW
1' - 0" 1' - 0"
EDGE OF SLAB BELOW
ROLLER SHADE ROLLER SHADE ROLLER SHADE ROLLER SHADE ASSEMBLY BY OTHERS ASSEMBLYASSEMBLY BYASSEMBLY OTHERSBY OTHERS BY OTHERS
10"
EDGE OF SLAB BELOW
1' - 0"
EDGE OF SLAB BELOW
MIN
1' - 4" SHEAR WALL - 0" SEE1' STRUCTURAL DRAWINGS
1/2"1/2"
SEE STRUCTRURAL DRAWINGS
1" 1" 1/2"
1/2"
1' - 4" SHEAR WALL
1"
1/2" 1' - 8" COLUMN
1/2"
3" 3"
SEE STRUCTURAL DRAWINGS
3"
0° .0 90
1' - 8" COLUMN
10"3"10"
SEE STRUCTRURAL DRAWINGS
10"
SEE STRUCTRURAL DRAWINGS
10"
3"
A
SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL
4"
ARCHITECT
Engineering E Interiors In
1"
NT ATH
SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL
SEE WALL SECTION PER LEVEL
3 5/8" METAL STUDS 3 5/8" 3 5/8" METAL METAL STUDS STUDS 3 5/8" METAL STUDS 4"
700 SOUTH FLO7 LOS ANGELES,L O 213.418.0201 O F 213.266.5294 F
HLW Internatio H
2"
FIRE SAFING FIREFIRE SAFING SAFING
SEE WALL SECTION PER LEVEL
3' - 3 13/16" FIBER CEMENT PANEL 4"
1"
4"
3/16"
MODULE
1"
START POINT OF ANGLED WALL AT EXTERIOR
THERMAL INSULATION THERMAL THERMAL INSULATION INSULATION THERMAL INSULATION AS SCHEDULED AS SCHEDULED AS SCHEDULED AS SCHEDULED
U
MODULE 3' - 4" 3' - 3 13/16" FIBER CEMENT PANEL
3"
FIRE SAFING
U 3' - 4"
3"
NCRETE SLAB - CONCRETE SEE CONCRETE SLAB - SEESLAB - SEE CONCRETE SLAB - SEE G RUCTURAL DRAWINGS STRUCTURAL STRUCTURAL DRAWINGSDRAWINGS STRUCTURAL DRAWINGS
START POINT OF ANGLED SHARP CORNERS ON WALL AT SHEAR WALLS,EXTERIOR TYP
5/8" THICK EXTERIOR 5/8" THICK 5/8" EXTERIOR 5/8" THICK THICK EXTERIOR EXTERIOR SHEATHING SHEATHING SHEATHING SHEATHING
A
2"
3' - 3"
SHARP CORNERS ON SHEAR WALLS, TYP 6" METAL SHARP STUDS CORNERS 6" METALON STUDS 6" SHEAR METAL STUDS 6" METAL STUDS WALLS, TYP
A
THERMAL INSULATION THERMAL INSULATION THERMAL THERMAL INSULATION INSULATION AS SCHEDULED AS SCHEDULED AS SCHEDULED AS SCHEDULED 3/16"
S SHARP CORNERS ON SHEAR WALLS, TYP
SEE WALL SECTION PER LEVEL
S
B
3/8"
B
5/8" THICK EXTERIOR 5/8" THICK 5/8" EXTERIOR 5/8" THICK THICK EXTERIOR EXTERIOR SHEATHING SHEATHING SHEATHING SHEATHING
C
SEE WALL SECTION PER LEVEL
C
1/2" CONTINUOUS 1/2" CONTINUOUS 1/2"1/2" CONTINUOUS CONTINUOUS RIGID INSULATION RIGID INSULATION RIGID RIGID INSULATION INSULATION
5/16"
