FILLING THE GA_P

Page 1


INDEX 01_ANALYSIS Larger scale analysis Closer scale analysis

02_URBAN SCALE Urban diagrams Masterplan and close-ups Views

03_ARCHITECTURAL SCALE Architectural diagrams Plans Sections and close-ups Perspective section Elevations Interiors diagrams Plan detail Axonometries Views


URBAN ANALYSIS | MAIN ACTIVITIES

SPORTS FACILITIES

PUBLIC INACCESSIBLE AREAS

SCHOOLS

MARKETS AND SUPERMARKETS

LIBRARY

THEATER

HEALTHCARE

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


01_ANALYSIS | Areas of influence

ACCESS NEW ACCESS BUS STOPS MAIN BUS STOPS SCHOOLS PARK

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


GREEN NETWORK

PUBLIC GREEN SPACES SEMI-PRIVATE GREEN SPACES PRIVATE GARDENS TREES

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


MOBILITY SYSTEM

PRIMARY ROADS SECONDARY STREETS BIKE LANES MAIN NODES BUS STOPS

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


SWOT ANALYSIS DIAGRAM

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


MASTERPLAN DEFINITION DIAGRAMS

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


MASTERPLAN DEFINITION DIAGRAMS

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


8.

6. 5. 4. 7.

2.

3.

MASTERPLAN LEGEND

1.

1. SLOW MOBILITY PAVED STREET 2. PUBLIC STEPPED OPEN SPACE 3. GREEN PUBLIC SPACE 4. SEMI-PRIVATE VEGETABLE GARDEN 5. SEMI-PRIVATE GREEN SPACE 6. PLAYGROUND 7. AMBULANCE EMERGENCY ACCESS POINT 8. PARKING LOT 9. PAVED PEDESTRIAN AND CAR ACCESS

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


Platforms Detail

01_ANALYSIS

Parking lot and rainwater channel Detail

02_URBAN SCALE

03_ARCHITECTURAL SCALE


Ambulance entrance and green terracing Detail

Vegetables garden Detail

Platforms and green area Detail

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


Platform Detail section

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


URBAN DESIGN | View of the square and the shared road unifying the street

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


BUILDING MODIFICATIONS CONCEPT Architectural Diagrams

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


BUILDING MODIFICATIONS CONCEPT Environmental and structural diagrams

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


ENVIRONMENTAL STRATEGIES

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


URBAN DESIGN | View of the corner entrance plaza

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


URBAN DESIGN | View of the vegetable garden

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


GROUND FLOOR | Functional Plan

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


GROUND FLOOR | Architectural plan 1:100

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


GROUND FLOOR | Architectural axonometry and schemes

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


GROUND FLOOR | Bel Bar View

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


UNDERGROUND FLOOR | Functional Plan

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


UNDERGROUND FLOOR | Architectural plan 1:100

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


08 MIXEDSECTION GREEN PERSPECTIVE

Using grass and trees to cool the area and create therapeutic and vegetable gardens for the patients

