City of Tulare- 2010 IDSM Audit DR Recommendation Summary 5.10.2011

Page 1

IDSM Audit Summary

1

Integrated Demand Side Management (IDSM) Audit

Demand Response Summary PARTNER : CITY OF TULARE

On September 21, 2010, Southern California Edison (SCE) conducted an IDSM audit at three of your facilities. The focus of these audits was to identify energy efficiency and demand response opportunities. In an effort to assist you in meeting, the Energy Leader “Gold” level criteria, the audit outlined key demand response programs, and measures for implementation. A list of these key findings is outlined below.

Key Findings Demand Response Measure Recommendation City of Tulare: Demand Response Measure Contact SCE Account Representative to obtain a rate analysis for TOU-8-CPP

kW Reduction

Potential: Enroll in SCE’s Critical Peak Pricing Program (Structural Benefiters) City of Tulare: 1875 S WEST ST #3 Demand Response Measure Contact SCE Account Representative to obtain a rate analysis for TOU-8-CPP

kW Reduction

Potential: Enroll in SCE’s Critical Peak Pricing Program (Structural Benefiters) City of Tulare: 1875 S WEST ST Demand Response Measure Contact SCE Account Representative to obtain a rate analysis for TOU-8-CPP Utilize current SCADA System to participate in SCE Auto Demand Response (Auto DR) Program Replace current Cogeneration Unit with Fourth Fuel Cell Unit Total kW Reduction

March 9, 2012

kW Reduction


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.