1/2"1/2" CONTINUOUS CONTINUOUS 1/2" CONTINUOUS 1/2" CONTINUOUS RIGID RIGID INSULATION INSULATION RIGID INSULATION RIGID INSULATION
THERMAL INSULATION THERMAL INSULATION THERMAL INSULATION THERMAL INSULATION AS SCHEDULED AS SCHEDULED AS SCHEDULED AS SCHEDULED
ULATION NSULATION
SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL
WATERPROOFING WATERPROOFING WATERPROOFING WATERPROOFING MEMBRANE MEMBRANE MEMBRANEMEMBRANE
D
N
SEE WALL SECTION PER LEVEL
WATERPROOFING WATERPROOFING WATERPROOFING WATERPROOFING MEMBRANEMEMBRANE MEMBRANE MEMBRANE
SEE WALL SECTION PER LEVEL
WATERPROOFING WATERPROOFING WATERPROOFING WATERPROOFING MEMBRANE MEMBRANEMEMBRANE MEMBRANE
SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL 3' - 3" SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL SEE WALL SECTION PER LEVEL 3' - 3" 3' - 3"
7/8" THICK CEMENT7/8" THICK 7/8" 7/8" THICK THICK CEMENT CEMENT CEMENT PLASTER OVER LATH PLASTER PLASTER OVER LATH LATH PLASTER OVER LATHOVER
5/8" THICK EXTERIOR 5/8" THICK 5/8" EXTERIOR 5/8" THICK THICK EXTERIOR EXTERIOR SHEATHING SHEATHING SHEATHING SHEATHING
N
TION N
CEMENT 7/8" THICK THICK CEMENT CEMENT 7/8" THICK CEMENT7/8" THICK 7/8" PLASTER OVER PLASTER PLASTER LATHOVER OVER LATH LATH PLASTER OVER LATH
SEE WALL SECTION PER LEVEL
D
OR
7/8" THICK CEMENT7/8" THICK 7/8" CEMENT THICK CEMENT 7/8" THICK CEMENT PLASTER OVER LATH PLASTER OVER PLASTER LATHOVER LATH PLASTER OVER LATH
SEE WALL SECTION PER LEVEL
SHED LINE INDICATES DASHED GYPSUM LINE DASHED INDICATES LINELINE INDICATES GYPSUM GYPSUM DASHED INDICATES GYPSUM ALLBOARD BY OTHERS WALLBOARD WALLBOARD BY OTHERSBY OTHERS WALLBOARD BY OTHERS
SEE WALL SECTION PER LEVEL
1/2" THICK RIGID INSULATION 1/2" THICK 1/2" RIGID THICK INSULATION RIGID INSULATION 1/2" THICK RIGID INSULATION
4"
2' - 0" MODULE 5/8"
PLAN DETAIL
6"
1/2" 5/8"
5/8"
7/8" 6"
1/2"
5/8"
7/8"
U U
HLW International LLP HLW International LL Architecture
R
Engineering Interiors
R
Planning
3 5/8" COLD FORMED METAL FRAMING
6" COLD -FORMED METAL FRAMING
3 5/8" COLD FORMED METAL FRAMING EDGE OF SLAB BELOW
5/8" SHEATHING 5/8" SHEATHING 1/2" CONTINUOUS INSULATION BATT INSULATION
10"
Consulting
GWB FINISH N.I.C
Tel 310 453 2800
Santa Monica, CA 90404
EDGE OF SLAB BELOW
Fax 310 453 7020
1-B
1-B 1-B
1/2" CONTINUOUS INSULATION
AIR AND VAPOR BARRIER
