IDSM Audit Summary
1
Integrated Demand Side Management (IDSM) Audit
Demand Response Summary PARTNER : CITY OF TULARE
On September 21, 2010, Southern California Edison (SCE) conducted an IDSM audit at three of your facilities. The focus of these audits was to identify energy efficiency and demand response opportunities. In an effort to assist you in meeting, the Energy Leader “Gold” level criteria, the audit outlined key demand response programs, and measures for implementation. A list of these key findings is outlined below.
Key Findings Demand Response Measure Recommendation City of Tulare: Demand Response Measure Contact SCE Account Representative to obtain a rate analysis for TOU-8-CPP
kW Reduction
Potential: Enroll in SCE’s Critical Peak Pricing Program (Structural Benefiters) City of Tulare: 1875 S WEST ST #3 Demand Response Measure Contact SCE Account Representative to obtain a rate analysis for TOU-8-CPP
kW Reduction
Potential: Enroll in SCE’s Critical Peak Pricing Program (Structural Benefiters) City of Tulare: 1875 S WEST ST Demand Response Measure Contact SCE Account Representative to obtain a rate analysis for TOU-8-CPP Utilize current SCADA System to participate in SCE Auto Demand Response (Auto DR) Program Replace current Cogeneration Unit with Fourth Fuel Cell Unit Total kW Reduction
March 9, 2012
kW Reduction