SOLAR RADIATION STUDY

REINFORCEMENT OF TH

0,3

The chart shows how from 10-12 am the REINFORCEMENT OF THE STRUCTURE solar radiation is hitting the facade. In yellow 1.3 The chart shows are how highlighted the I from 10-12 am the months. hottest SOLAR RADIATION STUDY STRUCTURE STRUCTUREAND AND REINFORCEMENT OF THE STRUCTURE solar radiation is hitting 01.1 SHADOWS INDIRECT INSULATION TERRACE MIND SHADOWS INDIRECTLIGHT LIGHT INSULATION TERRACE MINDTHE THEGAP GAP the facade. In yellow are highlighted the The chart shows how SOLAR RADIATION STUDY 02.4 NEED OFSTRUCTURE FIXED AND REINFORCEMENT OF THE hottest months. I from 10-12 am the MOVEABLE SHUTTERS CURRENT CONDITION CURRENT CONDITION 1:2 solar radiation is hitting E 06.0 The chart shows howthe facade. In yellow NEED OF FIXED AND I from 10-12 am theare highlighted the hottest months. MOVEABLE SHUTTERS radiation is hitting CURRENTsolar CONDITION CURRENT CONDITION 1:20 the facade. In yellow E SOLAR RADIATION STUDY 12:00 are highlighted 12:00 theREINFORCEMENT OF THE STRUCTURE INSULATING THE WALLS 21 Jun. hottest months. 21 Jun. NEED OF FIXED AND WATERFALL WALL DETAIL KEY PLAN CONCEPT DIAGRAMS: CURRENT CONDITION 12:00 I Plaster1:2 MOVEABLE SHUTTERS EXTENDING THE ROOF, INSERTING SKYLIGHTS AND SHUTTERS E chart 0shows how CURRENT The CONDITION 12:00 CURRENT CONDITION 1:20 PROJECT P 7.2 21 Apr. Acoustic 21 Apr. from 10-12 am the 12:00 I -Aug. INSULATING THE WALLS Brick blo 12:00 -Aug. STRUCTURE AND 21 Jun. NEED OF FIXED AND solar radiation is hitting Reinforce 21 Jun. I MOVEABLE SHUTTERS SHADOWS INDIRECT LIGHT AIRSHADOWS FLOWS COOLING INDIRECT STRATEGY LIGHT AIR FLOWS1:20 MIND THE GAP the facade. In yellow 12:00 CURRENT CONDITION 12:00 CURRENTINSULATION CONDITION CURRENT CONDITION 1:20 PROJECT PROPOSAL 1:20 Reinforce 12:00 12:00 21 Dec. are highlighted the 21 Apr. Vapour b 21 Dec. 21 Apr. 09.0 -Aug. hottest months. 09.0 Rockwoo -Aug. 80.0 12:00 INSULATING THE WALLS 80.0 12:00 Plaster 21 Jun. E 12:00 22.0 I 21 Jun. 68° 68° E E

PROJECT PROPOSAL 1:20

I

21 Dec.

EPROJECT PROPOSAL 1:20

PROJECT PROPOSAL

0,2

0,25

I

0,25 0,53

0,2

0,2

0,25 0,53

0,05

,25 0,53

,05

0,25 0,53

0,05

0,05

0,25 0,28

0reason, 9.reason, 2 12:00 Reinforcing Reinforcingthe thestructure structure forsafety safety Legendfor 12:00 21 Dec. INSULATING insulating insulatingthe theentire entirebuilding buildingfor foraabetter better 21 Jun.

0,28

Enlarging Enlargingthe thegap gaptotocreate createliveable liveableopen open 12:00 air level. airspaces spacesalso alsoininthe theunderground underground level. 21 Dec.

0,05

I Working Workingwith withthe theangles anglesofofthe thesun suninin Extending the Extendingthe thebalcony, balcony,extending extending therooftop rooftop THE WALLS section COOLING STRATEGY AND AIR FLOW sectiontotobe beable abletotoavoid avoidthe theheating heating and adding on and addingmoveable moveableshutters shutters onthe thesouthern southern 12:00 PROJECT PROPOSAL 1:20 21 Jun. even adding more opening for the E CURRENT CONDITION PROJECT PROPOSAL even adding more opening for thelight. light. facade comfort facadetotocreate createaaprotection protectionfrom fromthe thesun sun comfortand andaasustainable sustainablebehaviour. behaviour. CURRENT 1:20 21° 68° 58°CONDITION 12:00 Additions (The (Theangle anglehere hereisison on12:00 12:0021 21June). June). (here (here12:00 12:0021 21June). June). 12:00 21 Apr. 12:00 21 April 12:00 21 December 12:00 21 June Legend 21 Apr. -Aug. 12:00 21 August I -Aug. 56.2E PROJECT PROPOSAL 1:20 21.0 I ofwall Water CURRENT CONDITION 68°68° 12:00PROJECT PROPOSAL 31.0 21° lenght 58° In the existing building the the overhang of the balcony and of the Additions 68° 12:00 68° 21 Dec. 68° 12:00 21 April 12:00 21 December 12:00 21 June 53.0 rooftop are not sufficient to stop the sun rays and the heat to enter. In the 21 Dec. 12:00 21 August Legend 01.0 entering is relly little. underground the light PROJECT PROPOSAL 1:20 I CURRENT CONDITION PROJECT PROPOSAL In the project proposal all the windows were aubstituted with a low emissivity In the existing building the lenght of the overhang of the balcony and of the 21° chamber glass. The rooftop 68° 58° double andheat the to balcony extended enough to rooftop are not sufficient toDecember stop the sun raysAdditions and the enter. were In the Legend E wooden 12:00 21 April 12:00 21 12:00 21 June protect the building. Some folding panels were added E I on the perimiter of underground 12:00 21 August the light entering is relly little. the balcony. Some skylight were inserted to chatch more light. In the project proposal all the windows were aubstituted with a low emissivity 21° 68° with Working the angles58° of sun in By lenght opening more distribution Creating a water the angles facadeofto the cool sunthe in air. By opening more the distribution corridor Additions Extending extending theopen rooftop Extending theof balcony, extending thecorridor rooftop Reinforcing the structure forthe safety reason, Enlargingthe thebalcony, gap to create liveable In the existing building the the the overhang of the andWorking ofwere thewith double chamber glass. The rooftop andbalcony the balcony extended enough to 12:00 21 April 12:00 21 December 12:00 21 June section to be to building avoid thefor heating by adding openings it’s possible section to be able to avoid the heating and by adding more openings it’s possible 1:20 and addingalso moveable shutters on the southern andand adding moveable shutters onPROJECT the southern insulating theable entire aare better air spaces in the underground level. rooftop not sufficient to the more sun rays and the heatPROPOSAL to enter. Inadded the protect thestop building. Some folding wooden panels were on the perimiter of 12:00 21 August CURRENT CONDITIONeven adding more PROJECT PROPOSAL opening for the light. to achieve better air flows. even adding more opening for the light. to achieve better air flows. E facade to create a protection from the sun facade toiscreate a protection frominserted the sun to chatch more light. comfort and a sustainable behaviour. the lightthe underground entering relly little. balcony. Some skylight were here isbuilding on 12:00 21 (The angle here is on 12:00 21 June). (here 12:00 21 June). (here 12:00 21 In(The theangle existing lenght the overhang ofwindows theJune). balcony of the with a low emissivity 01_ANALYSIS SCALE 03_ARCHITECTURAL SCALE In the theJune). projectofproposal all 02_URBAN the were and aubstituted Legend Extending Extendingthe thebalcony balconytototransform transform ititinto intoaaliveable liveablespace. space.