AIR AND VAPOR BARRIER BATT INSULATION
EXTERIOR CEMENT STUCCO AIR AND VAPOR BARRIER
EXTERIOR CEMENT STUCCOAIR AND VAPOR BARRIER
5/8" SHEATHINGEXTERIOR CEMENT STUCCO 5/8"
1/2" CONTINUOUS INSULATION
5/8" SHEATHING
1/2" CONTINUOUS INSULATION CORNER BEAD 1" Z METAL
CORNER BEAD
6"
1" Z METAL 6"
EXTERIOR CEMENT STUCCO
Planning
1556 20th Street Suite B
10"
10"
54
1556 20th Street Suite B Santa Monica, CA 90404
10"
1-B
7/8" FURRING CHANNEL
5/8"
1-B
GWB FINISH N.I.C
10"
6" COLD -FORMED METAL FRAMING
SHARP CORNERS ON SHEAR WALLS, TYP
Consulting
7/8" FURRING CHANNEL 10"
10"
10"
SHARP CORNERS ON SHEAR WALLS, TYP
Architecture
Engineering Interiors
Tel 310 453 2800 Fax 310 453 7020
Drawing Title1-B
Drawing Title
PLAN DETAILS PLAN DETA
55
IRST FLOOR , THERECORD SHOP AND CAFE SURROUND THE PACKAG AND STORAGE AREAS OFTHE MANUFACTURING PROCESS , ALLOWNG VISITORS TOVISUALLY INTERACT WITH THE PRODUCTS THAT NGTHE HEY ARE SHOPPING FOR .O NTHE OUTSIDE , THEPUBLIC ISABLE TO PLACE: HONORABLE MENTION WITNESS THE PRODUCTION OFVINYL RECORDS ,. O N THE SECOND LOOR OFTHE HUB , THEWORK SHARE AREAS ARE FARTHER REMOVED The MangoOF Vinyl Hub is a personal effort for an international design competition. The scope of work includes the adaptive re-use of an ROM THE NOISES AND MOVEMENTS THE PRODUCTION PROCESS existing manufacturing building into a vinyl WHILE STILL ALLOWING THEM TOOVERLOOK WHEN NECESSARY . manufacturing space with creative office above. The concept of the project is centered around the manufacturing process of vinyl records THROUGH THE IDEAS OFEXPERIENCE BASED DESIGN , THEGOAL ISTOas an experience and the reinterpretation of the iconic industrial chimney stack into a more modern typology that allowsVISITING for more human scale interaction. NHANCE THE EXPERIENCES OFTHOSE THEM ANGO VINYL HUB. ROOF LEVEL + 27™-0fl
Mango Vinyl Hub Competition SECOND LEVEL + 13™-6fl
FIRST LEVEL + 0™-0fl
Perspective
CROSS SECT
Floor Plans 1
RE-INTERPRETING THE CHIMNEY TYPOLOGY
2
3
4
5
6
7
8
9
10
SCALE: 1/16fl = 1
A
CLASSIC INDUSTRIAL CHIMNEY:
CONTEMPORARY SKYLIGHT CHIMNEY:
SYMBOL OF PRODUCTION AND POLUTION FORM AND SCALE ARE LOFTY AND INTIMIDATING REPRESENTATION OF A TIME PAST
SMALLER SCALE ALLOWS FOR CLOSER INTERACTION SYMBOL OF INTERACTION WITH PUBLIC ACTS AS SKYLIGHT TO SPACES BELOW
18 B
19
1
2
3
4
C
5
6
7
8
9
10
PRODUCTION SEQUENCE DIAGRAMS
TOP OF CHIMNEY + 53™-8fl
ELEVATOR FOR UPSTIARS EMPLOYEES
COMMON ENTRY FOR VISITORS AND EMPLOYEES Y TR ER ENOY F
D
BREAK ROOM AND LOCKER ROOM FOR EMPLOYEES 18. ROOFTOP PATIO 19. CHIMNEY SKYLIGHT PARK
INTERMEDIATE BUFFER ROOM
G AL
ROOF LEVEL PLAN SCALE: 1/16fl = 1™0fl
Y BB
LO
LE
RY
1
2
3
4
5
6
7
8
9
10
A
13
E YE O Y PL BB EM LO
NG
I UR
1. ENTRY FOYER
2. LOBBY
SUPPLY AND RETURN FOR EQUIPMENT FROM CENTRAL MECHANICAL ROOM
12
A
M
B
AREA FOR SORTING AND ORGANIZING PRESSED VINYL
NEW GLASS WALL ALLOWS FOR PUBLIC INTERACTION
ROOF LEVEL
CTA FARE NU A
3. COMMON ROOM
N O M M OM CO RO
+ 27™-0fl
14
15
G
IN AG A CK RE PA A
OPEN FLOOR FOR MANUFACTURING EQUIPMENT
C
11 16 N O M M OM CO RO
NG
RI
SECOND LEVEL
17
D
U CTA FARE NU A
11. LOBBY 13. CONFERENCE 15. ROOMS ASSEMBLY AREA 17. RESTROOM 12. OPEN WORK14. AREA FLEXIBLE WORK 16.AREA KITCHENETTE
A
M
+ 13™-6fl
SECOND LEVEL PLAN SCALE: 1/16fl = 1™0fl
EXPERIENCE BASED DESIGN
A
4. MANUFACTURING
TOP OF CHIMNEY DURING SHIPMENT TIMES AT
+ 0™-0fl
G
IN
R TU ACEA UFAR
AN
M
3
4
D5
6
7
8
9
10
A
2
3
B
GLASS WALL ALLOWS FOR VISITORS TO VISUALLY INTERACT WITH PACKAGING OF RECORDS
4 2
10
9
OPEN FLOOR SPACE FOR HANDING AND PACKAGING RECORDS
VI
NY
L
C
BOXES STORED FOR LOADING AND DISTRIBUTION
ADJACENT VINYL RECORD SHOP
FIRST LEVEL
2
NIGHT, GALLERY IS CLOSED TO ALLOW FOR TRUCK LOADING
+ 53™-8fl G IN AD EA LO AR
TRIUM SPACE AROUND WHICH THE MANUFACTURING AND PACKAGING OFTHEVINYL RECORDS WOULD OCCUR . AT THECENTER OFTHE TRIUM SPACE IS THEMECHANICAL ROOM WHICH PROVIDES THE NECESSARY POWER AND RESOURCES FOR THE MACHINERY .O N THE IRST FLOOR , THERECORD SHOP AND CAFE SURROUND THE PACKAG AND STORAGE AREAS OFTHE MANUFACTURING PROCESS , ALLOWNG VISITORS TOVISUALLY INTERACT WITH THE PRODUCTS THAT NGTHE Elevation HEY ARE SHOPPING FOR .O NTHE OUTSIDE , THEPUBLIC ISABLE TO WITNESS THE PRODUCTION OFVINYL RECORDS ,. O N THE SECOND LOOR OFTHE HUB , THEWORK SHARE AREAS ARE FARTHER REMOVED ROM THE NOISES AND MOVEMENTS OFTHE PRODUCTION PROCESS OR RENDERING WHILE STILL ALLOWING THEM TOOVERLOOK WHEN NECESSARY . THROUGH THE IDEAS OFEXPERIENCE BASED DESIGN , THEGOAL ISTO NHANCE THE EXPERIENCES OFTHOSE VISITING THEM ANGO VINYL HUB.