0,05

0,53

0,05 0,25

0,53

0,1

CURRENT CONDITION 1:20 CURRENT CONDITION 1:20 12:00

12:00 21 Apr. CURRENT-Aug. CONDITION

0,05 0,28 0,25

THE WALLS

68° CONDITION68° 1:20

0,1

CURRENT 21 Dec.

0,25 0,28

12:00 21 Apr. INSULATING -Aug.

82.0

0,25 0,28

12:00 12:00 21 Apr. 21 Dec. -Aug. SOLAR RADIATION ANALYSIS

12:00 21 Dec. 12:00 21 Jun.

0,53

0,28

CURRENT CONDITION

12:00 21 Jun.

12:00 NEED OF FIXED AND 21 Apr. MOVEABLE -Aug. SHUTTERS

0,05

0,3

0,25

0,28

0,3 0,28

0,25

0,28 0,3

0,28 0,3

SOLAR RADIATION STUDY

E


UNDERGROUND FLOOR | Waterfall view

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR| Functional Plan

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR | Architectural plan 1:100

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


A-A’ SECTION

B-B’ SECTION

KEY PLAN

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


A-A’ SECTION

THGIL TTCHEG RILDN TCI ERIDNI

DNA ERDUN TC AUERRTUSTCURTS NOITALN UO SN ITIALUSNI

SWODASHWSODAHS

°86

°86

ECARREETCARRET

CONCEPT DIAGRAMS: ENLARGING THE GAP AND THE BALCONY

SLAB - TERRACE - SHUTTERS CONNECTION DETAIL

°86

PAG EHPTADGNEIM HT DNIM

°86

3.1

Bninepo yB ada yb dna etveihca ot

ni nus ehn t fionu seslg eh ntafeohstehlgtinwagen hitkhrotiW w gnikroWpotfoor ephot tgfo noidrneehttxgen,yid nn oecltaxbe e,yhntogcnlaid bneehttxgEnidnetxE,nosaer yt,neo fassareorfyetreufatcsuro rtfseerhut cgunritcsro eh fntig eRnicrofnieR gnitaeh eghntidtaioevhaeohttedlb ioaveabotoet lnboaitecbesot noitcn esrehtuosnerehht tnuoosreethtut n ho s eslrbeatteuvhosm elg bn aeidvdoamdg nn aidda dna retteb a ro reftgtenbidaliu robf egrnitin deliuebhteg ritnniteaeluhstngi nitalusni .thgil eht.rtohfggilneih nterpoof g ernoinmep go niedrdoamng evneidda neve nus eht mnoursf enhotitm ceoto rfrnpoaitceetatoerp c oatetdaaecracfot edacaf .ruoivahe.b rueolibvanhieabtseulsbaan dinaatsturo s famdonca trofmoc .)enuJ 12.0)e0n:2u1J n 12 o 0si0e:2re1hneolgsinearehTe(lgna ehT( .)enuJ 12.0)e0n:2u1J e1r2e0h0( :21 ereh(