1
5. SORTING AREA
G IN RT EA SO AR
THEMAJOR ARCHITECTURAL MOVE WAS TOCREATE ACENTRAL
B
SH
O
P
8 C
6
1
5 7
7. STORAGE AREA
6. PACKAGING AREA
LONGITUDINAL S
D G IN AGA CK E PA AR
G IN RT EA SO AR
ROOF LEVEL + 27™-0fl
N
1. ENTRY FOYER 3. VINYL RECORD5.STORE RESTROOMS 7. MANUFACTURING AREA 9. PACKAGING AREA 2. GALLERY 4. RECORD CAFE6. LOBBY 8. ACCESSORY MACHINE 10. ROOM STORAGE AREA
FIRST LEVEL PLAN SCALE: 1/16fl = 1 SCALE: 1/16fl = 1™0fl
SECOND LEVEL + 13™-6fl
INTERIOR RENDERING FIRST LEVEL + 0™-0fl
CROSS SECT
SCALE: 1/16fl = 1
Sections TOP OF CHIMNEY + 53™-8fl
ROOF LEVEL + 27™-0fl
SECOND LEVEL + 13™-6fl
FIRST LEVEL + 0™-0fl
56
1
2
3
4
5
6
7
8
WESTERN ELEVA 9
10
SCALE: 1/16fl = 1™
Sectional Axon
Spacial Axons
1. Entry Foyer
2. Lobby
3. Common Room
4. Manufacturing
5. Sorting Area
6. Packaging Area
7. Storage Area
57
E
D
C
B
A
Owner: KBS Location: Downtown Los Angeles, CA Project Role: Project Designer
UBP Coral Tree Plaza
Originally designed by renowned landscape architect Garrett Eckbo, the Coral Tree plaza located adjacent to the main entry of the Union Bank Building in DTLA is part of a three-acre public park. Though originally occupied by pre-cast concrete planters housing large overgrown coral trees, it was apparent the trees had outgrown their enclosures and the plaza had become under-utilized. In its place, a new plaza is designed to provide a lush amenity area with bar-height seating, fire pits, and large gathering area for tenant use. 9
C4 L325_2A
2
2
L-AC-1
L-AC-1
L-AC-1
1' - 6"
2
L-AC-2
2
L-AC-2
2
2
L-AC-2
5
8"
5
1
8"
L-WS-1
L-WS-1 11
L-WS-1
1
L-WS-1
L-AC-3
3' - 6"
TABLE 2 L-WD-2
8"
1 3
2 BENCH 4
L-AC-2
L-AC-1
18 1' - 6"
11
2
BENCH 3
8"
13
L-PAV-1
8
L-WD-2
11
4' - 0"
5
18
11
8
L-PAV-1
1' - 6"
SEE PLUMBING DRAWINGS FOR CONNECTION DETAIL
5
2
L-AC-2
12
L-WD-2
TABLE 1
8"
11
L-PAV-1
3' - 6"
BENCH 3 OH
1' - 6" L-WD-2
8
4' - 0"
16
EQ
EQ
30' - 0"
4
L-WS-1
2
1
L-AC-1
1
8 2' - 6"
F4 L321_2A
8
1' - 6"
8
L-AC-3
1
1
2' - 6" L-WD-2
BENCH 2
1' - 6"
BENCH SEATING
C1 L326_2A
16
3
2' - 6"
L-WD-2
BENCH 1
L-WD-2
16
3
4' - 0"
6"
UP
2
L-AC-2
F6 L322_2A
4' - 0" 1
9
8"
5' - 6"
L-AC-3
2
L-WD-2
BENCH 4 OH
13
L-PAV-1
F4 L322_2A
5
11
E1 L310_2A
L-AC-1 8"
3
19
BENCH 5
B3 L326_2A
F5 L325_2A
1' - 6"
L-WD-2
17
2' - 5 1/2"
L-PAV-1
1
1
17
F2 L322_2A
L-PAV-1 F3 L324_2A
8
Sim
F2 L322_2A
1
L-WS-1
19 5
L-AC-2
F5 L323_2A
12
L-WS-1
L-WD-2
8
1' - 6"
16 1
3
L-AC-3
3' - 2"
30' - 0"
4' - 0" 4' - 0"
1
L-PAV-1
L-AC-3
BENCH 1 OH
L-AC-3
L-WS-1
2 L-AC-1
L-PAV-1
F2 L321_2A
L-WD-2
8
1
2' - 6"
1' - 0"
1' - 6"
11
2
2
L-AC-2
L-AC-2
16 D5 L325_2A
1' - 6"
2
L-AC-2
C4 L325_2A
2' - 6"
C4 L325_2A A4 L325_2A
2 L-AC-1 9
L-AC-1
L-AC-1
6 EXISTING ONE-STORY BUILDING
L-PAV-1
15
L-AC-1
105
106
107
108
10
11
12
13
14
SITE KEY NOTES
FINISH.
E
58
15
SITE PLAN LEGEND
1
PLANTING MATERIAL - SEE PLANTING PLAN
12
NEW TABLE WITH WOOD CLADDING
2
NEW FLATWORK AND NEW PAVING TO REPLACE EXISTING. SAWCUT JOINT TO MATCH EXISTING PATTERN. TRANSITION FROM EXISTING GRADE TO NEW PLAZA GRADE. MAINTAIN 2% SLOPE MAXIMUM AND 1/4" MAXIMUM CHANGE IN SURFACE FINISH
13
NEW GAS FED FIREPIT SUPPORTED ON CONCRETE CURB
PLANTING AREA ( SEE LANDSCAPE DRAWINGS)
3
NEW CAST-IN-PLACE CONCRETE PLANTER
14
NEW CONCRETE CURB TO AND HANDRAIL TO MATCH ORIGINAL
4
NEW CAST-IN-PLACE CONCRETE PLANTER CONCEALED WITH WOOD CLADDING
EXISTING CONCRETE FINISH
15
EXISTING PLANTER TO REMAIN
5
NEW WEATHERED STEEL PLANTER EDGING
6
NOT USED
7
NOT USED
8
NEW BENCH WITH WOOD CLADDING ON PEDESTALS
9
EXISTING ARCHITECTURAL CONCRETE TO REMAIN
10
NEW CAST-IN-PLACE CONCRETE PLANTER WITH NEW PLANTING AREA
11
NEW PORCELAIN DECKING ON PEDESTALS
D
16
PLANTER DEMISING WALLS; SEE STRUCTURAL DRAWINGS
NEW CONCRETE TO MATCH EXISTING, SEE HARDSCAPE PLAN AND DETAIL
17
SEE PLUMBING DRAWINGS FOR CONNECTION DETAIL
NEW CONCRETE TO MATCH EXISTING, SEE HARDSCAPE PLAN AND DETAIL
18
TIMER FOR FIREPIT RECESSED MOUNT WITH ACCESS DOOR, SEE DETAIL DRAWING AND PLUMBING DRAWINGS
NEW PORCELAIN TILE PEDESTAL DECKING, SEE DETAIL
19
E-STOP FOR FIREPIT SURFACE MOUNT, SEE PLUMBING DRAWINGS
C
IPE WOOD PLANKS (SEE MATERIAL SCHEDULE)
B
A
59
Owner: Hayman Properties Location: Denver, CO Project Role: Project Designer
Vibe Arts District
Located at the edge of Denver's Arts District, the existing brick-clad structure was due for upgrades to fit into the changing neighborhood end demographics. As a major part of the renovation, the bridge structure connecting the office levels and parking structure was identified as an element that could provide a unique entry experience. Special attention was put into the design and detailing of a heated glass entry canopy and custom perforated railing depicting the foliage of the local aspen trees. The pattern of the railing is a mixture of voronoi leaf forms and hexagonal perforations in the negative space.
Perspectives F
D
E 2B
C
3C
4D
15' - 0"
15' - 0"
OPEN
F
D
E 2B
4D
15' - 0"
Level 3
B
C
3C
15' - 0"
15' - 0"
3' - 6"
31' - 0"
5
OPEN
AL-02
Level 3 31' - 0"
Typical Details
Custom Perforated Railing Elevation
A
B 3' - 6"
C
1/4"/FT SLOPE
10' - 0"
VIBE
1/4"/FT SLOPE
AL-02
F1 TYP. A800
AL-01
ALIGN PANEL JOINTS TO RAILING BEHIND 5' 0" O.C.
4"
4
OPEN
OPEN
VIBE ARTS DISTRICT 1391 SPEER BOULEVARD DENVER, CO
10' - 0" 1 1/2"
AL-01
HSS PER STRUCTURAL
ALIGN PANEL JOINTS TO RAILING BEHIND 5' 0" O.C.