nepo elbanevpio l eKEY etalbearecPLAN voitl eptaagerechottgpnaigreahlntEgnigralnE .level dnu.loervgerleddnnuuoerghrtendinouslaehset cnai p oslraiasecaps ria

mrofsnarm t ortoyfsnnoacrltaobteyhntogcnlaid bneehttxgEnidnetx .ecaps elb.eaceavpilsaeolbtnaietviil a otni

4.20

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


A-A’ SECTION

YGETARTSYGN ETILAORO TSC GNILOOC

SWOLF RIA SWOLF RIA

ROOFROP - SKYLIGHT - FAKE CEILING DETAIL

THGIL TCETRHID GN ILI TCERIDNI

SWODAHS WODAHS

CONCEPT DIAGRAMS: EXTENDING THE ROOF, INSERTING SKYLIGHTS AND SHUTTERS

llaw retaW llaw retaW

°86

°86

°86

°

KEY PLAN .ria eht looc o.ritaeedhatclaoforcetoatwed aagcnaiftareetraCw a gnitaerC rodirroc noitruobdiirrtrsoidc n eh B gninepo yB ni nus eht fonsienlgunsaeh eh otiteurboim rtsigdneinhet peo roym t ftohsteiwlggnnaiekrhotW htiw gnikropW otfoor eht g ab pn oitdfonoertxeeht,ygnnoicdln etexhet,ygnnoidclnaebtxeEht gnid elbissop s’ti seglbniisnseopos’etirsogmnignneipdodaeryobmdg nn aidda yb dna gnitaeh eht g dn ioitvaaeohteehlbtadeiobvaotont oeiltbcaeseb ot nonitrceehstuos ehntrneo baserevtotumhsgenlibdadeavdonma gnid htsureotstuehhstenlo .swofl ria rett.sew boeflveriiahrceattoetb eveihca ot .thgil eht rof.tghnginileephot reorfogmnignneipdodaernoem vegnidda neve nus eht mornf n oroprfaneotiatceerctoortpeadaectaef rc ot uo s ietchettm .)enuJ 12 00:.2)e1nnuoJ 1si2e0re0h:2e1lgnnoasieehrTe(h elgna ehT( .)enuJ 12 00:.2)e1neurJe1h2( 00:21

01_ANALYSIS

3.1 3.1

02_URBAN SCALE

03_ARCHITECTURAL SCALE


DETAIL SECTION 1:20 LEGEND

4 11

3

12

13

16 18

3.1

17

19 1.10

4.20

0.60

20 2.70

0.90

0.90

0.08 0.08 0.22 0.28

24

25 2.90

26 27

-2.65 0.12 0.13 0.35 0.10

1 Skylight 2 Metal plate 3 Cellular glass insulation 4 Beam 5 Concrete and brick slab 6 Screed 7 Vapour barrier 8 Thermal insulation 9 Double waterproof sheath 10 Roof covering 11 Beam reinforcement 12 Schoeck Isokorb type KS 13 Gutter 14 Roller blinds 15 Insulated fake cieling 16 Installations 17 Double glazing wooden window 18 Wooden lamella 19 Folding shutters 20 Handrail 21 Pavement 22 Underfloor heating 23 Acoustic insulation 24 Screed with gradient 25 Existing reinforced concrete overhang 26 Added reinforced concrete overhang 27 Metal support 28 Ventilated crawl space 29 Foundation plinth 30 Concrete floor 31 Gravel 32 Drainage pipe 33 Soil 34 Water pump 35 Lower basin 36 Drywall for pipes 37 Upper basin 38 Retaining wall 39 Rail


ARCHITECTURE | North-East Elevation & South-East Elevation SOUTH-EAST ELEVATION

SOUTH-EAST ELEVATION | NIGHT VIEW

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


ARCHITECTURE | Elevations EAST ELEVATION

WEST ELEVATION

NORTH ELEVATION

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR | Detail Plan 1:50

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR | Axonometry of common space

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR | Detail of common space

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR | Main void view

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR| Clinic Plan 1:50

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR| Clinic modules Details

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE


FIRST FLOOR | Clinic View

01_ANALYSIS

02_URBAN SCALE

03_ARCHITECTURAL SCALE



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.