1437 4th Street, 4th Floor Santa Monica, California 90401 t +1 310 453 2800 | www.hlw.com
9' - 1" CLEAR HEIGHT
Level 2 19' - 0"
WIRING FOR HEATED GLASS
Level 2
STRUCTURAL ENGINEER 888 S. FIGUEROA ST, 18TH FL LOS ANGELES, CA 90017 t +1 323 733 6673
PIPING FOR GUTTER
19' - 0"
OWNER REPRESENTATIVE 1801 Broadway | Suite 700 DENVER, CO 80202 t +1 303 957 5318
ALIGN
ALIGN
8' - 8"
MC + ENGINEERING,LLC
2"
ELECTRICAL ENGINEER 3700 OSAGE ST. DENVER,CO 80211 t +1 303 589 6202
1"
3
1"
VH ENGINEERING
CAP OFF TOP OF TUBE
1/2" = 1'-0"
PLUMBING ENGINEER 7985 W. 16TH AVE. LAKEWOOD, CO 80214 t +1 303 296 6900
2 1/2"
CONTINUOUS BENT STEEL FORM WELDED TO TOP OF TUBE
F5
LANDSCAPE ARCHITECT 881 BROADWAY, 5TH FLOOR NEW YORK, NY 10003 t +1 310 543 2800
LED LIGHT AS SCHEDULED
2"
5' - 4"
5' - 4"
LIGHTING DESIGNER 881 BROADWAY, 5TH FLOOR NEW YORK, NY 10003 t +1 310 543 2800
LIGHT FIXTURE AS SCHEDULED
TYPICAL RAILING LAYOUT ELEVATION
WIRING INSIDE VERITCAL POST FOR LED LIGHT
NO. PERFORATED 1/4" THICK ALUMINUM PLATE PAINTED
DATE
0
04/29/2019
ISSUE OR REVISION
ISSUED FOR PLAN CHECK
3' - 8"
10' - 0"
F5
1/2" = 1'-0"
1" X 3" PAINTED STEEL VERTICALS @ 5'-0" O.C. MAX.
TYPICAL RAILING LAYOUT ELEVATION STEEL COLUMN - SEE STRUCTURAL DRAWINGS
1' - 0"
1 3/8"
3"
2"
EQ
Enlarged Railing Pattern
1/4"
10' - 0"
T SHAPED PAINTED STEEL WELDED TO VERTICAL
EQ 1/4"
1"
1"
ALIGN
2 1/2"
PAVING AS SCHEDULED
SLOPE PER FINISH PLAN
EQ
H.P. 0' - 0" L.P. -0' - 6" 3RD FLOOR
KEY PLAN W 14TH AVE
EE
EXISTING
2
SP RB
1' - 9"
D LV
3' - 8"
F1 TYP. A800
NORTH
EXISTING CONCRETE SLAB & BEAM SHOWN SHADED
THERMAL INSULATION SEAL/ SIGNATURE
3' - 8"
WATERPROOFING MEMBRANE SHOWN DASHED
1"
6"
10"
2 1/2"
VARIES V.I.F.
2 1/2" METAL STUDS
2 1/2" 5/8" 3 5/8" METAL STUD KICKERS. REF. STRUCTURAL FOR CONNECTION DETAILS.
SHEET TITLE:
EXTERIOR DETAILS
METAL PANEL SYSTEM AS SCHEDULED 5/8" THICK DENSGLASS GOLD EXTERIOR SHEATHING
3 5/8" METAL STUDS
1
20GA STUD, 18GA CHANNEL.
PANEL SYSTEM HANGER EXTRUSION
60
5/16" 1 3/8" 5/8"
3 5/8"
PROJECT NO. 18309 STAINLESS STEEL FLASHING
8' - 6" 2ND FLOOR
362T150-43 w/ X-U SHOT PIN
WOOD PANEL AS SCHEDULED (MODULO FACADE SYSTEM OR EQUAL)
3/8"
C
F1
B 4/29/2019 4:44:47 PM
3" = 1'-0"
F
TYPICAL RAILING MODULE
SCALE: 3" = 1'-0"
DATE: 04/29/19
CHECKED BY: DS
DRAWN BY: JX
SHEET NO.
1/8"
A732 .25" BORDER ALL AROUND
A
© 2019 HLW International LLP
E
D
C
B
WareHouse on Grand
Location: El Segundo, CA Project Role: Project Designer
Warehouse on Grand is a study for a new four story building adjacent to an existing office campus. A major part of the study was a comprehensive landscape scheme that would tie in the existing circular water feature and landscaped park. The organic shape and burming of the at-grade planting spread throughout the site is meant to create a meandering experience for the user as if one is walking on a path through the bluffs.
Site Plan
Site Diagrams
SITE MASTER PLANNING | EXISTING SITE CIRCULATION
E. GRAND AVE LEGEND Employee Vehicular Circ. Visitor Vehicular Circ. Pedestrian Circ. Loading
1960 Grand
Passive Green Space
Parking Structure
N
SITE PLANNING |PROPOSED BUILDING AND CIRCULATION 1950 GRANDMASTER AVENUE CONCEPT PRESENTATION
04 MARCH 2020
E. GRAND AVE LEGEND Employee Vehicular Circ. Visitor Vehicular Circ. Pedestrian Circ. Loading Tenant Entries
Future Building
1960 Grand
Create integrated landscape zones with active and passive amenities to create campus feel.
Actived Campus Space
Create new drop-off area within site for convenient access. Parking Structure Surface Parking
N
SITE PLANNING | PROGRAM ZONES 1950 GRANDMASTER AVENUE CONCEPT PRESENTATION
04 MARCH 2020
E. GRAND AVE LEGEND
1. The Promenade - Cafe Pavilion - Fire Pit -Elevated Terraces - Canopy Feature
Promenade Fitness Zone
2. Fitness Zone
Active Backyard
- Indoor - Outdoor Fitness Space - Yoga Deck - Bicycle Storage
3. The Backyard
1
Future Building
1960 Grand
- Oudoor BBQ - “Creekwalk“ - Game Amenities - Hammocks
Parking Structure
2
3
N
1950 GRAND AVENUE CONCEPT PRESENTATION
04 MARCH 2020
61
Owner: USC Location: Downtown Los Angeles, CA Project Role: Project Designer
USC East Library Building
The East Library Building project is a study for USC for a new ground-up office building, adaptive re-use of an existing four story building and landscaping in the side and central plazas. The new 350,000 SF, 12-story building would consolidate USC's currently scattered office leases and create its first office campus East of the I-110 freeway. The facade of the new building is highlighted by vertical strips of copper ProPoSEd PLaN brick materiality of the USC campus without using the same material. paneling, a nod toSItE the traditional
Site Plan
15’
Secured Access
58’
50’ Building Plaza Entries Entry from Parking
Loading Zone
Loading Zone 130’ Secured Access
Perspectives USC EAST LIBRARY CONCEPT PRESENTATION
62
Secured Access
Massing Studies
N.
N
MAY 17, 2019
Owner: Confidential Location: Sunnyvale, CA Project Role: Project Designer
Building E
As part of the architecture and site improvements to this existing 1980's building, new passenger drop off, site softscape, and entry canopy are proposed to enhance the tenant entry experience. The form of the canopy structure is derived from the adjacent salt ponds and serves as a way finding element and sun shading element.
Perspective
F
E
D
C
14 S
5
4S
3S
16 S
51 S
21 C 21 C
10 C
9 22 C
7C
22 C
4
9 9
25 C
24 C
WA Y.
18 S
Site Plan
9
LO CK HE ED MA RT IN
Sketches
28 C
24 C
38 C
9 22 C
39 C
22 C
9 38 S
9 21 C P
39 S
15 C
3
7
4
9 3M 8 CP
8' -
6"
BIK E
STO
RAG E
25 EV
8C
23 EV
3S
7C
5
6" 18' 8
6 CP
7A
23' -
9S
11 7 /8"
1
8M
E
8A
2 SV
2M
1S
11 S
2
4
4
6
2
4
AREA OF WORK LINE
3
1ST AV E.
N. M ATH ILD AA VE.
1
N. 63
1
SITE PLAN SCALE: 1" = 30'-0"
VICTOR ZHANG, AIA 774-275-4335 bowenvzhang@gmail.com Los Angeles, CA